HomeMy WebLinkAbout2724 LOKER AVE; ; CBC2024-0046; PermitPrint Date: 06/11/2025
Building Permit Finaled
Commercial Permit
CBC2024-0046Permit No:
Job Address:
Permit Type:
Parcel #:
Valuation:
Occupancy Group:
2724 LOKER AVE W, CARLSBAD, CA 92010-6603
BLDG-Commercial
2090812800
$488,000.00
Work Class:
Lot #:
Project #:
Cogen
Status:
Applied:
Issued:
02/08/2024
04/10/2024
Finaled Close Out:06/11/2025
#of Dwelling Units:
Track #:
Plan #:
Closed - Finaled
Plan Check #:
Orig. Plan Check #:Bathrooms:
Final Inspection:11/21/2024Bedrooms:Construction Type:
Occupant Load:
Code Edition:
Sprinkled:
INSPECTOR:de Roggenbuke, Dirk
Kersch, Tim
NEW 610KW ROOF MOUNT PV SYS W/ 1220 MODS, 10 INV, 6 TRANSFORMERS. (E-REVIEW)Description:
Project Title:
Contractor: HOME ENERGY SYSTEMS INC
9085 AERO DR, # STE A
SAN DIEGO, CA 92123-2377
(619) 692-2015
AMOUNTFEE
BUILDING INSPECTION FEE $604.00
BUILDING INSPECTION FEE $604.00
BUILDING INSPECTION FEE $604.00
BUILDING PLAN CHECK $1,578.85 FIRE Special Equipment (Ovens, Dust, Battery)$3,144.00
SB1473 – GREEN BUILDING STATE STANDARDS FEE $20.00
SOLAR–COMMERCIAL: per kW $3,829.00
STRONG MOTION – COMMERCIAL (SMIP)$136.64
Total Fees:$10,520.49 Total Payments To Date:$10,520.49 Balance Due:$0.00
Please take NOTICE that approval of your project includes the "Imposition" of fees, dedications, reservations, or other exactions hereafter
collectively referred to as "fees/exaction." You have 90 days from the date this permit was issued to protest imposition of these fees/exactions. If you protest them, you must follow the protest procedures set forth in Government Code Section 66020(a), and file the
protest and any other required information with the City Manager for processing in accordance with Carlsbad Municipal Code Section
3.32.030. Failure to timely follow that procedure will bar any subsequent legal action to attack, review, set aside, void, or annul their
imposition.
You are hereby FURTHER NOTIFIED that your right to protest the specified fees/exactions DOES NOT APPLY to water and sewer connection
fees and capacity changes, nor planning, zoning, grading or other similar application processing or service fees in connection with this
project. NOR DOES IT APPLY to any fees/exactions of which you have previously been given a NOTICE similar to this, or as to which the statute of limitation has previously otherwise expired.
1635 Faraday Avenue, Carlsbad CA 92008-7314 ï 442-339-2719 ï 760-602-8560 f ï www.carlsbadca.gov
Building Division Page 1 of 1
{"Cityof
Carlsbad
COMMERCIAL
BUILDING PERMIT
APPLICATION
B-2
Plan Check
Est. Value
PC Deposit
Date
Job Address Suite: APN:
Tenant Name #: Lot #: Year Built:
Year Built:_______ Occupancy:_______ Construction Type:______ Fire sprinklers: YES NO A/C: YES NO
BRIEF DESCRIPTION OF WORK:
PROPERTY OWNER
Name:
Address:
State: Zip: City: State: Zip:
Phone:
Email:
CONTRACTOR OF RECORD
Business Name:
State: Zip:
APPLICANT (PRIMARY CONTACT)
Name:
Address:
City:
Phone:
Email:
DESIGN PROFESSIONAL
Name:
Address:
City:
Phone:
Email:
Architect State License:
Address:
City: State: Zip:
Phone:
Email:
CSLB License #: Class:
Carlsbad Business License # (Required):
APPLICANT CERTIFICATION: I certify that I have read the application and state that the above information is correct and that the
information on the plans is accurate. I agree to comply with all City ordinances and State laws relating to building
construction.
