HomeMy WebLinkAbout6480 EL CAMINO REAL; ; AS0602699/19/24, 11:37 AM AS060269 Permit Data
City of Carlsbad
Sprinkler Permit
6480 EL CAM INO
Job Address:
REAL
Permit Type: SPRINK
Parcel No: 2150202700
Lot #: 0
Reference No.:
Permit No: AS060269
Status: ISSUED
Applied 11/9/2006
Approved: 11/20/2006
Issued: 11/20/2006
PC #: Inspector:
Project Title: CASSIA HEIGHTS UNDGR FIRE SPRINKLER PLAN CHECK &
INSPECTIONS
Applicant:
UNDERGROUND UTILITIES INC
130 REA AVE
EL CAJON, CA 92020
619-442-9415
Owner:
CITY OF CARLSBAD
CALIFORNIA STATE ASSESSED
Fees ($) Add'I Fees ($) Total ($) Balance ($)
400 0 400 I 0
about:blank 1/1
CARLSBAD FIRE DEPARTMENT
Standard FPB-045
VERBATIM NOTES FOR UNDERGROUND PIPING FOR HYDRANTS & SPRINKLERS
Place The Following Notes, Verbatim, On The Plan:
1. Prior to installation, all required permits shall be obtained from the building and water departments having
jurisdiction.
2. Inspections are required:
prior to corrosion protection (grease and sleeve)
prior to pouring thrust blocks, FD will measure bearing area
for hydrostatic testing, and
for flushing.
All inspections shall be scheduled at least 48 hours in advance. Inspections canceled after 1 p.m. on the day
before the scheduled date will be subject to a re-inspection fee. To schedule an inspection call (760) 602-4660.
3. Installation, inspection, and testing shall conform to 1999 NFPA 13 and 1995 NFPA 24. Underground mains
may be center-loaded prior to visual inspection, so long as all D.I. fitting joints are left fully exposed.
4. Fire hydrants shall be approved wet barrel style per Carlsbad Public Works standard. The 4" outlet shall face
the fire department access road. All outlets shall be provided with National Standard Threads (NST).
5. Fire hydrant supply piping shall be a minimum of six inches in diameter. The lowest operating nut shall be a
minimum of 18" above grade and the hydrant flange shall be a minimum of 2" above grade.
6. Fire hydrants shall be a minimum of 40 feet from all structures. A keyed gate valve shall be provided for each
hydrant in an accessible location. Valves shall not be located in parking stalls or in areas subject to obstruction.
7. All pipes shall be approved for use in fire service systems (Class 150 minimum). Class 200 pipe shall be used
where the pressure may exceed 150 PSI.
8. Riser spools shall be cement-lined-mortar-coated with welded flanges, no exceptions. These would occur at
the Backf low prevention device assembly and at the end of line.
9. All bolted joints shall be cleaned and thoroughly coated with No-ox grease or other corrosion retarding
material after assembly and prior to poly-tube (sleeve) installation.
10. All ferrous pipe and fittings shall be protected with a loose 8-mil Polyethylene tube.
The ends of the tube and any splices made for "l's or other piping components shall be
sealed with 2" tape, approved for underground use. Polyethylene Encasement (poly
sleeve) in accordance with AWWA C-105 must be used, no exceptions. Complete
details shall be shown on the drawings.
11. A 12" bed of clean fill sand shall be provided below and above the pipe (total 24").
12. All bolts used for underground connections shall be stainless steel (316).
13. Full flange caskets shall be used, rubber gaskets are not permitted
14. Bury depth shall be a minimum of 36 inches in all areas, including finished grade.
15. Thrust blocks, or other approved method of thrust restraint, shall be provided at all changes of direction and
elevation. Thrust block calculations shall be provided and in accordance with CMWD Standard DWG. W19.
The trench shall be excavated for thrust blocks and inspected prior to pour. All corrosion protection shall be
in pace.
A hydrostatic test (200 psi for two hours or 50 psi over maximum static pressure, whichever is greater) shall be
witnessed by a CFD Inspector. The trench shall be back-filled to prevent movement of the pipe.
The system shall be thoroughly flushed before connection is made to overhead piping. Flow shall be through
a minimum of a 4" hose or pipe unless otherwise approved by the CFD inspector. A CFD Inspector shall witness
the flush.
The following flush connections shall be made:
<4 in underground main - two (2) 2.5" coupling & hose
4 in underground main - one (1) 4" coupling & hose
6 in underground main - one (1) 4" coupling & hose
8 in underground main - one (1) 4" coupling & hose
Larger than 8 in - Contact the Fire Prevention Bureau
NOTE: - The flushing operation shall be of sufficient time to ensure thorough cleaning, THOSE SYSTEMS GREATER
THAN 4 INCHES IN DIAMETER SHALL REQUIRE THE USE OF A SINGLE LARGE DIAMETER HOSE. All flushing shall be
coordinated with the appropriate Water Authority and in accordance with the appropriate "Storm Water
Protection" requirements of 'Regional Water Quality Control Board - San Diego Region's requirements for
potable water discharges - Order No. R9-2002-0020.
All hydrants, sprinkler control valves, back-flow prevention assemblies, post indicating valves and fire
department connections shall be painted in accordance with local requirements.
All control valves shall be locked in the open position. Valves shall be monitored if they serve 100 or more
sprinkler heads.
Per NFPA 13 Chapter 8-1, a "Contractor's Material and Test Certificate for Underground Piping", shall be
completed, signed and delivered to the Fire Prevention Bureau prior to clearance for overhead sprinkler
connection.
Carlsbad Municipal Water District
Potable Water Discharge
Event Report
Date: Fi-3 -o(
Location:
Reason for Discharge Event: F'- Flow
Type of Event: Initial
Dewatering Water Mains P7L? Estimated Discharge Flow: ?c9 Note: Includes flow testing and flushing
Dewatering Reservoirs
Unscheduled Water Discharge
Clear flow path of debris, surface
contaminants and/or hazardous
materials. Do not remove native
vegetation.
Start Time 0Th
End Time 4I()
Pre-Dechiorinatlon Residual: 1. i
Post-DechlorinatIon Residual:
(less than 0.1 mg/L)
MCI
pH within limits of 6.0 and 9.0 71
Erosion control, I.e.
sandbags, silt fencing, hay bales,
gravel bags, decreasing the velocity
of discharge water. ,4'g
Upon completion of dewatering, ensure
that the flow path is free of all
temporary erosion prevention materials. p CI
Upon completion of dewatering, ensure
that any sediment or silted areas are
cleared.
Water Sampling Performed by: /7" P20th
Comments:
Submitted by: .."7t1.L 7%€ei._- '3 11 P1 Reviewd by