Loading...
HomeMy WebLinkAbout2501 DAVIS AVE; ; PC2022-0052; PermitBuilding Permit Finaled Plan Check Permit Print Date: 07/16/2025 Job Address: Permit Type: Parcel #: Valuation: Occupancy Group: #of Dwelling Units: Bedrooms: Bathrooms: Occupant Load: Code Edition: Sprinkled: 2501 DAVIS AVE, BLDG-Plan Check 1552511400 $260,810.44 CARLSBAD, CA 92008-1452 Work Class: Track#: Lot#: Project#: Plan#: Construction Type: Orig. Plan Check #: Plan Check #: Project Title: 2501 DAVIS DEDICATION Residential DEV2023-0113 Permit No: Status: Applied: Issued: (city of Carlsbad PC2022-0052 Issued -Active 11/04/2022 04/15/2024 Finaled Close Out: Final Inspection: INSPECTOR: Description: BON EE: NEW DETACHED ADU (960SF) OVER GARAGE (688SF) WITH DECK(188SF)//GARAGE CONVERSION TO JADU (260 SF WITH MPU (SEE SDGE WORKORDER) Applicant: PRO-CAL DESIGN AND ENGINEERING JESSE LEON 10245 CASA CT SANTEE, CA 92071-4900 (619) 733-8134 FEE BUILDING PLAN CHECK BUILDING PLAN CHECK Property Owner: BONEE MARCEL 2501 DAVIS AVE CARLSBAD, CA 92008-1452 BUILDING PLAN REVIEW-MINOR PROJECTS (LDE) BUILDING PLAN REVIEW-MINOR PROJECTS (PLN) SWPPP INSPECTION TIER 1 -Medium BLDG SWPPP PLAN REVIEW TIER 1 -Low Total Fees: $2,458.08 Total Payments To Date: Building Division $2,458.08 Balance Due: 1635 Faraday Avenue, Carlsbad CA 92008-7314 I 442-339-2719 I 760-602-8560 f I www.carlsbadca.gov AMOUNT $336.70 $1,455.38 $194.00 $98.00 $292.00 $82.00 $0.00 Page 1 of 1 j ( City of Carlsbad ,ADU2 RS O'~ / :s..t.t:>\) ~ J 4 { i{ RESIDENTIAL BUILDING PERMIT APPLICATION B-1 Plan Check Pc2o22-oos ~ Est. Value C0'-1, Lf5 7. O""&- PC D•P:::: -'i?/51;;,°-;;= Job Address 2501 Davis Ave Unit: APN: 155-251-14-00 ·----- er /Project #:. _________________ Lot #: ____ Year Built: _1_95_4 _______ _ BRIEF DESCRIPTION OF WORK: PROPOSED GARAGE CONVERSION TO JADU. PROPOSED DETACHED ADU ABOVE NEW GARAGE r:j:J New SF: Living SF, 960 Deck SF, 188 Patio SF, -Garage SF _6_88 __ Is this to create an Accessory Dwelling Unit? fv O N New Fireplace? O Y~ N, if yes how many? ___ _ ff! Remodel: 260 SF of affected area Is the area a conversion or change of use? f YO N 0 Pool/Spa: ____ SF Additional Gas or Electrical Features? ____________ _ 0 Solar: ___ KW, ___ Modules, Mounted: QRoof QGround, Tilt: 0 YON, RMA: 0 YO N, Battery:OYO N, Panel Upgrade: Oy ON Electric Meter number: ------------0th er: APPLICANT (PRIMARY CONTACT) PROPERTY OWNER Name: Jesse Leon Name: MARCEL BONEE Address: 4901 MORENA BLVD, STE 906 Address: 2501 DAVIS AVE City: SAN DIEGO State: CA Zip:_9_21...;.1_7 __ City: CARLSBAD state: CA Zip:._9_2o_o_s __ _ Phone: 619 733 8134 Phone: __________________ _ Email: JESSE@PROCALDESIGN.COM Email: MARCEL@DWELLWEST,t!OMES.COM DESIGN PROFESSIONAL CONTRACTOR OF RECORD Name: _______________ Business Name: S pt A-f.-H/;'/-\0 Co f\J ~ rive 77 0)✓ Address: Address: /()C) W '3nfll 6[ <;[I! £. /,dl'1 City: _______ .State: ___ .Zip:.____ City: t'PrflOl\/~t-cnystate: (A Zip: jl 11~0 Phone: Phone:~/ 1 1-'f H (90'f Email: Email: :ii>rJ:-e SfecM~d • (on~1)vC{l6Y'I Architect State License: CSLB License#: JQqq <,'-I'!:.. Class: (!,1:N 8 Carlsbad Business License# (Required): gL.o 5011/0?, 8-o 1-20~'!. APPL/CANT CERT/FICA TION: I certify that I hove read the application and state that the above informotio • correct and that the informorion of rhe plans is accurate. 1 agree to comply with all City ordinances ond Store lows relating to building construction. Jesse Leon NAME (PRINT):--------- 1635 Faraday Ave Carlsbad, CA 92008 Ph: 442-339-2719 Email: Building@carlsbadca.gov REV. 04122 • THIS PAGE REQUIRED AT PERMIT ISSUANCE PLAN CHECK NUMBER: ______ _ A ~t11LDING PERMIT CAN BE ISSUED TO EITHER A STATE LICENSED CONTRACTOR OR A PROPERTY OWNER. IF THE PERSON SIGNING THIS FORM IS AN AGENT FOR EITHER ENTITY AN AUTHORIZATION FORM OR LETTER IS REQUIRED PRIOR TO PERMIT ISSUANCE. (OPTION A): LICENSED CONTRACTOR DECLARATION: I herebyaf firm under penalty of perjury that I am licensed under provisions of Chapter 9 (commencing with Section 7000)of Division] of the Business and Professions Code, and my license is in full force and effect. I also affirm under penalty of perjury one of the following declarations(CHOOSE ONE): Di have and will maintain a certificate of consent to self-insure for workers' compensation provided by Section 3700 of the Labor Code, for tt,e performance of the work which this permit is issued. PolicyNo. ____________________________________________ _ -OR- DI have and will maintain worker's compensation, as required by Section 3700 of the Labor Code, for the performance of the work for which this permit is issued. My workers' compensation insurance carrier and y_o11·cy number are: Insurance Company Name: v I vU. WI Policy No. ) e 'A,(... 'd 5 'Z,. U l Expiration Date: { 2. ~ /(, -l ()t, L/ -OR- D Certificate of Exemption: I certify that in the performance of the work for which this permit is issued, I shall not employ any person in any manner so as to become subject to the workers' compensation Laws of California. WARNING: Failure to secure workers compensation coverage is unlawful and shall subject an employer to criminal penalties and civil fines up to $100,000.00, in addition the to the cost of compensation, damages as provided for in Section 3706 of the labor Code, interest and attorney's fees. CONSTRUCTION LENDING AGENCY, IF ANY: I hereby affirm that there is a construction lending agency for the performance of the work this permit is issued (Sec. 3097 (i) Civil Code). lender's Name: _______________________ lender's Address: _______________________ _ CONTRACTOR CERT/FICA TION: The applicant certifies that all documents and plans clearly and accurately show all existing and proposed buildings, structures, access roads, and utilities/utility easements. All proposed mod1f1cat1ons and/or additions are clearly labeled on the site plan. Any potenllally existing detail within these plans inconsistent with the Site plan are not approved for construction and may be required to be altered or removed. The city's approval of the application 1s based on the premise that the submitted documents and plans show the correct dimensions of; the property, buildings, structures and their setbacks from property lines and from one another; access roads/easements, and utilities. The existing and proposed use of each building as stated Is true and correct; all easements and other encumbrances to development have be accurately shown and labeled as well as all on-site grading/site preparation. All improvements ex1st1ng on the property were completed in accordance with all regulations m existence at the ti eir construction, unless otherwise noted. NAME (PRINT): Note: If the person signing above is an authorized agent for the contra on contractor letterhead. -OR- (OPTION B): OWNER-BUILDER DECLARATION: I hereby affirm that I am exempt from Contractor's License Law for the following reason: D I, as owner of the property or my employees with wages as their sole compensation, will do the work and the structure is not intended or offered for sale (Sec. 7044, Business and Professions Code: The Contractor's License Law does not apply to an owner of property who builds or improves thereon, and who does such work himself or through his own employees, provided that such improvements are not intended or offered for sale. If, however, the building or improvement is sold within one year of completion, the owner-builder will have the burden of proving that he did not build or improve for the purpose of sale). -OR- D I, as owner of the property, am e~clusively contracting with licensed contractors to construct the project (Sec. 7044, Business and Professions Code: The Contractor's License Law does not apply to an owner of property who builds or improves thereon, and contracts for such projects with contractor(s) licensed pursuant to the Contractor's License law). -OR- DI am exempt under Business and Professions Code Division 3, Chapter 9, Article 3 for this reason: D FORM B-61 "Owner Builder Acknowledgement and Verification Form" is required for any permit issued to a property owner. By my signature below I acknowledge that, except for my personal residence in which I must have resided for at least one year prior to completion of the improvements covered by this permit, I cannot legally sell a structure that I have built as an owner-builder if it has not been constructed in its entirety by licensed contractors./ understand that a copy of the applicable law, Section 7044 of the Business and Professions Code, is available upon request when this application is submitted or at the following Web site: http:I/www.leginfo.ca.gov/ ca/aw.html. OWNER CERTIFICATION: The applicant certifies that all documents and plans clearly and accurately show all existing and proposed buildings, structures, access roads, and utilities/utility easements. All proposed modifications and/or additions are clearly labeled on the site plan. Any potentially existing detail w1th1n these plans inconsistent with the site plan are not approved for construction and may be required to be altered or removed. The city's approval of the application is based on the premise that the submitted documents and plans show the correct dimensions of; the property, buildings, structures and their setbacks from property lines and from one another; access roads/easements, and utilities. The existing and proposed use of each building as stated 1s true and correct; all easements and other encumbrances to development have been accurately shown and labeled as well as all on-site grading/site preparation. All improvements existing on the property were completed in accordance with all regulations in existence at the time of their construction, unless otherwise noted. NAME {PRINT): SIGN: ___________ DATE: _______ _ Note: If the erson si nin above is an authorized a ent for the ro ert owner include form 8-62 si ned b ro ert owner. 1635 Faraday Ave Carlsbad, CA 92008 Ph: 442-339-2719 Email: Building@carlsbadca.gov 2 REV. 04/22 Transmittal Letter March 15, 2023 City of Carlsbad Community Development Department -Building Division 1635 Faraday Ave. Carlsbad, CA 92008 True North COMPLIANCE SERVICES SECOND REVIEW City Permit No: PC2022-0052 True North No.: 22-018-397 Plan Review: Garage Conversion to JADU and New Detached Garage with ADU Address: 2501 Davis Ave, Carlsbad CA Applicant Name: Jesse Leon Applicant Email: jesse@procaldesign.com True North Compliance Services, Inc. has completed the second review of the following documents for the project referenced above on behalf of the City of Carlsbad: 1. 2. 3. Drawings: Electronic copy dated February 28, 2023, by Jesse Leon. Structural Calculations: Electronic copy dated February 28, 2023, by Pro-Cal design & Engineering. Energy Document: Electronic copy dated October 19, 2022, by Diane Mendoza Attn: Permit Technician, the plans have been reviewed for coordination with the permit application. See below for addi tional information: Valuation: Scope of Wark: Floor Area: Confirmed Confirmed Confirmed Our comments follow on the attached list. Please call if you have any questions or if we can be of further assistance. Sincerely, True North Compliance Services Review By: Richard Moreno -Plans Examiner True North Compliance Services, Inc. 3939 Atlantic Avenue Suite 224, Long Beach, CA 90807 T / 562. 733.8030 Garage Conversion to JADU and New Detached Garage with ADU 2501 Davis Ave March 15, 2023 City of Carlsbad-SECOND REVIEW City Permit No.: PC2022-0052 True North No.: 22-018-397 Page2 Plan Review Comments RESUBMITT AL INSTRUCTIONS: Please do not resubmit plans until all departments have completed their reviews. For status, please contact building@carlsbadca.gov Deliver THREE corrected sets of plans and TWO corrected calculations/reports directly to the City of Carlsbad Building Division, 1635 Faraday Ave., Carlsbad, CA 92008, ( 442) 339-2719. The City will route the plans to True North, Planning and Land Development Engineering Departments (if applicable) for continued review. Note: If this project requires FIRE PREVENTION review, ensure that you follow their specific instructions for resubmittal review. The City will not route plans back to Dennis Grubb & Associates for continued Fire Prevention review. GENERAL lNFORMA TJON: A. The following comments are referred to the 2019 California Building, Mechanical, Plumbing, Electrical Codes, California Green Building Standards Code, and Energy Code (i.e., 2018 TBC, UMC, UPC, and 20 17 NEC, as amended by the State of California). B. There may be other comments generated by the Building Division and/or other City departments that will also require your attention and response. This attached list of comments, then, is only a portion of the plan review. Contact the City for other items. C. Respond in writing to each comment by marking the attached comment list or creating a response letter. Indicate which details, specification, or calculation shows the required information. Your complete and clear responses will expedite the re-check. D. Please be sure to include the architect and engineer's stamp and signature on all sheets of the drawings and on the coversheets of specifications and calculations per CBPC 5536. l and CBPC 6735. This item will be verified prior to plan approval. OCCUPANCY & BUJLDING SUMMARY: Occupancy Groups: Type of Construction: Sprinklers: Stories: Area of Work (sq. ft.): R-3/U V-B No 1 and 2 Remodel: 260 sq. ft. Deck 188 SF New Garage: 688 SF ADU: 960 SF Garage Conversion to JADU and New Detached Garage with ADU 2501 Davis Ave City of Carlsbad-SECOND REVIEW City Permit No.: PC2022-0052 True North No.: 22-018-397 Page3 March 15, 2023 ARCIDTECTURAL COMMENTS: A I. All sheets of plans must be signed by the person responsible for their preparation. (California Business and Professions Code). PC2: plans were not signed. Please sign all plan sheets. A) Engineer of record to stamp and sign structural plan sheets. B) Plan sheets must be signed prior to approval. A3. Please address the following on CS-01. a) Please add "U" to occupancy list on sheet CS-01. PC2: Plans occupancy state R-2. R-2 occupancies are for apartment buildings. Permit application is for a single family structure. R-3. STRUCTURAL COMMENTS: S 1. A soils report is required for al l new construction, additions over 500 sf, and new detached AD Us over 500 sf. Submit a soils report and incorporate the recommendations of the report into the design. See link below for additional information. https://www.carlsbadca.gov/home/showpublisheddocument/6835/63 7842553336870000 PC2: Submit a letter from the geotechnical engineer confirming that the foundation plan, details, and specifications have been reviewed and that it has been determined that the recommendations in the geotechnical report are properly incorporated into the plans. Alternatively, the geotechnical engineer may stamp and sign the foundation plan and all sheets containing foundation details. If you have any questions regarding the above comments, please contact Richard Moreno via email richardm@tncservices.com or telephone (562) 733-8030. [END! Transmittal Letter November 23, 2022 City of Carlsbad Community Development Department -Building Division 1635 Faraday Ave. Carlsbad, CA 92008 True North COMPLIANCE SERVICES FIRST REVIEW City Pennit No: PC2022-0052 True North No.: 22-018-397 Plan Review: Garage Conversion to JADU and New Detached Garage with ADU Address: 2501 Davis Ave, Carlsbad CA Applicant Name: Jesse Leon Applicant Email: jesse@procaldesign.com True North Compliance Services, Tnc. has completed the first review of the fo llowing documents for the project referenced above on behalf of the City of Carlsbad: 1. 2. 3. Drawings: Electronic copy dated NIA by Jesse Leon. Structural Calculations: Electronic copy dated N/ A, by Pro-Cal design & Engineering. Energy Document: Electronic copy dated October 19, 2022, by Diane Mendoza Attn: Permit Technician, the plans have been reviewed for coordination with the permit application. See below for additional information: Valuation: Scope of Work: Floor Area: Confirmed Confirmed Confirmed Our comments follow on the attached list. Please call if you have any questions or if we can be of further assistance. Sincerely, True North Compliance Services Review By: Richard Moreno -Plans Examiner True North Compliance Services, Inc. 3939 Atlantic Avenue Suite 224, Long Beach, CA 90807 T / 562. 733.8030 Garage Conversion to JADU and New Detached Garage with ADU 2501 Davis Ave November 23, 2022 Plan Review Comments RESUBMITT AL INSTRUCTIONS: City of Carlsbad-FIRST REVIEW City Permit No.: PC2022-0052 True North No.: 22-018-397 Page 2 Please do not resubmit plans until all departments have completed their reviews. For status, please contact building@carlsbadca.gov Deliver THREE corrected sets of plans and TWO corrected calculations/reports directly to the City of Carlsbad Building Division, 1635 Faraday Ave., Carlsbad, CA 92008, ( 442) 339-2719. The City will route the plans to True North, Planning and Land Development Engineering Departments (if applicable) for continued review. Note: If this project requires FIRE PREVENTION review, ensure that you follow their specific instructions for resubmittal review. The City will not route plans back to Dennis Grubb & Associates for continued Fire Prevention review. GENERAL INFORMATION: A. The following comments are referred to the 20] 9 California Building, Mechanical, Plumbing, Electrical Codes, California Green Building Standards Code, and Energy Code (i.e., 2018 IBC, UMC, UPC, and 2017 NEC, as amended by the State of California). 