Loading...
HomeMy WebLinkAbout2025-07-02; Planning Commission; 01; Coastline Church – Amendment to a Site Development Plan (SDP 02-16/AMEND 2018-0003) to update and modify the development phases of a worship center addition, café restroo Meeting Date: July 2, 2025 Item To: Planning Commission Staff Contact: Kyle Van Leeuwen, Associate Planner; 442-339-2611; kyle.vanleeuwen@carlsbadca.gov Subject: Coastline Church – Amendment to a Site Development Plan (SDP 02-16/AMEND 2018-0003) to update and modify the development phases of a worship center addition, café restroom addition, new maintenance building, and parking lot expansion. Location: 2215 Calle Barcelona / APN: 255-273-07-00 / District 4 Numbers: AMEND 2025-0001 (DEV02116) Applicant/Representative: James E. Grant, Grant General Contractors, 760-438-1500, jgrant@grantgc.com CEQA Recommendation: ☐ Not a Project ☐ Exempt ☐ IS/ND or IS/MND ☐ EIR ☒ Other: Consistent with a prior environmental document (i.e. Certified Final Program Environmental Impact Report (EIR, SCH# 1988041323) and Mitigation Monitoring and Reporting Program for the Arroyo La Costa Master Plan) pursuant to CEQA Guidelines §15162 through §15168 Permit Type(s): ☐ SDP ☐ CUP ☐ CDP ☐ TM/TPM ☐ GPA ☐ REZ ☐ LCPA ☐ Other: AMEND (Amendment to SDP) Commission Action: ☒ Decision ☐ Recommendation to City Council ☐ Informational (No Action) Recommended Actions That the Planning Commission ADOPT the Planning Commission Resolution (Exhibit 1) APPROVING a Site Development Plan Amendment, AMEND 2025-0001, based on the findings and subject to the conditions contained therein. 1 July 2, 2025 Item #1 1 of 30 PLANNING COMMISSION Staff Report . 0 Existing Conditions & Project Description Existing Setting The project site is located on the south side of Calle Barcelona and east of Paseo Aliso (Exhibit 2), and comprises the 6.43-acre “Village J” of the Arroyo La Costa Master Plan (MP 88-01). The site (Village J) was designated for church use in MP 88-01 and is currently developed as Coastline Church. The church campus includes a worship center, café, and children’s ministry building. The site currently provides 193 parking spaces for the existing church campus uses. Site Map Table “A” below includes the General Plan and Zoning designations, and current land uses of the subject site and surrounding properties. TABLE A – SITE AND SURROUNDING LAND USE Location General Plan Designation Zoning Designation Current Land Use Site Residential (R-4) Planned Community (P-C) Church Campus North Open Space (OS) P-C Open Space South OS; R-4 P-C HOA Open Space; Single- Family Residential East Public (P) P-C Athletic Fields/Park West OS; R-4 P-C HOA Open Space; Single- Family Residential General Plan Designation(s) Zoning Designation(s) July 2, 2025 Item #1 2 of 30 Background The site, Village J of the Arroyo La Costa Master Plan (MP 88-01), was designated in the master plan for church use. Although churches are typically processed as conditional use permits, MP 88-01 designated a Site Development Plan (SDP) as the required discretionary action to develop the site. Development of the church campus was originally approved in January 2004 under project number SDP 02-16. SDP 02-16 allowed for a 37,318 square foot church campus, built in phases. The phased buildout approved also allowed the use of temporary modular buildings during specific phases. In November 2012, the first Site Development Plan amendment was requested and approved (SDP 02-16(A)), which extended the period of time the temporary modular building could be utilized on site. A second, minor amendment, to the Site Development Plan was approved in May of 2016 (CD 16-07), which expanded the availability of parking on site. In March 2018, the church submitted for a third Site Development Plan amendment (AMEND 2018-0003). The Planning Commission adopted Planning Commission Resolution No. 7333 on May 15, 2019, approving the third amendment to Site Development Plan SDP 02-16. At that time, only one permanent structure was developed on site: the worship center and café building located in the northeast portion of the site. The amended Site Development plan allowed for the continued development of the church campus in two phases: 1) a new two- story 23,746 square foot children’s ministry center and a total of 193 on-site parking spaces; and 2) a 2,141 square foot expansion to the worship center, a 442 square foot expansion to the café, a two-story 1,374 square foot maintenance/storage building and the addition of 34 parking spaces for a total of 227 on-site parking spaces. The Planning Commission Staff report and Planning Commission Resolution No. 7333 are provided as Exhibit 4. Of the two-phase approved under AMEND 2018-0003, only Phase 1 has been carried out and completed. The proposed amendment updates and modifies the second phase of the development plan and adds Phase 3. This staff report will focus on the newly proposed changes. Proposed Project The applicant proposes to modify the timeline for developments approved under Phase 2 to allow for the parking lot expansion to occur as a Phase 3. Allowing the expansion of the parking lot to be deferred until after the other facility improvements would allow for the church’s financial resources to be utilized first for facility expansion. The facility expansion will accommodate the steadily increasing membership of the church without the immediate added cost associated with the parking lot expansion. The proposed change in phasing for the project is shown on project plans, Exhibit 6. The applicant has provided confirmation from two properties adjacent or near the church allowing Coastline Church to utilize their parking lots to meet the increased parking demands of the expanded church facilities. The two sites, El Camino Creek Elementary (Encinitas Union School District) and the San Dieguito Sports Complex (San Dieguito Union School District), would each provide at least 34 parking spaces to utilize on Sundays during church services (El Camino Creek Elementary has approximately 90 parking spaces and the San Dieguito Sports Complex has approximately 175 parking spaces). The applicant has also stated that a shuttle will be utilized to take members to and from the off-site parking lots at one or both of these locations. According to the applicant, the lease agreements proposed with the off-site parking facilities would be for approximately 10 years. To address concerns of parking availability if off-site parking leases expire prior to the parking lot expansion, the applicant has suggested and agreed to a specific condition or approval to reduce any parking impact concerns. Those conditions include: 1) securing an extension to the proposed parking lease agreements with one or both of the School Districts; 2) entering into a new lease agreement for an alternate, off-site parking location; or 3) reducing the available seating within the expanded worship center to meet the seating limit accommodated by the onsite parking spaces. Notwithstanding, Phase 3 (expansion of the parking lot) must be completed within a 20-year build-out timeframe. This condition of approval is included in the draft resolution (Exhibit 1). July 2, 2025 Item #1 3 of 30 The city’s development regulations provide a three-year life for entitlement approvals. If an approved project is not initiated (i.e., the applicant has “performed substantial work” and incurred substantial liabilities in good faith reliance upon such permit(s), CMC Chapter 21.58.030, as amended by Ord. CS-474) within the three-year period, the permit(s) expire unless an application for the extension of the entitlement(s) has been submitted prior to expiration and granted by the designated approving authority. Thus, should the Planning Commission approve the applicant’s request, entitlement approvals for the worship center and café, and new maintenance/storage building would be valid until July of 2028. If substantial construction work has not been performed, the applicant would need to resubmit the project for new entitlements. However, should the applicant complete the constructive improvements for Phase 2 on schedule, shuttle service operations would be allowed to continue until 2045, at which point the expansion of the parking lot must be completed (Phase 3). Public Outreach & Comment The Developer has completed the Early Public Notice procedures pursuant to City Council Policy No. 84 (Development Project Public Involvement Policy). A notice of project application was mailed on Feb. 6, 2025, to all owners of property located within a 600-foot radius of the project site. A two-foot-tall by three-foot-wide yellow sign was also posted at the project site on Feb.13, 2025, notifying all pass-by traffic of the project, which provides project name, application numbers, description, as well as both Developer and city staff contact information. A total of 85 property owners were notified by mail through the notice of project application. No comments were received by city staff in response to the provided notifications. Project Analysis General Plan Consistency Village J of the Arroyo La Costa Master Plan has a General Plan Land Use designation of Residential (R-4). Village J is designated for a church use consistent with the General Plan, which requires new and, as appropriate, existing master plan and specific plan developments to provide land designated for community facilities such as worship uses. An analysis of the project's compliance with the general plan is included in the Planning Commission Staff Report, dated May 15, 2019 (Exhibit 4). No change in the scope of physical development is proposed with this application. Municipal Code Consistency The project site is zoned Planned Community (P-C). The PC Zone does not contain development standards. The P-C Zone requires a master plan, including development standards, to be established for parcels of land under the P-C zoning designation. The Arroyo La Costa Master Plan is the approved master plan for the site, and it includes the development standards applicable to the property. Therefore, no additional analysis is needed with respect to the project’s compliance with