Loading...
HomeMy WebLinkAbout7270 CALLE PLATA; ; AS0700198/9/24, 11:42 AM AS070019 Permit Data City of Carlsbad Sprinkler Permit Permit No: AS070019 Job Address: 7270 CALLE PLATA Status: ISSUED Permit Type: SPRINK Applied 1/19/2007 Parcel No: 2230320400 Approved: 1/19/2007 Lot #: 0 Reference No.: Issued: 1/19/2007 PC #: Inspector: Project Title: HUNTER'S POINT THREE FIRE SPRINKLER INSPECTIONS @ $62/EA Applicant: SOUTHLAND FIRE PROTECTION, INC 4733 PT. LOMAAV SAN DIEGO, CA 92107 619-523-1400 Owner: REAL ESTATE COLLATERAL MANAGEMENT CO C/O MORROW DEV/ LIZ LAYMAN 1903 WRIGHT PL #180 CARLSBAD CA Fees ($) Add'I Fees ($) Total ($) Balance ($) 186 0 186 0 about:blarik 1/1 SEE PERMIT AS070010 7271 CALLE PLATA HUNTER'S POINT FOR CALCS & PLANS 1190 - -INSrALLAUONOFSPRKIRMS A 604-odll. Contractor's Material and Test Certificate for Abovegro u n d P i p i n g PROCEDURE Upon completion of work, inspection and feats shall be made by the contractor's representative a n d w i t n e s s e d b y a n o w n e r ' s representative. All detects shall be corrected and system left In service before contract o r ' s p e r s o n n e l f i n a l l y l e a v e t h e j o b . A certificate shall be filled out and signed by both representatives. C o p i e s s h a l l b e p r e p a r e d f o r a p p r o v i n g a u t h o r i t i e s , o w n e r s , a n d contractor. It Is understood the owners representative's signature in no way prejudices any claim against contractor for faulty material, p o o r workmanship, or failure to comply with approving authorltys requirem e n t s o r l o c a l o r d l i n f n c e s . Property name Huln+~ry TO, CeJet::7_ Ite73o_o7 Property address (p f(t (j Accepted by approving authorities (names) Address Plans Installation conforms to accepted plans Yes D No Equipment used is approved Yes No If no, explain deviations Has person in charge of fire equipment been Instructed 0 No to location of control valves and care and maintenance of this new equipment? If no, explain Instructions Have copies of the following been left on the premises? Yes 0 No System components Instructions Yes 0 No Care" maJntenace Instructions Yes :: No NFPA25 Yes [3 No Location Of system Supplies buildings Year of Orifice Temperature Make Model manufacture size QUWtilty rating Sprinklers r'lt'o -M4 F3 If2. 7oo It . z oo Pipe and Type of pipe 5c 3° (2 Type of fittings COt c-j- fittings Alarm Maximum time to operate valve or it-., Alarm device through test Connection. Type Make - Model Minutes Seconds indicator 1119!47... C• . Dryvalve Cf. O.D. Make Modal J Serial no. Make Model Serial no. Dry pipe operating test Time to trip through test connection .2 Water pressure Air pressure Trip point air pressure 711119 water reached. test ou11e111.2 Aiarm operated propeily Minutes Seconds psi psi psI Minutes Seconds Yes No LQ With II no, explain 1Measured from time inspector's test connection is opened 2NFk 13 only requires the 60second limitation In specific sections FIG LIRE 16.1 contractor's Material and Test Certificate for Aboveground Piping. 2002 Edition SYSTEMS ACCEPTANCE 13-19 Operation El Pneumatic El Electric El Hydraulics Piping supervised El Yes El No Detecting media supervised Yes El No Does valve operate from the manual trip, remote, or both El Yes El No control stations? Deluge and preaction Is there an accessible facility In each circuit If no, explain for testinvalvesg? El Yes _ElNo Does each circuit operate Does each circuit operate Maximum time to Make Model supervision loss alarm? valve release? operate release. Yes No Yes No Minutes j Seconds Location Make and Setting Static pressure Residual pressure Flow rate Pressure and floor j model (flowing) reducing Inlet (psi) Outlet (psi) Inlet (psi) Outlet 09l) Flow (gpm) valve test -9tic: Krostatictestsshallbemadeatnotlessthan200psi(13.6bar)for2houraor50p s i ( 3 . 