Loading...
HomeMy WebLinkAbout6191 EL CAMINO REAL; ; AS0600108/1/24, 4:28 PM AS060010 Permit Data City of Carlsbad Sprinkler Permit 6191 ELCAMINO Job Address: REAL Permit Type: SPRINK Parcel No: 2131002300 Permit No: AS0600I0 Status: ISSUED Applied 1/20/2006 Approved: 2/2/2006 Lot #: 0 Reference No.: Issued: 2/2/2006 PC #: Inspector: Project Title: VIASAT BLDG. 4 SIX INPECTIONS FOR FIRE SPRINKLER SYSTEM Applicant: Owner: WESTERN FIRE PROTECTION 12232 THATCHER CT P0 WAY CA 858-513-4949 Fees ($) Add'IFees($) Total ($) Balance(s) 360 0 360 0 about:blank 1/1 WESTERN FIRE PROTECTION, INC. 12232 THATCHER COURT POWAY,CA 92064 HYDRAULIC CALCULATIONS FOR VIASAT BUILDING #4 6161 EL CAMINO REAL WATER CURTAIN "FILE NUMBER: C-1549 DATE: JAN 12, 2006 -DESIGN DATA- OCCUPANCY CLASSIFICATION: AREA OF APPLICATION: NUMBER OF SPRINKLERS CALCULATED: TOTAL SPRINKLER WATER FLOW REQUIRED: TOTAL WATER REQUIRED (including hose) FLOW AND PRESSURE (@ BOR) SPRINKLER K-FACTOR: DESIGN/LAYOUT BY: AUTHORITY HAVING JURISDICTION: CONTRACTOR CERTIFICATION NUMBER: WATER CURTAIN 2ND FLR. 0.15/1500 1ST= 4HD. WATER CURTAIN 10 SPRK. + 4 WATER CURTAIN SPRKS. 500.6 gpm 750.5 gpm 500.6 GPM @ 47.9 PSI 5.6 G. LOERA CARLSBAD FIRE DEPARTMENT CALCULATIONS BY HASS COMPUTER PROGRAM (LICENSE # 50040828 HRS SYSTEMS, INC. TUCKER, GA 30084 SPRINKLER SYSTEM HYDRAULIC ANALYSIS Page 2 DATE: 1/12/2006-JOBS\C-1549 VIASAT BLDG #4\CALCS\C-1549 2ND FLR.WATER.SDF JOB TITLE: Viasat Bldg 4 WATER SUPPLY DATA SOURCE STATIC RESID. FLOW AVAIL. TOTAL REQ'D NODE PRESS. PRESS. @ PRESS. @ DEMAND PRESS. TAG (PSI) (PSI) (GPM) (PSI) (GPM) (PSI) SRC 99.0 94.5 1177.0 97.0 750.5 65.0 AGGREGATE FLOW ANALYSIS: TOTAL FLOW AT SOURCE 750.5 GPM TOTAL HOSE STREAM ALLOWANCE AT SOURCE 250.0 GPM OTHER HOSE STREAM ALLOWANCES 0.0 GPM TOTAL DISCHARGE FROM ACTIVE SPRINKLERS 500.5 GPM NODE ANALYSIS DATA NODE TAG ELEVATION NODE TYPE PRESSURE DISCHARGE (FT) (PSI) (GPM) 51 23.9 K=11.20 12.3 39.2 S2 23.9 K=11.20 12.1 38.9 S3 23.9 K=11.20 12.0 38.8 S4 23.9 K=11.20 12.2 39.1 S5 23.9 K=11.20 11.9 38.6 S6 23.9 K=11.20 11.6 38.2 S7 23.9 K=11.20 11.5 38.0 S8 23.9 K=11.20 11.6 38.2 S9 23.9 K=11.20 14.4 42.5 S1O 23.9 K=11.20 14.9 43.2 A 25.7 - - - - 15.9 - - - B 25.7 - - - - 15.6 - - - C 25.7 - - - - 15.5 - - - D 25.7 - - - - 15.7 - - - E 25.7 - - - - 15.8 - - - F 25.7 - - - - 15.5 - - - G 25.7 - - - - 15.3 - - - H 25.7 - - - - 15.5 - - - I 25.7 - - - - 18.9 - - - J 25.7 - - - - 19.5 - - - T 25.7 - - - - 20.9 - - - 1A 25.7 - - - - 21.3 - - - 2 25.7 - - - - 21.1 - - - 3 25.3 - - - - 20.8 - - - hA 25.7 - - - - 30.5 - - - 13A 25.7 - - - - 29.2 - - - Ml 25.7 - - - - 22.3 - - - M2 25.7 - - - - 22.2 - - - M3 25.7 - - - - 21.8 - - - SPRINKLER SYSTEM HYDRAULIC ANALYSIS Page 3 DATE: 1/12/2006-JOBS\C-1549 VIASAT BLDG #4\CALCS\C-1549 2ND FLR.WATER.SDF JOB TITLE: Viasat Bldg 4 NODE ANALYSIS DATA NODE TAG ELEVATION NODE TYPE PRESSURE DISCHARGE (PT) (PSI) (GPM) M4 25.7 - - - - 19.5 - - - M5 25.7 - - - - 16.3 - - - M6 25.7 - - - - 16.4 - - - M7 25.7 - - - - 19.8 - - - M8 25.7 - - - - 19.9 - - - M9 25.7 - - - - 27.5 - - - M1O 25.7 - - - - 27.5 - - - Mil 25.7 - - - - 27.5 - - - N12 25.7 - - - - 27.3 - - - M13 25.7 - - - 27.2 - - - M14 25.7 - - - - 27.4 - - - MiS 25.7 - - - - 26.0 - - - M16 25.7 - - - - 27.2 - - - M17 25.7 - - - - 26.7 - - - M18 25.7 - - - - 26.9 - - - M19 25.7 - - - - 26.9 - - - M20 25.7 - - - - 36.1 - - - M21 25.7 - - - - 36.2 - - - M22 25.7 - - - - 36.8 - - - M23 25.7 - - - - 38.0 - - - M24 25.7 - - - - 35.0 - - - M25 25.7 - - - - 33.8 - - - M26 25.7 - - - - 33.2 - - - M27 25.7 - - - - 33.1 - - - M1A 25.3 - - - - 22.0 - - - M2A 25.3 - - - - 21.9 - - - M3A 25.3 - - - - 21.6 - - - M4A 25.3 - - - - 20.1 - - - MSA 25.3 - - - - 18.8 - - - M6A 25.3 - - - - 18.8 - - - M7A 25.3 - - - - 19.4 - - - M8A 25.3 - - - - 19.5 - - - M9A 25.3 - - - - 27.6 - - - M10A 25.3 - - - - 27.6 - - - M11A 25.3 - - - - 27.6 - - - M12A 25.3 - - - - 27.5 - - - M13A 25.3 - - - - 