Loading...
HomeMy WebLinkAboutVerdantas Inc.; 2025-06-27; PSA25-3829CMIPSA25-3829CMI Page 1 General Counsel Approved 2/11/2025 MASTER AGREEMENT FOR AS-NEEDED MATERIALS TESTING VERDANTAS INC. THIS AGREEMENT is made and entered into as of the ______________ day of ___________________, 2025, by and between the Carlsbad Municipal Water District, a Public Agency organized under the Municipal Water Act of 1911, and a Subsidiary District of the City of Carlsbad, California ("CMWD"), and Verdantas Inc., a California corporation ("Contractor"). RECITALS A. CMWD requires the professional services of a consultant that is experienced in materials testing. B. The professional services are required on a non-exclusive, project-by-project basis. C. Contractor has the necessary experience in providing professional services and advice related to as-needed materials testing. D. Contractor has submitted a proposal to CMWD responsive to Request for Qualifications RFQ25-3671CMI and has affirmed its willingness and ability to perform such work as outlined in the Request for Qualifications. NOW, THEREFORE, in consideration of these recitals and the mutual covenants contained in this Agreement, CMWD and Contractor agree as follows: 1. SCOPE OF WORK CMWD retains Contractor to perform, and Contractor agrees to render, those services ("Services") that are defined in attached Exhibit "A," which is incorporated by this reference in accordance with this as specified in the Task Description for the project (see paragraph 5 below). 2. STANDARD OF PERFORMANCE While performing the Services, Contractor will exercise the reasonable professional care and skill customarily exercised by reputable members of Contractor's profession practicing in the Metropolitan Southern California Area, and will use reasonable diligence and best judgment while exercising its professional skill and expertise. 3. TERM The term of this Agreement will be effective from the date first above written to Aug. 17, 2028. The Executive Manager may amend the Agreement to extend it for two (2) additional one (1) year periods or parts of a year CMWD needs, and appropriation of funds by the CMWD Board of Directors. The parties will prepare a written amendment indicating the effective date and length of the extended Agreement. 4. PROGRESS AND COMPLETION The work for any project granted to Contractor pursuant to this Agreement will begin within ten (10) days after receipt of notification to proceed by CMWD and be completed within the time specified in the Task Description for the project (see paragraph 5 below). Extensions of time for a specific Task Description may be granted if requested by Contractor and agreed to in writing by the Executive Manager or General Manager as authorized by the Executive Manager. The Executive Manager or General Manager will give ) June 24, 2025 Item #6 Page 857 of 1064 Docusign Envelope ID: 063721B4-05C7-4FBA-B778-2349BC8C3E36 June 27th PSA25-3829CMI Page 2 General Counsel Approved 2/11/2025 allowance for documented and substantiated unforeseeable and unavoidable delays not caused by a lack of foresight on the part of Contractor, or delays caused by CMWD inaction or other agencies' lack of timely action. In no event shall a specific Task Description exceed the term of this Agreement. 5. COMPENSATION The cumulative total for all projects allowed pursuant to this Agreement will not exceed six hundred thousand dollars ($600,000) per Agreement year. If the City elects to extend the Agreement pursuant to Section 3, the costs of services may increase by a maximum of 2% per Agreement year, if agreed to by both parties. Fees will be paid on a project-by- Payment terms are Net 30 unless otherwise provided or agreed to in writing by the parties. Prior to initiation of any project work by Contractor, CMWD shall prepare a Project Task Description and Fee Allotment ("Task Description") which, upon signature by Contractor and for CMWD, the Executive Manager or General Manager, will be considered a part of this Agreement. The Task Description will include a detailed scope of services for the particular project being considered and a statement of Contractor's fee to complete the project in accordance with the specified scope of services. The Task Description will also include a description of the method of payment and will be based upon an hourly rate, percentage of project complete, completion of specific project tasks or a combination of these. 6. PUBLIC WORKS 6.1 Prevailing Wage Rates. Any construction, alteration, demolition, repair, and maintenance work, including work performed during design and preconstruction such as inspection and land surveying work, cumulatively exceeding $1,000 and performed under this California Labor Code Section 1720 et seq. and are subject to state prevailing wage laws. The general prevailing rate of wages, for each craft or type of worker needed to execute the contract, shall be those as determined by the Director of Industrial Relations pursuant to the Section 1770, 1773 and 1773.1 of the California Labor Code. Pursuant to Section 1773.2 of the California Labor Code, a current copy of applicable wage rates is on file in the office of the City Engineer. Contractor shall not pay less than the specified prevailing rates of wages to all such workers employed by Contractor in the execution of the Agreement. Contractor and any subcontractors shall comply with Section 1776 of the California Labor Code, which generally requires keeping accurate payroll records, verifying and certifying payroll records, and making them available for inspection. Contractor shall require any subcontractors to comply with Section 1776. 6.2 DIR Registration. California Labor Code Section 1725.5 requires the Contractor and any subcontractor or subconsultant performing any public work under this Agreement to be currently registered with the California Department of Industrial Relations (DIR), as specified in California Labor Code section 1725.5. California Labor Code Section 1771.1 provides that a contractor or subcontractor shall not be qualified to engage in the performance of any contract for public work, unless currently registered and qualified to perform public work pursuant to California Labor Code Section 1725.5. Prior to the performance of public work by any subcontractor under this Agreement, Contractor must furnish City with the subcontractor's current DIR registration number. 