HomeMy WebLinkAbout3313 CALLE COBRE; ; AS0700188/9/24, 11:43 AM AS070018 Permit Data
City of Carlsbad
Sprinkler Permit
Job Address: 3313 CALLE COBRE
Permit Type: SPRINK
Parcel No: 2230320400
Lot #: 0
Permit No: AS070018
Status: ISSUED
Applied 1/19/2007
Approved: 1/19/2007
Reference No.: Issued: 1/19/2007
PC #: Inspector:
Project Title: HUNTER'S POINT THREE FIRE SPRINKLER INSPECTIONS @
$62/EA
Applicant:
SOUTHLAND FIRE PROTECTION, INC
4733 PT. LOMAAV
SAN DIEGO, CA 92107
619-523-1400
Owner:
REAL ESTATE COLLATERAL MANAGEMENT
CO
C/O MORROW DEV/ LIZ LAYMAN
1903 WRIGHT PL #180
CARLSBAD CA
Fees ($) Add'l Fees ($) Total ($) Balance ($)
186 0 186 0
about:blank 1/1
SEE PERMIT
AS070010
7271 CALLE PLATA
HUNTER'S POINT
FOR CALCS &
PLANS
13-190 INSTALLATION OF SPRINKLER SYSTEMS
Contractor's Material and Test Certificate for Aboveground Piping
PROCEDURE
Upon completion of work inspection and tests shall be made by the contractor's representative and witnessed by an owners
representative. All defects shall be corrected and system left In service before contractor's personnel finally leave the job.
A certificate shall be filled out and signed by both representatives. Copies shall be prepared for approving authorities, owners, and
contractor. It Is understood the owner's representative's signature In no way prejudices any claim against contractor for faulty material, poor workmanship, or failure, to comply with approving authority's requirements or local ordinances.
Property name. I-1UTE pAJT I 'ate 7d)7
Property address 3
Accepted by approving authorities (names)
Address
Plans
Installation conforms to accepted plans Yes [J No
Equipment used Is approved Yes D No If no, explain deviations
Has, person In charge of fire equipment been instructed as Yes EJ No to location of control valves and care and maintenance
of this new equipment?
If no, explain
Instructions Have copies of the following been left on the premises? Yes EJ No
System components Instructions' Yes EJ No
Care and maintenance Instructions Yes E] No
NFPA25 Yes D No
Location of
system
Supplies buildings
Make Model
Year of
manufacture
Orifice
size Quantity
Temperature
rating
__ FlW I12- I5
NZ' Sprinlders
Pipe and
fittings
Type of pipe
Type of fittings. CPV'C_
Alarm
flow
valve or Alarm device
Manmum time to operate
through test connection
Type I Make Model Minutes Seconds
Indicator
Dry valve QO.o.
Make no. no. _Serial Model ____Serial _Make _Model
Dry pipe
operating
t
Twie to td, P through test
connection1.2 Wa
pressure
Air
re T Trip point reachedt
air pressure
Time water
test outlet12
Alarm
operated property
Minutes Seconds psi Minutes Seconds Yes
Without f4 _No
With
If no, explain
rvivaiaumu iruin urns inspectors test connecuon is openea 2 NFPA 13 only requires the 604econd limitation In specific sections
FIGURE 16.1 Coñlractor's Material and Test Certificate for Aboveground Piping.
02 Edition
Operation
DPneumatic [2 Electric OHydraulics
Piping t: Yes [2 No Detecting media supervised [2 Yes [2 No Does valve trip, remote, or both [2Yes El No control stations?
Deluge and
preaction Is there an accessible facility In each hs4L. If no, explain valves for testing?
Yes E:33 No
Does each circuit operate eespach circuit operate Maximum time to Make Model supervision loss alarm? heJ!ease? operate release Yes No Yes The.,. Minutes Seconds
L Make and Setting Static pressure Residual pressure Flow rate Pressure and floor I (flowing) reduCUl
valve test Inlet (psi) Outlet (psi) Inlet (psi) Outlet 4p51) Flow (gpm)
,. rosta Hydrostatic tests shall be made at not less than 200 bar) for 2 hours or 50 psi (3.4 bar) c pressure In excess of 150 psi (10.2 bar) for 2 hours. Differential dry-pipe valve clappers shall be left open during the test to prevent damage. All aboveground piping leakage shall be stopped. Test
description Pneumatics Establish 40 psi (2.7 bar) alr pressure and measure drop, which shall not exceed 1½ psi (0.1 bar) In 24 hours. Test pressure tanks at normal water level and air pressure and measure air pressure drop, which shall not exceed 1½ psi (0.1 bar) In 24 hours.
All piping hydrostatically tested at 242:5 psi (_ bar) for -L_ hours If no, state reason Dry piping pneumatically tested [2 Yes 0 No Equipment operates properly
. Yes El No
Do you certify as the sprinkler contractor that additives and corrosive chemicals, sodium silicate or derivatives of sodium silicate, brine, or other corrosive chemicals were not used for testing systems or stopping leaks?