27.4 - - - M14A 25.3 - - - - 27.3 - - - M15A 25.3 - - - - 27.1 - - - M16A 25.3 - - - - 27.1 - - - M17A 25.3 - - - - 27.0 - - - M18A 25.3 - - - - 27.0 - - - M19A 25.3 - - - - 27.0 - - - M20A 25.3 - - - - 36.9 - - - M21A 25.3 - - - - 37.1 - - - M22A 25.3 - - - - 37.7 - - - M23A 25.3 - - - - 39.6 - - - SPRINKLER SYSTEM HYDRAULIC ANALYSIS Page 4 DATE: 1/12/2006-JOBS\C-1549 VIASAT BLDG #4\CALCS\C-1549 2ND FLR.WATER.SDF JOB TITLE: Viasat Bldg 4 NODE ANALYSIS DATA NODE TAG ELEVATION NODE TYPE PRESSURE DISCHARGE (FT) (PSI) (GPM) M24A 25.3 - - - - 36.0 - - - M25A 25.3 - - - - 34.4 - - - M26A 25.3 - - - - 33.9 - - - M27A 25.3 - - - - 33.8 - - - TOR 25.7 - - - - 40.9 - - - BOR 1.5 - - - - 54.8 - - - DI -3.0 - - - - 56.9 - - - UG1 -3.0 - - - - 57.1 - - - BF1 3.0 - - - - 54.6 - - - UG2 -3.0 - - - - 67.2 - - - BF2 3.0 - - - - 64.6 - - - SRC 2.5 SOURCE 65.0 500.5 Wi 8.9 K= 5.60 27.5 29.4 W2 8.9 K= 5.60 23.3 27.1 W3 8.9 K= 5.60 19.8 24.9 W4 8.9 K= 5.60 19.2 24.5 W5 13.0 - - - - 29.7 - - - X2 13.0 - - - - 24.0 - - - X3 13.0 - - - - 19.8 - - - X4 13.0 - - - - 19.1 - - - X5 13.0 - - - - 27.5 - - - W6 13.0 - - - - 45.3 - - - Hi 13.0 - - - - 46.2 - - - H2 13.0 - - - - 46.2 - - - H3 13.0 - - - - 46.1 - - - H4 13.0 - - - - 46.2 - - - H6 13.0 - - - - 46.0 - - - H7 13.0 - - - - 45.7 - - - H8 13.0 - - - - 45.6 - - - H9 13.0 - - - - 45.5 - - - H10 13.0 - - - - 45.5 - - - Hil 13.0 - - - - 45.5 - - - H12 13.0 - - - - 47.0 - - - H13 13.0 - - - - 47.0 - - - H14 13..0 - - - - 47.1 - - - H15 13.0 - - - - 47.2 - - - H16 13.0 - - - - 47.2 - - - H17 13.0 - - - - 47.6 - - - H18 13.0 - - - - 46.7 - - - H19 13.0 - - - - 46.6 - - - H20 13.0 - - - - 46.5 - - - H21 13.0 - - - - 46.5 - - - H1A 12.7 - - - - 46.3 - - - H2A 12.7 - - - - 46.3 - - - H4A 12.7 - - - - 46.3 - - - H6A 12.7 - - - - 46.1 - - - H8A 12.7 - - - - 45.6 - - - SPRINKLER SYSTEM HYDRAULIC ANALYSIS Page 5 DATE: 1/12/2006-JOBS\C-1549 VIASAT BLDG it4\CALCS\C-1549 2ND FLR.WATER.SDF JOB TITLE: Viasat Bldg 4 NODE ANALYSIS DATA NODE TAG ELEVATION NODE TYPE PRESSURE DISCHARGE (FT) (PSI) (GPM) H9A 12.7 - - - 45.6 - - - H10A 12.7 - - - - 45.6 - - - H11A 12.7 - - - - 45.6 - - - H12A 12.7 - - - - 47.2 - - - H13A 12.7 - - - - 47.2 - - - H14A 12.7 - - - - 47.3 - - - H16A 12.7 - - - - 47.4 - - - H18A 12.7 - - - - 46.9 - - - H19A 12.7 - - - - 46.8 - - - H20A 12.7 - - - - 46.7 - - - H21A 12.7 - - - - 46.7 - - - TORi 12.7 - - - - 47.9 - - - SPRINKLER SYSTEM HYDRAULIC ANALYSIS Page 6 DATE: 1/12/2006-JOBS\C-1549 VIASAT BLDG #4\CALCS\C-1549 2ND FLR.WATER.SDF JOB TITLE: Viasat Bldg 4 PIPE DATA PIPE TAG Q(GPM) DIA(IN) LENGTH PRESS. END ELEV. NOZ. PT DISC. VEL(FPS) HW(C) (FT) SUM. NODES (FT) (K) (PSI) (GPM) FL/FT (PSI) Pipe: 1 -39.2 1.049 PL 2.58 PF 4.3 51 23.9 11.2 12.3 39.2 14.6 120 FTG ET PS -0.8 A 25.7 0.0 15.9 0.0 0.453 TL 9.58 PV Pipe: 2 -38.9 1.049 PL 2.58 PF 4.3 S2 23.9 11.2 12.1 38.9 14.4 120 FTG ST PE -0.8 B 25.7 0.0 15.6 0.0 0.446 TL 9.58 PV Pipe: 3 -38.8 1.049 PL 2.58 PF 4.2 S3 23.9 11.2 12.0 38.8 14.4 120 FTG ET PS -0.8 C 25.7 0.0 15.5 0.0 0.443 TL 9.58 PV Pipe: 4 -39.1 1.049 PL 2.58 PF 4.3 S4 23.9 11.2 12.2 39.1 14.5 120 FTG ST PS -0.8 D 25.7 0.0 15.7 0.0 0.449 TL 9.58 PV Pipe: 5 -38.6 1.049 PL 3.75 PF 4.7 S5 23.9 11.2 11.9 38.6 14.3 120 FTG ST PE -0.8 5 25.7 0.0 15.8 0.0 0.439 TL 10.75 PV Pipe: 6 -38.2 1.049 PL 3.75 PF 4.6 S6 23.9. 11.2 11.6 38.2 14.2 120 FTG ET PE -0.8 F 25.7 0.0 15.5 0.0 0.430 TL 10.75 PV Pipe: 7 -38.0 1.049 PL 3.75 PF 4.6 S7 23.9 11.2 11.5 38.0 14.1 120 FTG ET PE -0.8 G 25.7 0.0 15.3 0.0 0.427 TL 10.75 PV Pipe: 8 -38.2 1.049 PL 3.75 PF 4.6 S8 23.9 11.2 11.6 38.2 14.2 120 FTG ST PS -0.8 H 25.7 0.0 15.5 0.0 0.431 TL 10.75 PV Pipe: 9 -42.5 1.049 PL 2.92 PF 5.2 S9 23.9 11.2 14.4 42.5 15.8 120 FTG ST PE -0.8 I 25.7 0.0 18.9 0.0 0.525 TL 9.92 PV Pipe: 10 . -43.2 1.049 PL 2.92 PF 5.4 S1O 23.9 11.2 14.9 43.2 16.0 120 FTG ET PE -0.8 J 25.7 0.0 19.5 0.0 0.540 TL 9.92 PV Pipe: 11 -35.9 1.728 PL 0.34 PF 0.4 M1A 25.3 0.0 22.0 