4 b a i ) ( above .ststic-pesureln excess of 150 psi (10.2 bar) for 2 hours. Differential dry-plpe valve clappers shall be left open during the test to prevent damage. All aboveground piping leakage shall be stopped. Test description Pneumatic: Establish 40 psi (2.7 bar) air pressure and measure drop, which shall not exceed 1½ psi (0.1 bar) In 24 hours Test pressure tanks at normal water level and air pressure and measure air pressure drop, Which shaH not exceed l½ pal (0.1 bar) 1n24hours. All piping hydrostatically tested at 1fpsi (__- bar) for L.. hours If no, state reason Dry piping pneumatically tested El Yes El No Equipment operates properly Yes El No Do you certify as the sprinkler contractor that additives and corrosive chemical s , s o d i u m s i l i c a t e or derivatives of sodium lijlicate, brine, or other corrosive chemicals were not used for testing systems or stopping leaks? Yes El No Drain Reading of gauge 1005te4 near water Residual pressure with valve In test Tests test supply test connection: -10--5' pal (_bar) connection open wide:ID-1—psi.(- bar) Underground mains and lead-In connections to system risers flushed before connection made to sprinkler piping Verified by copy of the Contractors Material and Test Yes El No Other Explain Certificate for Underground Piping. Rushed by installer of underground sprinkler piping Yes El No If powder-driven fasteners are used In concrete, El Yes M No If no, explain has representative sample testing been satisfactorily completed? Blank testing Number used Locations Number removed gaskets Welding piping El Yes No If yes... Do you certify as the sprinkler contractor that welding procedures comply El Yes ((No with the requirements of at least AWS 82.1? Welding Do you certify that the welding was performed by welders qualified In El Yes NO compliance with the requirements of at least AWS 82.1? Do you certify that the welding was carried out In compliance with a El Yes Jj 'No documented quality control procedure to ensure that all discs are retrieved, that openings in piping are smooth, that slag and other welding residue are removed, and that the Internal diameters of piping are not penetrated? Cutouts Do you certify that you have a control feature to ensure that El Yes XNo (discs) all cutouts (discs) are retrieved? FIGURE 16.1 Contènued 2002 Edition 13-192 INSTALLATION OF SPRINKLER SY S T E M S Hydraulic Nameplate provided If no, explain data nameplate Yes - No . Date left in service with all control v a l v e s o p e n Remarks Name of sprinkler contraor$ a4KcA Tests witnessed by Signatures Additional explanations and notes FIGURE 16.1 Continued 16.2.1.2 Portions of systems n o r j n a l l y s u b j e c t e d t o s y s t e m working pressures in excess of 1 5 0 p s i ( 1 0 . 4 b a r ) s h a l l b e tested as described in 16.2.2.1 at a p r e s s u r e o f 5 0 p s i ( - 3 . 5 b a r ) in excess of system working pres s u r e . 16.2.1.3 Where cold weather wil l n o t p e r m i t t e s t i n g w i t h w a - ter, an interim air test shall be p e r m i t t e d t o b e c o n d u c t e d a s described in 16.2.3. 