8. There may be other comments generated by the Building Division and/or other City departments that will also require your attention and response. This attached list of comments, then, is only a portion of the plan review. Contact the City for other items. C. Respond in writing to each comment by marking the attached comment list or creating a response letter. Indicate which details, specification, or calculation shows the required information. Your complete and clear responses will expedite the re-check. D. Please be sure to include the architect and engineer's stamp and signature on all sheets of the drawings and on the coversheets of specifications and calculations per CBPC 5536.l and CBPC 6735. This item will be verified prior to plan approval. OCCUPANCY & BUILDING SUMMARY: Occupancy Groups: Type of Construction: Sprinklers: Stories: Area of Work (sq. ft.): R-3/U V-B No land 2 Remodel: 260 sq. ft. Deck 188 SF New Garage: 688 SF ADU: 960 SF Garage Conversion to JADU and New Detached Garage with ADU 2501 Davis Ave November 23, 2022 ARCIDTECTURAL COMMENTS: City of Carlsbad-FIRST REVIEW City Permit No.: PC2022-0052 True North No.: 22-018-397 Page3 A 1. All sheets of plans must be signed by the person responsible for their preparation. (California Business and Professions Code). a) Submit stamped and signed revisions from the licensed architect. A2. Truss calculations were not submitted for review. The fo llowing comments apply to deferred submittal items: a) The registered design professional in responsible charge shall list the deferred submittals on the cover sheet of construction documents for review by the building official. b) Documents for deferred submittal items shall be reviewed by the registered design professional in responsible charge who shall forward them to the building official with a notation indicating that they have been reviewed and are in general conformance with the design of the building. A3 . Please address the following on CS-01. a) Please add "U" to occupancy list on sheet CS-01. b) Define dashed lines shown around the proposed Garage/ADU building on CS-01. c) Note on plans if any part of the steel fence is new or existing. d) Add "New" to the proposed Terrace overlay. e) Note" New Stairs" on site plans. f) Note if CMU wall is new or existing. If new, note that wall height and if under a separate permit. g) Define hashed areas on site plans. h) Complete landscape areas percentile on the "Notes" section i) Show the proposed future driveway for new Garage location on site plans. A4. Provide electrical and wall legend on A-10 for the JADU floor plans and A-20 garage/ADU building. AS. Please date stamp each plan sheet. A6. Show location of sub-panel for JADU on A-10. JADUs must have electrical circuits completely independent of the main dwelling unit. If this is not feasible, the electrical panel serving the main dwelling unit may be approved for this use. This panel must be in a common area with direct access from both units. Government Code Section 65852.22. a) If sub-panel is installed, note the panel rating, in amperage, on plans. A 7. Provide a cross section for the JADU conversion. In section note ceiling/plate height, roof height, wall and ceiling insulation values, etc. A8. For garage conversions: CRC Section R506 requires a vapor retarder for all slabs below conditioned space. Please provide verification that a vapor retarder was installed at the time of construction; or demonstrate how slab will be moisture proofed. Include product manufacturer, method of application, and ICC ( or equal) approval. Garage Conversion to JADU and New Detached Garage with ADU 2501 Davis Ave November 23, 2022 City of Carlsbad-FIRST REVIEW City Permit No.: PC2022-0052 True North No.: 22-018-397 Page4 A 9. Main door for the JDAU on A-11 measures 94-inches in height. Plans state 80 inches. Please scale door on A-11. a) Also, note JADU floor elevation on exterior views. b) Call out the landing at the exterior side of Door to be no more than 7.75" below the door threshold. CRC R3 I 1.3.1. c) Provide detail for infi II exterior wall showing the exterior wall covering, water proofing, sheathing, framing, insulation, and interior wall covering. CRC R 701. A I 0. Effective July I, 2019, new or replacement garages shall have battery back-up installed for any garage door openers. SB969. Note on floor plans or electrical plans of JADU. A 11. Address the following on A20 and A2 l. a) Provide and reference a minimum of 2 sections for the ADU building. One each way. Only one longitudinal was provided. Please provide a traversal section. b) The garage shall be separated from the residence and its attic area by not less than½" gypsum board applied to the garage side (at walls). Garages beneath habitable rooms shall be separated by not less than 5/8" Type X gypsum board. Section R302.6. c) The area of the floor used for parking of vehicles shall be sloped to drain toward the main vehicle entry doorway. Section R309. 1 d) Provide plan view and section views that graphically delineate the fire-rated and sound rated separation between the dwelling units. i) Provide construction details with basis of approval ( e.g. UL Design #, GA File No., etc. that are tested in accordance with ASTM El 19 or UL 263) for the following: ii) Separation between dwelling units -Floor and walls must be one-hour fire-resistance rated. iii) Fire-resistance rated floor/ceiling assemblies shall extend to and be tight against the exterior wall assembly. iv) Supporting construction of the fire rated assemblies shall have equal or greater fire- resistance rating per CRC R302.3. e) Sound Rating between Dwelling Units: Wall and floor-ceiling assemblies separating dwelling units shall be sound rated per CRC AKI O 1.1. Air-borne sound insulation for wall and floor-ceiling assemblies shall meet a Sound Transmission Class (STC) rating of 45 when tested in accordance with ASTM E 90. Provide construction details with basis of approval (i.e., UL design #, G.A. file #). CRC AK.102.1 t) Provide illumination at exterior and interior stairway per CRC R303.8. g) Provide landing at the bottom of the exterior ADU stairs. CRCR3 l 1.7.5. h) Note elevation difference between ADU and deck. i) Provide details of the stairs. Include the following information: i) Stair tread depth (10" minimum plus tread nosing) and riser height (7.75" maximum) per CRC R311.7.5.l ii) Provide light fixture to illuminate the walking surface of the stairs per CRC R311. 7 .9. j) The casement window next to door for garage 2 needs to be tempered. R308.4. Garage Conversion to JADU and New Detached Garage with ADU 2501 Davis Ave November 23, 2022 City of Carlsbad-FIRST REVIEW City Permit No.: PC2022-0052 True North No.: 22-018-397 Page 5 k) Wall Assemblies: CRC 702. Provide wall assembly detail showing the following: i) Framing members size, spacing, height, ii) Type and thickness of the wall covering material. iii) Type of waterproofing membrane, as applicable. iv) Top and bottom of wall attachments. A 12. Address the fol lowing deck infonnation on plans: a) Enclosed framing in wood exterior balconies and decks shall be provided with openings that provide a net free cross ventilation area not less than 1/150 of the area of each separate space. Section R3 l 7. I .6 b) Wood balconies and decks that support moisture-penneable floors shall be provided with an impervious moisture barrier system under the moisture-permeable floor, with positive drainage. Section R317.1. c) Specify on the plans the following information for the deck/balcony surfacing materials, per Section R 106. l . I : d) Manufacturer's name and product name/number. e) ICC approval number, or equal. Al 3. For both ADU and JADU address the following on Al0 and A20. a) On floor plans or roof plans show attic ventilation per CRC R806. l . i) Show the number of vents and calculation to justify the quantity is adequate to provide 1 square feet of ventilation per 150 square feet of vented space. CRC R806.2. ii) Specify a I-inch minimum space between the bottom of the roof sheathing and the insulation. CRC R806.3. b) Revise the plan to show the location of the attic access. Attic access shall not be less than 22 inches by 30 inches and shall be located in a hallway or other readily accessible location. CRC R807. MECHANICAL COMMENTS: Ml. On sheet A-21: Detail the dryer exhaust duct design from the dryer to the exterior. The maximum length is 14 feet with a maximum of two 90-degree elbows or provide the manufacturer's duct length specification description on the plans: Include the dryer specifications (manufacturer, model, and fuel type) as well as the duct description (size and type). CMC Section 504.4.2.1. ELECTRICAL COMMENTS: El. For both JADU and ADU/Garage on site plans CS-01: Show on the plan the amperage of the electrical service, the location of the service panel and the location of any sub-panels. If the service is over 200 amperes, submit a single line diagram, panel schedules, and provide service load calculations. Garage Conversion to JADU and New Detached Garage with ADU 2501 Davis Ave City of Carlsbad-FffiST REVIEW City Permit No.: PC2022-0052 True North No.: 22-018-397 Page6 November 23, 2022 E2. Please address the following on Sheet A-10 and A21: a) smoke alarms in the junior ADU area allowed to be placed within 6-ft of a cooking appliance provided that they area photoelectric type. Per R314. b) Kitchen Receptacle Outlet Placement: Show locations of receptacle outlets serving the kitchen counter. Wall spaces along the kitchen countertop shall be provided with receptacles such that no point along the wall line is more than 24 inches, measured horizontally, from a receptacle outlet in that space. CEC 210.52(C)(1 ). c) At the kitchen island countertop, the receptacle shall not be located where the countertop extends more than 6 inches beyond its support base per CEC 210.52(C)(5) Exception. d) Include on the plans the following specifications for electrical devices installed in dwellings: CEC Article 210 & 406 i) ii) iii) iv) Tamper resistant receptacles for all locations described in 210.52 and 550.13.(i.e. all receptacles in a dwelling). Weather resistant type for receptacles installed in damp or wet locations (outside). 406.4(D)(6). Arc-fault protection for al l outlets (not just receptacles) located in rooms described in NEC 210.12(A): Kitchens, laundry areas, family, living, bedrooms, dining, halls, etc. GFCI protected outlets for locations described in NEC 210.8(A): Laundry areas, kitchen dishwashers, kitchens, garages, bathrooms, outdoors, within 6' of a sink, etc. PLUMBING COMMENTS: P 1. Overflow roof drains shall terminate in an area where they will be readily visible and will not cause damage to the building. If the roof drain terminates through a wall, the overflow drain shall terminate 12" minimum above the roof drain. City Policy 84-35 P2. Provide the following note for the use of recycled water for irrigation: The City of Carlsbad requires the installation of a "bypass tee and associated ball valves" be installed above grade on the main water supply line before it enters the building. Please include the location and specifications for this fitting on the plumbing plans. (The City Engineer has a detail available, Standard drawing W35). GREEN BUILDING COMMENTS: G 1. Climate Action Plan requirements apply to all new structures, residential additions/remodels equal to or exceeding $60,000 in valuation, and commercial City of Carlsbad requires that all projects that qualify for CAP compliance will require a completed Climate Action Plan (CAP) Consistency Checklist (city form B- 50) to be completed by the APPLICANT. a) For plans submitted to the City the following Climate Action Plan requirements apply, per Carlsbad ordinance: b) The applicant is to fill out the B-50 CAP Consistency Checklist. The scope of work and project valuation will determine which sections of the CAP are required. Garage Conversion to JADU and New Detached Garage with ADU 2501 Davis Ave November 23, 2022 ENERGY COMPLIANCE COMMENTS: City of Carlsbad-FIRST REVIEW City Permit No.: PC2022-0052 True North No.: 22-018-397 Page 7 Tl. Note on plans that all domestic hot water piping to have the following minimum insulation installed: ½" pipe (1/2" insulation); ¾" pipe (1" insulation); 1" to 1-½" pipe ( 1-½" insulation). CPC 609.1 1 & ES 150.0(j) a) Additionally, the ½" hot water pipe to the kitchen sink, and the cold-water pipe within 5' of the water heater both require 1" minimum insulation. ES 150.O(j) T2. For both ADU and JADU, address the following on A 10 and A-20: a) Note or provide the following design requirements for gas water heaters installed to serve individual dwelling units: ES 150.0(n) i) Gas piping sizing based upon a minimum input of200,000 btu/hr. ii) A condensate drain installed no higher than 2" above the base of the heater that also allows for gravity drainage. iii) The "B" vent installed in a straight position from the room containing the water heater to the roof termination. (For future possible sleeving for high efficiency heater venting.) iv) A 120-volt receptacle accessible to the heater installed within 3 '. STRUCTURAL COMMENTS: SI. A soils report is required for all new construction, additions over 500 sf, and new detached ADUs over 500 sf. Submit a soils report and incorporate the recommendations of the report into the design. See Link below for additional information. https://www.carlsbadca.gov/home/showpublisheddocument/6835/637842553336870000 S2. Provide non-load bearing top and bottom connection details for the JADU conversion. S3. Trnsses: If trusses are to be deferred, please add deferred noted a) Provide truss details and truss calculations for this project. Specify truss identification numbers on the plans. b) Please provide evidence that the engineer-of-record (or architect) has reviewed the truss calculation package prepared by others (i.e., a "review" stamp on the truss calculations or a letter). CBC Section 107.3.4.1. S4. Please address the following on sheet S-10. a) Detail callout 7/S502. There is no such sheet on set. b) S.O.G. information noted on foundation plan does not state any moisture barrier. Please provide informaiton on resubmittal. c) Provide and reference exterior post to footing connection detail. d) Notice hat detail 5/SS l states typical interior grade beam, not exterior footing connection. Please review and revise. e) Shear wall type SW was not defined on shear wall schedule S-66. Please review. f) Plans show double sided Simpson walls at front of garage. Verify that foundation plans are coordinated with structural calculations. Grid Y4. Garage Conversion to JADU and New Detached Garage with ADU 2501 Davis Ave November 23, 2022 City of Carlsbad-FIRST REVIEW City Permit No.: PC2022-0052 True North No.: 22-018-397 Page8 If you have any questions regarding the above comments, please contact Richard Moreno via email richardm@tncservices.com or telephone (562) 733-8030. [END] PRO-CAL DES IGN & ENG I NEER IN G '•'.1Cl l.iiQP[:\l;\ "".iOULf-:'✓A :o, $l -?C'f, SI\\ D EGO. CJ\ 92117 STRUCTURAL CALCULATIONS FOR: DAVIS AVE ADU 2501 DAVIS AVENUE CARLSBAD, CA 92008 PC2022-0052 2501 DAVIS AVE BONEE: NEW DETACHED (688SF) WITH DECK(188sF~~~::g~FbO0VER GARAGE JAOU (260 SF) NVERSION TO 1552511400 11/4/2022 PC2022-0052 TABLE OF CONTENTS PROJECT SUMMARY .............................................. A1 GRAVITY DESIGN ................................................... 81 -814 LATERAL DESIGN ................................................... C1 -C22 FOUNDATION DESIGN ............................................ 01 PROJECT SUMMARY THE PROJECT CONSISTS OF A 2-STORY ADU STRUCTURE OF WOOD LIGHT FRAME CONSTRUCTION. THE BUILDING USES STANDARD SHALL FOUNDATIONS WITH SLAB ON GRADE AT THE FIRST FLOOR AND CONVENTIONAL DIMENSION LUMBER FLOOR FRAMING FOR THE SECOND FLOOR. PRE-MANUFACTURED WOOD ROOF TRUSSES ARE USED FOR THE ROOF FRAMING AND ARE A DEFERRED SUBMITTAL TO THESE PERMIT PLANS. THE LATERAL FORCE RESISTING SYSTEM OF THE STRUCTURE CONSISTS OF LIGHT FRAMED WOOD WALLS SHEATHED WITH SHEAR PANELS AND SIMPSON STRONG WALLS AT THE GARAGE FRONT. THE ADU STRUCTURE CONSISTS OF GROUND FLOOR PARKING GARAGES WITH LIVING SPACE ABOVE. THE FLOOR PLAN OF THE LIVING SPACE DOES NOT ALIGN WITH THE GARAGE FLOOR PLAN BELOW AND THEREFORE DISCONTINUOUS BEARING/SHEAR WALLS ARE PRESENT. AT THE SECOND FLOOR, THESE DISCONTINUOUS LOADS ARE SUPPORTED BY A SYSTEM OF CANTILEVER JOISTS AND BEAMS. STRUCTURAL MEMBERS SUPPORTING THE DISCONTINOUS SHEAR WALLS (IE WOOD BEAMS, DIAPHRAGMS, SHEAR WALLS BELOW) ARE DESIGNED FOR OVERSTRENGTH SEISMIC FORCES PER ASCE 7-16 WHILE THE UPPER SHEAR WALLS AND FOUNDATIONS ARE DESIGNED FOR JUST THE CODE LEVEL SEISMIC FORCES. THE FOUNDATIONS ARE DESIGNED USING THE PRESUMPTIVE SOIL BEARING VALUES FROM THE CBC TABLE 1806.2 (CLAY, SANDY CLAY, SILTY CLAY, ETC). GOVERNING CODES -CALIFORNIA BUILDING CODE (CBC 2019) -CITY OF SAN DIEGO AMENDMENTS -ASCE 7-16 -NOS 2018 / SPDWS 2015 -ACI 318-14 LOADING CRITERIA DEAD LOADS: LIVE LOADS: -TYPICAL FLOOR: ............ 16 PSF -TYPICAL FLOOR: ............... 40 PSF -EXTERIOR BALCONY: ..... 20 PSF -EXTERIOR BALCONY: ....... 60 PSF -ROOF : ............................... 