0.0 4.9 120 FTG T PS -0.1 Ml 25.7 0.0 22.3 0.0 0.034 TL 11.63 PV SPRINKLER SYSTEM HYDRAULIC ANALYSIS Page 7 DATE: 1/12/2006-JOBS\C-1549 VIASAT BLDG #4\CALCS\C-1549 2ND FLR.WATER.SDF JOB TITLE: Viasat Bldg 4 PIPE TAG Q(GPM) DIA(IN) LENGTH PRESS. END ELEV. NOZ. PT DISC. VEL(FPS) HW(C) (FT) SUM. NODES (PT) (K) (PSI) (GPM) FL/FT (PSI) Pipe: 12 -36.2 1.728 PL 0.34 PP 0.4 M2A 25.3 0.0 21.9 0.0 5.0 120 FTG T PE -0.1 M2 25.7 0.0 22.2 0.0 0.034 TL 11.63 PV Pipe: 13 -32.7 1.728 PL 0.34 PP 0.3 M3A 25.3 0.0 21.6 0.0 4.5 120 FTG T PE -0.1 M3 25.7 0.0 21.8 0.0 0.028 TL 11.63 PV Pipe: 14 39.2 1.728 PL 0.34 PP 0.5 2 25.7 0.0 21.1 0.0 5.4 120 FTG T PE 0.1 3 25.3 0.0 20.8 0.0 0.040 TL 11.63 PV Pipe: 15 40.0 1.728 PL 0.34 PF 0.5 M4A 25.3 0.0 20.1 0.0 5.5 120 FTG T PE -0.1 M4 25.7 0.0 19.5 0.0 0.041 TL 11.63 PV Pipe: 16 94.7 1.728 PL 0.34 PP 2.4 M5A 25.3 0.0 18.8 0.0 13.0 120 FTG T PE -0.1 M5 25.7 0.0 16.3 0.0 0.203 TL 11.63 PV Pipe: 17 93.5 1.728 PL 0.34 PP 2.3 M6A 25.3 0.0 18.8 0.0 12.8 120 FTG T PE -0.1 M6 25.7 0.0 16.4 0.0 0.199 TL 11.63 PV Pipe: 18 -42.2 1.728 PL 0.34 PP 0.5 M7A 25.3 0.0 19.4 0.0 5.8 120 FTG T PE -0.1 M7 25.7 0.0 19.8 0.0 0.046 TL 11.63 PV Pipe: 19 -41.9 1.728 PL 0.34 PF 0.5 M8A 25.3 0.0 19.5 0.0 5.7 120 FTG T PE -0.1 MO 25.7 0.0 19.9 0.0 0.045 TL 11.63 PV Pipe: 20 -11.3 1.728 PL 0.34 PP 0.0 M9A 25.3 0.0 27.6 0.0 1.5 120 FTG T PE -0.1 M9 25.7 0.0 27.5 0.0 0.004 TL 11.63 PV Pipe: 21 -11.6 1.728 PL 0.34 PP 0.0 M10A 25.3 0.0 27.6 0.0 1.6 120 FTG T PE -0.1 M10 25.7 0.0 27.5 0.0 0.004 TL 11.63 PV Pipe: 22 -16.8 1.728 PL 0.34 PF 0.1 M11A 25.3 0.0 27.6 0.0 2.3 120 FTG T PE -0.1 Mil 25.7 0.0 27.5 0.0 0.008 TL 11.63 PV Pipe: 23 5.7 1.728 PL 0.34 PF 0.0 M12A 25.3 0.0 27.5 0.0 0.8 120 FTG T PE -0.1 M12 25.7 0.0 27.3 0.0 0.001 TL 11.63 PV SPRINKLER SYSTEM HYDRAULIC ANALYSIS Page 8 DATE: 1/12/2006-JOBS\C-1549 VIASAT BLDG #4\CALCS\C-1549 2ND FLR.WATER.SDF JOB TITLE: Viasat Bldg 4 PIPE TAG Q(GPM) DIA(IN) LENGTH PRESS. END ELEV. NOZ. PT DISC. VEL(FPS) HW(C) (FT) SUM. NODES (FT) (K) (PSI) (GPM) FL/FT (PSI) Pipe: 24 5.0 1.728 PL 0.34 PF 0.0 M13A 25.3 0.0 27.4 0.0 0.7 120 FTG T PE -0.1 M13 25.7 0.0 27.2 0.0 0.001 TL 11.63 PV Pipe: 25 -25.9 1.728 PL 0.34 PF 0.2 M14A 25.3 0.0 27.3 0.0 3.5 120 FTG T PE -0.1 M14 25.7 0.0 27.4 0.0 0.018 TL 11.63 PV Pipe: 26 58.3 1.728 PL 0.34 PP 1.0 M15A 25.3 0.0 27.1 0.0 8.0 120 FTG T PE -0.1 MiS 25.7 0.0 26.0 0.0 0.083 TL 11.63 PV Pipe: 27 -28.3 1.728 PL 0.34 PP 0.3 M16A 25.3 0.0 27.1 0.0 3.9 120 FTG T PE -0.1 M16 25.7 0.0 27.2 0.0 0.022 TL 11.63 PV Pipe: 28 23.5 1.728 PL 0.34 PP 0.2 M17A 25.3 0.0 27.0 0.0 3.2 120 FTG T PE -0.1 M17 25.7 0.0 26.7 0.0 0.015 TL 11.63 PV Pipe: 29 0.4 1.728 PL 0.34 PP 0.0 M18A 25.3 0.0 27.0 0.0 0.1 120 FTG T PE -0.1 M18 25.7 0.0 26.9 0.0 0.000 TL 11.63 PV Pipe: 30 0.9 1.728 PL 0.34 PF 0.0 M19A 25.3 0.0 27.0 0.0 0.1 120 FTG T PE -0.1 M19 25.7 0.0 26.9 0.0 0.000 TL 11.63 PV Pipe: 31 47.2 1.728 PL 0.34 PF 0.7 M20A 25.3 0.0 36.9 0.0 6.5 120 FTG T PE -0.1 M20 25.7 0.0 36.1 0.0 0.056 TL 11.63 PV Pipe: 32 47.8 1.728 PL 0.34 PP 0.7 M21A 25.3 0.0 37.1 0.0 6.5 120 FTG T PE -0.1 M21 25.7 0.0 36.2 0.0 0.057 TL 11.63 PV Pipe: 33 49.5 1.728 PL 0.34 PP 0.7 M22A 25.3 0.0 37.7 0.0 6.8 120 FTG T PE -0.1 M22 25.7 0.0 36.8 0.0 0.061 TL 11.63 PV Pipe: 34 74.3 1.728 PL 0.34 PP 1.5 M23A 25.3 0.0 39.6 0.0 10.2 120 FTG T PE -0.1 N23 25.7 0.0 38.0 0.0 0.130 TL 11.63 PV Pipe: 35 54.1 1.728 PL 0.34 PF 0.8 M24A 25.3 0.0 36.0 0.0 7.4 120 FTG T PE -0.1 M24 25.7 0.0 35.0 0.0 0.072 TL 11.63 PV SPRINKLER SYSTEM HYDRAULIC ANALYSIS Page 9 DATE: 1/12/2006-JOBS\C-1549 VIASAT BLDG #4\CALCS\C-1549 2ND FLR.WATER.SDF JOB TITLE: Viasat Bldg 4 PIPE TAG Q(GPM) DIA(IN) LENGTH PRESS. END ELEV. NOZ. PT DISC. VEL(FPS) HW(C) (PT) SUM. NODES (PT) (K) (PSI) (GPM) FL/FT (PSI) Pipe: 36 38.9 1.728 PL 0.34 PF 0.5 M25A 25.3 0.0 34.4 0.0 5.3 120 FTG T PE -0.1 M25 25.7 0.0 33.8 0.0 0.039 TL 11.63 PV Pipe: 37 41.8 1.728 PL 0.34 PP 0.5 M26A 25.3 0.0 33.9 0.0 5.7 