NAME (PRINT):DATE:
1635 Faraday Ave Carlsbad, CA 92008
SIGN:
Ph: 442-339‐2719 Fax: 760‐602‐8558 Email: Building@carlsbadca.gov
1 REV. 07/21
Solar: KW, Modules, Mounted: Roof Ground
Reroof:
Plumbing/Mechanical/Electrical
Other: ______________________________________________________________________________________
Additional Gas or Electrical Features? Pool/Spa: SF
Tenant Improvement: ___________ SF, Existing Use: ________________ Proposed Use: ________________
___________ SF, Existing Use: ________________ Proposed Use: ________________
Addition/New:___________________________ New SF and Use, New SF and Use
_______________ SF Deck, ________________SF Patio Cover, __________________ SF Other (Specify)__________
2724, 2726, 2728,2730, 2732, 2738 LOKER AVE 209-081-29-00, 209-081-2800
NEW 610KW ROOF MOUNT PV SYS W/ 1220 MODS, 10 INV, 6 TRANSFORMERS
610
LINDSAY GRIMSHAW HG FENTON
10769 WOODSIDE AVE SANTEE CA 92071 SAME
8082864939 6196922015
LINDSAY@DESIGNS.SOLAR LINDSAY@DESIGNS.SOLAR
HES RENEWABLES
9085 AERO DR, SAN DIEGO CA 92123
6196092015
LINDSAY@DESIGNS.SOLAR
LINDSAY GRIMSHAW 2/8/24LINDSAY GRIMSHAW
4
□
□
□
□
□
□
□
( City of
Carlsbad
0 0 0 0
0 0
THIS PAGE REQUIRED AT PERMIT ISSUANCE PLAN CHECK NUMBER: __________________
A BUILDING PERMIT CAN BE ISSUED TO EITHER A STATE LICENSED CONTRACTOR OR A PROPERTY OWNER. IF THE PERSON
SIGNING THIS FORM IS AN AGENT FOR EITHER ENTITY AN AUTHORIZATION FORM OR LETTER IS REQUIRED PRIOR TO
PERMIT ISSUANCE.
(OPTION A): LICENSED CONTRACTOR DECLARATION:
I hereby affirm under penalty of perjury that I am licensed under provisions of Chapter 9 (commencing with Section 7000) of Division 3
of the Business and Professions Code, and my license is in full force and effect. I also affirm under penalty of perjury one of the
following declarations (CHOOSE ONE):
I have and will maintain a certificate of consent to self‐insure for workers’ compensation provided by Section 3700 of the Labor Code, for the performance of the
work which this permit is issued. Policy No.
-OR-
I have and will maintain worker’s compensation, as required by Section 3700 of the Labor Code, for the performance of the work for which this permit is issued.
My workers’ compensation insurance carrier and policy number are: Insurance Company Name:
Policy No. _____________________________________________________________ Expiration Date:
-OR-
Certificate of Exemption: I certify that in the performance of the work for which this permit is issued, I shall not employ any person in any manner so as to become
subject to the workers’ compensation Laws of California. WARNING: Failure to secure workers compensation coverage is unlawful and shall subject an employer to
criminal penalties and civil fines up to $100,000.00, in addition the to the cost of compensation, damages as provided for in Section 3706 of the Labor Code,
interest and attorney’s fees.
CONSTRUCTION LENDING AGENCY, IF ANY:
I hereby affirm that there is a construction lending agency for the performance of the work this permit is issued (Sec. 3097 (i) Civil Code).
Lender’s Name: Lender’s Address:
CONTRACTOR CERTIFICATION: I certify that I have read the application and state that the above information is correct and that
the information on the plans is accurate. I agree to comply with all City ordinances and State laws relating to building
construction.
NAME (PRINT):SIGNATURE: DATE:
Note: If the person signing above is an authorized agent for the contractor provide a letter of authorization on contractor letterhead.
‐ OR ‐
(OPTION B): OWNER‐BUILDER DECLARATION:
I hereby affirm that I am exempt from Contractor’s License Law for the following reason:
I, as owner of the property or my employees with wages as their sole compensation, will do the work and the structure is not intended or offered for sale (Sec.
7044, Business and Professions Code: The Contractor’s License Law does not apply to an owner of property who builds or improves thereon, and who does such
work himself or through his own employees, provided that such improvements are not intended or offered for sale. If, however, the building or improvement is sold
within one year of completion, the owner‐builder will have the burden of proving that he did not build or improve for the purpose of sale).