14 PSF -ROOF (Lr): .......................... 20 PSF WIND LOADS: SEISMIC LOADS: -DESIGN WIND SPEED: ............................. 96 MPH -Ss: .................... 1.055g Sds: ...... 0.844g -EXPOSURE CATERGORY: ....................... B -S1: ................... 0.383g Sd1: ...... 0.489g -GUST EFFECT FACTOR: ......................... 0.85 -SITE CLASS: ... D (DEFAULT) -INTERNAL PRESSURE COEFFICIENT: ... +/-0.18 -RISK CATEGORY: II -SEISMIC DESIGN CATEGORY: D PRO-CAL DESIGN & ENG INEER ING GRAVITY DESIGN DAVIS AVE ADU 2501 DAVIS AVENUE CARLSBAD, CA 92008 UP POST 1 L..JI:--------- IT Ill 11 II II , II JOIST AND BEAM DESIGN KEY PLAN T£P.W.E AEC ,,, RA 1? 3/4" OSB SHrG TYPE 0 ATTYP INTERIOR FLOOR.SEE W ~ I/ ,(!~V' /4"'6/ /1, .. mo 3/4" Pl YWOOD TYPE 0 WITH TRAFFIC COATING PER ARCH. TYP AT EXTERIOR BALCONIES SEEW ~ \ HOR I 3/4" OSB SHrG TYPE ( 3 AT HATCHED FLOOR. SEEW ~ ID Yi · N ~ ....., ill 31'-0" ~ ~I [i]~I-t' r r ,,_,,.,, ~.~ r r r c,1 al 7777;,,•~7777 -- (0 ill 32'-0" 12·-0-,r 1 'I 2ND FLR FRAMING PLAN B1 HEADER RUNS ON TOP STRONG WALL BELOW. SEE SHEET WSWH-1 Project Title: Engineer: Project ID: B2 Project Descr: Wood Beam Project File: Davis Street Calcs.ec6 UC#: KW-06018968, Build:20.22.10.25 PRO-CAL Design (c) ENERCALC INC 1983-2022 DESCRIPTION: JOIST 1: 2ND FLOOR SHORT CANTILEVER JOIST CODE REFERENCES Calculations per NDS 2018, IBC 2018, CBC 2019, ASCE 7-16 Load Combination Set: IBC 2018 Material Properties Analysis Method : Load Resistance Factor D Load Combination IBC 2018 Wood Species Wood Grade Douglas Fir-Larch No.2 Beam Bracing Beam is Fully Braced against lateral-torsional buckling D(0.023994i L(0 05332/ 2x12 Span = 10.50 ft Applied Loads Beam self weight calculated and added to loading Load for Span Number 1 Fb + Fb - Fe -Prll Fe -Perp Fv Ft 900 psi 900 psi 1350 psi 625 psi 180 psi 575 psi E : Modulus of Elasticity Ebend-xx 1600 ksi Eminbend -xx 580ksi Density 31.21 pcf Repetitive Member Stress Increase 0(012~26) D(0 0333251 L(0 05332) 2x12 Span= 2.50 ft Service loads entered. Load Factors will be applied for calculations. Uniform Load: D"' 0.0180, L"' 0.040 ksf, Tributary Width"' 1.333 ft, (2ND FLOOR LOAD) Load for Span Number 2 Uniform Load : D "' 0.0250, L "' 0.040 ksf, Tributary Width "' 1.333 ft, (2ND FLOOR LOAD) Point Load : D "'0.20, Lr "' 0.260 k@ 2.50 ft, (ROOF LOAD) Point Load: D "'0.270 k @ 2.50 ft, (2ND FLR WALL LOAD) DESIGN SUMMARY Design OK Maximum Bending Stress Ratio = 0.567: 1 Section used for this span 2x12 fb: Actual "' 1,013.38psi F'b "' 1,788.48psi Load CombinatiOOD+1.60Lr+0.50L +1 .60H, LL Comb Run (LL) Location of maximum on span 10.500ft Span # where maximum occurs "' Span # 1 Maximum Deflection Max Downward Transient Deflection Max Upward Transient Deflection Max Downward Total Deflection Max Upward Total Deflection Overall Maximum Deflections 0.043 in Ratio = -0.039 in Ratio = 0.107 in Ratio = -0.058 in Ratio= Maximum Shear Stress Ratio = 0.312 : 1 Section used for this span 2x12 fv: Actual "' 96.99 psi F'v "' 311.04 psi Load Combina1i6!{)D+1.60Lr+0.50L +1.60H, LL Comb Run (LL) Location of maximum on span 10.500 ft Span # where maximum occurs "' Span # 1 1404 >=480 1536>=480 560>=240 2164 >=240 Span: 2 : Lr Only, LL Comb Run ('L) Span: 2: L Only, LL Comb Run (L') Span: 2 : +D+Lr+H, LL Comb Run ('L) Span: 1 : +D+Lr+H, LL Comb Run ('L) Load Combination Span Max. "-" Defl Location in Span Load Combination Max. "+" Defl Location in Span L Only, LL Comb Run (L*) +D+Lr+H, LL Comb Run (LL) Vertical Reactions Load Combination 1 2 Max Upward from all Load Conditions Max Upward from Load Combinations Max Upward from Load Cases Max Downward from all Load Conditio 0.0506 0.1069 4.575 2.500 +D+Lr+H, LL Comb Run (LL) Support notation : Far left is #1 Support 1 Support 2 Support 3 0.302 1.394 0.302 1.394 0.280 0.831 -0.062 -0.0582 0.0000 Values in KIPS 6.453 6.453 Project Title: Engineer: Project ID: B3 Project Descr: Wood Beam Project File: Davis Street Calcs.ec6 UC#: KW-06018968. Build:20.22.10.25 PRO-CAL Design (c) ENERCALC INC 1983-2022 DESCRIPTION: JOIST 1: 2ND FLOOR SHORT CANTILEVER JOIST Vertical Reactions Support notation : Far left is #1 Values in KIPS Load Combination Support 1 Support 2 Support 3 Max Downward from Load Combinations -0.040 Max Downward from Load Cases (Resis -0.062 +D+H 0.022 0.831 +D+L +H, LL Comb Run (*L) 0.006 0.980 +D+L +H, LL Comb Run (L *) 0.302 1.110 +D+L +H, LL Comb Run (LL) 0.286 1.260 +D+Lr+H, LL Comb Run (*L) -0.040 1.152 +D+Lr+H, LL Comb Run (L *) 0.022 0.831 +D+Lr+H, LL Comb Run (LL) -0.040 1.152 +D+S+H 0.022 0.831 +D+0.750Lr+0.750L+H, LL Comb Run(* -0.036 1.184 +D+0.750Lr+0.750L+H, LL Comb Run (L 0.232 1.Q40 +D+0.750Lr+0.750L+H, LL Comb Run (L 0.174 1.394 +D+0.750L +0.750S+H, LL Comb Run (*L 0.010 0.942 +D+0.750L+0.750S+H, LL Comb Run (L* 0.232 1.040 +D+0.750L +0. 750S+H, LL Comb Run (LL 0.220 1.152 +D+0.60W+H 0.022 0.831 +D+0.70E+H 0.022 0.831 +D+0.750Lr+0.750L +0.450W+H. LL Comb -0.036 1.184 +D+0.750Lr+0.750L+0.450W+H, LL Comb 0.232 1.Q40 +D+0.750Lr+0.750L+0.450W+H, LL Comb 0.174 1.394 +D+0.750L+0.750S+0.450W+H, LL Comb 0.010 0.942 +D+0.750L+0.750S+0.450W+H, LL Comb 0.232 1.040 +D+0.750L +0.750S+0.450W+H, LL Comb 0.220 1.152 +D+0.750L +0.750S+0.5250E+H, LL Comb 0.010 0.942 +D+0.750L +0. 750S+0.5250E+H, LL Comb 0.232 1.040 +D+0.750L +0. 750S+0.5250E+H. LL Comb 0.220 1.152 +0.60D+0.60W+0.60H 0.013 0.498 +0.60D+0.70E+0.60H 0.013 0.498 D Only 0.022 0.831 Lr Only, LL Comb Run (*L) -0.062 0.322 Lr Only, LL Comb Run (LL) -0.062 0.322 L Only, LL Comb Run (*L) -0.016 0.149 L Only, LL Comb Run (L*) 0.280 0.280 L Only, LL Comb Run (LL) 0.264 0.429 H Only Project Title: DAVIS ADU Engineer: PS Project ID: Project Descr: 2-STORY ADU B4 Wood Beam Project File: Davis Street Calcs.ec6 UC#: KW-06018968, Build:20.22.10.25 PRO-CAL Design (c) ENERCALC INC 1983-2022 DESCRIPTION: JOIST 2: 2ND FLOOR LONG CANTILEVER JOIST CODE REFERENCES Calculations per NOS 2018, IBC 2018, CBC 2019, ASCE 7-16 Load Combination Set: IBC 2018 Material Properties Analysis Method : Load Resistance Factor D Load Combination IBC 2018 Wood Species Wood Grade Beam Bracing Applied Loads Douglas Fir-Larch No.2 Beam is Fully Braced against lateral-torsional buckling D 0 023994 L 0.05332 2x12 Span= 10 on Beam self weight calculated and added to loading Load for Span Number 1 Fb + Fb - Fe -Prll Fe -Perp Fv Ft 900.0 psi 900.0 psi 1,350.0 psi 625.0 psi 180.0 psi 575.0 psi E : Modulus of Elasticity Ebend-xx 1,600.0 ksi Eminbend -xx 580.0ksi Density 31.210pcf Repetitive Member Stress Increase D O 033325 L O 05332 2x12 Span= 5 250 fl Service loads entered. Load Factors will be applied for calculations. Uniform Load: D = 0.0180, L = 0.040 ksf, Tributary Width= 1.333 ft, (2ND FLOOR LOAD) Load for Span Number 2 Uniform Load : D = 0.0250, L = 0.040 ksf, Tributary Width = 1.333 ft, (2ND FLOOR LOAD) Point Load : D = 0.030, Lr= 0.040 k@ 5.250 ft, (ROOF LOAD) Point Load : D = 0.270 k@ 5.250 ft, (2ND FLR WALL LOAD) DESIGN SUMMARY Maximum Bending Stress Ratio Section used for this span fb: Actual F'b Load Combination Location of maximum on span Span # where maximum occurs Maximum Deflection Max Downward Transient Deflection Max Upward Transient Deflection Max Downward Total Deflection Max Upward Total Deflection Overall Maximum Deflections = = = 0.825 1 2x12 1,106.88 psi 1,341.36psi +1.40D+1.60H 10.000ft Span# 1 0.109 in Ratio= -0.071 in Ratio= 0.402 in Ratio= -0.089 in Ratio= Design OK Maximum Shear Stress Ratio = 0.269 : 1 Section used for this span 2x12 fv: Actual = 83.82 psi F'v = 311.04psi Load CombinatlaWD+0.50Lr+1.60L +1.60H, LL Comb Run (*L) Location of maximum on span = 10.000 ft Span # where maximum occurs = Span # 1 11 58 >=480 1780>=480 312>=240 1343>=240 Span: 2 : L Only, LL Comb Run (*L) Span: 2 : L Only, LL Comb Run (L*) Span: 2: +D+L+H, LL Comb Run (*L) Span: 1 : +D+L +H. LL Comb Run (*L) Load Combination Span Max. "-" Defl Location in Span Load Combination Max. "+" Defl Location in Span 1 +D+L +H, LL Comb Run (*L) 2 Vertical Reactions Load Combination Max Upward from all Load Conditions Max Upward from Load Combinations Max Upward from Load Cases Max Downward from all Load Conditio 0.0000 0.4020 0.000 5.250 +D+L +H, LL Comb Run (*L) Support notation : Far left is #1 Support 1 Support 2 Support 3 0.267 1.461 0.196 1.461 0.267 0.841 -0.144 -0.0893 0.0000 Values in KIPS 5.978 5.978 Project Title: DAVIS ADU Engineer: PS B5 Project ID: Project Descr: 2-STORY ADU Wood Beam UC#: KW-06018968, Build:20.22.10.25 PRO-CAL Design DESCRIPTION: JOIST 2: 2ND FLOOR LONG CANTILEVER JOIST Vertical Reactions Load Combination Max Downward from Load Combinations Max Downward from Load Cases (Resis +D+H +D+L+H, LL Comb Run (•L) +D+L +H, LL Comb Run (L ') +D+L +H, LL Comb Run (LL) +D+Lr+H, LL Comb Run ('L) +D+Lr+H, LL Comb Run (L') +D+Lr+H, LL Comb Run (LL) +D+S+H +D+0.750Lr+0.750L +H, LL Comb Run(* +D+0.750Lr+0.750L+H, LL Comb Run (L +D+0.750Lr+0.750L +H, LL Comb Run (L +D+0.750L+0.750S+H, LL Comb Run (*L +D+0.750L+0.750S+H, LL Comb Run (L* +D+0.750L+0.750S+H, LL Comb Run (LL +D+0.60W+H +D+0.70E+H +D+0.750Lr+0.750L +0.450W+H, LL Comb +D+0.750Lr+0.750L +0.450W+H, LL Comb +D+0.750Lr+0.750L +0.450W+H, LL Comb +D+0.750L +0.750S+0.450W+H, LL Comb +D+0.750L +0.750S+0.450W+H, LL Comb +D+0.750L+0.750S+0.450W+H, LL Comb +D+0.750L +0. 750S+0.5250E+H, LL Comb +D+0.750L+0.750S+0.5250E+H, LL Comb +D+0.750L+0.750S+0.5250E+H, LL Comb +0.60D+0.60W+0.60H +0.60D+0.70E+0.60H DOnly Lr Only, LL Comb Run (*L) Lr Only, LL Comb Run (LL) L Only, LL Comb Run ('L) L Only, LL Comb Run (L•) L Only, LL Comb Run (LL) H Only Support notation : Far left is #1 Support 1 Support 2 Support 3 -0.144 -0.073 -0.070 -0.144 0.196 0.123 -0.091 -0.070 -0.091 -0.070 -0.141 0.130 0.059 -0.125 0.130 0.075 -0.070 -0.070 -0.141 0.130 0.059 -0.125 0.130 0.075 -0.125 0.130 0.D75 -0.042 -0.042 -0.070 -0.021 -0.021 -0.073 0.267 0.193 0.841 1.194 1.107 1.461 0.902 0.841 0.902 0.841 1.152 1.041 1.352 1.106 1.041 1.306 0.841 0.841 1.152 1.041 1.352 1.106 1.041 1.306 1.106 1.041 1.306 0.505 0.505 0.841 0.061 0.061 0.353 0.267 0.620 Project File: Davis Street Calcs.ec6 (c) ENERCALC INC 1983-2022 Values in KIPS lJl::.l-'IH=11.L'.!J" 1"NUICHAI Ut:.r'IH=~.S 'V ~ -1/4" PER FT Eni:pneer: DAVIS ADU PS . I~ ~ EXTERIOR WALL/ Project Title: _ 1 ___ ~: :;)-ProJect ID: I~ Project Descr: 2-STORY ADU . . . '""--DEPTH= 7.4" -I B6 Wood Beam Project File: Davis Street Calcs.ec6 UC#: KW-06018968, Build:20.22.10.25 PRO-CAL Design (c) ENERCALC INC 1983-2022 DESCRIPTION: JOIST 3: CANTILEVER BALCONY JOIST CODE REFERENCES Calculations per NOS 2018, IBC 2018, CBC 2019, ASCE 7-16 Load Combination Set: IBC 2018 Material Properties Analysis Method : Load Resistance Factor D Load Combination IBC 2018 Wood Species Wood Grade Douglas Fir-Larch No.2 Fb + Fb - Fe -Prll Fe -Perp Fv Ft 900.0 psi 900.0psi 1,350.0 psi 625.0 psi 180.0 psi 575.0 psi E : Modulus of Elasticity Ebend-xx 1,600.0ksi Eminbend -xx 580.0ksi Density 31.21 O pct Beam Bracing Beam is Fully Braced against lateral-torsional buckling Repetitive Member Stress Increase I l • D(O Q®l4)__ D(& 02666)❖L(0 053J2l l. Applied Loads 1.50 X 8.30 Span= 10 750 ft DJ0 033325) L(0.07998) 1.50 X 7 40 Span= 3 670 ft _1 ____ _ Service loads entered. Load Factors will be applied for calculations. Beam self weight calculated and added to loading Load for Span Number 1 Uniform Load : D = 0.020, L = 0.040 ksf, Extent= 0.0 --» 3.0 ft, Tributary Width = 1.333 ft, (2ND FLOOR LOAD (INTERIOR)) Point Load : D = 0.030, Lr= 0.040 k@ 3.0 ft, (ROOF LOAD) Point Load : D = 0.270 k@ 3.0 ft, (2ND FLOOR WALL WEIGHT) Uniform Load : D = 0.0250, L = 0.060 ksf, Extent= 3.0 --» 10.750 ft, Tributary Width= 1.333 ft, (BALCONY LOAD) Load for Span Number 2 Uniform Load : D = 0.0250, L = 0.060 ksf, Tributary Width = 1.333 ft, (BALCONY LOAD) DESIGN SUMMARY Design OK Maximum Bending Stress Ratio = 0.999: 1 Maximum Shear Stress Ratio = 0.434 : 1 Section used for this span 1.50 X 8.30 fb: Actual = 1,965.59psi F'b = 1,967.33 psi Load Combim1ti.:00D+0.50Lr+1 .60L+1 .60H, LL Comb Run (L•) Location of maximum on span = 4.744ft Span# where maximum occurs = Span # 1 Maximum Deflection Max Downward Transient Deflection Max Upward Transient Deflection Max Downward Total Deflection Max Upward Total Deflection Overall Maximum Deflections 0.146 in Ratio= -0.218 in Ratio= 0.355 in Ratio= -0.336 in Ratio= Section used for this span 1.50 X 7.40 Iv: Actual = 134.99 psi F'v = 311.04 psi Load Combina1iaWD+0.50Lr+1.60L+1.60H, LL Comb Run (LL) Location of maximum on span = 0.000 ft Span# where maximum occurs = Span # 2 604 >=360 402>=360 363>=240 262>=240 Span: 2 : L Only, LL Comb Run (*L) Span: 2: L Only, LL Comb Run (L*) Span: 2: +D+L+H, LL Comb Run (*L) Span: 2 : +D+L +H, LL Comb Run (L *) Load Combination Span Max."." Dell Location in Span Load Combination Max. "+" Defl Location in Span +D+L+H, LL Comb Run (L*) Vertical Reactions Load Combination 1 2 Max Upward from all Load Conditions Max Upward from Load Combinations Max Upward from Load Cases 0.3547 0.0000 5.225 5.225 +D+L+H, LL Comb Run (L*) Support notation : Far left is #1 Support 1 Support 2 Support 3 0.731 1.190 0.731 1.190 0.370 0.762 0.0000 -0.3361 Values in KIPS 0.000 3.670 Project Title: DAVIS ADU Engineer: PS B7 Project ID: Project Descr: 2-STORY ADU Wood Beam LIC#: KW-06018968, Build:20.22.10.25 PRO-CAL Design DESCRIPTION: JOIST 3: CANTILEVER BALCONY JOIST Vertical Reactions Load Combination Max Downward from all Load Conditio Max Downward from Load Cases (Resis +D+H +D+L +H, LL Comb Run (*L) +D+L +H, LL Comb Run (L *) +D+L +H, LL Comb Run (LL) +D+Lr+H, LL Comb Run (*L) +D+Lr+H, LL Comb Run (L *) +D+Lr+H, LL Comb Run (LL) +D+S+H +D+0.750Lr+0.750L +H, LL Comb Run(* +D+0.750Lr+0.750L +H, LL Comb Run (L +D+0.750Lr+0.750L +H, LL Comb Run (L +D+0.750L +0.750S+H, LL Comb Run (*L +D+0.750L +0.750S+H, LL Comb Run (L* +D+0.750L+0.750S+H, LL Comb Run (LL +D+0.60W+H +D+0.70E+H +D+0.750Lr+0.750L+0.450W+H, LL Comb +D+0.750Lr+0.750L +0.450W+H, LL Comb +D+0.750Lr+0.750L +0.450W+H, LL Comb +D+0.750L+0.750S+0.450W+H, LL Comb +D+0.750L+0.750S+0.450W+H, LL Comb +D+0.750L +0.750S+0.450W+H, LL Comb +D+0.750L +0.750S+0.5250E+H, LL Comb +D+0.750L+0.750S+0.5250E+H, LL Comb +D+0.750L +0.750S+0.5250E+H, LL Comb +0.60D+0.60W+0.60H +0.600+0. 70E+0.60H D Only Lr Only, LL Comb Run (L*) Lr Only, LL Comb Run (LL) L Only, LL Comb Run (*L) L Only, LL Comb Run (L *) L Only, LL Comb Run (LL) H Only Support notation : Far left is #1 Support 1 Support 2 Support 3 -0.050 -0.050 0.370 0.320 0.731 0.681 0.370 0.399 0.399 0.370 0.333 0.663 0.625 0.333 0.641 0.604 0 370 0.370 0.333 0.663 0.625 0.333 0.641 0.604 0.333 0.641 0.604 0.222 0.222 0.370 0.029 0.029 -0.050 0.361 0.311 0.428 0.772 0.847 1.190 0.428 0.439 0.439 0.428 0.686 0.750 1.008 0.686 0.742 1.000 0.428 0.428 0.686 0.750 1.008 0.686 0.742 1.000 0.686 0.742 1.000 0.257 0.257 0.428 0.011 0.011 0.344 0.419 0.762 Project File: Davis Street Calcs.ec6 (c) ENERCALC INC 1983-2022 Values in KIPS Project Title: Engineer: DAVIS ADU PS B8 Project ID: Project Descr: 2-STORY ADU Wood Beam LIC#: KW-06018968, Build:20.22.10.25 DESCRIPTION: BEAM 1 CODE REFERENCES PRO-CAL Design Calculations per NDS 2018, IBC 2018. CBC 2019, ASCE 7-16 Load Combination Set: IBC 2018 Material Properties Project File: Davis Street Calcs.ec6 (c) ENERCALC INC 1983-2022 Analysis Method : Load Resistance Factor D Load Combination IBC 2018 Fb + Fb - 1,000.0 psi 1,000.0 psi 1,500.0 psi E : Modulus of Elasticity Wood Species Wood Grade Beam Bracing Douglas Fir-Larch No.1 Fe -Prll Fe -Perp Fv Ft Beam is Fully Braced against lateral-torsional buckling 6x12 Span= 10.50 ft 625.0 psi 180.0 psi 675.0 psi Ebend-xx 1,700.0 ksi Eminbend -xx 620.0 ksi Density 31 .210pcf Applied Loads Service loads entered Load Factors will be applied for calculations. Beam self weight calculated and added to loading Uniform Load : D :::: 0.10, L = 0.2670 . Tributary W idth :::: 1.0 ft. (2ND FLOOR LOAD) DESIGN SUMMARY Maximum Bending Stress Ratio Section used for this span fb: Actual F'b Load Combination Location of maximum on span Span # where maximum occurs Maximum Deflection Max Downward Transient Deflection Max Upward Transient Deflection Max Downward Total Deflection Max Upward Total Deflection Overall Maximum Deflections Load Combination Span +D+L Vertical Reactions Load Combination Max Upward from all Load Cond1t1ons Max Upward from Load Combinations Max Upward from Load Cases DOnly +D+L +D+0.750L +0.60D L Only :::; 0.445: 1 6x12 768.90psi 1,728.00psi +1.20D+1 .60L 5.250ft Span# 1 Maximum Shear Stress Ratio Section used for this span fv: Actual F'v Load Combination Location of maximum on span Span # where maximum occurs 0.062 in Ratio= O in Ratio= 0.088 in Ratio= O in Ratio= 2032>=480 0 <480 1425 >=240 0<240 Span: 1 : L Only n/a Span: 1 : +D+L n/a Max ... _ .. Defl Location in Span Load Combination 0.0884 5.288 Support notation : Far left is #1 Support 1 Support 2 1.999 1.999 1.999 1.999 1.402 1.402 0.597 0.597 1.999 1.999 1.648 1.648 0.358 0.358 1.402 1.402 Design OK = 0.184: 1 6x12 = 57.37 psi = 311.04 psi +1.20D+1.60L = 0.000 ft = Span# 1 Max. "+" Defl Location in Span 0.0000 Values in KIPS 0.000 LJl::PIH =1 1.Lti" 1"NUICHAI Ut:r'IH=t.5.S 'V ~ -1/4" PER FT EnQtneer: DAVIS ADU PS B9 . I. ~ EXTERIOR WALL✓ Project Title: I ; ➔ Proiect ID: ~ Project Descr: 2-STORY ADU .__ ---+---------+---~! .......