HomeMy WebLinkAbout7270 CALLE PLATA; ; AS0700198/9/24, 11:42 AM AS070019 Permit Data
City of Carlsbad
Sprinkler Permit
Permit No: AS070019
Job Address: 7270 CALLE PLATA Status: ISSUED
Permit Type: SPRINK Applied 1/19/2007
Parcel No: 2230320400 Approved: 1/19/2007
Lot #: 0
Reference No.: Issued: 1/19/2007
PC #: Inspector:
Project Title: HUNTER'S POINT THREE FIRE SPRINKLER INSPECTIONS @
$62/EA
Applicant:
SOUTHLAND FIRE PROTECTION, INC
4733 PT. LOMAAV
SAN DIEGO, CA 92107
619-523-1400
Owner:
REAL ESTATE COLLATERAL MANAGEMENT
CO
C/O MORROW DEV/ LIZ LAYMAN
1903 WRIGHT PL #180
CARLSBAD CA
Fees ($) Add'I Fees ($) Total ($) Balance ($)
186 0 186 0
about:blarik 1/1
SEE PERMIT
AS070010
7271 CALLE PLATA
HUNTER'S POINT
FOR CALCS &
PLANS
1190 - -INSrALLAUONOFSPRKIRMS A 604-odll.
Contractor's Material and Test Certificate for Abovegro
u
n
d
P
i
p
i
n
g
PROCEDURE
Upon completion of work, inspection and feats shall be made by the contractor's representative
a
n
d
w
i
t
n
e
s
s
e
d
b
y
a
n
o
w
n
e
r
'
s
representative. All detects shall be corrected and system left In service before contract
o
r
'
s
p
e
r
s
o
n
n
e
l
f
i
n
a
l
l
y
l
e
a
v
e
t
h
e
j
o
b
.
A certificate shall be filled out and signed by both representatives.
C
o
p
i
e
s
s
h
a
l
l
b
e
p
r
e
p
a
r
e
d
f
o
r
a
p
p
r
o
v
i
n
g
a
u
t
h
o
r
i
t
i
e
s
,
o
w
n
e
r
s
,
a
n
d
contractor. It Is understood the owners representative's signature in no way prejudices any claim against contractor for faulty material, p
o
o
r
workmanship, or failure to comply with approving authorltys requirem
e
n
t
s
o
r
l
o
c
a
l
o
r
d
l
i
n
f
n
c
e
s
. Property name Huln+~ry TO, CeJet::7_ Ite73o_o7 Property address (p f(t (j
Accepted by approving authorities (names)
Address
Plans
Installation conforms to accepted plans
Yes D No Equipment used is approved
Yes No If no, explain deviations
Has person in charge of fire equipment been Instructed
0 No to location of control valves and care and maintenance
of this new equipment?
If no, explain
Instructions
Have copies of the following been left on the premises?
Yes 0 No System components Instructions
Yes 0 No Care" maJntenace Instructions
Yes :: No NFPA25
Yes [3 No Location Of
system
Supplies buildings
Year of Orifice Temperature Make Model manufacture size QUWtilty rating
Sprinklers r'lt'o -M4 F3 If2. 7oo
It . z oo
Pipe and Type of pipe 5c 3° (2 Type of fittings COt c-j- fittings
Alarm Maximum time to operate valve or
it-.,
Alarm device through test Connection. Type Make
- Model Minutes Seconds indicator 1119!47... C•
.
Dryvalve Cf. O.D. Make Modal
J
Serial no. Make Model Serial no.
Dry pipe
operating
test
Time to trip
through test
connection .2 Water
pressure Air
pressure Trip point
air pressure
711119 water
reached.
test ou11e111.2
Aiarm
operated
propeily Minutes Seconds psi psi psI Minutes Seconds Yes No
LQ
With
II no, explain
1Measured from time inspector's test connection is opened 2NFk 13 only requires the 60second limitation In specific sections
FIG LIRE 16.1 contractor's Material and Test Certificate for Aboveground Piping.
2002 Edition
SYSTEMS ACCEPTANCE 13-19
Operation
El Pneumatic El Electric El Hydraulics
Piping supervised El Yes El No Detecting media supervised Yes El No Does valve operate from the manual trip, remote, or both El Yes El No control stations? Deluge and
preaction Is there an accessible facility In each circuit If no, explain for testinvalvesg?
El Yes _ElNo
Does each circuit operate Does each circuit operate Maximum time to Make Model supervision loss alarm? valve release? operate release. Yes No Yes No Minutes j Seconds
Location Make and Setting Static pressure Residual pressure Flow rate Pressure and floor j model (flowing) reducing
Inlet (psi) Outlet (psi) Inlet (psi) Outlet 09l) Flow (gpm) valve test
-9tic: Krostatictestsshallbemadeatnotlessthan200psi(13.6bar)for2houraor50p
s
i
(
3
.