-OR-
I, as owner of the property, am exclusively contracting with licensed contractors to construct the project (Sec. 7044, Business and Professions Code: The
Contractor’s License Law does not apply to an owner of property who builds or improves thereon, and contracts for such projects with contractor(s) licensed
pursuant to the Contractor’s License Law).
-OR-
I am exempt under Business and Professions Code Division 3, Chapter 9, Article 3 for this reason:
AND,
FORM B‐61 “Owner Builder Acknowledgement and Verification Form” is required for any permit issued to a property owner.
By my signature below I acknowledge that, except for my personal residence in which I must have resided for at least one year prior to completion of the
improvements covered by this permit, I cannot legally sell a structure that I have built as an owner‐builder if it has not been constructed in its entirety by licensed
contractors. I understand that a copy of the applicable law, Section 7044 of the Business and Professions Code, is available upon request when this application is
submitted or at the following Web site: http://www.leginfo.ca.gov/calaw.html.
OWNER CERTIFICATION: I certify that I have read the application and state that the above information is correct and that the
information on the plans is accurate. I agree to comply with all City ordinances and State laws relating to building
construction.
NAME (PRINT): SIGN: DATE:
Note: If the person signing above is an authorized agent for the property owner include form B‐62 signed by property owner.
1635 Faraday Ave Carlsbad, CA 92008 Ph: 442-339‐2719 Fax: 760‐602‐8558 Email: Building@carlsbadca.gov
2 REV. 07/21
LINDSAY GRIMSHAWLINDSAY GRIMSHAW 2/8/24
n
United Wisconsin Insurance Companywc518-00190-022-sz 6/1/24
□
□
□
□
□
□
□
Building Permit Inspection History Finaled
PERMIT INSPECTION HISTORY for (CBC2024-0046)
BLDG-Commercial 02/08/2024Application Date:Permit Type:Owner:
Cogen 04/10/2024Work Class:Issue Date:Subdivision:CARLSBAD TCT#74-21
04/14/2025Expiration Date:Status:
IVR Number: 54678
Closed - Finaled 2724 LOKER AVE W
CARLSBAD, CA 92010-6603
Address:
Scheduled
Date
Inspection Type Inspection No. Inspection
Status
Primary Inspector Reinspection InspectionActual
Start Date
10/09/2024 10/09/2024 BLDG-33 Service
Change/Upgrade
263439-2024 Passed Tim Kersch Complete
COMMENTS PassedChecklist Item
BLDG-Building Deficiency Prep only.Yes
BLDG-34 Rough
Electrical
263440-2024 Partial Pass Tim Kersch Reinspection Incomplete
COMMENTS PassedChecklist Item
BLDG-Building Deficiency Yes
10/10/2024 10/10/2024 BLDG-11
Foundation/Ftg/Piers
(Rebar)
263923-2024 Passed Dirk de Roggenbuke Complete
COMMENTS PassedChecklist Item
BLDG-Building Deficiency 10/10/24 equipment pad rebar ok Yes
BLDG-34 Rough
Electrical
263750-2024 Partial Pass Dirk de Roggenbuke Reinspection Incomplete
COMMENTS PassedChecklist Item
BLDG-Building Deficiency Yes
10/15/2024 10/15/2024 BLDG-33 Service
Change/Upgrade
264296-2024 Passed Dirk de Roggenbuke Complete
COMMENTS PassedChecklist Item
BLDG-Building Deficiency 10/12/24 Disconnect reconnect OT
inspection
Yes
NOTES Created By TEXT Created Date
Dirk de Roggenbuke 10/12/24 OT inspection 10/15/2024
11/14/2024 11/14/2024 BLDG-Final Inspection 268005-2024 Partial Pass Tim Kersch Reinspection Incomplete
COMMENTS PassedChecklist Item
BLDG-Building Deficiency Yes
BLDG-Plumbing Final No
BLDG-Mechanical Final No
BLDG-Structural Final Yes
BLDG-Electrical Final No
11/21/2024 11/21/2024 BLDG-Final Inspection 268882-2024 Passed Tim Kersch Complete
Wednesday, June 11, 2025 Page 1 of 2
{cityof
Carlsbad
PERMIT INSPECTION HISTORY for (CBC2024-0046)
BLDG-Commercial 02/08/2024Application Date:Permit Type:Owner:
Cogen 04/10/2024Work Class:Issue Date:Subdivision:CARLSBAD TCT#74-21
04/14/2025Expiration Date:Status:
IVR Number: 54678
Closed - Finaled 2724 LOKER AVE W
CARLSBAD, CA 92010-6603
Address:
Scheduled
Date
Inspection Type Inspection No.Inspection
Status
Primary Inspector Reinspection InspectionActual
Start Date
COMMENTS PassedChecklist Item
BLDG-Building Deficiency Yes
BLDG-Plumbing Final Yes
BLDG-Mechanical Final Yes
BLDG-Structural Final Yes
BLDG-Electrical Final Yes
Wednesday, June 11, 2025 Page 2 of 2
True North Compliance Services, Inc.