__DEPTH= 7.4" -I Wood Beam UC#: KW-06018968, Build:20.22.10.25 DESCRIPTION: BEAM 2 PRO-CAL Design CODE REFERENCES Calculations per NDS 2018, IBC 2018, CBC 2019, ASCE 7-16 Load Combination Set: IBC 2018 Material Properties Analysis Method : Load Resistance Factor D Load Combination IBC 2018 Wood Species Douglas Fir-Larch Wood Grade No.1 Beam Bracing Beam is Fully Braced against lateral-torsional buckling Fb + Fb - Fe -Prll Fe -Perp Fv Ft Project File: Davis Street Calcs.ec6 (c) ENERCALC INC 1983-2022 1350 psi E : Modulus of Elasticity 1350 psi Ebend-xx 1600ksi 925psi Eminbend -xx 580ksi 625psi 170 psi 675 psi Density 31.21 pcf D(O.~u;Q14-4)f-----,.,~---"'-D(c,cO__,,Oc:,33'-"3-"'25'ti-"'L(""0--"07:....:.9'-"9"'-'8)c..__-----,--------;..* --~,,...-!:D~(0~0~4.J.!)*L!,J:(0!!.._l112u_) ~--~~ 0(0., 022661l L(O 053,,32) l ~ DJQ 03332~ L(O 0799~) i ) • 1h~ OMEGA*OVERTURNING SEISMIC LOAD APPLIED. s;;;;oDIVIDED BY 2 TO BE SPLIT BETWEEN TWO BEAMS Span= 10.670 n 5.50 X 7.40 Span = 3.670 n Applied Loads Service loads entered. Load Factors will be applied for calculations. Beam self weight calculated and added to loading Load for Span Number 1 Uniform Load : D = 0.0170, L = 0.040 ksf, Extent= 0.0 --» 3.0 ft, Tributary Width = 1.333 ft, (2ND FLOOR LOAD (INTERIOR)) Point Load : D = 0.030, Lr= 0.040 k @ 3.0 ft, (ROOF LOAD) Point Load: D = 0.270 k@ 3.0 ft, (2ND FLOOR WALL WEIGHT) Uniform Load : D = 0.0250, L = 0.060 ksf, Extent= 3.0 --» 10.670 ft, Tributary Width = 1.333 ft, (BALCONY LOAD) Point Load : E = 4.80 k @ 3.0 ft, (2ND FLR DISCONTINUOUS SHEAR WALL LOAD) Load for Span Number 2 Uniform Load : D = 0.0250. L = 0.060 ksf, Tributary Width= 1.333 ft, (BALCONY LOAD) Uniform Load: D = 0.020, L = 0.060 ksf, Tributary Width= 2.0 ft, (STAIR LOAD) DESIGN SUMMARY Maximum Bending Stress Ratio Section used for this span 0.70l 1 5.50 X 8.30 fb: Actual 2,254.01 psi F'b = 3,207.60psi Load Combin~0.50L+0.70S+E+1.60H, LL Comb Run (L*) Location of maximum on span = 3.040ft Span # where maximum occurs = Span # 1 Maximum Deflection Max Downward Transient Deflection Max Upward Transient Deflection Max Downward Total Deflection Max Upward Total Deflection Overall Maximum Deflections 0.099 in Ratio= -0.058 in Ratio= 0.248 in Ratio= -0.263 in Ratio= Design OK Maximum Shear Stress Ratio = 0.404 : 1 Section used for this span 5.50 X 7.40 Iv: Actual = 148.40 psi F'v = 367 .20 psi Load Combina'ffiB+0.50L +0. 70S+E+1 ,60H, LL Comb Run (L *) Location of maximum on span = 0.000 ft Span # where maximum occurs = Span # 2 892>=360 1514 >=360 354 >=240 334 >=240 Span: 2 : L Only, LL Comb Run (*L) Span: 2 : L Only, LL Comb Run (L*) Span: 2 : +D+0.750L+0.750S-0.5250E+H, LL Comb Run Span: 2 : +D+0.70E+H Load Combination Span Max. "-" Defl Location in Span Load Combination Max. "+" Dell Location in Span +D+0.70E+H Vertical Reactions Load Combination 1 2 Max Upward from all Load Conditions 0.3080 0.0000 4.769 4.769 +D+0,70E+H Support notation : Far left is #1 Support 1 Support 2 Support 3 3.450 2.329 0.0000 -0.2633 Values in KIPS 0,000 3.670 Wood Beam UC#: KW-06018968, Build:20.22.10.25 DESCRIPTION: BEAM 2 Vertical Reactions Load Combination Max Upward from Load Combinations Max Upward from Load Cases Max Downward from all Load Conditio Max Downward from Load Combinations Max Downward from Load Cases (Resis +D+H +D+L +H, LL Comb Run (*L) +D+L +H, LL Comb Run (L *) +D+L+H, LL Comb Run (LL) +D+Lr+H, LL Comb Run (*L) +D+Lr+H, LL Comb Run (L*) +D+Lr+H, LL Comb Run (LL) +D+S+H +D+0.750Lr+0.750L+H, LL Comb Run(* +D+0.750Lr+0.750L+H, LL Comb Run (L +D+0.750Lr+0.750L+H, LL Comb Run (L +D+0.750L +0.750S+H, LL Comb Run (*L +D+0.750L+0.750S+H, LL Comb Run (L* +D+0.750L+0.750S+H, LL Comb Run (LL +D+0.60W+H +D+0.70E+H +D-0.70E+H +D+0.750Lr+0.750L+0.450W+H, LL Comb +D+0.750Lr+0.750L+0.450W+H, LL Comb +D+0.750Lr+0.750L+0.450W+H, LL Comb +D+0.750L +0.750S+0.450W+H, LL Comb +D+0.750L+0.750S+0.450W+H, LL Comb +D+0.750L+0.750S+0.450W+H, LL Comb +D+0.750L +0. 750S+0.5250E+H, LL Comb +D+0.750L +0. 750S+0.5250E+H, LL Comb +D+0.750L +0.750S+0.5250E+H, LL Comb +D+0.750L +0.750S-0.5250E+H, LL Comb +D+0.750L +0.750S-0.5250E+H, LL Comb +D+0.750L +0.750S-0.5250E+H, LL Comb +0.60D+0.60W+0.60H +0.60D+0.70E+0.60H +0.60D-0.70E+0.60H D Only Lr Only, LL Comb Run (L *) Lr Only, LL Comb Run (LL) L Only, LL Comb Run (*L) L Only, LL Comb Run (L*) L Only, LL Comb Run (LL) E Only E Only* -1 .0 H Only Project Title: DAVIS ADU Engineer: PS Project ID: Project Descr: 2-STORY ADU B10 Project File: Davis Street Calcs.ec6 PRO-CAL Design (c) ENERCALC INC 1983-2022 Support notation : Far left is #1 Values in KIPS Support 1 Support 2 Support 3 2.782 2.329 3.450 1.350 -3.450 -1 .350 -2.195 -0.546 -3.450 -1.350 0.367 0.664 0.241 1.524 0.725 1.079 0.599 1.939 0.367 0.664 0.396 0.675 0.396 0.675 0.367 0.664 0.272 1.309 0.657 0.984 0.562 1.629 0.272 1.309 0.635 0.975 0.541 1.620 0.367 0.664 2.782 1.608 -2.048 -0.281 0.272 1.309 0.657 0.984 0.562 1.629 0.272 1.309 0.635 0.975 0.541 1.620 2.084 2.017 2.447 1.684 2.352 2.329 -1.539 0.600 -1.176 0.267 -1.271 0.912 0.220 0.398 2.635 1.343 -2.195 -0.546 0.367 0.664 0.Q29 0.011 0.029 0.011 -0.126 0.860 0.358 0.415 0.232 1.276 3.450 1.350 -3.450 -1.350 Project Title: Engineer: DAVIS ADU PS B11 Project ID: Project Descr: 2-STORY ADU Wood Beam Project File: Davis Street Calcs.ec6 LIC#: KW-06018968, Build:20.22.10.25 DESCRIPTION: BEAM 3 CODE REFERENCES PRO-CAL Design Calculations per NOS 2018, IBC 2018, CBC 2019, ASCE 7-16 Load Combination Set : IBC 2018 Material Properties (c) ENERCALC INC 1983-2022 Analysis Method : Load Resistance Factor D Load Combination IBC 2018 Fb + Fb - 1,000.0 psi 1,000.0 psi 1,500.0 psi E : Modulus of Elasticity Wood Species Wood Grade Beam Bracing Douglas Fir-Larch No.1 Beam is Fully Braced against lateral-torsional buckling E(1 35) D(O 32L L(0.57) ..-----,,,,---'=='f'r="""'-'_L_-• Fe -Prll Fe -Perp Fv Ft E(1.35) I , 4x14 Span = 10.50 n 625.0psi 180.0 psi 675.0 psi D(O 233) L(O 31) Ebend-xx 1,700.0 ksi Eminbend -xx 620.0ksi Density 31.210pcf J Applied Loads Service loads entered. Load Factors will be applied for calculations. Beam self weight calculated and added to loading Load for Span Number 1 Uniform Load : D = 0.320, L = 0.570 k/ft, Extent= 0.0 --» 4. 750 ft, Tributary Width = 1.0 ft Uniform Load : D = 0.2330, L = 0.310 k/ft, Extent = 4. 750 --» 10.50 ft, Tributary Width = 1.0 ft Point Load : E = 1.350 k @ 4. 750 ft Point Load : E = 1.350 k@ 6.0 ft DESIGN SUMMARY Maximum Bending Stress Ratio Section used for this span fb: Actual F'b Load Combination Location of maximum on span Span # where maximum occurs Maximum Deflection = = = o.94a 1 4x14 1,638.31 psi 1,728.00psi +1 .20D+1.60L 4.637ft Span# 1 Maximum Shear Stress Ratio Section used for this span fv: Actual F'v Load Combination Location of maximum on span Span # where maximum occurs Span: 1 : L Only n/a = Design OK 0.483: 1 4x14 150.23 psi 311.04 psi +1.20D+1.60L 0.000ft Span# 1 Max Downward Transient Deflection Max Upward Transient Deflection Max Downward Total Deflection Max Upward Total Deflection 0.100 in Ratio= O in Ratio= 0.192 in Ratio= -0.027 in Ratio= 1255 >=360 0<360 654>=180 4636 >=180 Span: 1 : +D+0.750L +0.5250E Span: 1 : +0.60D-0.70E Overall Maximum Deflections Load Combination +D+0.750L +0.5250E Vertical Reactions Load Combination Span Max Upward from all Load Conditions Max Upward from Load Combinations Max Upward from Load Cases Max Downward from all Load Conditio Max Downward from Load Combinations Max Downward from Load Cases (Resis Max. "." Dell Location in Span Load Combination 0.1924 5.212 Support notation : Far left is #1 Support 1 Support 2 4.225 3.525 4.225 3.525 2.583 1.907 -1 .318 -1.382 -0.146 -1 .318 -1.382 Max. "+" Dell Location in Span 0.0000 Values in KIPS 0.000 Wood Beam UC#: KW-06018968, Build:20.22.10.25 DESCRIPTION: BEAM 3 Vertical Reactions Load Combination D ny +D+L +D+0.750L +D+0.70E +D-0.70E +D+0. 750L +0.5250E +D+0.750L-0.5250E +0.600 +0.60O+0.70E +0.600-0. 70E L Only E Only E Only * -1.0 Support 1 1.59 4.179 3.533 2.518 0.673 4.225 2.841 0.957 1.880 0.035 2.583 1.318 -1.318 Project Title: DAVIS ADU Engineer: PS B12 Project ID: Project Descr: 2-STORY ADU PRO-CAL Design Support notation : Far left is #1 Support 2 1.3 9 3.276 2.800 2.337 0.402 3.525 2.074 0.822 1.789 -0.146 1.907 1.382 -1 .382 Project File: Davis Street Calcs.ec6 (c) ENERCALC INC 1983-2022 Values in KIPS Project Title: Engineer: Project ID: Project Descr: Wood Column DAVIS ADU PS 2-STORY ADU B1 3 Project File: Davis Street Calcs.ec6 UC#: KW-06018968, Build:20.22.10.25 DESCRIPTION: POST 1 PRO-CAL Design (c) ENERCALC INC 1983-2022 Code References Calculations per NOS 2018, IBC 2018, CBC 2019, ASCE 7-16 Load Combinations Used : IBC 2018 General Information Analysis Method Load Resistance Factor Design End Fixities Top & Bottom Pinned Overall Column Height 9 ft ·, -Jscri fol' .nvn-.:;tc:nr:cr :;c,Jcu/{)t1•)n~·) Wood Species Douglas Fir-Larch Wood Grade No.2 Fb + 900.0 psi Fb -900.0psi Fe -Prll 1,350.0 psi Fe -Perp 625.0 psi Fv Ft Density 180.0 psi 575.0 psi 31.210 pct Wood Section Name 4x6 Wood Grading/Manuf. Graded Lumber Wood Member Type Sawn Exact Width Exact Depth Area Ix ly 3.50 in Allow Stress Modification Factors 5.50 in Cf or Cv for Bending 1.30 19.250 inA2 Cf or Cv for Compressio1 1.10 48.526 inA4 Cf or Cv for Tension 1.30 19.651 inA4 Cm : Wet Use Factor 1.0 Ct: Temperature Fact 1.0 Cfu : Flat Use Factor 1.0 E : Modulus of Elasticity . . . x-x Bending y-y Bending Basic 1,600.0 1,600.0 Axial 1,600.0 ksi Kf : Built-up columns Use Cr : Repetitive ? 1.0 t,1D S '5 3 2 No Minimum 580.0 580.0 Brace condition for deflection (buckling) along columns : Applied Loads Column self weight included : 37.550 lbs• Dead Load Factor AXIAL LOADS ... Axial Load at 9.0 ft, D = 2.60, L = 3.50 k DESIGN SUMMARY Bending & Shear Check Results PASS Max. Axial+Bending Stress Ratio = Load Combination 0.7817 : 1 +1.20D+1.60L Comp Only, fc/Fc' Governing NDS Forumla Location of max.above base At maximum location values are . Applied Axial Applied Mx Applied My Fe : Allowable PASS Maximum Shear Stress Ratio = Load Combination Location of max.above base Applied Design Shear Allowable Shear Load Combination Results 0.0 ft 8.765 k 0.0 k-ft 0.0 k-ft 582.51 psi 0.0 : 1 +0.90D 0.0 ft 0.0 psi 0.0 psi X-X (width} axis: Unbraced Length for buckling ABOUT Y-Y Axis= 10 ft,~ Y-Y (depth} axis: Fully braced against buckling ABOUT X-X Axis Service loads entered. Load Factors will be applied for calculations. Maximum SERVICE Lateral Load Reactions .. Top along Y-'r 0.0 k Bottom along Y-Y Top along X-)< 0.0 k Bottom along X-X Maximum SERVICE Load Lateral Deflections ... Along Y-Y 0.0 in at 0.0 ft above base for load combination : n/a Along X-X 0.0 in at 0.0 ft above base for load combination : n/a Other Factors used to calculate allowable stresses ... ~ Compression LRFD -Format Conversion factor 2.541 2.400 LRFD -Resistance factor 0.850 0.900 0.0 k 0.0 k ~ 2.700 0.800 Ms!xim!,!m Axis!I + Benging Stress Rs!lios Mexirrrnm Sbeer Rs!lios Load Combination +1 .40D +1.20D+1.60L +1.20D+0.50L +1.20 D +0.90D Maximum Reactions Load Combination D Only +D+L Lambda C p 0.000 0.182 0.000 0.182 0.000 0.182 0.000 0.182 0.000 0.182 X-X Axis Reaction @ Base @ Top Stress Ratio Status Location 0.3293 PASS 0.0ft 0.7817 PASS 0.0ft 0.4383 PASS 0.0ft 0.2823 PASS 0.0ft 0.21 17 PASS 0.0 ft k Y-Y Axis Reaction @Base @Top Axial Reaction @Base 2.638 6.138 Stress Ratio Status Location 0.0 PASS 0.0 ft 0.0 PASS 0.0 ft 0.0 PASS 0.0 ft 0.0 PASS 0.0 ft 0.0 PASS 0.0 ft Note: Only non-zero reactions are listed. My -End Moments k-ft Mx -End Moments @ Base @ Top @ Base @Top Wood Column UC#· KW-06018968, Build:20.22.10.25 DESCRIPTION: POST 1 Maximum Reactions Load Combination +D+0.750L +0.600 L Only X-X Axis Reaction @ Base @ Top Maximum Deflections for Load Combinations Load Combination Max. X-X Deflection DOnly 0.0000in +D+L 0.0000in +D+0.750L 0.0000in +0.600 0.0000in L Only 0.0000in Sketches 4 6 3.50 in Project Title: DAVIS ADU Engineer: PS B1 4 Project ID: Project Descr: 2-STORY ADU PRO-CAL Design k Y-Y Axis Reaction @Base @Top Axial Reaction @Base 5.263 1.583 3.500 Project File: Davis Street Calcs.ec6 (c) ENERCALC INC 1983-2022 Note. Only non-zero reactions are listed. My -End Moments k-ft Mx -End Moments @ Base @Top @ Base @Top Distance Max. Y-Y Deflection Distance 0.000ft 0.000 in 0.000ft 0.000ft 0.000 in 0.000 ft 0.000ft 0.000 in 0.000ft 0.000ft 0.000 in 0.000 ft 0.000ft 0.000 in 0.000ft .... . '" +X PRO-CAL DESIGN & ENGINEER 1 NG .:,A'-. __ ,fl.C.Ci (A JJl' l LATERAL DESIGN DAVIS AVE ADU 2501 DAVIS AVENUE CARLSBAD, CA 92008 I· SEISMIC DESIGN LOADS: Per ASCE 7-16, Chapters 11 & 12 Address: 2501 Davis Street, Carlsbad, CA Site Spectrum: Given a Site-Specific Response Spectrum? No Code Reference § 11.4.8 Input values below from map or CD: Spectral Response Acceleration, Short Period Spectral Response Acceleration, 1-Sec. Period Input value below from soils report: Site Class Value of Coefficients based on SPA periods: Site Coefficient for Short Period Site Coefficient for 1-Sec. Period Class= Site Class per Geotech Report = 1.055 0.383 D No Designing per Exception 2 of§ 11.4.8 § 11.4.2 § 11.4.2 § 20.1 & Table 20.3-1 § 11.4.4 F O = 1.2 Table 11.4-1 F, = 1.917 Table 11.4-2 Determine Maximum Considered Earthquake (MCE) parameters: MCE Spectral Response Acceleration, Short T MCE Spectral Response Acceleration, 1-Sec. T Determine Design Base Earthquake (DBE) parameters: DBE Spectral Response Acceleration, Short T DBE Spectral Response Acceleration, 1-Sec. T Building Response: Input Building properties: Risk Category Long Period Transistion Period Effective Height Seismic Design Category Risk Importance Factor Seismic Force Resisting System Seismic Force Resisting System Response Modification Factor System Overstrength Factor Deflection Amplification Factor Period Parameters Period Parameters Redundancy Determine Period for Base Shear: X y Coefficient for Upper Limit on Calculated Period Approximate Fundamental Period Analysis Calculated Fundamental Period Design Fundamental Period Limit Period T0 Period T, Design Period (Force) Design Period (Drift) Coefficient for Distribution of Forces Determine Base Shear: Se,sm,c Response Coefficient (11.4.8 e2) TosT <l.5Ts Seismic Response Coefficient (11.4.8 e2) TSTL Seismic Response Coefficient (11.4.8 e2) T>TL Min. Allowable Seismic Response Coefficient Min. Allow. Seismic Response Coefficient (S1 > 0.6) Seismic Base Shear (Equiv. Lat. Force Proc.) <i.Pic:;mir Rrtc:;P <i.hPrtr inrl11rlin'1 r S Ms= SM,= All Criteria Met Per 12.8.1.3? Sos= So,= Categ.= T<= hn= Cat.= 1.266 g 0.734 g No 0.844 g 0.489 g II 8.00 sec 30.0 ft D Table 1.5-1 § 11.4.4 § 11.4.4 § 12.8.1.3 § 11.4.5 § 11.4.5 Figures 22-14 to 22-17 § 12.8.2.1 § 11.6 & Tables 11.6-1 & 11.6-2 I, = 1.00 § 11.5.1 & Table 1.5-2 A15 -Light-frame (wood) walls sheathed w/ wood rated panels or steel sheets A15 -Light-frame (wood) walls sheathed w/ wood rated panels or steel sheets X y R= 6.5 6.5 Table 12.2-1 n o= 3.0 3.0 Table 12.2-1 Cd= 4.0 4.0 Table 12.2-1 C,= 0.02 0.020 Table 12.8-2 x= 0.75 0.75 Table 12.8-2 p = 1.0 1.0 § 12.3.4 Cu= 1.40 1.40 Table 12.8-1 T.= 0.256 sec 0.256 sec § 12.8.2.1 Tb= TuM = 0.359 sec 0.359 sec § 12.8.2 To= 0.116 sec 0.116 sec § 11.4.6 T,= 0.580 sec 0.580 sec § 11.4.6 T= 0.256 sec 0.256 sec § 12.8.2 T= 0.256 sec 0.256 sec § 12.8.6.2 k= 1.00 1.00 § 12.8.3 C,= 0.130 0.130 Equation 12.8-2 (T <l.5Ts) C,= N/A N/A Equation 12.8-3 x 1.5 C,= N/A N/A Equation 12 8-4 x 1.5 C s,mln_olfowablr = 0.037 0.037 Equation 12.8-5 C s,min_allowable = N/A N/A Equation 12.8-6 C = ' 0.130 0.130 Governing Value V= 0.13 • W 0.13 * W Equation 12.8-1 nV= nn•w n ,~ • w VERTICAL MASS DISTRIBUTION ROOF Floor Weights Wall Weights Tr Area Label Description Area (ft2) lsmic Mass ( smic Mass (I Wall Label Description R4 Roof -Wood Construction (CFS Similar) 1100 25 28 ws Exterior Walls -Wood Construction (CFS Similar) 0 0 Wl Interior Non-Bearing Walls - Wood Construction (CFS Sim Totals 1100 28 2 Floor Weights Wall Weights Tr ~rea Labe Description Area (ft2) ::.mic Mass (1 smic Mass ( Wall Label Description F5 Typical Floor -Wood Construction (CFS 1100 21 23 Similar) W4 Interior Bearing/Shear Walls Wood Construction (CFS Sim F6 Balconies & Exterior Walkways -Wood 275 23 6 Construction (CFS Similar) Wl Interior Non-Bearing Walls - Wood Construction (CFS Simi 0 0 Exterior Walls -Wood W5 Construction (CFS Similar) Totals 1375 29 "'°"'' l,OU t1on )O!)NO SEISMIC FORCE DISTRIBUTION Per ASCE 7-16, Chapter 12 TOTAL W ; r; Cs; 2015-IBC CODE-LEVEL BASE SHEAR, V • p; UNFACTORED BASE SHEAR, 0.7 V •I'; k; no; .. -· ., .. _,. -·---·~"·--~·-·· .. ,-··· -. LEVEL Floor Area w, I:W,(k) Ht (ft2) (kl (ft) ROOF 1,100 53 53 22 2 1,375 68 121 10 Totals: 121 Vertical Force Distribution -Y (LRFDl LEVEL Floor Area w, I:W.(kl Ht (ft2l (kl (ft) ROOF 1,100 53 53 22 2 1,375 68 121 10 Totals: 121 121 kips X y 1 0.13 0.13 16 16 11 11 1.00 1.00 3.0 3.0 W,xHt' V (k•ftl (k) 1163 10 681 6 1844 16 W,xHt' V {k·ft) (k) 1163 10 681 6 1844 16 Kips Kips :i::v (kl 10 16 r. V (k) 10 16 DESIGN METHOD: I LRFD Shear increase due to ASCE 12.3.3.4? Yes (use for LRFD design) (use for ASD design) Shear Minimum (psf) 10.2•s,,.•11 Eq.12.10-2 9.02 8.11 4.22 8.36 13.24 Shear Minimum (psf) (0.2'S,,.'1) 9.02 8.11 4.22 8.36 13.24 Diaphragm Shear Per §12.10.l (psf) Maximum Actual Actual Diaphragm (0,4'S,,,fl Eq.12.10-1 fq. 12.8-11 Design Eq.12.10-3 w/p 16.23 9.02 9.02 9.02 16.72 6.44 4.22 8.36 Diaphrae:m Shear Per §12.10.l (psf) Maximum Actual Actual Diaphragm 10,4•s.,•11 Eq. 12.10•1 £q llB,11 Design w/p 16.23 9.02 9.02 9.02 16.72 6.44 4.22 8.36 C3 a, l T l Sheet Oate ,h,... 