Loading...
HomeMy WebLinkAbout6163 EL CAMINO REAL; ; AS120064Applicant: PACIFIC BUILDING GROUP STE 150 9752 ASPEN CREEK CT SAN DIEGO, CA 92126 858-552-0600 Owner: LEVINE INVESTMENTS LIMITED PARTNERSHIP 1702 E HIGHLAND AVE #310 PHOENIX AZ 7/10/24,2:51 PM AS120064 Permit Data City of Carlsbad Sprinkler Permit Permit No: AS120064 Status: APPROVED Applied 6/19/2012 Approved: 6/22/2012 Issued: 6/22/2012 Job Address: Permit Type: SPRINK Parcel No: 2131002100 Lot #: 0 Reference No.: PC #: Inspector: PrOject Title: VIA SAT-CAFE UNDERGROUND Fees ($) Add'I Fees ($) Total ($) Balance ($) 295 0 295 0 about:blank 1/1 THERE ARE NO PLANS ASSOCIATED WITH THIS PERMIT UNDERGROUND PIPING AS t2_oc)(,A 24-17 Contractor's Material and Test Certificate for Underground Piping PROCEDURE . . Upon completion of work, inspection and tests shall be made by the contractors representative and witnessed by. an. owners representative. All defects shall be corrected and system left in service before contractor's personnel finally leave the job. A certificate shall be filled out and signed by both representatives. Copies shall be prepared for approving authorities, owners, and contractor. It is understood the owner's representative's signature in no way prejudices an claim against contractor for faulty material, poor workmanship, or failure to comply with approving authority's requirements or local ordinances. Property name V1S -r Date - /LJE4t.2)(j. Property address &/61 72, 64-9ti&0 A-244— Accepted by approving authorities (names) NPT Address Plans - Installation conforms to accepted plans J Yes J No Equipment used is approved . Yes No If no, state deviations Has person in charge of fire equipment been instructed as to location of Yes No control valves and care and maintenance of this new equipment? If no, explain In F-lava copies of appropriate instructions and care and maintenance Li Yes Ll No charts been left on premises? If no, explain Location Supplies buildings VIS,4-T Pipe types and class Type 'oint /. Pipe conforms to standa d . Yes Li No Underground Fittings conform to JX)4_. standard ItrYes J No pipes and joints If no, explain Joints needing anchorage clamped, strapped, or blocked in Li. Yes No accordance with CM4j.1L.-_-__,_. standard If no, explain j1 Z 1 , ñiifl. Flow the required rate until water is clear as indicated by no collection of foreign material in burlap bags at outlets such as hydraTVsand blow-offs. Flush at flows not less than 390 gpm (1476 Llmin) for 4 in. pipe, 880 gpm (3331 L/min) for 6 in. pipe, 1560 gpm (5905 L/min) for 8 in. pipe, 2440 gpm (9235 L/min) for 10 in, pipe, and 3520 gpm (13,323 L/min) for 12 in. pipe. When supply cannot tipulated flow rates, obtain maximum available. 4ZXgrosta All piping and attached appurtenances subjected to system working pressure shall be hydrostatically tested at 200 psi Test (13.8 bar) or 50 psi (3.4 bar) in excess of the system working pressure, whichever is greater, and shall maintain that pressure ± 5 psi description for 2 hours. H_ydrostatic Testing Allowance: Where additional water is added to the system to maintain the test pressures required by 10.10.2.2.1, the amount of water shall be measured and shall not exceed the limits of the following equation (For metric equation, see 10.10.2.2.4): L = testing allowance (makeup water), in gallons perhour SD'[ L S = length of pipe tested, in feet 148,000 D = nominal diameter of the pipe, in inches ' P = average test pressure during the hydrostatic test,in pounds per square inch (gauge) New underqund piping flushed according to - Yes Li No JEFEA_j standard by (company) If no, explain How flushing flow was obtained Through what type opening Flushing 11141 Public water Li Tank or reservoir Li Fire pump Li Hydrant butt Open pipe tests Lead-ins flushed according to f#..)f44 standard by (company) Li Yes Li No If no, explain How flushing flow was obtained Through what type opening Public water EJ Tank or reservoir Fire pump Y connection to flange Open pipe and spigot © 2007'1itionaI Fire Protection Association NFPA 24 (p. 1 of 2) FIGURE YO.10. 1 Sample of Contractor's Material and Test Certificate for Underground Piping. 2007 Edition 24-18 INSTALLATION OF PRIVATE FIRE SERVICE MAINS AND THEIR APPURTENANCES All new underground piping hydrostatically tested at Joints covered Hydrostatic test 2A psi for ___________ hours Yes D No Total amount of leakage measured Leakage gallons hours test Allowable leakage gallons 2-. hours Number installed Type and make All operate satisfactorily Hydrants j Yes No Water control valves left wide open - . - . Li Yes Li No If no, state reason Control valves Hose threads of fire department connections and hydrants interchangeable with U Yes• Li No those of tire department answering alarm Date left in service Remarks Name of installing contractor C 7(,TI 2 Tests witnessed by Signatures For property owner (signed) Title - Date Additional explanation and notes 4- -, © 2007 National Fire Protection Association NFPA 24 (p. 2 of 2) FIGURE 10.10.1 Continued 4 tIA 2007 Edition