8369 Vickers Street, Suite 207, San Diego, CA 92111
T | 562.733.8030
Transmittal Letter
February 19, 2024
City of Carlsbad FIRST REVIEW
Community Development Department - Building Division City Permit No: CBC2024-0046
1635 Faraday Ave. True North No.: 24-018-139
Carlsbad, CA 92008
Plan Review: Commercial PV System
Address: 2724, 2726, 2728, 2730, 2732, & 278 Loker Ave W, Carlsbad CA
Applicant Name: Lindsay Grimshaw Applicant Email: LINDSAY@DESIGNS.SOLAR
True North Compliance Services, Inc. has completed the review of the following documents for the project
referenced above on behalf of the City of Carlsbad. Our comments can be found on the attached list.
1. Drawings: Electronic copy dated January 23, 2024, by HES Commercial, Inc.
2. Structural Calculations: Electronic copy dated February 1, 2024, by Phong Truong.
Attn: Permit Technician, the scope of work on the plans has been reviewed for coordination with the scope of
work on the permit application. See below for information if the scope of work on plans differs from the permit
application:
Valuation: Confirmed
Scope of Work: Confirmed
Floor Area: Confirmed
Our comments follow on the attached list. Please call if you have any questions or if we can be of further
assistance.
Sincerely,
True North Compliance Services
Review By: Ali Al-Murshid - Plan Review Engineer
Quality Review By: Alaa Atassi - Plan Review Engineer
True orth
'/. COMPLIANCE SERVICES
Commercial PV System City of Carlsbad– FIRST REVIEW
2724, 2726, 2728, 2730, 2732, & 278 Loker Ave W City Permit No.: CBC2024-0046
February 19, 2024 True North No.: 24-018-139
Page 2
Plan Review Comments
ELECTRONIC - RESUBMITTAL INSTRUCTIONS:
Please do not resubmit plans until all departments have completed their reviews. For status, please
contact building@carlsbadca.gov
Please make all corrections, as requested in the correction list. Corrected sets can be submitted as follows:
Email the revised plans and comment response letter(s) to building@carlsbadca.gov for continued
review.
Note: If this project requires FIRE PREVENTION review, ensure that you follow their specific
instructions for resubmittal review. The city will not route plans back to Dennis Grubb &
Associates for continued Fire Prevention review.
GENERAL INFORMATION:
A. The following comments are referred to the 2022 California Building, Mechanical, Plumbing, Electrical
Codes, California Green Building Standards Code, and Energy Code (i.e., 2021 IBC, UMC, UPC, and 2020
NEC, as amended by the State of California).
B. There may be other comments generated by the Building Division and/or other City departments that will
also require your attention and response. This attached list of comments, then, is only a portion of the plan
review. Contact the City for other items.
C. Respond in writing to each comment by marking the attached comment list or creating a response letter.
Indicate which details, specification, or calculation shows the required information. Your complete and
clear responses will expedite the re-check.
D. Where applicable, be sure to include the architect and engineer’s stamp and signature on all sheets of the
drawings and on the coversheets of specifications and calculations per CBPC 5536.1 and CBPC 6735. This
item will be verified prior to plan approval.
OCCUPANCY & BUILDING SUMMARY:
Occupancy Groups: B
Occupant Load: N/A
Type of Construction: N/A
Sprinklers: N/A
Stories: 2
Area of Work (sq. ft.): N/A sq. ft.
STRUCTURAL COMMENTS:
S1. It appears the proposed location of the new PV panel ballasted system is a relatively flat roof area.