11/2022 Diaphragm System Wood Rl= 3 N; 2 Zs= 1 1 r m1= 1.25 1.25 r ml= 0.23 0.23 c,.; 0.34 0.34 (pi; 0.44 0.44 Csz = 0.46 0.46 c..,= 0.50 0.50 Alternate Diaphragm Shear Per §12.10.3 (psO Diaphragm Minimum hx/hn Cpx Fpx Diaphragm Mass Connection 10.2•s.,•11 ~is;ur& U.10-2 Eq.12.1(),4 Design lrregularit Design Eq. 12.10·5 Check 11.27 8.11 1.0 0.499 7.99 8.11 10.45 8.36 0.5 0.227 3.74 8.36 Alternate DiaphraRm Shear Per §12.10.3 (psf) Diaphragm Minimum hx/hn Cpx Fpx Diaphragm Mass Connection (0.2•s,,,•1) Flgur• 12 10-2 Eq.12.10-4 Design lrreg1.1larlt Design Eq. 12.l.0-5 Check 11.27 8.11 1.0 0.499 7.99 8.11 10.45 8.36 0.5 0.227 3.74 8.36 UVALUE! @) LATERAL DESIGN KEY PLAN = SHEAR WALL ON LEVEL 1 = SHEAR WALL ON LEVEL 2 = LATERAL FORCE RESISTING LINE CORRELATING WITH CALCULATION UP ili.....fil.§. II (LOW) JI! ,. 11 g ii "Ii ~II 2 11 8'-0" RIM RIM D ) 1S FLGOR SHEAR wAlLs ALIGN ~ ffi ~ 31'·0' ~ N N N --, '°I ◄ I/ / / 6!"1~ / ~JI§:/ / / /~ CD 7 7 7 7 7 7 1 ~/ 7 7 7 _,, 32'-0" ~ \_ ffi 1 ST AND SECOND FLOOR SHEAR WALLS ALIGN 12'-0·1 C4 LATERAL DESIGN Y-DIRECTION -ROOF w= 9PSF*26FT = 234 PLF 111111111 l I I I I I I I I I I I I I IJJ I I I I 111111111111111 HDR HDR :11 · 1 • 1 \ J·1·u, ~-L:_J i J -~ ",-··-i \: i Y.L c:1--' I / • lnnl . _:,tt g; ~ 1,- I,::!. (/) (/) >-0 lL.. o;:; C :::J IJ-··-·--·-·-' HDR ~lu _.,_<fJ __ .,.. __ RIDGE ~@ 8" _J ___________ / -- HDR ~I I ! X1 ~ ------- C( .... • __ _. __ .. HDR ti4~. X II 'I ( I I I!'! ! I ,w ...J ~ ~[I .. ,,• wu ·~~ v, C :::J C:::J (/) (/) .!f,;k;; -~ -~ U \. .... 0 lL.. O" ON c:5@ I~" I __ ,;, /~? Ii 1 r iK ,J .~~l f' JDR C :::J I HDR JC J HOR • r L >1 ,1 ~ 1 ( x 1 Rv, = Rv-i = (W*L)/2 = 4.7k SEE NEXT PAGES FOR SHEAR WALL DESIGN ALONG GRIDS Y1 AND Y4 0) C5 SHEAR WALL DESIGN: GRID Y1 @ ROOF WALLS WILL BE DESIGNED AS SEGMENTED DUE TO LARGE DOOR OPENING C6 v= 4.7K/ (4'+7') = .43KLF CAPACITY OF 15/32" OSB SHT'G = .496 KLF > .43 KLF DEMAND TYP~HEAR WALLS ARE ADEQUATE V=4 ?k v= .43 KLF . ► -lrrr,,.----lrrrr,.-lrrr,,.-lrrr,,. v= .43 KLF -lrrr,,. ----lrrr.. ----lrrr.. -lrrr,,. -lrrr,,. -lrrr,,. ----lrrr.. H=10' L=4FT OVERTURNING CHECKS L=7FT V=1.7k ► .------, RA= R6 = (1.7k*1 O' -W*2') I 4 H=10' USE 4x4 POST AND HDU4 HOLDOWN V=3k ►~~ RA= Rs = (3k*1 O' -W*3.5') / 7 H=10' tw USE 4x4 POST AND HDU4 HOLDOWN 1' L=7' 1' RA Rs SHEAR WALL DESIGN: GRID Y4@ ROOF WALLS WILL BE DESIGNED AS PERFORATED v= 4. 7K/ (24') = 195 PLF Co= 0.77 (FROM TABLE 4.3.3.5 SDPWS) CAPACITY OF 15/32" OSB SHT'G WITH TYPE ~ NAILING= .544 KLF*0.77 = 418PLF > 195 PLF DEMAND. OK H=10' 6'X4' 6'X4' WINDOW WINDOW L=3' L=6' L=3' L=24' OVERTURNING CHECKS V=4.7k ►.----------------, H=10' t W= 24'x1 0'x20PSF = 4.8K L=24' t RA= Rs = (4.7k*1 0' -W*24/12') / 24 7.68 RA = Rs = -.4k IE NO NET UPLIFT USE (2) 2x4 POST AT EACH END OF SHEAR WALL C7 w= 9PSF*40FT = 360 PLF LATERAL DESIGN Y-DIRECTION -ROOF 7.50' HOR HOR HOR HOR ~ 11 I [~ I 1L~1v111u / \!1 ?c~ I ,,.. ,. -'~,":':°C "", I ] L~ I _ ·11 0:: 3: oo :r: d- cr:r C:J0. ~r--, J ) j ' I ~ i gi L ~ ~Jg 0"° 00 c~B I u. 1· ON _ .,_ctr _____ RIDGE er:@ ~ ------· g: w ...J <D <3 cr:l'i--....__ 0 o f :r: ...J ffi[ · 1> 2 c.. :r: wU c..Cl'. 0 <( ...J en C~ r· .:.~. 1-=':K H C~ C~ IDR HOR R x1 = 2.34k R x2 = 4 .25k R x4 = 2.7k -~ > -~-----------~L __ HOR ~ \ u::c,.; .. •-~u ✓ f-0 u. • 0"" ON c:5 @ HOR J ",,,[ . ~:-: -~ C i ~~ ® SEE NEXT PAGES FOR SHEAR WALL DESIGN ALONG GRIDS X1, X2 AND X4 HOR Y4 C8 ~X4 ~A? SHEAR WALL DESIGN: GRID X1 @ ROOF WALLS WILL BE DESIGNED AS PERFORATED v= 2.34K/ (34') = 70 PLF Co= 0.71 (FROM TABLE 4.3.3.5 SDPWS) CAPACITY OF 15/32" OSB SHT'G WITH TYPE ~ NAILING= .544 KLF*0.71 = 386PLF > 70 PLF DEMAND. OK v= 70 PLF V=2.3k ► -..lio.-..llo.-..llo.-..llo.-..llo.-..llo.-..llo.-..llo.-..llo.-..lio.-..llo.-..llo.-..llo.-..llo.-..llo.-..lio.-..llo.-..llo.-..llo.-..llo.-..lio.-..llo.-..llo.-..lio.-..llo. H=10' 4'X5' 2'X5' 2'X5' WINDOW MNDOV 1tvlNDOV L=2'-10" L=2'-4" L=5'-2" L=15'-9" L=34' OVERTURNING CHECKS V=2.3k ►,----------------, H=10' □ D tP W= 34'x1 0'x20PSF = 6.8K t L=34' 1' RA= Rs = (2.34k*1 0' -W*34'/2) / 34 RA= Rs= -2.3k ....... IE NO NET UPLIFT USE (2) 2x4 POST AT EACH END OF WALL C9 SHEAR WALL DESIGN: GRID X1 @ ROOF WALLS WILL BE DESIGNED AS PERFORATED v= 4.25K/ (18') = 236 PLF C10 CAPACITY OF 15/32" OSB SHT'G WITH TYPE ~ NAILING= .544 KLF > 236 PLF DEMAND. OK v= 236 PLF H=10' L=8' OVERTURNING CHECKS Rw V=1.9k 11 I I I I I I I I 11 ► H=10' tw t L=8' t RA Rs Rw '=2.36k 11 I I I I I I I I 11 ► H=10' tw t L=10' t RA Rs v= 236 PLF H=10' L=10' W= 8'x10'x9PSF = .72K Rw= 12'x15PSFx8' = 1.44K RA= Rs = (1.9k*1 O' -W*8'/2 -Rw*8'/2) / 8 RA= RB= 1.3k USE (2) 2x4 AND HOU 2 AT EACH END OF WALL W= 10'x10'x9PSF = .9K Rw= 12'x15PSFx10' = 1.8K RA= R8 = (2.36k*1 O' -W*10'/2 -Rw*10'/2) / 10 RA= RB= 1k USE (2) 2x4 AND HOU 2 AT EACH END OF WALL SHEAR WALL DESIGN: GRID X1 @ ROOF WALLS WILL BE DESIGNED AS PERFORATED v= 2.7K/ (37') = 73 PLF Co= 0.91 (FROM TABLE 4.3.3.5 SDPWS) CAPACITY OF 15/32" OSB SHT'G WITH TYPE .&. NAILING= .544 KLF*0.91 = 495PLF > 73 PLF DEMAND. OK v= 73 PLF V = 2 . 7 k ► --i. --i. --i. --i. --i. --i. --i. --i. --i. --i. --i. --i. --i. --i. __lo,. --i. --i. --i. --i. --i. --i. --i. --i. --i. --i. H=10' 2.5'X5' .5'X5' 1.5'X5 1.5'X5 INDO INDO INDO INDO L=7' L=7'-9" L=5'-10" L=4'-6" L=5' L=37' OVERTURNING CHECKS V=2.7k ► .-------------------, H=10' □ DtP D W= 37'x10'x20PSF = 7.4K t L=37' t RA= Rs = (2.7k*10' -W*37'/2) / 37 RA= Rs= -3k ....... IE NO NET UPLIFT USE (2) 2x4 POST AT EACH END OF WALL C11 UP Iii~ II (LOW) Ill II II II JI JI C12 LATERAL DESIGN Y-DIRECTION -2ND FLOOR 4.7K* OMEGA (3.0) = 14.1K • 8'-0" w= 4.2PSF*24FT = 100 PLF I I ~I D LEVEL 2 DIAPHRAGM ANALYZED AS A DEEP BEAM TO DETERMINE REACTIONS AT THE OFFSET LEVEL 1 WALLS BELOW. SEE ENERCALC OUTPUT ON NEXT PAGE SHOWING REACTIONS 4.7K* OMEGA (3.0) = 14.1K 12·-0·1 Project Title: DAVIS ADU Engineer: PS C13 Project ID: Project Descr: 2-STORY ADU Wood Beam Project File: Davis Street Calcs.ec6 UC#• KW-06018968, Build:20.22.10.25 DESCRIPTION: diaphragm transfer CODE REFERENCES PRO-CAL Design Calculations per NDS 2018, IBC 2018, CBC 2019, ASCE 7-16 Load Combination Set: IBC 2018 Material Properties {c) ENERCALC INC 1983-2022 Analysis Method : Load Resistance Factor D Load Combination IBC 2018 Fb + Fb - 900.0psi 900.0psi E : Modulus of Elasticity Wood Species Wood Grade Beam Bracing 1 • Douglas Fir-Larch No.2 Beam is Fully Braced against lateral-torsional buckling E(0 1) E(15) • • l • 24x24 ( ) A Span= 15.0 ft Fe -Prll Fe -Perp Fv Ft E(0 1) 24x24 Span = 33.0 ft 1,350.0 psi 625.0 psi 180.0 psi 575.0 psi Ebend-xx 1,600.0ksi Eminbend -xx 580.0ksi Density 31.210pcf E(15) E(0 1) ! ,. 24x24 Span= 5.0 ft t --------- Applied Loads Service loads entered. Load Factors will be applied for calculations. Beam self weight NOT internally calculated and added Load for Span Number 1 Uniform Load : E = 0.10 , Tributary Width = 1.0 ft Point Load : E = 15.0 k @ 12.0 ft, (seismic transfer load) Load for Span Number 2 Uniform Load : E = 0.10 , Tributary Width = 1.0 ft Load for Span Number 3 Uniform Load : E = 0.10 , Tributary Width = 1.0 ft Point Load : E = 15.0 k @ 5.0 ft DESIGN SUMMARY Maximum Bending Stress Ratio Section used for this span fb: Actual F'b Load Combination Location of maximum on span Span # where maximum occurs Maximum Deflection Max Downward Transient Deflection Max Upward Transient Deflection Max Downward Total Deflection Max Upward Total Deflection Overall Maximum Deflections = = = 0.234: 1 24x24 423.03psi 1,804.12psi E Only 33.000ft Span# 2 0.239 in Ratio = -0.323 in Ratio = 0.167 in Ratio= -0.226 in Ratio = Maximum Shear Stress Ratio Section used for this span fv: Actual F'v Load Combination Location of maximum on span Span # where maximum occurs 502>=360 1225>=360 716>=180 1750 >=180 Span: 3 : E Only Span: 2 : E Only Span: 3 : E Only• 0.70 Span: 2 : E Only• 0.70 Load Combination Span Max. "-" Defl Location in Span Load Combination E Only E Only Vertical Reactions Load Combination 1 2 3 Max Upward from all Load Conditions 0.6336 0.0000 0.2389 0.000 0.000 5.000 E Only Support notation : Far left is #1 Support 1 Support 2 Support 3 Support 4 17.544 17,756 Design OK = 0.114: 1 24x24 = 44.30 psi 388.80 psi E Only = 13.109ft = Span# 1 Max. "+" Defl Location in Span 0.0000 -0.3232 0.0000 Values in KIPS 0.000 17.193 17.193 Wood Beam LIC#: KW-06018968, Build:20.22.10.25 DESCRIPTION: diaphragm transfer Vertical Reactions Load Combination E Only* 0.70 E Only * 0.5250 E Only -11 .lj ases 1134 Gl8 Project Title: DAVIS ADU Engineer: PS Project ID: C14 Project Descr: 2-STORY ADU PRO-CAL Design Support notation : Far left is #1 Support 1 Support 2 Support 3 Support 4 17.544 1 .75 12.281 12.429 9.211 9.322 17.544 17.7561 il5 1121 lll 11.ll Project File: Davis Street Calcs.ec6 (c) ENERCALC INC 1983-2022 Values in KIPS AMPLIFIED SHEAR FORCES GOING TO OFFSET SHEAR WALLS ON GRIDS Y2 AND Y3 Wood Beam UC#: KW-06018968, Build:20.22.10.25 DESCRIPTION: diaphragm transfer SHE ARTR ~NSFE RZON IND IAPHR I\GM A OFF~ WAl LS.BL :)CKE[ 1 AND TIGI ffER f'. AIL SP ACING PRC VIDEO ~s ET Project Title: DAVIS ADU Engineer: PS Project ID: Project Descr: 2-STORY ADU C15 Project File: Davis Street Calcs.ec6 PRO-CAL Design (c) ENERCALC INC 1983-2022 I - I I -~ 1 ., I I I I I I I g t,Ulc~-)> ~ ~ ! i ~1 I V MAX 0 1~.SK ~ I I i -lbl IOJ4 14l4 DlrHRAGM SHEAR DE;MAND 1= 16.SK/24' = 690 Pllr (LRF[D 0.8 CA ACIT'1 OF TYPE '4' DIAPH~AGM ~AILINd = 1280 PLF * = 1 ()24 PLf > 690 PLF DEMAN ..... ~ 1121 Cistoo:e(k) 1E,,1, i4il W.fl:e~) 11J,f,•Pl I EC•~•! mt 1!0.\ l!l 41.i.1 4118 SHEAR WALL DESIGN: GRID Y2@ 1ST FLOOR WALLS WILL BE DESIGNED AS PERFORATED v= 16.8K/ (21.5') = 780 PLF (LRFD) Co= 0.85 (FROM TABLE 4.3.3.5 SDPWS) CAPACITY OF 15/32" OSB SHT'G WITH TYPE ~ NAILING = 1330 PLF*0.8*0.85 = 904PLF > 780 PLF DEMAND. OK _ v= 780 PLF V -1 6 . 8 k ___,,. ___,,. ___,,. ___,,. ___,,. ___,,. ___,,. ___,,. ___,,. ___,,. ___,,. ___,,. ___,,. ___,,. ___,,. ___,,. ___,,. ___,,. ___,,. ___,,. ► H=10' 3'X4' WINDOW 3'X4' WINDOW L=4' L=2'-10" ,r-L:------------------.l1, l L=21 '-6" 1 L=8'-10" OVERTURNING CHECKS 2Fw v= 1 s.8k 11 I I I I I I I I I I I I I I I I I I I I I I I I I I ►,-----------------, H=10' t □ D tP L=21.5' t W= 21.5'x10'x20PSF = 4.3K 2Fw= 115 PLFx21 .5' = 2.5K RA= R8 = (16.8k*1 O' -W*21 .5'/2 -2Fw*21 .5/2) / 21 .5 73 USE 4x4 POST AND HOU 4 AT EACH END OF WALL C1 6 SHEAR WALL DESIGN: GRID Y3@ 1ST FLOOR WALLS WILL BE DESIGNED AS SEGMENTED AND SIMPSON STRONG WALLS USED AT THE GARAGE FRONT V=16.8k ► H=10' SW L=1'-6" HDR HOR SW SW L=2'-0" L=1 '-6" BACK TO BACK STRONG WALLS WILL BE USED IN A 2x8 WALL DUE TO MINIMIMAL WALL LENGTH AND HIGH SHEAR LOADS. SEE DESIGN OUTPUT FROM SIMPSON STRONG WALL DESIGNER ON NEXT PAGES. SHEAR LOADS ARE HALVED AND DESIGN IS FOR ONE HALF OF THE DOUBLE WALL ASSEMBLY C17 SIMPSON STRONG-TIE COMPANY INC. (800) 999-5099 5956 W. Las Positas Blvd., Pleasanton, CA 94588. www.strongtie.com Job Name: Job #1 Wall Name: Wall Line 1 Application: Garage Front Design Criteria: • 2021 International Bldg Code • Seismic R=6.5 • 2500 psi concrete • ASD Design Shear = 6000 lbs • Shearwall Height = 8' with header on top of Strong-Wall Selected Strong-Wall® Panel Solution: Model Type w H T (in) (in) (in) WSWH 18x8 SWP Wood 18 93.25 3.5 WSWH 18x8 SWP Wood 18 93.25 3.5 WSWH24x8 SWP Wood 24 93.25 3.5 Actual Shear & Drift Distribution: RR Actual Allowable Model Relative Shear Shear Rigidity (lbs) (lbs) l WSWH18x8 SWP 0.23 1382 $ 3170 OK WSWH 18x8 SWP 0.23 1382 $ 3170 OK WSWH24x8 SWP 0.54 3236 $ 6240 OK Notes: C18 SIMPSON Strong-Tie End Total Axial Actual Sill Anchor Load Uplift Anchor Bolts (lbs) (lbs) N/A 2 -1" 1000 8780Ib N/A 2 -1" 1000 8780Ib N/A 2 -1" 1000 16741 lb Actual / Actual Drift Allow Drift Limit Shear (in) (in) 0.44 0.19 0.47 0.44 0.19 0.47 0.52 0.19 0.47 1. Strong-Wall High-Strength Wood Shearwalls have been evaluated to the 2021 IBC/IRC. See www.strongtie.com for additional design and installation information. 2. Anchor templates are recommended for proper anchor bolt placement, and are required in some jurisdictions. 3. Check that wall height "H" plus curb height (above slab) will attain overall rough header opening height (top of driveway slab to bottom of header). 4. WSWH Portal Connection Kit WSWH-PK is included with panels less than 100 inches in height and must be ordered separately for panels over 100 inches tall. 5. The applied vertical load shall be a concentric point load or a uniformly distributed load not exceeding the allowable vertical load. Alternatively, the load may be applied anywhere along the width of the panel if imposed by a continuous bearing vertical load transfer element such as a rimboard or beam. For eccentric axial loads applied directly to the panel, the allowable vertical load shall be divided by two. 6. Panels may be trimmed to a minimum height of 74½". 7. 2-ply headers may be used with Strong-Wall High-Strength Wood Shearwall panels. Minimum 11 ¼ inch deep nominal header is required with header design by others. Disclaimer: Page 1 of 5 SIMPSON STRONG-TIE COMPANY INC. (800) 999-5099 5956 W. Las Positas Blvd., Pleasanton, CA 94588. www.strongtie.com C19 SIMPSON Strong-Tie It is the Designer's responsibility to verify product suitability under applicable building codes. In order to verify code listed applications please refer to the appropriate product code reports at www.strongtie.com or contact Simpson Strong-Tie Company Inc. at 1-800-999-5099. Page 2 of 5 SIMPSON STRONG-TIE COMPANY INC. (800) 999-5099 5956 W. Las Positas Blvd., Pleasanton, CA 94588. www.strongtie.com Job Name: Job #1 Wall Name: Wall Line 1 Application: Garage Front Design Criteria: • Slab on grade -Garage curb • 2021 International Bldg Code • Seismic R=6.5 • 2500 psi concrete Anchor Solution Details: Curb Installation WSWH·AB 6' Minimum curb/stemwall 6½' ' H + Shear reinforcement per detail when required d " ~ '. :: • ' . •• .. : . t;;,;l . . . . ;\; 6'min. ½W-½W -----w---.... Curb Section View ... Perspective View (Slab not shown for clanty) ,.------i I I I I I I I I I I I I I L-------~ ½W I • I I I I C20 SIMPSON Strong!J'ie ,______,· LJ iw ½W l w -------. -------.J ---~~ 8 ~ ½W ._, Footing Plan Anchor Solution Assuming Cracked Concrete Design: Anchor Solution Assuming Uncracked Concrete Design: Model w de B Anchor Bolt Strength Model w de B Anchor Bolt Strength WSWH18x8 33 11 14 WSWH-AB Standard WSWH18x8 28 10 14 WSWH-AB Standard SWP SWP WSWH24x8 35 12 20 WSWH-AB Standard WSWH24x8 30 10 20 WSWH-AB Standard SWP SWP Page 3 of 5 SIMPSON STRONG-TIE COMPANY INC. (800) 999-5099 5956 W. Las Positas Blvd., Pleasanton, CA 94588. www.strongtie.com Notes: C21 SIMPSON Strong-Tie 1. Anchorage designs conform to ACI 318-19, ACI 318-14 and 318-11 Appendix D with no supplementary reinforcement for cracked and uncracked concrete as noted. 2. Anchorage strength indicates required grade of anchor bolt. Standard (ASTM F1554 grade 36) or High Strength (HS)(ASTM A 193 Grade B7). 3. Seismic indicates Seismic Design Category C though F. Detached 1 & 2 family dwellings in SOC C may use wind anchorage solutions. Seismic anchorage designs conform to ACI 318-11 section 0.3.3.4.3 and ACI 318-14 section 17.2.3.4.3 and ACI 318-19 section 17.10.5.3. 4. Foundation dimensions are for anchorage only. Foundation design (size and reinforcement) by others. The registered design professional may specify alternate embedment, footing size or anchor bolt. Page 4 of 5 SIMPSON STRONG-TIE COMPANY INC. (800) 999-5099 5956 W. Las Positas Blvd., Pleasanton. CA 94588. www.strongtie.com -------4,mln ______ .., 4----- 3' WSWH-AB 13 na1rp1n 9f1!<1•60re!>3r (mm.) fieid ltt'l arta Sf'l'.:llf8 dl.llfiO concrete pta,cement O\ertap 'larit~ With bolt C:ti,aCIOQ. WSWli-AS ;311, field 1.e and secure during ro11c,ete pt&ct1ner.t Hairpin Shear Reinforcement WSWH-AB 13 lla111wl {#3 ™ s1m1larJ, see ttble for r,qu•red qu11111ty !!'>' CLR 11;1 spacing • Hairpin installation /Gar~ a11b st10wri. oll,ar footng lff.JIJ~ ssmiat) Shear Anchorage Solutions ;tade60 retJ4r 1min) Tie Shear Reinforcement Stltmie• Wind' ,...,,.., .. "'"'"''""'"' l, orl• WOOCISM.lfwa,I /n,) .,,.., -~ RtfnlOf~ WS'M<1? 10v. (1)#.llle WSWH18 15 12) #3 hairp,ns'' WSWH1• 1\l {21 #:!hairp,,s' .........,...., Stemw.lHwtdth -(In.) ...,,._ 6 SeeNo'l! 7 6 ii) •3hairoill 6 (i} 43 n,11rru\'l~ Mhllmum Curb/ St ....... Wl'1ll (lo.I 6 6 UnctM:ktd Cracked 1,080 770 Hairpin re!OforceTler.t adl~cs ma,yrmum aJ'<lwalllcS11ear IOOd of 111c Strong-WM' WSffrl I Shecv anct'<)rago ~confcrm toACi 318-14 ~ 17 ,y,d ACi ,)18-11 Cl"IO C\1SU'M m,,,,r,l;m 2,54Xl psi ~o 2 Shoaf ~ ~ not llXl\.ltOO tor intOf!OI' fWxk'lt,on ~ !P<.1f'l(li nstaC(ld ;s..v~, from oogo cf conerot«, O< broCOC wt.A Pofld ~1W$. 3 Sf.Qnie lf'ldtCatoo 58(:;fTtie <~ ca~ C t!YOl.q"I F. D:~ta.'Ml.1 ,.,,ne dfK: two-rar•Wy <MiJlf)!.}~ 1t1 SOC C may~ WfX! 8fU't~ .nJflt'll'S. Sei:.wrtc.: ahetJr ~-torcef't)Ql";I00:SlgMOONO€rnloACl318 14,50Cro(l lf2.3.63-'l1'X1ACl:.'!HI ,. SOCtl<.W'ID,:JJ,!) 4 WttJ ,"""'1e<I """""'° d<:o.g, ce\nQ('Y A and ll 'Yl<l ce!ac!'.ed om acd lw<> IM'll', dwt:k,g.," 8IJC C. 5. AddtlOt\5 I/es llld'j be "eq•ed at 0-YlKJf:l' a..ro (lf 3ten~ 0$13',!1J()f'IS, Ot>t)w af'ld?