Loading...
HomeMy WebLinkAbout6941 EL CAMINO REAL; ; AS1101619/19/24, 11:40AM AS110161 Permit Data City of Carlsbad Sprinkler Permit 6941 ELCAMINO Job Address: REAL Permit Type: SPRINK Parcel No: 2150507500 Lot #: 0 Permit No: ASII0I6I Status: APPROVED Applied 10/25/2011 Approved: 10/25/2011 Reference No.: Issued: 10/25/2011 PC #: Inspector: Project Title: CINEOPOLIS CINEMAS RENOVATION/UPGRADE TO AN EXISTING THEATRE COMPLEX Applicant: COSCO FIRE PROTECTION 10695 TREENA ST SAN DIEGO, CA 858-444-2000 Owner: THE VONS COMPANIES INC PLAZA PASEO REAL ASS C/O MADISON MARQUETTE 2001 PENNSYLVANIA NW 10TH FLOOR WASHINGTON DC Fees ($) Add'I Fees ($) Total ($) Balance 591 0 591 0 about:blank 1/1 Contractor's Material and Test Certificate for Aboveground Piping PROCEDURE Upon completion of work Inspection and tests shall be made by the contractors representative and witnessed by the property owner or their authorized agent. All detects shall be corrected and system left in service before contractors personnel finally leave the job Acertificate shall be filled out and signed by both representatives. Copies shall be prepared for approving authorities, owners, and contractor. It is understood the owner's representative's signature in no. way prejudices any claim against contractor for faulty material, poor workmanship, or failure to comply with approving authority's requirements or local ordinances.. Property name C,vpo/i~ ni Vtat 4z , t. Property address (qq / 1n1Pfl) j?ii, Cr/.rI,41d1 44 Acepted by approving atithoritiés(names) ,- Address Plans / Installation conforms to accepted plans Yes No Equipment used is approved Yes Li No If no, explain detions Has person: in. charge of fire equipment been Instructed as . . /Yes UNo to location of control valves and care and maintenance of this new equipment? If no, explain Instructions Have copies of the following been left on the premises? . as . Li No • System óOmponents fnstruions es Li No Care àrid.maintenace instructions Yes No 14IFAA26 : . . . .. . •.. JYes system Location 'of'... . . . Supplies buildings . . Year of Orifice Temperature Make Model •• mthufacture size Quantity rating III ,, piann 4e. VktI 14 . ( t/ I 1515 Sprinklers 3a~ NZ . _ _ 3 Z . :. . . t(j.. .. . .Zoo Vz-. 7_ _____: . Pipe and Typeof pipe (-2" SCM'tO. . 22 •n1 i sc. (0 Typeoffittings t—.i!.;C.t. . 2Y2 4.4 to .9Qt4t. fittings . : . . . Maxirnumll Alarm . device rough test connection valve or indicator Dry valve Q'0. D. Make • Modal Serial no. Make no. Time - Time water Alarm through test Air Lp-bint reached operáthd Dry pipe connectiona b pre pressure air pressure . lest outlet - , properly operating test Minutes Seconds_psi psi Minutes Seconds Yes No .. .... WA .g , . explain •' . :. 2Oeg ational Fire Protection Association - 11FPA 13 p. 'I 1-232 INSTALLATION OF SPRINKLER SYSTEMS &6b 45 I(e)ItQL Measures trom time inspector!slest connection is openeci. b NFPA 13 only requires the 60-second limitation.in specific sections . FIGURE 24.1 çontracto Materi I and Test Certificate for Abovegrtund. Piping. 2010 Edition SACCEPTCE.. 13-233 Operation IJPneumatic CiElecinO. UH,draulics Piping supervised CiVes UNo I Detecting media supervised . . Ci'es (JNo Does valve, operate from the manual trip, remote, or both Ci Yes . . Ci No control stations? Deluge and preaction Is there an accessible facility in each Circuit . It no, explain valves for testing? Ci Yes ..J No . . . . . Does each circuit operate Does each circuit operate Maximum time to t.j I Make Model supervision loss alarm? valve release?. . ., .. operate release Yes No Yes No Minutes Seconds NIA Location Make and Residual presro Pressure- and floor- .. model Setting Static pressure (flowing) Flow rate reducing test valve Inlet (psi) OutIet (psi)-. Inlet (psi) Outlet (psi) Flow (gpm) ( Hyr -Mtfr ydrostatic tests shall be made at not less th 200 Ps .6 bar) for 2 hours oL5O psi (3.4 bar) ressure in excess of 150 psi (10.2 bar) for 2 hours. erential dry p1Väiclppers shall be left open during the test to prevent damage. All aboveground piping leakage shall be stopped. Test ., ..