16.2.1.4 Modifications affectin g 2 0 o r f e w e r s p r i n k l e r s s h a l l not require testing in excess of s y s t e m w o r k i n g p r e s s u r e . 16.2.1.5 Where addition or m o d i f i c a t i o n i s m a d e t o a n e x i s t - ing system affecting more than 2 0 s p r i n k l e r s , t h e n e w p o r t i o n shall be isolated and tested at no t l e s s t h a n 2 0 0 p s i ( 1 3 . 8 b a r ) for 2 hours. 16.2.1.6 Modifications that ca n n o t b e i s o l a t e d , s u c h a s r e l o - cated drops, shall not require testi n g i n e x c e s s o f s y s t e m w o r k - ing pressure. 16.2.1.7 Loss shall be deter m i n e d b y a d r o p i n g a u g e p r e s - sure or visual leakage. 16.2.1.8 The test pressure sh a l l b e r e a d f r o m a g a u g e l o c a t e d at the low elevation .point of t h e s y s t e m o r p o r t i o n b e i n g tested. 16.2.1.9 Additives, corrosive ch e m i c a l s s u c h a s s o d i u x n s i i - cate, or derivatives of sodium s i l i c a t e , b r i n e , o r o t h e r d i e n i i - cals shall not be used while hy d r o s t a t i c a l l y t e s t i n g s y s t e m s o r for stopping leaks. 16.2.1.10 Piping between the e x t e r i o r f i r e d e p a r t m e n t c o n - nection and the check valve in th e f i r e d e p a r t m e n t i n l e t p i p e shall be hydrostatically tested in t h e s a m e m a n n e r a s t h e - - b a l - ance of the system, 16.2.1.11 , When deluge systems are be i n g h y d r o s t a t i c a l l y tested, plugs shall be installe d i n f i t t i n g s a n d r e p l a c e d w i t h open sprinklers after the: test i s c o m p l e t e d , o r t h e o p e r a t i n g elements of automatic sprin k l e r s s h a l l b e r e m o v e d a f t e r t h e test is completed. ---. ... 16.2.1.12* The trench shall b e b a c k f i l l e d b e t w e e n j o i n t s b e - fore testing to prevent movemen t O f p i p e sl 16.2.1.13 here-required forSaf:meas u r e s p r e s e n t e d by the haaards of open trenches, t h e p i p e a n d j o i n t s s h a l l b e p e r mitted to be backfihlèd prov i d e d t h e ' i n s t a l l i n g c o n t r a c t o r takes th respQn. cg.an4co1Tectng leakag e i n excess of 16.2.1.14. .Provision,.,shall b...made-for ..the ..proper disposal of water used for flushing or tes t i n g 16.2,,1.15 Test Blanks. . 16.2.1.15.1 Test' blanks.shall hay pai.nted'lugs p r o t r u d i n g i n such a way as to clearly indicat e t h e i r p r e s e n c e . 16 2 1 15.2 The test blartks s h a l l l e n u x i b e r e d a n d t h e i n , stalling contractor shall have a r e c o r d k e é p i n g m e t h o d e n s u r -ing their removal after work i s c o m p l e t e d . '1 16,2,1.46- --NVhen-subject.tohy.drusta t i c i ~ s t p r e s s u t e ~ , ' d i e ' clap. per of a differential-type valve s h a l l b e h e l d o f f i t s s e a t t o p r e . vent ing the. valy. . -. .......... . . . 1622 Dry Pipe and Double 1nt e i 1 O c k S y s t e m ( s ) A i r T e s t . 16.2.2.-i....-h ddidbn .o the 9tindirWh y d i O s t a t i c t e s t , a n a r pressure leakage test-at 4OpsL.( 2 . 8 . . b a r ) . . s h a l i b e 4 o n d u c t e d . f o r 24-hours..Anyleakage-hat- a 1 o s s . o f p r e s s u r e i n : e x c e s s of 1½ psi (0.1 bar) 1o'th--241 4 u i t s h a l l b e c o r r e c t e d : 16.2.2.2 Where systems are in s t a l l e d i n s p a c e s t h a t a r e c a - pable of being operated at te m p e r a t u r A b e l o w 5 2 E ( G C ) ' a f r pressure leakage tests required i n 1 6 . 2 . 2 s h a l l b e c q n d u c t e d a t the lowest nominal temperatur e o f t h e s p a c e . 2002 Edition