120 FTG T PE -0.1 M26 25.7 0.0 33.2 0.0 0.045 TL 11.63 PV Pipe: 38 41.1 1.728 PL 0.34 PF 0.5 M27A 25.3 0.0 33.8 0.0 5.6 120 FTG T PR -0.1 M27 25.7 0.0 33.1 0.0 0.043 TL 11.63 PV Pipe: 39 -35.9 1.728 PL 121.67 PP 5.3 Ml 25.7 0.0 22.3 0.0 4.9 120 FTG 2E2T PE 0.0 M9 25.7 0.0 27.5 0.0 0.034 TL 155.54 PV Pipe: 40 -47.2 1.728 PL 129.83 PP 8.5 M9 25.7 0.0 27.5 0.0 6.5 120 FTG 2T PR 0.0 M20 25.7 0.0 36.1 0.0 0.056 TL 152.41 PV Pipe: 41 -36.2 1.728 PL 121.67 PF 5.3 N2 25.7 0.0 22.2 0.0 5.0 120 FTG 2E2T PR 0.0 MiD 25.7 0.0 27.5 0.0 0.034 TL 155.54 PV Pipe: 42 -47.8 1.728 PL 129.33 PP 8.7 MiD 25;7 0.0 27.5 0.0 6.5 120 FTG 2T PR 0.0 M21 25.7 0.0 36.2 0.0 0.057 TL 151.91 PV Pipe: 43 -32.7 1.728 PL 123.92 PF 5.8 M3 25.7 0.0 21.8 0.0 4.5 120 FTG 6E4T PE 0.0 Nil 25.7 0.0 27.5 0.0 0.028 TL 202.95 PV Pipe: 44 -49.5 1.728 PL 129.33 PF 9.3 Mil 25.7 0.0 27.5 0.0 6.8 120 FTG 2T PE 0.0 M22 25.7 0.0 36.8 0.0 0.061 TL 151.91 PV Pipe: 45 -39.2 1.728 PL 122.75 PP 6.2 2 25.7 0.0 21.1 0.0 5.4 120 FTG 2E2T PE 0.0 M12 25.7 0.0 27.3 0.0 0.040 TL 156.62 PV Pipe: 46 -33.6 1.728 PL 91.42 PP 3.2 M12 25.7 0.0 27.3 0.0 4.6 120 FTG ET PE 0.0 hA 25.7 0.0 30.5 0.0 0.030 TL 108.35 PV Pipe: 47 -42.5 1.728 PL 1.25 PP 0.6 I 25.7 0.0 18.9 0.0 5.8 120 FTG T PR 0.0 M4 25.7 0.0 19.5 0.0 0.046 TL 12.54 PV SPRINKLER SYSTEM HYDRAULIC ANALYSIS Page 10 DATE: 1/12/2006-JOBS\C-1549 VIASAT BLDG #4\CALCS\C-1549 2ND FLR.WATER.SDF JOB TITLE: Viasat Bldg 4 PIPE TAG Q(GPM) DIA(IN) LENGTH PRESS. END ELEV. NOZ. PT DISC. VEL(FPS) HW(C) (PT) SUM. NODES (PT) (K) (PSI) (GPM) FL/FT (PSI) Pipe: 48 -2.6 1.728 PL 10.75 PP 0.0 M4 25.7 0.0 19.5 0.0 0.4 120 FTG ---- PE 0.0 J 25.7 0.0 19.5 0.0 0.000 TL 10.75 PV Pipe: 49 -45.7 1.728 PL 15.92 PP 1.4 J 25.7 0.0 19.5 0.0 6.3 120 FTG T PE 0.0 T 25.7 0.0 20.9 0.0 0.053 TL 27.21 PV Pipe: 50 -45.7 1.728 PL 2.25 PP 0.4 T 25.7 0.0 20.9 0.0 6.3 120 FTG B PE 0.0 1A 25.7 0.0 21.3 0.0 0.053 TL 7.89 PV Pipe: 51 -45.7 1.728 PL 95.00 PF 5.9 1A 25.7 0.0 21.3 0.0 6.3 120 FTG ET PE 0.0 M13 25.7 0.0 27.2 0.0 0.053 TL 111.93 PV Pipe: 52 -40.7 1.728 PL 60.50 PP 3.3 N13 25.7 0.0 27.2 0.0 5.6 120 FTG ET PE 0.0 hA 25.7 0.0 30.5 0.0 0.043 TL 77.43 PV Pipe: 53 -74.3 1.728 PL 46.00 PF 7.4 hA 25.7 0.0 30.5 0.0 10.2 120 FTG 2E PE 0.0 M23 25.7 0.0 38.0 0.0 0.130 TL 57.29 PV Pipe: 54 -25.9 1.728 PL 68.00 PP 1.8 M14 25.7 0.0 27.4 0.0 3.5 120 FTG E2T PE 0.0 13A 25.7 0.0 29.2 0.0 0.018 TL 96.22 PV Pipe: 55 -38.6 1.728 PL 1.25 PP 0.5 B 25.7 0.0 15.8 0.0 5.3 120 FTG T PE 0.0 M5 25.7 0.0 16.3 0.0 0.039 TL 12.54 PV Pipe: 56 56.1 1.728 PL 10.75 PP 0.8 MS 25.7 0.0 16.3 0.0 7.7 120 FTG ---- PE 0.0 F 25.7 0.0 15.5 0.0 0.077 TL 10.75 PV Pipe: 57 17.9 1.728 PL 16.00 PF 0.1 F 25.7 0.0 15.5 0.0 2.5 120 FTG ---- PE 0.0 G 25.7 0.0 15.3 0.0 0.009 TL 16.00 PV Pipe: 58 -20.1 1.728 PL 16.00 PF 0.2 G 25.7 0.0 15.3 0.0 2.7 120 FTG ---- PE 0.0 H 25.7 0.0 15.5 0.0 0.012 TL 16.00 PV Pipe: 59 -58.3 1.728 PL 92.33 PP 10.5 H 25.7 0.0 15.5 0.0 8.0 120 FTG 4ET PE 0.0 MiS 25.7 0.0 26.0 0.0 0.083 TL 126.20 PV SPRINKLER SYSTEM HYDRAULIC ANALYSIS Page 11 DATE: 1/12/2006-JOBS\C-1549 VIASAT BLDG #4\CALCS\C-1549 2ND FLR.WATER.SDF JOB TITLE: Viasat Bldg 4 PIPE TAG Q(GPM) DIA(IN) LENGTH PRESS. END ELEV. NOZ. PT DISC. VEL(FPS) HW(C) (FT) SUM. NODES (PT) (K) (PSI) (GPM) FL/FT (PSI) Pipe: 60 -28.3 1.728 PL 68.50 PF 2.0 M16 25.7 0.0 27.2 0.0 3.9 120 FTG 2ET PE 0.0 13A 25.7 0.0 29.2 0.0 0.022 TL 91.08 PV Pipe: 61 -54.1 1.728 PL 69.33 PF 5.8 13A 25.7 0.0 29.2 0.0 7.4 120 FTG T PE 0.0 M24 25.7 0.0 35.0 0.0 0.072 TL 80.62 PV Pipe: 62 -39.2 1.728 PL 1.29 PP 0.5 A 25.7 0.0 15.9 0.0 5.4 120 FTG T PE 0.0 M6 25.7 0.0 16.4 0.0 0.040 TL 12.58 PV Pipe: 63 54.3 1.728 PL 10.75 PP 0.8 M6 25.7 0.0 16.4 0.0 7.4 120 FTG ---- PE 0.0 B 25.7 0.0 15.6 0.0 0.073 TL 10.75 PV Pipe: 64 15.4 1.728 PL 16.00 PF 0.1 B 25.7 0.0 15.6 0.0 2.1 120 FTG ---- PE 0.0 C 25.7 0.0 15.5 0.0 0.007 TL 16.00 PV Pipe: 65 -23.4 1.728 PL 16.00 PF 0.2 C 25.7 0.0 15.5 0.0 3.2 120 FTG ---- PE 0.0 