<X ret!'l~Tie't ()Elf de<,;q-,er 6 Use (1) ~3 hlll-fJ«s !or Wb'WH18 when standt#d &ln,ogtl' ar<t<;, O' u.""1 7 Use (1) :13 f~IOI' ~12 wt'lflr. f}tf"'lel~gi lt16&r forO:li iall~ t~te<t ondic,r:,tt~~:il-., ~ \oad 8 No. 4 gr'OO(l 40 shror reinfortornont rT\f.l'/ be Sl.bstitvted for" WSVVrl :.ho,3f JOChOroOO oolut>CnS q Conctete~cis~lor t,ndl(Jrnmuslf!0rn1;1yWtthAO31S-1-l ~1()('117.7 :,&.:iAC1318-11 so-.:t1rn10a7 10. ·r~ c~ 1TtSy ~'Jly iiliooVlte ShAat" ancha~. C22 SIMPSON Sti--ong-Tie STRONG-WALL® WSWH SHEAR ANCHORAGE SCHEDULE AND DETAILS Page 5 of 5 PRO-CAL DESIGN & ENG INEER.NG FOUNDATION DESIGN DAVIS AVE ADU 2501 DAVIS AVENUE CARLSBAD, CA 92008 L 3·-0· L 'f 1 !CF 1.01 24'-6" 2 1 --i ----:r ~□ S-50 I u . TI --------~--------~~ : I I 6 I I ..:, I _J r ---\-~, I \ I I I I ~>RPACf t I I I I I . II I s so I '.I' 4 L ., ' IN ' f&Mt§&ii % i I I WI \ ti t 5' 00 I t I ~ 1cF1.sl --:::----------------~~ ;;; -9 w A 7 ---------------~ i~ 31·-o.. I : -~ I I(·~~ I~ I I LL I I u G,,,... ~I fl _ _J : ~'"''.'!!.i lSJ: . I 1 :.n I . I ,i I 5' I I i, I N L _ --------------/:-'r ----------------~ SW' TI! CENTER STRIP FOOTING CHECK: ROOF LOADING= 12' TRIB * 15PSF = 180PLF • I . ~ ffi I I ~ ~ 32'-0" L __ _J N 4" SLAB ON GRADE OVER COMPACTED SUB GRADE w/ #4 @ 18" OC EA WAY. SEE~ ~ w 2ND FLOOR LOADING= 12' TRIB * 18PSF = 216 PLF WALL WEIGHT= 20'x 9PSF = 180 PLF D1 TOTAL= 576 PLF / 1 FT WALL WIDTH = 576 PSF BEARING PRESSURE < 1500 ALLOWABLE BEARING PRESSURE ..... CF1 .0 IS OK EXTERIOR STRIP FOOTING CHECK: ROOF LOADING = 8' TRIS * 15PSF = 120PLF 2ND FLOOR LOADING= 8' TRIS * 18PSF = 144 PLF WALL WEIGHT= 20'x 20PSF = 400 PLF TOTAL= 664 PLF / 1 FT WALL WIDTH = 664 PSF BEARING PRESSURE < 1500 ALLOWABLE BEARING PRESSURE ..... CF1 .0 IS OK - February 23, 2023 Jenna Gallanosa Dwell West Homes 2501 Davis Avenue Carlsbad, California 92008 SUBJECT: Dear Ms. Gallanosa: SCOPE File No. 1106E4-23 SITE INSPECTION Proposed Residential Building Site 2501 Davis A venue City of Carlsbad P.O. Box 1195 Lakeside, California 92040 (619) 443-0060 In accordance with your request, a Site Inspection has been performed at the subject site. The purpose of this investigation was to examine existing site conditions and provide engineering recommendations for the proposed second story accessory dwelling unit over a garage. If project details vary significantly from those described, Soil Testers should be notified prior to final submittal for possible revisions of the recommendations presented herein. This report is issued with the understanding that it is the responsibility of the owner or the owner's representative to ensure that the information and recommendations contained herein are brought to the attention of the architect and engineer for the project and incorporated into the plans, and the necessary steps are taken to see that the contractor and subcontractors carry out such recommendations in the field. FIELD INSPECTION To accomplish this purpose, a representative of this finn visited the site, reviewed the topography and site conditions, and visually and texturally classified the surface and near surface soils. Representative samples of the on-site soils were obtained from a test exploration approximately 4 feet in depth and tested for density, shear strength and expansive characteristics. 1 Dwell West Homes File No. 1106E4-23 February 23, 2023 SITE CONDITIONS The subject site is located on the southwest comer of Davis Avenue and Buena Vista Way. The site is a relatively level lot with a one-story, single family residence. A small structure along the west property line viewed on Google Earth has been removed. Neighboring properties are occupied by single and multi-family residential structures. Fill materials were encountered to a depth of approximately 2 feet during this inspection. SOIL CONDITIONS Soils encountered in the test explorations were fill soils consisting of loose to firm, light brown, moist, fine to medium, silty sands to approximately l O inches in depth, underlain with firm, reddish-brown, moist, fine to medium, silty sands with light clay to approximately 24 inches in depth. These soils were underlain by native soils consisting of dense, reddish-brown, fine to medium, silty sands with light clay to the bottom of the trench approximately 4 feet in depth. Ground water was not encountered in the test pit. The soils we encountered were not considered to be detrimentally expansive with respect to change in volume with change in moisture content. CONCLUSIONS AND RECOMMENDATIONS 1. A representative sample of the foundation soil was remolded to 90% of maximum dry density. Based on the following test results, a safe allowable bearing value of at least 2000 pounds per square foot for 12 inch deep footings may be used in designing the foundations and slab for the proposed structures. This value may be increased by one third for wind and/or seismic loading. This value may be increased by 20 percent for each additional foot of depth and or width to a maximum of 3 times the designated value. Maximum Dry Density Optimum Moisture Angle of internal friction Cohesion Unit weight Expansion Index 128.6 pcf 9.5% 34° 151 psf 116.1 pcf 36 2. The soils we encountered were considered to be Low Index (EI), (with the valve ranging from 21 to 50) with respect to change in volume along with change in moisture content. For the remaining indexes: Low (E1=2 1- 50), medium (EI=51-90), high (EI=91-130), and very high (EI >130). 2 Dwell West Homes File No. 1106E4-23 February 23, 2023 3. Lateral resistance to horizontal movement may be provided by the soil passive pressure and friction of concrete to soil. An allowable passive pressure of 250 pounds per square foot per foot of depth may be used. A coefficient of friction of 0.35 is recommended. The soils passive pressure may be increased by 1/3 for wind and seismic loading. 4. The seismic parameters for the site coordinates 33.16867°N, 117.34597°W for assumed Site Class Dare as follows: • Ss = 1.055 g • S1 = 0.383 g Srns = 1.266 g Srn1 = null Sds = 0.844 g Sd1 = null 5. The existing fill soils we encountered should not be utilized to support the proposed single family residence. They should be removed and recompacted to at least 90 percent of maximum dry density in accordance with the Grading Specifications in this report to provide adequate support for the proposed new structures. Anticipated depth of recompaction is approximately 2 to 3 feet for the proposed structure. The recompaction should extend at least five feet outside the proposed building footprints. Organic materials and roots must be removed from the soils before replacement. A representative of this firm should be scheduled during the grading operation for testing and observation. 6. In lieu of grading, footings for the proposed structure may extend through any loose soils a minimum of 12 inches into dense native soils. Anticipated footing depth is 36 inches. Footing excavations should be inspected by a representative of this firm prior to placement of forms and reinforcing steel to ensure proper depth has been achieved and that all footings are founded a minimum of 12 inches into competent soils. Loose soils should be removed from excavations prior to our inspection. Th.is foundation depth is based upon the soil values only and does not take into consideration the structural requirements. The slab preparation in #9 must be adhered to for proposed slab construction. A representative of this firm must observe the slab preparation including a bottom check before placement of structural fill. 7. Conventional spread footings founded a minimum of 12 inches below lowest adjacent grade and 12 inches into competent native soils, having a width determined by the allowable soil bearing value as detailed above are recommended for foundation support. Footing widths should be at least 12 inches for continuous footings and 24 inches for square footings due to practical considerations as well as Building Code requirements. These recommendations are based entirely upon the soil types and do not take into consideration the requirements of the proposed structure. 3 Dwell West Homes File No. 1106E4-23 February 23, 2023 8. Reinforcing in footings should consist of at least one #4 steel bar placed continuously in the top and bottom of continuous footings regardless of structural requirements. Reinforcing for isolated footings is dictated by the structural requirements. These recommendations are based upon on the soil type encountered and do not take into consideration the proposed bearing load. In addition to the top and bottom reinforcements, a #4 steel bar should be placed horizontally for each additional foot of depth beyond 24 inches. 9. Concrete Slab-On-Grade, SOG, should be designed by the project's strnctural engineer based on anticipated loading conditions. We recommend that conventional reinforced concrete SOG for this project be founded on 4 inches of Class lI Virgin Aggregate Base (with approximately 2% +/-over optimum moisture content and 90% compaction, relative to the lab maximum dry density, ASTM D 1557), overlying a 12 inch thick zone of adequately placed and compacted structural fill. A representative of our firm should be contacted during this process to approve the excavation and test the compaction. We recommend that a moisture barrier be provided by a membrane, visqueen 10 mils in minimum thickness or equivalent, be placed at top of well compacted Class II Aggregate Base, between 4 inches of moist clean sand having a minimum sand equivalent of 30 when tested in accordance with the American Society of Testing and Materials test method 'ASTM D1555. Floor slabs, as a minimum, should be 5 inches thick with #4 reinforcing steel at 16" on-center each way. Reinforcement should be placed at mid-height of the slab. The final slab thickness and reinforcement should be determined by the structural design engineer. Control joints should be provided in accordance with the recommendations of the structural design engineer. SITE EROSION CONTROL During the construction, surface water should be controlled via berms, gravel bags and/or sandbags, silt fence, straw wattles, siltation basins, while maintaining positive surface grades or other methods to avoid damage to the finish work or adjoining properties. All site entrances and exits must have coarse gravel or steel shaker plates to minimize offsite sediment tracking. Best management Practices (BMP's) must be used to protect storm drains and minimize pollution. The contractor should take measures to prevent erosion of graded areas until such time as permanent drainage and erosion control measures have been installed. After completion of grading, all excavated surfaces should exhibit positive drainage and eliminate areas where water might pond. 4 Dwell West Homes File No. 1106£4-23 February 23, 2023 SITE AND SURF ACE DRAINAGE Drainage at the site should be directed away from foundations, collected and tight lined to appropriate discharge points. Consideration may be given to collecting roof drainage by eave gutters and directing it away from foundations via non-erosive devices. Water, either natural or from irrigation, should not be permitted to pond, saturate the surface soils or flow towards the foundation. Landscaping requiring a heavy irrigation schedule should not be planted adjacent to foundations or paved areas. The type of drainage issues found within the project and materials specified and used should be determined by the Engineer of Record. GROUNDWATER AND SURF ACE WATERS There was no indication of a near-surface groundwater table or perched groundwater within our exploratory trench. Although groundwater is not expected to be a significant constraint to the proposed development, our experience indicates that near-surface groundwater conditions can develop in areas where no such groundwater conditions previously existed, especially in areas where a substantial increase in surface water infiltration results from landscape irrigation or unusually heavy precipitation. It is anticipated that site development will include appropriate drainage provisions for control and discharge of surface water runoff. The type of drainage issues found within the project and materials specified and used should be determined by the Civil Engineer. The type of plants and soil specified along with proper irrigation used should be determined by the Landscape Architect. The following grading specifications should be utilized if grading is proposed. RECOMMENDED GRADING SPECIFICATIONS For Proposed Residential Building Site 2501 Davis Avenue City of Carlsbad GENERAL: Soil Testers and 'Engineer' are synonymous hereinafter and shall be employed to inspect and test earthwork in accordance with these specifications, the accepted plans, and the requirements of any jurisdictive governmental agencies. They are to be allowed adequate access so that the inspections and tests may be performed. The Engineer shall be apprised of schedules and any unforeseen soil conditions. Substandard conditions or workmanship, inadequate compaction, adverse weather, or deviation from the lines and grades shown on the plans, etc., shall be cause for the 5 Dwell West Homes File No. 11 06E4-23 February 23, 2023 engineer to either stop construction until the conditions are corrected or recommend rejection of the work. Refusal to comply with these specifications or the recommendations and/or interpretations of the engineer will be cause for the engineer and/or his representative to immediately terminate his services. A pre-construction meeting or conference with the developer, contractor, civil engineer, soil engineer, and the agency inspector in attendance should be held at the site prior to the beginning of the grading operations. Special soil handling requirements can be discussed at that time. Grading of the site should commence with the removal of all vegetation and existing improvements from the area to be graded. Deleterious material and debris such as broken asphalt and concrete, underground pipe materials, wires, trash, etc. if encountered, should be exported from the site and may not be mixed with the fill soils. Abandoned foundations and buried septic tanks or cisterns (if encountered) should be removed and the subsequent depressions and /or trenches should be filled with properly compacted materials as part of the remedial grading. All fill and backfill soils should be placed in horizontal loose layers approximately 8 inches thick, moisture conditioned to a water content of one to three percent above optimum moisture content, and compacted to at least 90 percent relative compaction, as determined by ASTM Test Method D 1557-00. The excavation bottom should then be scarified to a depth of approximately 6 to 8 inches, moisture-conditioned to 1 to 3 percent above optimum moisture content, and re- compacted to a minimum relative compaction of 90 percent in accordance with ASTM D 1556-00 or D6938-17ael. Excavated sandy or clayey soils should then be uniformly moisture conditioned at above optimum moisture content, placed in 8-inch-thick loose layers and compacted to a relative compaction of at least 90 percent. Import fill soil, if required, should consist of granular materials with low expansion potential (EI less than 50 or stated by the soil engineer) and should be compacted as indicated herein. Soil Testers should be notified of the import source and should perform laboratory testing of the soil prior to its arrival at the site to determine its suitability as fill material. Deviations from the recommendations of the Soil Report, from the plans, or from these Specifications must be approved in writing by the owner and the contractor and endorsed by the engineer. 6 Dwell West Homes SOIL TEST METHODS: Maximum Density & Opt Moisture Density of Soil In-Place Soil Expansion Shear Strength Gradation & Grain Size File No. 1106E4-23 February 23, 2023 --ASTM Dl557-70 --ASTM D1556, D2922 and D3017 --UBC ST AND ARD 29-2 --ASTM D3080-72 --ASTM Dl 140-71 --ASTM D2325-68 Capillary Moisture Tension Organic Content --% Weight loss after heating for 24 hours at 300° F and after deducting soil moisture. LIMITING SOIL CONDITIONS: Minimum Compaction Expansive Soils Insufficient fines Oversized Particles 90% for 'disturbed' soils. (Existing fill, newly placed fill, plowed ground, etc.) 84% for natural, undisturbed soils. 95% for pavement subgrade within 2' of finish grade and pavement base course. Expansion index exceeding 20 Less than 40% passing the #4 sieve. Rocks over 6" in diameter. PREPARATION OF AREAS TO RECEIVE FILL: Brush, trash, debris and detrimental soils shall be cleared from the areas to receive fill. Detrimental soils shall be removed to firm competent soil. Slopes exceeding 20% should be stepped uphill with benches 1 O' or greater in width. Scarify area to receive fill to 6" depth and compact. FILL MATERIAL shall not contain insufficient fines, oversized particles, or excessive organics. On-site disposition of oversized rock or expansive soils is to be at the written direction of the Engineer. Select fill shall be as specified by the engineer. All fills shall be compacted and tested. SUBDRAINS shall be installed if required by and as directed by and detailed by the engineer and shall be left operable and unobstructed. They shall consist of 3" plastic perforated pipe set in a minimum cover of 4" of filter rock in a ·vee' ditch to intercept and drain free ground from the mass fills. Perforated pipe shall be schedule 40, Poly-Vinyl-Chloride or Acrylonitrile Butadienne Styrene plastic. Rock filter material shall conform to the following gradation: Sieve size: %Passing: 3/4" 90-100 #4 25-50 #30 5-20 #200 0-7 Subdrains shall be set at a minimum gradient of 0.2% to drain by gravity and shall be tested by dye flushing before acceptance. Drains found inoperable shall be excavated and replaced. 