HomeMy WebLinkAbout2310 CAMINO VIDA ROBLE; 101; CBC2024-0015Building Permit Finaled
Commercial Permit
Print Date: 11/13/2024
Job Address: 2310 CAMINO VIDA ROBLE, # 101, CARLSBAD, CA 92011-1561
Permit Type: BLDG-Commercial Work Class: Tenant Improvement
Parcel#: 2130500800 Track#:
Valuation: $350,000.00 Lot#:
Occupancy Group: A-3
#of Dwelling Units:
Bedrooms:
Bathrooms:
Occupant Load: 577
Code Edition: 2022
Sprinkled: Yes
Project Title: KIDS AND COFFEE
Project#: DEV2023-0088
Plan#:
Construction Type:II
Orig. Plan Check#:
Plan Check#:
Permit No:
Status:
{cityof
Carlsbad
CBC2024-0015
Closed -Finaled
Applied: 01/12/2024
Issued: 06/21/2024
Finaled Close Out: 11/13/2024
Final Inspection: 11/06/2024
INSPECTOR: Salcedo, Felix
Kersch, Tim
Description: KIDS & COFFEE: 11,583 SF Tl TO CREATE NEW SPACE FOR KIDS PLAYGROUND, PARTY ROOM. AND CAFE
Applicant:
KEN LI
15504 ANDORRA WAY
SAN DIEGO, CA 92129-1110
{646) 801-0221
FEE
BUILDING PLAN CHECK
BUILDING PLAN REVIEW-MINOR PROJECTS (LDE)
BUILDING PLAN REVIEW-MINOR PROJECTS (PLN)
CERTIFICATE OF OCCUPANCY
COMM/IND Tl -STRUCTURAL
FIRE A-2 & A-3 Occupancies -Tl
FIRE Hourly Services (first hour)
FIRE Plan Resub (3rd&Subsequent Submittal/hr)
PUBLIC FACILITIES FEES -outside CFD
SB1473 -GREEN BUILDING STATE STANDARDS FEE
SEWER CONNECTION FEE (General Capacity all areas)
STRONG MOTION -COMMERCIAL (SMIP)
SWPPP INSPECTION TIER 1 -Medium BLDG
S\NPPP PLAN REVIEW TIER 1-Medium
TRAFFIC IMPACT Commercial-Industrial Outside CFD
Total Fees: $23,378.69 Total Payments To Date: $23,378.69 Balance Due:
AMOUNT
$1,606.79
$197.00
$104.00
$20.00
$2,471.98 •
$791.00
$200.00
$212.50
$12,250.00
$14.00
$647.36
$98.00
$292.00
$82.00
$4,392.06
$0.00
Please take NOTICE that approval of your project includes the "Imposition" of fees, dedications, reservations, or other exactions hereafter
collectively referred to as "fees/exaction." You have 90 days from the date this permit was issued to protest imposition of these
fees/exactions. If you protest them, you must follow the protest procedures set forth in Government Code Section 66020(a), and file the
protest and any other required information with the City Manager for processing in accordance with Carlsbad Municipal Code Section
3.32.030. Failure to timely follow that procedure will bar any subsequent legal action to attack, review, set aside, void, or annul their
imposition.
You are hereby FURTHER NOTIFIED that your right to protest the specified fees/exactions DOES NOT APPLY to water and sewer connection
fees and capacity changes, nor planning, zoning, grading or other similar application processing or service fees in connection with this
project. NOR DOES IT APPLY to any fees/exactions of which you have previously been given a NOTICE similar to this, or as to which the
statute of limitation has previously otherwise expired.
Building Division Page 1 of 1
1635 Faraday Avenue, Carlsbad CA 92008-7314 I 442-339-2719 I 760-602-8560 f I www.carlsbadca.gov
i .,. ----------------------------------------..
{City of
Carlsbad
COMMERCIAL
BUILDING PERMIT
APPLICATION
8-2
Plan Check C &'.:2011.-f -00/5
Est. Value $.{olDJ.tot-fL-f. 12
PC Deposit
Job Address 2310 CAMINO VIDA ROBLE, CARLSBAD, CA 92011
Date 01/fl./llf
I I
Suite: 101 APN: 213-050-08-00 -----·
Tenant Name#: KIDS & COFFEE Lot#: Year Built: ----------------·---------------
Year Built:___ Occupancy:___ Construction Type:___ Fire sprinklers0ESQNO A/C:QYESQNO
BRIEF DESCRIPTION OF WORK: PROPOSED INTERIOR TENANT IMPROVEMENT OF A NEW 11,583 SF RECREATION FACILITY
(INCLUDES KIDS PLAYGROUND AREA, PARTY ROOM, AND CAFE)
D Addition/New: ___________ New SF and Use,. _________ New SF and Use
______ SF Deck, SF Patio Cover, SF Other (Specify) ___ _
[Z]Tenant Improvement: _1_1,_58_3 ___ SF, Existing Use: _O_F_F_IC_E_S ____ Proposed Use: RECREATION FAc1L1TY,cAFE
_____ SF, Existing Use: . • Proposed Use: ______ _
D Pool/Spa: _____ SF Additional Gas or Electrical Features? ___________ _
D Solar: KW, ___ Modules, Mounted:0Roof 0Ground
D Reroof: __________________________________ _
D Plumbing/Mechanical/Electrical
D Other: __________________________________ _
APPLICANT (PRIMARY CONTACT) PROPERTY OWNER
Name: RACHELLE DOMINGO-ROGERS Name: JARED DOUMANI
Address· 2825 DEWEY RD, BLDG 202, SUITE 207 Address: 1006 TENNESSEE ST
City· SAN DIEGO State: CA Zip:_9_21_0_6 __ City: SAN FRANCISCO State: CA Zip:_94_1_0_1 ---
Phone· (619) 546-9670 Phone: (415) 203-2858
Email. ADMIN@ARCH5.DESIGN Email: JARED@DOUMANI.NET
DESIGN PROFESSIONAL CONTRACTOR OF RECORD TBD
Name: RACHELLE DOMINGO-ROGERS Business Name: ----------------Address: 2825 DEWEY RD, BLDG 202, SUITE 207 Address: ·------------------City: SAN DIEGO State: CA Zip:_9_21_06 ___ City:. _______ State: ___ .Zip: _____ _
Phone: (619) 546-9670 Phone: ------------------Em a i I: ADMIN@ARCH5.DESIGN Email: __________________ _
Architect State License: CSLB License #: _______ Class: ______ _
Carlsbad Business License# (Required):. _______ _
APPLICANT CERT/FICA TION: I certify that I have read the application and state that the above information is correct and that the
information on the plans is accurate. I agree to comply with all City ordinances and State laws relating to building
construction. ~r..JR.. /
NAME (PRINT): RACHELLE DOMINGO-ROGERS SIGN: ___ ~ _______ DATE: 1/5/2024
1635 Faraday Ave Carlsbad, CA 92008 Ph: 442-339-2719 Fax: 760-602-8~ Email: Building@carlsbadca gov
REV. 07/21
THIS PAGE REQUIRED AT PERMIT ISSUANCE PLAN CHECK NUMBER: ______ _
A BU!U}!l\l(3 PH{r,/!ff Cl:l.N S!t rSSUED TO UH!ER /\ ST!\TE UCU\tSED [Of\!Hl/.\Crmi OR[.\ PROPtERTV OiNNEJ-t ff THE PERSOi\i
SIGI\HNG THIS FORM IS /\N /\GE.NT FOH EITHER E\\lT\TV /VJ AUTHrn11urnoN FOFUVl OR LETTER 15 RiEQU!RED PRIOR TO
P[RMIT !SSU.A.NCE,,
IC'i''T'f"'•I t'!.)· LB(,:f'li"Cr1 CPl\rni'AC;••,·,q, I)P'1 t I::11,··r•"'',1\,\· \ Jpr-·u~ ... ..l!U'\i .-.. ~ ·f ,.[: ~.J>t.., ... .-'»t\-._,J~-:,~,,t. .,, •. ~t.Rt" .... ~ ... \,,.,~,\ ti.P:..i ~\.. .. !,,,.
I herebyaffirm underpenaltyof perjury that I am licensedunderprovisionsof Chapter 9 (commencingwith Section 7000)of Division 3
of the Business and Professions Code, and my license is in full force and effect. I also affirm under penalty of perjury one of the
following declarations (CHOOSE ONE):
D1 have and will maintain a certificate of consent to self-insure for workers' compensation provided by Section 3700 of the labor Code, for the performance of the
work which this permit is issued. Policy No. ______________________________________ _
-OR-
D1 have and will maintain worker's com pensaf1on, as required by Section 3700 of the labor Code, for the performance of the work for which this permit is issued.
My workers' compensation insurance carrier and policy number are: Insurance Company Name:·----------------------
Policy No. ___________________________ Expiration Date: _______________ _
-OR-
1:t/!-lcertificate of Exemption: I certify that in the performance of the work for which this permit is issued, I shall not employ any person in any manner so as to become
subject to the workers' compensation Laws of California. WARNING: Failure to secure workers compensation coverage is unlawful and shall subject an employer to
criminal penalties and civil fines up to $100,000.00, in addition the to the cost of compensation, damages as provided for in Section 3706 of the Labor Code,
interest and attorney's fees.
COf\!STRUCTiON LENDiNG ,¢1,GENClf. ff t\NJ_:
I hereby affirm that there is a construction lending agency for the performance of the work this permit is issued (Sec. 3097 (i) Civil Code).
Lender's Name: ____________________ Lender's Address: ____________________ _
CONTRACTOR CERT/FICA T/ON: I certify that I have read the application and state that the above information is correct and that
the information on the plans is accurate. I agree to comply with all City ordinances and State laws relating to building
construction. // J
NAME(PRINT): fh,\ce r--J ~">f SIGNATURE: ~cl~ DATE: 0'-'""' 5 202'
Note: If the person signing above is an authorized agent for the contractor provide a letter of authorization ~or letterhead.
(OPTION B): OWNEFH3l..Ht.DER DECLARAT!O[\J:
I hereby affirm that I am exempt from Contractor's License Law for the following reason: D I, as owner of the property or my employees with wages as their sole compensation, will do the work and the structure is not intended or offered for sale (Sec,
7044, Business and Professions Code: The Contractor's License Law does not apply to an owner of property who builds or improves thereon, and who does such
work himself or through his own employees, provided that such improvements are not intended or offered for sale. If, however, the building or improvement is sold
within one year of completion, the owner-builder will have the burden of proving that he did not build or improve for the purpose of sale).
-OR-
01, as owner of the property, am exclusively contracting with licensed contractors to construct the project (Sec. 7044, Business and Professions Code: The
Contractor's License Law does not apply to an owner of property who builds or improves thereon, and contracts for such projects with contractor(s) licensed
pursuant to the Contractor's license law).
-OR-
D1 am exempt under Business and Professions Code Division 3, Chapter 9, Article 3 for this reason:
AND, D FORM B-61 "Owner Builder Acknowledgement and Verification Farm" is required ro, ,my peri•11t issu,,rj to" property owm,r.
By rny signature below I ackncnviedg<:> th<1t, except i·or rny personi:.! re:;idence fn whic~1 l must hcivt' resided for ot least one year prior to completion of the
improvc~ments covered by this permit_. i cannor. leg;:;liy sc-::!I ;.1 struc:itffC:~ 1·har I huve buill .1s an ovvner-buitder if it has not been constructed in its entirety by licensed
contractors./ understand that a copy of the applicable law, Section 7044 of the Business and Professions Code, is available upon request when this application is
submitted or at the following Web site: http: I /www,/eginfo.ca.gov/ca/aw.html.
OWNER CERT/FICA T/ON: I certify that I have read the application and state that the above information is correct and that the
information on theplansisaccurate. /agree to comply with all City ordinances and State laws relating to building
construction.
NAME (PRINT): SIGN: DATE: ------------------------Note: If the person signing above is an authorized agent for the property owner include form B-62 signed by property owner.
1635 Faraday Ave Carlsbad, CA 92008 Ph: 442-339-2719 Fax: 760-602-8558 Email: Building@carlsbadca.gov
2 REV. 07/21
Building Permit Inspection History Finaled
{cityof
Carlsbad
Permit Type: BLDG-Commercial Application Date: 01/12/2024 Owner: JARED DOUMANI
Work Class: Tenant Improvement Issue Date: 06/21/2024 Subdivision: CARLSBAD TCT#73-49
Status: Closed -Finaled Expiration Date: 03/10/2025 Address: 2310 CAMINO VIDA ROBLE, # 101
IVR Number: 54244 CARLSBAD, CA 92011-1561
Scheduled Actual Inspection Type Inspection No. Inspection Primary Inspector Reinspection Inspection
Date Start Date Status
08/19/2024 08/19/2024 BLDG-22 Sewer/Water 258268-2024 Passed Tim Kersch Complete
Service
Checklist Item COMMENTS Passed
BLDG-Building Deficiency Yes
08/20/2024 08/19/2024 BLDG-34 Rough 258267-2024 Partial Pass Tim Kersch Reinspection Incomplete
Elec_trical
Checklist Item COMMENTS Passed
BLDG-Building Deficiency Yes
08/26/2024 08/26/2024 BLDG-34 Rough 259011-2024 Passed Tim Kersch Complete
Electrical
Checklist Item COMMENTS Passed
BLDG-Building Deficiency Yes
09/11/2024 09/11/2024 BLDG-84 Rough 260364-2024 Passed Tim Kersch Complete
Combo(14,24,34,44)
Checklist Item COMMENTS Passed
BLDG-Building Deficiency Yes
BLDG-14 Yes
Frame-Steel-Bolting-Welding
(Decks)
BLDG-24 Rough-Topout Yes
BLDG-34 Rough Electrical Yes
BLDG-44 Yes
Rough-Ducts-Dampers
11/05/2024 11/05/2024 BLDG-Fire Final 266809-2024 Passed • Felix Salcedo Complete
Checklist Item COMMENTS Passed
FIRE-Building Final Yes
11/06/2024 11/06/2024 BLDG-Final Inspection 267021-2024 Passed Tim Kersc:h Complete
Checklist Item COMMENTS Passed
BLDG-Building Deficiency Yes
BLDG-Plumbing Final Yes
BLDG-Mechanical Final Yes
BLDG-Structural Final Yes
BLDG-Electrical Final Yes
Wednesday, November 13, 2024 Page 1 of 1
True North
COMPLIANCE SERVICES
June 13, 2024
City of Carlsbad
Community Development Department -Building Division
1635 Faraday Ave.
City of Carlsbad -FINAL REVIEW
City Permit No: CBC2024-0015
True North No.: 24-018-034
Carlsbad, CA 92008
Plan Review: TI Kids & Coffee
Address: 2310 Camino Vida Roble
Applicant Name: Rachelle Domingo-Rogers
Applicant Email: Admin@arch5.design
OCCUPANCY AND BUILDING SUMMARY:
Occupancy Groups: A-3
Occupant Load: 563
Type of Construction: II
Sprinklers: Yes
Stories: 1
Area of Work (sq. ft.): 11,583 sq. ft.
The plans have been reviewed for coordination with the permit application.
Valuation:
Scope of Work:
Floor Area:
Confirmed
Confirmed
Confirmed
Attn: Building & Safety Department,
True North Compliance Services, Inc. has completed the final review of the following documents for the project
referenced above on behalf of the City of Carlsbad:
1. Drawings: One (1) copy dated May 31, 2024, by arch5design.
2. Structural Calculations: One (1) copy dated January 9, 2024, by HTK Structural Engineers, LLP.
3. Other Documents: One (1) copy dated May 14, 2024, by City of Carlsbad.
The 2022 California Building, Mechanical, Plumbing, and Electrical Codes (i.e., 2021 IBC, UMC, UPC, and 2020
NEC, as amended by the State of California), 2022 California Green Building Standards Code, 2022 California
Existing Building Code, and 2022 California Energy Code, as applicable, were used as the basis of our review.
Please note that our review has been completed and we have no further comments.
True North Compliance Services, Inc.
8369 Vickers Street, Suite 207, San Diego, CA 92111
T / 562.733.8030
We have enclosed the above noted documents bearing our review stamps for your use. Please call if you have any
questions or if we can be of further assistance.
Sincerely,
True North Compliance Services
Review By: Mohammad Afaneh -Plan Review Engineer
Quality Review By: Alaa Atassi -Plan Review Engineer
Transmittal Letter
May 21,2024
City of Carlsbad
Community Development Department -Building Division
1635 Faraday Ave.
Carlsbad, CA 92008
Plan Review: TI Kids & Coffee.
Address: 2310 Camino Vida Roble, Carlsbad CA
Applicant Name: Rachelle Domingo Applicant Email: Admin@arch5.design
~fr11e N ortl1
C(UiiPUANCS S!HP/ICES
THIRD REVIEW
City Pennit No: CBC2024-0015
True North No.: 24-018-034
True North Compliance Services, Inc. has completed the review of the following documents for the project
referenced above on behalf of the City of Carlsbad. Our comments can be found on the attached list.
l. Drawings: Electronic copy dated May IO, 2024, by Arch 5 Design.
2. Structural Calculations: Electronic copy dated January 9, 2024, by HTK structural engineers.
Attn: Permit Technician, the scope of work on the plans has been revie\ved for coordination with the scope of
work on the permit application. See below for information if the scope of work on plans differs from the pennit
application:
Valuation:
Scope of Work:
Floor Area:
Confirmed
Confirmed
Confirmed
Our comments follow on the attached list. Please call if you have any questions or if we can be of further
assistance.
Sincerely,
True North Compliance Services
Review By: Mohammad Afaneh -Plan Review Engineer
Quality Review By: Alaa Atassi -Plan Review Engineer
True North Compliance Services, Inc.
8369 Vickers Street, Suite 207, San Diego, CA 92111
T / 562. 733.8030
TI Kids & Coffee.
2310 Camino Vida Roble.
May 21, 2024
Plan Review Comments
City of Carlsbad-THIRD REVIEW
City Permit No.: CBC2024-0015
True North No.: 24-018-034
Pagel
Please do not resubmit plans until all departments have completed their reviews. For status, please
contact building@carlsbadca.gov
Please make all corrections, as requested in the correction list. Submit FOUR new complete sets of plans
for commercial/industrial projects (THREE sets of plans for residential projects). Corrected sets can be
submitted as follows:
Deliver THREE corrected sets of plans and TWO corrected calculations/reports directly to the City
of Carlsbad Building Division, 1635 Faraday Ave., Carlsbad, CA 92008, (442) 339-2719. The city
will route the plans to True North, Planning and Land Development Engineering Departments (if
applicable) for continued review.
Note: If this project requires FIRE PREVENTION review, ensure that you follow their specific
instrnctions for resubmittal review. The city will not route plans back to Dennis Grubb &
Associates for continued Fire Prevention review.
GENERAL INFOR1'1ATION:
A. The following comments are referred to the 2022 California Building, Mechanical, Plumbing, Electrical
Codes, California Green Building Standards Code, and Energy Code (i.e., 2021 IBC, UMC, UPC, and 2020
NEC, as amended by the State of California).
B. There may be other comments generated by the Building Division and/or other City departments that will
also require your attention and response. This attached list of cormnents, then, is only a portion of the plan
review. Contact the City for other items.
C. Respond in writing to each comment by marking the attached comment list or creating a response letter.
Indicate which details, specification, or calculation shows the required information. Your complete and
clear responses will expedite the re-check
D. Where applicable, be sure to include the architect and engineer's stamp and signature on all sheets of the
drawings and on the coversheets of specifications and calculations per CBPC 5536.l and CBPC 6735. This
item will be verified prior to plan approval.
OCCUPAJ.~CY & BUILDING SUMMARY:
Occupancy Groups:
Occupant Load:
Type of Construction:
Sprinklers:
Stories:
Area of Work (sq. ft.):
A-3
563 PLEASE UPDATE OCCUPANT LOAD AND
II TYPE OF CONSTRUCTION TO MATCH
Yes DATA PROVIDED ON SHEET T0.0
I
1 I ,583 sq. ft.
TI Kids & Coffee.
2310 Camino Vida Roble.
May 21, 2024
ARCIDTECTURAL COMMENTS:
City of Carlsbad-THIRD REVIEW
City Permit No.: CBC2024-0015
True North No.: 24-018-034
Page3
Al. Review and approval from the Health Department is required. This comment will be noted as a condition
of approval of permit issuance.
PC2: Comment remains., no response required. ACKNOWLEDGED· APPROVED HEAL TH
' PC3: No response required. DEPARTMENT PLANS INCLUDED IN SET
A2. Licensed Architect or Engineer to stamp and sign all plan sheets. (Business & Professions Code Sections
5537, 5538, and 6737.1)
PC2: Stamp provided, please address the following:
Remove the "Not for construction" note provided on stamp.