4
b
a
i
)
( above .ststic-pesureln excess of 150 psi (10.2 bar) for 2 hours. Differential dry-plpe valve clappers shall be left open during the test to prevent damage. All aboveground piping leakage shall be stopped. Test
description Pneumatic: Establish 40 psi (2.7 bar) air pressure and measure drop, which shall not exceed 1½ psi (0.1 bar) In 24 hours Test pressure tanks at normal water level and air pressure and measure air pressure drop, Which shaH not exceed l½ pal (0.1 bar) 1n24hours.
All piping hydrostatically tested at 1fpsi
(__- bar) for L.. hours If no, state reason Dry piping pneumatically tested El Yes El No Equipment operates properly Yes El No
Do you certify as the sprinkler contractor that additives and corrosive chemical
s
,
s
o
d
i
u
m
s
i
l
i
c
a
t
e
or derivatives of sodium lijlicate, brine, or other corrosive chemicals were not used for testing systems or stopping leaks? Yes El No
Drain Reading of gauge 1005te4 near water Residual pressure with valve In test Tests test supply test connection: -10--5' pal (_bar) connection open wide:ID-1—psi.(- bar) Underground mains and lead-In connections to system risers flushed before connection made to sprinkler piping
Verified by copy of the Contractors Material and Test Yes El No Other Explain Certificate for Underground Piping. Rushed by installer of underground sprinkler piping Yes El No
If powder-driven fasteners are used In concrete, El Yes M No If no, explain has representative sample testing been satisfactorily completed?
Blank testing Number used Locations
Number removed gaskets
Welding piping El Yes No
If yes...
Do you certify as the sprinkler contractor that welding procedures comply El Yes ((No with the requirements of at least AWS 82.1?
Welding Do you certify that the welding was performed by welders qualified In El Yes NO compliance with the requirements of at least AWS 82.1?
Do you certify that the welding was carried out In compliance with a El Yes Jj 'No documented quality control procedure to ensure that all discs are retrieved, that openings in piping are smooth, that slag and other welding residue are removed, and that the Internal diameters of piping are not penetrated?
Cutouts Do you certify that you have a control feature to ensure that
El Yes XNo (discs) all cutouts (discs) are retrieved?
FIGURE 16.1 Contènued
2002 Edition
13-192
INSTALLATION OF SPRINKLER SY
S
T
E
M
S
Hydraulic Nameplate provided
If no, explain data
nameplate
Yes - No .
Date left in service with all control v
a
l
v
e
s
o
p
e
n
Remarks
Name of sprinkler contraor$
a4KcA
Tests witnessed by Signatures
Additional explanations and notes
FIGURE 16.1 Continued
16.2.1.2 Portions of systems
n
o
r
j
n
a
l
l
y
s
u
b
j
e
c
t
e
d
t
o
s
y
s
t
e
m
working pressures in excess of
1
5
0
p
s
i
(
1
0
.
4
b
a
r
)
s
h
a
l
l
b
e
tested as described in 16.2.2.1 at a
p
r
e
s
s
u
r
e
o
f
5
0
p
s
i
(
-
3
.
5
b
a
r
)
in excess of system working pres
s
u
r
e
.
16.2.1.3 Where cold weather wil
l
n
o
t
p
e
r
m
i
t
t
e
s
t
i
n
g
w
i
t
h
w
a
-
ter, an interim air test shall be
p
e
r
m
i
t
t
e
d
t
o
b
e
c
o
n
d
u
c
t
e
d
a
s
described in 16.2.3.
16.2.1.4 Modifications affectin
g
2
0
o
r
f
e
w
e
r
s
p
r
i
n
k
l
e
r
s
s
h
a
l
l
not require testing in excess of
s
y
s
t
e
m
w
o
r
k
i
n
g
p
r
e
s
s
u
r
e
.
16.2.1.5 Where addition or m
o
d
i
f
i
c
a
t
i
o
n
i
s
m
a
d
e
t
o
a
n
e
x
i
s
t
-
ing system affecting more than 2
0
s
p
r
i
n
k
l
e
r
s
,
t
h
e
n
e
w
p
o
r
t
i
o
n
shall be isolated and tested at no
t
l
e
s
s
t
h
a
n
2
0
0
p
s
i
(
1
3
.
8
b
a
r
)
for 2 hours.
16.2.1.6 Modifications that ca
n
n
o
t
b
e
i
s
o
l
a
t
e
d
,
s
u
c
h
a
s
r
e
l
o
-
cated drops, shall not require testi
n
g
i
n
e
x
c
e
s
s
o
f
s
y
s
t
e
m
w
o
r
k
-
ing pressure.
16.2.1.7 Loss shall be deter
m
i
n
e
d
b
y
a
d
r
o
p
i
n
g
a
u
g
e
p
r
e
s
-
sure or visual leakage.
16.2.1.8 The test pressure sh
a
l
l
b
e
r
e
a
d
f
r
o
m
a
g
a
u
g
e
l
o
c
a
t
e
d
at the low elevation .point of
t
h
e
s
y
s
t
e
m
o
r
p
o
r
t
i
o
n
b
e
i
n
g
tested.
