Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
2858 LOKER AVE E; ; AS990130
12/2/2020 AS990130 Permit Data City of Carlsbad Sprinkler Permit Permit No: AS990130 Job Address: 2858 LOKER AV EAST Permit Type: SPRINK Parcel No: 2090830100 Lot #: 0 Reference No.: PC #: Project Title: PRESCRIPTION SOLUTIONS Status: ISSUED Applied 12/20/1999 Approved: Issued: Inspector: Applicant: Owner: INDUSTRIAL DEVELOPMENT INTERNATI C/O J R WETZEL 18101 VON KARMAN AVE #120 IRVINE CA L Fees ($) Add'l Fees ($) Total ($) Balance ($) 592.75 0 592.75 0 DESIGN/LAYOUT BY: DAN AMATO ASIROM AUTHORITY HAVING JURISDICTION: CAP.LSBAD FIRE PREVENTION BUREAU CONTRACTOR CERTIFICATION NUtvIEP.: C-16 763542 ** ALL SPRINKLERS CALCULATED ASStflviED A 2' AMOVEP. & 25 FOOT DROP WITH 4 ELBOWS AND 1 TEE. WEST COAST FIRE PROTECTION 5416 LOGAMERRY WAY OCEANSIDE, CA 92057 C-16 763542 HYDRAULIC CALCULATIONS FOR. Prescrition Solutions Preaction system Computer Room T <FILE NUMBER: preact DATE: 12-19-99 -DESIGN DATA- OCCUPANCY CLASSIFICATION: LIGHT DENSITY: .10 gpm/sq. ft. AREA OF APPLICATION: 1500 sq. ft. COVERAGE PER SPRINKLER: 400 sq. ft. NUMBER OF SPRINKLERS CALCULATED: 5 sprinklers TOTAL SPRINKLER. WATER. FLOW REQUIRED: 201.6 gpm TOTAL WATER REQUIRED (including hose): 301.6 gpm SPINKLEP. SYSTEM HYDRAULIC ANALYSIS Page 1 Date: 06/28/90 PREACT2 JOB TITLE: PRESCRIPTION SOLUTIONS - PEACTION SYSTEM LIGHT HAZARD WATER SUPPLY DATA SOURCE STATIC RESID. PLOW AVAIL. TOTAL NODE PRESS. PRESS. @ PRESS. @ DEMAND PRESS. TAG (PSI) (PSI) (GPM) (PSI) (GPM) (PSI) 21 128.0 124.0 1491.0 127.8 301.5 65.4 AGGREGATE PLOW ANALYSIS: TOTAL PLOW AT SOURCE TOTAL HOSE STREAM ALLOWANCE AT SOURCE OTHER HOSE STREAM ALLOWANCES TOTAL DISCHARGE FROM ACTIVE SPRINKLERS 301.5 GPM 100.0 GPM 0.0 GPM 201.5 GPM NODE ANALYSIS DATA NODE TAG ELEVATION NODE TYPE PRESSURE DISCHARGE (FT) (PSI) (PM) 1 10.0 K= 7.80 26.3 40.0 .1 SPRINKLER SYSTEM HYDRAULIC ANALYSIS Page 2 JOB TITLE: PRESCRIPTION SOLUTIONS - PBACTION SYSTEM LIGHT HAZARD NODE TAG ELEVATION NODE TYPE PRESSURE DISCHARGE (FT) (PSI) (GPM) 2 33.0 - - - 34.4 - - - 3 10.0 K= 7.80 26.4 40.0 4 33.0 - - - - 34.5 - - - 5 10.0 K= 7.80 26.5 40.1 6 33.0 - - - - 34.7 - - - 7 10.0 K= 7.80 27.1 40.6 8 33.0 - - - - 35.8 - - - 9 10.0 K= 7.80 27.2 40.7 10 33.0 - - - - 35.9 - - - 11 33.0 - - - - 36.1 - - - 12 33.0 - - - - 38.8 - - - 13 33.0 - - - - 41.4 - - - 14 3.0 - - - - 57.7 - - - 15 31.0 - - - - 46.2 - - - 16 31.0 - - - - 46.8 - - - 17 31.0 - - - - 46.9 - - - 18 0.5 - - - - 60.1 - - - 19 0.0 - - - - 60.4 - - - 20 0.0 - - - - 65.4 - - - 21 0.0 SOURCE 65.4 201.5 SPRINKLER SYSTEM HYDRAULIC ANALYSIS Page 3 JO? TITLE: PRESCRIPTION SOLUTIONS - PPACTIOt't SYSTEM LIGHT HAZARD PIPE DATA PIPE TAG Q(PM) DIA(IN) LENGTH PRESS. END ELEV. NOZ. PT DISC. VEL(FPS) Hw(c) (FT) SUM. NODES (FT) (K) (PSI) (GPM) F.L./FT (PSI) Pipe: 1 -40.0 1.049 PL 25.50 PF 18.1 1 10.0 7.8 26.3 40.0 14.8 120 PTO 4ET PE 10.0 2 33.0 0.0 34.4 0.0 0.469 TL 38.50 PV 1.5 Pipe: 2 -40.0 2.727 PL 20.00 PF 0.1 2 33.0 0.0 34.4 0.0 2.2 120 PT ---- PE 0.0 4 33.0 0.0 34.5 0.0 0.004 TL 20.00 PV 0.0 Pipe: 3 -40.0 1.049 PL 25.50 PF 18.1 3 10.0 7.8 26.4 40.0 14.9 120 FTC 4ET PE 10.0 4 33.0 0.0 34.5 0.0 0.470 TL 38.50 PV 1.5 Pipe: 4 -80.0 2.727 PL 12.00 PF 0.2 4 33.0 0.0 34.5 0.0 4.4 120 PTO ---- PE 0.0 6 33.0 0.0 34.7 0.0 0.016 TL 12.00 PV 0.1 Pipe: 5 -40.1 1.049 PL 25.50 PF 18.2 5 10.0 7.8 26.5 40.1 14.9 120 PTO 4ET PE 10.0 6 33.0 0.0 34.7 0.0 0.472 TL 38.50 PV 1.5 Pipe: 6 -120.2 2.727 PL 25.00 PF 1.5 6 33.0 0.0 34.7 0.0 6.6 120 PTG ET PE 0.0 11 33.0 0.0 36.1 0.0 0.034 TL 43.00 PV 0.3 Pipe: 7 -40.6 1.049 PL 25.50 PF 18.6 7 10.0 7.8 27.1 40.6 15.1 120 PTO 4ET PE 10.0 8 33.0 0.0 35.8 0.0 0.483 TL 38.50 PV 1.5 Pipe: 8 -40.6 2.727 PL 20.00 PF 0.1 8 33.0 0.0 35.8 0.0 2.2 120 PT ---- PE 0.0 10 33.0 0.0 35.9 0.0 0.005 TL 20.00 PV 0.0 Pipe: 9 -40.7 1.049 PL 25.50 PF 18.6 9 10.0 7.8 27.2 40.7 15.1 120 PTO 4ET PE 10.0 10 33.0 0.0 35.9 0.0 0.484 TL 38.50 PV 1.5 Pipe: 10 -81.3 2.727 PL 17.00 PF 0.3 10 33.0 0.0 35.9 0.0 4.5 120 FTG ---- PE 0.0 11 33.0 0.0 36.1 0.0 0.017 TL 17.00 PV 0.1 Pipe: 11 -201.5 2.727 PL 23.50 PF 2.6 11 33.0 0.0 36.1 0.0 11.1 120 FTC E PE 0.0 12 33.0 0.0 38.8 0.0 0.089 TL 29.50 PV 0.8 Pipe: 12 -201.5 2.727 PL 17.00 PF 2.6 12 33.0 0.0 38.8 0.0 11.1 120 FTC 2E PE 0.0 13 33.0 0.0 41.4 0.0 0.089 TL 29.00 PV 0.8 Pipe: 13 -201.5 2.727 PL 25.00 PF 3.3 13 33.0 0.0 41.4 0.0 11.1 120 PTG 2E PE 13.0 14 3.0 0.0 57.7 0.0 0.089 TL 37.00 PV 0.8 p SFRINRLEP