PC3: Note was not removed from arch sheets. Please remove the "Not for construction" note provided
011 stamp.
,)dJ~ u,.:ryv, \..fo\ "::J '-· a: vo
Phone: 6 ! 9.546.%70 ALL ARCHITECTURAL SHEETS ARE NOW
STAMPED AND SIGNED BY LICENSED ARCHITECT.
ALL OTHER SHEETS, EXCEPT PLAY EQUIPMENT
AND FOOD SERVICE SHEETS ARE STAMPED AND
SIGNED BY LICENSED ENGINEERS.
PC3: Sheet AO.l: Please compare the totlll area of the building to the ,,llowable area to verif.v the area of the
building does not exceed the calculated allowable area.
;E CAlCULA HONS BELOW)
PLEASE SEE UPDATED 'ALLOWABLE AREA CALCULATION'
ON SHEET A0.1 FOR ADDED BUILDING AREA
PC3: Per city instructi.ons, provide docume11tatio11 to demonstrate that the mi11imum number of requfred f,xtures
is within the minimllm required by CPC 422.0 and Table 422.1.
ACCESSIBILITY COMMENTS:
No comment.
jACKNOWLEDGEDj
MECHANICAL COMl\IENTS:
No Comments.
!ACKNOWLEDGEDj
PLEASE ADDED
'PLUMBING FIXTURE OCCUPANCY CALCULATIONS'
ON SHEET A0.3
TI Kids & Coffee. City of Carlsbad-THIRD REVIE\V
City Permit No.: CBC2024-0015
True North No.: 24-018-034
Page4
2310 Camino Vida Roble.
May 21, 2024
GREEN I ENERGY COMPLIANCE COMMENTS:
No Comments.
!ACKNOWLEDGED I
' STRUCTURAL COl\BlENTS:
S4. Incorporate the manufacture sheet proved on to plans, address the following:
S6.
a) Some plans are not eligible, please provide a higher quality.
PC2: Response states the comment 1vas addressed and connection and shop drawings were prov;ded_,
structural calculations sheets were not updated. Please revise and coordinate with response.
PC3: Response states plans and calculations are pending fire approval. Clarifj1, please provide to be
reviewed by the building department.
Revise structural calculations:
PLEASE SEE ATTACHED RESPONSE LETTER
FROM HTK STRUCTURAL ENGINEERS
a) Provide a detailed lateral analysis using site specific seismic coeflicients for all ne,v structures to
justify the base support calculation provided.
PC2: Response states per manufcatring specifcations, please revise and provide lateral analysis
using site specific seLsmic coefficients for all nett' elements and structures to justijj, base connection.
PC3: Response states plans and calculations are pe11di11g fire approval. Clarilv, please provide to be
reviewed by the building department. PLEASE SEE ATTACHED RESPONSE LETTER
If you have any questions regarding the above comments, plea FROM HTK STRUCTURAL ENGINEERS
Mohammada@tncservices.com or telephone (562) 733-8030.
[END]
STRUCTURAL PLAN CHECK RESPONSES
DATE: June 4, 2024
PROJECT: Kids and Coffee
PROJECT No.: ~HTK
PLAN CHECKNo.: STRUCTURAL ENGINEERS, LLP
S4. Calculations have been updated with the design information from the manufacturer.
S6. Calculations have been updated with the design information from the manufacturer.
From: Ben Seibel
Copies to: File Page 1
PROJECT:
STRUCTURAL CALCUIATIONS
Jt..,.o> ~ c.o~
DESIGN ASSUMPTIONS:
CONCRETE STRENGTH AT lWENlY EIGHT DAYS:
MASONRY: GRADE 11N11 CONCRETE BLOCK FI M =
MORTAR: TYPES 1,800 PSI
GROUT: 2000PSI
REINFORCING STEEL: A-615
STRUCTURAL STEEL: A-36
LUMBER: DOUGLAS FIR-LARCH
JOISTS
GRADE 40:
GRADE 60:
#2
#2
-~........._ ______ PSI
PSI -----
BEAMS AND POSTS
STUDS STUD OR BETTER
SEISMIC FORCE:---·
WIND FORCE: REPORT NO.:·~·. _____ _ SOIL PRESSURE:_,_
DESIGN LOADS:
ROOF DEAD LOAD
SLOPING
ROOFING
PLYWOOD
JOISTS
INSUL&CLG.
MISC.
TOTAL=
ROOF LIVE LOAD
SLOPING=
FLAT•
FLOOR DEAD LOAD
FLOORING
PLYWOOD
JOISTS
INSUL&CLG.
MISC.
INT.
TOTAL = ----·
FLOOR LIVE LOAD
INTERIOR
BALCONY
EXIT WALKWAY
fil
40 PSF
60 PSF (U.O.N.}
100 PSF
WALL DEAD LOAD
INTERIOR
EXTERIOR
10 PSF
16 PSF
These calculatlons are lfmlted only to the items included herein, selected by the client and do not imply approval of any
other portfon of the structure by this office. These calculatfons are not valid ff altered in any way, or not accompanied by a
wet sbmp and signature of the Engineer of Record.
• Address:
2310 Camino Vida Roble
Carlsbad, California
92011
Wind
Results:
Wind Speed
10-year MRI
25-yearMRI
50-yearMRI
100-year MRI
Data Source:
Date Accessed:
ASCE Hazards Report
Standard: . ASCE/SEI 7-16
Risk Category: Ill
Soil Class: D -Default (see
• Section 11.4.3)
102Vmph
67Vmph
72Vmph
nvmph
82Vmph
Latitude: 33.11996
Longitude: -117.270541
Elevation: 266.5970855061721 ft
{NAVD88)
ASCE/SEI 7-16, Rg. 26.5-1C and Figs. CC.2-1-CC.2-4, and Section 26.5.2
Thu Mar 21 2024
Value provided Is 3-sacond gust wind speeds at 33 ft above ground for Exposure C Category, based on linear
interpolation between contours. Wind speeds are interpolated In acoorclanoe with the 7-16 Standard. Wind speeds
correspond to approximately a 3% probability of exceedance In 50 years (annual exceedance pro.babllity =
0.000588, MRI= 1,700 years).
Site is not in a hurricane-prone.region as defined in ASCE/SEI 7-16 Section 26.2.
httpsi/ascel)mrdtool.ora/ Page 1 of3 Thu Mar 21 2024
Seismic
Srta Soll Class: D -Default (see Section 11.4.3)
Results:
Se:
S1:
Fa :
0.977
0.356
1.2
Fv : NIA
SMS 1.173
S01 . .
TL:
PGA:
PGA,.:
FPGA
NIA
8
0.427
0.512
1.2
h: ~ ~: 1•
Soe : 0.782 C., : 1.289
Ground motion hazard analysis may be required. See ASCE/SEI 7-16 Section 11.4.8.
Data Accessed: Thu Mar 21 2024
Date Source: USG§ Seismic Design Maps
https:1/ascehazardtool.orgf Page2of3 Thu Mar 21 2024
The ASCE Hazard Tool la provided fer your CO!'!venlence, l'or lnfonnationat purpoaaa only, end la provided •u la" and without warranties of eny
kind. The location data Included herein has been obt.alned from information developed, produced, end maintained by third party providers; or
has bean extrapolated from maps Incorporated rn the ASCE standard. While ASCE has med& every effort to 1.188 data obtained from rellab!&
aourees or methodo!Ogies, ASCE does not rrial«t any representations or warranties as to the accuracy, completanesa, 1'$llabfllty, currency, or
quality of any data provided herein. Any third-party !Inks provided by lhls Toot should not be construed M an endorsement. affiliation,
relationship, or aponaorshlp of such third-party content by or from ASCE.
ASCE doeG not Intend, nor should anyone Interpret, ths NIS!Jlts provided by this Tool to replace the sound Judgment of a oompetent
profes&lonal, having knowledge and experience In the appropriate fleld(s) of practice, nor to substitute for the standard of care required of such
profes&lonala In Interpreting and applying 1he contents of this Tool or the ASCE standard.
In using this Tool, you expressly auume all risks lill80Clated wtth your use. Under no cira.llTISt8nces ahall ASCE or !ta officers, dlreetora,
emplcyees, membera, affiliates, or agents be Hable to you or any other peraon for any dimct, indired, apeclal, lncldemal, or eonsequentlat
damaga arising from or related to your use of, or reliance on, the Tool or any Information obtained therein. To the fu!leflt extent permitted by
few, you agree to release and hold hermlen ASCE from any and en llabl!lty of sny nature arising out of or multing from li!ny use of data
provided by the ASCE Hazard Tool.
https:/fascehazarotool .orq/ Page3of3 Thu Mar 21 2024
www.htkse.com
L: 3 . .r ~ . .t.f" 'IC i 0 .. zr,~ ~
P..,"" ,., ... i,3.~ "-.s.
j'> ... ~ -=-"'Z.,)f "\ \ ~
~ 1.S"r 'e ,"t ~ • ,1 lt~ti )(.!lra.~(.\f--)
If ~ --'f",;p I fJ,/3,.. r ,. (t .. G, FT
~-~ &,~st~~ '6.G/'t,) ~/ 2. .. ~ "'-i~
PROJECT:
DESIGNER: ~ .......... ;,;,:,,-;;: .............................................................................................................. ..
4tJ\J.J~ , tr(,"'"¥:,~~~.r)(?.r} :. (i6'2 Pf..-(£,.J v ~sr ~1'-8
o,e:__,,
C, = 6,6 In
C:i .. 5,6 In
t,/ .. 3 !ail
SI.AB IBICKNESS T ., 6 In
DROP CAP I PANEL THICKNESS Td ., 0 In
BAR SIZE AT TOP SI.AB # " TRUSS BARS # 3 eachWFI!/
FACTORED AXIAL LOAD Pu,cd .. klpa
FAC,:ORED BENDING 1.0A0 Mu.col .. 0 ft-klpa
FACTORED POINT LOAD Pu,pcm't .. 2.354 klps
THE PUNCHING DESIGN ta ADEQUATE.
ANALYSIS
CHECK PUNCHING CAPACITY FOR COLUMN (A.Cl 318-05 SEC.11.6.7.4, 11.12.U, 11.12.8 & 13.U.2}
lvc(ptl)=/(2+y)J/4+{Avf ysma}I Ap= 316 kl! > vJpai)=~+~:!!..'t!!!}:!£f![~i.,,. o kel
AP J
wtln $ = 0.76 (ACI 318-06. Sectlan 9.3.2.3)
Po .. ra!lo d Ieng llide 1o lhctt lllfde of oancantralld 11.-.1 • 1.00
d = T+T11 •2(0.15db) • 2 ·00WII'= u In
b1 = (Ci +d) = 8 in
DJ • (o,a+d)"' e In
bo • ~ +21>a •2cei +d)+2(ca +d) • 32.0 In
1•MIN(2....!..,40.!).. 0.0 , (lfffllllllban!Used, ymuatbu111roperACI 11.12.3.1) Pc bo
Ap = bod = eo ln3
A,, ,. 0.44 ln2, total 4 aide&
a.
fy
..
"
46 o
&O kaJ
CHl:!CK PUNCHING CAPACITY FOil POI.NT LOAD (AC! 318-05 SEC.11.12. 1.2, & 11.12.6)
where • = 0.76 (ACI :ns.c5, Ser::1lcn 9.3.2.3)
d .. T •2"awar-2 (0.6 db)= 2.5 in
bo = d11= 7.864 In
Ap .. bod " 20 irf-
~
C1 "' 12 In
COLUMN DEPTH C:t "' 12 In
• SLAB CONCRETE STRENGTH le' .. 3Ji kal
SLAB THICKNESS T .. !i In
DROP CAP/ PANEL THICKNESS id .. 0 In
BAR SIZE AT TOP SLAB # 3 Pu,poin!
TRUSS BARS '# 3 eachwtlt/
FACTORED AXIAL LOAD Pu,c:01 " kips
FACTORED BENDING LOAD Mu,COI = 0 ft-klpl
FACTORED POINT LOAD Pu, point B 3822 klpa
THE PUNCHING DESIGN IS ADEQUATE.
ANALYSIS
CHECK PUNCHING CAPACITY FOR COUIMN (A.Cl 318-05 SEC.11.5. 7.4. 11.12. 1.2, 11.12.6 & 13.6.3.2)
;vtJ.psf)=;(2+y}J/4+{A.vf ysma)l Ap= 210 kl! > vu(f181)= P~c;1 + O.Sr~u.coJln= o kl!
Where • = 0.16 (AC! 318-06, Sdon 9.3.2.S )
Po " 1111o d 1mg side ta lhcrt side ar cancentlated 1oa:1 " 1.00
d • T+T0 •2(0.5db) • 2 ~canr• 2.826 In
b1 "' {C1 +d}• 14.825 in
D2 .. <ca+d)• 14,826 In
l:t, ,. ~ +,2ba= 2(c1 + d) + 2<tii + d),. 613.5 In
y • MIN(2. ..i_ .4Q-!l) .. o.o
lie bO
(lf!M&~u!llld, ymuet beDSl'O perACI 11,12.3,1}
Ap .. bod "' 164
Av • OM ina, tots! 4 e!de&
ll • Mi 0
fy "' eo kal
CHECKPIJNCKINO CAPACITY FOR POINT LOAD (AC! 318-0UEC.11.12.1.2, & 11.12.8)
3.822 k.1119 ~
wtln • = 0.76 (ACI 31&-05, Section 9.3.2.3 )
d • T • Z' cover-2 (0,5 db)., 2.826 In
b:i .. d11• U47 In
A, .. bti d = 22 lrf
Hlltl PROFl8 Engineering 3.0.90 Dyl'lMlc
tic loads
www.hutr.com
Company.
AddreM:
Phone I Fax:
Design:
Fastening point:
Speclfltr"t commtnto:
1 lnputdata
Anchor type encl diameter:
Item number:
Effective embedment deplh:
Materiel:
Evaluadon Sel'Vfce Report:
lseued ! Valid:
Proof:
Stand-off lr,WtlletJor,:
Anchor plaf.8111 :
Profile:
auematertal:
Installation:
Relnfnrcemerrt:
I
Page:
Spec!ffar.
E-Ma!I:
Concrate • Jan 8, 2024 Date:
Load for Bridge Foundation end 110ft frame
KWII( HUs-EZ (KH.ez)-P 1/4 {1 518)
2189856 KH-EZ P 1/4"x1 718"
fl.t.a<t .. 1.180 In,, i,_ = 1.825 In.
camonSteel
ESR-3027
411/2022112/1/2023
Dealgn Method AC! 318-19 / Mech
ei, = 0,000 In. (no atand-off); t = 0.250 In.
'· x ~ x t = s.soo In. x 6.500 In. x 0.250 In.; (Recommanded plate thk:kneu: not ee!culated)
Square HSS (AISC). HSS2X2X.250; (L x W x T) = 2.000 In. x 2.000 In. x 0.250 In.
cmcked CCl'K'll'etD, 4000, fa'= 4,000 pal; h = 4.000 In.
hammer drilled holo. mtellatlon condition: Dry
18n$10n: not pn!lfl8nt, shear: not present no supplemental aplil'llng reinforcement present
edve nmforoement none or< No, 4 bat
R. The anchOf' csloolatlon la baead on a rigid anchor plate assumption.
Geometry .[In.] & loading [lb, ln.lbJ
ij
' ~
y
. ,
lnpmdlllllnllllWl!llltlll6ibelfflllidmdffl!'~~tloo«llltlf!O~llmll!br~
MOl'i$ El'lglrm1'1!19 ( o) 2Cfl3./lila4 HOO AB, f'~ 8':hl.9n Him lte fOll,..iwd 'fuldsrtlii'kcf tffll M, 8d'll!M .... . ...
1/8i'2024
Hlltl PROFIS Engineering 3.0.90
www.bDtl.com ww••••,•h~mw•••••••••
Company: Paga:
Addi'$$$: Specifier:
Phone I Fax: I E-Mall:
Design: CorM:Nl:te • Jan 8, 2024 Date:
Fa81enlng point Lot!ld for Bridge Foundation and soft frame
1.1 o..Jgn l'Q\llt$
cau Descr1t)tlon ~~~.P~l./.~~Jl11:l~l
1 Combination 1 N., -2,354; v. ,. 171; V1 • O;
M.=O; M1=3,700; ~=O:
2 Load case/Raaultlng anchor forces
Anchor reaetlana [lb]
Tenalon force: {+T&nSlon, -compreselon)
Anchor Tenekm foroa Shear force Shear force ll ... f>~~ ~x
1 20 43
2 0 43
3 20 43
4 D 43
ma.x. concrete compreeafve strain: 0.05 ['Lo]
max. concrete comp""81w streae: 235 fpsij
reeultlng tension force In (xly)=(O.OOOI0.000): 0 Pbl
43 0
43 0
43
43
0
0
reeu!Ung COmpr$981on force !n {xly)r.(4.25312.750~ 2,393 [lb}
Andlor forcee are caleukud baaed en the assumption of a rigid anchor plate.
3 Tension load
2
Sel8mlc . ~~:.tJfll. Anchor [¾J
no e
01
Load Nu. [lbJ
20
... ~~ ! ~ [11') Utilization P.. •.~ N11 Status
OK
OK
OK
Steel Strength"
Pullout Strength*
Concrate Breakout Failure""
20
39
* highest loaded anchor .. anchor group (anchom In tension)
I~ dim a ll!$Ul1Smum bi~ l'OfOMfermttyv.111'1 II',$-.!-~ illlid fflf lllUll!li¥
PROF!$ ~Mil ( f) }~ lfl!l Af'J, 1'!...e4114 ~~ H111 la a res!il!$!\lld 'fmdomlllltllf HIil AG, Sw1111
3,879 'f
346 6
4
2
Hlltl PROFIS Engineering 3,0.90
www.hlltl.com
Company:
Addl'fl8:
Phon& I Fax:
Design: I Concrete -Jan a, 2024
Faetenlng point: Load fer Brtdge Foumllltlon and soft frame
3. 1 Steol Stnmgth
mmr to ICC-ES ESR,-3027
ACI 318-19 Table 17.5.2
Varlablea
A"':1Pn'.i. f.1, (e~Q
0.06 125,000
Celculatlomi
...... ~0P~L
5,680
Reaultll
r-i,,.P~L ............. !~1
5,650 0.850
3.2 Pullout Stnsngth
NP!',.i .. NpJIIOO a,~ (f0'/2500)0·'
♦ N~t!I\.
Yar1ablee
f. (pal] .... , .......... , ........... .
4,000
Cak:ulatlons
J't~e
1.151
Adult.
i •
1.000
.. ~p~{lt)J ···············J~
768 OA5Q
.... +~u(il>l ............... ~wJ~l ..
3,679 20
refer to ICC-ES ESR-3021
ACI 318-19 Table 17.5.2
N"'P~t 20
Page: 3
Speettiar:
E-Mail:
Date: 1/8/2024
3
Hlltl PROFIS Engineering 3.0.90
www.hlltf.com ·································.····.•·········.· .......... • ....•.... ············ Company: Page:
Address: Spoolfler:
Phonel Fax: I E-Mail:
Design: Conctet. • Jan 8, 2024 Date:
Fastening point Load for Bridge Foundation and eafl frame
Nlllirg =~) ll'.,.,14 '¥1111,H 11'11,N "Vq,,11Nb
♦ No11u ~ N.,.
~ see ACI 318•19, Section 17.6.2.1, Fig. R 17.6.2.1(b)
.\i.o =9h~
·~ a c.k) !C1.0
Ii' ell,N • 0.7 + 0.3 ( f::;,} !C 1.0
IV Q1!,N "'MN<(~. 1;!iti-) ,: 1.0
N, =kc).._ .J!h:: A
Va~bleo
l\i, Pn'.J
1.180
. 9-nAPn'.L
0.000
l.ti;,rn vn.]
0.000
&+Jn,J
2.000 ···•·······················•• ·································A•
Cafculatlona
.. ·.· ... ·.· ;i\,,,sjlr,t:J
25.0&
Rnulta
N,Hpb]
2,758
17 1.000
Awo [n.~ ,. ...................... 'll ""'.tt
12.53 1.000
t~
0.450
tl',l;;,,..[lbl
1,240
ACI 3113-19 Eq. {17.6.2.1b)
ACI 318·19Table 17.U
ACI 318-19 Eq. (17.6.2.1.4)
AC! 318-19 Eq. (17.6.2.3.1)
ACI 318-19 Eq. (17.6.2.4.1b)
ACI 318-19 Eq. (17.6.2.8.1b)
ACI 318-19 Eq. (17.6.2.2.1)
5,,wt. pri.J ..... .