D 25.7 0.0 15.7 0.0 0.015 TL 16.00 PV Pipe: 66 -62.4 1.728 PL 83.00 PP 11.0 D 25.7 0.0 15.7 0.0 8.5 120 FTG 4ET PE 0.0 M17 25.7 0.0 26.7 0.0 0.094 TL 116.87 PV Pipe: 67 -38.9 1.728 PL 135.00 PF 7.1 M17 25.7 0.0 26.7 0.0 5.3 120 FTG 4E2T PE 0.0 M25 25.7 0.0 33.8 0.0 0.039 TL 180.16 PV Pipe: 68 -42.2 1.728 PL 121.67 PP 7.1 M7 25.7 0.0 19.8 0.0 5.8 120 FTG 2E2T PE 0.0 M18 25.7 0.0 26.9 0.0 0.046 TL 155.54 PV Pipe: 69 -41.8 1.728 PL 129.67 PP 6.3 M18 25.7 0.0 26.9 0.0 5.7 120 FTG 2E PE 0.0 M26 25.7 0.0 33.2 0.0 0.045 TL 140.96 PV Pipe: 70 -41.9 1.728 PL 121.67 PP 7.0 M8 25.7 0.0 19.9 0.0 5.7 120 FTG 2E2T FE 0.0 M19 25.7 0.0 26.9 0.0 0.045 TL 155.54 PV Pipe: 71 -41.1 1.728 PL 121.67 PP 6.3 M19 25.7 0.0 26.9 0.0 5.6 120 FTG 2T PE 0.0 M27 25.7 0.0 33.1 0.0 0.043 TL 144.25 PV SPRINKLER SYSTEM HYDRAULIC ANALYSIS Page 12 DATE: 1/12/2006-JOBS\C-1549 VIASAT BLDG #4\CALCS\C-1549 2ND FLR.WATER.SDF JOB TITLE: Viasat Bldg 4 PIPE TAG Q(GPM) DIA(IN) LENGTH PRESS. END ELEV. NOZ. PT DISC. VEL(FPS) HW(C) (FT) SUM. NODES (FT) (K) (PSI) (GPM) FL/FT (PSI) Pipe: 72 35.9 2.203 PL 10.50 PF 0.1 M1A 25.3 0.0 22.0 0.0 3.0 120 FTG ---- PE 0.0 M2A 25.3 0.0 21.9 0.0 0.010 TL 10.50 PV Pipe: 73 72.1 2.203 PL 9.25 PF 0.3 M2A 25.3 0.0 21.9 0.0 6.1 120 FTG ---- PE 0.0 M3A 25.3 0.0 21.6 0.0 0.038 TL 9.25 PV Pipe: 74 104.8 2.203 PL 11.00 PF 0.8 M3A 25.3 0.0 21.6 0.0 8.8 120 FTG ---- FE 0.0 3 25.3 0.0 20.8 0.0 0.075 TL 11.00 PV Pipe: 75 144.1 2.203 PL 5.00 PF 0.7 3 25.3 0.0 20.8 0.0 12.1 120 FTG ---- PE 0.0 M4A 25.3 0.0 20.1 0.0 0.135 TL 5.00 PV Pipe: 76 104.1 2.203 FL 16.83 PF 1.2 M4A 25.3 0.0 20.1 0.0 8.8 120 FTG ---- PE 0.0 M5A 25.3 0.0 18.8 0.0 0.074 TL 16.83 PV Pipe: 77 9.4 2.203 PL 14.83 PF 0.0 NSA 25.3 0.0 18.8 0.0 0.8 120 FTG ---- PE 0.0 M6A 25.3 0.0 18.8 0.0 0.001 TL 14.83 PV Pipe: 78 -84.2 2.203 FL 11.75 PF 0.6 M6A 25.3 0.0 18.8 0.0 7.1 120 FTG ---- PE 0.0 M7A 25.3 0.0 19.4 0.0 0.050 TL 11.75 PV Pipe: 79 -41.9 2.203 PL 6.83 PF 0.1 M7A 25.3 0.0 19.4 0.0 3.5 120 FTG ---- PE 0.0 M8A 25.3 0.0 19.5 0.0 0.014 TL 6.83 PV Pipe: 80 11.3 2.203 PL 10.50 PF 0.0 M9A 25.3 0.0 27.6 0.0 1.0 120 FTG ---- PE 0.0 MbA 25.3 0.0 27.6 0.0 0.001 TL 10.50 PV Pipe: 81 22.8 2.203 PL 9.25 PF 0.0 M10A 25.3 0.0 27.6 0.0 1.9 120 FTG ---- PE 0.0 M11A 25.3 0.0 27.6 0.0 0.004 TL 9.25 PV Pipe: 82 39.6 2.203 FL 9.92 FE' 0.1 M11A 25.3 0.0 27.6 0.0 3.3 120 FTG ---- PE 0.0 M12A 25.3 0.0 27.5 0.0 0.012 TL 9.92 PV Pipe: 83 34.0 2.203 PL 8.33 PF 0.1 M12A 25.3 0.0 27.5 0.0 2.9 120 FTG ---- PE 0.0 M13A 25.3 0.0 27.4 0.0 0.009 TL 8.33 PV SPRINKLER SYSTEM HYDRAULIC ANALYSIS Page 13 DATE: 1/12/2006-JOBS\C-1549 VIASAT BLDG #4\CALCS\C-1549 2ND FLR.WATER.SDF JOB TITLE: Viasat Bldg 4 PIPE TAG Q(GPM) DIA(IN) LENGTH PRESS. END ELEV. NOZ. PT DISC. VEL(FPS) HW(C) (FT) SUM. NODES (FT) (K) (PSI) (GPM) FL/FT (PSI) Pipe: 84 29.0 2.203 PL 7.50 PF 0.1 M13A 25.3 0.0 27.4 0.0 2.4 120 FTG ---- PE 0.0 M14A 25.3 0.0 27.3 0.0 0.007 TL 7.50 PV Pipe: 85 54.8 2.203 PL 10.92 PF 0.2 M14A 25.3 0.0 27.3 0.0 4.6 120 FTG ---- PE 0.0 M15A 25.3 0.0 27.1 0.0 0.023 TL 10.92 PV Pipe: 86 -3.5 2.203 PL 4.08 PF 0.0 M15A 25.3 0.0 27.1 0.0 0.3 120 FTG ---- PE 0.0 M16A 25.3 0.0 27.1 0.0 0.000 TL 4.08 PV Pipe: 87 24.8 2.203 PL 11.00 PF 0.1 M16A 25.3 0.0 27.1 0.0 2.1 120 FTG ---- PE 0.0 M17A 25.3 0.0 27.0 0.0 0.005 TL 11.00 PV Pipe: 88 1.3 2.203 PL 7.58 PF 0.0 M17A 25.3 0.0 27.0 0.0 0.1 120 FTG ---- PE 0.0 M18A 25.3 0.0 27.0 0.0 0.000 TL 7.58 PV Pipe: 89 0.9 2.203 PL 5.83 PF 0.0 M18A 25.3 0.0 27.0 0.0 0.1 120 FTG ---- PE 0.0 M19A 25.3 0.0 27.0 0.0 0.000 TL 5.83 PV Pipe: 90 -47.2 2.203 PL 10.50 PF 0.2 M20A 25.3 0.0 36.9 0.0 4.0 120 FTG ---- PE 0.0 N21A 25.3 0.0 37.1 0.0 0.017 TL 10.50 PV Pipe: 91 -95.0 2.203 PL 10.00 PF 0.6 M21A 25.3 0.0 37.1 0.0 8.0 120 FTG ---- PE 0.0 M22A 25.3 0.0 37.7 0.0 0.063 TL 10.00 PV Pipe: 92 -144.5 2.203 PL 14.25 PF 1.9 M22A 25.3 0.0 37.7 0.0 12.2 120 FTG ---- PE 0.0 M23A 25.3 0.0 39.6 0.0 0.136 TL 14.25 PV Pipe: 93 175.9 2.203 PL 18.58 