7. CONSTRUCTION MANAGEMENT SOFTWARE Procore Project Management and Collaboration System. This project may utilize CMWD (www.procore.com) online project management and document control platform. The intent of utilizing Procore is to reduce cost and schedule risk, improve quality and safety, and maintain a healthy team dynamic by improving information flow, reducing non-productive activities, reducing rework and June 24, 2025 Item #6 Page 858 of 1064 Docusign Envelope ID: 063721B4-05C7-4FBA-B778-2349BC8C3E36 PSA25-3829CMI Page 3 General Counsel Approved 2/11/2025 decreasing turnaround times. Contractor is required to create a free web-based Procore user account(s) and utilize web-based training/tutorials (as needed) to become familiar with the system. Unless the City of Carlsbad City Engineer approves otherwise, Contractor shall process all project documents through Procore because this platform will be used to submit, track, distribute and collaborate on project. If unfamiliar or not otherwise trained with Procore, Contractor and applicable team members shall complete a free training certification course located at http://learn.procore.com/procore-certification- subcontractor. Contractor is responsible for attaining their own Procore support, as needed, either through the online training or reaching out to the Procore support team. It will be the responsibility of Contractor to regularly check Procore and review updated documents as they are added. There will be no cost to the Contractor for use of Procore. It is recommended that Contractor provide mobile access for Windows, iOS located at https://apps.apple.com/us/app/procore-construction-management/id374930542 or Android devices located at https://play.google.com/store/apps/details?id=com.procore.activities with the Procore App installed to at least one on-site individual to provide real-time access to current posted drawings, specifications, requests for information, submittals, schedules, change orders, project documents, as well as any deficient observations or punch list items. Providing mobile access will improve communication, efficiency, and productivity for all parties. The use of Procore for project management does not relieve the contractor of any other requirements as may be specified in this Agreement or Task Descriptions. 8. STATUS OF CONTRACTOR Contractor will perform the Services in Contractor's own way as an independent contractor and in pursuit of Contractor's independent calling, and not as an employee of CMWD. Contractor will be under the control of CMWD only as to the result to be accomplished, but will consult with CMWD as necessary. The persons used by Contractor to provide services under this Agreement will not be considered employees of CMWD for any purposes. The payment made to Contractor pursuant to this Agreement will be the full and complete compensation to which Contractor is entitled. CMWD will not make any federal or state tax withholdings on behalf of Contractor or its agents, employees or subcontractors. CMWD will not be required to pay any workers' compensation insurance or unemployment contributions on behalf of Contractor or its employees or subcontractors. Contractor agrees to indemnify CMWD and the City of Carlsbad within thirty (30) days for any tax, retirement contribution, social security, overtime payment, unemployment payment or workers' compensation payment which CMWD may be required to make on behalf of Contractor or any agent, employee, or subcontractor of Contractor for work done under this CMWD may deduct the indemnification amount from any balance owing to Contractor. 9. CONTRACTOR EVALUATIONS program. Prior to the release of any task orders, the Contractor will be notified of the program may be evaluated and the results will be considered for future task orders or agreements. 10. SUBCONTRACTING Contractor will not subcontract any portion of the Services without prior written approval of CMWD. If Contractor subcontracts any of the Services, Contractor will be fully responsible to CMWD for the acts and omissions of Contractor's subcontractor and of the persons either directly or indirectly employed by the subcontractor, as Contractor is for the acts and omissions of persons directly employed by Contractor. June 24, 2025 Item #6 Page 859 of 1064 Docusign Envelope ID: 063721B4-05C7-4FBA-B778-2349BC8C3E36 PSA25-3829CMI Page 4 General Counsel Approved 2/11/2025 Nothing contained in this Agreement will create any contractual relationship between any subcontractor of Contractor and CMWD. Contractor will be responsible for payment of subcontractors. Contractor will bind every subcontractor and every subcontractor of a subcontractor by the terms of this Agreement applicable to Contractor's work unless specifically noted to the contrary in the subcontract and approved in writing by CMWD. 11. OTHER CONTRACTORS CMWD reserves the right to employ other Contractors in connection with the Services. 12. INDEMNIFICATION Contractor agrees to defend (with counsel approved by CMWD), indemnify and hold harmless CMWD and the City of Carlsbad and its officers, elected and appointed officials, employees and volunteers from and against all claims, damages, losses and expenses including attorneys fees arising out of the performance of the work described in this Agreement and Task Descriptions caused by any willful misconduct or negligent act or omission of the Contractor, any subcontractor, anyone directly or indirectly employed by any of them or anyone for whose acts any of them may be liable. Contractor California Civil Code Section 2782.8), then, and only to the extent required by California Civil Code Section 2782.8, which is fully incorporated in this Agreement, Contractor arise out of, pertain to, or relate to the negligence, recklessness, or willful misconduct of the Contractor, and, upon Contractor obtaining a final adjudication by a court of competent jurisdiction. Co percentage of fault. The parties expressly agree that any payment, attorneys fee, cost or expense CMWD or the City of Carlsbad incurs or -administered section will survive the expiration or early termination of this Agreement. 