the P-C Zone. Parking standards applicable to the site have not changes since approval of the current scope of development. The original analysis of the projects compliance with the parking standards is included in the Planning Commission Staff Report, dated May 15, 2019 (Exhibit 4). Arroyo La Costa Master Plan (MP 88-01) The project site is located within Village J of the Arroyo La Costa Master Plan. Area J is designated as a church site within the Master Plan. Pursuant to the Master Plan, Coastline Church has been developed on the site. An analysis of the project's compliance with the Arroyo La Costa Master Plan is included in the Planning Commission Staff Report, dated May 15, 2019 (Exhibit 4). No change in the scope of physical development is proposed with this application, and the Arroyo La Costa Master Plan does not address or interfere with the proposed phasing schedule or provisions for shuttling and off-site parking. July 2, 2025 Item #1 4 of 30 Discretionary Actions & Findings The following discretionary actions are requested. Amendment to Site Development Permit AMEND 2025-0001 Pursuant to the Arroyo La Costa Master Plan (MP 88-01), development of the project site (Village J) requires the approval of a Site Development Plan (SDP), processed pursuant to Chapter 21.06 (Q-Overlay Zone). This fourth amendment to the Site Development Plan (SDP 02-16) is presented to update and modify the second phase of the development plan. Phase 2 was initially scheduled to include expansion of the worship center, expansion of the café, a new maintenance/storage building, and additional parking. Phase 2 is proposed to be restructured to defer the expansion of the parking lot. All phases to be completed within a 20-plus-year build- out timeframe. All aspects of the development plan that are not specifically amended herein shall remain in effect as previously approved. Staff finds that the required findings for this application can be met (Exhibit 1). Environmental Review The project has been reviewed pursuant to the California Environmental Quality Act (CEQA). The potential environmental effects of the project were adequately analyzed by the previously certified Final Program Environmental Impact Report (EIR) and Mitigation Monitoring and Reporting Program (MMRP) for the Arroyo La Costa Master Plan (EIR 86-02), dated July 31, 1990. The project has no new significant environmental effect not analyzed as significant in the EIR and MMRP; none of the circumstances requiring further environmental compliance under CEQA Guidelines Sections 15162 or 15163 exist; and all feasible mitigation measures identified in the EIR and MMRP, which are appropriate to this subsequent project, will be incorporated. The approved EIR and MMRP are on file for review at the Planning Division. Conclusion Considering the information above and in the referenced Exhibits, staff has found that the proposed project is consistent with all applicable policies of the General Plan, Arroyo La Costa Master Plan, and provisions of the Municipal Code, and Local Facilities Management Zone 12. All required public improvements and utilities are available to serve the proposed development. In addition, there are no environmental issues associated with the project. The project is conditioned to ensure the proposed project’s compatibility with the surrounding properties and that the public health, safety, and welfare of the community are maintained. The project would be required to comply with all applicable California Building Standards Codes and engineering standards through the standard building permit and civil improvement plan checking process. Staff recommends that the Planning Commission adopt the resolution approving the project, as described in this staff report. Exhibits 1. Planning Commission Resolution 2. Location Map 3. Disclosure Statement 4. Planning Commission Staff Report and Resolution No. 7333, May 15, 2019 (on file in the Office of the City Clerk) 5. List of Acronyms and Abbreviations 6. Reduced Exhibits 7. Full Size Exhibit(s) “A” – “F” dated July 2, 2025 (On file in the Planning Division) July 2, 2025 Item #1 5 of 30 A RESOLUTION OF THE PLANNING COMMISSION OF THE CITY OF CARLSBAD, CALIFORNIA, APPROVING THE FOURTH AMENDMENT TO SITE DEVELOPMENT PLAN SDP 02-16 TO UPDATE AND MODIFY THE DEVELOPMENT PHASES OF A WORSHIP CENTER ADDITION, CAFÉ RESTROOM ADDITION, NEW MAINTENANCE BUILDING, AND PARKING LOT EXPANSION ON THE 6.43-ACRE COASTLINE CHURCH CAMPUS LOCATED AT 2215 CALLE BARCELONA IN LOCAL FACILITIES MANAGEMENT ZONE 12. CASE NAME: COASTLINE CHURCH CASE NO.: AMEND 2025-0001 (DEV02116) WHEREAS, James E. Grant, “Applicant,” has filed a verified application with the City of Carlsbad regarding property described as: PARCEL: 255-273-07-00 LOT 482 OF CARLSBAD TRACT NO. 88-03-2, ARROYO LA COSTA, UNIT 2 (VILLAGES G, H, J, P, Q, R AND S), IN THE CITY OF CARLSBAD, COUNTY OF SAN DIEGO, STATE OF CALIFORNIA, ACCORDING TO MAP THEREOF NO. 13386, FILED IN THE OFFICE OF THE COUNTY RECORDER OF SAN DIEGO COUNTY, DEC. 20, 1996 (“the Property”); and WHEREAS, said verified application constitutes a request for a Site Development Plan (SDP) Amendment as shown on Exhibit(s) “A” – “F” dated July 2, 2025, on file in the Planning Division, AMEND 2025-0001 (DEV02116) – COASTLINE CHURCH, as provided by Chapters 21.06 and 21.38 of the Carlsbad Municipal Code; and WHEREAS, the Planning Commission did, on July 2, 2025, hold a duly noticed public hearing as prescribed by law to consider said request; and WHEREAS, at said public hearing, upon hearing and considering all testimony and arguments, if any, of all persons desiring to be heard, said Commission considered all factors relating to the amended SDP. PLANNING COMMISSIO N RESOLUTION NO. 7546 July 2, 2025 Item #1 6 of 30 Exhibit 1 NOW, THEREFORE, BE IT HEREBY RESOLVED by the Planning Commission of the City of Carlsbad as follows: A) That the foregoing recitations are true and correct. B) Compliance with CEQA. The potential environmental effects of the project were adequately analyzed by the previously certified Final Program Environmental Impact Report (EIR) and Mitigation Monitoring and Reporting Program (MMRP) for the Arroyo La Costa Master Plan (EIR 86-02), dated July 31, 1990. The project has no new significant environmental effect not analyzed as significant in the EIR and MMRP; none of the circumstances requiring further environmental compliance under CEQA Guidelines Sections 15162 or 15163 exist; and all feasible mitigation measures identified in the EIR and MMRP, which are appropriate to this subsequent project, will be incorporated. C) That based on the evidence presented at the public hearing, the Commission APPROVES AMEND 2025-0001 – COASTLINE CHURCH, based on the following findings and subject to the following conditions: Findings: 1. That the proposed development or use is consistent with the General Plan and any applicable master plan (as amended) or specific plan, complies with all applicable provisions of Chapter 21.06 of the Carlsbad Municipal Code, and all other applicable provisions of this code, in that the project’s design complies with the requirements of the Zoning Ordinance (Title 21) and Arroyo La Costa Master Plan as discussed in the findings below. The project complies with the General Plan in that the property is designated for a church use in the Arroyo La Costa Master Plan and the General Plan requires new and, as appropriate, existing master plan and specific plan developments to provide land designated for community facilities such as worship uses. The proposed amendment to change the phasing of development is consistent with the General Plan. The existing use and the proposed amendment are compatible with surrounding residential, park, and open space uses, and the project will meet all required Building and Fire Codes. The proposed development plan provides an orderly framework for the overall development of worship center, café, new maintenance/storage building, and parking lot expansion. and addresses larger planning issues such as building locations, traffic circulation, drainage, access, and site function. The conditions of approval establish provisions that apply to the overall project site and all development phases, and remain valid until the completion of all development phases. 2. That the requested development or use is properly related to the site, surroundings and environmental settings, will not be detrimental to existing development or uses or to development or uses specifically permitted in the area in which the proposed development or use is to be located, and will not adversely impact the site, surroundings or traffic circulation, in that the 6.43-acre site is adequate in size and shape to accommodate the church campus design. The site does not have any constraints that would impede development or require significant site alterations. The church campus and off-site parking lots utilized on a temporary basis July 2, 2025 Item #1 7 of 30 comply with all applicable requirements, including but not limited to building setback, landscaping, lot coverage, parking requirements, and architectural design standards. The application shows that there is no substantial conflict in the principal operating hours of the buildings or uses for which the joint use of a parking facility is proposed. The existing surrounding streets which are fully improved have adequate capacity to accommodate the 1,397 Average Daily Trips (ADT) generated by the project. 3. That the site for the intended development or use is adequate in size and shape to accommodate the use, in that the project complies with all development standards of the Arroyo La Costa Master Plan, including setbacks, building coverage, landscaping requirements, parking, and height restrictions. This fourth amendment to the Site Development Plan (SDP 02-16) is presented to update and modify the second phase of the development plan and add Phase 3 (deferring the expansion of the parking lot). All phases to be completed within a 20-plus year build-out timeframe. 