Therefore, please clarify the existing roof slope and drainage systems on the plans. Also, please review the
roof deflection resulting from additional PV system installation to confirm potential for water ponding
issues on the flat roof areas will not be created. CBC 1607.14.4.5
Commercial PV System City of Carlsbad– FIRST REVIEW
2724, 2726, 2728, 2730, 2732, & 278 Loker Ave W City Permit No.: CBC2024-0046
February 19, 2024 True North No.: 24-018-139
Page 3
If you have any questions regarding the above comments, please contact Ali Al-Murshid via email
alia@tncservices.com or telephone (562) 733-8030.
[END]
February 26, 2024,
Submission ID- 325B10361
Attention:
Community Development Department
Ali Al-Murshid
alia@tncservices.com
(562) 733-8030
THE CITY OF CARLSBAD
Community Development Department
1635 Faraday Ave., Carlsbad, CA 92008
Plan check comments / responses:
Construction Change:
[ Intake Comment | Sheet PV200.1, PV200.2, PV200.3, PV200.4, PV200.5, PV200.6]
It appears the proposed location of the new PV panel ballasted system is a relatively flat roof area.
Therefore, please clarify the existing roof slope and drainage systems on the plans. Also, please review the
roof deflection resulting from additional PV system installation to confirm potential for water ponding
issues on the flat roof areas will not be created. CBC 1607.14.4.5
Response– Please see updated sheets PV200.1 - PV200.6 with all construction change clouds with Delta1.
[ Intake Comment | Sheet PV200.3]
Can you confirm there will be no electrical lines/trenching needed at the ground level for this project? I
didn’t see it on the site plan but since there are easements and water mains I just wanted to be sure before I
sign off for LDE .
Response– Please see updated sheet PV200.3 for trenching details
Thank you,
Zeel Sarang
_______________________________________________________________________________________________
9085 Aero Drive, Suite A| San Diego, CA 92123 | CSL 1102539 | www. hesrenewables.com
''HES ,, RENEWABLES
2724, 2726, 2728, 2730, 2732, 2738 LOKER AVE. W.
CARLSBAD, CA 92010
HG FENTON 330
Design Criteria
1- Code: CALIFORNIA BLDG CODE 2022 / ASCE 7-16
2 - Wind: 96 MPH, Exposure: B
3 - Wood Species: DF-L No. 1 (SG = 0.5 )
Notice: Use restrictions of these calculations.
The attached Calculations are valid only when bearing original signature hereon.
Contractor/Client to verify existing dimensions/conditions prior to construction
& solar racking is installed per manufacturer span requirements.
The use of these calculations is solely intended for the above mentioned project.
3/29/2024
Structural Calculations for
SOLAR POWER SYSTEM CONNECTION CHECK AT:
Job:
1-844-PV ELITE | info@yoursolarplans.com
3000 E. Birch Street Suite 201 | Brea CA 92821
R E G I S T E R E D P R O F E S S I O N A L E N G I N E E R
C I V I L
No. C70784
Exp. 06/30/2025
S T A T E O F C A L I F O R N I A
PH O N G TRUO
N
G
THESE PLANS/DOCUMENTS HAVE BEENREVIEWED FOR COMPLIANCE WITH THE
APPLICABLE CALIFORNIA BUILDING STANDARDSCODES AS ADOPTED BY THE STATE OFCALIFORNIA AND AMENDED BY THE
JURISDICTION. PLAN REVIEW ACCEPTANCE OFDOCUMENTS DOES NOT AUTHORIZECONSTRUCTION TO PROCEED IN VIOLATION OFANY FEDERAL, STATE, NOR LOCAL REGULATION.
BY: _________________ DATE: ________________
True North Compliance Services, Inc.
THIS SET OF THE PLANS AND SPECIFICATIONS
MUST BE KEPT ON THE JOB SITE AT ALL TIMESAND IT IS UNLAWFUL TO MAKE ANY CHANGESOR ALTERATIONS WITHOUT PERMISSION FROM
THE CITY. OCCUPANCY OF STRUCTURE(S) ISNOT PERMITTED UNTIL FINAL APPROVAL ISGRANTED BY ALL APPLICABLE DEPARTMENTS.
Ali Al-Murshid 04/04/24
\I yoursolarplonS.com
ENGINEERING SOLUTIONS FOR ALL YOUR SOLAR NEEDS
Uplift Pa =-592 lbs
Screw to Plywood # 14 Wood Screw
Plywood thickness tply =0.5 in
Screw Withdrawal Capacity Tu =350 lbs (Form No. E830E Group 1 Plywood, V.I.F.)