13. INSURANCE Contractor will obtain and maintain for the duration of the Agreement and any and all amendments, insurance against claims for injuries to persons or damage to property which may arise out of or in connection with performance of the services by Contractor employees or subcontractors. The insurance will be obtained from an insurance carrier admitted and authorized to do business in the State of California. The insurance carrier is required to have a current Best's Key Rating of not less than "A-:VII"; OR Approved Surplus Line Insurers OR an alien non-admitted insurer listed by the National Association of Insurance Commissioners (NAIC) latest quarterly listings report. 13.1 Coverages and Limits. Contractor will maintain the types of coverages and minimum limits indicated below, unless Risk Manager or City Manager approves a lower amount. These minimum amounts of coverage will not constitute any limitations or cap on Contractor's indemnification obligations under this Agreement. City, its officers, agents and employees make no representation that the limits of the insurance specified to be carried by Contractor pursuant to this Agreement are adequate to protect Contractor. If Contractor believes that any required insurance coverage is inadequate, Contractor will June 24, 2025 Item #6 Page 860 of 1064 Docusign Envelope ID: 063721B4-05C7-4FBA-B778-2349BC8C3E36 PSA25-3829CMI Page 5 General Counsel Approved 2/11/2025 obtain such additional insurance coverage, as Contractor deems adequate, at Contractor's sole expense. The full limits available to the named insured shall also be available and applicable to the City as an additional insured. 13.1.1 Commercial General Liability Insurance. including personal and advertising injury, with limits no less than $2,000,000 per occurrence. If a general aggregate limit applies, either the general aggregate limit shall apply separately to this project/location or the general aggregate limit shall be twice the required occurrence limit. 13.1.2 Automobile Liability. (If the use of an automobile is involved for Contractor's work for City). $2,000,000 combined single-limit per accident for bodily injury and property damage. 13.1.3 Workers' Compensation and Employer's Liability. Workers' Compensation limits as required by the California Labor Code. Workers' Compensation will not be required if Contractor has no employees and provides, to satisfaction, a declaration stating this. 13.1.4 Professional Liability. with limits of not less than $1,000,000 per claim. Coverage must be maintained for a period of five years following the date of completion of the work. 13.2. Additional Provisions. Contractor will ensure that the policies of insurance required under this Agreement contain, or are endorsed to contain, the following provisions: 13.2.1 CMWD will be named as an additional insured on General Liability which shall provide primary coverage to CMWD. 13.2.2 Contractor will obtain occurrence coverage, excluding Professional Liability, which will be written as claims-made coverage. 13.2.3 If Contractor maintains higher limits than the minimums shown above, the City requires and will be entitled to coverage for the higher limits maintained by Contractor. Any available insurance proceeds in excess of the specified minimum limits of insurance 13.2.4 This insurance will be in force during the life of the Agreement and any extensions of it and will not be canceled without thirty (30) days prior written notice to CMWD sent by certified mail pursuant to the Notice provisions of this Agreement. 13.3 Providing Certificates of Insurance and Endorsements. Prior to execution of this Agreement, Contractor will furnish certificates of insurance and endorsements to CMWD. 13.4 Failure to Maintain Coverage. If Contractor fails to maintain any of these insurance coverages, then CMWD will have the option to declare Contractor in breach, or may purchase replacement insurance or pay the premiums that are due on existing policies in order to maintain the required coverages. Contractor is responsible for any payments made by CMWD to obtain or maintain insurance and CMWD may collect these payments from Contractor or deduct the amount paid from any sums due Contractor under this Agreement. June 24, 2025 Item #6 Page 861 of 1064 Docusign Envelope ID: 063721B4-05C7-4FBA-B778-2349BC8C3E36 PSA25-3829CMI Page 6 General Counsel Approved 2/11/2025 13.5 Submission of Insurance Policies. CMWD reserves the right to require, at anytime, complete and certified copies of any or all required insurance policies and endorsements. 14. BUSINESS LICENSE Contractor will obtain and maintain a City of Carlsbad Business License for the term of the Agreement, as may be amended from time-to-time. 15. ACCOUNTING RECORDS Contractor will maintain complete and accurate records with respect to costs incurred under this Agreement. All records will be clearly identifiable. Contractor will allow a representative of CMWD during normal business hours to examine, audit, and make transcripts or copies of records and any other documents created pursuant to this Agreement. Contractor will allow inspection of all work, data, documents, proceedings, and activities related to the Agreement for a period of four (4) years from the date of final payment under this Agreement. 