SYSTEM HYDRAULIC ANALYSIS Page 4 JOB TITLE: PRESCRIPTION SOLUTIONS - PREACTION SYSTEM LIGHT HAZARD PIPE DATA (cont!d) PIPE TAG Q(GPM) DIA(IN) LENGTH PRESS. END ELEV. NOZ. PT DISC. VEL(FPS) Hw() (FT) SUM. NODES (FT) (K) (PSI) (GPM) F.L./FT (PSI) Pipe: 14 -201.5 4.328 PL 8.00 PF 0.7 14 3.0 0.0 57.7 0.0 4.4 120 PTG 2ECGA FE 12.1 15 31.0 0.0 46.2 0.0 0.009 TL 72.00 PV 0.1 Pipe: 15 -201.5 4.328 PL 50.00 PF 0.6 15 31.0 0.0 46.2 0.0 4.4 120 FTG E FE 0.0 16 31.0 0.0 46.8 0.0 0.009 TL 60.00 PV 0.1 Pipe: 16 -201.5 8.249 PL 319.00 PF 0.2 16 31.0 0.0 46.8 0.0 1.2 120 PTG 3E FE 0.0 17 31.0 0.0 46.9 0.0 0.000 TL 373.00 PV 0.0 Pipe: 17 -201.5 8.249 PL 33.00 PF 0.0 17 31.0 0.0 46.9 0.0 1.2 120 FTG ---- FE 13.2 18 0.5 0.0 60.1 0.0 0.000 TL 33.00 PV 0.0 Pipe: 18 -201.5 9.790 PL 130.00 PF 0.0 18 0.5 0.0 60.1 0.0 0.9 150 FTG 3ET FE 0.2 19 0.0 0.0 60.4 0.0 0.000 TL 305.28 PV 0.0 Pipe: 19 FIXED PRESSURE LOSS DEVICE 20 0.0 0.0 65.4 0.0 5.0 psi, 201.5 gpm 19 0.0 0.0 60.4 0.0 Pipe: 20 -201.5 9.790 PL 15.00 PF 0.0 20 0.0 0.0 65.4 0.0 0.9 150 PTG ET FE 0.0 21 0.0 SRCE 65.4 (N/A) 0.000 TL 123.80 PV 0.0 NOTES: Calculations were performed by the HASS 5.4.0 computer program under license no. 422C1327E granted by HRS Systems, Inc. 213 Ranchwood Dr., N.E. Atlanta, GA 30345 The system has been balanced to provide an average imbalance at each node of 0.012 gpm and a maximum imbalance at any node of 0.126 gpm. Velocity pressures are printed for information only, and are not used in balancing the system. Maximum water velocity in any pipe is 15.1 ft/sec. SPRINKLER SYSTEM HYDRAULIC ANALYSIS Page S 302 TITLE: PRESCRIPTION SOLUTIONS - PACTION SYSTEM LIGHT HAZARD (4) PIPE FITTINGS TABLE Pipe Table Name: STANDARD.PIP PAGE: A MATERIAL: Steel HWC: 120 Diameter Equivalent Fitting Lengths in Feet (in) E T L C B G A D Eli Tee LngEl ChkVl BfyVl GatVl Almck DPVlv 1.049 2.00 5.00 2.00 5.00 6:00 1.00 10.00 10.00 8.249 18.00 35.00 13.00 45.00 12.00 4.00 35.00 27.00 SPINKLP SYSTEM HYDRAULIC ANALYSIS Page 6 JOB TITLE: PRESCRIPTION SOLUTIONS - PREACTION SYSTEM LIGHT HAZAD WATER SUPPLY CURVE 165+ 150+ 135+ * I <-124.0 psi @ 1491 gpm P120+ Flow Test Point E R S S105~ U R E 90+ P S I 75~ x 60+ 45+ 30+ LEGEND 'I 'p X = Required Water Supply 65.41 psi @ 301.5 gpm 15+ 0 = Available Water Supply 127.79 psi @ 301.5 gpm I It 0++-+---+----+-----+ ------+ --------+ --------+ ---------+ -----------+ 400 600 800 1000 1200 1400 1600 1800 2000 FLOW (cPM) WEST COAST PIE PROTECTION 5416 L0GANEY WAY OCEMSIDE, CA 92057 C-16 763542 HYDP.AUL I C CALCULATIONS FOR Prescrition Solutions Extended Coverage Ordinary Hazard <PILE NUM: DATE: 12-19-99 -DESIGN DATA- OCCUPANCY CLASSIFICATION: ordinary DENSITY: .20 gpm/sq. ft. AREA OF APPLICATION: 1500 sq. ft. COVERAGE PER SPRINKLER: 400 sq. ft. NUMBER OF SPRINKLERS CALCULATED: 7 sprinklers TOTAL SPPINKLEP. WATEP. PLOWREQUIRED: 560.8 gpm TOTAL WATER REQUIRED (including hose): 810.8 gpm FLOW & PRESSURE (at base of riser) : 560.8 GPM @ 101 PSI SPRINKLER ORIFICE SIZE: .7 Inch NAME OF WEST COAST FIRE PROTECTION DESIGN/LAYOUT BY: DAN AMATO AUTHORITY HAVING JURISDICTION: CARLSBAD FIRE PREVENTION BUREAU CONTACTOR CERTIFICATION NUMBER: C-16 7635-4-2- ALL SPRINKLERS CALCULATED ASSUMED A 61 ARMOVER &19 FOOT DROP WITH 3 ELBOWS AND 1 TEE. (actual armovers 2 feet) SPRINKLER SYSTEM HYDRAULIC ANALYSIS Page 1 Date: 06/28/90 PSGB20QR JOB TITLE: PRESCRIPTION SOLUTIONS EXTENDED COVERAGE SPRINKLER CALC WATEP. SUPPLY DATA SOURCE STATIC RESID. PLOW AVAIL. TOTAL P.EQD NODE PRESS. PRESS. @ PRESS. @ DEMAND- PRESS. TAG (PSI) (PSI) (GPM) (PSI) (GPM) (PSI) 127 128.0 124.0 1491.0 126.7 810.8 104.5 AGGREGATE PLOW ANALYSIS: TOTAL PLOW AT SOURCE TOTAL HOSE STREAM ALLOWANCE AT SOURCE OTHER HOSE STREAM ALLOWANCES TOTAL DISCHARGE FROM ACTIVE SPRINKLERS 810.8 GPM 250.0 GPM 0.0 GPM 560.8 GPM NODE ANALYSIS DATA NODE TAG ELEVATION NODE TYPE PRESSURE DISCHARGE (FT) (PSI) (GPM) 1 31.5 - - - - 85.8 SPRINKLER SYSTEM HYDRAULIC ANALYSIS Page 2 JOB TITLE: PRESCRIPTION SOLUTIONS EXTENDED COVERAGE SPRINKLER CALC NODE TAG ELEVATION NODE TYPE PRESSURE DISCHARGE (FT) (PSI) (GPM) 2 33.0 - - - - 84.5 - - - 3 14.0 K=14.50 30.5 80.0 4 33.0 - - - - 83.2 - - - S 14.0 TC=14.50 30.4 80.0 6 33.0 - - - - 83.0 - - - 7 14.0 K=14.50 30.4 80.0 8 33.0 - - - - 83.1 - - - 9 33.0 - - - - 84.8 - - - 10 31.5 - - - - 85.8 - - - 11 31.5 - - - - 85.8 - - - 12 33.0 - - - - 84.5 - - - 13 14.0 K=14.50 30.5 80.0 14 33.0 - - - - 83.2 - - - 15 14.0 K=14.50 30.4 