PF 3.6 M23A 25.3 0.0 39.6 0.0 14.8 120 FTG ---- PE 0.0 M24A 25.3 0.0 36.0 0.0 0.196 TL 18.58 PV Pipe: 94 121.8 2.203 PL 16.33 PF 1.6 M24A 25.3 0.0 36.0 0.0 10.3 120 FTG ---- PE 0.0 M25A 25.3 0.0 34.4 0.0 0.099 TL 16.33 PV Pipe: 95 82.9 2.203 PL 10.25 PF 0.5 M25A 25.3 0.0 34.4 0.0 7.0 120 FTG ---- PE 0.0 M26A 25.3 0.0 33.9 0.0 0.049 TL 10.25 PV SPRINKLER SYSTEM HYDRAULIC ANALYSIS Page 14 DATE: 1/12/2006-JOBS\C-1549 VIASAT BLDG #4\CALCS\C-1549 2ND FLR.WATER.SDF JOB TITLE: Viasat Bldg 4 PIPE TAG Q(GPM) DIA(IN) LENGTH PRESS. END ELEV. NOZ. PT DISC. VEL(FPS) HW(C) (PT) SUM. NODES (PT) (K) (PSI) (GPM) FL/FT (PSI) Pipe: 96 41.1 2.203 PL 5.83 PP 0.1 M26A 25.3 0.0 33.9 0.0 3.5 120 FTG ---- PE 0.0 M27A 25.3 0.0 33.8 0.0 0.013 TL 5.83 PV Pipe: 97 -394.7 4.310 PL 14.42 PF 1.4 M23A 25.3 0.0 39.6 0.0 8.7 120 FTG T PE -0.1 TOR 25.7 0.0 40.9 0.0 0.033 TL 42.29 PV Pipe: 98 -500.6 4.310 PL 12.67 PF 2.1 TORi 12.7 0.0 47.9 0.0 11.0 120 FTG 2E PE 4.8 BOR 1.5 0.0 54.8 0.0 0.052 TL 40.54 PV Pipe: 99 -500.6 8.385 PL 5.00 PP 0.1 BOR 1.5 0.0 54.8 0.0 2.9 140 FTG 3L PE 1.9 DI -3.0 0.0 56.9 0.0 0.002 TL 70.97 PV Pipe: 100 -500.6 7.980 PL 131.00 PF 0.3 DI -3.0 0.0 56.9 0.0 3.2 150 FTG 2L PE 0.0 UG1 -3.0 0.0 57.1 0.0 0.002 TL 171.00 PV Pipe: 101 -500.6 8.385 PL 6.00 PP 0.0 UG1 -3.0 0.0 57.1 0.0 2.9 140 FTG L PE -2.6 BF1 3.0 0.0 54.6 0.0 0.002 TL 27.99 PV Pipe: 102 FIXED PRESSURE LOSS DEVICE BF2 3.0 0.0 64.6 0.0 10.0 psi, 500.6 gpm BF1 3.0 0.0 54.6 0.0 Pipe: 103 -500.6 8.385 PL 6.00 PF 0.0 BF2 3.0 0.0 64.6 0.0 2.9 140 FTG L PE 2.6 UG2 -3.0 0.0 67.2 0.0 0.002 TL 27.99 PV VICI Pipe: 104 -500.5 7.980 PL 15.00 PP 0.1 2 UG2 -3.0 0.0 67.2 0.0 3.2 150 FTG TG PE -2.4 SRC 2.5 SRCE 65.0 (N/A) 0.002 TL 74.00 PV Pipe: 1-X -29.4 1.049 PL 4.50 PP 1.7 Wi 8.9 5.6 27.5 29.4 10.9 120 FTG E PE -1.8 X5 13.0 0.0 27.5 0.0 0.265 TL 6.50 PV Pipe: 1-Y -29.4 1.049 PL 4.33 PP 2.2 X5 13.0 0.0 27.5 0.0 10.9 120 FTG 2E PE 0.0 WS 13.0 0.0 29.7 0.0 0.265 TL 8.33 PV Pipe: 2-X -27.1 1.049 PL 3.67 PP 2.4 W2 8.9 5.6 23.3 27.1 10.0 120 FTG ET PE -1.8 X2 13.0 0.0 24.0 0.0 0.228 TL 10.67 PV SPRINKLER SYSTEM HYDRAULIC ANALYSIS Page 15 DATE: 1/12/2006-JOBS\C-1549 VIASAT BLDG #4\CALCS\C-1549 2ND FLR.WATER.SDF JOB TITLE: Viasat Bldg 4 PIPE TAG Q(GPM) DIA(IN) LENGTH PRESS. END ELEV. NOZ. PT DISC. VEL(FPS) HW(C) (FT) SUM. NODES (FT) (K) (PSI) (GPM) FL/FT (PSI) Pipe: 2-Y -76.5 1.049 PL 1.67 PF 5.7 X2 13.0 0.0 24.0 0.0 28.4 120 FTG E PE 0.0 W5 13.0 0.0 29.7 0.0 1.557 TL 3.67 PV Pipe: 3-X -24.9 1.049 PL 2.42 PF 1.8 W3 8.9 5.6 19.8 24.9 9.2 120 FTG ET PE -1.8 X3 13.0 0.0 19.8 0.0 0.195 TL 9.42 PV Pipe: 3-Y -49.4 1.049 PL 6.00 PF 4.2 X3 13.0 0.0 19.8 0.0 18.4 120 FTG ---- PE 0.0 X2 13.0 0.0 24.0 0.0 0.694 TL 6.00 PV Pipe: 4-X -24.5 1.049 PL 1.50 PF 1.6 W4 8.9 5.6 19.2 24.5 9.1 120 FTG ET PE -1.8 X4 13.0 0.0 19.1 0.0 0.190 TL 8.50 PV Pipe: 4-Y -24.5 1.049 PL 4.08 PF 0.8 X4 13.0 0.0 19.1 0.0 9.1 120 FTG ---- PE 0.0 X3 13.0 0.0 19.8 0.0 0.190 TL 4.08 PV Pipe: 5-X -105.9 1.380 PL 14.92 PF 15.6 W5 13.0 0.0 29.7 0.0 22.7 120 FTG T PE 0.0 W6 13.0 0.0 45.3 0.0 0.747 TL 20.92 PV Pipe: 22-X -12.0 1.728 PL 0.34 PF 0.1 H1A 12.7 0.0 46.3 0.0 1.6 120 FTG T PE -0.1 Hi 13.0 0.0 46.2 0.0 0.004 TL 11.63 PV Pipe: 23-X -12.3 1.728 PL 0.34 PF 0.1 H2A 12.7 0.0 46.3 0.0 1.7 120 FTG T PE -0.1 H2 13.0 0.0 46.2 0.0 0.005 TL 11.63 PV Pipe: 24-X -12.5 1.728 PL 0.34 PF 0.1 H4A 12.7 0.0 46.3 0.0 1.7 120 FTG T PE -0.1 H4 13.0 0.0 46.2 0.0 0.005 TL 11.63 PV Pipe: 25-X -14.4 1.728 PL 0.34 PF 0.1 H6A 12.7 0.0 46.1 0.0 2.0 120 FTG T PE -0.1 H6 13.0 0.0 46.0 0.0 0.006 TL 11.63 PV Pipe: 26-X -14.2 1.728 PL 0.34 PF 0.1 H8A 12.7 0.0 45.6 0.0 1.9 120 FTG T PE -0.1 H8 13.0 0.0 45.6 0.0 0.006 TL 11.63 PV Pipe: 27-X -13.5 1.728 PL 0.34 PF 0.1 H9A 12.7 0.0 45.6 0.0 1.8 120 FTG T PE -0.1 H9 13.0 0.0 45.5 0.0 0.006 TL 11.63 PV SPRINKLER SYSTEM HYDRAULIC ANALYSIS Page 16 DATE: 1/12/2006-JOBS\C-1549 VIASAT BLDG #4\CALCS\C-1549 2ND FLR.WATER.SDF JOB TITLE: Viasat Bldg 4 