16. OWNERSHIP OF DOCUMENTS All work product produced by Contractor or its agents, employees, and subcontractors pursuant to this Agreement is the property of CMWD. In the event this Agreement is terminated, all work product produced by Contractor or its agents, employees and subcontractors pursuant to this Agreement will be delivered at once to CMWD. Contractor will have the right to make one (1) copy of the work product for 17. COPYRIGHTS Contractor agrees that all copyrights that arise from the services will be vested in CMWD and Contractor relinquishes all claims to the copyrights in favor of CMWD. 18. NOTICES The name of the persons who are authorized to give written notice or to receive written notice on behalf of CMWD and on behalf of Contractor under this Agreement. For CMWD: For Contractor: Name Jennifer Chapman Name Kristen D. Williams Title Senior Contract Administrator Title Area Leader/Vice President Dept Public Works/CM&I Address 3934 Murphy Canyon Rd., Ste. B-205 CARLSBAD MUNICIPAL WATER DISTRICT S , CA 92123 Address 1635 Faraday Ave. Phone 858-292-8030 Carlsbad, CA 92008 Email kwilliams@verdantas.com Phone 442-339-2780 Each party will notify the other immediately of any changes of address that would require any notice or delivery to be directed to another address. 19. GENERAL COMPLIANCE WITH LAWS Contractor will keep fully informed of federal, state and local laws and ordinances and regulations which in any manner affect those employed by Contractor, or in any way affect the performance of the Services by Contractor. Contractor will at all times observe and comply with these laws, ordinances, and June 24, 2025 Item #6 Page 862 of 1064 Docusign Envelope ID: 063721B4-05C7-4FBA-B778-2349BC8C3E36 PSA25-3829CMI Page 7 General Counsel Approved 2/11/2025 regulations and will be responsible for the compliance of Contractor's services with all applicable laws, ordinances and regulations. Contractor will be aware of the requirements of the Immigration Reform and Control Act of 1986 and will comply with those requirements, including, but not limited to, verifying the eligibility for employment of all agents, employees, subcontractors and consultants whose services are required by this Agreement. 20. CALIFORNIA AIR RESOURCES BOARD (CARB) ADVANCED CLEAN FLEETS REGULATIONS -duty package delivery vehicles operated in California may be subject to the California Air Resources Board (CARB) Advanced Clean Fleets regulations. Such vehicles may therefore be subject to requirements to reduce emissions of air pollutants. For more information, please visit the CARB Advanced Clean Fleets webpage at https://ww2.arb.ca.gov/our-work/programs/advanced-clean-fleets. 21. DISCRIMINATION, HARASSMENT, AND RETALIATION PROHIBITED Contractor will comply with all applicable local, state and federal laws and regulations prohibiting discrimination, harassment, and retaliation. 22. DISPUTE RESOLUTION If a dispute should arise regarding the performance of the Services the following procedure will be used to resolve any questions of fact or interpretation not otherwise settled by agreement between the parties. Representatives of Contractor or CMWD will reduce such questions, and their respective views, to writing. A copy of such documented dispute will be forwarded to both parties involved along with recommended methods of resolution, which would be of benefit to both parties. The representative receiving the letter will reply to the letter along with a recommended method of resolution within ten (10) business days. If the resolution thus obtained is unsatisfactory to the aggrieved party, a letter outlining the disputes will be forwarded to the City Manager. The City Manager will consider the facts and solutions recommended by each party and may then opt to direct a solution to the problem. In such cases, the action of the City Manager will be binding upon the parties involved, although nothing in this procedure will prohibit the parties from seeking remedies available to them at law. 23. TERMINATION In the event of the Contractor's failure to prosecute, deliver, or perform the Services, CMWD may terminate this Agreement for nonperformance by notifying Contractor by certified mail of the termination. If CMWD decides to abandon or indefinitely postpone the work or services contemplated by this Agreement, CMWD may terminate this Agreement upon written notice to Contractor. Upon notification of termination, Contractor has five (5) business days to deliver any documents owned by CMWD and all work in progress to CMWD address contained in this Agreement. CMWD will make a determination of fact based upon the work product delivered to CMWD and of the percentage of work that Contractor has performed which is usable and of worth to CMWD in having the Agreement completed. Based upon that finding CMWD will determine the final payment of the Agreement. CMWD may terminate this Agreement by tendering thirty (30) days written notice to Contractor. Contractor may terminate this Agreement by tendering thirty (30) days written notice to CMWD. In the event of termination of this Agreement by either party and upon request of CMWD, Contractor will assemble the work product and put it in order for proper filing and closing and deliver it to CMWD. Contractor will be paid for work performed to the termination date; however, the total will not exceed June 24, 2025 Item #6 Page 863 of 1064 Docusign Envelope ID: 063721B4-05C7-4FBA-B778-2349BC8C3E36 PSA25-3829CMI Page 8 General Counsel Approved 2/11/2025 the lump sum fee payable under this Agreement. CMWD will make the final determination as to the portions of tasks completed and the compensation to be made. 24. COVENANTS AGAINST CONTINGENT FEES Contractor warrants that Contractor has not employed or retained any company or person, other than a bona fide employee working for Contractor, to solicit or secure this Agreement, and that Contractor has not paid or agreed to pay any company or person, other than a bona fide employee, any fee, commission, percentage, brokerage fee, gift, or any other consideration contingent upon, or resulting from, the award or making of this Agreement. For breach or violation of this warranty, CMWD will have the right to annul this Agreement without liability, or, in its discretion, to deduct from the Agreement price or consideration, or