4. That all yards, setbacks, walls, fences, landscaping, and other features necessary to adjust the requested development or use to existing or permitted future development or use in the neighborhood will be provided and maintained, in that the proposed church campus and other necessary improvements can fit within the developable area of the lot and all applicable development standards are met. Adequate vehicle circulation has been provided to accommodate safety and truck turning movements. Access to the site will continue to be provided by Calle Barcelona. The church campus satisfies all applicable requirements, including but not limited to building setbacks, landscaping, lot coverage, and architectural design standards. 5. That the street systems serving the proposed development or use is adequate to properly handle all traffic generated by the proposed use, in that the project site and off-site parking lots proposed to be used temporarily will continue to be accessed off Calle Barcelona, which can accommodate the 1,397 ADT expected to be generated by the proposed church campus. The project is not anticipated to impact the existing levels of service on Calle Barcelona and El Camino Real. Updating and modifying the development phases of the worship center addition, café restroom addition, new maintenance building, and parking lot expansion, and the addition of a shuttle service, does not change the traffic system. There are adequate roads, bridges, highways, and related infrastructure to accommodate the ultimate build-out of the church campus. General: 6. The project is consistent with the Citywide Facilities and Improvements Plan, the Local Facilities Management Plan for Zone 12 and all city public facility policies and ordinances. The project includes elements or has been conditioned to construct or provide funding to ensure that all facilities and improvements regarding sewer collection and treatment; water; drainage; circulation; fire; schools; parks and other recreational facilities; libraries; government administrative facilities; and open space, related to the project will be installed to serve new development prior to or concurrent with need. 7. That the project is consistent with the city’s Landscape Manual and Water Efficient Landscape Ordinance (Carlsbad Municipal Code Chapter 18.50). July 2, 2025 Item #1 8 of 30 8. The Planning Commission has reviewed each of the exactions imposed on the Developer contained in this resolution and hereby finds, in this case, that the exactions are imposed to mitigate impacts caused by or reasonably related to the project, and the extent and the degree of the exaction is in rough proportionality to the impact caused by the project. Conditions: NOTE: Unless otherwise specified herein, all conditions shall be satisfied prior to issuance of a grading permit or building permit, whichever occurs first. 1. If any of the following conditions fail to occur, or if they are, by their terms, to be implemented and maintained over time, if any of such conditions fail to be so implemented and maintained according to their terms, the city shall have the right to revoke or modify all approvals herein granted; deny or further condition issuance of all future building permits; deny, revoke, or further condition all certificates of occupancy issued under the authority of approvals herein granted; record a notice of violation on the property title; institute and prosecute litigation to compel their compliance with said conditions or seek damages for their violation. No vested rights are gained by Developer or a successor in interest by the city’s approval of this Site Development Plan Amendment. 2. Staff is authorized and directed to make, or require the Developer to make, all corrections and modifications to the Site Development Plan Amendment, documents, as necessary to make them internally consistent and in conformity with the final action on the project. Development shall occur substantially as shown on the approved Exhibits. Any proposed development different from this approval, shall require an amendment to this approval. 3. Developer shall comply with all applicable provisions of federal, state, and local laws and regulations in effect at the time of building permit issuance. 4. If any condition for construction of any public improvements or facilities, or the payment of any fees in-lieu thereof, imposed by this approval or imposed by law on this Project are challenged, this approval shall be suspended as provided in Government Code Section 66020. If any such condition is determined to be invalid, this approval shall be invalid unless the City Council determines that the project without the condition complies with all requirements of law. 5. Developer/Operator shall and does hereby agree to indemnify, protect, defend, and hold harmless the City of Carlsbad, its Council members, officers, employees, agents, and representatives, from and against any and all liabilities, losses, damages, demands, claims and costs, including court costs and attorney’s fees incurred by the city arising, directly or indirectly, from (a) city’s approval and issuance of this Site Development Plan Amendment, (b) city’s approval or issuance of any permit or action, whether discretionary or nondiscretionary, in connection with the use contemplated herein, and (c) Developer/Operator’s installation and operation of the facility permitted hereby, including without limitation, any and all liabilities arising from the emission by the facility of electromagnetic fields or other energy waves or emissions. This obligation survives until all legal proceedings have been concluded and continues even if the city’s approval is not validated. July 2, 2025 Item #1 9 of 30 6. Prior to the issuance of a building permit, the Developer shall provide proof to the Director from the Encinitas Union School District that this project has satisfied its obligation to provide school facilities. 7. This project shall comply with all conditions and mitigation measures which are required as part of the Zone 12 Local Facilities Management Plan and any amendments made to that Plan prior to the issuance of building permits. 8. Building permits will not be issued for this project unless the local agency providing water and sewer services to the project provides written certification to the city that adequate water service and sewer facilities, respectively, are available to the project at the time of the application for the building permit, and that water and sewer capacity and facilities will continue to be available until the time of occupancy. 9. This approval shall become null and void if building permits for Phase 2 are not issued for this project within 36 months from the date of project approval. Phase 3 is to be constructed in the future. All phases must be completed within a 20-year build-out timeframe. 10. All roof appurtenances, including air conditioners, shall be architecturally integrated and concealed from view and the sound buffered from adjacent properties and streets, in substance as provided in Building Department Policy No. 80-6, to the satisfaction of the Directors of Community Development and Planning. 11. Developer shall pay the Citywide Public Facilities Fee imposed by City Council Policy #17, the License Tax on new construction imposed by Carlsbad Municipal Code Section 5.09.030, and CFD #1 special tax (if applicable), subject to any credits authorized by Carlsbad Municipal Code Section 5.09.040. Developer shall also pay any applicable Local Facilities Management Plan fee for Zone 12, pursuant to Chapter 21.90. All such taxes/fees shall be paid at issuance of building permit. If the taxes/fees are not paid, this approval will not be consistent with the General Plan and shall become void. 12. Prior to the issuance of a building or grading permit, the Developer shall submit to the city a Notice of Restriction to be filed in the office of the County Recorder, subject to the satisfaction of the City Planner, notifying all interested parties and successors in interest that the City of Carlsbad has issued a Site Development Plan Amendment by Resolution on the property. Said Notice of Restriction shall note the property description, location of the file containing complete project details and all conditions of approval as well as any conditions or restrictions specified for inclusion in the Notice of Restriction. The City Planner has the authority to execute and record an amendment to the notice which modifies or terminates said notice upon a showing of good cause by the Developer or successor in interest. 13. No outdoor storage of materials shall occur onsite unless required by the Fire Chief. When so required, the Developer shall submit and obtain approval of the Fire Chief and the City Planner of an Outdoor Storage Plan, and thereafter comply with the approved plan. 14. Developer shall submit and obtain Planning Director approval of an exterior lighting plan including parking areas. All lighting shall be designed to reflect downward and avoid any impacts on adjacent homes or property. July 2, 2025 Item #1 10 of 30 15. The applicant or property owner shall provide a copy of the executed off-site parking agreement or agreements with Encinitas Union School District and/or San Dieguito Union High School District for the use of no less than 34 parking spaces at El Camino Creek Elementary School (Encinitas Union School District) and/or the San Dieguito Sports Complex (San Dieguito Union High School District). Parties involved in the parking agreement(s) shall provide evidence of agreement and shall be recorded in the office of the County Recorder. Nothing in this resolution shall be construed to prevent the applicant or property owner from developing a joint use agreement to share existing facilities at an alternate location, subject to Chapter 21.44.080 of the CMC. 16. The previously amended Site Development Plan (AMEND 2018-0003) allowed for the continued development of the church campus in two phases: 1) a new two-story 23,746 SF children’s ministry center and a total of 193 on-site parking spaces; and 2) a 2,141 SF expansion to the worship center, a 442 SF expansion to the café, a two-story 1,374 SF maintenance/storage building, and the addition of 34 parking spaces for a total of 227 on-site parking spaces. The development of the 34 additional parking spaces on the Coastline Church campus will now be required as “Phase 3” of the development plan and must be completed within a 20-year build- out. Moreover, the development of 34 additional parking spaces on the Coastline Church campus must be completed prior to the expiration of any off-site parking agreements. In the event that offsite parking agreement(s) expire and the additional parking spaces have not been completed, the applicant or property shall execute one of the following: a. Secure an extension to an off-site parking lease agreement for no less than 34 spaces; b. Enter into a new lease agreement for an alternate off-site parking location of no less than 34 parking spaces on a site no more than 0.25 miles from the church campus; or c. Reduce the available seating within the expanded worship center to meet the seating limit accommodated by the onsite parking spaces, to the satisfaction of the City Planner. Engineering: General 17. Prior to hauling dirt or construction materials to or from any proposed construction site within this project, the developer shall apply for and obtain approval from the city engineer for the proposed haul route. 