PIPE TAG Q(GPM) DIA(IN) LENGTH PRESS. END ELEV. NOZ. PT DISC. VEL(FPS) HW(C) (FT) SUM. NODES (FT) (K) (PSI) (GPM) FL/FT (PSI) Pipe: 28-X -13.6 1.728 PL 0.34 PF 0.1 H10A 12.7 0.0 45.6 0.0 1.9 120 FTG T PE -0.1 H10 13.0 0.0 45.5 0.0 0.006 TL 11.63 PV Pipe: 29-X -13.4 1.728 PL 0.34 PF 0.1 H11A 12.7 0.0 45.6 0.0 1.8 120 FTG T PE -0.1 Hil 13.0 0.0 45.5 0.0 0.005 TL 11.63 PV Pipe: 30-X 12.0 1.728 PL 0.34 PF 0.1 H12A 12.7 0.0 47.2 0.0 1.6 120 FTG T PE -0.1 H12 13.0 0.0 47.0 0.0 0.004 TL 11.63 PV Pipe: 31-X 12.3 1.728 PL 0.34 PF 0.1 H13A 12.7 0.0 47.2 0.0 1.7 120 FTG T PE -0.1 H13 13.0 0.0 47.0 0.0 0.005 TL 11.63 PV Pipe: 32-X 12.5 1.728 PL 0.34 PF 0.1 H14A 12.7 0.0 47.3 0.0 1.7 120 FTG T PE -0.1 H14 13.0 0.0 47.1 0.0 0.005 TL 11.63 PV Pipe: 33-X 14.4 1.728 PL 0.34 PF 0.1 H16A 12.7 0.0 47.4 0.0 2.0 120 FTG T PE -0.1 H16 13.0 0.0 47.2 0.0 0.006 TL 11.63 PV Pipe: 34-X 14.2 1.728 PL 0.34 PF 0.1 H18A 12.7 0.0 46.9 0.0 1.9 120 FTG T PE -0.1 H18 13.0 0.0 46.7 0.0 0.006 TL 11.63 PV Pipe: 35-X 13.5 1.728 PL 0.34 PF 0.1 H19A 12.7 0.0 46.8 0.0 1.8 120 FTG T PE -0.1 H19 13.0 0.0 46.6 0.0 0.006 TL 11.63 PV Pipe: 36-X 13.6 1.728 PL 0.34 PF 0.1 H20A 12.7 0.0 46.7 0.0 1.9 120 FTG T PE -0.1 H20 13.0 0.0 46.5 0.0 0.006 TL 11.63 PV Pipe: 37-X 13.4 1.728 PL 0.34 PF 0.1 H21A 12.7 0.0 46.7 0.0 1.8 120 FTG T PE -0.1 H21 13.0 0.0 46.5 0.0 0.005 TL 11.63 PV Pipe: 38-X -12.0 1.728 PL 155.08 PF 0.8 Hi 13.0 0.0 46.2 0.0 1.6 120 FTG 2T PE 0.0 H12 13.0 0.0 47.0 0.0 0.004 TL 177.66 PV Pipe: 39-X -12.3 1.728 PL 155.08 PF 0.8 H2 13.0 0.0 46.2 0.0 1.7 120 FTG 2T PE 0.0 H13 13.0 0.0 47.0 0.0 0.005 TL 177.66 PV SPRINKLER SYSTEM HYDRAULIC ANALYSIS Page 17 DATE: 1/12/2006-JOBS\C-1549 VIASAT BLDG #4\CALCS\C-1549 2ND FLR.WATER.SDF JOB TITLE: Viasat Bldg 4 PIPE TAG Q(GPM) DIA(IN) LENGTH PRESS. END ELEV. NOZ. PT DISC. VEL(FPS) HW(C) (FT) SUM. NODES (FT) (K) (PSI) (GPM) FL/FT (PSI) Pipe: 40-X -12.5 1.728 PL 156.25 PF 0.9 H4 13.0 0.0 46.2 0.0 1.7 120 FTG 2E2T PE 0.0 H14 13.0 0.0 47.1 0.0 0.005 TL 190.12 PV Pipe: 41-X -14.4 1.728 PL 160.92 PP 1.2 H6 13.0 0.0 46.0 0.0 2.0 120 FTG 2E2T PE 0.0 H16 13.0 0.0 47.2 0.0 0.006 TL 194.79 PV Pipe: 42-X -14.2 1.728 PL 158.17 PF 1.2 H8 13.0 0.0 45.6 0.0 1.9 120 FTG 2E2T PE 0.0 H18 13.0 0.0 46.7 0.0 0.006 TL 192.04 PV Pipe: 43-X -13.5 1.728 PL 156.92 PF 1.1 H9 13.0 0.0 45.5 0.0 1.8 120 FTG 2E2T PE 0.0 H19 13.0 0.0 46.6 0.0 0.006 TL 190.79 PV Pipe: 44-X -13.6 1.728 PL 155.08 PF 1.0 H10 13.0 0.0 45.5 0.0 1.9 120 FTG 2T PE 0.0 H20 13.0 0.0 46.5 0.0 0.006 TL 177.66 PV Pipe: 45-X -13.4 1.728 PL 155.08 PP 1.0 Hil 13.0 0.0 45.5 0.0 1.8 120 FTG 2T PE 0.0 H21 13.0 0.0 46.5 0.0 0.005 TL 177.66 PV Pipe: 46-X 12.0 2.203 PL 12.42 PP 0.0 H1A 12.7 0.0 46.3 0.0 1.0 120 FTG ---- PE 0.0 H2A 12.7 0.0 46.3 0.0 0.001 TL 12.42 PV Pipe: 47-X 24.3 2.203 FL 7.25 PP 0.0 H2A 12.7 0.0 46.3 0.0 2.0 120 FTG ---- PE -0.1 H3 13.0 0.0 46.1 0.0 0.005 TL 7.25 PV Pipe: 48-X 24.3 2.203 PL 1.00 PP 0.0 H3 13.0 0.0 46.1 0.0 2.0 120 FTG ---- PE 0.1 H4A 12.7 0.0 46.3 0.0 0.005 TL 1.00 PV Pipe: 49-X 36.8 2.203 PL 18.83 PP 0.2 H4A 12.7 0.0 46.3 0.0 3.1 120 FTG ---- PE 0.0 H6A 12.7 0.0 46.1 0.0 0.011 TL 18.83 PV Pipe: 50-X 51.2 2.203 PL 13.00 PP 0.3 H6A 12.7 0.0 46.1 0.0 4.3 120 FTG ---- PE -0.1 H7 13.0 0.0 45.7 0.0 0.020 TL 13.00 PV Pipe: 52-X 51.2 2.203 PL 8.00 PF 0.2 H7 13.0 0.0 45.7 0.0 4.3 120 FTG ---- PE 0.1 H8A 12.7 0.0 45.6 0.0 0.020 TL 8.00 PV SPRINKLER SYSTEM HYDRAULIC ANALYSIS Page 18 DATE: 1/12/2006-JOBS\C-1549 VIASAT BLDG #4\CALCS\C-1549 2ND FLR.WATER.SDF JOB TITLE: Viasat Bldg 4 PIPE TAG Q(GPM) DIA(IN) LENGTH PRESS. END ELEV. NOZ. PT DISC. VEL(FPS) HW(C) (FT) SUN. NODES (FT) (K) (PSI) (GPM) FL/FT (PSI) Pipe: 53-X 65.4 2.203 PL 5.17 PP 0.2 H8A 12.7 0.0 45.6 0.0 5.5 120 FTG ---- PE -0.1 W6 13.0 0.0 45.3 0.0 0.031 TL 5.17 PV Pipe: 54-X -40.5 2.203 PL 7.83 PP 0.1 W6 13.0 0.0 45.3 0.0 3.4 120 FTG ---- PE 0.1 H9A 12.7 0.0 45.6 0.0 0.013 TL 7.83 PV Pipe: 55-X -27.0 2.203 PL 3.00 PP 0.0 H9A 12.7 0.0 