"'
........ fc.~~
4,000
.. Y•i:2.t,___
1.000
. ~01J~L
39
V •.N
1.000
!~«.If
1.000
4
1/8J2024
4
HUtl PROFIS £nglnoerfng 3.0.90
www.hlltl.com ................. , ................................... .
Company;
Address:
Phone I Fax:
Design: I Concrete • Jan 8, 2024
Fastening point: Load for Sridge Foundation and soft Imme
4Shearload
t.o.dV111 [lbl
steeistrenglh• 43
steel failure (With levw arm)" NIA
PryootSnngtn"" 171
Concrete edge fallure In direction .., NIA
• highest loaded anchor ... anchor group (relevant anchonl)
v., = ESR value
♦ vl¥V$, :t v ...
Vai'lablM
AJfer to ICC-ES ESR-3027
ACI 318-19 Table 17.5.2
i\,x pn'.j ............ .... f;,%~ij_
0.05 125,000
Caleulatlona
YwPl>J
1,550
RHults
V"'Pbl . . . tY,,, P~l ................... v~.J11>t .
1,550 930 43
lnp!,11 dllill n flM!llt> mlml bit~ f!l<' canfurmity wl!h 1h11 ~U Ul!l'ld!llrmil and for~
Page:
Specifier.
E-Mall:
Date:
... ~.~ .. ~ .. Vn[11.,J
930
NIA
3,859
NIA
PRO!"!$ l!il",jfl!lNmg ( 1.1) ~· Hm:! AG, FL~ 8dtlmn H!ll II II reglll!INII l'flldo11111111'11 H!11 AG, &mwn
5
1/812024
Utlll&atlon IJv • V ,.tt Yn Statua
5 OK
NIA NIA
5 OK
NIA NIA
·----M----------~-------~~----·
HHtl PROFIS Engineering 3.0.90
www.hlltJ.com
Company:
Addreae:
Phone I Fax:
Design: I Concrete • Jen 8, 2024
Page:
Specifier:
E-Mail:
Date;
Faetenrng point: load for Bridge Foundation and llOft frame
4.2PryoutSnngth
vtf/8 =kcii [(::) vtwtN 111.i.N w..,N "l'op,NNb]
♦ V'" ~Vue At., neACI 318-19, Section 17.6.2.1, Fig. R 17.6.2.1(b)
~ =9h~
~ ~ = c .~) s 1.0
vtlll.H =0.1+0.s({':;,) s1.o
•&1j>,N =MAX{~, 1c) s1.0
No "' I\. ). • 'Vfo t\1,/
Variables
ACI 318-19 Eq. (17.7.3.1b)
ACI 318-19 Table 17.5.2
ACI 318-19 Eq. (17.U.1A)
ACI 31S.:19 Eq. (17.6.2.3.1)
ACI 318-19 Eq. (17.6.2.4.1b)
ACI 318-19 Eq. (17.6.2.6.1b}
ACI 318-19 Eq. (17.6.2.2.1)
~+91'1:L .................. ~; Uli 9!"'.L . .. .......... .!;tH ~!",:! .... ~.+r.!":!:l
!~.
1.000
Calcufat!orul
&;,.Jin.;
50.13
Rnui..
• \l,nllbJ
5,513
1.180 0.000 0.000
.· .. ~PnJ
2.000
Aw1 Pn'.i
12.53
ko
17
!."!"1.t<
1.000
♦Y,P\\ObJ .
3,859
,._
1.000
'lf~,N
1.000
Y#P~L ..
171
...
5 Combined tensJon and shear loads, per ACI 318-19 section 17.8
flN ........................... !iv ..... ·························
0.057 0.046
~=~+~<=1
Wn•,• " ,••••-••••••••••·,.,•,.•~•• •••• Y~v.~,-,--
JJ'4)llt clQ1!J ll!O NllllltamUl!IIO l!MOkt4fllt~!lyWftllf/1$ ~; f.D'll!l!l!ml lm!fl!ll'p!sul!Jlll~
PROFIS ~ ( o }~ Mi!!!AG, FL,00l4 Sdmanl-tllti foe !'OQlfflllld~ l'lf l«l!JAG, ~
Status
OK
!•0.N.
1.000
~,,Dbl
1,378
8
1/8/2024
6
Hlltl PROFIS Engineering 3.0.90
www.hffll.com
'••••••'•••••· .•nmm• .. ,.,.,w.,•,ww.wmumm
Company:
Address:
Phone I Fax:
Oesfgn:
Fastening point:
&Warnings
I Concmta-Jan8,2024
Load for Bridge Foundation end soft frame
Page:
Specifier:
E-Mail:
Date: 1/8/2024
• The anchor d&slgn method& In PROFIS Engineering mqulre rigid andlcr plates per cun-ent regul&tlon$ (AS 6216:2021, ETAG 001/Annex C,
EOTA TR029 etc.). Thia meama load re-dlstribuflcn on the anchora due to elaatlc def01TR8tlcna of the anchor pin ~ net considered -the
anchor plate 18 aaaumed to be sufficiently altff, In ordar not to be deformed when subjected to the design loadlng. PROFIS Engineering calc:uletes
the mlnlmum required anchor plate thlcknesa wlt!'I CBFEM to limit the stresa cf the anchor plat.e baaed en 1he assumptions explelned above. The
proof If the rigid anchor plate assumption Is valid Is not carried cut by PROF!S Engineering. Input data and ll)Sulta must be checked for
a,ureemsnt with the existing eondftlcms and for p!s.uslbllttyl
• Condlllon A applies where the potential conct91& faDure aurfacM are cros.ted by supplemantery reJnl'orcement proportioned to l1e the potsn11rd
conaete fallure prism Into the atructural member. Condition B appllee whera such supplementary reinforcement le not provldad, or where pullout
or pryout atrength governs.
• Refer to the manufaclurer'a product lltereture for cleaning and lnalallatfon lnntM:tlomi.
• For additional Information a.bout ACI 318 mngth deetgn provlalona, please go to https://submlltal1.us.hlttl.comJPROFISAncholOfllgnGulde/
• Hilti post-in&talled anc:horv shell be inatalled in accordance with the HIIU Manufacturer's Printed ln&tallatfon lnwuctiona (MPII). Refarence ACI
318-19, Section 26.7,
Fastening meets the design criteria!
w.-,••••• -.v•,•.-•••••,,•.-,•,_.,,,._.~.,,.,, N.w.-m; ..... n,N-'rn,n,•,nmnmNuu H, H•••""'••••• .. , ......... n.•, . .v •••••••••••••-'...,••••'"-"•"•Vm,,,,_....,,,,.w., ........ .-. .-, ••••
kl;Mit dala Mil l'l!IUlll l'!ll.lllt beeheelal<I for oonlill!'!llJIY\dl!l Ille~ amm!O"<II and for~llyl
PROF!$ E!!aJ-"'11 ( c) 2ll~ HilUAG, Fl/4194 $dl!llll!I H11!l bi 11 ,..1'9Cf Trmimlllk of H!I!! AG, Sdlalin .. ... .... . . . ..
7
Hlltf PROFIS Engineering 3.0,90
www.hlltf.com
...... ,,.,.,. ... • , wnn••
company: Page: a
Addreu: Speclller:
Phone I Fax: I E-Mail:
Dulgn: Concmte-Jane, 2024 Date: 1/8/2024
Fastening point Load lbr Bridge Foundation and soft frame
7 Installation data
Proflle: Square HSS (AISC), HSS2X2X..250; (L x W x T) = 2.000 In. x 2.000 in.
x0.250In.
Hole dlamet8r In the fixture: ct,= 0.375 In.
Plate thickness (fnput}: 0.250 !n.
Recommended plate thlcknen: not calculated
Drilling method: Hemmer drilled
Cleenlng: Manual cleaning of the drflled hole according to IMtnJctlona for U$Ct le
required.
Anooor type and diameter: KWIK HUS-EZ (KH-EZ)-P 1/4
(1 518)
Item number: 2189856 l<H-EZ P 1/4"x1 7184
Maximum lnstallatton torque: 218 In.lb
Hole diameter In the base mat.rial: 0.375 In.
Hole depth In !he base materiel: 1.836 In.
Minimum thlokneas of the base material: 3.250 In.
Hl!tl l<H-EZ.P 8Cl"eW anchor wtlh 1.625 In embedment, 1/4 (1 518}, Cetbon stsel, lnstalla11on per ESR-3027
7.1 Recommended accnaorlu
. ll11111.~~L .. ........................ £l~lrt9 ........................................ ·.········································································:::·c·::::-.:.:'"'·· .................................................................. ,. .. ,., .
• Suitable Rotary Hammer
• Properly 8Wld drill bit
Coordinate. Anchor [In,)
Anchor
1
2
3
4
X ..... '1 ............ c,..
-2.000 -2.000
2.000 -2.000
-2.000 2.000
2.000 2.000
•• ••• ••.••,••.•w,••.•, •w.• ••s•w.ssww•,mY.,.•.w.
• Manual blow-out pump
y
2.750
Input data Md m,,;l!i! l!'IUffl bo ~for~ wfth Ille lillllllir.!I Ollll!il!OIIS arul for~
PlWFIS ~ll&!illr!fl ( o) ~ Hlll1 AG, FL-8494 Stllffi'I HIii! la a mgi&tenld 'l'mdemfflk of Hill AG, l!ml!ffll
• Torque wrench
8
Hlltl PROFIS Englnurlng 3.0.90
www.hmt.com
Company:
Addren:
Phone I Fax:
Design:
Fastening point:
I Concrete • Jen 8, 2024
Load for Brtdge Foundation and 80ft Imme
8 Remarks; Your Cooperation Duties
Page:
Specifier:
E-Me!I:
Date:
• Any and all Information and data eontalned In 1he Softwam concern solely the use of H!IU products and am based on the plinclplea, fonnulaa and
security regulation• In ~c:e with Hlltl'a technical directions end operating, mounting and aaumbly Instructions, etc., lhat must be strictfy
complied with by the user. All flgum mnla!Md themln am average figures. and themore un-apecl&: teste are to be Cl>nducted prior to using
1he relevant Hill! product. The multa of the calc:ulal!ona oarrted out by means of the Softwere are based esaentlslly on the data you put In.
Therefore, you bear the sole mponelblllty for the absence of errors, the completeneu and tha rekMlnee of the date to be put In by you.
Moreover, you beat sole reaponaibillt)' for having the results of the calculation chec:ked and aaarad by an expert, partlculsrfy with regard to
compllance wllh applicable normu and permlta, prlor to using them for your speofflc facility. The Software lfflMll only aa an aid to !ntarprat norme
and permlte without any guarantee n to 1he absence of em>ra, !he cormctnesa and the tale1/8!'1C8 of the msufll9 or eultabllllY fol a apacffle
appllca11on.
, You must take all necesaary and reasonable at&p11 to prevent or llmlt damage caused by thfil Softwara. In partlcular, you must amlll(l8 tor the
~lar baclwp of programs and data end, If eppllcable, eany out the updates of the~ offered by Him on a regular basis. If you do not uee
the AutoUpdate fl.mctlon of the Software, you must anaun, that you are ualng the current and thus up-to-date VGl'$!on of the Software In each
ceee by carrying out manual updetea via the Hilti WeballB. HllU will not be liable for consequences, such aa the l'GCOV$fY of lost or damaged data
or programs, arising from a culpable breach of duty by you.
9
9
Hlltl PROFIS Engineering 3.0.90 239.9:!N' .. ,,_lb(
1$1.IIN • J7.ffl!l,f
www.hlltl.com
troom -.uth 105lbf
211l'f•m .. !.fflx t<flliNn
~.•~. •••••'•'•••••' .. •-'""••••••N ·• ••W •••••••••••««•«•««««•«««•••• •••••••• •••••••••••••••••••••••••• ... " "··········pag~:•········ $:i@l,m•U~l"~lhf-m Company:
Addtets:
Phone I Fax:
Dealgn:
Fastening point:
Sptclfl•r•• commenta:
1 lnputdata
Anchor ty,-and dlamatw:
Item number.
Effedlve embedment depth:
Material:
Evaluatlm Se!vloo Report:
leeued I Velld:
Proof:
Stsnd-ol'f lnstallatlon:
Anchor plateR :
Proflle:
Base matm1al:
lftataDatlon:
Relnforcement
Specifier:
I E-MaB:
Concrele 2 -Jan 8, 2024 Date:
Load for Rope Course Foundallon
KWIK HUS-EZ (KH-EZ)•P 114 (1 518)
2169856 KH-EZ P 1/4"x1 718"
h.,...,. = 1,180 In., hnot.1 = 1.625 In.
Cetbon Steel
ESR-3027
4/1/202'. I 1211/2023
Design Me1hod ACI 318-19 / Mech
9i, = 0.000 In. (no stand-off}; t = 0.250 In.
~ x 1, x t = 13.760 In. x 13.760 in, JC 0.260 In.; (Recommended plate thickness: not calculated)
Round HSS (AISC), HSS6-5/8X.37S; (l x W x T) = U25 In, x 6.825 In. x 0.375 In.
crac.ud concrete, 4000. fc' "'4,000 pt!; h "' 4.000 In.
hammer drfll8d hole, lnatallatlon condition: Dry
tension: not pmeent. shear. not present; no supplemental eplltting reinfaroernent present
edge l'fllnforoement: none or < No. 4 bar
R -The anchor calculation la based on a rigid anchor plate assumption.
Geomstry [ln.J & Loading (lb, In.lb]
ij
I
I
11812024
Hlltl PROFIS Engineering 3.0.90
www.hUtl.com ......................................................
Company: Page: 2
Addreaa: Speclfler:
Phone! Fax: I E-Mail:
Oeelgn: Concrete 2 • Jan 8, 2024 Dats:
Fastening point: Load for Rope Course Foundation
1.1 O.alp multa
Case ......... ~~rlpltrlt1 '
Combination 1
.............................. ~~. P~l/Moments ~~J~L Seismic ...... ~'. lJ~I: .O.ri_c:florJ:%1
2 Load caaa/ReauJtlng anchor forcee
Anchorructlona [lb]
Temslon force: (+Tension, -Compresslon)
N = -3,822; V. • 54; Vv • 38;
M,. = 1,888; M, = 4,691; M. = O;
AndlOr Tenelonfotee Shear force Shear forte X Shearforcey
1 0 8 7 5
2 0 8 1 5
3 0 8 7 5
4 0 8 7 5
5 0 8 7 5
8 0 8 7 5
7 0 8 7 5
8 D 8 7 5
max. concrvtacompre88lvttettaln: 0.01 ['X,,,]
max. concrvta compreselve atteee: 46 [p8l]
reau1t1ng tension force In (x/y)=(0.000/0.000): o PbJ
reeulting compression force In (xJy)=(8.102/8.386): 3,822 Pb]
Anchor foras are calculated based en Ille anumptlon of a rigid anchor plate.
3 Tension load
no 1
Loe~ N.llb]
NIA
. ~city t N,, ObI . ~~1.lnllon ~ ~ ~ ~ .. Status
NIA
NIA
NIA
Stee!Slrenglh·
PuBcut Strengttf
Concrer» Breakout Fe.llure••
NIA
NIA
• highest loaded anchor -anchor group (anchors In tension)
• ••••w••• • •••••.•.••••••' _.,.,•.w.w.w•.w .v.w.•.•s•.,••.,•='•,w,w.-.w..w.w~w,,w••••
11\pU! 611111 ll!Wl~!!11itbo~fbf ffll!lfclm~w11!!1M IMlldng OO!llil!IG!l•alldfwplllu~I
l"!Wfll!i !tulllllillffilg ( c }200$-a4 HllllAG, fL,,M&4 Sdlsan Hill la 1111111~ 'fflldemm,f( at HIii AG.~
NIA NIA
NJA NJA
NIA NIA
2
Hlltl PROFIS Englneet1ng 3.0.90
www.hlltl.com
Company:
Address:
Phone I Fax: I Dsslgn: Conerme 2. Jan a. 2024
Fastening point Load for Rope Co111'6e Foundation
4Shearload
Steel stmngttt•
Steel fallure (with lever arm)>
Pryout S1rengthtt
Conorete edge failure In direction ...
L.OiHJV""~~!
8
NIA
66
NIA
• highest loaded anchor ... anchor group {relevant anchont}
4.1 lteef strength
V.,. = ESR value
• VIIHI :2: v ..
refer to ICC-ES ESR-3027
ACI 318-19 Table 11.5.2
Varlablaa
~xP~J . .. 1\q ~L
0.05 125,000
Calculations
. Y-t~~l
1,550
Re'ulta
.... .Yl!IIJ~L .................... t~ • '!i~Jlb] ..... ·.· ............ Y~&~~L
1,550 0.600 930 8
lnpm data mnlll m~ mim be~ for canfomili)' w!t.ll 'lh$ el!lllllng llll!ldl1ionll and for plsullbl~
Page:
Specffler.
E•Mall:
Date:
cepac1~• v,P~L ut11nt1onfl.,•~~ vfl
930 1
NIA
7,655
NIA
NIA
1
NIA
l'ftOF1$ ~ta)~ Hl!IAG, Fl..~ ~Hl!lli.e~ Tnldemla1!Gf HffllAG. Smman
Stetua
01(
NIA
OK
NIA
3
1/8/2024
3
Hlttl PROFIS Engineering 3.0.90
www.hlffl.com
m,••ww•wn~W.••••••• •••••• d ••. -, •. •.,.~,.,;.•,.••••••••••'~"""•••••••d;.d
Company:
Address;
Phone I Fax: I
Pago: 4
Specffl&r:
E-Mail:
Design: Concrete 2 -Jan 8, 2024 Date: 1/812024
Fastening point Load for Rope Couru Foundation
4.2 Pryout Strangth
V,w =k,,p [(t;;) IJlec,N 'l'e4,i. Vc.N lilq,.NNb]
♦ v""" :.:V1111 ~ ReeACI 318-19, Secflon 17.6.2.1, Fig. R 17.6.2.1(b)
At.co =9h~
v~ = ( ~) s1.0 • 1+3h,,,
ljl 111,N .. 0.7 + 0.3 ( ~) s 1.0
1V Cll.H ,. MAX(~, 1!:'1) s 1.0
Nb "kc t. l\::
Varfabln
C.lculatlona
ko
17
........ A,g.lin.~ .. . ... A,m D!'-~ .. ,,....... ... 'l'.!"ift .
98.14 12.53 1.000
Ruulbl
SWamlngs
+~.,,
0.700
ACI 318-19 Eq. (17.7.3.1b)
ACI 318-19 Table 17.5.2
ACI 318-19 Eq. (17.6.2.1.4)
ACI 318-19 Eq. {17.6.2.3.1)
ACI 318-19 Eq. (17.6.2.4.1b)
ACI 3113-19 Eq. (17.8.2.6.1b)
ACI 31S..19 Eq. (17.8.2.2.1}
··········· "}'<'2,N ....
1.000
,,,,,vwtpb]
66
···········'·"'···•'•"'"'" 4,000
J'.~J' ..
t.000 !rt"'•····. 1.000
...... ..t:'i~~t .... ,.
1,378
• The anchor design methods In PROFIS Engineering requll'lt rigid anchor plates per current regulatlons (AS 5216:2021, ETAG 001/Annex c,
EOTA TR029 etc.}. Thia means load re-dlafr1butian on the anchors due to ele.Uc deformsllon9 of the anchor plate are not conald&red • the
anchor plate le aaaumed to be aufflclemly 8tiff, In order not to be defom,ed when subjected to the dealgn loading. PROFIS Engineering c:alculatas
the minimum required anchor plate thickness with CBFEM to llmfl the stress of 1he anchor plate based on the aaaumpUons axplalned above. The
proof If the rigid anchor plat& 881umptlon la valld la not carried out by PROFIS Engineering. Input data and resufts must be checked for
agreement wllh the existing concffllona end for plauelbllltyl
• Condftlon A applla where the potential concrete failure 11urfa001 ere Cll'0888d by supplemaniary reinforcement proportioned to tle the potential
concrete falhm, prlam Into the stNctural member. Condition B eppllu where euctt supplementary reinforcement 18 not provided, or whete pufloul
or pryout swnglh governe. •
• Refer to the manufactul!!r'll product lllenrtum tor dff.nlng and lnstall1111on lnalnJcttons.
• For addlllonal informa11on about ACI 318 strength design provia!ona, please go to httpa://aubmlttals.u&.hllti.comlPROFISAnchorOeafgnGulde/
• Hlllf poet-Installed anchors mall be Installed In accordanoe with lhe Hlltl Menufaclurer'a Pttnted lnatelletion lnstrucllon9 (MPII). Refer.nee ACI
31&-19, Section 26.7.
. ......
!1¥1f,t ffldll W l&llld!a rrA111 illll W!Md 1111 oan1!!1ln~dl lOO 9ll!llllna !!l:lrldll!!n end f!!f plaUtllb4t.,!