18. This project is approved upon the express condition that building permits will not be issued for the development of the subject property unless the district engineer has determined that adequate water and sewer facilities are available at the time of permit issuance and will continue to be available until the time of occupancy. 19. Developer shall install sight distance corridors at all street intersections and driveways in accordance with City Engineering Standards. The property owner shall maintain this condition. July 2, 2025 Item #1 11 of 30 Fees/Agreements 20. Developer shall cause property owner to execute and submit to the city engineer for recordation, the city’s standard form Geologic Failure Hold Harmless Agreement. 21. Developer shall cause property owner to execute and submit to the city engineer for recordation the city’s standard form Drainage Hold Harmless Agreement. 22. Developer shall cause property owner to submit an executed copy to the city engineer for recordation a city standard Permanent Stormwater Quality Best Management Practice Maintenance Agreement. Grading 23. Based upon a review of the proposed grading and the grading quantities shown on the site plan, a grading permit for this project is required. Developer shall prepare and submit plans and technical studies/reports as required by city engineer, post security and pay all applicable grading plan review and permit fees per the city’s latest fee schedule. 24. Prior to issuance of a building permit, supplemental grading plans are required for precise grading associated with this project. Developer shall prepare, and submit for approval, grading plans for the precise grading as shown on the site plan all subject to city engineer approval. 25. If shoring is determined to be required, Developer shall include shoring plans as part of the grading plans to the satisfaction of the city engineer and building official. Structural calculations for all shoring shall be submitted for review and approval by the building division. The developer shall pay all deposits necessary to cover any 3rd party review. Storm Water Quality 26. Developer shall comply with the city's Stormwater Regulations, the latest version, and shall implement best management practices at all times. Best management practices include but are not limited to pollution control practices or devices, erosion control to prevent silt runoff during construction, general housekeeping practices, pollution prevention and educational practices, maintenance procedures, and other management practices or devices to prevent or reduce the discharge of pollutants to stormwater, receiving water or stormwater conveyance system to the maximum extent practicable. Developer shall notify prospective owners and tenants of the above requirements. 27. Developer shall complete and submit to the city engineer a Determination of Project’s SWPPP Tier Level and Construction Threat Level Form pursuant to City Engineering Standards. Developer shall also submit the appropriate Tier level Storm Water Compliance form and appropriate Tier level Storm Water Pollution Prevention Plan (SWPPP) to the satisfaction of the city engineer. Developer shall pay all applicable SWPPP plan review and inspection fees per the city’s latest fee schedule. 28. This project is subject to ‘Priority Development Project’ requirements. Developer shall prepare and process a Storm Water Quality Management Plan (SWQMP), subject to city engineer approval, to comply with the Carlsbad BMP Design Manual latest version. The final SWQMP July 2, 2025 Item #1 12 of 30 required by this condition shall be reviewed and approved by the city engineer with final grading plans. Developer shall pay all applicable SWQMP plan review and inspection fees per the city’s latest fee schedule. 29. Developer is responsible to ensure that all final design plans (grading plans, improvement plans, landscape plans, building plans, etc) incorporate all source control, site design, pollutant control BMP and applicable hydromodification measures. 30. Ponding depths exceeding 12” in any stormwater basin will require a fence to be installed around the stormwater basin to the satisfaction of the city engineer. Dedications/Improvements 31. Developer shall design the private drainage systems, as shown on the site plan to the satisfaction of the city engineer. All private drainage systems (12” diameter storm drain and larger) shall be inspected by the city. Developer shall pay the standard improvement plan check and inspection fees for private drainage systems. 32. Prior to any work in city right-of-way or public easements, Developer shall apply for and obtain a right-of-way permit to the satisfaction of the city engineer. 33. Developer shall design, and obtain approval from the city engineer, the structural section for the access aisles with a traffic index of 5.0 in accordance with city standards due to truck access through the parking area and/or aisles with an ADT greater than 500. Prior to completion of grading, the final structural pavement design of the aisle ways shall be submitted together with required R-value soil test information subject to the review and approval of the city engineer. Utilities 34. Developer shall meet with the fire marshal to determine if fire protection measures (fire flows, fire hydrant locations, building sprinklers) are required to serve the project. Fire hydrants, if proposed, shall be considered public improvements and shall be served by public water mains to the satisfaction of the district engineer. 35. The developer shall design and agree to construct public water, sewer, and recycled water facilities substantially as shown on the site plan to the satisfaction of the district engineer and city engineer. 36. Sizes and locations of water service, water meter, and backflow preventer shall be shown on the grading plans and shall be provided to the satisfaction of the district engineer and city engineer. 37. The developer shall meet with and obtain approval from the Leucadia Wastewater District regarding sewer infrastructure available or required to serve this project. 38. The developer shall meet with and obtain approval from the Olivenhain Municipal Water District regarding potable water infrastructure available or required to serve this project. July 2, 2025 Item #1 13 of 30 39. The developer shall meet with and obtain approval from the Olivenhain Municipal Water District regarding recycled water infrastructure available or required to serve this project. Code Reminders: 40. Developer acknowledges new forthcoming requirements related to the city’s Climate Action Plan (CAP) will likely impact development requirements of this project, and may be different than what is proposed on the project plans or in the project’s CAP Checklist. Developer acknowledges new CAP requirements are related to energy efficiency, photovoltaic, electric vehicle charging, water heating and traffic demand management requirements, as set forth in City Council Ordinance Nos. CS-347, CS-348, CS-349 and CS-350 and City Council Resolution No. 2019-024, are available on the city’s website. CAP requirements may impact, but are not limited to, site design and local building code requirements. If incorporating new CAP requirements results in substantial modifications to the project, then prior to issuance of development permits, Developer may be required to submit and receive approval of a Consistency Determination or Amendment for this project through the Planning Division. Once adopted as part of Title 18 and in effect, compliance with the new CAP requirements must be demonstrated on or with the construction plans prior to issuance of the applicable development permits. 41. Developer shall pay traffic impact and sewer impact fees based on Section 18.42 and Section 13.10 of the City of Carlsbad Municipal Code, respectively. The Average Daily Trips (ADT) and floor area contained in the staff report and shown on the (SITE PLAN/TENTATIVE MAP) are for planning purposes only. 42. Prior to the issuance of a building permit, Developer shall pay a Public Facility fee as required by Council Policy No. 17. 43. Prior to the issuance of a building permit, Developer shall pay the Local Facilities Management fee for Zone 12 as required by Carlsbad Municipal Code Section 21.90.050. 44. Approval of this request shall not excuse compliance with all applicable sections of the Zoning Ordinance and all other applicable city ordinances in effect at time of building permit or occupancy permit issuance, except as otherwise specifically provided herein. 45. The project shall comply with the latest nonresidential disabled access requirements pursuant to Title 24 of the California Building Code. 46. Premise identification (addresses) shall be provided consistent with Carlsbad Municipal Code Section 18.04.320. 