80.0 16 33.0 - - - 83.1 - - - 17 14.0 R=14.50 30.4 80.0 18 33.0 - - - - 83.1 - - - 19 33.0 - - - - 84.8 - - - 20 31.5 - - - - 85.8 - - - 21 31.5 - - - - 85.8 - - - 22 33.0 - - - - 85.1 - - - 23 33.0 - - - - 85.2 - - - 24 31.5 - - - - 85.8 - - - 25 31.5 - - - - 85.8 - - - 26 33.0 - - - - 85.1 - - - 27 14.0 K=14.50 31.1 80.8 28 33.0 - - - - 84.8 - - - 29 33.0 - - - - 85.1 - - - 30 31.5 - - - - 85.8 - - - 31 31.5 - - - - 85.8 - - - 32 33.0 - - - 85.2 - - - 33 33.0 - - - - 85.2 - - - 34 31.5 - - - - 85.9 - - - 35 31.5 - - - - 85.9 - - - 36 33.0 - - - - 85.2 - - - 37 33.0 - - - - 85.2 - - - 38 31.5 - - - - 85.9 - - - 39 31.5 - - - - 85.9 - - 40 33.0 - - - - 85.2 - - - 41 33.0 - - - - 85.3 - - - 42 31.5 - - - - 85.9 - - - 43 31.5 - - - - 85.9 - - - 44 33.0 - - - - 85.3 - - - 45 33.0 - - - - 85.3 - - - 46 31.5 - - - - 85.9 - - - 47 31.5 - - - - 86.0 - - - 48 33.0 - - - - 85.3 - - - 49 33.0 - - - - 85.3 - - - 50 31.5 - - - - 86.0 - - 51 31.5 - - - - 86.0 - - - 52 33.0 - - - - 85.3 - - - 53 33.0 - - - - 85.3 - - - 54 31.5 - - - - 86.0 - - - 55 31.5 - - - - 86.0 - - - SPRINKLER SYSTEM HYDRAULIC ANALYSIS Page 3 JOB TITLE: PRESCRIPTION SOLUTIONS EXTENDED COVERAGE SPPINKLEP. CALC NODE TAG ELEVATION NODE TYPE PRESSURE DISCHARGE (FT) (PSI) (PM) 56 33.0 - - - - 85.4 - - - 57 33.0 - - - - 85.4 - - - 58 31.5 - - - - 86.0 - - - 59 31.5 - - - - 86.0 - - - 60 33.0 - - - - 85.4 - - - 61 33.0 - - - - 85.4 - - - 62 31.5 - - - - 86.0 - - - 63 31.5 - - - - 86.1 - - - 64 33.0 - - - - 85.4 - - - 65 33.0 - - - - 85.4 - - - 66 31.5 - - - - 86.1 - - - 67 31.5 - - - - 86.1 - - - 68 33.0 - - - - 85.4 - - - 69 33.0 - - - - 85.4 - - - 70 31.5 - - - - 86.1 - - - 71 31.5 - - - - 86.1 - - - 72 33.0 - - - - 85.5 - - - 73 33.0 - - - - 85.5 - - - 74 31.5 - - - - 86.1 - - - 75 31.5 - - - - 86.2 - - - 76 33.0 - - - - 85.5 - - - 77 33.0 - - - - 85.5 - - - 78 31.5 - - - - 86.1 - - - 79 31.5 - - - - 86.2 - - - 80 33.0 - - - - 85.5 - - - 81 33.0 - - - - 85.5 - - - 82 31.5 - - - - 86.1 - - - 83 31.5 - - - - 86.2 - - - 84 33.0 - - - - 85.6 - - - 85 33.0 - - - - 85.5 - - - 86 31.5 - - - - 86.2 - - - 87 31.5 - - - - 86.3 - - - 88 33.0 - - - - 85.6 - - - 89 33.0 - - - - 85.5 - - - 90 31.5 - - - - 86.2 - - - 91 31.5 - - - - 86.3 - - - 92 33.0 - - - - 85.7 - - - 93 33.0 - - - - 85.6 - - - 94 31.5 - - - - 86.2 - - - 95 31.5 - - - - 86.4 - - - 96 33.0 - - - - 5•7 - - - 97 33.0 - - - - 85.6 - - - 98 31.5 - - - - 86.2 - - - 99 31.5 - - - - 86.4 - - - 100 33.0 - - - - 85.7 - - - 101 3.0 - - - - 85.6 - - - 102 31.5 - - - - 86.2 - - - 103 31.5 - - - - 86.5 - - - 104 33.0 - - - - 85.8 - - - 105 33.0 - - - - 85.6 - - - 106 31.5 - - - - 86.2 - - - 107 31.5 - - - - 86.5 - - - 108 33.0 - - - - 85.9 - - - 109 33.0 - - - - 85.6 - - - SPRINKLER SYSTEM HYDRAULIC ANALYSIS Page 4 JOE TITLE: PRESCRIPTION SOLUTIONS EXTENDED COVERAGE SPRINKLER CALC NODE TAG ELEVATION NODE TYPE PRESSURE DISCHARGE (FT) (PSI) (GPM) 110 31.5 - - - - 86.2 - - - 111 31.5 - - - - 86.6 - - - 112 33.0 - - - - 85.9 - - - 113 33.0 - - - - 85.6 - - - 114 31.5 - - - - 86.2 - - - 115 31.5 - - - - 86.7 - - - 116 33.0 - - - - 86.0 - - - 117 33.0 - - - - 85.6 - - - 118 31.5 - - - - 86.2 - - - 119 31.5 - - - - 86.8 - - - 120 33.0 - - - - 86.1 - - - 121 - - - - 33 •0 85.6 - - - 122 31.5 - - - - 86.2 - - - 123 31.5 - - - - 87.3 - - - 124 0.5 - - - - 101.0 - - - 125 0.0 - - - - 101.4 - - - 126 0.0 - - - - 104.4 - - - 127 0.0 SOURCE 104.5 560.8 SPRINKLER SYSTEM HYDRAULIC ANALYSIS Page 5 JOE TITLE: PRESCRIPTION SOLUTIONS 9XT89-DED COVERAGE SPP.IMCLE. CALC PTP! flATA PIPE TAG O(PM) DIA(IN) LENGTH PRESS. END ELEV. NZ. PT DISC. VEL(FP) Hw() (FT) SUN. NODES (FT) (K) (PSI) (GPM) F.L./FT (PSI) Pipe: 1 135.4 2.727 PL 1.50 PF 0.6 1 31.5 0.0 85.8 0.0 7.4 120 PTO T PE 0.6 2 33.0 0.0 84.5 0.0 0.043 TL 13.50 PV 0.4 Pipe: 2 135.4 2.727 PL 19.67 PF 1.4 2 33.0 0.0 84.5 0.0 7.4 120 FTG T PE 0.0 4 33.0 0.0 83.2 0.0 0.043 TL 31.67 PV 0.4 Pipe: 3 -80.0 1.049 PL 25.00 PF 60.9 3 14.0 14.5 30.5 80.0 29.7 120 PTO 3ET PE 8.2 4 33.0 0.0 83.2 0.0 1.693 TL 36.00 PV 5.9 Pipe: 4 55.4 2.727 PL 16.00 PF 0.1 4 33.0 0.0 83.2 0.0 3.0 120 PTO ---- PE 0.0 6 33.0 0.0 83.0 0.0 0.008 TL 16.00 PV 0.1 Pipe: 5 -80.0 1.049 PL 25.00 PF 60.9 5 14.0 14.5 30.4 80.0 29.7 120 PTG 3ET PE 8.2 6 33.0 0.0 83.0 0.0 1.690 TL 36.00 PV 5.9 Pipe: 6 -24.6 2.727 PL 24.00 PF 0.0 6 33.0 0.0 83.0 0.0 1.4 120 PTG ---- PE 0.0 8 33.0 0.0 83.1 0.0 0.002 TL 24.00 PV 0.0 Pipe: 7 -80.0 1.049 PL 25.00 PF 60.9 7 14.0 14.5 30.4 80.0 29.7 