PROMS ~ll'ller!I$ { C )~H!!UAG, l'L-$4&4 llthasl!Hl!ll !ea ~!1Cl ~af Hlt!IAG, 81:tmtm
4
HIit! PROFIS Engineering 3.0.90
www.hlltl.com
Company:
Addms:
Phone I Fax:
Deelgn:
Fa&tenlng point:
I concrete 2 • Jan a, 2024
Load tor Rope Couraa Foundstton
Page:
Specifier.
E-Mail:
Date:
Fastening meets the design crlterlal
··················· , .. , . .-,·.,,
lftl)LII datft w ~ ~11$ ~ fol'~liltwffli fM olll!nll mnd!llcm111'11! for pllQII~
PFIOl'IS £/Ql!IMl'ln@( c )~ Hlffl Aft, FL~~ H!iff ma ~red lllllll<olttm ttf Hl!II AG, &ma~
1/8/2024
5
Hiltl PROFIS Engineering 3.0.90
www.hlltl..com
Company:
Addtfl&:
Phone I Fax:
Design:
Fastening point.
6 Installation data
I COncmte 2 • J11n 8, 2024
Load for Rope Courae Foundet!on
Pase:
Specffler:
E-Mal:
Dlllte: 1/B/2024
Anehor type and diameter: KWII( HUS-EZ {KH-EZ}P 114
(1 5.18)
Profile: Round HSS (AISC), HSS6-6/BX.375; (L x W x T) = 6.625 In. x 6.625 In.
x0.3751n.
Hole diameter In the fixture: d,"" 0.375 in.
Plate thlcknaM Qnput): 0.250 In.
Recommended plate 1hlckness: not calouleted
Drlllln; method: Hamm&r drilled
Cleaning: Manual clunlng of the dr!Hed hole according to Instructions for use le
required.
lt.m number: 2169856 KH-EZ P 1/4"x1 718"
Maximum Installation torque: 218 In.lb
Hole diameter In the base material: 0.375 In.
Hole depth In 1he baae materiel: 1.838 ln.
M!nlm!Jm thlckneas of the base matenal: 3,250 In.
Hffli KH-EZ.P oomw anchor with 1.625 In embedment. 1/4 (1 Ml), carbon llleel, lmaflatlon per ESR-3027
8,1 Rfcom!Mnded HCNaorfoa
~11119 ·---~'~!mt ..
• Suitable Rotary Hammer • Manual blow-out PIJl"IIP
• Properly 8lzed drill bit
'I 6.875 6.875
Coordlnma Anchor [In.) 2.150 1.375
Anchor X ....... 'f., . . C..,_ c,. ........ , C'L " , ~:t ..
1 0.000 •5.500
2 3.350 .3.350
3 .o.500 0.000
4 5.500 0.000
................. , ... .; .. ,-. ....•................... •-•• ··················· . ·····•·····
l~da'la a!ld !'IIIWlil!IIUltba~fllr~l!yl'.ffl lM ~~• Md fcrp~~I
Anchor
5 e
7
8
PROl'IS Ell!!~ { c 1202024 HOO AG, Fl.-8494 tiesn Hitt !1 a r!iflilternd Tmdemll!ltol/ Hl!l Alt~
X
.3.350
3.350
0.000
•USO
Setting. . .
• Torque wrench
)I
3.350
3.350
5.500
~.350
8
Hlltl PROFIS Engineering 3.0.90
www.tifflLeam
Company:
Addma:
Phone I fax:
Det.lgn:
Futenlng point·
I
Ccncrete 2 -Jan 8, 2024
Lead for Rope Coume Foundation
7 Remarks; Your Cooperation Duties
Page:
S~er.
E-Mal:
Date:
• MY and all lnforma11on and data contained In the Software concern solely 1he use of HIit! products and are b88Gd on the principle&, fom\ulae and
security regulations In accordance wflh HIii!'& tachnlcal dlreetlona and operating, mounting and a888mbly ln&1ructlt.lns, etc., that muat be atrlctly
oompllod with by Uls uaer. All figure$ contained thenlln are awrage figures, and therefore ua&-apecllic test& are to be condueted prior to Utllng
ihs relevant HIit! product. The reault& of !he calel.llalfona carried out by means of !he Softwn are baaed eaaentlally on. the data you put In.
Therefore, you bear Che sol• mponslblllty for tht abaente of errors, the compl&temmi and th& relJvanoe of Iha data to be put In by you,
Moreover, you bear eole rftponsibiltty for having th• tesults of 1he calculatlon thsck&d arid o!eared by an expert. partlculariy with 199Grd to
compllanoe with appllcable norm, and perm1ta. prior to ualng them for your specllic faclllty. Th& Software serves orily as an aid to lnt(lt'!)m nonne
and permtte without any guarantee u to the absence of errors. the 00f'l"8ClneSS arid tho m!&vanca of the results or aultablllty ror a ep&Cfflc
application.
• You must take all neceesary and reasonable etape to prevent or llmlt damage caund by the Saltware. In particular, you must arrange far the
regular backup of programs and date and, If appllcable, cany out the updates of the Software offered by Hlltl on a 1'9gt.llar ball. If you do not use
tho AutoUpdete function of the Soflwere, you muat enaure that you are using the aJrrent and ttwa up-to-ttet. veralon of the Software In each
c:aee by carrying out manual updates via the Hilti Webllte. HIit! will not be liable for ccnHquences, such u the t'9COV6ly of lost or damaged dais
or programs, arlelng from e culpable br8ach of duty by you.
~amanint;.·•·t,e~ far~it;·.;·h··~ ~W fcrPfflualblnt-,1
PROFIS~lr!Mmg( O ,~ HfllAG, FL-9494 Silhaln Hill Illa ro,;!a=rml iradem1ltef Hlll 11.G,St:llalln
7
7
Calculation Cover Sheet
Customer K&C USA
Project Title K&C Indoor playground
Calculation
Title Indoor playground equipment -Softplay
Calculation Method
Ansys workbench was the primary tool used for the analysis and design of the indoor
playground equipment -softplay
Software Used
Title Version
Ansys workbench 2020R2
Assumptions
None that require further confirmation.
References
1. ASCE 7, Minimum Design Loads for Buildings & Other Structures, 2016
2. ASTM F1918-21 Standard Safety Performance Specification for Soft Contained Play
Equipment
3. Seismic data by A TC council
1
Contents
• Units
• Codes, Standards & Design Parameters
• Seismic
• Dead loads
• Live loads
• Material Data
o Structural Steel
o Plastic, PC {copolymer, heat resistant)
" Wood. Oak
• Model (C4)
o Geometry
• Part
■ Parts
o Materials
o Cross Sections
• RectTube1
o ,9oordinate Systems
r, Connections
, .. , Mesh
o Static Structural (C5}
• Analysis Settinqs
• Accelerations
• loads
• Solution (C6)
• Solution Information
• Equivalent Stress
• Beam Tool
• Results
• Probes
• Material Data
o Structural Steel
o Wood, Oak
Units
TABLE 1
Metric (m,_~1;11 .. ~.!.~L.Y,'.L~) Radians rad/s Celsi·IJ·~·
Radians
rad/s
Celsius ................................................... ,.,. .. ,------····•··•·······-·················
Codes, Standards & Design Parameters
a) ASCE 7-16
b) ASTM.F1918
Seismic
Occupancy Category Ill
2
Importance Factor le =1
Site Class D
Design, 5% Damped, Spectral Response Acceleration Parameter (short period), Sos=
0.723
From ASCE7-16 Table 15.4-1,Rp = 1.0
the seismic design base shear can be calculatedusing Equation
12.8-1 of ASCE 7-16:
V= CsW(Eq. 12.8-1)
Where:
Vis the seismic design base shear
Cs is the seismic response coefficient based on Section 12. 8. 1. 1
Wis the effective seismic weight as per Section 12.7.2
The formula for determining the seismic response coefficient is:
C5 = S~s (Eq. 12. 8-2)
Where:
S05 is the design spectral response acceleration parameter in the
short period range (from USGS Data)
R is the response modifcation factor as per
Table 12.2-1
le is the importance factor determined from Section 11. 5. 1
However, we need to satisfy Equations 12.8-3 to 12.8-6:
The value of C, should not exceed 12.8-3 or 12.8-4
Dead load
Dead load will be calculated by software according to the
material and volume.
Live load
ASTM F1918 section 10.4 Components and Structures Subject to
Vertical Loads. 10.4. 1 Determine the number of simultaneous users, n,
of acomponent or structure as specified in this section. If n is nota
whole number, round to the next largest whole number. Placen load
distribution devices on the component or structure in amanner that
simulates the anticipated load distribution. Simul. taneously load
each load distribution device with a downwardforce,F, given by the
following equation:
(1)
where:
3
F = force/load distribution device.
250= user weight, lb, and
( 1 + ;;)= dynamic factor.
The force shall be applied gradually and maintained for a period
of 5 min.
10.4.2 Individual Surface
10.4.2. 1 This section applies to components such as platfon~
crawl tubes, junction boxes and stair treads. Determine the component
projected surface area, A. For a rectangular horizontal platform, A
=(length) x (width). For other than horizontal surfaces, A = the
projection of the component use area onto a horizontal plane. The
component use area is the maximum component extents which are
normally contacted during use. Use this value of A in Eq 2 or Eq 3
and determine the number of users, n, (round to the next largest whole
number).Use this value of n in Eq 1 to determine the magnitude of
each force to be applied.
For A, m2 :
Material Data
Structural Steel
A
n = 0.35
TABLE 2
Structural Steel > Constants ,--------,
7850 kg m"-3
1.2e-005 C"-1
434 J kg"-1 C"-1
60.5 W m"-1 C"-1
1.?e-007 ohm m
TABLE3
Structural Steel > Color
TABLE 4
TABLE 5
TABLE 6
Structural Steel > Tensile Yield Strength
4
(3)
Wood, Oak
TABLE 7
Structural Steel > Tensile Ultimate Strength
TABLES
TABLE 9
Structural Steel > S-N Curve
3.999e+009 10 0
2.827e+009 20 0 f--------t----+--1.896e+009 50 0
1.413e+009 100 0
1.069e+009 200 0
4.41 e+00B 2000 0
2.62e+008 10000 0
2.14e+008 20000 0
1.38e+008 1.e+005 0
1.14e+008 2.e+0051 0
8.62e+007 1.e+006 0
TABLE 10
Structural Steel > Strain-Life Parameters
TABLE 11
TABLE 12
TABLE 13
Oak > Constants
5
------~ .935.7 kg m"'-3
4. 776e+007 Pa
1.467e+008 Pa
4.69e-006 C"'-1
Model (C4)
Geometry
TABLE 14
TABLE 15
TABLE 16
0.4528 W m"-1 C"-1
1685 J kg"-1 C"-1
Soft play can be simplify as one element as below:
LOADING AND BOUNDARY CONDITION
6
TABLE 17
____ Model{C4)_> .. Geometry ···•··--------
____ G_e_ometry"----
Full Defined
D:\4.youle\BRIDGE\LANGQIAO _ SHUWU _files\dpO\Geom-
______ 1_\D_M_\Geom-1 _.ag'--d_b ________ ,
Design Modeler
Yes
Yes
Yes
No
Yes
Yes
No
3-D
No
None
7
Yes
Yes
TABLE 19
Model (C4) >Geometry> Part> Parts;c.---
-.-5-0-F.-5-0-F'i'soi=· SOF i SOFfSOF i SOF i SOFT T SOFT 1 T T T T T • T I T
Flexible
Default Coordinate System
By Environment
RectTube1
.............. Refre~~~~o~:dat_e __________ J
--------------------
None
Beam
8
8.3448e-004 m3
m3
6.5507 kg 11.437 : 9.6649 i
kg ~~-
1.22 m 2.13 m: 1.8 m
6.84e-004 m2
3.7141e-007 m2•m2
3.7141e-007 m2•m2
7
None
TABLE 20
Model C4
Surfa Surfac Surfa
SOFT SOFT SOFT SOFT ce e ce
Body Body Body
Flexible
Default Coordinate System
By Environment
RectTube1
9
Refresh on Update
Centroid Middle
None
Beam Shell
3D
1.8e-002 m
Structural Steel
Yes
_w_o_od_,_o_a_k ___ ~
Yes
1e-3.9528e-002 1 e-
002 m' 002 m'
m' m3 m3
25.06 36.986 kg 25.06 36.986 kg 9 kg ........ 9 .. k9 ....
m m
6.84e-004 m2
3.7141e-007 m2•m2
3.7141e-007 m2-rn2
0.61 0.m 1.22 0.61 m m m
0.m 0.9m 1.8 m 0.9m
-0.61 m 0 •-1.22 .m' m
3.109 14.574 3.109 9.9863 3 kg·m2 3 kg·m2
kg·m2 kg·m2
10
Coordinate Systems
'6.218 4.5875 7 kg·m2
_kg·m2
3.109: 9.9863 3 kg·m2
k ·m2
1.488 2.196 m2
TABLE 23
> Cross Sections > RectTube1
RectTube1
3.e-003 m
3.e-003 m
3.e-003 m
6.84e-004 m2
3.7141e-007 m2-m2
3.7141e-007 m2•m2
11
6.218 4.5875 7 kg·m2
kg·m2_ ··············•····· ...........
3.109; 14.574 3 kg·m2
~9·m2
1.488 2.196 m2
Connections
Mesh
TABLE 24
s > Co~rdinateSy~tem
TABLE 25
12
No
Default (1.2)_
Yes
Default (8.7503e-004 m).
Yes
Default (1.7501e-003 m)
Default (0.5236 rad)
No
4.2921 m
1.9601 m2
1.22 m
Static Structural (C5)
TABLE 28
Smooth Transition
0.272
2
1.2
Dimensionally Reduced
.... Program Controlled
Yes
No
Default (1.5751e-003 m)
No
522
tructura/ (C
No
C4 > Static Structural (CS) > Analysis Setting~--
Ana/ysis Settings
1.
1. s
13
Program Controlled
,__ ________ P_ro_2ram Controlled
...... ,.P.r.?gr.am Cont.r.9..I.I~9.
Program Controlled
Program Controlled
___ P_re>,gram Con!r.?.11~-~·········--------l
f---_________ P_mgram Co~f,r,9.II_~9..
No
Yes
Yes
No
No
Yes
Yes
No
No
D:\4. youle\BRIDGE\LANGQIAO _ SHUWU _files\dp0\SYS-
1 \MECH\
None
No
Program Controlled
Yes
No
Active System
mks
14
TABLE 29
> Static Structural C5 > Accelerations
Standa_r._d Earth Gravity : Acceleration
Full Defined
0. m/s2 (ramped)
-9.8066 m/s2 (ramped)
0. m/s2 (ramped)
No
-Y Direction Defined
Vector
!7.17 m/s2 (ramped)
FIGURE 1
Model {C4) > Static Structural {C5) > Standard Earth Gravity
L
FIGURE 2
Model {C4) > Static Structural {CS) > Acceleration
15
l.
IP------······························----············································································-~--····························································· >"I
o. ti'.< .................................................................. --~-···························································································---~ .............................................................. 1 r_
TABLE 30
• Model C4 > Static Structural CS > Loads
Fixed Fixed Fixed Pressur I Pressur Pressur Pressur Pressur
Suppo Suppa Suppa e • e 2 e 3 e 4 e 5
rt2 rt3 rt4
No
Components
Surface Effect
Deformed
Global Coordinate System
-208.1 208.1 O.Pa Pa Pa
(ramped (ramped (ramped
) ) )
0. Pa (ramped)
-2081.
Pa
(ramped
)
0. Pa (ramped)
0. Pa (ramped) 208.1 -208.1
Pa Pa
16
(ramped, (ramped
> I >
FIGURE 3
Model (C4) > Static Structural (CS) > Pressure
FIGURE 4
Model (C4) > Static Structural (CS) > Pressure 2
17
FIGURES
Model {C4) > Static Structural {CS) > Pressure 3
L
FIGURES
Model (C4) > Static Structural (CS) > Pressure 4
18
l.
W&-i ....................................... ·-----------~·······················································-------····----····································--·--····--------·----.. ----·--.-.-1
L
FIGURE 7
Model {C4) > Static Structural {C5) > Pressure 5
1.
L
Solution (C6)
19
TABLE 31
> Static Structural {C5) > Solution
TABLE 33
20
olution (C6)j
Solved •
CG > Solution Information
All Nodes
Connection Type
No
....... Sing,_le __
Lines
..... !IS 0:. .....
FIGURE 8
Model (C4) > Static Structural (CS) > Solution (C6) > Equivalent Stress
TABLE 34
Model (C4) > Static Structural (CS) > Solution (C6) > Equivalent Stress
TABLE 35
Model (C4) > Static Structural CS > Solution (C6) > Beam Tool
Beam Tool
Solved
TABLE 36
Model (C4) > Static Structural (CS) > Solution (C6) > Beam Tool > Results
21
Direct Stress
.8145e+006
Pa
2.2745e+006 Pa
-8.0936e+005
Pa
Minimum Combined
Stress
Solved
Time
Last
Yes
3.4246e+005 Pa
-1.0359e+007 Pa
FIGURE9
Maximum Combined
Stress
5.0232e+007 Pa
8. 7 406e+006 Pa
Model (C4) > Static Structural (CS) > Solution (C6) > Beam Tool > Direct Stress
..... ~ .....
22
TABLE 37
FIGURE 10
Model (C4) > Static Structural (C5) > Solution (CS) > Beam Tool > Minimum Combined
Stress
..... C. ....
[sl
TABLE 38
Model (C4) > Static Structural (C5) > Solution (CS)> Beam Tool> Minimum Combined
Stress
FIGURE 11
Model (C4} > Static Structural (C5} > Solution (CS) > Beam Tool > Maximum Combined
Stress
23
,...
C. .....
TABLE 39
Model (C4) > Static Structural (C5) > Solution (C6) > Beam Tool > Maximum Combined
Stress
TABLE40
Model (C4 > Static Structural C5 > Solution (C6) > Probes ..... T ~--i .. -----~
L Force i Force Force i M t I Moment ·1· Moment Moment ,orce R • 'R t· R t· ' omen 'R t· R t· R t·
R t. eactJOn i eac JOn eac 10n i R t· i eac 10n 1 eac ton eac 10n eac,on 2 I 3 4 I eac,on
1 2 ! 3 4
Solved
Boundary Condition
Fixed Fixed Fixed Fixed Fixed Fixed Fixed
Support Support Support S rt Support Support Support
2 3 4 uppo 2 3 4
Global Coordinate System
No
24
3293.1 N -102.31 -102.33 -0.23963 0.2401 I 0.23874 I-0.24068
N N N·m N·m N·m : N·m
603.14 I 603.13 -2.0641 2.0635 1.991 -1.9901
N I N N·m N·m N·m N·m
624.2 N·m 620.15 620.14
-102.31 -102.33 0.23874 -0.24068
N N N·m N·m N·m N·m 1----+---··························••« ................................ .
-2.0641 2.0635 1.991 -1.9901
N·m N·m N·m N·m
620.15 ! 620.14
-102.31 0.23874 -0.24068
N N·m N·m N·m N·m
603.14 • 603.13 -2.0641 i 2.0635 1.991 -1.9901
N N N·m N·m N·m N·m
620.15 620.14
FIGURE 12
Model (C4) > Static Structural (CS) > Solution {C6) > Force Reaction
25
TABLE41
FIGURE 13
Model (C4) > Static Structural (C5) > Solution (CS) > Force Reaction 2
26
TABLE42
FIGURE 14
Model (C4) > Static Structural (CS) > Solution {C6) > Force Reaction 3
2J
fsl
TABLE43
FIGURE 15
Model (C4) > Static Structural (C5) > Solution {C6) > Force Reaction 4
28
♦
[SJ
TABLE44
FIGURE 16
Model (C4) > Static Structural (C5) > Solution (CS) > Moment Reaction
29
fsl
TABLE45
FIGURE 17
Model (C4) > Static Structural (C5) > Solution (C6) > Moment Reaction 2
30
fsJ
TABLE46
FIGURE 18
Model (C4) > Static Structural (CS) > Solution {CG) > Moment Reaction 3
31
fsl
TABLE47
FIGURE 19
Model (C4) > Static Structural (C5). > Solution (C6) > Moment Reaction 4
32
[s!
TABLE48
Reaction summary
TABLE 49
Fz
603.14 624.2 N·m N N·m
-2.8708 3293.1 N 603.13 624.19 0.2401 N·m 2.0635 N·m N N N·m
-2.8026 -102.31 597.46 620.14 0.23874 N·m 1.991 N·m N N N N·m
-102.33 597.46 620.14 -0.24068 -1.9901
N N N·m N·m N·m
Since Fy positive is press on the metal plate. Also one plate
have 4 mechanical anchors Fx and Fz is within 4 x Shear force, Fy
negative within 4 x tensile force, mechanical anchor is suitable.