Factor of Safety F.O.S.=5
Allowable Withdrawal Ts = Tu / F.O.S.=70.0 lbs
Number of Screws per Attachment ns =6
Load Duration Factor CD =1.6
Allowable Uplift per Attachment Ta = CD * Ts * ns =672 lbs
Demand Capacity Ratio DCR = Pa / Ta =0.88 < 1 OK
Screw Shear Capacity Vu =590 lbs (Form No. E830E Group 1 Plywood, V.I.F.)
Factor of Safety F.O.S.=6
Allowable Withdrawal Vs = Vu / F.O.S.=98.3 lbs
Number of Screws per Attachment ns =6
Allowable Shear per Attachment Va = CD * Vs * ns =944 lbs
Demand Capacity Ratio DCR = Va / Ta =0.63 < 1 OK
Plywood Bending
APA Span Rating 32/16
Rafter Spacing L =24 in
Tributary Width b =4ft
Equivalent Uniform Load Qa = Pa / (L*b)=-74 psf
Plywood Nominal Bending Strength FbS =370 lb-in/ft
Load Duration CD =1.6
Panel Size Factor Cs =1.00
Adjusted Plywood Nominal Bending Strength FbS'=592.00
Plywood Design Capacity wb = 96FbS' / L2 =98.67 psf
Demand Capacity Ratio DCR = wb / Qa =0.750 < 1 OK
Ballast
Loads
Roof Dead Load QD =9psf
Roof Live Load QLr =0 psf (Panels not to be walked on)
Panel Weight Ppv =57.8 lbs
Ballast Block Weight Pb =32 lbs
Number of Ballast blocks nb =2
Weight per Ballast Pan Ppan =121.8 lbs
Beam Analysis
Demand
Beam Span L =8ft
Rafters Spacing sr =2ft
Uniform Dead Load wD = QD * sr =18 plf
Spacing Between Ballast Pan span =4ft
Starting Point Load a =4ft
Maximum Moment M =388 lb-ft
Capacity
Beam Wood Grade DF-L No. 1
Lumber Size 2x4
Breath b =1.5 in
Depth d =3.5 in
Section Modulus Sx = bd2 / 6 =3.06 in3
Load Duration Factor CD =0.9
Repetitive Factor Cr =1.15
Size Factor CF =1.5
Beam design stress fb =1000 psi
Moment Capacity Ma = fb * CD * CF * Sx =396 lb-ft
Demand Capacity Ratio DCR = M / Ma =0.98 < 1 OK
Deflection
Service Deflection =-0.428 in
Deflection Allowed a = L / 180 =0.800 in
Demand Capacity Ratio DCR = / a =0.54 < 1 OK
SEISMIC WEIGHT COMPARISON / ANALYSIS - (PER CEBC 2022 Part 10 Chapter 5 Section 502.5)
Building 2724
Ballast System Weight
Total PV System Weight WPV =24818 lbs
Existing Roof Weight
Roof Weight QD =9.0 psf
Building Length Lbuild =140 ft
Building Width Wbuild =75 ft
Roof Area Abuild =10500 ft2
Building Perimeter Pbuild =430 ft
Wall Height ht =10 ft
Wall weight Qwall =75 psf
Interior wall weight Qint =0 psf
Roof Load Wfloor = Abuild * QD =94.5 lbs
Wall LoadWwall = ht /2 * Qwall * Pbuild + Abuild * Qint /2=161.3 lbs
Total Story Weight Wbuild = Wfloor + Wwall =255.8 kips
Percentage Weight Increase WPV / Wbuild =9.70% < 10% OKAY
‐450.0
‐400.0
‐350.0
‐300.0
‐250.0
‐200.0
‐150.0
‐100.0
‐50.0
0.0
0.000 1.000 2.000 3.000 4.000 5.000 6.000 7.000 8.000 9.000 10.000
MO
M
E
N
T
LOCATION (FT)
Moment Diagram
SEISMIC WEIGHT COMPARISON / ANALYSIS - (PER CEBC 2022 Part 10 Chapter 5 Section 502.5)
Building 2726
Ballast System Weight
Total PV System Weight WPV =23889 lbs
Existing Roof Weight
Roof Weight QD =9.0 psf
Building Length Lbuild =150 ft
Building Width Wbuild =65 ft