120 FTC 3ET PE 8.2 8 33.0 0.0 83.1 0.0 1.691 TL 36.00 PV 5.9 Pipe: 8 -104.6 2.727 PL 52.33 PF 1.7 8 33.0 0.0 83.1 0.0 5.7 120 FTC T PE 0.0 9 33.0 0.0 84.8 0.0 0.026 TL 64.33 PV 0.2 Pipe: 9 -104.6 2.727 PL 1.50 PF 0.4 9 33.0 0.0 84.8 0.0 5.7 120 FTC T PE 0.6 10 31.5 0.0 85.8 0.0 0.026 TL 13.50 PV 0.2 Pipe: 10 135.5 2.727 PL 1.50 PF 0.6 11 31.5 0.0 85.8 0.0 7.4 120 FTG T PE 0.6 12 33.0 0.0 84.5 0.0 0.043 TL 13.50 PV 0.4 Pipe: 11 135.5 2.727 PL 19.67 PF 1.4 12 33.0 0.0 84.5 0.0 7.4 120 FTC T PE 0.0 14 33.0 0.0 83.2 0.0 0.043 TL 31.67 PV 0.4 Pipe: 12 -80.0 1.049 PL 25.00 PF 60.9 13 14.0 14.5 30.5 80.0 29.7 120 FTC 3T PE 8.2 14 33.0 0.0 83.2 0.0 1.693 TL 36.00 PV 5.9 Pipe: 13 55.4 2.727 PL 16.00 PF 0.1 14 33.0 0.0 83.2 0.0 3.0 120 FTC ---- PE 0.0 16 33.0 0.0 83.1 0.0 0.008 TL 16.00 PV 0.1 SPRINKLER SYSTEM HYDRAULIC ANALYSIS Page 6 JOE TITLE: PPECIPTION SOLUTIONS EXTENDED COVERAGE SPRINKLER cALC PIPE DATA (cont'd) PIPE TAG Q(GPM) DIA(IN) LENGTH PRESS. END ELEV. NOZ. PT DISC. VEL(FPS) H() (FT) SUM. NODES (FT) (K) (PSI) (GPM) F.L./FT (PSI) Pipe: 14 -80.0 1.049 PL 25.00 PF 60.9 15 14.0 14.5 30.4 80.0 29.7 120 PTG 3ET PE 8.2 16 33.0 0.0 83.1 0.0 1.690 TL 36.00 PV 5.9 Pipe: 15 -24.6 2.727 PL 24.00 PF 0.0 16 33.0 0.0 83.1 0.0 1.3 120 PTO ---- PE 0.0 18 33.0 0.0 83.1 0.0 0.002 TL 24.00 PV 0.0 Pipe: 16 -80.0 1.049 PL 25.00 PF 60.9 17 14.0 14.5 30.4 80.0 29.7 120 PTO 3ET PE 8.2 18 33.0 0.0 83.1 0.0 1.691 TL 36.00 PV 5.9 Pipe: 17 -104.6 2.727 PL 52.33 PF 1.7 18 33.0 0.0 83.1 0.0 5.7 120 PTO T PE 0.0 19 33.0 0.0 84.8 0.0 0.026 TL 64.33 PV 0.2 Pipe: 18 -104.6 2.727 PL 1.50 PF 0.4 19 33.0 0.0 84.8 0.0 5.7 120 PTO T PE 0.6 20 31.5 0.0 85.8 0.0 0.026 TL 13.50 PV 0.2 Pipe: 19 -7.5 2.727 PL 1.50 PF 0.0 21 31.5 0.0 85.8 0.0 0.4 120 PTO T PE. 0.6 22 33.0 0.0 85.1 0.0 0.000 TL 13.50 PV 0.0 Pipe: 20 -7.5 2.727 PL 112.00 PF 0.0 22 33.0 0.0 85.1 0.0 0.4 120 PTO 2T PE 0.0 23 33.0 0.0 85.2 0.0 0.000 TL 136.00 PV 0.0 Pipe: 21 -7.5 2.727 PL 1.50 PF 0.0 23 33.0 0.0 85.2 0.0 0.4 120 FTG T PE 0.6 24 31.5 0.0 85.8 0.0 0.000 TL 13.50 PV 0.0 Pipe: 22 40.3 2.727 PL 1.50 PF 0.1 25 31.5 0.0 85.8 0.0 2.2 120 PTO T PE 0.6 26 33.0 0.0 85.1 0.0 0.005 TL 13.50 PV 0.0 Pipe: 23 40.3 2.727 PL 59.67 PF 0.3 26 33.0 0.0 85.1 0.0 2.2 120 PTO ---- PE 0.0 28 3.0 0.0 84.8 0.0 0.005 TL 59.67 PV 0.0 Pipe: 24 -80.8 1.049 PL 25.00 PF 62.0 27 14.0 14.5 31.1 80.8 30.0 120 PTO 3ET PE 8.2 28 33.0 0.0 84.8 0.0 1.722 TL 36.00 PV 6.1 Pipe: 25 -40.5 2.727 PL 52.33 PF 0.3 28 33.0 0.0 84.8 0.0 2.2 120 PTO T PE 0.0 29 33.0 0.0 85.1 0.0 0.005 TL 64.33 PV 0.0 Pipe: 26 -40.5 2.727 PL 1.50 PF 0.1 29 33.0 0.0 85.1 0.0 2.2 120 F'TG T PE 0.6 30 31.5 0.0 85.8 0.0 0.005 TL 13.50 PV 0.0 SPRINKLER SYSTEM HYDRAULIC ANALYSIS Page 7 JOS TITLE: PRESCRIPTION SOLUTIONS EXTENDED COVERAGE SPRINKLER CALC flTTIV Th7T'7 !-~"4-WAI PIPE TAG Q(GPM) DIA(IN) LENGTH PRESS. END ELEV. NOZ. PT DISC. VEL(FPS) HW(C) (FT) SUM. NODES (FT) (K) (PSI) (GPM) F.L./FT (PSI) Pipe: 27 -5.6 2.727 PL 1.50 PF 0.0 31 31.5 0.0 85.8 0.0 0.3 120 FTG T P8 0.6 32 33.0 0.0 85.2 0.0 0.000 TL 13.50 PV 0.0 Pipe: 28 -5.6 2.727 PL 112.00 PF 0.0 32 33.0 0.0 85.2 0.0 0.3 120 FTG T P2 0.0 33 33.0 0.0 85.2 0.0 0.000 TL 124.00 PV 0.0 Pipe: 29 -5.6 2.727 PL 1.50 PF 0.0 33 33.0 0.0 85.2 0.0 0.3 120 PTO T PE 0.6 34 31.5 0.0 85.9 0.0 0.000 TL 13.50 PV 0.0 Pipe: 30 -4.4 2.727 PL 1.50 PF 0.0 35 31.5 0.0 85.9 0.0 0.2 120 FTG T PE 0.6 36 33.0 0.0 85.2 0.0 0.000 TL 13.50 PV 0.0 Pipe: 31 -4.4 2.727 PL 112.00 PF 0.0 36 33.0 0.0 85.2 0.0 0.2 120 PTO T PE 0.0 37 33.0 0.0 85.2 0.0 0.000 TL 124.00 PV 0.0 Pipe: 32 -4.4 2.727 PL 1.50 PF 0.0 37 33.0 0.0 85.2 0.0 0.2 120 PTO T PE 0.6 38 31.5 0.0 85.9 0.0 0.000 TL 13.50 PV 0.0 Pipe: 33 -3.3 2.727 PL 1.50 PF 0.0 39 31.5 0.0 85.9 0.0 0.2 120 PTO T PE 0.6 40 33.0 0.0 85.2 0.0 0.000 TL 13.50 PV 0.0 Pipe: 34 -3.3 2.727 PL 112.00 PF 0.0 40 33.0 0.0 85.2 0.0 0.2 120 PTG T PE 0.0 41 33.0 0.0 85.3 0.0 0.000 TL 124.00 PV 0.0 Pipe: 35 -3.3 2.727 PL 1.50 PF 0.0 41 33.0 0.0 853 0.0 0.2 120 ?TG T PE 0.6 42 31.5 0.0 85.9 0.0 0.000 TL 13.50 PV 0.0 Pipe: 36 -2.2 2.727 PL 1.50 PF 0.0 43 31.5 0.0 85.9 0.0 0.1 120 FTG T PE 0.6 44 33.0 0.0 85.3 0.0 0.000 TL 13.50 PV 0.0 Pipe: 37 -2.2 2.727 PL 112.00 PF 0.0 44 33.0 0.0 85.3 0.0 0.1 120 FTC T PE 0.0 45 33.0 0.0 85.3 0.0 0.000 TL 124.00 PV 0.0 Pipe: 38 -2.2 2.727 PL 1.50 PF 0.0 45 33.0 0.0 85.3 0.0 0.1 120 FTC T PE 0.6 46 31.5 0.0 85.9 0.0 0.000 PL 13.50 PV 0.0 Pipe: 39 -0.8 2.727 PL 1.50 PF 0.0 47 31.5 0.0 86.0 0.0 0.0 120 FTC