47. Any signs proposed for this development shall at a minimum be designed in conformance with the city’s Sign Ordinance and shall require review and approval of the City Planner prior to installation of such signs. 48. Developer shall pay a landscape plancheck and inspection fee as required by Section 20.08.050 of the Carlsbad Municipal Code. July 2, 2025 Item #1 14 of 30 49. Developer shall pay planned local area drainage fees in accordance with Section 15.08.020 of the City of Carlsbad Municipal Code to the satisfaction of the City Engineer. NOTICE Please take NOTICE that approval of your project includes the “imposition” of fees, dedications, reservations, or other exactions hereafter collectively referred to for convenience as “fees/exactions.” You have 90 days from date of final approval to protest imposition of these fees/exactions. If you protest them, you must follow the protest procedure set forth in Government Code §66020(a) and file the protest and any other required information with the City Manager for processing in accordance with Carlsbad Municipal Code Section 3.32.030. Failure to timely follow that procedure will bar any subsequent legal action to attack, review, set aside, void, or annul their imposition. You are hereby FURTHER NOTIFIED that your right to protest the specified fees/exactions DOES NOT APPLY to water and sewer connection fees and capacity charges, nor planning, zoning, grading, or other similar application processing or service fees in connection with this project; NOR DOES IT APPLY to any fees/exactions of which you have previously been given a NOTICE similar to this, or as to which the statute of limitations has previously otherwise expired. PASSED, APPROVED, AND ADOPTED at a regular meeting of the Planning Commission of the City of Carlsbad, California, held on July 2, 2025, by the following vote, to wit: AYES: NAYES: ABSENT: ABSTAIN: ROY MEENES, Chairperson Carlsbad Planning Commission ATTEST: ERIC LARDY City Planner July 2, 2025 Item #1 15 of 30 49.Developer shall pay planned local area drainage fees in accordance with Section 15.08.020 of theCity of Carlsbad Municipal Code to the satisfaction of the City Engineer. NOTICE Please take NOTICE that approval of your project includes the "imposition" of fees, dedications, reservations, or other exactions hereafter collectively referred to for convenience as "fees/exactions." You have 90 days from date of final approval to protest imposition of these fees/exactions. If you protest them, you must follow the protest procedure set forth in Government Code §66020{a) and file the protest and any other required information with the City Manager for processing in accordance with Carlsbad Municipal Code Section 3.32.030. Failure to timely follow that procedure will bar any subsequent legal action to attack, review, set aside, void, or annul their imposition. You are hereby FURTHER NOTIFIED that your right to protest the specified fees/exactions DOES NOT APPLY to water and sewer connection fees and capacity charges, nor planning, zoning, grading, or other similar application processing or service fees in connection with this project; NOR DOES IT APPLY to any fees/exactions of which you have previously been given a NOTICE similar to this, or as to which the statute of limitations has previously otherwise expired. PASSED, APPROVED, AND ADOPTED at a regular meeting of the Planning Commission of the City of Carlsbad, California, held on July 2, 2025, by the following vote, to wit: AYES: NAYES: ABSENT: ABSTAIN: Meenes, Burrows, Foster, Hubinger. None. Lafferty, Merz, Stine. None. RQjMEENES, Chairperson Carlsbad Planning Commission ATTEST: ERIC LARDY City Planner July 2, 2025 Item #1 15 of 30 PA S E O A L I S O CALLE B A R C E L O N A LA PLANCHALN P A SEOTULIPERO AR B U S T O C T VI S T A CH A P ARRAL COR T E ACEB O CORTE C I D R O E L C AMINO R E A L LA COSTA AV A L G A R D C A R L S B A D B L AMEND-2025-0001(DEV02116) Coastline Church SITE MAP J SITE Map generated on: 5/6/2025 Exhibit 2 July 2, 2025 Item #1 16 of 30 Exhibit 3 July 2, 2025 Item #1 17 of 30 C cityof Carlsbad AUTHORIZATION, CONSENT, AND DISCLOSURE STATEMENT P-1(A) .Development Services Planning Division 1635 Faraday Avenue 442-339-2600 www.carlsbadca.gov §) APPLICATION AND ACKNOWLEDGEMENT INFORMATION This submittal form {Part A through Part F) must be completed as part of your application with the City of Carlsbad. Your project cannot be reviewed until this information is completed. PART A. Owner Authorization and Consent NOTE: This Consent and Disclosure Form must list the name of the principal owners {10% or greater) and attach a copy of the current corporate articles, partnership agreement, or trust document, as applicable. Provide name(s} of the person(s) authorized to sign on behalf of the organization. (A separate page may be attached if necessary.) IF NO INDIVIDUALS OWN MORE THAN 10% OF THE SHARES, PLEASE IND/CA TE NOT-APPLICABLE (N/A) IN THE SPACE BELOW. This is to certify under penalty of perjury that the undersigned is/are the record owner(s) of the property known as: Assessor's Map Book, Page and Parcel (APN/APNs): _2_2_5_-2_7_3_-0_7_-_oo ___________ _ ________________________________ ; and St t Add (.f 1. bl ) 2215 Calle Barcelona ree ress I app Ica e : _______________________ _ that I/we (full legal name of all record owners) consent to the filing of the Land Use Review Application on our property for processing by the City of Carlsbad Planning Division. I/We declare under penalty of perjury that I/we have reviewed this Affidavit and the information is tru0'"2. 1. Name: Joel Aaron Jayne Signature: ~ Signature, c;;,~------1----... ------- Phone Number: 760-7Za6 • Email: jaj@coastlinechurch.org Contact Address: __ 2_21_s_c_a_l_le_B_a_rc_e_lo_n_a ______________ _ 2. Name: ___________ Signature: ____________ _ Phone Number: ___________ Email : __________ _ Contact Address: ______________________ _ NOTE: For additional names, please use a separate sheet of paper. J' MAP 1 0 7.0l Page 1 of 6 P-1(A) Form Rev4/2024 July 2, 2025 Item #1 18 of 30 IMPORTANT: A Grant Deed is required if the ownership does not match city records. Ownership on the deed must correspond exactly with the ownership listed. If the owner noted on the Grant Deed does not match the person signing as Property Owner, provide paperwork documenting the person signing is authorized to sign as a Property Owner. Whenever any excavation, fill, or other project-related improvement requires entry onto adjacent property for any reason, the Land Use Review Application shall include the written consent or legal easements or other property rights of the adjacent property owner or their authorized representative, and shall include such consent with the application package. The application will not be deemed complete unless and until all necessary consent documents are so filed. The consent shall be in a form acceptable to the City Planner. If the proposed improvements on the adjacent property change the nature of the property's development rights (or implied bundle of rights), the city might require recordation of a Covenant and Agreement for Offsite Improvements and Release of Liability as a condition of project approval. Does the project's limits of disturbance encroach on property not owned by the Property Owner? □ Yes ~ No If yes, attach adjacent owner authorization. PART B. Owner Declarations (to be signed by Property Owner) I/We hereby certify that I/we have read the information below and that: 1. I/We understand that it is the responsibility of the Applicant to substantiate the request through the requirements of the application. 2. I/We understand that if there is a zoning violation on the property, application review may be delayed. Any unpermitted structures or uses must either be removed or legalized at part of this application. 3. I/We understand that if this application is approved, I/we may be required to record a covenant with the County Recorder's Office, the form and content that is satisfactory to the City and its City Attorney, to notify future owners of the project approval and restrictions. 4. If this Land Use Review Application is approved or conditionally approved, I/we hereby certify that I/we will comply with all conditions attached to the approval action. I/We understand that the failure to comply with any conditions shall constitute grounds for the revocation or modification of the approval, permit, or other authorizations provided. 5. Prior to any use of the project site pursuant to the permit issued, all conditions of approval (if any) will be c~mpleted or securM~ or required. Property Owner S1gnature(s): ~ ......, J I A J 3/6/25 Name(s): __ o_e __ a_ro_n_a_y_n_e _______________ Date:-------- Page 2 of 6 P-1 (A) Form Rev 4/2024 July 2, 2025 Item #1 19 of 30 PART C. Project Team Information (complete all applicable fields) Applicant: □ Same as Owner 0 Different from Owner Name (if different from Owner): __ J_a_m_e_s_E_._G_r_a_nt _________________ _ Grant General Contractors Company or Firm: _____________________________ _ Phone Number: 760-438-7500 Email: ___ ig_ra_n_t@_g_ra_n_t_gc_._co_m _______ _ Contact Address: 1545 Faraday Ave. City: Carlsbad CA 92008 State: __ Zip Code: ___ _ Agent or Representative: 0:Same as Applicant □ Different from Applicant ON/A Name (if different from Applicant): _______________________ _ Company or Firm: ____________________________ _ Phone Number: Email: ---------------------------- Contact Address: ___________ City: ______ State: __ Zip Code: ___ _ Other (specify Architect, Engineer, CEQA Consultant, etc.): ______________ _ N Al Burghard ame: --------------------------------- BOG Architects, Inc. Company or Firm: ____________________________ _ Phone Number: _9_5_1-_9_7_0-_6_8_5_5 ______ Email: ___ a_e_b@_b_d_g_-a_rc_h_it_e_ct_s_.c_o_m _____ _ C t t Add 27450 Ynex Rd. c· Temecula CA d 92591 on ac ress: ___________ Ity: ______ State:_ Zip Co e: ___ _ NOTE: A Letter of Authorization (LOA) from the Property Owner empowering a person or persons to act on the behalf of the Property, is required if anyone other than the Property Owner signs the Land Use Review Application as the Applicant or Agent. The authorized person (Applicant or Agent) on the LOA must correspond with the name and signature, above. PART D. Single "Point of Contact,, Designation A single "point of contact" is an individual that handles all communications with the city and its review team for the purposes of sending and receiving application materials, information, reports, etc. The point of contact is to be the single individual elected on the Land Use Review Application form for all communications and to remain as the primary contact for all status updates relating to the Land Use Review Application. Single Point of Contact: 0 Applicant □ Property Owner □ Agent □ Other ________ _ Page 3 of 6 P-1 (A) Form Rev 4/2024 July 2, 2025 Item #1 20 of 30 PART E. Contribution Disclosure Has the Property Owner, Applicant, or Agent had more than $900 worth of business transacted with any member of city staff, Boards, Commissions, Committees and/or Council within the past 12 months? □ Yes I[] No If yes, indicate person(s): ___________________ _ NOTE: Attach additional sheets if necessary. PART F. Applicant Declarations (to be signed by Applicant) I hereby certify that I have read the information below and that: 1. I have carefully reviewed and prepared the application and plans in accordance with the instructions. 