Roof Area Abuild =9750 ft2
Building Perimeter Pbuild =430 ft
Wall Height ht =10 ft
Wall weight Qwall =75 psf
Interior wall weight Qint =0 psf
Roof Load Wfloor = Abuild * QD =87.75 lbs
Wall Load Wwall = ht /2 * Qwall * Pbuild + Abuild * Qint /2 =161.3 lbs
Total Story Weight Wbuild = Wfloor + Wwall =249 kips
Percentage Weight Increase WPV / Wbuild =9.59% < 10% OKAY
SEISMIC WEIGHT COMPARISON / ANALYSIS - (PER CEBC 2022 Part 10 Chapter 5 Section 502.5)
Building 2728
Ballast System Weight
Total PV System Weight WPV =38350 lbs
Existing Roof Weight
Roof Weight QD =9.0 psf
Building Length Lbuild =155 ft
Building Width Wbuild =155 ft
Roof Area Abuild =24025 ft2
Building Perimeter Pbuild =620 ft
Wall Height ht =10 ft
Wall weight Qwall =75 psf
Interior wall weight Qint =0 psf
Roof Load Wfloor = Abuild * QD =216.2 lbs
Wall Load Wwall = ht /2 * Qwall * Pbuild + Abuild * Qint /2 =232.5 lbs
Total Story Weight Wbuild = Wfloor + Wwall =448.7 kips
Percentage Weight Increase WPV / Wbuild =8.55% < 10% OKAY
SEISMIC WEIGHT COMPARISON / ANALYSIS - (PER CEBC 2022 Part 10 Chapter 5 Section 502.5)
Building 2730
Ballast System Weight
Total PV System Weight WPV =20108 lbs
Existing Roof Weight
Roof Weight QD =9.0 psf
Building Length Lbuild =120 ft
Building Width Wbuild =80 ft
Roof Area Abuild =9600 ft2
Building Perimeter Pbuild =400 ft
Wall Height ht =10 ft
Wall weight Qwall =75 psf
Interior wall weight Qint =0 psf
Roof Load Wfloor = Abuild * QD =86.4 lbs
Wall Load Wwall = ht /2 * Qwall * Pbuild + Abuild * Qint /2 =150 lbs
Total Story Weight Wbuild = Wfloor + Wwall =236.4 kips
Percentage Weight Increase WPV / Wbuild =8.51% < 10% OKAY
SEISMIC WEIGHT COMPARISON / ANALYSIS - (PER CEBC 2022 Part 10 Chapter 5 Section 502.5)
Building 2732
Ballast System Weight
Total PV System Weight WPV =16455 lbs
Existing Roof Weight
Roof Weight QD =9.0 psf
Building Length Lbuild =100 ft
Building Width Wbuild =70 ft
Roof Area Abuild =7000 ft2
Building Perimeter Pbuild =340 ft
Wall Height ht =10 ft
Wall weight Qwall =75 psf
Interior wall weight Qint =0 psf
Roof Load Wfloor = Abuild * QD =63 lbs
Wall Load Wwall = ht /2 * Qwall * Pbuild + Abuild * Qint /2 =127.5 lbs
Total Story Weight Wbuild = Wfloor + Wwall =190.5 kips
Percentage Weight Increase WPV / Wbuild =8.64% < 10% OKAY
SEISMIC WEIGHT COMPARISON / ANALYSIS - (PER CEBC 2022 Part 10 Chapter 5 Section 502.5)
Building 2738
Ballast System Weight
Total PV System Weight WPV =30976 lbs
Existing Roof Weight
Roof Weight QD =9.0 psf
Building Length Lbuild =200 ft
Building Width Wbuild =70 ft
Roof Area Abuild =14000 ft2
Building Perimeter Pbuild =540 ft
Wall Height ht =10 ft
Wall weight Qwall =75 psf
Interior wall weight Qint =0 psf
Roof Load Wfloor = Abuild * QD =126 lbs
Wall Load Wwall = ht /2 * Qwall * Pbuild + Abuild * Qint /2 =202.5 lbs
Total Story Weight Wbuild = Wfloor + Wwall =328.5 kips
Percentage Weight Increase WPV / Wbuild =9.43% < 10% OKAY