T PE 0.6 48 33.0 0.0 85.3 0.0 0.000 TL 13.50 PV 0.0 SPRINKLER SYSTEM HYDRAULIC ANALYSIS Page B JOB TITLE: PRESCRIPTION SOLUTIONS EXTENDED COV8RACE SPPINKLEP. cALC DTDP flhiT (rri-, PIPE TAG Q(GPM) DIA(IN) LENGTH PRESS. END ELEV. NOZ. PT DISC. VEL(FPS) Hw() (FT) SUM. NODES (FT) (K) (PSI) (GPM) F.L./FT (PSI) Pipe: 40 -0.8 2.727 PL 112.00 PF 0.0 48 33.0 0.0 85.3 0.0 0.0 120 FTG T PE 0.0 49 33.0 0.0 85.3 0.0 0.000 TL 124.00 PV 0.0 Pipe: 41 -0.8 2.727 PL 1.50 PF 0.0 49 33.0 0.0 85.3 0.0 0.0 120 F'TG T PE 0.6 50 31.5 0.0 86.0 0.0 0.000 TL 13.50 PV 0.0 Pipe: 42 1.7 2.727 PL 1.50 PF 0.0 51 31.5 0.0 86.0 0.0 0.1 120 PTO T PE 0.6 52 33.0 0.0 85.3 0.0 0.000 TL 13.50 PV 0.0 Pipe: 43 1.7 2.727 PL 112.00 PF 0.0 52 33.0 0.0 85.3 0.0 0.1 120 PTC T PE 0.0 53 33.0 0.0 85.3 0.0 0.000 TL 124.00 PV 0.0 Pipe: 44 1.7 2.727 PL 1.50 PF 0.0 53 33.0 0.0 85.3 0.0 0.1 120 FTG T PE 0.6 54 31.5 0.0 86.0 0.0 0.000 TL 13.50 PV 0.0 Pipe: 45 2.8 2.727 PL 1.50 PF 0.0 55 31.5 0.0 86.0 0.0 0.2 120 PTG T PE 0.6 56 33.0 0.0 85.4 0.0 0.000 TL 13.50 PV 0.0 Pipe: 46 2.8 2.727 PL 112.00 PF 0.0 56 33.0 0.0 85.4 0.0 0.2 120 PTO T PB 0.0 57 33.0 0.0 85.4 0.0 0.000 TL 124.00 PV 0.0 Pipe: 47 2.8 2.727 PL 1.50 PF 0.0 57 33.0 0.0 85.4 0.0 0.2 120 PTO T PE 0.6 58 31.5 0.0 86.0 0.0 0.000 TL 13.50 PV 0.0 Pipe: 48 3.9 2.727 PL 1.50 PF 0.0 59 31.5 0.0 86.0 0.0 0.2 120 PTG T PE 0.6 60 33.0 0.0 85.4 0.0 0.000 TL 13.50 PV 0.0 Pipe: 49 3.9 2.727 PL 112.00 PF 0.0 60 33.0 0.0 85.4 0.0 0.2 120 FTG T PE 0.0 61 33.0 0.0 85.4 0.0 0.000 TL 124.00 PV 0.0 Pipe: 50 3.9 2.727 PL 1.50 PF 0.0 61 33.0 0.0 85.4 0.0 0.2 120 PTG T PE 0.6 62 31.5 0.0 86.0 0.0 0.000 TL 13.50 PV 0.0 Pipe: 51 5.0 2.727 PL 1.50 PF 0.0 63 31.5 0.0 86.1 0.0 0.3 120 PTG T PE 0.6 64 33.0 0.0 85.4 0.0 0.000 TL 13.50 P17 0.0 Pipe: 52 5.0 2.727 PL 112.00 PF 0.0 64 33.0 0.0 85.4 0.0 0.3 120 FTC T PE 0.0 65 33.0 0.0 85.4 0.0 0.000 TL 124.00 PV 0.0 SPRINKLER SYSTEM HYDRAULIC ANALYSIS Page 9 JOB TITLE: PRESCRIPTION SOLUTIONS EXTENDED COVERAGE SFP.INKLEP. cALC PIPE DATA (cont'd) PIPE TAG Q(GPM) DIA(IN) LENGTH PRESS. END ELEV. NOZ. PT DISC. VEL(FPS) HW() (FT) SUM. NODES (FT) (K) (PSI) (GPM) F.L./FT (PSI) Pipe: 53 5.0 2.727 PL 1.50 PF 0.0 65 33.0 0.0 85.4 0.0 0.3 120 FTC T FE 0.6 66 31.5 0.0 86.1 0.0 0.000 TL 13.50 PV 0.0 Pipe: 54 6.2 2.727 PL 1.50 PF 0.0 67 31.5 0.0 86.1 0.0 0.3 120 FTC T FE 0.6 68 33.0 0.0 85.4 0.0 0.000 TL 13.50 PV 0.0 Pipe: 55 6.2 2.727 PL 112.00 PF 0.0 68 33.0 0.0 85.4 0.0 0.3 120 FTC T FE 0.0 69 33.0 0.0 85.4 0.0 0.000 TL 124.00 PV 0.0 Pipe: 56 6.2 2.727 PL 1.50 PF 0.0 69 33.0 0.0 85.4 0.0 0.3 120 FTC T FE 0.6 70 31.5 0.0 86.1 0.0 0.000 TL 13.50 PV 0.0 Pipe: 57 7.5 2.727 PL 1.50 PF 0.0 71 31.5 0.0 86.1 0.0 0.4 120 FTC T FE 0.6 72 33.0 0.0 85.5 0.0 0.000 TL 13.50 PV 0.0 Pipe: 58 7.5 2.727 PL 112.00 PF 0.0 72 33.0 0.0 85.5 0.0 0.4 120 FTC T FE 0.0 73 33.0 0.0 85.5 0.0 0.000 TL 124.00 PV 0.0 Pipe: 59 7.5 2.727 PL 1.50 PF 0.0 73 33.0 0.0 85.5 0.0 0.4 120 FTC T FE 0.6 74 31.5 0.0 86.1 0.0 0.000 TL 13.50 PV 0.0 Pipe: 60 9.0 2.727 PL 1.50 PF 0.0 75 31.5 0.0 86.2 0.0 0.5 120 FTC T FE 0.6 76 33.0 0.0 85.5 0.0 0.000 TL 13.50 PV 0.0 Pipe: 61 9.0 2.727 PL 112.00 PF 0.0 76 33.0 0.0 85.5 0.0 0.5 120 FTC T FE 0.0 77 33.0 0.0 85.5 0.0 0.000 TL 124.00 PV 0.0 Pipe: 62 9.0 2.727 PL 1.50 PF 0.0 77 33.0 0.0 85.5 0.0 0.5 120 FTC T FE 0.6 78 31.5 0.0 86.1 0.0 0.000 TL 13.50 PV 0.0 Pipe: 63 10.6 2.727 PL 1.50 PF 0.0 79 31.5 0.0 86.2 0.0 0.6 120 FTC T FE 0.6 80 33.0 0.0 85.5 0.0 0.000 TL 13.50 PV 0.0 Pipe: 64 10.6 2.727 PL 112.00 PF 0.0 80 33.0 0.0 85.5 0.0 0.6 120 FTC T FE 0.0 81 33.0 0.0 85.5 0.0 0.000 TL 124.00 PV 0.0 Pipe: 65 10.6 2.727 PL 1.50 PF 0.0 81 33.0 0.0 85.5 0.0 0.6 120 FTC T FE 0.6 82 31.5 0.0 86.1 0.0 0.000 TL 13.50 PV 0.0 SPRINXLER SYSTEM HYDRAULIC ANALYSIS Page 10 jOB TITLE: PRESCRIPTION SOLUTIONS EXTENDED COVERAGE SPRINKLER CALC PIPE DATA (cont'd) PIPE TAG Q(GPM) DIA(IN) LENGTH PRESS. END ELEV. NOZ. PT DI. VEL(FPS) HW(C) (FT) SUM. NODES (FT) (K) (PSI) (GPM) F.L./FT (PSI) Pipe: 66 12.3 2.127 PL 1.50 PF 0.0 83 31.5 0.0 86.2 0.0 0.7 120 PTG T PE 0.6 84 33.0 0.0 85.6 0.0 0.001 TL 13.50 PIT 0.0 Pipe: 67 12.3 2.727 PL 112.00 PF 0.1 84 33.0 0.0 85.6 0.0 0.7 120 FTC T PE 0.0 85 33.0 0.0 85.5 0.0 0.001 TL 124.00 PIT 0.0 Pipe: 68 12.3 2.727 PL 1.50 PF 0.0 85 33.0 0.0 85.5 0.0 0.7 120 FTG T PE 0.6 86 31.5 0.0 86.2 0.0 0.001 TL 13.50 PV 0.0 Pipe: 69 14.2 2.727 PL 1.50 PF 0.0 87 31.5 0.0 86.3 0.0 0.8 120 PTO T P8 0.6 88 33.0 0.0 85.6 0.0 0.001 TL 13.50 PV 0.0 