2. I understand that the specific information needed to initiate planning case processing corresponds to those items listed in the application form's "Minimum Submittal Intake Requirements Checklist." I also understand that even if the application is duly filed and accepted for intake processing, each application submitted to the Planning Division is required to have specified information included in the application packet before it is determined to be complete. The specific information to determine completeness is in "Completeness Determination Requirements Checklist." 3. The Planning Division has developed policies to help ensure that discretionary permit applications are timely processed. The Permit Streamlining Act shot clock starts on the intake date the Planning staff accepts a duly filed application. 4. I understand that once an application is determined to be complete, project or design changes that will increase the number of units, add uses that were not previously listed, substantially change the site plan, or other changes that trigger the need for additional discretionary approvals will require a new application, or the filing of other application permit types, which would restart the review "clock" and extend processing timelines. 5. I understand that upon city review, additional information, documents, reports, entitlements and fees might be required, including any referral fees. I understand that all fees and deposits submitted with this application will be refunded only as provided for by the ordinances, regulations, or policies in effect at the time of the application submittal. 6. I certify that the description of the development and all the plans and supporting documentation are accurate in all material respects as of the date when made. I understand that it is my responsibility to ensure that statements and representations are not misleading. Furthermore, I agree to promptly remove, correct, or add information as needed to correct any misleading or materially inaccurate information. I understand that any misstatement or omission of the requested information or of any information subsequently requested might be Page 4 of 6 P-1(A) Form Rev 4/2024 July 2, 2025 Item #1 21 of 30 grounds for rejecting the application, deeming the application incomplete, denying the application, suspending or revoking a permit issued on the basis of these or subsequent representations, or for the seeking of such other and further relief as deemed appropriate by the City of Carlsbad. 7. If discrepancies exist between the architectural plans and the structural plans, the architectural plans shall take precedence. Ultimately, the scope of work, as described on the permit that authorizes construction, takes precedence over the plans. If there is a discrepancy between the plans and the description on the permit, the permit governs. 8. I understand that all materials submitted in connection with this application might become public record subject to inspection and copying by the public. I acknowledge and understand that the public might inspect and copy these materials and that some or all of the materials might be posted on the city website or elsewhere on line, outside of the city's control. 9. I understand there are no assurances at any time, implicitly or otherwise, whether provided to me in writing or by oral communications regarding final staff recommendations to the decision- making body about this application or the determination of any decision-making body. 10. I understand that the overall design process consists of several steps, each with increasingly more detail. The planning phase is one of the first steps in the design process. A Land Use Review Application (or "planning application") consists only of a schematic design package. If the project is approved or conditionally approved, the schematic design phase is immediately followed by a design development phase (with construction drawings). Construction drawings, such grading and drainage plans, are much more comprehensive and provide additional detail, specificity, and instructions on how to build and implement the project. Review comments, statements, or approvals from the City of Carlsbad concerning a Land Use Review Application are based on the representations of the intent of design and construction. City comments and statements are believed to be accurate; however, such accuracy is not guaranteed when implementing the intended design solution. I understand that the approval or conditional approval of a Land Use Review Application does not replace the more thorough review of the construction drawings by the city or another agency during the design development phase; or services or recommendations provided by design professionals, such as architects, engineers, code professionals, etc. Furthermore, the approval or conditional approval of a Land Use Review Application does not relieve the Applicant of the obligation from complying with all applicable regulations, standards, policies, and guidelines applicable to the design development phase. Therefore, the ultimate design solutions required in construction drawings may differ from the project's initial schematic design. The approved plan set of project drawings, civil plans/grading, sections, site plans, floor plans, architectural elevations, and landscape plans shall not be altered without express authorization by the City Planner. Once a permit has been issued, the Applicant may request permit modifications. "Minor" modifications might be granted if found by the City Planner to be in substantial conformity with the approved plan set, including all exhibits and permit conditions. Page 5 of 6 P-1(A) Form Rev 4/2024 July 2, 2025 Item #1 22 of 30 Modifications beyond the scope described in the approved plan set might require submittal of an amendment to the permit and approval by the authorized review body. 11. Should any proponent of the project fail to file a timely and valid appeal of the permit within the applicable appeal period, such inaction shall be deemed to constitute acceptance of the permit by the Applicant; and agreement by the Applicant to be bound by, to comply with, and to do all things required of or by the Applicant pursuant to all of the terms, provisions, and conditions of the issued permit or other approval. 12. As part of this application, the Applicant hereby agrees to defend, indemnify, and hold harmless the City of Carlsbad, its Council, boards and commissions, officers, employees, volunteers, and agents from any claim, action, or proceeding against the City of Carlsbad, its Council, boards and commissions, officers, employees, volunteers and agents, to attack, set aside, void or annul an approval of the application or related decision, including environmental documents, or to challenge a denial of the application or related decisions. This indemnification shall include, but not be limited to, damages awarded against the city, if any, costs of suit, attorneys' fees, and other expenses incurred in connection with such claim, action, causes of action, suit or proceeding whether incurred by Applicant, city, and/or the parties initiating or bringing such proceeding. The Applicant shall indemnify the city for all of the city's costs, attorneys' fees, and damages that the city incurs in enforcing the indemnification provisions set forth herein. The Applicant shall pay to the city upon demand any amount owed to the city pursuant to the indemnification requirements prescribed. By signing below, I acknowledge that I have complete! read, understand, and agree to the declarations above and accept all terms set fort Name: ___ J_o_e_l _A_a_ro_n_J_a_y_n_e ______________ Date: __ 31_6_12_5 ____ _ This form must be stapled/attached to the application and shall be effective until replaced or revoked in writing. Page 6 of 6 P-1 (A) Form Rev 4/2024 Exhibit 4 Planning Commission Staff Report and Resolution No. 7333, May 15, 2019 (on file in the Office of the City Clerk) July 2, 2025 Item #1 23 of 30 LIST OF ACRONYMS AND ABBREVIATIONS Exhibit 5 This is a list of acronyms and abbreviations (in alphabetical order) that are commonly used in staff reports. Acronym Description Acronym Description APA American Planning Association LCPA Local Coastal Program Amendment APN Assessor Parcel Number LOS Level of Service AQMD Air Quality Management District MND Mitigated Negative Declaration BMP Best Management Practice NCTD North County Transit District CALTRANS California Department of Transportation ND Negative Declaration CC City Council PC Planning Commission CCR Conditions, Covenants and Restrictions PDP Planned Development Permit CEQA California Environmental Quality Act PEIR Program Environmental Impact Report CFD Community Facilities District PUD Planned Unit Development CIP Capital Improvement Program ROW Right of Way COA Conditions of Approval RWQCB Regional Water Quality Control