16.2.1.9 Additives, corrosive ch
e
m
i
c
a
l
s
s
u
c
h
a
s
s
o
d
i
u
x
n
s
i
i
-
cate, or derivatives of sodium
s
i
l
i
c
a
t
e
,
b
r
i
n
e
,
o
r
o
t
h
e
r
d
i
e
n
i
i
-
cals shall not be used while hy
d
r
o
s
t
a
t
i
c
a
l
l
y
t
e
s
t
i
n
g
s
y
s
t
e
m
s
o
r
for stopping leaks.
16.2.1.10 Piping between the
e
x
t
e
r
i
o
r
f
i
r
e
d
e
p
a
r
t
m
e
n
t
c
o
n
-
nection and the check valve in th
e
f
i
r
e
d
e
p
a
r
t
m
e
n
t
i
n
l
e
t
p
i
p
e
shall be hydrostatically tested in
t
h
e
s
a
m
e
m
a
n
n
e
r
a
s
t
h
e
-
-
b
a
l
-
ance of the system,
16.2.1.11
, When deluge systems are be
i
n
g
h
y
d
r
o
s
t
a
t
i
c
a
l
l
y
tested, plugs shall be installe
d
i
n
f
i
t
t
i
n
g
s
a
n
d
r
e
p
l
a
c
e
d
w
i
t
h
open sprinklers after the: test
i
s
c
o
m
p
l
e
t
e
d
,
o
r
t
h
e
o
p
e
r
a
t
i
n
g
elements of automatic sprin
k
l
e
r
s
s
h
a
l
l
b
e
r
e
m
o
v
e
d
a
f
t
e
r
t
h
e
test is completed.
---. ...
16.2.1.12* The trench shall
b
e
b
a
c
k
f
i
l
l
e
d
b
e
t
w
e
e
n
j
o
i
n
t
s
b
e
-
fore testing to prevent movemen
t
O
f
p
i
p
e
sl 16.2.1.13 here-required forSaf:meas
u
r
e
s
p
r
e
s
e
n
t
e
d
by the haaards of open trenches,
t
h
e
p
i
p
e
a
n
d
j
o
i
n
t
s
s
h
a
l
l
b
e
p
e
r
mitted to be backfihlèd prov
i
d
e
d
t
h
e
'
i
n
s
t
a
l
l
i
n
g
c
o
n
t
r
a
c
t
o
r
takes th respQn.
cg.an4co1Tectng leakag
e
i
n
excess of
16.2.1.14. .Provision,.,shall b...made-for ..the ..proper disposal of water used for flushing or tes
t
i
n
g
16.2,,1.15 Test Blanks.
. 16.2.1.15.1 Test' blanks.shall hay pai.nted'lugs
p
r
o
t
r
u
d
i
n
g
i
n
such a way as to clearly indicat
e
t
h
e
i
r
p
r
e
s
e
n
c
e
.
16 2 1 15.2 The test blartks s
h
a
l
l
l
e
n
u
x
i
b
e
r
e
d
a
n
d
t
h
e
i
n
,
stalling contractor shall have a
r
e
c
o
r
d
k
e
é
p
i
n
g
m
e
t
h
o
d
e
n
s
u
r
-ing their removal after work i
s
c
o
m
p
l
e
t
e
d
.
'1 16,2,1.46- --NVhen-subject.tohy.drusta
t
i
c
i
~
s
t
p
r
e
s
s
u
t
e
~
,
'
d
i
e
' clap. per of a differential-type valve
s
h
a
l
l
b
e
h
e
l
d
o
f
f
i
t
s
s
e
a
t
t
o
p
r
e
.
vent ing the. valy.
. -. ..........
.
.
.
1622 Dry Pipe and Double 1nt
e
i
1
O
c
k
S
y
s
t
e
m
(
s
)
A
i
r
T
e
s
t
.
16.2.2.-i....-h ddidbn .o the 9tindirWh
y
d
i
O
s
t
a
t
i
c
t
e
s
t
,
a
n
a
r
pressure leakage test-at 4OpsL.(
2
.
8
.
.
b
a
r
)
.
.
s
h
a
l
i
b
e
4
o
n
d
u
c
t
e
d
.
f
o
r
24-hours..Anyleakage-hat-
a
1
o
s
s
.
o
f
p
r
e
s
s
u
r
e
i
n
:
e
x
c
e
s
s
of 1½ psi (0.1 bar) 1o'th--241
4
u
i
t
s
h
a
l
l
b
e
c
o
r
r
e
c
t
e
d
:
16.2.2.2 Where systems are in
s
t
a
l
l
e
d
i
n
s
p
a
c
e
s
t
h
a
t
a
r
e
c
a
-
pable of being operated at te
m
p
e
r
a
t
u
r
A
b
e
l
o
w
5
2
E
(
G
C
)
'
a
f
r
pressure leakage tests required i
n
1
6
.
2
.
2
s
h
a
l
l
b
e
c
q
n
d
u
c
t
e
d
a
t
the lowest nominal temperatur
e
o
f
t
h
e
s
p
a
c
e
.
2002 Edition