otherwise recover, the full amount of the fee, commission, percentage, brokerage fees, gift, or contingent fee. 25. CLAIMS AND LAWSUITS By signing this Agreement, Contractor agrees that any agreement claim submitted to CMWD must be asserted as part of the Agreement process as set forth in this Agreement and not in anticipation of litigation or in conjunction with litigation. Contractor acknowledges that if a false claim is submitted to CMWD, it may be considered fraud and Contractor may be subject to criminal prosecution. Contractor acknowledges that California Government Code Section 12650 et seq., the False Claims Act applies to this Agreement and, provides for civil penalties where a person knowingly submits a false claim to a public entity. These provisions include false claims made with deliberate ignorance of the false information or in reckless disregard of the truth or falsity of information. If CMWD seeks to recover penalties pursuant to the False Claims Act, it is entitled to recover its litigation costs, including attorney's fees. Contractor acknowledges that the filing of a false claim may subject Contractor to an administrative debarment proceeding as the result of which Contractor may be prevented to act as a Contractor on any public work or improvement for a period of up to five (5) years. Contractor acknowledges debarment by another jurisdiction is grounds for City to terminate this Agreement. 26. JURISDICTION AND VENUE This Agreement shall be interpreted in accordance with the laws of the State of California without regard to, or application of, choice of law rules or principles. Any action at law or in equity brought by either of the parties for the purpose of enforcing a right or rights provided for by this Agreement will be tried in a court of competent jurisdiction in the County of San Diego, State of California, and the parties waive all provisions of law providing for a change of venue in these proceedings to any other county. 27. SUCCESSORS AND ASSIGNS It is mutually understood and agreed that this Agreement will be binding upon CMWD and Contractor and their respective successors. Neither this Agreement nor any part of it nor any monies due or to become due under it may be assigned by Contractor without the prior consent of CMWD, which shall not be unreasonably withheld. 28. THIRD PARTY RIGHTS Nothing in this Agreement should be construed to give any rights or benefits to any party other than the CMWD and Contractor. 29. ENTIRE AGREEMENT This Agreement, together with any other written document referred to or contemplated by it, along with the purchase order for this Agreement and its provisions, embody the entire Agreement and June 24, 2025 Item #6 Page 864 of 1064 Docusign Envelope ID: 063721B4-05C7-4FBA-B778-2349BC8C3E36 PSA25-3829CMI Page 9 General Counsel Approved 2/11/2025 understanding between the parties relating to the subject matter of it. In case of conflict, the terms of the Agreement supersede the purchase order. Neither this Agreement nor any of its provisions may be amended, modified, waived or discharged except in a writing signed by both parties. This Agreement may be executed in counterparts. 30. PUBLIC AGENCY CLAUSE Contractor agrees that any public agency as defined by Cal. Gov. Code section 6500, if authorized by its governing body, shall have the option to participate in this contract at the same prices, terms, and conditions. If another public agency chooses to participate, the term shall be for the term of this contract, and shall be contingent upon Contractor's acceptance. Participating public agencies shall be solely responsible for the placing of orders, arranging for delivery and/or services, and making payments to the Contractor. The City of Carlsbad and Carlsbad Municipal Water District shall not be liable, or responsible, for any obligations, including but not limited to financial responsibility, in connection with participation by another public agency. 31. AUTHORITY The individuals executing this Agreement and the instruments referenced in it on behalf of Contractor each represent and warrant that they have the legal power, right and actual authority to bind Contractor to the terms and conditions of this Agreement. {signatures on following page} June 24, 2025 Item #6 Page 865 of 1064 Docusign Envelope ID: 063721B4-05C7-4FBA-B778-2349BC8C3E36 PSA25-3829CMI Page 10 General Counsel Approved 2/11/2025 CONTRACTOR CARLSBAD MUNICIPAL WATER DISTRICT, a Public Agency organized under the Municipal Water Act of 1911, and a Subsidiary District of the City of Carlsbad VERDANTAS INC., a California corporation By: By: (sign here) K , President Kristen D. Williams, Vice President (print name/title) ATTEST: By: SHERRY FREISINGER, Secretary (sign here) By: Pat Sheridan, CFO Director of Constituent & Clerk Services (print name/title) Proper notarial acknowledgment of execution by Contractor must be attached. If a corporation, Agreement must be signed by one corporate officer from each of the following two groups: Group A Group B Chairman, President, or Vice-President Secretary, Assistant Secretary, CFO or Assistant Treasurer Otherwise, the corporation must attach a resolution certified by the secretary or assistant secretary under corporate seal empowering the officer(s) signing to bind the corporation. APPROVED AS TO FORM: CINDIE K. McMAHON, General Counsel By:_______________________________ June 24, 2025 Item #6 Page 866 of 1064 Docusign Envelope ID: 063721B4-05C7-4FBA-B778-2349BC8C3E36 PSA25-3829CMI Page 11 General Counsel Approved 2/11/2025 EXHIBIT A SCOPE OF SERVICES AND FEE Contractor shall perform as-needed materials testing services in accordance with the city/CMWD Request for Qualifications (RFQ25-3671CMI) dated March 5, 2025. The City/CMWD within fifteen (15) minutes of the scheduled time and is expected to be prepared to perform the requested tests and tasks. Costs incurred by the City/CMWD due to time delays created by the materials testing firm shall be at the expense of said firm. The City/CMWD will make every effort to coordinate