33
34
Calculation Cover Sheet
Customer K&C USA
Project Title K&C Indoor playground
Calculation Indoor playground equipment -elevated walkway Title
-.r,.,,.w,.,.¥,.,,.,.,-,m«««<• .. ••N"~-•
Calculation Method
Ansys workbench was the primary tool used for the analysis and design of the indoor
playground equipment -elevated walkway
Software Used
Title Version
Ansys workbench 2020R2
Assumptions
None that require further confirmation.
References
1. ASCE 7, Minimum Design Loads for Buildings & Other Structures, 2016
2. ASTM F1918-21 Standard Safety Performance Specification for Soft Contained Play
Equipment
3. Seismic data by A TC council
1
Contents
• Units
" Codes, Standards & Design Parameters
" Seismic
• Dead loads
• Uve loads
• Material Data
o Structural Steel
o Plastic. PC {copolymer, heat resistant)
o Wood, Oak
• Model (84)
Units
o Geometry
• Part 3
• Parts
o Materials
o Cross Sections
• RectTube1
o Coordinate S_ystems
o Connections
._, Mesh
o Static Structural (85)
• Analysis Settinqs
• Accelerations
• Loads
• Solution (86)
• Solution Information
• Equivalent Stress
• Beam Tool
• _Results
• Probes
TABLE 1
Metric (m, kg, N, s, V, A) Radians rad/s Celsius
Radians
rad/s
Celsius
Codes, Standards & Design Parameters
a) ASCE 7-16
b) ASTM F1918
Seismic
Occupancy Category Ill
Importance Factor le =1
Site Class D
2
Design, 5% Damped, Spectral Response Acceleration Parameter (short period), Sos =
0.723
From ASCE7-16 Table 15.4-1,Rp = 1.0
The seismic design base shear can be calculated using Equation 12.8-1 of ASCE 7-16:
V = CsW(Eq.12.8-1)
Where:
V is the seismic design base shear
Cs is the seismic response coefficient based on Section 12.8.1.1
Wis the effective seismic weight as per Section 12.7.2
The formula for determining the seismic response coefficient is:
Cs=~ (Eq. 12.8-2)
Where:
SDs is the design spectral response acceleration parameter in the short period range
(from USGS Data -ATC Council)
,R is the response modification factor as per Table 15.4-1
le is the importance factor determined from Section 11.5.1
However, we need to satisfy Equations 12.8-3 to 12.8-6:
The value of C, should not exceed 12.8-3 or 12.8-4
Dead load
Dead load will be calculated by software according to the material and volume.
Live load
ASTM F1918 section 10.4 Components and Structures Subject to Vertical Loads.10.4.1
Determine the number of simultaneous users, n, of component or structure as specified
in this section. If n is nota whole number, round to the next largest whole number. Place
load distribution devices on the component or structure in a manner that simulates the
anticipated load distribution. Simultaneously load each load distribution device with a
downward force, F, given by the following equation:
F = 250 ( 1 + ~) (1)
where:
F = force/load distribution device.
250= user weight, lb, and
( 1 + ~)= dynamic factor.
The force shall be applied gradually and maintained for a period of 5 min.
10.4.2 Individual Surface
10.4.2.1 This section applies to components such as platform, crawl tubes, junction
boxes and stair treads. Determine the component projected surface area, A. For a
rectangular horizontal platform, A =(length)x (width). For other than horizontal surfaces,
A= the projection of the component use area onto a horizontal plane. The component
use area is the maximum component extents which are normally contacted during use.
Use this value of A in Eq 2 or Eq 3 and determine the number of users, n,{round to the
next largest whole number).Use this value of n in Eq I to determine the magnitude of
each force to be applied.
For A, m2:
A n=--0.35 (3)
3
Material Data
Structural Steel
TABLE 70
Structural Steel > Constants -------, 7850 kg mA-3
1.2e-005 C"-1
.. 1~4 J kg"-1 C"-1 ..
60.5 W m"-1 CA-1
1.?e-007 ohm m
TABLE 71
Structural Steel > Color
TABLE 72
Structural Steel > Compressive Ultimate Strength
TABLE 73
TABLE 74
Structural Steel > Tensile Yield Strength
TABLE 75
Structural Steel > Tensile Ultimate Strength
TABLE 76
TABLE 77
Structural Steel > S-N Curve ~lt~'.tli~lll\i:~$$ Rafi!l@119i~li!Me~n sie~~[lffi~ll
3.999e+009 10 • 0 •
2.827e+009 20 0
1.896e+009 50 0
1.413e+009 100 0
1.069e+009 200 0
4.41e+008 2000 0
2.62e+008 10000 0
2.14e+008 20000 0
4
1.38e+008 1.e+005 0
1.14e+008 2.e+005 0
8.62e+007 1.e+006 0
TABLE 78
Structural Steel > Strain-Life Parameters
TABLE 79
!il'gijg:~rvt9~0
2.e+011
TABLE 80
Plastic, PC (copolymer, heat resistant)
TABLE 81
TABLE 82
ll1! { ; 1~g~~!l;1
. 0.4 .
i:rvt~~J~E!d!~!;i1
TABLE 83
TABLE 84
istant) > Constants ..
·-········ 1· 160 kg mA-3
6.193e+007 Pa
6.282e+007 Pa
9.786e-005 CA-1
0.1998 W mA-1 CA-1
1190 J kgA-1 CA-1
Plastic, PC (copolymer, heat resistant}> Isotropic Secant Coefficient of Thermal
Ex
Wood, Oak /
5
Oak > Constants
TABLE 86
TABLE 87
TABLE 88
6
-------935.7 kg m"-3
4.776e+007 Pa
1.467e+008 Pa
4.69e-006 C"-1
0.4528 W m"-1 C"-1
1685 J kg"-1 C"-1
Model (B4)
Geometry
LOADING AND BOUNDARY CONDITION
7
TABLE2
Model (84) > Geomet.~---------
Yes
Yes
Yes
No
Yes
Yes
8
No
3-D
No
None
Yes
Yes
TABLE 3
TABLE4
Model 84 > Geomet > Part 3 > Parts
GUJI l GUJI GUJIA GUJI GUJI • GUJ/ GUJI GUJI GUJI i GUJI
A ! A A A A A I A A i A
Flexible
9
Default Coordinate System
By Environment
RectTube2 R~~\Tut ___ _ RectTube2
Refresh on Update
Centroid
None
Structural Steel
Yes
Yes
7m m
0.538 0.16
m 27 m m O.m 0.16 0.568 0.57 0.548 0 2e-0.224
27 m 77 m • m 17 m m m 002m
8e-4e-8e-Se-4e-9e-
004 ml 004 ml 004 004 m, 004 004 I
m, ml m3 I ml ffil ml m, m:i ! ... , ................ ........................ .......... ...................... ··················-........ 1
0.859 8.1907 0.859 3.051 3.060 4.247 0.644 0.859 3.835 i
1 kg kg 1 kg 3 kg 6 kg 3 kg 33 kg 1 kg 5kg
0.16 2.35m 0.16 0.568 0.57 0.791 0.12 0.16 0.714 i
m rn m 27m m 01 m m m 32m i
6.84e-004 m 2 4.44e-6.84e-004 m2
• 004 m 2
1.0197
1.8429e-007 m2-m2 e-007 1.8429e-007 m 2•m2
m2·m2
1.0197
5.5853e-007 m2·m2 e-007 5.5853e-007 m 2•m2
None
10
m3
3.835
5 kg
TABLE 5
--~M_od~e_lj_l:3,~)> Geomet _>~P_a_rt_3...,.>_P_art_s..,--____ ,,,_,,, __
4e-
004
rn3
0.859
1 kg
G~JI G~J/ G~JI I GUJIA GUJIA GUJIA GUJIA GUJIA
RectTube2
6e-4e-
003 003
m' rn'
8.914 8.591
8kg kg
Flexible
Default Coordinate System
By Environment
: RectT RectT RectT RectT RectT
ube1 ube2 ube1 ube2 ube1
Refresh on Update
6e-
003
m•
8.914
8 kg
Centroid
None
Yes
Yes
Be-
005 m' m3
0.64 5.5766 433 kg kg
11
m
0.5487
7m
m'
4.2473
kg
0.m 0.57m 0.m
m' rn3 rn'
5.5766 3.0606 5.5766
kg kg kg
0.16 1.660 1 6 1.660 0.12 1.6 m 0.7910 1.6 m 0.57m 1.6 m m 3m • m 3m m 1m
6.84e-004 m2 4.44e-6.84e-4.44e-6.84e-4.44e-
004 m2 004 m2 004 m2 004 m2 004 m2
1.0197 1.8429 1.0197 1.8429 1.0197
1.8429e-007 m2-m2 e-007 e-007 e-007 e-007 e-007 m2,m2 m2,m2 m2·m2 m2-m2 m2,m2
1.0197 5.5853 1.0197 5.5853 1.0197
5.5853e-007 m2•m2 e-007 e-007 e-007 e-007 e-007
TABLES
Model 84 > Geomet > Part 3 > Parts
GUJIA I GUJ/A I ~~J ~~JI GUJIA i GUJIA I GUJIA ~~J ~~JI GUJIA I
Flexible
Default Coordinate System
By Environment
RectTu I RectTu RectTube ! RectTu ! RectTu RectTu RectTube I RectTu
be1 be2 1 i be2 i be1 be2 1 ' be2
Refresh on Update
Centroid
None
Beam
Yes
12
0.5682
7m
--~
1.0434e-8.436e-
m3 m3 003 m3 m3 m3 m3 004 m3 m3
5.5766 0.8591 8.1907 kg 0.8591 6.6223 3.0513 6.6223 kg 3.0606
kg kg kg kg kg kg
1.6 m 0.16 m 2.35m 0.16 m 1 9 i 0.5682
• m: 7m 1.9 m 0.57m
4.44e-6.84e-4.44e-6.84e-4.44e-6.84e-4.44e-6.84e-
004 m2 004 m2 004 m2 004 m2 004 m2 004 m2 004 m2 004m2
1.0197 1.8429 1.0197e-1.8429 1.0197 1.8429 1.0197e-1.8429
e-007 e-007 007 e-007 e-007 e-007 007 e-007
m2·m2 m2·m2 m2·m2 m2·m2 m2-m2 m2·m2 m2-m2 m2-m2:
1.0197 5.5853 , 1.0197e-5.5853 1.0197 5.5853 1.0197e-5.5853
e-007 e-007 I
Mode
GUJI i GUJI
A I A
007 e-007 e-007 e-007 007 e-007
TABLE 7
> Part 3 > Parts ~-------,--,--""a
GUJ/ I GUJIA GUJJ GUJ/
A · A A
Flexible
Default Coordinate System
By Environment
RectT RectT , RectT ! i RectT RectTube2 ube1 ube2 , ube1 I RectTube2 • ube1 RectTube2
13
8e-
m" 005 m" m' m"
6.6223 4.247 6.6223
kg 3 kg kg
0.791 1.9 m 01 m
6.84e-004 4.44e-
m2 004 m2
1.8429e-1.0197
007 m2·m2 e-007
m2-m2
5.5853e-1.0197
e-007
12
Refresh on Update
Centroid
None
Yes
Yes
5.0212
e-002 0. m
m
m' ffi3
0.8591 6.6223
kg kg
0.16 m 1.9m
6.84e-4.44e-
004 m2 004 m2
1.8429 1.0197
e-007 e-007
m2-m2 m2,m2
5.5853 1.0197
e-007 e-007
1 12
None
TABLE 8
2e-
002
4e-
004
m"
9e-
004
m'
0.859 3.835
1 kg 5 kg
0.16 0.714
m 32m
6.84e-004
m2
1.8429e-007
m2,m2
5.5853e-007
1 4
ml
6.6223
kg
1.9 m
4.44e-
004 m2
1.0197
e-007
m2,m2
1.0197
e-007
12
0.224 6e-
17 m 002
9e-Se-
004 004
ffi3 m'
3.835 1.415
5kg 7 kg
0.714 0.263
32m 67m
6.84e-004
m2
1.8429e-007
m2,m2
5.5853e-007
4 2
--~--_M_o_d~el ... B4 > GeC>'!'~try > Part 3 ~-~~a_rt_s_~-~--~--
GUJI I GUJIA GUJ/ I GUJIA I GUJ/ I GUJ/A GUJ/ i G~JtA GUJ/ Al A1 :A: Al A
14
11 RectT ! 11 ube1 I
m, m,
Yes
No
Flexible
Default Coordinate System
RectT
ube1
m3
By Environment
11 RectT I' 11 ube1
RectT
ube1 11 RectT
ube1 11
Refresh on Update
4e-
003
m3
Centroid
None
Yes
Yes
m,
15.132 7.104e 34.366 7.992e e-e-5e-
003 -004 004 -005 003 m, m3
m3 m' m3
3.165 6.6223 9.909 6.6223 9.909 5.5766 8.890 5.5766 2.642 0.6273 8.890
2 kg kg 8 kg kg 8 kg kg 3 kg kg 6 kg 7 kg 3 kg
0.191 19 06 19 06 16 0.538 16 0.16 018 0.538 . m • m . m . m • m 27 m • m m • m 27 m
4.44e-2.104 4.44e-2.104 4.44e-2.104 4.44e-2.104 4_44e-2.104
004 m• e-0023 004 m2 e-0~3 004 m2 e-0~3 004 m2 e-003 004 m> e-0023 ~ m m m ~ m
2
3.690 3.690 3.690 3.690 3.690
1.0197 Se-1.0197 Se-1.0197 Se-1.0197 5e-1.0197 5e-
e-007 006 e-007 006 e-007 006 e-007 006 e-007 006
m2·m2 m2·m m2·m2 m2·m m2·m2 m2 ·m m2·m2 m2·m m2·m2 m2·m
2 2 2 2 2
15
11
I 1.334 1.334 1.334 1.334 1.334
1.0197 8e-1.0197 8e-1.0197 8e-1.0197 8e-1.0197 8e-
e-007 006 e-007 006 e-007 006 e-007 006 e-007 006
4 12 4 10 3 10 1 3 I
None --i
TABLE 9
Model B4 > Geomet > Part 3 > Parts
No
Flexible
Default Coordinate System
By Environment
RectTube1
Refresh on Update
Centroid
None
Yes
--------------------------·--·i
Yes
O.m 0.3m 0.m 0.3m
m
1.3399 1.5156
0.m 0.3m 0.3m e-002 m m
0.m 1.9 m 1.6 m 0.m
16
7.104e-004 m3
1.8837 5.9493 1.8837 4.234e
e-004 e-004 e-004 -005
1.4787 4.6702 1.4787 0.3323
. .,., ....... ., .. ., ..... _5_.5_7_6_6_k_g __ .. ., ........ , ........ kg ...... k9.. kg 7 kg
1.6m 0.4242 1.3399 0.4242 9.536e
6 m m 6 m -002 m
4.44e-004 m2
1.0197e-007 m2·m2
1.0197e-007 m2·m2
None
TABLE 10
l
···················ll!lodel 84) > Geometry ~ Part 3 > Parts
.GUJIA GUJIA GUJIA I G~JI I GUJ/A I GUJIA I G~J/ G~JI G~J/ GUJIA
Meshed
No
Flexible
Default Coordinate System
By Environment
RectTube1
Refresh on Update
Centroid
None
Structural Steel
17
GUJI
A
Yes
Yes
3.9692 1.5604 3.6509 i 8.436 3.6509 1.5604
e-004 e-004 e-004 I e-004 e-004 e-004 8.436e-004 m3
m' m' m' m' m' m' ... --+----+--~--+---+-------,---3.1158 1.2249 2.8659 6.622 2.8659 1.2249 3.1158 6.622
kg kg kg 3 kg kg kg 6•6223 kg kg 3 kg
0.8939 0.3514 0.8222 1 9 0.8222 0.3514 1 9 0.8939 1 9 5m 4m 6m • m 6m 4m • m 5m • m
4.44e-004 m2
1.0197e-007 m2-m2
1.0197e-007 m2·m2
2 12
None
TABLE 11
Model (B4) > Geomet > Part 3 > Parts
GUJ/ I GUJ/ GUJ/ I GUJ/ ! GUJ/ UJI GUJ/ j GUJI GUJ/ GUJI I GUJI
A A A Ai A A A A.A A A
Flexible
Default Coordinate System
By Environment
RectTube1 11 RectTube2
18
m"
m
Refresh on Update
Centroid
None
Yes
Yes
7e-3e-6e-7e-9e-4e-
004 004 004 004 003 004
rn3 m3 m• m3 m" rn3
1.478 4.670 6.62 1.478 23.60 2.419
7 kg 2 kg 23 kg 7 kg 4 kg 7 kg
0.424 1.339 1.9 0.424 1.429 0.450
26m I 9m m 26m • 1m 65m
2.104
4.44e-004 m2 e-003
m2
3.690
1.0197e-007 m2·m• 5e-
006
m2·m2
1.334
1.0197e-007 m2-m2 8e-
006
TABLE 12
4e-5e-
004 004
m, m•
92 rn
0.141 5.021 2e-43 rn 002 m
4e-4e-
004 004
rn3 ll)3
0.859 1.415 2.419 0.859 I
1 kg 7 kg 7 kg 1 k '
0.16 0.263 0.450 0.16
m 67 m 65 rn m
6.84e-004 m2
1.8429e-007 m2·rn2
5.5853e-007 m2·rn2
Model B > Part 3 > Parts
GUJIA : GUJ/A GUJ/A I GUJ/ G~JI GUJIA !
19
11
0.m
0.5107
9 rn
m3
Yes
Flexible
Default Coordinate System
By Environment
i
___ R_e_c_tT_u_b_e1___ ~----R-ec_t_Tu_b_e_1 __ --_---ii
Refresh on Update
Centroid
None.
Yes
Yes
7.9454 0.5798 7.9454e-0.5798 0.51151 rn e-002 0. rn m 002 rn m m rn
0.m i 1.9399 0.m ' m
m' 004 m3 m' m' m3 005 m3
m3
8.4364 0.2769 1.7828 kg 0.2769 32.041 2.0208 0_27693 kg 2.0208
kg 3 kg 3 kg kg kg kg
0.5107 7•9454 1
9 m e-002 : 0.51151 m ::cio5
2
4 1.9399 0.5798 7.9454e-0.5798
m m 002 rn m m rn
2.104e-003 2.104e
4.44e-004 m2 -003 rn2 m2
4.44e-004 m2
3.6905e-006 3.6905
m2-m2 1.0197e-007 m2•m2 e-006
m2-m2
1.0197e-007 m2•m2
1.3348e-006 1.3348
1.0197e-007 m2-m2 e-006 1.0197e-007 m2-m2
20
3 7 5 7 5 25 9 3 9
1 3 2 3 2 12 4 1 4
None
TABLE 13
Model B4 > Geomet > Part 3 > Parts
GUJI I GUJ/ GUJ/ GUJ/ ! GUJI f GUJ/ I GUJI i GUJ/ 1 GUJI GUJI GUJI
A i A I A A A A A'A'A A A
Flexible
Default Coordinate System
By Environment
RectTube1
Refresh on Update
Centroid
None
Yes
Yes
le-1e-0. m 9m 002m 002m
0.358 0.146 5.812 9.343 0.328 2.753 2.753 0.475 0.358 4e-1e-6e-0.m 6e-37 m 61 m ,003m 003 m 43m 002 m 002m 04m 37m
1.889 1.555 1.623 2.610
3e-4e-Be-2e-4e-ffi3 4e-m3 Be-3e-
21
004 004 005 005 004 004 I 004 004
m3 m3 m" ml m3 m3 m" I ml m3 ' 1.483 i 1.221 0.127 0.204 2.735 0.448 5.57 I 0.448 3.956 1.483
1 kg , kg 47 kg ~~g 3 kg_ kg 66kg_ kg 3 kg 1 kg
0.425 0.350 3.657 5.878 0.784 0.128 1.6 0.128 1.135 0.425 2e-8e-m 53m 32m 002m 002 m 78m 54m m 54 m 1 m 53m
4.44e-004 m 2
----......................... ,_,._ ....
1.0197e-007 m2-m2
1.0197e-007 m2 -m2
2 1
TABLE 14
Model 84 > Geomet > Part 3 > Parts
Flexible
Default Coordinate System
By Environment
RectTube1
___________ R_e_f-re_s_h_o_n_U_p_d_a-te·-----·==····-······-·'. _ Centroid
None
Yes
22
m
Yes
7.104e-004 I 1.7511e-
m3 : 004 m3
!