-, description RrmamattarMtablish 40 psi (2.7 bar) air pressure and measure drop, which shall not excee d 1 1/2 psi (0.1 bar) in 24 hours. Test pressure tanks at normal water level and airpressure and measure air pressure dr o p , w h i c h s h a l l not exceed l½ psi (0.1 bar) in24hours. If no, state reason All piping hydrostatically tested at psi (—bar) for ou Dry piping pneumatically tested A1 Yes . N Equipment operates properly - Ye U No Do you Ø'rtifyas the sprinkler contractor that additives and corrosive chemicals, sodium silicate or derivativ e s cfwgiiicate, brine, or other corrosive chemicals were not,usedfor testing systems or stopping lea k s ? ldYes CiNo Drain Reading of gauge located near water Residual pressure with valve in test Tests test supply test connection: psi (— bar) connection open wide: psi (____bar) Underground mains and lead-in connections to system riserq flyshed before connection made to sprinkler piping tJ ,.— U No Other Explain Verified by copy of the Contractor's Material and Test /'A Z Certificate for Underground Piping. Flushed by installer of underground sprinkler piping U No It powder-driven fasteners are used in concrete, U Yes U No If no, explain ' as representative sample testing been satisfactorily completed? Blank testing Number used/' Locations LZ Number removed gaskets ~ Welding piping Yes U No It yes... Do you certify as the sprinkler contractor that welding procedures used complied with 'Yes Ci No the minimum requirements of AWS B2.1, ASME Section IX Welding and Brazing Qua iltications, or other applicable qualification standard as required by the Al-IJ? Do you certify that all welding was performed by welders or welding operators ?YGS U No qualified in accordance with the minimum requirements of AWS B2.1, ASME Section IX Welding and Brazing Qualifications, or other applicable qualification standard as Welding required by the AR)? Do you certify that the welding was conducted in compliance with a documented 'Yes UNo v4 quality control procedure to ensure that (1) all discs are retrieved; (2) that openings in piping are smooth, that slag and other welding residue are removed; (3) the internal diameters of piping are not penetrated; (4) completed welds are free from cracks, incomplete fusion, surface porosity greater than !e in. diameter, undercut deeper than the lesser of 25% of the wall thickness or ½z in.; and (5) completed circumferential butt weld reinforcement does not exceed %2 in.? © 2009 National Fire!rotci9n.Association ............ .NFPA 13 (p.2 of 3) FIGURE 24.1 Continued 2010 Edition 13-234 INSTALLATION OF SPRINKLER SYSTEMS Cutouts Do you certify that you have a cpntrol feature to ensure that JYes (No (discs) all cutouts (discs) are retrieved? Hydraulic Nameplate provided Awfv it no, explain data nameplate W Yes UNo Sprinkler contractor removed all caps and straps? 1AYas I.No bàtl'eft in thiiice with all control ' Wesojè Remarks Name of sprinkler contractor C-0 F"& ?ioT (A/.: Tests witnessed by Signatures The roperty owner. o!Jbe)r authorized agent (signed) Title. Date z 12— F\AA/ Additional explatins)dnote FIGURE 24.1 Continued 2010 Edition