work to allow use of a single technician, but is under no obligation to do so. The City/CMWD may schedule or reschedule work on a same day basis if a technician is available. The City/CMWD will not be held liable for any test cancellation that occurred at least two (2) hours prior to the scheduled time. The City/CMWD will only pay for time spent on site; no charges for mileage or travel time. Rates should be inclusive of vehicle usage and administrative time, which includes coordination, scheduling, billing, etc. The cost of each test performed will also be an inclusive rate that includes vehicle usage, the test, the tools needed to perform the test, the report, pickup and drop off. Time will be billed in 2-hour increments with a 2-hour minimum. Invoices for services are expected to be reviewed for accuracy before being submitted to the City/CMWD. If the use of subcontractors is approved by the City/CMWD, they shall be billed at cost plus no more than 10%. Compaction test reports will be made available in the field at the time of testing where sampling for maximum densities was made available two (2) days prior to testing of soils and aggregates, and the same day for asphalt concrete. When proctors for maximum densities are not available on the day of testing, compaction test results shall be available no later than the next day. Contractor will prepare and submit a formal report as soon as that segment of work is completed or when otherwise requested by the City/CMWD. June 24, 2025 Item #6 Page 867 of 1064 Docusign Envelope ID: 063721B4-05C7-4FBA-B778-2349BC8C3E36 PUBLIC WORKS REQUEST FOR QUALIFICATIONS RFQ25-3671CMI 2025 Master Agreement Consultant Services for Construction Management & Inspection Services SAMPLE MASTER AGREEMENT RATE SCHEDULE Prices valid through initial Term of Agreement STAFF NAME TITLE HOURLY RATE 1. 2. 3. 4. 5. . . . . . . . EXPENSES DESCRIPTION COST % MARKUP 1. 2. . . . . PSA25-3829CMI; Exhibit "A" (cont.) June 24, 2025 Item #6 Page 868 of 1064 Docusign Envelope ID: 063721B4-05C7-4FBA-B778-2349BC8C3E36 PUBLIC WORKS REQUEST FOR QUALIFICATIONS RFQ25-3671CMI 2025 Master Agreement Consultant Services for Construction Management & Inspection Services EXHIBIT B SAMPLE MASTER AGREEMENT RATE SCHEDULE Prices valid through initial Term of Agreement SUB-CONSULTANTS NAME/FIRM TITLE HOURLY RATE 1. 2. 3. 9. 10. PSA25-3829CMI; Exhibit "A" (cont.) June 24, 2025 Item #6 Page 869 of 1064 Docusign Envelope ID: 063721B4-05C7-4FBA-B778-2349BC8C3E36 West 1/29/2025 Staff-15v1 AggPW+veh 2025 AMENDED BILLING RATE SCHEDULE (Verdantas West) Professional Services Hourly Rate Hourly Rate Senior Consultant I, Associate $235.00 Administrative//Technical $90.00 Senior Consultant II, Principal $265.00 Editor/ Project Coordinator I Senior Consultant III, Sr. Principal $310.00 Administrative//Technical $105.00 Project Manager $190.00 Editor/Project Coordinator II Senior Project Manager $215.00 Operations / Laboratory Manager $185.00 Field/Lab Supervisor $150.00 Staff Engineer/Scientist/Geologist $155.00 Senior Staff Engineer/Scientist/Geologist $165.00 CAD/GIS/Data Management Hourly Rate Project Engineer/Scientist/Geologist $190.00 CAD Designer I $145.00 Senior Engineer/Scientist/Geologist $215.00 CAD Designer II $160.00 Project Designer $165.00 Support Hourly Rate Senior Project Designer $185.00 Field/Lab Technician I $90.00 CAD Technician I $125.00 Field/Lab Technician II/Special Inspector $100.00 CAD Technician II $140.00 Field/Lab Technician III/Special Inspector II $105.00 CAD Technician III $150.00 Senior Technician/Senior Special Inspector $115.00 Source Inspector $135.00 GIS Analyst I $150.00 System Operation & Maintenance Specialist $150.00 GIS Analyst II $160.00 Non-Destructive Testing (NDT) Specialist $170.00 Senior GIS Analyst $210.00 Prevailing Wage (Group 1) *$145.00 GIS Technician I $125.00 Prevailing Wage (Group 2) *$158.00 GIS Technician II $145.00 Prevailing Wage (Group 3) *$160.00 City of Los Angeles Deputy Building/$160.00 Data Manager $165.00 Grading Inspector Senior Data Manager $185.00 PSA25-3829CMI; Exhibit "A" (cont.) June 24, 2025 Item #6 Page 870 of 1064 Docusign Envelope ID: 063721B4-05C7-4FBA-B778-2349BC8C3E36 West 1/29/2025 Staff-15v1 AggPW+veh GEOTECHNICAL LABORATORY TESTING METHOD $/TEST METHOD $/TEST Classification & Index Properties Soil Chemistry & Corrosivity Photograph of sample 15 Sulfate content - by ion chromatograph (CTM 417 Part 2)85 Moisture content (ASTM D2216)25 Sulfate screen (Hach®)35 Moisture & density (ASTM D2937) ring samples 37 Chloride content (AASHTO T291/CTM 422)75 Moisture & density (ASTM D2937) Shelby tube or cutting 45 pH + minimum resistivity (CTM 643)140 Atterberg limits 3 points (ASTM D4318)160 Chloride content by ion chromatograph (AASHTO 85 -Single point, non-plastic 90 T291/CTM 422) -Atterberg limits (organic ASTM D2487 / D4318)195 Corrosion suite: minimum resistivity, sulfate, chloride,285 -Visual classification as non-plastic (ASTM 15 pH (CTM 643) D2488) Particle size:Organic matter content (ASTM D2974)70 -Sieve only 1½ inch to #200 (AASHTO T27/ASTM 155 Consolidation & Expansion/Swell Tests C136/ASTM D6913/CTM 202)Consolidation (ASTM D2435):210 -Large sieve 6 inch to #200 (AASHTO T27/ASTM 195 Each additional time curve.50 C136/ASTM D6913/CTM 202)Each additional load/unload w/o time reading 45 -Hydrometer only (ASTM D7928)120 Expansion Index (ASTM D4829)140 -200 Relative compaction of untreated/treated soils/270 -Percent passing #200 sieve, wash only (ASTM D1140)75 aggregates (CTM 216) Specific gravity and absorption of fine aggregate 140 Relative density 0.1 ft mold (ASTM D4253, D4254)250 (AASHTO T84/ASTM C128/ASTM D854/CTM 207)California Bearing Ratio (ASTM D1883) - 3 point 535 Specific gravity and absorption of coarse aggregate 110 California Bearing Ratio (ASTM D1883) - 1 point 200 (AASHTO T85/ASTM C127/CTM 206)R-Value untreated soils/aggregates (AASHTO T190/335 Total porosity - on Shelby tube sample (calculated)180 ASTM D2844/CTM 301) Total porosity - on other sample (calculated)165 R-Value lime or cement treated