Pipe: 70 14.2 2.727 PL 112.00 PF 0.1 88 33.0 0.0 85.6 0.0 0.8 120 PTO T PE 0.0 89 33.0 0.0 85.5 0.0 0.001 TL 124.00 PIT 0.0 Pipe: 71 14.2 2.727 PL 1.50 PF 0.0 89 33.0 0.0 85.5 0.0 0.8 120 PTC T PE 0.6 90 31.5 0.0 86.2 0.0 0.001 TL 13.50 PV 0.0 Pipe: 72 16.2 2.727 PL 1.50 PF 0.0 91 31.5 0.0 86.3 0.0 0.9 120 PTO T PE 0.6 92 33.0 0.0 85.7 0.0 0.001 TL 13.50 PV 0.0 Pipe: 73 16.2 2.727 PL 112.00 PF 0.1 92 33.0 0.0 85.7 0.0 0.9 120 PTG T PE 0.0 93 33.0 0.0 85.6 0.0 0.001 TL 124.00 PIT 0.0 Pipe: 74 16.2 2.727 PL 1.50 PF 0.0 93 33.0 0.0 85.6 0.0 0.9 120 PTO T PE 0.6 94 31.5 0.0 86.2 0.0 0.001 TL 13.50 PIT 0.0 Pipe: 75 18.4 2.727 PL 1.50 PF 0.0 95 31.5 0.0 86.4 0.0 1.0 120 PTC T PE 0.6 96 33.0 0.0 85.7 0.0 0.001 TL 13.50 PV 0.0 Pipe: 76 18.4 2.727 PL 112.00 PF 0.1 96 33.0 0.0 85.7 0.0 1.0 120 PTO T PE 0.0 97 33.0 0.0 85.6 0.0 0.001 TL 124.00 PV 0.0 Pipe: 77 18.4 2.727 PL 1.50 PF 0.0 97 33.0 0.0 85.6 0.0 1.0 120 PTO T PE 0.6 98 31.5 0.0 86.2 0.0 0.001 TL 13.50 PV 0.0 Pipe: 78 20.8 2.727 PL 1.50 PF 0.0 99 31.5 0.0 86.4 0.0 1.1 120 PTG T PE 0.6 100 33.0 0.0 85.7 0.0 0.001 TL 13.50 PIT 0.0 SPRINKLER SYSTEM HYDRAULIC ANALYSIS Page 11 JOB TITLE: PRESCRIPTION SOLUTIONS EXTENDED COVERAGE SPRINKLER CALC PIPE DATA (cont'd) PIPE TAG Q(CPM) DIA(IN) LENGTH PRESS. END ELEV. NOZ. PT DISC. VEL(FP) HW(C) (FT) SUM. NODES (FT) (K) (PSI) (GPM) F.L./FT (PSI) Pipe: 79 20.8 2.727 PL 112.00 PF 0.2 100 33.0 0.0 85.7 0.0 1.1 120 FTC T PE 0.0 101 33.0 0.0 85.6 0.0 0.001 TL 124.00 PV 0.0 Pipe: 80 20.8 2.727 PL 1.50 PF 0.0 101 33.0 0.0 85.6 0.0 1.1 120 FTC T PE 0.6 102 31.5 0.0 86.2 0.0 0.001 TL 13.50 PV 0.0 Pipe: 81 23.3 2.727 PL 1.50 PF 0.0 103 31.5 0.0 86.5 0.0 1.3 120 FTC T PE 0.6 104 33.0 0.0 85.8 0.0 0.002 TL 13.50 PV 0.0 Pipe: 82 23.3 2.727 PL 112.00 PF 0.2 104 33.0 0.0 85.8 0.0 1.3 120 FTC T PE 0.0 105 33.0 0.0 85.6 0.0 0.002 TL 124.00 PV 0.0 Pipe: 83 23.3 2.727 PL 1.50 PF 0.0 105 33.0 0.0 85.6 0.0 1.3 120 FTC T PE 0.6 106 31.5 0.0 86.2 0.0 0.002 TL 13.50 PV 0.0 Pipe: 84 26.0 2.727 PL 1.50 PF 0.0 107 31.5 0.0 86.5 0.0 1.4 120 FTC T PE 0.6 108 33.0 0.0 85.9 0.0 0.002 TL 13.50 PV 0.0 Pipe: 85 26.0 2.727 PL. 112.00 PF 0.2 108 33.0 0.0 85.9 0.0 1.4 120 FTC T PE 0.0 109 33.0 0.0 85.6 0.0 0.002 TL 124.00 PV 0.0 Pipe: 86 26.0 2.727 PL 1.50 PF 0.0 109 33.0 0.0 85.6 0.0 1.4 120 FTC T PE 0.6 110 31.5 0.0 86.2 0.0 0.002 TL 13.50 PV 0.0 Pipe: 87 28.8 2.727 PL 1.50 PF 0.0 iii. 31.5 0.0 86.6 0.0 1.6 120 FTC T PE 0.6 112 33.0 0.0 85.9 0.0 0.002 TL 13.50 PV 0.0 Pipe: 88 28.8 2.727 PL 112.00 PF 0.3 112 33.0 0.0 85.9 0.0 1.6 120 FTC T PE 0.0 113 33.0 0.0 85.6 0.0 0.002 TL 124.00 PV 0.0 Pipe: 89 28.8 2.727 PL 1.50 PF 0.0 113 33.0 0.0 85.6 0.0 1.6 120 FTC T PE 0.6 114 31.5 0.0 86.2 0.0 0.002 TL 13.50 PV 0.0 Pipe: 90 31.8 2.727 PL 1.50 PF 0.0 115 31.5 0.0 86.7 0.0 1.7 120 FTC T PB 0.6 116 33.0 0.0 86.0 0.0 0.003 TL 13.50 PV 0.0 Pipe: 91 31.8 2.727 PL 112.00 PF 0.4 116 33.0 0.0 86.0 0.0 1.7 120 FTC T PE 0.0 117 33.0 0.0 85.6 0.0 0.003 TL 124.00 PV 0.0 SPRINKLER SYSTEM HYDRAULIC ANALYSIS Page 12 JOB TITLE: PRESCRIPTION SOLUTIONS EXTENDED COVERAGE SPP.ThWLEP. cALC PIPE DATA (cont!d) PIPE TAG Q(GPM) DIA(IN) LENGTH PRESS. END ELEV. NOZ. PT DISC. VEL(FPS) HW() (FT) SUM. NODES (FT) (K) (PSI) (GPM) F.L./FT (PSI) Pipe: 92 31.8 2.727 PL 1.50 PF 0.0 117 33.0 0.0 85.6 0.0 1.7 120 FTG T PE 0.6 118 31.5 0.0 86.2 0.0 0.003 TL 13.50 PV 0.0 Pipe: 93 35.0 2.727 PL 1.50 PF 0.0 119 31.5 0.0 86.8 0.0 1.9 120 PTO T PE 0.6 120 33.0 0.0 86.1 0.0 0.003 TL 13.50 PV 0.0 Pipe: 94 35.0 2.727 PL 112.00 PF 0.4 120 33.0 0.0 86.1 0.0 1.9 120 PTO T PE 0.0 121 33.0 0.0 85.6 0.0 0.003 TL 124.00 PV 0.0 Pipe: 95 35.0 2.727 PL 1.50 PF 0.0 121 33.0 0.0 85.6 0.0 1.9 120 PTO T PE 0.6 122 31.5 0.0 86.2 0.0 0.003 TL 13.50 PV 0.0 Pipe: 96 -135.4 6.357 PL 10.00 PF 0.0 1 31.5 0.0 85.8 0.0 1.4 120 FTG ---- PE 0.0 11 31.5 0.0 85.8 0.0 0.001 TL 10.00 PV 0.0 Pipe: 97 -270.9 6.357 PL 10.00 PF 0.0 11 31.5 0.0 85.8 0.0 2.7 120 FT ---- PE 0.0 21 31.5 0.0 85.8 0.0 0.002 TL 10.00 PV 0.1 Pipe: 98 -263.4 6.357 PL 10.00 PF 0.0 21 31.5 0.0 85.8 0.0 2.7 120 FTC ---- PE 0.0 25 31.5 0.0 85.8 0.0 0.002 TL 10.00 PV 0.0 Pipe: 99 -303.7 6.357 PL 10.00 PF 0.0 25 31.5 0.0 85.8 0.0 3.1 120 FTG ---- PE 0.0 31 31.5 0.0 85.8 0.0 0.003 TL 10.00 PV 0.1 Pipe: 100 -298.1 6.357 PL 10.00 PF 0.0 31 31.5 0.0 85.8 0.0 3.0 120 FTC ---- PE 0.0 35 31.5 0.0 85.9 0.0 0.003 TL 10.00 PV 0.1 Pipe: 101 -293.7 6.357 PL 10.00 PF 0.0 35 31.5 0.0 85.9 0.0 3.0 120 PT ---- PE 0.0 39 31.5 0.0 85.9 0.0 