7 Dwell West Homes File No. 1106E4-23 February 23, 2023 CAPPING EXPANSIVE SOILS: If capping expansive soils with non-expansive soil to mitigate the expansive potential is used, the cap should be compacted, non-expansive, select soil placed for a minimum thickness 3' over the expansive soil and for a minimum distance of 8' beyond the exterior perimeter of the structure. Special precautions should be taken to ensure that the non-expansive soil remains uncontaminated and the minimum thickness and dimensions around the structure are maintained. The expansive soils underlying the cap of non-expansive cap should be pre-saturated to a depth of 3' to obtain a degree saturation exceeding 90% before any construction supported by the compacted cap. The non-expansive soil comprising the cap should conform to the following: Minimum Compaction Maximum Expansion Index Minimum Angle of Internal Friction Cohesion Intercept 90% 30 33 Deg 100 psf UNFORESEEN CONDITIONS: Soil Testers assume no responsibility for conditions, which differ from those, described in the applicable current reports and documents for this property. Upon termination of the engineer's services for any reason, his fees up to the time of termination become due and payable. If it is necessary for the engineer to issue an unfavorable report concerning the work that he has been hired to test and inspect, the engineer shall not be held liable for any damages that might result from his 'unfavorable report'. If we can be of any further assistance, please do not hesitate to contact our office. This opportunity to be of service is sincerely appreciated. Plate I and Detail 1 are part of this report. Respectfully submitted, CCC/mlj 8 N I N w I N w m X '1J r 0 ~ 0 z ~ ::0 m z 0 I ~I <-<- r 0 0 ~ 0 z 0 "Tl 1~1 I~ ~ m 0 X iJ ..... r '"d 0 ..... E ~ 0 0) "Tl 6 ~ t,::j z I N -I w 1-4 ;:o m z () I "'I -· .., _T _____ _ ,--l&~'it~RYARDGAAAGEsiiiAOC ..i.. --, uf--l--.._, -,.. . / // / .,. / / ... ·-_-.....,,'------,i-------l I / __ //PROPO~ED-,.· , w I : -, I I 10''"6• I o: a: f/1 <' >-I ~: _, ;'.!I I ' I ~ 1 1 ·>/ ./ ADU AND 2//,) ~II l ~ , / GARAGE /► ► I 3 I -·. · ,,, / ~ ~I : ~ I ,/, .' ADDffiON / /... 01 I ,.· , ,, • / ,·!:'.: ~ I _.,,. ,, I I / / / ,· • / ' I • / .-,,/ ✓ / - ~:! EXISTING 1- STORY HOUSE 8 ,..,./·/, ..,-1 I "'' \i I t ' "'' ~: o l ci ' -, I I I I I ,ST6El F!NCE ~I I G..;._l'O;. I 21·.o· I rotNERTEO 1100 I I IJAOU IZ!'I I , ,' • ' j!! I ma.,e,te ~- I I / /.' :( I _, '.·' / If. f I • J I G t ~ : E ,' I I I I I / I ► ,, I < , L2[f!\QNJJA!(0~.l'.lt ___ --f EXISTING 1.AHOSCAPE (E)OtUWM..l GRAVEL l'l,!,0.00 w ... D EXISTING WA"TER ME'TcR TO BE UPGRADED DAVIS AVENUE :'I ~ ~ 8 ; J: ~ .;; t; 0 " 8 II l , ' I OJ C m z ► z < ~.:~ U) ~~ ~ m ~ ~ . z. co ~ ~ w 0 C!) • z ;:: 0 0 u. ---------------------------- -=-: SCARIFY, MOISTURIZE AND -= =-=--COMPACT 12" ZONE OF --~- =====-= STRUCTURAL FILL :-==== I . PER PLAN • I NON-GRADED LOT * LOWEST ADJACENT GRADE OF STRUCTURAL FILL OR COMPACTED BASE : z. co -::':? 0 ----_-_-_-_-_ w ----_-_-_-_-_ er -=-=-=-=-=-=-::J -_-_-_-_-_-_- ~ ============= :::E :-=-=-=-=-=-= ~ !~~~~~~~~~~~ 0 :-=-=-=-=-=-= C!) -=-=-=-=-=-=-z -_-_-_-_-_-_- ;:: :-=-=-=-=-=-= 0 -=-=-=-=-=-=-0 -~----------1.J... -_-_-_______ _ C> -_-_-_-_-_-_-• t, . ---------------------------- -------------------------------------------------------- -=-=-=-STRUCTURAL FILL -=-=-= t, . .• ___________________________ _ ·--------------• t, _-_-_______________________ _ ------------------------------------------. 6. _-_-_-_-_-_-_-_-_-_-_-_-_-_--------· ~-----~--------------1 I . PER PLAN .. I GRADED LOT 5" SLAB 2"T04" SAND 4" TO 6" VIRGIN CLASS II BASE 5" SLAB 2"T04" SAND 4" TO 6" VIRGIN CLASS II BASE * * LOWEST ADJACENT GRADE OF OUTSIDE GRADE OR COMPACTED BASE/INSIDE GRADE NO SCALE SLAB AND FOOTING DETAILS DETAIL 1 (city of Carlsbad CERTIFICATION OF SCHOOL FEES PAID This form must be completed by the City, the applicant, and the appropriate school districts and returned to the City prior to issuing a building permit. The City will not issue any building permit without a completed school fee form. Project# & Name: DEV2023-0113, 2501 DAVIS DEDICATION Permit#: PC2022-0052 ___;._;;;..,;;.....;;..;..;...... _____________ _ Project Address: 2501 DAVIS AVE ------------------- Assessor's Parcel #: 1552511400 ------------------- Project Applicant: BON EE MARCEL -------------------(Owner Name) Residential Square Feet: New/Additions: ------------------- Second Dwelling Unit: (96o sF DETACHED ADU & 250 SF GARAGE coNVERs1ON FOR JADU) Commercial Square Feet: New/Additions: ------------------- City Certification: City of Carlsbad Building Division Date: 03/06/2024 Certification of ApplicanUOwners. The person executing this declaration ("Owner") certifies under penalty of perjury that (1) the information provided above is correct and true to the best of the Owner's knowledge, and that the Owner will file an amended certification of payment and pay the additional fee if Owner requests an increase in the number of dwelling units or square footage after the building permit is issued or if the initial determination of units or square footage is found to be incorrect, and that (2) the Owner is the owner/developer of the above described project(s), or that the person CK] Carlsbad Unified School District 6225 El Camino Real Carlsbad CA 92009 Phone: (760) 331-5000 D Encinitas Union School District 101 South Rancho Santa Fe Rd Encinitas, CA 92024 Phone: (760) 944-4300 x1166 D San Dieguito Union H.S. District 684 Requeza Dr. Encinitas, CA 92024 Phone: (760) 753-6491 Ext 5514 (By Appt. Only) D San Marcos Unified Sch. District 255 Pico Ave Ste. 100 San Marcos, CA 92069 Phone: (760) 290-2649 Contact: Katherine Marcelja (By Appt.only) D Vista Unified School District 1234 Arcadia Drive Vista CA 92083 Phone: (760) 726-2170 x2222 SCHOOL DISTRICT SCHOOL FEE CERTIFICATION (To be completed by the school district(s)) THIS FORM INDICATES THAT THE SCHOOL DISTRICT REQUIREMENTS FOR THE PROJECT HAVE BEEN OR WILL BE SATISFIED. The undersigned, being duly authorized by the applicable School District, certifies that· the developer, builder, or owner has satisfied the obligation for school facilities. This is to certify that the applicant listed on page 1 has paid all amounts or completed other applicable school mitigation determined by the School District. The City may issue building permits for this project. Signature of Authorized School District Officia1::s)6 , ~C/\o .,,,.4~ ::\-r:'.'.'.'('-LA A 4 d r:A,A .AJl2 . . (_ C ' G \..\. '<"-'l--e \ \Nt;l \f'\ ~ . T 1tle. .s \ J<y' (J\C: \ y\ ;:\.;,..R/Y\ A ':£_.Q~ Date. 3 . :i -8--o al/ CARLSBAD UNIFIED SCHOOL DISTRICT Name of School District: 6225 El CAMINO REAL Phone: :'1 {,p 6 33 / -5 MO CARLSBAD, CA 92009 COMMUNITY DEVELOPMENT -Building Division 1635 Faraday Ave I Carlsbad, CA 92008-7314 I 442-339-2719 I building@carlsbadca.gov I www.carlsbadca.gov STORM WATER POLLUTION PREVENTION NOTES 1. ALL NECESSARY EQUIPMENT AND MATERIALS SHALL BE AVAILABLE ON SITE TO FACILITATE RAPID INSTALLATION OF EROSION AND SEDIMENT CONTROL BMPs WHEN RAIN IS EMINENT. 2. THE OWNER/CONTRACTOR SHALL RESTORE ALL EROSION CONTROL DEVICES TO WORKING ORDER TO THE SATISFACTION OF THE CITY INSPECTOR AFTER EACH RUN-OFF PRODUCING RAINFALL. 3. THE OWNER/CONTRACTOR SHALL INSTALL ADDITIONAL EROSION CONTROL MEASURES AS MAY BE REQUIRED BY THE CITY INSPECTOR DUE TO INCOMPLETE GRADING OPERATIONS OR UNFORESEEN CIRCUMSTANCES WHICH MAY ARISE. 4. ALL REMOVABLE PROTECTIVE DEVICES SHALL BE IN PLACE AT THE END OF EACH WORKING DAY WHEN THE FIVE (5) DAY RAIN PROBABILITY FORECAST EXCEEDS FORTY PECENT ( 40%). SILT AND OTHER DEBRIS SHALL BE REMOVED AFTER EACH RAINFALL. 5. ALL GRAVEL BAGS SHALL CONTAIN 3/4 INCH MINIMUM AGGREGATE. 6. ADE QUA TE EROSION AND SEDIMENT CONTROL AND PERIMETER PROTECTION BEST MANAGEMENT PRACTICE MEASURES MUST BE INSTALLED AND MAINTAINED. 7. THE CITY INSPECTOR SHALL HAVE THE AUTHORITY TO ALTER THIS PLAN DURING OR BEFORE CONSTRUCTION AS NEEDED TO ENSURE COMPLIANCE WITH CITY STORM WATER QUALITY REGULATIONS. OWNER'S CERTIFICATE: I UNDERSTAND AND ACKNOWLEDGE THAT I MUST: (1) IMPLEMENT BEST MANAGEMENT PRACTICES (BMPS) DURING CONSTRUCTION ACTIVITIES TO THE MAXIMUM EXTENT PRACTICABLE TO AVOID THE MOBILIZATION OF POLLUTANTS SUCH AS SEDIMENT AND TO AVOID THE EXPOSURE OF STORM WATER TO CONSTRUCTION RELATED POLLUTANTS; AND (2) ADHERE TO, AND AT ALL TIMES, COMPLY WITH THIS CITY APPROVED TIER 1 CONSTRUCTION SWPPP THROUGHOUT THE DURATION OF THE CONSTRUCTION ACTIVITIES UNTIL THE CONSTRUCTION WORK IS COMPLETE AND APPROVED BY THE CITY OF CARLSBAD. l',AA-W~ L £;.oiv~ r .... OWNER(S)/OWNER'S AGENT NAME --Y-o ~ (_ LVP--I Jr S OWNER(S)/OWNER'S AGENT NAM E-29 l{--I{"-l-~ DATE STORM WATER COMPLIANCE FORM TIER 1 CONSTRUCTION SWPPP BEST MANAGEMENT PRACTICES (BMP) SELECTION TABLE Erosion Control Sediment Control BMPs Tracking Non-Stonn Water Waste Management and Materials BMPs Control BMPs Management BMPs Pollution Control BMPs C ..., C C 0 ..., 0 0 ~ C C "'C ~ ~ 0, C Q) "'C Q) C E C "'C Cf) (.) (.) C C 0, E C ..., C :::, :::, 0 '5 ·;:: -~ C C C ..., ... ... Q) :::::!!: "'C Cf) E 0, ... Q) ..., ..., ~ C ... :::, >, 0, C Q) ... C Q) C Cf) Cf) Cf) C ·;:: '-CT ... C C 0, C. (I) ·;:: C > ... (I) 0 Best Management Practice* <Id .s Ccj C CD 'c.. -C C/l ... (!) Q) w > C ... 0 (I) 0 ~ Cf) 3: Cf) ... (I) C C (I) ..., (I) C ..., ..c C I-u ... u Cf) "'C Qj Cf) :::::!!: C CUC (BMP) Description ➔ Cf) (.) (I) (/) ·5 E Cf) 0, (I) 0, CD •5 C 0, C "'C Cf) ~ C Cl :::, (I) ..., (I) ~ :5 ~ Q) Q) ..., C C 3: C ... 0 ~~ "'C >, 0 Cf) Cc C 0, > ~ E ~ ... (.) C Cl 0 CD (/) ·-0, Cl~ ~c u (I) Co (I) Q) X :::::!!: Cl o, Cl C (I) c:: E C N C/l (.) en:;:; (I) ~-~ 0 (I) 0 'a. .___ :;:: (I) C (I) E ~ Qj ..., :::, .0 E ~ = Cf) = 3: ... ·-::0 ·-0, ·;:: 0.. 0 0, Q) "'C ..C C (I) LL (I):::, ·-(I) ·-"'C ~u CC (.) C ... C ~ ... "'C C ..., (.) ... > "'C ... ..., .0 ... .0 C ·-... C (I) ... (I) (.) _..., 0 0 -·-C. '5 (I) (I) (I)(.) C ~:g_ ..., ·-C ..., 0 ..., = C ,_ C ... C 0 ..., C 0 0 C 0, ..s 0 CC ..c (I) 0 (I) j C ... c'5 (I) ..c .0 ... .!:;c 0 ..., ... V) C :;::a: 0 (I)_ c_ C ..., C. 0 QC (.!) WO c:n (/) u G: (!) cr,> (/) (/) 0.. (/) c:: 0..0 0.. >U :::::!!: (/) :::::!!: (/) (/) u (/) :::::!!: CASQA Designation ➔ r--IX) 0, ..-r") v L{") <.D r--IX) 0 N r") r--IX) N r") v L{") ' ..-..-..-I I I I I I I I I I I I I I I I I I I I I I u u u u w w w w w w w w ~ c:: (/) (/) (/) (/) i i i i i Construction Activity w w w w (/) (/) (/) (/) (/) (/) (/) (/) I-z z z z )( Grad in a /Soil Disturbance ' ' Trenchina/Excavation " "-' Stockoilina Drillina /Borina '\. Concrete/Asphalt Sawcuttina Concrete Flatwork I Pavina Conduit/Pipe Installation ' Stucco7Mortar Work "-Waste Disposal ' Staaina7Lav Down Area Eauioment Maintenance and Fuelina I Hazardous Substance Use/Storaae Dewaterina Site Access Across Dirt Other (I isfr Instructions: 1. Check the box to the left of all applicable construction activity ( first column) expected to occur during construction. 2. Located along the top of the BMP Table is a list of BMP's with it's corresponding California Stormwater Quality Association (CASQA) designation number. Choose one or more BMPs you intend to use during construction from the list. Check the box where the chosen activity row intersects with the BMP column. 3. Refer to the CASQA construction handbook for information and details of the chosen BMPs and how to apply them to the project. PROJECT INFORMATION Site Address:ZS.D, Olt-vl~ ltv F Assessor's Parcel Number: _______ _ Emergency Contact: Name: Jef:t-i£-l~i;...;tr~ 24 Hour Phone: Co I ~ 2-ll l-/ /<j(; C-J Construction Threat to Storm Water Quality (Check Box) 0 MEDIUM ~ LOW Q) ..., Cf) C :;:: ..., C Cf) (I) :::, E 0 (I) "'C 0, 6 C NC CC I:::!!: <.D I i Q) ..., Cf) c-3= C Q) cu E ..., Q) Q) 0, bc cc oc U::::l!: IX) I i ' Page 1 of 1 REV 11 /17 ) ( City of Carlsbad PURPOSE CLIMATE ACTION PLAN CONSISTENCY CHECKLIST B-50 Development Services Building Division 1635 Faraday Avenue 442-339-2719 www.carlsbadca.gov This checklist is intended to help building permit applicants identify which Climate Action Plan (CAP) ordinance requirements apply to their project. This completed checklist (B-50) and summary (B-55) must be included with the building permit application. The Carlsbad Municipal Code (CMC) can be referenced during completion of this document by clicking on the provided links to each municipal code section. NOTE: The following type of permits are not required to fill out this form ❖ Patio I ❖ Decks I ❖ PME (w/o panel upgrade) I ❖ Pool Consultation with a certified Energy Consultant is encouraged to assist in filling out this document. Appropriate certification includes, but is not limited to: Licensed, practicing Architect, Engineer, or Contractor familiar with Energy compliance, IECC/HERS Compliance Specialist, ICC G8 Energy Code Specialist, RESNET HERS rater certified, certified ICC Residential Energy Inspector/Plans Examiner, ICC Commercial Energy Inspector and/or Plans Examiner, ICC CALgreen Inspector/Plans Examiner, or Green Building Residential Plan Examiner. If an item in the checklist is deemed to be not applicable to a project, or is less than the minimum required by ordinance, check N/A and provide an explanation or code section describing the exception. Details on CAP ordinance requirements are available at each section by clicking on the municipal code link provided. The project plans must show all details as stated in the applicable Carlsbad Municipal Code (CMC) and/or Energy Code and Green Code sections. ~ l _______________ Ap_p_l_lcatl_on_l_nform __ atl_on _____________ ___ Project Name/Building Permit No.: Property Address/APN: Applicant Name/Co.: Applicant Address: ADU/JADU/GARAGE BP No.: 2501 Davis Avenue/ 155-25114-00 Jesse Leon 4901 MORENA BLVD, STE 906, SAN DIEGO, CA, 92117 Contact Phone: 619 733 8134 Contact Email: JESSE@PROCALDESIGN.COM Contact information of person completing this checklist (if different than above): Name: Company name/address: Contact Phone: 619 733 8134 Contact Email: Applicant Signature: _______________ Date: _______ _ B-50 Page 1 of 7 Revised 04/21 Use the table below to determine which sections of the Ordinance checklist are applicable to your project. For alterations and additions to existing buildings, attach a Permit Valuation breakdown on a separate sheet. Building Permit Valuation (BPV) $ breakdown _______ _ j Construction Type I Complete Section(s) I Notes: d A high-rise residential building is 4 or more stories, including a CJ! Residential Low-rise High-rise mixed-use building in which at least 20% of its conditioned floor area is residential use ~ New construction 2A*, 3A*, 1B, 2B, *Includes detached, newly constructed ADU 4A*, 3B, 4A □ Additions and alterations: □ BPV < $60,000 NIA N/A All residential additions and alterations □ BPV :2: $60,000 1A, 4A 4A 1-2 family dwellings and townhouses with attached garages □ Electrical service panel upgrade only only. 'Multi-family dwellings only where interior finishes are removed □ BPV :2: 5200,000 1A, 4A' 1B, 4A* and significant site work and upgrades to structural and mechanical, electrical, and/or plumbing systems are proposed □ Nonresidential □ New construction 1 B, 2B, 3B, 4B and 5 □ Alterations: □ BPV :2: $200,000 or additions :2: 1,000 1B, 5 square feet □ BPV :2: $1 ,000,000 1B, 2B, 5 Building alterations of :2: 75% existing gross floor area □ :2: 2,000 sq. ft. new roof addition 2B, 5 1 B also applies if BPV :2: $200,000 Checklist Item Check the appropriate boxes, explain all not applicable and exception ttems, and provide supporting calculations and documentation as necessary. 1. Energy Efficiency Please refer to Carlsbad Municipal Code (CMC) 18.21 .155 and 18.30.190,and the California Green Building Standards Code (CALGreen) for more infonnation. Appropriate details and notes must be placed on the plans according to selections chosen in the design. A D Residential addition or alteration ~$60,000 building permitvaluation. D N/A _________ _ Details of selection chosen below must be placed on the plans referencing CMC □ Exception: Home energy score~ 7 18.30.190. (attach certification) Year Built Single-family Requirements Multi-family Requirements D Before 1978 Select one option : D Ductsealing D Attic insulation □Cool roof D Attic insulation D 1978 and later Select one option : D Lighting package D Water heating Package D Between1978and 1991 Select one option: D Ductsealing D Attic insulation □Cool roof D 1992 and later Select one option: D Lighting package D Water heating package Updated 4/16/202 1 3 B. D Nonresidential* new construction or alterations~ $200,000 building permit valuation, or additions~ 1,000 square feet. See CMC 18.21.155 and CALGreen Appendix AS D N/A AS.203.1.1 Choose one: D .1 Outdoor lighting □ .2 Restaurant service water heating (CEC 140.5) D .3 Warehouse dock seal doors. □ .4 Daylight design PAFs D .5 Exhaust air heat recovery □ NIA AS.203.1.2.1 Choose one:□ .95 Energy budget (Projects with indoor lighting OR mechanical) □ .90 Energy budget (Projects with indoorlighting AND mechanical) □ NIA AS.211.1 ** □ On-site renewable energy: D N/A AS.211.3** □Green power: (If offered by local utility provider, 50% minimum renewable sources) D N/A AS.212.1 □ Elevators and escalators: (Project with more than one elevator or two escalators) D N/A AS.213.1 □ Steel framing: (Provide details on plans for options 1-4 chosen) D NIA • Includes hotels/motels and high-rise residential buildings ---------- ** Foralterations~$1 ,000, 000 BPVand affecting> 75%existing gross floor area, OR alterations that add 2, 000squarefeetof new roof addition: comply with CMC 18.30.130 (section 28 below) instead. 