Board CofO Certificate of Occupancy SANDAG San Diego Association of Governments CT Tentative Parcel Map SDP Site Development Permit CUP Conditional Use Permit SP Specific Plan DIF Development Impact Fee SWPPP Storm Water Pollution Prevention Program DISTRICT City Council Member District Number TM Tentative Map EIR Environmental Impact Report ZC Zone Change EIS Environmental Impact Statement (federal) EPA Environmental Protection Agency FEMA Federal Emergency Management Agency GP General Plan GPA General Plan Amendment GIS Geographic Information Systems HCA Housing Crisis Act 2019 IS Initial Study July 2, 2025 Item #1 24 of 30 PLANNING SUBMITTAL PACKAGE 2215 Calle Barcelona Carlsbad, California 92008 COASTLINE CHURCH ARCHITECT OWNER ARCHITECTURAL DRAWINGS CIVIL DRAWINGS CIVIL ENGINEER VICINITY MAP NORTH T1.0 C-1.0 A1.1 A1.3 A2.1 A2.2 A2.3 A2.4 SITE DATABUILDING DATA PROJECT DIRECTORY SHEET INDEX AMENDMENT 2018-0003 (DEV02116) FOR MAINTENANCE / STORAGE BUILDING - [FUTURE PHASE] A2.5 A2.6 A4.2 LANDSCAPE DRAWINGS L1.0 (E) WORSHIP CENTER EXPANSION - [FUTURE PHASE] (E) CAFE ADDITION - [FUTURE PHASE] LANDSCAPE ARCHITECT PROJECT OVERVIEW (E) WORSHIP CENTER / CAFE SPACE: MASTER PLAN PARKING TABULATION LA COSTA AVE. 5 EL C A M I N O R E A L E L C A M I N O R E A L CA L L E BA R C E L O N A OLIV E N H A I N R D LA COS T A A V E . SA X O N Y R D Q U A I L G A R D E N S D R . LEUCADIA BLVD GA R D E N V I E W R D CAL L E BAR C E L O N A TOTAL SITE DEVELOPMENT BUILDING FLOOR AREA: A1.4 A1.2 L2.0 L2.1 L3.0 L3.1 A1.1.1 A4.1 A4.3 C-2.0 C-2.1 CHILDREN'S MINISTRY CENTER: CHILDREN'S MINISTRY BUILDING MAINTENANCE / STORAGE BUILDING EXISTING WORSHIP CENTER EXPANSION EXISTING CAFE EXPANSION SITE AND PARKING GOVERNING CODES A4.4 A1.5 A1.0 A5.1 NEW CHILDREN'S MINISTRY BUILDING - [PHASE 1] C-2.2 C-3.0 TITLE SHEET T1.0 NTS 2215 CALLE BARCELONA CARLSBAD, CALIFORNIA 92008 P: \ C o a s t l i n e C h i l d r e n s B u i l d i n g \ N E W M I N I S T R Y B U I L D I N G \ P l a n n i n g S u b m i t t a l D o c u m e n t \ 1 7 1 0 5 _ T 1 . 0 _ T i t l e S h e e t . d w g jo h n . a l v a r a d o A p r 1 1 , 2 0 1 9 - 4 : 3 0 p m COASTLINE CHURCH PLANNING SUBMITTAL PACKAGE MARCH 22, 2018 AMENDMENT 2018-0003 (DEV02116) FOR 17105 PLANNING SUBMITTAL AMEND 2018-0003 (DEV02116) - COASTLINE CHURCH PLANNING DEPT. SUBMITTAL #2 07-23-2018 PLANNING DEPT. SUBMITTAL #3 10-12-2018 FO R R E F E R E N C E O N L Y Exhibit 6 July 2, 2025 Item #1 25 of 30 1 /1 6"-1' I I I I I 111 I I I I I I I I I I I I I 111 I I I I I I I I I I I I 1111 I I I I I I I I I 0 16 32 48 0 8 THE 5COFE OF l.lk:lRK 15 PLANNED TO 6E COMPLETED DURING Tl.lk:l SEPARATE PHASES. PHASE I INCLUDES A NEW CHILDREN'S MINISTRY CENTER WHICH WILL REPLACE, IN THE SAME APPROXIMATE LOCATION, THE EXISTING MODULAR 6UILDING5 WHICH HAVE: 6EEN USED FOR CLA55ROOM5 AND 5T AFF OFFICES. THE 6UILDING PAD FOR THE NEW CHILDREN'S MINISTRY 6UILDING WILL 6E LOWERED APPROXIMATELY 48" FROM IT'S CURRENT PAD ELEVATION. THIS PHASE ALSO INCLUDES PARKING EXPANSION AT THE CUL-DE-SAC AT THE WEST END OF DRIVE: "A". THIS AREA WILL 6E USED ON A TEMPORARY 6A5I5 TO LOCATE MODULAR CLASSROOM 6UILDING5 UNTIL THE MINISTRY CENTER 15 COMPLETED. PHASE 2 INCLUDES A 2,141 5F EXPANSION OF THE EXISTING l.lk:lRSHIF CENTER, A 442 5F EXPANSION TO THE EXISTING CAFE 6UILDING, A Tl.lk:l-5TORY 1,314 5F MAINTENANCE/STORAGE 6UILDING AND THE ADDITIONAL NEW PARKING AREA SHOWN ON THE PLANS AS DRIVE: ISLE "C". PORTIONS OF PHASE 2 MAY 6E 5EPARATEL Y PERMITTED WITH REQUIRED PARKING PROVIDED. IMPLEMENTATION OF PHASE I 15 PLANNED TO COMMENCE WITHIN THE NEXT YEAR, HOWEVER, THE ANTICIPATED CONSTRUCTION DATE FOR PHASE 2 15 NOT KNOWN AT THIS TIME. THE PROPOSED 2-5TORY MINISTRY CENTER 15 COMPRISED OF CLA55ROOM5 AND 6REAK-OUT ROOMS FOR FRE-5CHOOL TO JR HIGH AGE CHILDREN. THE YOUNGER CHILDREN ARE ON THE LOWER LEVEL. THE MUL Tl -PURPOSE ROOM ON THE GROUND FLOOR 15 DESIGNED FOR KIDS WORSHIP AND 15 PROVIDED 1111TH MUSIC AND VIDEO CAPA6ILITIE5 TO ENHANCE THEIR LEARNING EXPERIENCE. THE UPPER LEVEL HAS CLA55ROOM5 FOR OLDER KIDS AND A VERY LARGE MUL Tl -PURPOSE ROOM DESIGNED FOR SPECIAL EVENTS THAT WILL ACCOMMODATE A VARIETY OF FUNCTIONS. THE SIZE OF THE ROOM LENDS ITSELF WELL TO LARGE GROUP l.lk:lRSHIP, LIVE: MUSIC PERFORMANCES, LARGE FORMAT VIDEO STREAMING, AND KID'S EASTER AND CHRISTMAS FLAYS. THIS FLOOR 15 ALSO THE HOME FOR ADMINISTRATIVE OFFICES WHICH OVERSEE MANAGEMENT AND DAY TO DAY OPERATION OF THE CHURCH. EXTERIOR DECKS ARE PROVIDED AT EACH END OF THE 6UILDING WHICH CAN 6E USED AS A DESTINATION PLACE FOR SMALL GROUP GATHERINGS, OUTDOOR 6I6LE STUDIES, 66Q'5 ETC. THE CORE AREA OF EACH FLOOR 15 PROVIDED 1111TH A LARGE L066Y 1111TH SELF CHECK-IN AND RECEPTION STATIONS FOR NEIii ATTENDEES AND VISITORS. SECURITY 15 A HIGH PRIORITY 50 RECEPTION ALSO FUNCTIONS AS A CHECK-POINT FOR ANYONE ENTERING OR LEAVING. THE ARCHITECTURE OF THE MINISTRY CENTER 15 CONSISTENT 1111TH THE CRAFTSMAN-INFLUENCED ARCHITECTURE THAT IIIA5 APPROVED FOR THE ORIGINAL 5DF 02-IE> IN 2004. WE ARE FROF05ING USE OF THE SAME EXTERIOR FINISH MATERIALS, COLORS AND DETAILS THAT WERE USED ON THE EXISTING COMMUNITY CENTER AND CAFE. THIS MINISTRY CENTER 15 NOT DESIGNED TO FUNCTION A5 A SCHOOL OR DAY-CARE FACILITY DURING THE WEEK. THE PROPOSED 2-5TORY MAINTENANCE 6UILDING 15 LOCATED AT THE 50UTH-IIIE5T CORNER OF THE PROPERTY ADJACENT TO DRIVE "A". THE PRIMARY FURF05E OF THIS BUILDING 15 TO PROVIDE SHELTER FROM THE ELEMENTS FOR GOLF-TYPE CARTS THAT ARE USED ON THE CAMPUS. IT WILL ALSO 6E USED FOR STORAGE OF LAWN MOWER AND GARDENING EQUIPMENT, AND WHEN NECESSARY TO DO MINOR MAINTENANCE ON CARTS AND MOWERS. THE UPPER LEVEL WILL 6E USED FOR LONG-TERM STORAGE ITEMS SUCH AS PROPS AND DECORATIONS THAT ARE USED DURING THE EASTER AND CHRISTMAS SEASON. THE 6UILDING HAS A 10' FLOOR TO FLOOR HEIGHT, DESIGNED IN THE SAME VERNACULAR AS OTHER 6UILDING5 ON CAMPUS. IIIE WILL USE THE SAME COLORS AND FINISH MATERIALS. THE EXISTING WORSHIP CENTER 1111TH A SEATING CAPACITY OF 280 15 IN NEED OF REMODEL AND AN INCREASE IN SEATING CAPACITY. THE STYLE OF PREACHING, THE CURRRENT TECHNOLOGY, AUDIONIDEO/LIGHTING UPGRADES AND A GROWTH IN MEMBERSHIP ARE ALL DRIVING FACTORS. THE GOAL 15 TO PROVIDE ROUGHLY 430 5EAT5 6UT IN ORDER TO GET TO THIS 06JECTIVE, THE STAGE AND SEATING ORIENTATION NEEDS TO 6E ROTATED 90 DEGREES. IT 15 IMPORTANT TO KEEP THE STREET SIDE ELEVATION UNCHANGED. FOR THI& REA&ON THE EXFAN&ION WA& MOVED TO THE SOUTH SIDE WHERE CHANGE& ARE NOT vl5I6LE FROM CALLE 6ARCELONA. THIS EXPAN&ION INCLUDES A MUCH DEEPER &TAGE, ADA ACCE55I6LE RAMP, AND A/VIL CONTROL ROOM FOR NEW EQUIPMENT, AND A &TORAGE ROOM. OF COUR&E, IN ORDER TO GET THE HEIGHT REQUIRED FOR LIGHT 6AR5 AND &PEAKER ARRAYS, A PORTION OF THE EXl&TING ROOF WILL 6E REMOVED. AT THE EXTERIOR, THE EXPANSION NECE55ITATE5 MODIFICATION& TO THE RETAINING WALLS AT THE PATIO. AND IN ORDER TO KEEF THE PATIO AS OPEN AS P055I6LE, A NEIii STAIR UF TO DRIVE: "13" 15 PROPO&ED. ELEVATION WISE, THERE ARE NO CHANGES ON THE STREET SIDE OF THE 6UILDING. ONLY THE 50UTHERL Y PORTION OF THE 6UILDING 15 AFFECTED 61 THE EXFAN&ION. THAT PORTION OF THE 6UILDING WILL NOW HAVE A FARAFET ROOF WHICH WILL &GREEN ROOF-TOP EQUIPMENT. IIIE WILL INCORPORATE U&E OF THE SAME FINl&H MATERIAL&, COLORS AND DETAILS CURRENTLY EMPLOYED. ON THE SOUTH SIDE WE ARE PROPOSING A TRELLI& FOR A SHADED &EATING AREA 6ELOW AND WE HAVE: MAINTAINED THE FOCAL POINT OF A FIREPLACE AT THE VERY CENTER THE COM6INATION OF STONE, &TUCCO AND Uk:lOD SIDING HELF5 TO 6REAK UP THE MA55 INTO SMALLER PIECES. THIS 15 FURTHER EMPHASIZED 61 CHANGING PLANES FOR EACH FINl&H MATERIAL. THE EXl&TING CAFE WILL REMAIN LARGELY UNCHANGED. THERE ARE NO CHANGES TO THE STREET SIDE ELEVATION, THE EAST SIDE, AND MOST OF THE IIIE&T SIDE ELEVATION. THE ADDITION TO THI& 6UILDING 15 COMPRISED OF MUL Tl-STALL TOILET ROOM& ONLY. WHILE TOILET ROOM& ARE ALREADY PROVIDED WITHIN THE CAFE, THEY HAVE PROVEN TO 6E SOMEWHAT INCONVENIENT, E&FECIALL Y AFTER A CHURCH &ERVICE WHEN THE NEED 15 THE GREATE&T. THE ADDITION 6LEND5 WELL INTO EXISTING ARCHITECTURE SINCE THE &OUTH, WE&T AD A PORTION OF THE NORTH WALL ARE ALL FINISHED WITH THE &AME &TONE. 1/4"-1' 16 24 0 4 8 12 0 2 4 6 0 PROJECT NAME, COASTLINE CHURCH PROJECT ADDl'<l:55, 2215 CALLE 6ARCELONA OCCUPANCY GROUP, (C6C 201&, SECTION 303.4) CON&TRUCTION TYFE, (C6C 201&, TA6LE E>OI) FIRE PROTECTION, A-3 CARL56AD, CALIFORNIA 'il200S 111-13 FULLY SPRINKLERED NUMBER OF STORIES, (C6C 201&, SECTION 504, TA6LE 504.4! ALLOWED, ACTUAL, 2 2 BUILDING HEICirHT, (C6C 201&, &ECTION 504, TA6LE 504.3! ALLOWED, ACTUAL, BUILDING Al'i!EA, 1ST FLOOR, AREA OF FIR&T FLOOR 35 FEET 35 FEET EXTERIOR ELEVATOR 4 ELEV. MACHINE ROOM. TOTAL, I3,E,1& SQ. FT. 142 SQ. FT. 13,818 SQ. FT. 2ND FLOOR, AREA OF SECOND FLOOR OPEN DECK 4 6ALCONIE5, TOTAL, 6UILDING TOT AL FLOOR AREA, I0,070 SQ. FT. E>,03i!> &Q. FT. Ii!> ,IOi!> &Q. FT. 13,&1& + 10,010 • 23,14& SQ. FT. OCCUPANCY GROUP, (C6C 201&, SECTION 3113! CON&TRUCTION TYPE, 5-2 V-13 FULLY SPRINKLERED 2 FIRE PROTECTION, NUM6ER OF &TORIES, 6UILDING HEIGHT, FLOOR AREA, 1ST FLOOR, 2ND FLOOR, STAIRS /NOT ENCLO&ED! 6UILDING TOTAL FLOOR AREA, 25 FEET &81 &Q. FT. &81 SQ. FT. 138 SQ. FT. (E! GARDEN CHAPEL AREA (OPEN GAZE60!, &81 + E>S1 • 1,314 SQ. FT. 342 SQ. FT. PROJECT DESCRIPTION, A 2,141 5F FUTURE EXPANSION TO THE EXISTING WORSHIP CENTER NUM6ER OF STORIE&, /E! 6UILDINC:i HEIC:!HT, !E! TYPE OF CON&TRUCTION, /E) FIi'<!: PROTECTION, OCCUPANCY GROUP, OCCUPANCY LOAD, TOT AL AS5EM6L Y &EATING PROVIDED, !E) 6UILDINC:i FLOOR Al'<EA, I 22'-E>" TO TOP OF ROOF PARAPET V-6 FULLY &PRINKLEl'<ED A-3 / A2.I) 3,'il2E> &Fl 1 • 5&1 429 SEAT& FUTUl'<E PHASE 6UILDING EXPAN&ION FLOOR Al'<EA 4,320 &QFT. 2,141 &QFT. 6UILDINC:i TOTAL FLOOR AREA E> ,461 &QFT. PROJECT DESCRIPTION, A 442 &F FUTURE TOILET ROOM ADDITION TO THE EXISTING CAFE NUM6ER OF STORIES, (E) 6UILDINC:i HEIC:!HT, I 22'-E>" TO TOP OF ROOF PARAPET !E) 6UILDINC:i 6UILDING TYPE OF CON&TRUCTION, !E) FIi'<!: PROTECTION, OCCUPANCY C:!ROUP, OCCUPANCY LOAD, !E) 6UILDINC:i FLOOR Al'<EA, FUTUl'<E PHASE l'<E&TROOM ADDITION FLOOR A!'