5.5766 kg
1.6 m
1.3746kg
0.39439 m
m3 rn3
6.273 ! 0.17 4
7 kg 1 27 kg
l 5.e-
1.8 rn I 002 m
4.44e-004 m2
1.0197e-007 m2-rn2
1.0197e-007 m2-m2
TABLE 15
rn3 m3
5.228
1 kg
1.5 m 5.e-
002 m
9
___ e_t~~ :-. .. f:'ctrt,3 > Parts ............. , ...................... , .......................... , ...................... ,
IA I GUJIA I G~J/ G~JI G~J/ GUJIA G~JI
Flexible
Default Coordinate System
____________ s_y_E_n_vi-ro_n_m __ e_n_t ________ ~ I.
RectTube1 I
Refresh on Update
23
Centroid
None
Yes
Yes
5e-6.707 7e-7e-2e-3.552
004 e-004 004 004 004 e-004
m3 m3 m3 m' m3 m3 rn3 m3 m'
4.696 5.265 6.059 1.725 i 1.394 2.788 1.394 4.999 2.788
3 kg kg 2 kg 2 kg I 2 kg 3 kg 2 kg 8 kg 3 kg
1.347 1.510 1.738 I 0.494 J04 0.8m 0.4m 1.434 0.8 rn 4m 6m 4 m : 97m: • m 5m
4.44e-004 m2
1.0197e-007 m2·m2
1.0197e-007 m2·m2
TABLE 16
_____ M--.--o_de_l_,(_B4) > Geometry~>_P_a_rt..,..3_>_P_a..,..rt_s_~-~-~,----.......,
GUJIA GUJifGUJI I GUJI r-··GUJIA GUJ/ 1 GUJI GUJI GAUJI :.i GUJIA
__ _._ __ ..i..,.A i A 1 A i A ! A A
24
m2
4.9998
kg
1.4345
m
No
Flexible
Default Coordinate System
RectTube1
ml
1.7252 0.52281 kg kg
0.4949 0.15 m 7m
4 .44e-004 m 2
1.0197e-007 m 2-m2
1.0197e-007 m 2·m2
By Environment
RectTu
e2
Refresh on Update
Centroid
None
Structural Steel
Yes
Yes
ml 004 m3
m3
4.531 7.7024 0.522
kg kg 81 kg
1.3 m 1.4345 0.15
m m
6.84e-
004 m 2
1.8429e
-007
m 2·m2
5.5853e
-007
1 8
None
25
RectTube1
004 m 3
m3
1.7252 kg 0.522
81 kg
! 0.15 I o.49497 ~ m
4.44e-004 m 2
1.0197e-007 m 2-m2
1.0197e-007 m 2-m2
e-004
m3
5.4373
kg
1.56 m
TABLE 17
---,------,--M_o_d.-e_l ~8_4)._~ Geomet_ry > Part 3_>~P_a_rt_s--,---.----,-··· .. ·~·
G~JI GUJIA GUJIA I G~J G JI
Flexible
Default Coordinate System
By Environment
RectTube1 RectTu RectTu I
be2 be1 RectTube2
Refresh on Update
Centroid
None
Yes
Yes
0.m
1.3 0.35 0.15 1.963
m m m 8m m
0.35
5.9518 6e-6e-2e-e-004 004 004 003
m3 m3 m3 m3 m3 m3 m3 m3
4.53 4.672 4.2955 4.6722 2.657 0.80 10.54
1 kg 2 kg kg kg 7 kg ' 541 4 kg I kg
26
GUJI GUJIA GUJIA A
1.336
2m
Se-
004
m•
7.174
5 kg
RectTu I RectTu
be1 1 be2
2.3m 0.m
1.0282 1.3362 e-014 m m
1.0212 9.1395
e-003 e-004
m3 m•
8.0164 7.1745
kg kg
1.340 0.8m 1.3405 0.494 0.15 1.963 1.336 2.3m 1.3362
Sm m 97m m 8m 2 rn m
4.44e-004 rn2 6.84e-4.44e-6.84e-004 rn2 4.44e-6.84e-
004 m2 004 m2 004 m2 004 m2
1.0197e-007 1.8429 1.0197 1.0197 1.8429
e-007 e-007 1.8429e-007 m2•m2 e-007 e-007 m2,rn2 m2,rn2 m2-m2 m2,rn2 m2-m2
1.0197e-007 5.5853 1.0197 1.0197 5.5853
e-007 e-007 5.5853e-007 m2•m2 e-007 e-007
TABLE 18
Model B4 > Geomet > Part 3 > Parts
Flexible
Default Coordinate System
By Environment
RectTube1 ectTu I RectTube1 I RectTu I
-----.. ········· .............. ,.. .. _b_e_2__,I____ ........................ 1 .. be2 :
Refresh on Update
Centroid j
None
Yes
Yes
ZJ
1.15 m 0. m 1.15 0.m 2.3m 0.m m
0.267 0.267 1.6036 ' 1 •028 1.6036 0.m 0.m I 2e-0.m 44m 44m m 1014 m m
0.m I 1.5 m
1.0969e 6.66e-1.0969e 5.106e-004 m3 004 e-
-003 m' 004 -003 m3
m' ma m3 m3 m' m"
5.310 4.008 5.310 8.6105 15.228 8.016 5.22 8.6105 4.0082 kg 5 kg 2 kg 5 kg kg I 1 kg 4 kg 81 kg kg
1.15 m ! 1.523 1.15 1.523 1.6~3611.5 m 2.3m 1.5 1.6036
7m m 7m m m ,,,,m,_,~,,,,,~~~~,
4.44e-004 m2 6.84e-4.44e-004 m2 6.84e-
004 m2 004 m2
1.8429e 1.8429e
1.0197e-007 rn2•m2 -007 1.0197e-007 m2•m2 -007 m2,m2 m2,m2
5.5853e 5.5853e
1.0197e-007 m2·m2 -007 1.0197e-007 m2·m2 -007
No
Flexible
Default Coordinate System
By Environment
RectTube2 I RectTu RectTu RectTu
! be1 be2 be1 ............. .,., .. ! __ ~--~---'
28
m
Refresh on Update
Centroid
Yes
Yes
0.35 O 0.35 .m m m
0.35 0.8 0.35
6e-6e-e-6e-e-
004 004 004 004 004
m3 m3 m' m3 m3 m3
4.29 2.657 0.805 2.657 0.805 55 7 kg 41 kg 7 kg 41 kg kg
0.494 0.8 0.494 0.15 0.494 0.15
97m rn 97m rn 97 rn m
6.84e-004 rn2
1.8429e-007 m2·m2
5.5853e-007 m2·m2
TABLE 20
m
1.696 0_35 m 1.9638 0.2253
4m m 7m
3e-e-004 003
m3 n,3 m3 m'
9.108 1.7252 10.544 4.7377
5 kg kg kg kg
1.696 0.4949 1.9638 1.3593
4m 7m rn m
4.44e-6.84e-4.44e-
004m" 004 m2 004 rn2
1.0197 1.8429 1.0197
e-007 e-007 e-007
n,2-n,2 n,2,m2 n,2-n,2
1.0197 5.5853 1.0197
e-007 e-007 e-007
8
Model B4 > Geomet > Part 3 > Parts ---,----,---"
GUJ/ GUJIA : GUJ/ GUJ/ : GUJI : GUJ/ i GUJ/ GUJ/ GUJI GUJI
A A A A A A A A A
29
m' m'
5.265
kg
1.510
6m
4.44e-004 m2
1.0197e-007
rn2-m2
......................
1.0197 e-007
m2-m2
No
Flexible
Default Coordinate System
RectTu
be2
By Environment
RectTube1
Refresh on Update
Centroid
None
Yes
Yes
1.6964 0.15 1.738 0.15 : 1.56 0.m 0.35 O .m m
0.8 0.35 0.8
7e-Se-
m3 m' 004 m' 004
m3 m' m' m3 m3
-~y;
9.1085 0.522 6.059 0.522 I 5.437 2.78 1.725 2.78
kg 81 k~t 2_.!s~ 8 ~9-L~-kg 83 kg -~ kg 83 ~g
1.6964 0.15 1.738 0.15 : 1.56 0.8 0.494 0.8
m m 4m m m m 97m m
6.84e-4.44e-004 m2
004 m2
1.8429
e-007 1.0197e-007 m2·m2
m2-rn2 ···························••-l-••·············· 5.5853
e-007 1.0197e-007 m2-m2
m2·m2
30
7e-
004
m3
1.725
2 k~L
0.494
97m
··--1
I
RectTube1
Flexible
Default Coordinate System
By Environment
Refresh on Update
Centroid
None
Yes
Yes
0.15 0.35
m m
0.35
m' m3
31
RectTube2
m'
2e-
003
m' m•
RectTu
be1
1.0212e
-003 m•
4.531 i \,~2 1.725 7.702 7.197 12.35 7.197 8.0164
kg k 2 kg 4 kg 7 kg kg 7 kg kg
1.3 m 0.15 0.494 1.340 1.340 2.3m m m m 97m 5 m ! 2.3 m Sm
4.44e-004 m2 6.84e-004 m2 4.44e-
004 m2
1.0197e
1.0197e-007 m2-m2 1.8429e-007 m2·m2 -007
m2-m2 I
1.0197e
1.0197e-007 m2-m2 5.5853e-007 m2 •m2 -007
TABLE 22
Model B4 > Geomet > Part 3 > Parts
Flexible
Default Coordinate System
By Environment
R_e_c_n_u_b_e_1 ____ J~:~~ub I Re~t{u~J RectTube2
Refresh on Update
Centroid
None
Structural Steel
Yes
Yes
32
5.9518e-6.3692e-9.812e-6.473e-9.169 1.5732 9.169 9.812;
004 m3 004 m3 004 m3 004 m3 e-004 e-003 e-004 e-004 !
m3 m3 m3 m' m' !
4.6722 kg I 4.9998 kg 7.7024 5.0813 7.197 12.35 :7.197 7.702[
! kg kg 7 kg kg i 7 kg 4 kg i
1.3405 m I 1.4345 m 1.4579 1.340 2.3m 1.340 1.434 i
m Sm Sm Sm
4.44e-004 m2 6.84e-4.44e-6.84e-004 m2
004 m2 004 m2
1.8429e 1.0197e
1.0197e-007 m2•m2 -007 -007 1.8429e-007 m2·m2
m2·m2 m2·m2
5.5853e 1.0197e
1.0197e-007 m~·m2 -007 -007 5.5853e-007 m2-m2
TABLE 23
.................................... -~M_o_d~e!__(.~~) > Geomet,~y > Part 3 > Parts
GUJJ GUJ GUJ Surface Surfac Surfa Surfac Surfac Surfac Surfac
A IA IA Body e e e e e Body Body Body Bod
No
Flexible
Default Coordinate System
By Environment
RectTube1
Refresh on Update
Centroid Middle
33
Beam
Structural Steel
0.m
0.m 0.13297 m
5.9037e-
005 m'
622i 0.46344
__ kgJ__ kg
9 mi 0.13297 m
4.44e-004 m2
1.0197e-007 m2·m2
1.0197e-007 m2•m2
None
Shell
30
1.Be-002 m
Refresh
(copoly
mer,
heat
resistant
m
m
1.163e-i
002 m3 \ i i
13.491
Yes
Yes
0.3m
9m 0.3m
6e-
002 m' ml
13.57 \ ! 42.87
k9. 9kg ... J_kgj
-6.3575 6.559 6.409 m 8m 8m
2.4799 m 3.299
8m
-2.7 m
34
Manual
Wood, Oak
le-
002m
1.515
0.m 6e-
002m
1e-3e-
002 003
m3 m3
18.91
1 k
5.964 5.621
3m 7m
3.449 i 3.442
8m ! 3m
-1.75 m
79 m
0.280 0.284
54m 84 m
3e-9e-
002 002
m3 m3
11.241
6 kg 1
! -~ ' i
5.150 4.622 i
2m 9m
3.294 3.011
4m 7m !
3.3886 19531 4.2881 5.~89 o.5i8 8.606 3.~99
kg·rn2 kg·m2 :_·_ kg·rn2
---------+---l---'kg·rn2 kg·_rn2
___ kg·rn2 kg_-_rn2
__
0.15779 12.9 4.0484 ! 6.239 0.920 10.51 3.383
5 33 1 3 kg·rn2 kg·m2 • • _kg·rn~_kg·m2 kg·m2 __ kg·m2 ___ kg·rn2 !
2.312 •
3.5464 6.415 0.203 i 0.550 4e-1.905 0.115 i
6 65 1 38 1 76 I 003 kg·m2 kg·m2 I kg·m2 kg·m2 kg·m2 kg·m2 j kg·rn2
0.64612 2.545 0.806 1.122 0.181 1.698 0.667
74 m2 i
TABLE 24
Model B4 > Geomet > Part 3 > Parts
Surfa Surfac ! Surfa I Surfa Surfac i Surfac Surfac Surfac Surfac Surfac
ce e 1 ce 1 ce e e e e e e
Bod Body ! Bod i Body Body \ Bod Body Body Body --Body
30
Flexible
Default Coordinate System
By Environment
1.8e-002 rn
Manual
Middle
None
35
m3 m3
10.88
2 kg
--4.52 6.357 m Sm
2.479
2m 9m
-1.75 -0.8
m m
2.733
4
_kg·m2_
0.127
28
kg·m2
2.860
7
kg·m2
0.646
Surfa
ce
Body
Yes
Yes
5.021
2e-0.22417 m
002m
2.443e-002
m3 m3 m3
5.120 22.859 kg 5.120
2 kg 2k
---4.596 5.011 5.689 6.104 m 3m 3m m
1.841 1. 704 ! 1.480 1.343
9m 7m 6m 4m
-1.75 m
1.540: 6.8767 1.540
3 ' 3 ! kg·m2
kg·m2_.: .. kg:m2
1.551 : 7.8487 1.551
2 kg·m2 2
kg·m2 ! kg·m2
1.092 1.092
3e-0.97198 3e-
002 kg·m2 002
.. kg·m2 kg·m2
0.304 1.3572 m2 0.304
TABLE 25
m3
3.840
-4.46
m
1.867
m
1.155
2
.. kg:_m2
_
1.159
8
·m2
4.608
1e-
003
kg·m2
0.228
7m
0.548
77m
4e-
002
m3
46.63
4.115
1m
1.592
7m
-0.95
m
47.60:
0.22417 m
2.0572e-002
m3
19.25 kg
-5.011 5.689 m 3m
1.704 1.480
7m 6m
2.428 3.788 Se-
017 m 5e-
015 m
1 j4.1066kg·m2
~g·m2 !
50.03 i
2 j 4.9251 kg·m2
kg·m2 :
2.431 0.81851 4 kg·m2
kg·m2
2.768 1.1429 m2
Model 84 > Geomet > Part 3 > Parts ...
Surfa Surfa Surfa Surfa Sulfa Surfa Surfa i Sulfa
ce ce ce ce ce ce ce ce
Bod Body Body Body Body BodY.. ... Body Body__
36
e-003
m3
4.311
7 kg
6.104
3m
1.343
4m
1.002
9e-
015 m
0.919 1
83
kg·m~
0.929
03
kg·m2
9.198
10
Surfa
ce
__ Body __
4e-
002 m3 002
m'
67.1 kg 28.88
I 9 kg. !
6.180
3m 3m
2.403
m
No
3D
Flexible
Default Coordinate System
By Environment
1.8e-002 m
Manual
Middle
Refre
sh on
Updat
e
5.e-003 m
Manual
........... -..................... -~--........................... 1
None .
Wood, Oak
Yes
Yes
1e-8e-
002 002
m3 ma m' -··· 11.46 34.04 10.62
7 kg g 8 kg
6.065 4.597
6m 6m 2m
3.118 3.560 3.8m 2m 5m
37
0.113
04 m'
m3
47.97
6 kg
5.290 -0.47
1m m
1.867 3.8m m
Plastic, PC
(copolymer, heat
resistant)
4e-7e-
002 002
m' m'
11.89
9 kg
2.294 -1.05
9m 3m m
1.825 1.560 1.469
m 1 m 9m
1.618 1.834 6.952 2.529 1.767 3.554 1.075 3.168 -0.95 m 2e-Se-4e-2e-0.m 9e-Se-6e-1e-017 m 016 m 009m 016 m 017 m 003 m 003m 017m
75.743 8.929 2.619 7.265 2.267 10.23 5.641 2.439 2.284 1.966
kg·m2 6 4 2 3 5 1 3 8 1
kg·m2 kg·m2 kg·m2 kg·m2 kg·m2 kg·m2 kg·m2 ~g-m2 kg·m2
68.498 6.163 2.446 11.79 2.405 22.90 548.8 4.766 4.095 3.086
3 1 6 1 1 kg·m2 kg·m2 kg·m2
kg·m2 kg·m2 kg·m2
kg·m2 kg·m2
7.2449 2.766 12.67 1.811 1.12
kg·m2 7 1 7 kg·m2
1.752
TABLE 26
84 > Geomet > Part 3 > Parts
Surface Surface Surface 1
1
' Line i Line
__ B_o~dy~_~_B_o_d~y_ Body I Bod_y J Body
Line I Line
Body.J Body
Meshed
3D
Flexible
Default Coordinate System
By Environment
5.e-003 m
Manual
Middle Centroid
None
Shell
38
0.40379 m 0.33619 i 0.33619
I
002 n,3 002 m3 003 m' 2.0006e-004 rn3
12.881 kg 11.899 k!;L 10.163 kg_.+-! _____ 1_.5_70_5_k~g~-----;
2.7319 m . 1.3443 m 0.1 m
1.5601 m
1.0755e-
003 m
I 1.4699 m 1
2.2848
.,."---+-.kg·m2
1.9661 I
kg·rn2 i ·----· .. ··· .. ·· .. ············ .. ······· ........ ., .... .
kg·m2
2.3323
kg·m2
4.0953
kg·m2
1.8117
3.0861
kg·rn2
1.12
kg·m2 I kg·m2
--+--------------!
2.0515 rn2 I 1.7522 m2 I : i
0.45058 0.45059 rn ! 0.45058
m rn
4.44e-004 m2
1.0197e-007 m2-m2
None
TABLE 29
Cross Sections > RectTube1
1 RectTube2 /1
Imported
39
4.e-002 m 0.1 m
3.e-003 m 8.e-003 m
3.e-003 m 8.e-003 m
3.e-003 m 6.e-003 m --------<----3.e-003 m
4.44e-004 m2 6.84e-004 m2 2.1 04e-003 m2
1.0197e-007 m2•m2 : 1.8429e-007 rn 2-m2 3.6905e-006 m2 -rn2
1.0197e-007 m2·m2 I 5.5853e-007 m2·rn2 1.3348e-006 m2 -rn2
Coordinate Systems
Connections
Mesh
TABLE 30
84 > Coordinate s stems > Coordinate sy~tem
/obal Coordinate System
Fully Defined
TABLE 31
TABLE 32
40
Static Structural (B5)
Mechanical
Yes ··~-----···························· efault (8.0642e-004 m).
Yes
Default ( 1.6128e-003 mt
Default (0.5236 rad)
No
11.264 m
None
Smooth Transition
0.272 ----2
1.2
s
16e-003 m)
B4 > Anal sis
41
Static Structural (B5)
Solved
TABLE 34
> Static Structural B5 > Anal sis Settings
Analysis Settings
Fully Defined
_________ P_r_o9,ram Controlled
Off
Off
Program Controlled
Program Controlled
Program Controlled
Program Controlled
Program Controlled
Program Controlled
Program Controlled
No
Yes
Yes
No
No
Yes
42
Yes
No
No
\4.youle\BRIDGE\LANGQIAO~SHUWU_files\dpO\SYS\MECH\
None
No
Program Controlled
Yes -----------No
Active System
mks
TABLE 35
> Static Structural B5 > Accelerations
Standard Earth Gravity i Acceleration
Fully Defined
bal Coordinate System
0. rn/s2 (ramped)
-9.8066 m/s2 (ramped)
__ 0_._m/s2_(ramp,__e_d_,_) _ __, --------1
No
-Y Direction Defined
Vector
7.17 m/s2 (ramped)
FIGURE 1
Model (84) > Static Structural (85) > Standard Earth Gravity
43
·] .. &ti::$·················································································----························-----·····································································································"'
l..
FIGURE2
Model (84) > Static Structural (85) > Acceleration
;.>_.n ···························································································································································································································································································•
4.
I.
1.