soils/aggregates 365 Shrinkage limits wax method (ASTM D4943)135 (AASHTO T190/ ASTM D2844/CTM 301) Pinhole dispersion (ASTM D4647)225 Swell collapse Method A up to 10 load/unloads w/o 310 Total porosity - on other sample (calculated)165 time curves (ASTM D4546-A) Dispersive characteristics (double hydrometer ASTM 215 Single load swell/collapse - Method B (ASTM 115 D4221)D4546-B, seat, load & inundate only) As-received moisture & density (chunk/carved sample)65 Triaxial Tests Sand Equivalent (AASHTO T176/ASTM D2419/CTM 217)115 Unconfined compression strength of cohesive soil 145 -inch sieve, (ASTM D7928)200 (with stress/strain plot, ASTM D2166) Shear Strength Unconsolidated undrained triaxial compression test 185 Pocket penetrometer 20 on cohesive soils(UU, ASTM D2850, USACE Q test, Direct shear (ASTM D3080, mod., 3 points):per confining stress) -Consolidated undrained - 0.05 inch/min (CU)320 Consolidated undrained triaxial compression test 400 -Consolidated drained - <0.05 inch/min (CD)385 for cohesive soils, (CU, ASTM D4767, USACE R-bartest) Residual shear EM 1110-2-1906-IXA (price per each 55 with back pressure saturation & pore water pressure additional pass after shear)measurement (per confining stress) Remolding or hand trimming of specimens (3 points)95 Consolidated drained triaxial compression test (CD, Oriented or block hand trimming (per hour)70 USACE S), with volume change measurement. Price Single point shear 115 per soil type below EM 1110-21906(X): Torsional shear (ASTM D6467 / ASTM D7608)880 -Sand or silty sand soils (per confining stress)400 Compaction & Pavement Subgrade Tests -Silt or clayey sand soils (per confining stress)535 Standard Proctor compaction, 4 points (ASTM D698)-Clay soils (per confining stress)755 -4-inch diameter mold (Methods A & B)170 -Three-stage triaxial (sand or silty sand soils)700 -6-inch diameter mold (Method C)230 -Three-stage triaxial (silt or clayey sand soils)935 Modified Proctor compaction 4 points (ASTM D1557):-Three-stage triaxial (clay soils)1,320 -4-inch diameter mold Methods A & B 235 -Remolding of test specimens 70 -6-inch diameter mold Method C 265 Hydraulic Conductivity Tests Check point (per point)70 Triaxial permeability in flexible-wall permeameter with 335 Relative compaction of untreated/treated 270 backpressure saturation at one effective stress (EPA soils/aggregates (CTM 216)9100/ASTM D5084, falling head Method C): Relative density 0.1 ft mold (ASTM D4253, D4254)250 Each additional effective stress 130 California Bearing Ratio (ASTM D1883) - 3 point 535 Hand trimming of soil samples for horizontal K 65 California Bearing Ratio (ASTM D1883) - 1 point 200 Remolding of test specimens 70 R-Value untreated soils/aggregates (AASHTO T190/335 Permeability of granular soils (ASTM D2434)145 ASTM D2844/CTM 301)Soil-Cement R-Value lime or cement treated soils/aggregates 365 Moisture-density curve for soil-cement mixtures (ASTM 260 (AASHTO T190/ ASTM D2844/CTM 301)D558) Soil Chemistry & Corrosivity Wet-dry durability of soil-cement mixtures (ASTM D559) ¹1,290 pH Method A (ASTM D4972 or CTM 643)50 Compressive strength of molded soil-cement cylinder 65 Electrical resistivity single point as received moisture 50 (ASTM D1633)¹ Minimum resistivity 3 moisture content points (ASTM 95 Soil-cement remolded specimen (for shear strength,250 G187/CTM 643)consolidation, etc.) ¹ pH + minimum resistivity (CTM 643)140 ¹Compaction (ASTM D558 maximum density) should Sulfate content - gravimetric (CTM 417 B Part 2)75 also be performed not included in above price PSA25-3829CMI; Exhibit "A" (cont.) June 24, 2025 Item #6 Page 871 of 1064 Docusign Envelope ID: 063721B4-05C7-4FBA-B778-2349BC8C3E36 West 1/29/2025 Staff-15v1 AggPW+veh CONSTRUCTION MATERIALS LABORATORY TESTING METHOD $/TEST METHOD $/TEST Concrete Strength Characteristics 40 Flat & elongated particles in coarse aggregate (ASTM 230 D4791/CTM 235) Compression, concrete or masonry cores (testing only)45 Cleanness value of coarse aggregate (CTM 227)225 Soundness, magnesium (AASHTO T104/ASTM 240 Trimming concrete cores (per core) 25 C88/CTM 214) Flexural strength of concrete (simple beam-3rd pt. loading,90 Soundness, sodium (AASHTO T104/ASTM C88/695 ASTM C78/CTM 523)CTM 214) Flexural strength of concrete (simple beam- center pt.90 Masonry loading, ASTM C293/CTM 523)35 Non shrink grout cubes (2 inch, ASTM C109/C1107)30 35 Drying shrinkage - four readings, up to 90 days, 3 bars 430 - testing 45 (ASTM C157)only (ASTM C42) Length of concrete cores (CTM 531)45 Masonry core shear testing (Title 24)85 Hot Mix Asphalt (HMA)Veneer bond strength, cost for each - 5 required 60 Resistance of compacted HMA to moisture-induced 2,250 (ASTM C482) damage (AASHTO T283/CTM 371) - 3 required 60 Hamburg Wheel, 4 briquettes (modified) (AASHTO T324)965 (ASTM C140) Superpave gyratory compaction (AASHTO T312/ ASTM 375 CMU moisture content, absorption & unit weight - 6 55 D6925)required (ASTM C140) Extraction by ignition oven, percent asphalt (AASHTO 160 CMU linear drying shrinkage (ASTM C426)190 T308/ASTM D6307/CTM 382)215 Ignition oven correction/correlation values 1,445 (ASTM C1314) (AASHTO T308/ASTM D6307/CTM 382) 270 Extraction by centrifuge, percent asphalt (ASTM D2172) 160 (ASTM C1314) Gradation of extracted aggregate (AASHTO T30/ ASTM 145 Fasteners/Bolts/Rods D5444/CTM 202)-110 Stabilometer, S-Value (ASTM D1560/CTM 366)285 plain (ASTM A370) Bituminous mixture preparation (AASHTO R30/ CTM 304)85 -130 Moisture content of HMA (AASHTO T329/ASTM D6037 65 galvanized (ASTM A370) /CTM 370)-70 Bulk specific gravity of compacted HMA, molded 55 specimen or cores, uncoated (AASHTO T166/ ASTM -80 D2726/CTM 308) Bulk specific gravity of compacted HMA, molded 60 -70 specimen or cores, paraffin-coated (AASHTO T275/plain (ASTM A370) ASTM D1188/CTM 308)-80 Maximum density - Hveem (CTM 308)215 galvanized (ASTM A370) Theoretical maximum density and specific gravity of 140 -70 HMA (AASHTO T209/ASTM D2041/CTM 309)stainless steel (ASTM A370) Thickness or height of compacted bituminous paving 45 Reinforcing Steel and Prestressing Strands