0.003 TL 10.00 PV 0.1 Pipe: 102 -290.4 6.357 PL 10.00 PF 0.0 39 31.5 0.0 85.9 0.0 2.9 120 PTO ---- PE 0.0 43 31.5 0.0 85.9 0.0 0.003 TL 10.00 PV 0.1 Pipe: 103 -288.1 6.357 PL 10.00 PF 0.0 43 31.5 0.0 85.9 0.0 2.9 120 FTC ---- PE 0.0 47 31.5 0.0 86.0 0.0 0.003 TL 10.00 PV 0.1 Pipe: 104 -287.3 6.357 PL 10.00 PF 0.0 47 31.5 0.0 86.0 0.0 2.9 120 FTG -- PE 0.0 51 31.5 0.0 86.0 0.0 0.003 TL 10.00 PV 0.1 SPRINKLER SYSTEM HYDRAULIC ANALYSIS Page 13 JOE TITLE: PRESCRIPTION SOLUTIONS EXTENDED COVERAGE SPRINKLER cALC PIPE DATA (contd) PIPE TAG Q(GPM) DiA(IN) LENGTH PRESS. END ELEV. NOZ. PT DISC. VEL(FPS) HW(C) (FT) SUM. NODES (PT) (K) (PSI) (GPM) F.L./FT (PSI) Pipe: 105 -289.0 6.357 PL 10.00 PP 0.0 51 31.5 0.0 86.0 0.0 2.9 120 PTG -- PE 0.0 55 31.5 0.0 86.0 0.0 0.003 TL 10.00 PV 0.1 Pipe: 106 -291.8 6.357 PL 10.00 PP 0.0 55 31.5 0.0 86.0 0.0 2.9 120 PTG ---- PE 0.0 59 31.5 0.0 86.0 0.0 0.003 TL 10.00 PV 0.1 Pipe: 107 -295.7 6.357 PL 10.00 PF 0.0 59 31.5 0.0 86.0 0.0 3.0 120 PTG -S--- PE 0.0 63 31.5 0.0 86.1 0.0 0.003 TL 10.00 PV 0.1 Pipe: 108 -300.6 6.357 PL 10.00 PP 0.0 63 31.5 0.0 86.1 0.0 3.0 120 PTG ---- PE 0.0 67 31.5 00 86.1 0.0 0.003 TL 10.00 PV 0.1 Pipe: 109 -306.8 6.357 PL 10.00 PP 0.0 67 31.5 0.0 86.1 0.0 3.1 120 p: PE 0.0 71 31.5 0.0 86.1 0.0 0.003 TL 10.00 PV 0.1 Pipe: 110 -314.3 6.357 PL 10.00 PP 0.0 71 31.5 0.0 86.1 0.0 3.2 120 FTG ---- PE 0.0 75 31.5 0.0 86.2 0.0 0.003 TL 10.00 PV 0.1 Pipe: 111 -323.3 6.357 PL 10.00 PP 0.0 75 31.5 0.0 86.2 0.0 3.3 120 TG ---- PE 0.0 79 31.5 0.0 86.2 0.0 0.003 TL 10.00 PV 0.1 Pipe:- 112 -333 .9 6 .357 PL 10-.00 PP 0.01 79 31.5 0.0 86.2 0.0 3.4 120 FTC ---- PE 0.0 83 31.5 0.0 86.2 0.0 0.004 TL 10.00 PV 0.1 Pipe: 113 -346.2 6.357 PL 10.00 PP 0.0 83 31.5 0.0 86.2 0.0 3.5 120 PTG PE 0.0 87 31.5 0.0 86.3 0.0 0.004 TL 10.00 PV 0.1 Pipe: 114 -360.4 6.357 PL 10.00 PP 0.0 87 31.5 0.0 86.3 0.0 3.6 120 FTG ---- PE 0.0 91 31.5 0.0 86.3 0.0 0.004 TL 10.00 PV 0.1 Pipe: 115 -376.7 6.357 PL 10.00 PP 0.0 91 31.5 0.0 86.3 0.0 3.8 120PTG -- PE 0.0 95 31.5 0.0 86.4 0.0 0.005 TL 10.00 PV 0.1 Pipe: 116 -395.1 6.357 PL 10.00 PP 0.1 95 31.5 0.0 86.4 0.0 4.0 120 TG ---- PE 0.0 99 31.5 0.0 86.4 0.0 0.005 TL 10.00 PV 0.1 Pipe: 117 -415.9 6.357 PL 10.00 PP 0.1 99 31.5 0.0 86.4 0.0 4.2 120 PTG --- PE 0.0 103 31.5 0.0 86.5 0.0 0.006 TL 10.00 PV 0.1 SPRINKLER SYSTEM HYDRAULIC ANALY919 Page 14 JOB TITLE: PRESCRIPTION SOLUTIONS EXTENDED COVERAGE SPRINKLER cALC PIPE DATA (cont!d) PIPE TAG Q(GPM) DIA(iN)' LENGTH PRESS. END ELEV. NOZ. PT DISC. VEL(FPS) HW() (PT) SUM. NODES (FT) (K) (PSI) (GPM) F.L./FT (PSI) Pipe: 118 -439.2 6.357 PL 10.00 PF 0.1 103 31.5 0.0 86.5 0.0 4.4 120 F'TG• --- PE 0.0 107 31.5 0.0 86.5 0.0 0.006 TL 10.00 PV 0.1 Pipe: 119 -465.2 6.357 PL 10.00 PF 0.1 107 31.5 0.0 86.5 0.0 4.7 120 PTG ---- PE 0.0 111 31.5 0.0 86.6 0.0 0.007 TL 10.00 PV 0.1 Pipe: 120 -494.0 6.357 PL 10.00 PF 0.1 111 31.5 0.0 86.6 0.0 5.01 120 PTG ---- PE 0.0 115 31.5 0.0 86.7 0.0 0.008 TL 10.00 PV 0.2 Pipe: 121 -525.9 6.357 PL 10.00 PF 0.1 115 31.5 0.0 86.7 0.0 5.3 120 PTG ---- PE 0.0 119 31.5 0.0 86.8 0.0 0.009 TL 10.00 PV 0.2 Pipe: 122 -104.6 6.357 PL 10.00 PF 0.0 10 31.5 0.0 85.8 0.01 1.1 120 PTG - --- PE 0.0 20 31.5 0.0 85.8 0.0 0.000 TL 10.00 PV 0.0 Pipe: 123 -209.2 6.357 PL 10.00' PF 0.0 20 31.5 0.0 85.8 0.0 2.1 120 F'TG ---- PE 0.0 24 31.5 0.0 85.8 0.0 0.002 TL 10.00 PV 0.0 Pipe: 124 -216.7 6.357 PL 10.00 PF 0.0 24 31.5 0.0 85.8 0.0 2.2 120 PTG ---- PE 0.0 30 31.5 0.0 85.8 0.0 0.002 TL 10.00 PV 0.0 Pipe: 125 -257.2 6.357 PL 10.00 PP 0.0 30 31.5 0.0 85.8 0.0 2.6 120 PTO ---- PE 0.0 34 31.5 0-.01 85.9 0.0 0.002 TLI 10.00 PV 0.0' Pipe: 126 -262.8 6.357 PL 10.00 PF 0.0 34 31.5 0.0 85.9 0.0 2.7 120 PTG -• - - - PE 0.0 38 31.5 0.0 85.9 0.0 0.002 TL 10.00 PV 0.0 Pipe: 127 -267.2 6.357 PL 10.00 PP 0.0 38 31.5 0.0 85.9 0.0 2.7 120 FTG ---- PE 0.0 42 31.5 0.0 85.9 0.07 0.002 TL 10.00 PV 0.0 Pipe: 128 -270.5 6.357 PL 10.00 PP 0.0 42 31.5 0.0 85.9 0.0 2.7 120 PT --'-- PE 0.0 46 31.5 0.0 85.9 0.0 0.002 TL 10.00 PIT 0.1 Pipe: 129 -272.7 6.357 PL 10.00 PF 0.0- 46 31.5 0.0 85.9 0.0 2.8 120. PTO ---- PE 0.0 50 31.5 0.0 86.0 0.0 0.003 TL 10.00 PV 0.1 Pipe: 130 -273.5 6.357 PL 10.00 PF 0.0 50 31.5 0.0 86.0 0.0 2.8 120 PTG- PB 0.0 54 31.5 0.0 86.0 0.0 0.003 TL 10.00 PV 0.1 SPRINKLER SYSTEM HYDRAULIC ANALYSIS Page 15 JOB TITLE: PRESCRIPTION SOLUTIONS EXTENDED COVERAGE SPRINKLER CALC PIPE DATA (conttd) PIPE TAG O(GPM) DIA(IN) LENGTH PRESS. END ELEV. NOZ. PT DISC. VEL(FPS) HW(C) (FT) SUN. NODES (FT) (K) (PSI)' (GPM) F.L./FT (PSI) Pipe: 131 -271.8 6.357 PL 10.00 PF 0.0 54 31.5 0.0 86.0 0.0 2.7 120 PTG --- PE 0.0 58 31.5 0.0 86.0 0.0 0.003 TL 10.00 PV 0.1 Pipe: 132 -26.0 6.357 PL 10.00 PP 0.0 58 31.5 0.0 86.0 0.0 2.7 120 rTG ---- PE 0.0 62 31.5 0.0 86.0 0.01 0.002 fl 10.00 PV 0.0 Pipe: 133 -265.2 6.357 PL 10.00 PP 0.0 62 31.5 0.0 86.0 0.0 2.7 120 FTC- ---- PE 0.0 66 31.5 0.0 86.1 0.0 0.002 fl 10.00 PV 0.0 Pipe: 134 -260.2 6.357 PL 10.00 PP 0.0 66 31.5 0.0 86.1 0.0 2.6 120 PTG---- PE 0.0 70 31.5 0.0 86.1 0.0 0.002 TL 10.00 PV 0.0 Pipe: 135 -254.0 6.357 PL 10.00 PF 0.0 70 31.5 0.0 86.1 0.0 2.6 120 P. ml-- --- PE 0.0 74 31.5 0.0 86.1 0.0 0.002 TL 10.00 PV 0.0 Pipe: 136 -246.5 6.357 PL 10.00 PP 0.0 74 31.5 0.0 86.1 0.0 2.5 120 P ---- PE 0.0 78 31.5 0.0 86.1 0.0 0.002 fl 10.00 PV 0.0 Pipe: 137 -237.5 6.357 PL 10.00 PF 0.0 7 31.5 0.0 86.1 0.0 2.4 120 PTG -- PE 0.0 82 31.5 0.0 86.1 0.0 0.002 TL 10.00 PV 0.0 Pipe: 138 -226.9 6.357 PL 10.00 PP 0.0' 82 31.5 0.0 86.1 0.0 2.3 120 FTG ---- PE 0.0 86 31.5 0.0 86.2 0.0 0.002TL 10.00 PV 0.0 Pipe: 139 -214.6 6.357 PL 10.00 PF 0.0 86 31.5 0.0 86.2 0.0 2.2 120 PT --- PE 0.0 90 31.5 0.0 86.2 0.0 0.002 TL 10.00 PV 0.0 Pipe: 140' -200.4 6.357 PL 10.00 PP 0.0 90 31.5 0.0 86.2 0.0 2.0 120 PTG ---- PE 0.0 94 31.5 0.0 86.2 0.0 0.001 TL 10.00 PV 0.0 Pipe: 141 -184.2 6.357 PL 10.00 PP 0.0 94 31.5 0.0 86.2 0.0 1.9 120 PTG ---- PE 0.0 98 31.5 0.0 86.2 0.0 0.001 TL 10.00 PV 0.0 Pipe 142 -165.7 6.357 PL 10.00 PP 0.0 98 31.5 0.0 86.2 0.0 1.7 120 F'TG ---- PE 0.0 102 31.5 0.0 86.2 0.0 0.00i TL 10.00 PV 0.0 Pipe: 143 -144.9 6.357 PL 10.00 PP 0.0 102 31.5 0.0 86.2 0.0 1.5 120 FT ---- PE 0.0 106 31.5 0.0 86.2 0.0 0.001 TL 10.00 PV 0.0 SPRINKLER SYSTEM HYDRAULIC ANALYSIS Page 16 JOB TITLE: PRESCRIPTION SOLUTIONS EXTENDED COVERAGE SPRINKLER CALC PIPE DATA (contdY PIPE TAG (GPM) DIA(IN) LENGTH PRESS. END ELEV. NOZ. PT DISC. VEL(FPS) HW(C) (PT) SUM. NODES (FT) (K) (PSI) (GPM) F.L./FT (PSI) Pipe: 144 -121.6 6.357 PL 10.00 PF 0.0 106 31.5 0.0 8.2 0.0 1.2 120 PTO PE 0.0 110 31.5 0.0 86.2 0.0 0.001 TL '10.00 PV 0.0 Pipe: 145 -95.6 6.357 PL 10.00 PP 0.0 110 31.5 0.0 86.2 0.0 1.0 120 PTG ---- PE 0.0 114 31.5 0.0 86.7 0.0 0.000 TL 10.00 ?V 0.0 Pipe: 146 -66.8 6.357 PL 10.00 PP 0.0 114 31.5 0.0 86.2 0.0 0.7 120 TG PR 0.0 118 31.5 0.0 86.2 0.0 0.000 TL 10.00 PV 0.0 Pipe: 147 -35.0 6.357 PL 10.00 PF 0.0' 118 31.5 0.0 86.2 0.0 0.4 120 PTc' ---- PE 0.0 122 31.5 0.0 86.2 0.0 0.000 TLI 10.00 PV 0.0' Pipe: 148 -560.8 6.357 PL 25.50 PF 0.5 119 31.5 0.0 86.8 0.0 5.7 120 FTG 2E PE 0.0 123 31.5 0.0 87.3 0.0 0.010 TL 53.50 PV 0.2 Pipe: 149 -560.8 6.357 PL 32.50 PP 0.3 123 31.5 0.0 87.3 0.0 5.7 120 PTO ---- PE 13.4 124 0.5 0.0 101.0 0.01 0.010 TL 32.50 PV 0.2 Pipe: 150 -560.8 9.790 PL 115.00 PF 0.2 124 0.5 0-.01 101.0 0.0 2.4 150 PT 3E PE 0.2 125 0.0 0.0 101.4 0.0 0.001 TL 214.73 PV 0.0 Pipe: 151 FIXED PRESSURE LOSS DEVICE 126 0.0 0.0 104.4 0.0 3.0 psi, 560.9 gpm 125 0.0 0.0 101.4 , 0.0 Pipe: 152 -560.8 9.790 PL 40.00 PF 0.1 126 0.0 0.0 104.4 0.0 2.4 120 PTG T PE 0.0- 127 0.0 SRCE 104.5 (N/A) 0.001 TL 90.00 PV 0.0 MOTES: Calculations were performed by the HASS 5.4.0 computer program under license no. 422C1327E granted by liRs Systems, Inc. 2193 Ranchwood Dr., N.E. Atlanta, CA 30345- The system has been balanced to provide an average imbalance at each node of 0.001 gp and a maxi m' mum imbalance at any node of 0.063 gpm. Velocity pressure's are printed for information only, and are not used in balancing the system. Maximum water velocity in any pipe is 30.0 ft/sec. SPRINKLER SYSTEM HYDRAULIC ANALYSIS Page I? JOB TITLE: PRESCRIPTION SOLUTIONS EXTENDED COVVRAG8 SPRINKLER cALc (4) PIPE FITTINGS TABLE Pipe Table Name: STANDARD.PIP PAGE: A MATERIAL: Steel HWC: 12() Diameter Equivalent Fitting Lengths in Feet (in) E T L C B G A D Eli Tee LngEi ChkVi BfyVl GatVl AlmCk DPVlv 1.049 2.00 5.00 2.00 5.00 6.00 1.00 10.00 10.00 6.357 14.00 30.00 9.00 32.00 10.00 3.00 2.00 19.00 SPRICLER SYSTEM HYDRAULIC ANALYSIS Page 18 jOS TITLE PRESCRIPTION- SOLUTIONS EXTEiflED COVERAGE SPRThWLR CALC WATER SUPPLY CURVE 180+ 165+ 135+ I * P120+ R E S S105+ x U R E 90+ ( P S I 75+ ) I <-124.0 psi @ 1491 gpm FlOw Test Point 60+ 45+ 30+ LEGEND fl X = Required water Supply 104.50 psi @ 810.8 gpm 15+ 0 = Available Water Supply " 126.70 psi @ 810.8 gpm 0++-+---+----+-----+ ------+ --------+ --------+ ---------+ -----------+ 400 600 800 1000 1200 1400 1600 1800 2000 FLOW (GPM)