TABLE 36
Model B4 > Static Structural B5 > Loads
Pressu Pressu Pressu
re re2 re3
44
Faed F~ed F~ed F~ed
Supp Supp Supp Supp
ort 5 ort 6 ort 7 ort 8
Geometry Selection
1 Face 4 6
Components
Surface Effect
Deformed
Global Coordinate
System
0. Pa (ramped)
-1600. Pa (ramped)
0. Pa (ramped)
No
FIGURE 3
1 Vertex
Model (B4) > Static Structural (B5) > Pressure
FIGURE4
Model (84) > Static Structural (85) > Pressure 2
45
1.
ti=. ·G·,;;,~ ..,,._ .,. .......... ,,,....,.,.,. ....... ,.. . .,,....,.,.,..,..,.. ..... ,.. ..... ,..,., ............... _ ...... .,. ... -....................... ,..,,,.,.. .... ., ...................... .,. .... ,..,~ ........... .,. .... .,, ....... .,.. ...... .,,. .... ,...,,,.,,,,..,. .......... ,..,,,,,,,.,,...,,_., .~,,,.,.. .....
t.
FIGURE 5
Model (B4) > Static Structural (B5) > Pressure 3
•HlOO. ••
J.
TABLE 37
Model B4 > Static Structural B5 > Loads
Fixed Fixed Line
Suppa Suppa
rt10 rt11 e
Line Line Line Line I Line
Pressur Pressur Pressur Pressur ,
e3 e4 e5 · e6
46
No
Components
Global Coordinate System
-750.
Nim 0. Nim (ramped) . (rampe
• d)
750.
Nim
-750.
N/m
{rampe (rampe
d) d)
0. N/m (ramped)
0. Nim (ramped)
FIGURES
Model (B4) > Static Structural (B5) > Line Pressure
750.
Nim
(rampe
d)
?"SQ ··············································································································································································································································································s•
FIGURE7
Model (84) > Static Structural (85) > Line Pressure 2
47
!..
FIGURE 8
Model (B4) > Static Structural (B5) > Line Pressure 3
L
-t. ···8·,;"·"·---· .. ·"--"·--·"'· .. · .. · .. ·--· .. · .. ·•· .. ·"· ....... · .. · .. · .. · .. ·"'·-""'·""·w.· .. • .. ·--· .. ···"'·"·"· ...... • .. ·"'·"'·"'·""· ........ • .. • .. • .. • .. ·--· .. • .. ·"'· .. • .. ·--· .. ·"'·"'·"·---· .. • .. • .. • .. ·---·"'· .. • .. • .. ·"'--·
·-100 •
FIGURE9
Model (B4) > Static Structural (B5) > Line Pressure 4
48
!$4 ................................................. .
FIGURE 10
Model (B4) > Static Structural (B5) > Line Pressure 5
l,
t. ··~· ,·•·----·•·•·····--·······---·•·•·•·•·•·---·•·•·····---·······---·······•·---·•·•·•·•·--··" "--···········---·•·•···---·•·•·•·•·---·•·•·•·•·---· .,
;;~:{t .... ______ ................................................. _________ .............................................................................. _____ ......... ..
1.
FIGURE 11
Model (B4) > Static Structural (B5) > Line Pressure 6
49
;?SQ:, ............................................................... .c •••••••••••••••••••••••••••••••••••••••••.•••••••••••• • •.• •• .. ································.·········································"'············V·.·······························································
t.
Solution (B6)
TABLE 38
50
TABLE 40
All FE Connectors
All Nodes
Connection Ty e
No
Single
Lines
B4 > Static Structur':1:I{~~)?.'.~t:>.!.':'tion (B6) > -~-~~ults
Equivalent Stress
Solved
Time e--------································ Last
Yes
FIGURE 12
Model (B4) > Static Structural (B5) > Solution (86) > Equivalent Stress
51
.... I. ......
TABLE 41
Model (B4 > Static Structural B5 > Solution B6 > E uivalent Stress
~1Un!m9'lli[~~1I ~~~jitnµffl;![EJ~j:1 ]lvgr~g~?f!Ri
5019. 1.9503e+007 1.3602e+006 I
TABLE 42
Model (B4) > Static Structural BS > Solution (B6) > Beam Tool
Beam Tool
TABLE 43
> Static Structural (85) > Solution (B6) > Beam Tool> Results
Direct Stress Minimum Combined
Stress
Solved
Stress
Time
Last
Yes
52
Maximum Combined
Stress
Stress
1.8967e+007 Pa
-2.0641 e+00S
Pa
1.6499e+007 Pa
-1.6131e+007 Pa
GUJIA
FIGURE 13
1.2713e+008 Pa
1.5718e+007 Pa
Model (B4) > Static Structural (85) > Solution (86) > Beam Tool > Direct Stress
'i. ....
[sI
TABLE 44
FIGURE 14
Model (84) > Static Structural (BS) > Solution (B6) > Beam Tool > Minimum Combined
Stress
53
.... I. .....
[SJ
TABLE45
Model (84) > Static Structural (85) > Solution (86) > Beam Tool> Minimum Combined
Stress
FIGURE 15
Model (84) > Static Structural (85) > Solution (B6) > Beam Tool > Maximum Combined
Stress
i ....
54
TABLE 46
Model (84}.> Static Structural (85} > Solution (86) > Beam Tool> Maximum Combined
Stress
TABLE47
Model (B4) > Static Structural B5) > Solution (86} > Probes
I i Mome Force Force Force , Force Force Force Force I Force Force Force t
Reacti Reacti Reacti I Reacti Reacti Reacti Reactii Reacti Reacti Reacti R n f
on on 3 on 4 on 5 on 6 on 7 on 8 -1
1 on 9 on 10 on 11 eac 1
, . on
Solved
Force Reaction
Boundary Condition
Reacti
on
Fixed Fixed Fixed Fixed Fixed Fixed Fixed Fixed Fixed Fixed
Supp Supp Supp Supp Supp Supp Supp Supp Supp Supp
ort 3 ort 4 ort 5 art 6 ort 7 art 8 ort 9 art 10 ort 11 ort
Global Coordinate System
No
1746. 1225. 101.1
1 N 6N 4N
6230. 8698. 2951. 187.7 60.22 5391. 3903. 3417. 5170. 1.366
4N 1 N 4N 9N N 2N 6N 7N 5N 2N·m
3364. 2084. 3619. 414. 3142. -3086. 2163. 1994. 2884. 1 N N 6N N 4N N , 9N 7N 7N
6212. 14465.
7 N , 2 N
1327. 1937. 1746. 1225. 101.1 224.6
2N 7N 1 N 6N 4N 6N
6230. 8698. , 2951. 187.7 60.22 5391. 3903. 3417. 5170.
4N 1 N J 4N 9N N 2N 6N 7N SN
55
3364. 2084.13619. 414. 3142.
1N N 6N N 4N
1327. 1937. 1746. 532.4 1225.
2N 7N 1 N N 6N
6230. 8698. 2951. 187.7 60.22
4N 1 N 4N 9N N
........................ ...............
3364. 2084. 3619. 414. 3142.
1 N N 6N N 4N
FIGURE 16
96.79
8N
5391. 3903.
2N 6N
-3086. 2163. N 9N
101.1
4N
3417.
7N
1994.
7N
2884.
7N
224.6
6N
5170.
SN
2884.
7N
1.366
2N·m
723.6
Model (84} > Static Structural (85} > Solution (86) > Force Reaction
[SJ
I , _____ .,_..,,,,,""'~~
TABLE 48
56
FIGURE 17
Model (B4) > Static Structural (B5) > Solution (B6) > Force Reaction 3
z ......
TABLE49
FIGURE 18
Model (B4) > Static Structural (B5) > Solution (B6) > Force Reaction 4
[sJ
57
TABLE 50
FIGURE 19
Model {B4) > Static Structural {B5) > Solution {B6) > Force Reaction 5
{s]
TABLE 51
FIGURE 20
Model (B4) > Static Structural (B5) > Solution {B6) > Force Reaction 6
58
[s]
TABLE 52
FIGURE 21
Model {B4) > Static Structural {B5) > Solution {B6) > Force Reaction 7
z .....
[SJ
59
TABLE 53
FIGURE22
Model {B4} > Static Structural {B5} > Solution {B6) > Force Reaction 8
[sl
TABLE 54
FIGURE23
Model {B4} > Static Structural {B5} > Solution {B6) > Force Reaction 9
{s]
TABLE 55
FIGURE24
Model (84) > Static Structural (85) > Solution (86) > Force Reaction 10
{s}
61
TABLE 56
FIGURE25
Model (B4) > Static Structural (B5) > Solution (B6) > Force Reaction 11
[SJ
TABLE 57
FIGURE26
Model (84) > Static Structural (B5) > Solution (B6) > Moment Reaction
62
E i· ......
[S)
TABLE 58
TABLE 59
Model B4 > Static Structural B5 _> Solutic:>f.:1 (~~1 :,.:~~~~~~ -~--~
Mame Mame Mame Mame Mame Mame Mame Mome Mame
~ ~ ~ ~ ~ ~ ~ ~ ~
Reacti Reacti Reacti Reacti Reacti Reacti Reacti :
on 3 on 4 on 5 on 8 on 9 on 10 on 11
Boundary Condition
Fixed Fixed Fixed Fixed Fixed Fixed Fixed Fixed
Fixed Support Suppo Suppo Suppo Suppo Suppo Suppo Suppo Suppo 3 rt4 rt5 rt6 rt7 rt8 rt9 rt10 rt11
Global Coordinate System
Centroid
63
330.17 N·m 259.72 350.62 39.831 315.93 25;8.7 1543.3 1447.9 2391.7
N·m N·m N·m N·m N·m N·m N·m N·m
_56 _589 N·m 14_;54 26.864 43_849 50.432 -14.88 8_8;19 4.1229 8.6222
N·m N·m N·m N·m N·m N·m N·m N·m
672.35 N·m 830.87
N·m
826.95 215.84 630.6
N·m N·m N·m
27_~72 60_~05 45N.665 110.17
N·m N·m ·m N·m
870.64 898.61 223.82 j 707.11
N·m 1 N·m
2518.9 1544.6 1448.7 2394.3 !
259.72 350.62 39N.831 3N15.93125;8.7 1543.3 1447.9 23~1.7
N·m N·m ·m ·m N·m N·m N·m N·m
,!
I
_56_589 N·m 14_~54 26.864 43_~9 50.432 -14.88 8_8~19 4.1229 8.6222
N·m N·m N·m N·m . N·m N·m N·m ) N·m
672.35 N·m
N·m N·m
3~~!3 / 25; 8.711543.3
I N·m N·m N·m N·m i
_56 _589 N·m 14_~54 i 26.864 43_~49 50.432 -14.88 8_8~19 4.1229 8.6222 i
N·m N·m N·m N·m N·m N·m N·m N·m 1
672.35 N·m . 83~.87 8~~!5 215.84
1 N·m • N·m
630.6 27 .~72 i 60 -~05 45.665 110.17 N·m I N·m N·m N·m • N·m
j 870.64 I 898.61 223.82
• N·m N·m
707.11 I 2518.9 i 1544.6 i 1448.7 J 2394.3
N·m I N·m • N·m N·m • N·m
1 ---------------~_,,,,, _____________________ ,
1
1
FIGURE 27
Model (B4) > Static Structural (B5) > Solution (86) > Moment Reaction 2
64
e . . z• .....
e • z· .....
{s}
TABLE 60
FIGURE28
Model {B4) > Static Structural {B5) > Solution (B6) > Moment Reaction 3
[s}
65
TABLE 61
FIGURE29
Model (84) > Static Structural (85) > Solution (86) > Moment Reaction 4
E . ' z• .....
[s)
TABLE 62
FIGURE 30
Model (84) > Static Structural (85) > Solution {86) > Moment Reaction 5
...... ,..,.,.. ....... , ..• cw ...• w··
~ ~
(s)
TABLE 63
FIGURE 31
Model {84) > Static Structural {85) > Solution {86) > Moment Reaction 6
[SJ
6l
TABLE 64
FIGURE 32
Model (B4) > Static Structural (B5) > Solution (B6) > Moment Reaction 7
(s]
TABLE 65
FIGURE 33
Model (B4) > Static Structural (85) > Solution (86) > Moment Reaction 8
68
(S}
TABLE 66
FIGURE 34
Model (B4) > Static Structural (B5) > Solution (B6) > Moment Reaction 9
[s)
69
TABLE 67
FIGURE 35
Model (B4) > Static Structural (B5} > Solution (86} > Moment Reaction 10
TABLE 68
FIGURE36
Model (B4) > Static Structural (85) > Solution (86) > Moment Reaction 11
70
Reaction summary
{s}
TABLE 69
TABLE 70
reaction summary
71
Fx Fy Fz Mx My Mz
1509.5 N 6334.7 N 2004.1 N 270.21 N·m 1.3662 N·m -723.68
N·m
-1327.2 6230.4 N 3364.1 N 330.17 N·m -56.589 672.35 N·m N N·m
1937.7 N 8698.1 N 2084. N 259.72 N·m -14.954 -830.87
N·m N·m
Maximu -1746.1 2951.4 N 3619.6 N 350.62 N·m 26.864 N·m 826.95 N·m
m N
Dynamic 532.4 N -187.79 414. N 39.831 N·m -43.849 -215.84
and static N N·m N·m
loads -1225.6 60.22 N 3142.4 N 315.93 N·m 50.432 N·m 630.6 N·m N
96.798 N 5391.2 N -3086. N -2518.7 -14.88 N·m -27.672
N·m N·m
130.53 N 3903.6 N -2163.9 -1543.3 -8.8919 -60.905
N N·m N·m N·m
-101.14 3417.7 N -1994.7 -1447.9 4.1229 N·m 45.665 N·m N N N·m
-224.66 5170.5 N -2884.7 -2391.7 8.6222 N·m 110.17 N·m N N N·m
•···•m~·~~;N,ca1:a6ch9r it(rnm:v i {{ . ··• .... >· C ;Witfl ••·••i':\i)• •. •
M10 700 520
M12 1030 740
Since Fy positive is press on the metal plate. Also one plate have 4 mechanical anchors
Fx and Fz is within 4 x Shear force, Fy negative within 4 x tensile force, mechanical
anchor is suitable.
72
OFFICE USE ONLY SAN DIEGO REGIONAL
HAZARDOUS MATERIALS
QUESTIONNAIRE
RECORD ID# _________________ _
PLAN CHECK# ________________ _
Business Name
KIDS& COFFEE
Business Contact
KEN LI
BP DATE
Telephone#
(646) 801-0221
Project Address (indude suite)
2310 CAMINO VIDA ROBLE, SUITE 101 CiCARLSBAD State
CA
Zip Code
92011
APN#
213-050-08-00
Mailing Address (include suite)
2310 CAMINO VIDA ROBLE, SUITE 101 CiCARLSBAD State
CA
Zip Code Plan File#
92011
Project Contact
RACHELLE DOMINGO-ROGERS
Applicant E-mail
ADMIN ARCH5.DESIGN
Telephone#
(619) 546-9670
The following questions represent the facility's activities, NOT the specific project description.
PART I: FIRE DEPARTMENT-HAZARDOUS MATERIALS DMSION: OCCUPANCY CLASSIFICATION: (not required for projects within the City of San
Diego): Indicate by circling the item, whether your business will use, process, or store any of the following hazardous materials. If any of the items are circled,
applicant must contact the Fire Protection Agency with jurisdiction prior to plan submittal.
Occupancy Rating: Facility's Square Footage (including proposed project):
1. Explosive or Blasting Agents 5. Organic Peroxides 9. Water Reactives 13. Corrosives
2. Compressed Gases 6. Oxidizers 10. Cryogenics 14. Other Health Hazards ! 15. None of These. I 3. Flammable/Combustible Liquids 7. Pyrophorics 11. Highly Toxic or Toxic Materials
4. Flammable Solids 8. Unstable Reactives 12. Radioactives
PART II: SAN DIEGO COUNTY DEPARTMENT OF ENVIRONMENTAL HEAL TH -HAZARDOUS MATERIALS DMSION (HMD): If the answer to any of the
questions is yes, applicant must contact the County of San Diego Hazardous Materials Division, 5500 Overland Avenue, Suite 170, San Diego, CA 92123.
Call (858) 505-6700 prior to the issuance of a building permit.
FEES ARE REQUIRED Project Completion Date: Expected Date of Occupancy: 0 CalARP Exempt
I
1.
2.
3.
4.
5.
6.
7.
8.
YES NO □ fH 8 0
□ □ □ □
□
(for new construction or remodeling projects)
Is your business listed on the reverse side of this form? (check all that apply).
Will your business dispose of Hazardous Substances or Medical Waste in any amount?
Will your business store or handle Hazardous Substances in quantities greater than or equal to 55 gallons, 500
pounds and/or 200 cubic feet?
Will your business store or handle carcinogens/reproductive toxins in any quantity?
Will your business use an existing or install an underground storage tank?
Will your business store or handle Regulated Substances (CalARP)?
Will your business use or install a Hazardous Waste Tank System (Title 22, Article 10)?
Will your business store petroleum in tanks or containers at your facility with a total facility storage capacity equal to
or greater than 1,320 gallons? (California's Aboveground Petroleum Storage Act).
Date Initials
0 CalARP Required
I
Date Initials
0 CalARP Complete
I
Date Initials
PART Ill: SAN DIEGO COUNTY AIR POLLUTION CONTROL DISTRICT (APCD): The following questions are intended to identify the majority of
air pollution issues at the planning stage. Your project may require additional measures not identified by these questions. Residences are typically
exempt, except-single building with more than four dwelling units and those with more than one detached residential buildings
on the property-e.g. granny flats [+Excludes garages & small outbuildings not used as dwelling units]. If yes is answered for the questions below
please see link for further instructions: here or for more comprehensive requirements, please contact apcdcomo@sdaocd.org or call (858) 586-2650.
YES NO
1. [Z] D Will the project disturb 100 square feet or more of existing building materials? If yes, submit an asbestos survey to apcdcomp@sdapcd.org. •
2. □ 0
3. □ [Z]
4. □ [Z]
Will any load supporting structural members be removed? If yes, submit an asbestos survey and demolition notification to
apcdcomp@sdapcd.org at least 10 working days prior to starting the demolition of a load bearing structure. A notification is required even if no asbestos is present
in the structure.
(ANSWER ONLY IF QUESTION 1 IS YES) Will 100 square feet or more of friable asbestos material be disturbed? If yes, submit a notification of asbestos
removal to apcdcomp@sdapcd.org at least 10 working days prior to starting asbestos removal.
Will any equipment or operations be installed that may require an APCD Permit to Operate? Please see the reverse side of this form for typical equipment
requiring an APCD permit. If yes, contact APCD prior to the issuance of a building permit.
Briefly describe business activities: Briefly describe proposed project: PROPOSED INTERIOR TENANT IMPROVEMENT OF A NEW
11,583 SF RECREATION FACILITY (INCLUDES NEW KIDS PLAYGROUND AREA/PARTY ROOMS/CAFE) Indoor Playground with a cafe
I declare under penalty of perjury that to the best of my knowledge and belief t
VrtianHo 02 /13 12024
Name of Owner or Authorized Agent Date
FOR OFFICAL USE ONLY: FIRE DEPARTMENT OCCUPANCY CLASSIFICATION: ________________________________ _
BY· DATE· I I
EXEMPT OR NO FURTHER INFORMATION REQUIRED RELEASED FOR BUILDING PERMIT BUT NOT FOR OCCUPANCY RELEASED FOR OCCUPANCY
COUNTY-HMO• APCD COUNTY-HMO APCD COUNTY-HMO APCD
:t,on Co,,t, ~~ ""o.,... ,f'
!,:, Reviewed <2
ct 03/06/2024 MF ~
Oate/!nitlats
~I] t
D1eoo <-0~
.. • A stamp in this box only exempts businesses from completing or updating a Hazardous Matenals Business Plan. Other perrmlting requirements may still apply
HM-9171 (01/22) County of San Diego -DEH -Hazardous Materials Division
.Ccicyof
Carlsbad
PURPOSE
CLIMATE ACTION PLAN
CONSISTENCY CHECKLIST
8-50
Development Services
Building Division
1635 Faraday Avenue
442-339-2719
www.carlsbadca.gov
This checklist is intended to help building permit applicants identify which Climate Action Plan (CAP) ordinance requirements
apply to their project. This completed checklist (B-50) and summary (B-55) must be included with the building permit
application. The Carlsbad Municipal Code (CMG) can be referenced during completion of this document.
NOTE: The following type of permits are not required to fill out this form
❖ Patio I ❖ Decks I ❖ PME (w/ci panel upgrade) I ❖ Pool
The B-50 checklist was originally developed several years ago to support implementation of the CAP. Recent updates to
the California Building Standards Code have imposed newer performance standards on building permit applications.
Therefore, the applicant is advised to review all applicable code sections and apply the maximum. performance standard,
which may exceed the CAP consistency checklist requirements •
Consultation with a certified Energy Consultant is encouraged to assist in filling out this document. Appropriate
certification includes, but is not limited to: Licensed, practicing Architect, Engineer, or Contractor familiar with Energy
compliance, IECC/HERS Compliance Specialist, ICC G8 Energy Code Specialist, RESNET HERS rater certified, certified
ICC Residential Energy Inspector/Plans Examiner, ICC Commercial Energy Inspector and/or Plans Examiner, ICC CALgreen
Inspector/Plans Examiner, or Green Building Residential Plan Examiner.