Mixture specimens (ASTM D3549)Rebar bend test, up to No. 11 (ASTM A370)70 Wet track abrasion of slurry seal (ASTM D3910)160 215 Rubberized asphalt (add to above rates)+25%Resistance butt-up 70 Brick to No. 10 (CTM 670) Compression - cost for each, 5 required (ASTM C67)55 Resistance butt-90 Absorption - cost for each, 5 required (ASTM C67) 55 11 & over (CTM 670) Aggregate Properties 70 Bulk density and voids in aggregates (AASHTO T19/55 (CTM 670) ASTM C29/ CTM 212)45 Organic impurities in fine aggregate sand (AASHTO T21/65 (CTM 670) ASTM C40/CTM 213)215 LA Rattler-215 over (CTM 670) /ASTM C131/ CTM 211)215 LA Rattler-larger coarse aggregate 1-/270 (CTM 670) ASTM C535/CTM 211)70 Apparent specific gravity of fine aggregate (AASHTO T84/140 (CTM 670) ASTM C128/CTM 208)215 Specific gravity and absorption of coarse aggregate (ASTM 110 (CTM 670) C127/CTM 206) >#4 retained Epoxy coated rebar/dowel continuity (Holiday) 70 Clay lumps, friable particles (AASHTO T112/ASTM C142)190 (ASTM A775/A934) Durability Index (AASHTO T210/ASTM D3744/ CTM 229)215 Epoxy coated rebar flexibility/bend test, up to No. 50 Moisture content of aggregates by oven drying (AASHTO 45 11 (ASTM A775/A934) T255/ASTM C566/CTM 226)Prestressing wire, tension (ASTM A416)190 Uncompacted void content of fine aggregate (AASHTO 140 Sample preparation (cutting)55 T304/ ASTM C1252/ CTM 234)Epoxy coated rebar/dowel film thickness (coating) 50 Percent of crushed particles (AASHTO T335/ ASTM 145 test (ASTM A775/ A934) D5821/CTM 205) PSA25-3829CMI; Exhibit "A" (cont.) June 24, 2025 Item #6 Page 872 of 1064 Docusign Envelope ID: 063721B4-05C7-4FBA-B778-2349BC8C3E36 West 1/29/2025 Staff-15v1 AggPW+veh CONSTRUCTION MATERIALS LABORATORY TESTING METHOD $/TEST METHOD $/TEST Streetlights/Signals Bearing Pads/Plates and Joint Seal LED Luminaires / Signal Modules / Countdown By Elastomeric bearing pads (Caltrans SS 51-3)1,060 Pedestrian Signal Face Modules (Caltrans RSS 86)Quote Elastomeric bearing pad with hardness and 1,315 Spray Applied Fireproofing compression tests (Caltrans SS 51-3) Unit weight (density, ASTM E605)65 Type A Joint Seals (Caltrans SS 51-2)1,735 Sample Transport Type B Joint Seals (Caltrans SS 51-2)1,640 Pick-up and delivery (weekdays, per trip, <50 mile 110 Bearing plates (A536)770 radius from our office) Notes 1.Earth Material Samples:Quoted testing unit rates are for soil and/or rock (earth) samples free of hazardous materials. Additional costs will accrue beyond these standard testing unit rates for handling, testing and/or disposing of soil and/or rock containing hazardous materials. Hazardous materials es. Standard turn-around time for geotechnical-laboratory test results is 10 working days. Samples will be stored for 2 months following completion of assigned tests, after which they will be discarded. Prior documented notification is required if samples need to be stored for a longer time. A monthly storage fee of $15 per bagand $6 per sleeve or tube will be applied. Quoted unit rates are only for earth materials sampled in California. There may be additional cost for handling imported samples. 2.Construction Material Samples:After all designated breaks for a given sample set meet specified compressive at design age or other client- o the 28-day break. Unless specifically requested otherwise, all other construction materials will be disposed of after completion of testing and reporting. EQUIPMENT LISTING CLASSIFICATION $/UNIT CLASSIFICATION $/UNIT 1/4 inch Grab plates 5/ each Global Positioning System/Laser Range Finder 80/day 1/4 inch Tubing (bonded) 0.60/foot Hand auger set 90/day 1/4 inch Tubing (single)0.40/foot 40/roll 3/8 inch Tubing, clear vinyl 0.60/foot Horiba U-51 water quality meter 135/day 4-Gas meter (RKI Eagle or similar)/GEM 2000 140/day Light tower (towable vertical mast) 150/day Air flow meter and purge pump (200 cc/min)55/day Magnehelic gauge 15/day Box of 24 soil drive-sample rings 130/box Manometer 25/day Brass sample tubes 11/each Mileage (will adjust with IRS published rate) 0.70/mile Caution tape (1000-foot roll)22/each Moisture test kit (excludes labor to perform test, ASTM 65/test Combination lock or padlock 15/each E1907) Compressed air tank and regulator 55/day Nuclear moisture and density gauge 88/day -inch-dia)160/day Electrical moisture and density gauge 88/Day Consumables (gloves, rope, soap, tape, etc.)40/day Pachometer 50/day Core sample boxes 30/each Particulate Monitor 135/day Crack monitor Two-Dimensional 30/each pH/Conductivity/Temperature meter 60/day Crack monitor Thee-Dimensional 40/each Photo-Ionization Detector (PID)150/day Cutoff saws, reciprocating, electric (Sawzall®)80/day Pump, Typhoon 2 or 4 stage 55/day D-Meter Walking Floor Profiler 110/day QED bladder pump w/QED control box 175/day Disposable bailers 25/each Quire fee Phase I only 250/each Disposable bladders 20/each Resistivity field meter and pins 200/day Dissolved oxygen meter 75/day Slip / threaded cap, 2-inch or 4-inch diameter, 20/each DOT 55-gallon containment drum with lid 85/drum PVC Schedule 40 Double-ring infiltrometer 135/day Slope inclinometer 250/day Dual-stage interface probe 85/day Soil sampling T-handle (Encore) 10/day Dynamic Cone Penetrometer 430/day Soil sampling tripod 40/day Generator, portable gasoline fueled, 3,500 watts 90/day Speedy (R) moisture tester 10/day Stainless steel bailer 60/day Vapor sampling box 65/day Submersible pump with controller 180/day Vehicle usage (carrying equipment)16/hour Submersible pump/transfer pump, 10-25 gpm 65/day VelociCalc 40/day Support service truck usage (well installation)250/day Visqueen (20 x 100 feet) 130/roll Survey/fence stakes 10/each Water level indicator (electronic well sounder) 100/day Tedlar® bags 25/each <300 feet deep well 55/day ZIPLEVEL®. 40/day Turbidity meter 80/day Other specialized geotechnical and environmental testing Tyvek® suit (each)25/each and monitoring equipment are available, and priced per site PSA25-3829CMI; Exhibit "A" (cont.) June 24, 2025 Item #6 Page 873 of 1064 Docusign Envelope ID: 063721B4-05C7-4FBA-B778-2349BC8C3E36