2. Photovoltaic Systems A. ~ Residential new construction (for low-rise residential building permit applications submitted after 1/1/20). Refer to 2019 California Energy Code section 150.1(c)14 for requirements. If project includes installation of an electric heat pump water heater pursuant to CAP section 3B below (low-rise residential Water Heating), increase system size by .3kWdc if PV offset option is selected. Floor Plan ID (use additional CFA #d.u. Calculated kWdc* sheets if necessary) A--0 L) 4 tc,o I 1..?., 'L Total System Size: '7....'1-'1... kWdc = (CFAx.572) / 1,000 + (1.15 x #d.u.) *Formula calculation where CFA = conditional floor area, #du = number of dwellings per plan type If proposed system size is less than calculated size, please explain. kWdc Exception D D D □ B. 0 Nonresidential new construction or alterations ~$1,000,000 BPV AND affecting ~75% existing floor area, OR addition that increases roof area by ~2,000 square feet. Please refer to CMC 18.30.130 when completing this section. *Note: This section also applies to high-rise residential and hotel/motel buildings. Choose one of the following methods: □ Gross Floor Area (GFA)Method GFA: □ If< 10,000s.f. Enter: 5 kWdc Min.System Size: □ If 2: 10,000s.f. calculate: 15 kWdc x (GFA/10,O00) ** kWdc **Round building size factor to nearest tenth, and round system size to nearest whole number. Updated 4/16/2021 4 □ Time-Dependent Valuation Method Annual TDV Energy use: *** ______ x .80= Min. system size: ______ kWdc *** Attach calculation documentation using modeling software approved by the California Energy Commission. 3. Water Heating A. [Jl Residential and hotel/motel new construction. Refer to CMC 18.30.170 when completing this section. Provide complete details on the plans. □ For systems serving individual dwelling units choose one system: r/J Heat pump water heater AND Compact hot water distribution AND Drain water heat recovery (low-rise residential only) □ Heat pump water heater AND PV system .3 kWdc larger than required in CMC 18.30.130 (high rise residential hotel/motel) or CA Energy Code section 150.1 (c) 14 (low-rise residential) □ Heat pump water heater meeting NEEA Advanced Water Heating Specification Tier 3 or higher □ Solar water heating system that is either .60 solar savings fraction or 40 s. f. solar collectors □ Exception: □ For systems serving multiple dwelling units, install a central water-heating system with ALL of the following: □ Gas or propane water heating system □ Recirculation system per CMC 18.30.150(8) (high-rise residential, hotel/motel) or CMC 18.30.170(8) (low- rise residential) □ Solar water heating system that is either: □ .20 solar savings fraction □ .15 solar savings fraction, plus drain water heat recovery □ Exception: B. D Nonresidential new construction. Refer to CMC 18.30.150 when completing this section. Provide complete details on the plans. □ Water heating system derives at least 40% of its energy from one of the following (attach documentation): □ Solar-thermal □ Photovoltaics □ Recovered energy □ Water heating system is (choose one): □ Heat pump water heater □ Electric resistance water heater(s) □Solar water heating system with .40 solar savings fraction D Exception: It may be necessary to supplement the completed checklist with supporting materials, calculations or certifications, to demonstrate full compliance with CAP ordinance requirements. For example, projects that propose or require a performance approach to comply with energy-related measures will need to attach to this checklist separate calculations and documentation as specified by the ordinances. Updated 4/ 16/2 1 5 4. Electric Vehicle Charging A. f"1 Residential New construction and major alterations* Please refer to CMC 18.21.140 when completing this section. i,l One and two-family residential dwelling or townhouse with attached garage: VJ One EVSE Ready parking space required D Exception : ____________ _ D Multi-family residential· D Exception • Total Parking Spaces EVSE Spaces Proposed EVSE (10% of total) Installed (50% of EVSE) Other "Ready" Other "Capable" Calculations: Total EVSE spaces= .10 x Total parking spaces proposed (rounded up to nearest whole number) EVSE Installed = Total EVSE Spaces x .50 (rounded up to nearest whole number) EVSE other may be "Ready" or "Capable" *Major alterations are: (1) for one and two-family dwellings and townhouses with attached garages, alterations have a building permit valuation~ $60,000 or include an electrical service panel upgrade; (2) for multifamily dwellings (three units or more without attached garages), alterations have a building permit valuation~ $200,000, interior finishes are removed and significant site work and upgrades to structural and mechanical, electrical, and/or plumbing systems are proposed. *ADU exceptions for EV Ready space (no EV ready space required when): (1) The accessory dwelling unit is located within one-half mile of public transit. (2) The accessory dwelling unit is located within an architecturally and historically significant historic district. (3) The accessory dwelling unit is part of the proposed or existing primary residence or an accessory structure. (4) When on-street parking permits are required but not offered to the occupant of the accessory dwelling unit. (5) When there is a car share vehicle located within one block of the accessory dwelling unit. B. 0 Nonresidential new construction (includes hotels/motels) D Exception : ____________ _ Please refer to CMC 18.21.150 when completing this section Total Parking Spaces Proposed EVSE (10% of total) I Installed (50% of EVSE) I Other "Ready" I Other "Capable" I I I Calculation: Refer to the table below: Total Number of Parking Spaces provided Number of required EV Spaces Number of required EVSE Installed Spaces D 0-9 1 1 D 10-25 2 1 D 26-50 4 2 D 51-75 6 3 D 76-100 9 5 D 101-150 12 6 D 151-200 17 9 D 201 andover 10 percent of total 50 percent of Required EV Spaces Calculations: Total EVSE spaces= .10 x Total parking spaces proposed (rounded up to nearest whole number) EVSE Installed = Total EVSE Spaces x .50 (rounded up to nearest whole number) EVSE other may be "Ready" or "Capable" Updated 4/ 16/202 I 6 5. □Transportation Demand Management (TOM): Nonresidential ONLY An approved Transportation Demand Management (TOM) Plan is required for all nonresidential projects that meet a threshold of employee-generated ADT. City staff will usethetablebelowbased on your submitted plans to determine whether or nor your permit requires a TOM plan. If TOM is applicable to your permit, staff will contact the applicant to develop a site-specific TOM plan based on the permit details. Acknowledgment: Employee ADT Estimation for Various Commercial Uses Use EmpADTfor first 1,000 s.f. EmpADTI 1000 s.f.1 Office (all)2 20 Restaurant 11 Retaib 8 Industrial 4 Manufacturing 4 Warehousing 4 1 Unless otherwise noted, ra tes estimated from /TE Trip Generation Manual, 1 (Jlh Edition 13 11 4.5 3.5 3 1 2 For all office uses, use SAN DAG rate of 20 ADT/1,000 sf to calculate employee ADT 3 Retail uses include shopping center, variety store, supermarket, gyms, pharmacy, etc. Other commercial uses may be subject to special consideration sample calcylatioos: Office: 20,450 sf 1. 20,450 sf/ 1000 x 20 = 409 Employee ADT Retail: 9,334 sf 1. First 1,000 sf= 8 ADT 2. 9,334 sf -1,000 sf= 8,334 sf 3. (8,334 sf/ 1,000 x 4.5) + 8 = 46 Employee ADT I acknowledge that the plans submitted may be subject to the City of Carlsbad's Transportation Demand Management Ordinance. I agree to be contacted should my permit require a TD~M ~ n~rstand that an approved TOM plan is a condition of permit issuance. Applicant Signature:_____________________ Date: ..... f'+.___/ _'t._/_VL __ _ Person other than App ,cant to be contacted for TOM compliance (if applicable): Name(Printed): __________________ _ Phone Number: _____ _ Email Address: ___________________ _ Updated 4/16/2021 7 ( City of Carlsbad CLIMATE ACTION PLAN (CAP) COMPLIANCE CAP Building Plan Template B-55 Development Services Building Division 1635 Faraday Avenue 442-339-2719 www.carlsbadca.gov The following summarizes project compliance with the applicable Climate Action Plan ordinances of the Carlsbad Municipal Code and California Green Building Standards Code {CALGreen), current version. Use this form to summarize all applicable CAP measures for your project. IF CAP MEASURES ARE APPLICABLE, IMPRINT THIS COMPLETED FORM ONTO PROJECT PLANS. 1. ENERGY EFFICIENCY APPLICABLE: DYES ONO Complies with CMC 18.30.190 & 18.21.155 0 Yes O N/A Existing Structure, year built: ____ _ Prepared Energy Audit? O Yes 0No Energy Score: _____ _ Efficiency Measures included in scope: 2. PHOTOVOLTAIC SYSTEM APPLICABLE: [Z]YES □No Complies with CMC section 18.30.130 and 2019 California Energy Code section 150.l{c)14 O Yes O N/A Required Provided Size of PV system {kWdc): Sizing PV by load calculations D Yes D No If by Load Calculations: Total calculated electrical load: 80% of load: Hardship Requested O Yes O No Hardship Approved D Yes O No 3. ALTERNATIVE WATER HEATING SYSTEM APPLICABLE: [Z] YES □NO 4. s. Complies with CMC sections 18.30.150 and 18.30.170? Alternative Source: □ Electric □ Passive Solar Hardship Requested Hardship Approved ELECTRIC VEHICLE (EV) CHARGING APPLICABLE: O Yes O N/A OYes □Yes [Z]YES Complies with CMC section 18.21.140? Panel Upgrade? OYes O N/A O Yes O No Required Provided Total EV Parking Spaces: No. of EV Capable Spaces: No. of EV Ready Spaces: No. of EV Installed Spaces: Hardship Requested Hardship Approved O Yes □Yes TRAFFIC DEMAND MANAGEMENT APPLICABLE: Compliant? TDM Report on file with city? □No □No DYES 0No 0 Yes O No □Yes o No Building Permit Finaled Revision Permit Print Date: 07/16/2025 Job Address: 2501 DAVIS AVE, CARLSBAD, CA 92008-1452 Permit No: Status: (cityof Carlsbad PREV2025-0004 Closed -Finaled Permit Type: BLDG-Permit Revision Work Class: Residential Permit Revision Parcel#: 1552511400 Track#: Applied: 01/07/2025 Valuation: $260,810.44 Lot#: Issued: 01/21/2025 Occupancy Group: #of Dwelling Units: Project#: DEV2023-0113 Finaled Close Out: 07/16/2025 Bedrooms: Bathrooms: Occupant Load: Code Edition: Sprinkled: Project Title: 2501 DAVIS DEDICATION Plan#: Construction Type: Orig. Plan Check#: PC2022-0052 Plan Check#: Description: BONEE: CHANGE WATER HEATER TO ELECTRIC HEAT PUMP Applicant: PRO-CAL DESIGN AND ENGI NEERING JESSE LEON 10245 CASA CT SANTEE, CA 92071-4900 (619) 733-8134 FEE BUILDING PLAN CHECK REVISION ADMIN FEE THIRD PARTY REVIEW -Consultant Cost (BLDG) Property Owner: BONEE MARCEL 2501 DAVIS AVE CARLSBAD, CA 92008-1452 Total Fees: $155.00 Total Payments To Date: Building Division $155.00 Final Inspection: INSPECTOR: Balance Due: 1635 Faraday Avenue, Carlsbad CA 92008-7314 I 442-339-2719 I 760-602-8560 f I www.carlsbadca.gov AMOUNT $35.00 $120.00 $0.00 Page 1 of 1 CCityof Carlsbad PLAN CHECK REVISION OR DEFERRED SUBMITTAL APPLICATION 8-15 Development Services Building Division 1635 Faraday Avenue 442-339-2719 www.carlsbadca.gov Original Plan Check Number PC2022-0052 Project Address 2501 Davis Avenue ( by City S@ftJ Plan Revision Number .PttvJoJS-ooo l/ General Scope of Revision/Deferred Submittal: Revised water heater to electric heat pump water heater CONTACT INFORMATION: Name .Je5se l)e LeoY\ Address ___________________ City ______ Zip ____ _ Email Address v e_5<;e (o):p ro c.°'-1 des i3 V\ , COVV1 Original plans prepared by an architect or engineer, revisions must be signed & stamped by that person. 1 . Elements revised: [i] Plans D Calculations D Soils [i] Energy D Other 2. 3. Describe revisions in detail List page(s) where each revision is shown Updated title 24 to revised water heater to electric heat pump 1,2,3,4 . 4. Does this revision, in any way, alter the exterior of the project? OYes ~No 5. Does this revision add ANY new floor area(s)7 OYes ~No 6. Does this revision affect any fire related issues? OYes ~No 7. Is this a full set replacement (all sheets)? OYes ~No ~Signature d~ ~ Date 1) (; /zozs 1635 Faraday Avenue, Carlsbad, CA 92008 eti: 760-602-2719 fax: 760-602-8558 Email: buifding@carlsbadca.gov www.carlsbadca.gov SUBMITTAL INSTRUCTIONS: Revisions are changes to Active/Issued building permits that are not finaled or expired. Submission must be completed in the same manner as the original review (hard copy or digital). HARD COPY Residential or Commercial New, Addition, Remodels, must follow hard-copy submittal process. If you originally applied for a permit via hard copy plans, revisions are applied via a hard copy process. Hard copy submittals are submitted in-person at the Building Counter at 1635 Faraday Ave, Carlsbad CA 92008. Hard Copy Submittal Requirements: • Completed and signed form B-15. • A minimum of three (3) complete or partial plans is required. If the change effects any fire prevention related review items a fourth set is required. Note, if partial pages are submitted, at approval, the applicant will be responsible for slip-sheeting any new approved sheets into the city-held plan set at city offices. • If submitting revised reports/calculations, submit two (2) updated copies. If staff determine other reviewers to review the updated report/calculations, additional copies of reports/calculations may be required. • Form of payment for fees due or via online payment. Once city receives a complete application and submittal, city will process and route plans and update you, typically via email, with next steps such as fees due, plan check updates, resubmittals, approvals and/or instructions on updating city-held plan sets or other approval documents. DIGITAL If you originally applied for a permit via the online portal, submissions for revisions are uploaded via the self-service portal. Digital Submittal Reguire~ents: • Completed/signed form B-15. • Updated plan set (pdf). • Updates calculations or other supporting files, if applicable (pdf). Prior to uploading, be prepared with all submittal items listed above in pdf format. Once you are ready with pdf files, log into the portal. Go to your dashboard, find 'Active Permits' and the original permit. Open the original permit, go to the Attachments tab and upload all files. Remember as you add multiple files, to select the applicable file types for the different attachments. If you do not see the permit in the portal, please contact building. as you may need attached to the permit. Once all files are attached, click submit. City will review the new/uploaded files and update you via email and review/approval status and/or fees due. Once city receives a complete application, city will update you with next steps, including review updates, approval and updated plans. Depending on the scope of change, plan check may be required. If changes trigger additional plan review, additional plan review fees will be due per the City's current Master Fee Schedule. Substantial changes may trigger updates in development impact or permit fees. Outstanding fees are due prior to approval/issuance. If you have questions with navigating the portal (finding your permit, uploading files), please see the CSS Help Guide or contact us here. January 10, 2025 City of Carlsbad Community Development Department -Building Division 1635 Faraday Ave. Carlsbad, CA 92008 Plan Review: Revision New ADU Address: 2501 Davis Ave Applicant Name: Jesse De Leon Applicant Email: Jesse@procaldesign.com OCCUPANCY AND BUILDING SUMMARY: Occupancy Groups: R-3 Occupant Load: N/ A Type of Construction: V-B Sprinklers: N/A Stories: N/ A Area of Work (sq. ft.): NIA sq. ft. The plans have been reviewed for coordination with the pe1mit application. Valuation: See Notes Below Scope of Work: Confirmed Floor Area: See Notes Below Notes: Revision, no valuation or floor area. Attn: Building & Safety Department, True North COMPLIANCE SERVICES City of Carlsbad -FIN AL REVIEW City Pe1mit No: PREV2025-0004 True North No.: 25-018-025 True North Compliance Services, Inc. has completed the final review of the foll owing documents for the project referenced above on behalfof the City of Carlsbad: I. Energy Repo1t: One (I) copy dated December 9, 2024, by Cheers. The 2022 California Building, Mechanical, Plumbing, and Electrical Codes (i.e., 2021 IBC, UMC, UPC, and 2020 NEC, as amended by the State of California), 2022 California Green Building Standards Code, 2022 California Existing Building Code, and 2022 California Energy Code, as applicable, were used as the basis of our review. Please note that our review has been completed and we have no further comments, however, we bring the following to your attention: I. This project is Hourly. Please charge the applicant the following hours of plan review. True North Compliance Services, Inc. 8369 Vickers Street, Suite 207, San Diego, CA 92111 T / 562.733.8030 Review No. Hourly Rate Hours Total 1st Review $120.00 1 $120 Total $120 We have enclosed the above noted documents bearing our review stamps for your use. Please call if you have any questions or ifwe can be of further assistance. Sincerely, True North Compliance Services Review By: Qamar Aloqaily -Plan Review Engineer Quality Review By: Alaa Atassi -Plan Review Engineer