45.6 0.0 2.3 120 FTG ---- PE 0.0 H10A 12.7 0.0 45.6 0.0 0.006 TL 3.00 PV Pipe: 56-X -13.4 2.203 PL 10.58 PF 0.0 H10A 12.7 0.0 45.6 0.0 1.1 120 FTG ---- PE 0.0 H11A 12.7 0.0 45.6 0.0 0.002 TL 10.58 PV Pipe: 58-X -12.0 2.203 PL 12.42 PF 0.0 H12A 12.7 0.0 47.2 0.0 1.0 120 FTG ---- PE 0.0 H13A 12.7 0.0 47.2 0.0 0.001 TL 12.42 PV Pipe: 59-X -24.3 2.203 PL 9.42 PF 0.0 H13A 12.7 0.0 47.2 0.0 2.0 120 FTG ---- PE 0.0 H14A 12.7 0.0 47.3 0.0 0.005 TL 9.42 PV Pipe: 60-X -36.8 2.203 PL 5.42 PP 0.1 H14A 12.7 0.0 47.3 0.0 3.1 120 FTG ---- PE -0.1 H15 13.0 0.0 47.2 0.0 0.011 TL 5.42 PV Pipe: 61-X -36.8 2.203 PL 6.42 PF 0.1 H15 13.0 0.0 47.2 0.0 3.1 120 FTG ---- PE 0.1 H16A 12.7 0.0 47.4 0.0 0.011 TL 6.42 PV Pipe: 62-X -51.2 2.203 PL 2.42 PF 0.3 H16A 12.7 0.0 47.4 0.0 4.3 120 FTG T PE -0.1 H17 13.0 0.0 47.6 0.0 0.020 TL 16.06 PV Pipe: 63-X 54.7 2.203 PL 21.42 PF 0.8 H17 13.0 0.0 47.6 0.0 4.6 120 FTG T PS 0.1 H18A 12.7 0.0 46.9 0.0 0.023 TL 35.06 PV Pipe: 64-X 40.5 2.203 PL 14.17 PP 0.2 H18A 12.7 0.0 46.9 0.0 3.4 120 FTG ---- PE 0.0 H19A 12.7 0.0 46.8 0.0 0.013 TL 14.17 PV Pipe: 65-X 27.0 2.203 PL 4.75 PF 0.0 H19A 12.7 0.0 46.8 0.0 2.3 120 FTG ---- PE 0.0 H20A 12.7 0.0 46.7 0.0 0.006 TL 4.75 PV SPRINKLER SYSTEM HYDRAULIC ANALYSIS Page 19 DATE: 1/12/2006-JOBS\C-1549 VIASAT BLDG #4\CALCS\C-1549 2ND FLR.WATER.SDF JOB TITLE: Viasat Bldg 4 PIPE TAG Q(GPM) DIA(IN) LENGTH PRESS. END ELEV. NOZ. PT DISC. VEL(FPS) HW(C) (FT) SUM. NODES (FT) (K) (PSI) (GPM) FL/FT (PSI) Pipe: 66-X 13.4 2.203 PL 10.58 PF 0.0 H20A 12.7 0.0 46.7 0.0 1.1 120 FTG ---- PE 0.0 H21A 12.7 0.0 46.7 0.0 0.002 TL 10.58 PV Pipe: 67-X -105.9 4.310 PL 14.42 PF 0.1 H17 13.0 0.0 47.6 0.0 2.3 120 FTG T PE 0.1 TORi 12.7 0.0 47.9 0.0 0.003 TL 42.29 PV Pipe: 68-X -394.7 4.310 PL 12.80 PF 1.4 TOR 25.7 0.0 40.9 0.0 8.7 120 FTG 2E PE 5.6 TORi 12.7 0.0 47.9 0.0 0.033 TL 40.67 PV NOTES: Calculations were performed by the HASS 7.7 computer program under license no. 50040828 granted by HRS Systems, Inc. 4792 LaVista Road Tucker, GA 30084 The system has been calculated to provide an average imbalance at each node of 0.001 gpm and a maximum imbalance at any node of 0.132 gpm. Total pressure at each node is used in balancing the system. Maximum water velocity is 28.4 ft/sec at pipe 2-Y. PIPE FITTINGS TABLE Pipe Table Name: STANDARD.PIP PAGE: * MATERIAL: S40 HWC: 120 Diameter Equivalent Fitting Lengths in Feet (in) E T L C B G A D N Ell Tee LngEll ChkVlv BfyVlv GatVlv AlmChk DPVlv NPTee 1.728 5.64 11.29 2.82 12.70 8.47 1.41 14.11 14.11 11.29 2.203 6.82 13.64 4.09 15.00 8.18 1.36 13.64 13.64 13.64 4.310 13.94 27.87 8.36 30.66 16.72 2.79 27.87 27.87 27.87 8.385 22.89 44.52 16.53 57.23 15.26 5.09 39.43 39.43 44.52 SPRINKLER SYSTEM HYDRAULIC ANALYSIS Page 20 DATE: 1/12/2006-JOBS\C-1549 VIASAT BLDG #4\CALCS\C-1549 2ND FLR.WATER.SDF JOB TITLE: Viasat Bldg 4 PAGE: A MATERIAL: S40 HWC: 120 Diameter Equivalent Fitting Lengths in Feet (in) E T L C B G A D N Eli Tee LngEll ChkVlv BfyVlv GatVlv AlmChk DPVlv NPTee 1.049 2.00 5.00 2.00 5.00 6.00 1.00 10.00 10.00 5.00 1.380 3.00 6.00 2.00 7.00 6.00 1.00 10.00 10.00 6.00 PAGE: E MATERIAL: PVC150 HWC: 150 Diameter Equivalent Fitting Lengths in Feet (in) E T L C B G N Eli Tee LngEil ChkVlv BfyVlv GatViv NPTee 7.980 27.00 53.00 20.00 68.00 18.00 6.00 53.00 WATER SUPPLY ANALYSIS 120. 0 GL 00. 0 A U G E 80.0 P R E S S 60.0 U R E 40.0 p S i 20.0 'WI] 400 600 800 1000 1200 1400 1600 1800 2000 FLOW (GPM) SPRINKLER SYSTEM HYDRAULIC ANALYSIS Page 22 DATE: 1/12/2006-JOBS\C-1549 VIASAT BLDG #4\CALCS\C-1549 2ND FLR.WATER.SDF JOB TITLE: Viasat Bldg 4 WATER SUPPLY CURVE 108+ 99*\\\\\\\\\\\ 0\\\\\\\\\\\\ I * <-94.5 psi @ 1177 gpm I Flow Test Point 90+ 81+ P 72+ R I E I S I x 5 63+ U I R I B I 54+ P I S I I 45+ 36+ 27+ 18+ LEGEND I X = Required Water Supply 64.97 psi @ 750.5 gpm 9+ I 0 = Available Water Supply U I 97.04 psi @ 750.5 gpm 0++-+---+----+-----+ ------+ --------+ --------+ ---------+ -----------+