If an item in the checklist is deemed to be not applicable to a project, or is less than the minimum required by ordinance,
check N/A and provide an explanation or code section describing the exception.
The project plans must show all deta.ils as stated in the applicable Carlsbad Municipal Code (CMC) and/or Energy Code and
Green Code sections.
iAirtrrcat10:~IJriJ<>r; . q ,~
Project Name/Building
Permit No.: KIDS & COFFEE CBC2024-0015
Property Address/APN: 2310 CAMINO VIDA ROBLE, SUITE 101, CARLS
Applicant Name/Co.: ARCH5 DESIGN STUDIO
Applicant Address: 2825 DEWEY RD, UNIT 207, SAN DIEGO, CA 92106
Contact Phone: (619) 546-9670
Contact information of person completing this checklist (if different than above):
Name: Contact Pho
Company
name/address:
NLAWFUL TO MAKE AN'I CH.A
Contact Em 'I: AND IT 15 ~c: WITHOUT PERMISSION F_ROM THE AL TERA Tl ~ y OF STRUCTUREIS) IS NOT
B-50 Page 1 of 7 Revised 12122
Use' the table below to determine which sections of the Ordinance checklist are applicable to your project. For alterations and additions to existing
buildings, attach a Permit Valuation breakdown on a separate sheet. For purposes of determining valuation, the amount should be upon either
the actual contract price for the work to be permitted or,shall be determined with the use of the current "ICC Building Valuation Data" as
published by the International Code Council, whichever is higher (refer to Section 18.04.035 of the CMC).
Building Permit Valuation (BPV) $ breakdown $800,000 ---,---'----------'---
Compiefe Section($) • Notes:. J
D Residential
D New construction 2A*,.3A*, 4A* *Includes detached, newly constructed ADU
D Additions and _alterations:
D BPV < $60,000 NIA All residential additions and alterations
D BPV <!: $60,000 1A, 4A 1-2 family dwellings and townhouses with attached garages
D Electrical service panel upgrade only only.
*Multi-family dwellings only where interior finishes are
D BPV <!: $200,000 1A, 4A* removed and significant site work and upgrades to structural
and mechanical, electrical, and/or plumbing systems are
proposed
28* *Multi-family dwellings only where <!:$1,000,000 BPV AND
BPV ~ $1,000,000 affecting <!:75% existing floor area
' r D Nonresidential and hotels/motels .1
D New construction 1 B! 2B, 3B, 4B and 5
~ Alterations:
~ BPV <!: $200,000 or additions<!: 1B,5 1,000 square feet
D BPV <!: $1,000,000 1B,2B,5
<!: 2,000 sq. ft. new roof addition 2B, 5
Ir-=~:...:.:-:.:.'.===---:::-:.-==--~:-:-:· --
Instructions:·" ,;,,_.,,.1,, 1~,?.. ::.on,.:dr;,no~, tl«.,VI ~ .
Building alterations of<!: 75% existing gross floor area
1 B also applies ifBPV ~ $200,000
1. ; 9hoo~~-TIC~t e~twe~!!I~~i~~!i_a_l o_r non-residential based on the type of project being submitted.
2. I Next chose between raew construction oraaaition/alteration for residential or non-residential.
3. I, The cblum ... n's~t6.tt,;;right'of your selection· wu( determine which sections of the CAP program are applicable to your project.
4. f fppropriat~,!~tails;~~;~~f~ '.~clud!d;,~n ~h.; ~~ans for selections made.
EXA'MPLE: ;,')51,. I• • • .,;. . .. -.. • ... : ,; -•. . '
ScopJ of work includes irnew, 2 story; single family ~esidential structure.
The stlections would pe::Reside'ritiaFand New construction iri the table above. For a 2-story structure, CAP sections 2A, 3A and 4A would be
applicable. (Solar PV,,'A'atefheating, EV charging) The* indicates that new detached ADU's are included. f ~ J ; ~ • ' , t ,,-, ~~ I·. r • • , ~ -, •. • .. _ ~ .
EXAMPLE: ••,·-'-,1.,. 1..:: .,_·:,,-r' ~ Mt -°-·,l'r ,,1_. 1 j
Scopt of work includes a tenant improvement (i.e., alterations) valued at over one million dollars.
The'sklections w9uld be: Non-residential arid Alteration BPV.~ $1,000,000. CAP sections 1 B, 2B and_ 5 would be applicable to this project. (Energy
.4, I ,~~lt-: i" "). ~-' '·-',, ,• ~ -,, ,,, •• ,, --,.,.. . • . . •
effi~11ncy, Sol~r.J~V'a,nd /~~~g~o~at101npe?4a:p~ Maqag~ment (!DM)*)
j ! ~. 1~ • # r, •a·~ 'I • _,,. ••,,. ' J ·• 1 ~ t I, •• • '"".a~·., • . . •1 .... ~.;., ••• .1 . . 1· , f . . ,. . . . " It mfiy be necessary to supplem~nt t~e corr:ip!~te_q c,~egklist with supporting materials, calculations or certifications, to demonstrate full compliance with
CAPi prdinan~e requirements.1F0r example,·pr.ojec~s that propose; or require a performance approach to comply with energy-related measures will need
to a:ttach to this'checklist separate calculations and documentation as specified by the ordinances.
L .,_ ~ lA ,. ~ -• 'J
I
_ ,~ ·_I __ <:: ,: ;,-;·,;;,,GCj,. ,\ ·':;J ; ..__,..,.,_~ .. --__ .........._ __ .,. ______ ,_,,,._~
n .. _ _._.., J~,--..•~ .. -.... --,---....,.-,.,,... ___ t<._., _ _........,_.... . .....
j
l c'1eckffst 1teni. . · · • · .·· . . . • . ••
-• : Gn~idh~ :jAe~p,iate bo~e,,,!xpl~i~ ;~11,ngt a,epJi~ole anq, ex~pti~Qiifems, '.~ad'prQVjq~i~~P,P~r:ljn9 ~!e~l~l§A~!rid :dq J~!!Oft §S,n,e~J;~J¥... ~
1 1. Energy Efficiency
Please refer to Section 18.30.060 of the Carlsbad Municipal Code (CMC) and Section 150.2 of the CEC for more information. Appropriate
details and notes must be placed on the plans according to selections chosen in the design.
A. 0 Residential addition or alteration 2: $60,000 building permit valuation.
Details of selection chosen below must be placed on the plans
referencing CMC 18.30.060.
~ N/A ________ _
□ Exception: Home energy score
2: 7 (attach certification)
Year Built Single-family Requirements Multi-family Requirements
□ Before 1978 Select one option:
D Duct sealing D Attic insulation □Cool roof □ Attic insulation
□ 1978 and later Select one option:
□ Lighting package D Water heating package
□ Between1978-1991 Select one option:
D Duct sealing D Attic insulation D Cool roof
□ 1992 and later Select one option:
D Lighting package D Water-heating package
8. □ New Nonresidential construction (including additions over 1,000sf), new hotel/motel construction AND alterations 2:
$200,000 building permit valuation. See Section 18.21.050 of the CMC and CALGreen Appendix A5.
Al least one measure from each applicable building component required. 0 N/A _______ _
AS.203.1.1 Choose one:
D Outdoor lighting D Restaurant service water heating (Section 140.5 of the CEC)
D Warehouse dock seal doors D Daylight design PAFs ~ Exhaust air heat recovery
AS.203.1.2.1 Choose one: D .95 Energy budget
(Projects with indoor lighting OR mechanical)
D .90 Energy budget
(Projects with indoor lighting AND mechanical)
AS.211.1 ** D On-site renewable energy:
A5.211.3tt □ Green power: (If offered by local utility provider, 50% minimum renewable sources)
A5.212.1 D Elevators and escalators:(Project with more than one elevator or two escalators)
AS.213.1 □ Steel framing: (Provide details on plans for options 1-4 chosen)
* High-rise residential buildings are 4 or more stories.
0 N/A ----------
□ N/A ________ ,,_
0 N/A _______ _
0 NIA
0 N/A
0 N/A. ________ _
** For alterations~ $1,000,000BPV and affecting> 75%existing gross floor area, OR alterations that add 2,000 square feet of new roof addition: comply
with Section 18.030.040 of the CMC (section 28 below) instead.
4
, 2 .. Photovoltaic Systems
A. □ Residential new construction. Refer to Section 150.1 (c)14 of the CEC for single-family requirements and Section
170.2(d) of the CEC for multi-family requirements. If project includes installation of an electric heat pump water
heater pursuant to CAP section.3 below (residential water heating), increase system size by .3kWdc if PY offset
option is selected."
Floor Plan ID (use additional CFA orSARA #d.u. Calculated kWdc* Exception
sheets if necessary)
D
D
D
D
Total. System Size: kWdc
kWdc = (CFAx.572) / 1,000 + (1.15 x #d.u.)
*Formula calculation where CFA = conditional floor area, #du= number of dwellings per plan type
If proposed system size is less than calculated size, please explain.
e.·□ Nonresidential, hotel/motel and multifamily additions, alterations and repairs of these projects i!:$1,000,000 BPV AND
affecting i!:75% existing floor area, OR addition that increases roof area by i!:2,000 square feet. Please refer to
Section 18.30.040 and 18.30.070 of the CMC when completing this section.
Choose one of the follovving methods: (Gross floor area or Time-Dependent Valuation method)
D Gross Floor Area (GFA)Method
GFA: Min.System Size: kWd
0 If< 1 0,000s.f. Enter: 5 kWdc
□ If~ 10,000s.f. calculate: 15 kWdc x (GFA/10,000) **
**Round building size factor to nearest tenth, and round system size to nearest whole .number.
D Time-Dependent Valuation Method
C. 0
• Annual TDV Energyuse:*** ______ x .80= Min. system size: _____ kWdc
*** Attach calculation documentation using modeling software approved by the California Energy Commission.
*All newly constructed non residential, hotel/motel and highrise multifamily buildings thatare required by CEC section
140.10(a) to have a PV system shall also have a battery storage system meeting CEC section 140.10(b). Noh
residential, hotel/motel and multifamily additions, alterations or repairs that trigger solar due to the Car1sbad Climate Action
.Plan will NOT require battery storage. Battery storage is required when triggered by CEC section _140.10(a) and/or 170.2(9).
5
3. Water Heating
A. Residential. Refer to Section 18.30.050 of the CMC and Sections 150.1 (c)8 or 170.2(d) of the CEC when completing this
section. Provide complete details on the plans.
Residential new construction and alterations:
□ Required: 60% ofenergy needed for service water heating from on-site solar or recovered energy.
For systems serving individual units, choose one system:
D Single 240-volt heat pump water heater AND compact hot water distribution AND Drain water heat recovery (low-rise
residential only)
D Single 240-volt heat pump water heater AND PV system .3 kWdc larger than required.
D Heat pump water heater meeting NEEA Advanced Water Heating Specification Tier 3 or higher.
□ Solar water heating system that is either .60 solar savings fraction or 40 s.f. solar collectors
D Gas or propane system with a solar water hearing system and recirculation system.
For systems serving multiple units, choose one system:
D Heat pump water heating system with recirculation loop tank and electric backup.
D Solar water heating system that is either:
D .20 solar savings fraction □ .15 solar savings fraction, plus drain water heat recover
OR:
□ System meets performance compliance requirements of section 150.1(d) or 170.2(d) and deriving at least 60% of energy from
on-site solar or recovered energy.
□ Exception:. ____________________________________ _
B. Nonresidential and hotel/motel new construction. This section also applies to high-rise residential. Refer to Sections 18.030.020
and 18.040.030 of the CMC and Sections 140.5 and 170.2 of the CEC when completing this section. Provide complete details
on the plans.
1. Non-residential:
D Required: Water heating system derives at least 40% of its energy from one of the following:
□ Solar-thermal □ Photovoltaics D Recovered energy
D Required: High-capacity service water heating system
2. Water heating system is (choose one):
0 Heat pump water heater
□ Electric resistance water heater(s)
D Solar water heating system with .40 solar savings fraction
3. Hotel/motel:
D Required: High-capacity service water heating system (meeting Section 170.2(d) of the CEC)
□ Required: Located in garage or conditioned space
Exception:
6
1 4. Electric Vehi.cle Charging
A. D Residential• New construction and major alterations.* This section also applies to hotel/motel projects. Refer to Section
18.21.030 of the CMC and Section 4.106.4 of the GBSC when completing this section.
Choose one.: •
□ One and two-family residential dwelling alterations with attached private garage. (not required if a panel upgrade would be needed)
□ New detached ADU. (no EV space required when no additional parking facilities are added) .
□ New one and two-family residential dwellings and townhouse with attached private garage.
□ One EV Ready parking space required D Exception: -----------□ New and major alterations to multi-family and hotel/mc:>tel projects: □ Exception: ________________ _
Total Parking Spaces Proposed EVSE Spaces
EV Capable ( 10% of total) I EV Ready (25% ofTotal) I EV chargers (5% ofTotal)
I I
*Major alterations are:
(1) for one and two-family dwellings and for town houses with an attached garage, alterations have a building permit valuation~$ 60;000 or
include an electrical s~rvice panel upgrade.:
(2) for multifamily dwellings (three units or more without attached garages), alterations have ab uilding permit valuation ~ $200,000, i nteriorfinishes a re
removed and significant site work and upgrades to structural and mechanical, e lectrical,a nd/or plumbing systems are proposed.
B. D Non-Residential -New construction D Exception: ____________ _
Please refer to Section 18.21.040 of the CMC when completing this section
Total Parking Spaces
Proposed EV Capable I EVCS (Installed with EVSE) I EV Ready (optional) I EV Space (optional)
I I ·I
Calculation: Refer to the table below:
Total Number of Parking Spaces provided Number of required EV Capable Spaces Number of required EVCS (Installed with EVSE)
□ 0-9 1 1
a 10-25 4 1
□ 26-50 8 2
□ 51-75 13 3
a 76-100 17 5
IJ 101-150 25 6
IJ 151-200 35 g,
D 20fandover 20 percent of total 25 percent of Required EV Spaces
Calculations: Total EV Capable spaces= .20xTotal parking spaces proposed (rounded up to nearest who.le number) •
EVSE Installed= Total EVSE Spacesx .25 (rounded up to nea.restwhole number)
EVSEothermaybe "EV Ready" or "EV Space"
T
,·-. --·•······ c-··· ••. •• ·:.··.
J s.· lj! Transportatio" Demand Management (TOM): Nonresidential ONLY ..
An approved Transportation Demand Management (TOM) Plan is required for all nonresidential projects that meet a threshold of employee-generated ADl
City staff will use the table below based on your submitted plans to determine whether your permit requires a TOM plan. If TOM is applicable to
your permit, staff will contact the applicant to develop a site-specific TOM plan based on the permit details.
Acknowledgment:
Employee ADT Estimation for Various Commercial Uses
Office (all)2 20
Restaurant 11
Retai13 8
Industrial 4
Manufacturing 4
Warehousing 4
1 Unless otherwise noted, rates estimated from !TE Trip
Generation Manual, 10th Edition
13
11
4.5
3.5
3
1
2 For all office uses, use SANDAG rate of 20 ADT/1,000 sfto
calculate employee ADT
3Retail uses include shopping center, variety store, supermarket,
gyms, pharmacy, etc.
Other commercial uses may be subject to special
consideration
sample calcu!atjons:
Office: 20,450 sf
1. 20,450 sf/ 1000 x 20 = 409 Employee ADT
Retail: 9,334 sf
1. First 1,000 sf= 8 ADT
2. 9,334 sf -1,000 sf= 8,334 sf
3. (8;334 sf/ 1,000 x 4.5) + 8 == 46 Employee ADT
l acknowledge that the plans submitted may be subject to the City of Carlsbad's Transportation Demand Management Ordinance. I agree to be
contacted should my permit require a TOM plan and understand that an approved TOM plan is a condition of permit issuance.
Applicant Signature: . .,,,,...~ *SEE ATTACHED:
Name: RACHELLE DOMINGO-ROGERS CUP 2023-0010 (DEV-2023-0088)
PLEASE REFER TO FINDINGS (ITEM 3)
Date: 5114/Z024 REGARDING PARKING
Phone No.: (619) 546-9670
8
·Ccityof
Carlsbad
CLIMATE ACTION PLAN {CAP} .COMPLIANCE
CAP BuHding Plan
Template
B-55
Develbpment Services
Building Division
1635 Faraday Avenue
760-602-2719
www.carlsbadca.gov
The following summarizes project compliance with the applicable Climate Action·Plan ordinances of the Carlsbad Municipal Code and California
Green Building Standards Code (CALGreen), current version. The following certificate shall be included on the plans for all building permits that,
are required to comply with the CAP measures:
1. ENERGY EFFICIENCY APPLICABLE: □YES ONO
Complies with CMC 18.30.060
or 18.21.050 OYes ON/A
Existir)g Structure, year built: ____ _
Prepared Energy Audit? Des ONo
Energy Score: ~. ---~--
Efficiency Measures included in scope:
2. Pl:IOTOVOLTAIC SYSTEM APPLICABLE:· DYES D NO
Complies with CMC section .18,30.040 and 2022 California Energy
Code section 150.l(c::)14 □ Yes DIA
Size of PV system (kWdc):
Sizing PV by load c.alculations
. If by Load Calculations:
D Yes ONo
Total calculated electr.ical load:
80% of load:
Exception Requested.
Exception Approved
0Yes ONo D Yes ONo
3. ALTERNATIVE WATER HEATING SYSTEM APPL.ICABLE: □ YES □ NO
4.
5.
Complies with CMC sections 18.30.020
Oves ON/A 18.20.030 and/or .18.30.050?
Alternative Source:
□ EJectric
□ Passive Solar
Exception Requested
Exception Approved •
DYes
0Yes
ELECTRIC VEHICLE (EV) CHARGING.APPLICABLE: .[] YES
Complies with CMC
section iB.21.030?
Panel Upgrade?
Total EV Parking Spaces:
No. of EV Capable.Spaces:
No, of EV Ready Spaces:
.No. of EV Installed Spcjces:
Hardship Requested
Hardship Approved
·OYes ON/A 0 Yes ONo
Required Provided
----r:lYes
OYes
ONo
□No
TRAFFIC DEMAND MANAGEMENT APPLICABLE: OYEsONo
OYesONo
□Yes □No
Compliant?
TDM Report on file with city?
Building Permit Finaled
' Revision Permit
Print Date: 11/13/2024 Permit No:
{city of
Carlsbad
PREV2024-0145
Job Address: 2310 CAMINO VIDA ROBLE, # 101, CARLSBAD, CA 92011-1561 Status: Closed -Fina led
Permit Type: BLDG-Permit Revision Work Class: Commercial Permit Revision
Parcel#: 2130500800 Track#: Applied: 07/26/2024
Valuation: $0.00 Lot#: Issued: 08/15/2024
Occupancy Group: A-3 Project#: DEV2023-0088 Fina led Close Out: 11/13/2024
#of Dwelling Units: Plan#:
Bedrooms:
Bathrooms:
Occupant Load: 577
Code Edition: 2022
Sprinkled: Yes
Project Title: KIDS AND COFFEE
Construction Type:II
Orig. Plan Check#: CBC2024-0015
Plan Check#:
Final Inspection:
INSPECTOR:
Description: KIDS & COFFEE: NEW SUMP PUMP// REVISED LOCATION OF GREASE INTERCEPTOR// ELECTRICAL REVISIONS
Applicant:
KEN LI
15504 ANDORRA WAY
SAN DIEGO, CA 92129-1110
(646) 801-0221
FEE
BUILDING PLAN CHECK REVISION ADMIN FEE
THIRD PARTY REVIEW -Consultant Cost (BLDG)
Property Owner:
VIDA I LLC
1006 TENNESSEE ST
SAN FRANCISCO, CA 94107
Total Fees: $215.00 Total Payments To Date:
Building Division
$215.00 Balance Due:
1635 Faraday Avenue, Carlsbad CA 92008-7314 I 442-339-2719 I 760-602-8560 f I www.carlsbadca.gov
AMOUNT
$35.00
$180.00
$0.00
Page 1 of 1
C-··. City of Document Missing
From File Carlsbad
Permit Number PREV2024-0145
APN 2130500800
Development Services
Building Division
1635 Faraday Ave
www .carlsbadca.gov
Address 2310 CAMINO VIDA ROBLE, #10'1
City/State/Zip CARLSBAD, CA 92011-1561
The following document is missing from this file:
B-1□B-10
B-15□ □
This file was printed on: 11/13/24
1