Yes [2 No
Drain Reading of gauge located near water Residual pressure with valve In test Tests test SUPPlY test connection: 9z. psi (_ bar) connection open wide: psi ( bar) Underground mains and lead-In connections to system risers flushed before connection made to sprinkler piping
Verified by copy of the Contractors Material and Test Yes [2 No Other Explain Certificate for Underground Piping.
Rushed by Installer of underground sprinkler piping ,Yes [2 No
If powder-driven fasteners are used In concrete, [2 Yes J No If no, explain has representative sample testing been
satisfactorily completed?
Blank testing Number used Locations Number ranxwed gaskets
Welding piping [2 Yes No
If yes.
Doycucertify as the sprinkler contractor that welding procedures comply D Yes No at with the mentsofatleastAWS 52.1?
Welding Do you certify that the was ed by welders qualified in 0 Yes 0 No 1ance with the requirements of at leasfV$1,
Do you certify that the welding was canted out in compliance with a 0 Yes F-1 No documented quality control procedure to ensure that all discs are retrieved, tha openings in piping are smooth, that slag and other welding residue are removed, and that the Internal diameters of piping are not penetrated?
Cutouts Do you certify that you have a control feature to ensure that [2 Yes 014o (discs) all cutouts (discs) are retrieved?
or (spe). j. Title Date ,:.
Testswftnessedby
igned) Title umtv
S
13-192 INSTALlATION OF SPRiNKLER SYSTEMS
Hydraulic Nameplate provided
. it no, explain .. . . data
nameplate . .,. 19—Yes E No . ...
Date left in service with all control valves open Remarks -
.
Name of sprinkler contractor
FIGURE 16.1 .. Continued
16.2.1.2 Portions of systems normally subjected to system
open sprinklers after the test is completed, or the operating working pressures in excess of 150 psi (10.4 bar) shall be
. elements of automatic sprinklers shall be removed after th
e
tested as described in 16.2.2.1atsa•pressure of50psi(&5.bar)
test iscompleted.:
. ...
in excess of system working pressure.
. . •.' .: .- . ' . s 16.2.L12* The trench shall be backfilled between joints be- 16.2.1.3 Where cold weather will not permIt testing with Wa
fore testing to prevent movement of pipe ter, an interim air test shall be permitted to be conducted as
described in 162 3 164.1.13-Where required for safety measures presented by the hazards of open trenches the pipe and joints shall be p
e
r
16.2.1.4 Modifications affecting 20 or fewer sprinklers shall =provided mitted to be the installing contractor
not require testing in excess of system working pressure
takes the responsibility for locating and correcting leakage
in 16.2.1.5 Where addition or modification is made to an exist- excess of thatpennitted in 16.2.1,S. ing system affecting ..more than 20 sprinklers, thenew portion.. 16.2.1.14. Provision shall ..be made for the proper disposal-of
shall be isolated and tested at not less than 200 psi (13.8 bar)
water used for flushing or testing..s for 2 hours. .
16.2.1.15 Test Blanks. 16.2-1.6 Modificitions that cannot be isolated such as relo- cated drops, shall not require testing in excess of system work- 16.2.1.15.1 . Test-blanks shall haiepaintédlugs protruding in ing pressure.
. . such a way. as to clearly indicate their presence.
16.2.1.7 Loss shall be determined by a drop m gauge pres- 162 1 I5.2 The test blanks shall be numbered, and the in- sure or visual leakage, stalling contractor shall have a recordkeeping method ensur- ing their removal after work is completed. 16.2.1.8 The test pressure shall be read from a gauge loeated ..
.
.
.
.
. at the low elevation point of the system or portion being ;c s . ... i61i6ensubjecttohydn)static testpressures; the cla
p
.
tested. per of a differential-type valve shall be held off its seat to pre- 16.2.19 Additives; corrosive chemicals such as sodium sth- vent damaging the valve. .. . . ,...; cate or derivatives of sodium silicate brine, or other chem
i
16.2.2 Dry Pipe and Double Interlock System(s) Air Test. cals shall not be used while hydrostatically testing systems or
. 1&2.2.f ln addition....th tandàrd hydrostatic test, an au'
for stopping aks
pressure leakage test at 40 psi.12.8bar).shall be.conducted.for
16.2.1.10 Piping between the exterior fire department con- nection and the check valve in the fire department inlet pipe of 1½ psi (0.1 bar)fOrthë24h6 SshãlI be corrected: shall be hydroitaticallytested inthe same manner, asthebal-................... ..... . ................. ere systems are ..... ................. 16.2.2.2 Wh installed in spaces that are ca-
ance or the system.
pable of being operated at teniperatures b low 327 (0C),,sarr 16.2.1.11 When deluge systems are being hydrostatically pressure leakage tests required in 16.2.2 shall be cqiiducted at tested, plugs shall be installed in fittings and replaced with
the lowest nominal temperature of the space.
-
2002:Ed(tion