<EA, 6UILDINC:i TOTAL FLOOR AREA V-6 FULLY &PRINKLEl'<ED A-3 l,SII &F/I5 • IOI 2,S'ilO SQFT. 442 SQFT. 3,032 &QFT. 23,14& + 1,314 + E>,4&I + 3,032 • 34,E,I3 &Q. FT.I A5SE550R'5 PARCEL NO, 255-213-01-00 LEC:!AL DE&CRIFTION, TOT AL LOT Al'<EA, IE! ZONING, !E) LAND U&E, 5ET6ACK5, LOT COvERAC:!E, 6UILDING HEIC:!HT, SEWER Dl&TRICT, WATER Dl&TRICT, &CHOOL Dl&TRICT, LOT 482 OF CARL56AD TRACT NO. 88-03-2, ARROYO LA COSTA, UNIT 2 (VILLAGES G, H, J, P, Q, RAND 5), IN THE CITY OF CARL56AD, COUNTY OF &AN DIEGO, STATE OF CALIFORNIA, ACCORDING TO MAP THEREOF NO. 1338"', FILED IN THE OFFICE OF THE COUNTY RECORDER OF SAN DIEGO COUNTY, DECEMBER 20, l99i!>. E>.43 ACl'<l:5 • 2S0,09I &F. PLANNED COMMUNITY /FC) ARROYO LA CO&TA MASTER PLAN !MP 88-01) IN VILLAGE "J" CHURCH / EDUCATION / COMMUNITY CENTER R-4 RESIDENTIAL FRONT, 20'-0" ~AR.: 101-0 11 &IDE, I0'-0" ALLOIIIED, 50% MAXIMUM ACTUAL, 123&% (34,E,I4 / 280,0'ill) 3&'-011 LEUCADIA WASTEWATER Dl&TRICT (1i!>O) 153-0155> OLIVE:NHAIN MUNICIPAL WATER DISTRICT /1&0) 15>3-&4&& ENCINITA& UNION &CHOOL Dl&TRICT /1&0) 944-4300 (E! PARKING 5TALL5, PROPO&ED PARKING 5TALL5, 160 EXl&TING FULL SIZE 5T ALLS 221 FULL &IZE 5TALL5 CAFE, !E! LOUNGE COMMON AREA, SANCTUARY, COMMON AREA, I,S49 SF / 100 5F 1,483 &F I 25>0 5F 429 &EATS/ 5 2242 &F I 250 5F 2 PERSON/ AUDIO 1300TH TOT AL WORSHIP CENTER/CAFE PARKING REQUIRED CLA55ROOM, ADMIN STAFF, COMMON AREA, A55EM6L Y AREA, A55EM6L Y AREA, A55EM6L Y AREA, (9) CLA55ROOM5 (2 TEACHERS / CLA55ROOM) 2,024 &F. I 250 &F 8,3&5> SF I 250 5F I SPACE PER TEACHER 2 PERSONS / AUDIO 1300TH ADULT U&E-200 &EAT& I 5> TOTAL MINl&TRY CENTER PARKING REQUIRED !&EE FLOOR PLAN FOR AREA BREAKDOWN) IE> SPACES E> SPACES 8& SPACES 9 SPACES 2 SPACES 119 &PACE& 18 &PACE& 8 &PACE& 34 &PACE& 2 &PACE& 4 &PACE& 40 SPACE& IOi!> &PACES TOTAL PARKING l'<EGlUll'<ED, 225 &PACE& TOTAL PARKING PROVIDED, 221 &PACES NOTE, TOTAL PARKING COUNT OF 221 5TALL5 INCLUDE& 1 ACCE55I6LE SPACE& PERCENT AGE OF &ITE TO 6E LANDSCAPED, PERCENT AGE OF PARKINC:i Al'<EA TO 6E LANDSCAPED, !SEE LANDSCAPE DRAWING -SHEET L2.I! 43,01E> 5F (3E,%) i!>,I28 SF /11%! AvERAGE DAILY TRAFFIC C:!ENERATED -6A5ED ON TRAFFIC l'<EPORT OF 11-10-2003 CHURCH -36,ISI TOTAL S.F. (IIIEEKDAY5) 344 CHURCH -3S,1SI TOTAL S.F. !&ATURDAY! 310 CHURCH -3S,1SI TOT AL S.F. (5UNDAY) 1,391 !SEE TRAFFIC LETTER l'<EPORT INCLUDED WITH THIS SU6MITT AL! PROPOSED WATER DEMAND, PROPOSED SEWER C:!ENERATION, PROPOSED DRAINAGE DISCHARGE, EARTHWORK VOLUMES, 5>3 GPM 1,i!>OO GPD 22.4 CF& CUT -Ea ,250 CY FILL -3,i!>OO CY REMEDIAL GRADING -900 CY EXPORT -2,E,50 CY 1 "=1' 2 4 COA&TLINE CHURCH 2215 CALLE BARCELONA CARL56AD, CALIFORNIA 92008 /1&0) 438-1500 VOICE /1&0! 438-305>& FAX MR. JAME& GRANT 0 6URGHARD DE&IGN GROUP ARCHITECT&, INC. 41951 REMINGTON AVE:, &UITE 250 TEMECULA, CALIFORNIA 92590 /951) 29&-2828 VOICE MR. AL 6URGHARD FU&COE ENGINEERING, INC. &390 GREENWICH DRIVE:, &UITE 110 &AN DIEGO, CALIFORNIA 92122 (858) 554-1500 VOICE /85>8) 5>91-0335> FAX MR. ERIC ARM&TRONG MIii PELTZ + A550CIATE, INC. 143 5. CEDR05 AVE:., &UITE 6104 SOLANA 6EACH, CALIFORNIA 'il2015> /858) 481-0888 VOICE /858) 481-&808 FAX MR. MICHAEL PELTZ I \\ ) 2 3 PROJECT a 3" -1' t======:::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::J 0 COVER &HEET DETAIL& GRADING PLAN GRADING PLAN GRADING PLAN EROSION CONTROL PLAN EXISTING VEGETATION CONCEPTUAL LANDSCAPE PLAN CONCEPTUAL LANDSCAPE PLAN NOTES CONCEPTUAL IRRIGATION PLAN WATER EFFICIENT LAND&CAPE CALCULATION& EXISTING &ITE PLAN OVERALL MA&TER &ITE PLAN &TREET VIEW ELEVATIONS PROJECT PHASING PLAN PARTIAL ENLARGED SITE PLAN PARTIAL ENLARGED SITE PLAN PARTIAL ENLARGED SITE PLAN If this sheet is not 24" by 36" it is a reduced print, scale accordingly CHILDREN'S MINl&TRY 6UILDING -FIR&T FLOOR PLAN CHILDREN'& MINl&TRY 6UILDING -SECOND FLOOR PLAN CHILDREN'& MINl&TRY 6UILDING -ROOF PLAN l.lk:lRSHIP CENTER 6UILDING EXPAN&ION -FLOOR PLAN l.lk:lRSHIP CENTER 6UILDING EXPAN&ION -ROOF PLAN MAINTENANCE 6UILDING -FLOOR, ROOF PLAN 4 6LDG ELEVATION& CHILDREN'& MINl&TRY 6UILDING -6UILDING ELEVATION& CHILDREN'S MINl&TRY 6UILDING -ELEVATOR TOWER ELEVATIONS l.lk:lRSHIP CENTER 6UILDING -EXl&TING 6UILDING ELEVATIONS l.lk:lRSHIP CENTER 6UILDING EXPAN&ION -6UILDING ELEVATIONS CHILDREN'& MINl&TRY 6UILDING -&ITE SECTION& CHURCH /EDUCATION/ COMMUNITY CENTER THE CONTRACTOR SHALL 6E 50LEL Y AND COMPLETELY RE5PON5I6LE FOR COMPLYING WITH ALL GOVERNING 6UILDING CODE&, INCLUDING, 6UT NOT LIMTIED TO, 201E> CALIFORNIA 6UILDING CODE (Cl3C! 201& CALIFORNIA MECHANICAL CODE (CMC) 201E> CALIFORNIA PLUM6ING CODE (CFC! 201& CALIFORNIA ELECTRICAL CODE /CEC! 201E> CALIFORNIA FIRE CODE (CFC! 201E> CALIFORNIA ENERGY EFFICIENCY 5TANDARD5 CURRENT CITY OF CARL56AD MUNICIPAL CODE A PPROVED TIIIS IS THE APPROVED TENTATIVE MAP/SITE PLAN FOR PROJECT NO. PER CONDITION NO. OF PLANNING COMMISSION RESOLUTION NO. PLA.'INlNG VlVlSlON DATb EJ\GlNEERING UlVlSlON DATE ■ ■ ■ ■ ■ ■ ■ ■ ■ B U R G H A R D DESIGN GROUP ■ ■ ■ ■ ■ ■ ■ ■ ■ A R C H I T E C T 5, I N C 4 19 51 R E M I N G T O N AVE. , S U I T E 2 5 0 TEMECULA, CALIFORNIA 92590 (TEL) 951 • 296 • 2828 www.bdg-architects.com • ~I -~A=R=CHTE~=C~T~O_F_R_EC_OR_D __ _ ►~I --~PR=O=FE=S=S~IO~N_A_L _SE_A_L __ ~ • ~I ___ C_ON_SUL_TA_NT_S __ _ ►~I ____ RE_V_IS_IO_N_S ___ _ • ~I ---~AP~PR~O~V_A_L ___ ~ ►~I ___ P_R_O_JEC_T_PH_ASE ___ ~ • ~I --~P~R~O~JEC~T_NA_M_E ___ ~ ►~I ___ PR_O_JE_C_T_N_U_MB_ER ___ _ e1 SHEET TITLE ►1 SHEET NUMBER •1 SCALE ►1 DATE POLE POLE DENSE TREES GNV 135 135 135 135 130 125 120 1 1 5 13 0 12 5 12 0 13 0 12 5 120 115 110 105 100 95 130 125 120 115 110 105 100 95 130 130 12 5 12 0 115 11 0 10 5 10 0 130 12 5 120 115 11 0 105 140 135 140 135 130 160 155 150 145 185 180 175 170 165 195 190 195 190 185 180 175 170 165 160 155 150 145 140 190 185 180 175 170 165 160 155 150 145 140 185 180 175 170 165 160 155 150 145 140 135 180 175 170 165 160 155 150 145 140 13 5 130 125 120 115 110 105 100 95 90 85 125 120 115 110 105 100 95 90 105 100 95 90 100 9 5 105 100 95 90 90 90 90 85 85 95 90 105 10 0 125 120 115 110 100 95 90 85 10 0 95 90 85 110 110 110 115 110 120 115 130 125 120 115 110 13 0 120 11 5 110 100 130 125 12 0 90 PA S E O A L I S O 80 75 85 80 85 80 85 85 80 85 90 80 1 0 0 9 5 9 0 85 105 1 0 5 110 110 10 5 C A L L E B A R C E L O N A P A S E O A L I S O P A S E O A L I S O 100 95 90 105 110 E X I S T I N G S I T E P L A N TRUE NORTH W O R K I N G N O R T H REFERENCE ORIGINAL DESIGN : CA 0.1 EXISTING PLAY AREA PAD TO BE RAISED AND USED AS A TURF AREA SEE SHEET A1.2 EXISTING WORSHIP CENTER AND CAFE TO BE EXPANDED, SEE SHEET A1.2 (E) F I R E H Y D R A N T (E) F I R E H Y D R A N T EXISTING MODULAR CLASSROOM BUILDINGS TO BE REMOVED AND REPLACED WITH NEW MINISTRY CENTER SEE SHEET A1.2 FOR LOCATION OF NEW TEMPORARY MODULAR BUILDINGS EXISTING CHAPEL STRUCTURE TO BE RELOCATED, SEE SHEET A1.2 (E) R A M P D N . (E) WATER QUALITY BASIN EXISTING PARKING AREA TO BE RECONFIGURED, SEE SHEET A1.2 PROPOSED LOCATION FOR NEW DRIVE 'C' PARKING AISLE, SEE SHEET A1.2 PROPOSED PARKING EXPANSION AREA SEE SHEET A1.1 EXISTING AMPHITHEATER TO BE REMOVED SEE SHEET A1.2 EXISTING STAIR TO BE REPLACED WITH NEW STAIR SEE SHEET A1.2 EXISTING STAIR TO BE RECONFIGURED, SEE SHEET A1.2 EXISTING SITE PLAN A1.0 1" = 40' 2215 CALLE BARCELONA CARLSBAD, CALIFORNIA 92008 P: \ C o a s t l i n e C h i l d r e n s B u i l d i n g \ N E W M I N I S T R Y B U I L D I N G \ P l a n n i n g S u b m i t t a l D o c u m e n t \ 1 7 1 0 5 _ A 1 . 0 _ E x i s t i n g S i t e P l a n . d w g jo h n . a l v a r a d o A p r 1 5 , 2 0 1 9 - 8 : 5 7 a m COASTLINE CHURCH PLANNING SUBMITTAL PACKAGE MARCH 22, 2018 AMENDMENT 2018-0003 (DEV02116) FOR 17105 PLANNING SUBMITTAL AMEND 2018-0003 (DEV02116) - COASTLINE CHURCH PLANNING DEPT. SUBMITTAL #2 07-23-2018 PLANNING DEPT. SUBMITTAL #3 10-12-2018 FO R R E F E R E N C E O N L Y July 2, 2025 Item #1 26 of 30 1/16"-1' 1 o1" iii i I Iii iii i I I 1~1111111111111 ~d" 1111 I 11 1111 ~81 __ 11 _s .. -_,.~o':_~:=~~:5ir=~:'E~~~~=~~;'s'~ 16 I I 24 • --- -- I I I ' I ' I I I I ' \ ' \ ' , I I \ ' I ' I ' I l' ' I :-------• I ;' , I , I , I , ~~~ \ »~. \ ~-1\ ~i,~ \\\ .--, ~ ~ .·T!---i-..i 0 1 "=1' 2 4 6 0 2 4 0 2 3"=1' 3 0 If this she • by 36" . _et is not 24" . it 1s O d print, scale re uced accordingly / I l-- ■■■---8 u R ·c. H. A. R. o ?~SIGN GROUP ■ ■ ■ ■ ■ A R C H I T E C T s, I ~ C 41951 REMINGTON T EM E C U L A C AVE , 5 U I T E 2 5 o I ALIFORNIA (TEL)951·296 92590 • 2 8 2 8 • .--I_ www.bdg-architect . AR s.com -'" OIITECT OF RECORD ►1,----­~-l'PRK(OFESSIONAL SEAL cONsUL TANTS e,1-- ►~1,====~VISI REVISIO~NIS:::S ====~ APPROVA.C-L --e ~Cl ===-~_1,._---...~&QIY} ►1r---=::Jfil~r:::ffi~== -PROJECT PHASE PROJECT NAME ►1 PROJECT NUMBER SHEET TITLE ►1 SHEET NUMBER e I SCALE 1►1 DATE CHAPEL POLE POLE DENSE TREES GNV DENSETREESGNV DENSETREESGNV DENSE TREES GNV DENSETREESGNV DENSETREESGNVDENSETREESGNV DENSETREESGNV DENSE TREESGNV DENSETREESGNV DENSETREESGNV DENSE TREES GNV DENSETREESGNV DENSE TREES GNV DENSE TREESGNV DENSE TREES GNV DENSETREESGNV DENSE TREESGNV DENSE TREES GNV DENSETREESGNV DENSETREESGNV DENSETREESGNV DENSETREESGNV 40001 1971821.57 6252196.5482.59 400041971699.48 6252861.48 134.80 135 135 135 135 130 125 120 1 1 5 13 0 12 5 12 0 13 0 12 5 120 115 110 105 100 95 130 125 120 115 110 105 100 95 130 130 12 5 120 115 11 0 10 5 10 0 130 12 5 12 0 115 11 0 105 140 135 140 135 130 160 155 150 145 175 170 165 160 155 150 145 140 190 185 180 175 170 165 160 155 150 145 140 185 180 175 170 165 160 155 150 145 140 135 180 175 170 165 160 155 150 145 140 13 5 130 125 120 115 110 105 100 95 90 85 125 120 115 110 105 100 95 90 100 95 90 100 95 90 90 90 90 85 85 95 90 105 10 0 125 120 115 110 100 95 90 85 10 0 95 90 85 110 120 115 130 125 120 115 110 13 0 120 11 5 110 100 130 125 12 0 90 PA S E O A L I S O TREES TREES TREES TREES TREES TREES TREES TREES TREES TREES 80 75 85 80 85 80 85 85 80 85 90 80 1 0 0 9 5 9 0 85 105 10 5 110 110 TREES TREES 10 5 C A L L E B A R C E L O N A P A S E O A L I S O P A S E O A L I S O 100 95 90 105 110 (E ) S I D E W A L K EXISTING CAFE BUILDING EL 104.00 EXISTING WORSHIP CENT E R BUILDING EL 104.00 W.I. FE N C E MINIST R Y BUILD I N G EL 10 0 . 0 0 NEW CO V E R E D W A L K W A Y PLAZA A R E A SI D E W A L K UP RA M P U P UP UP UP UP 12' x 24' VIDEO WALL (E) COURTYAR D DN NEW R E T A I N I N G W A L L PLAZA A R E A NEW RETAIN I N G W A L L 24' WIDE D R I V E A I S L E NEW RETAIN I N G W A L L 24' WIDE DRIVE AISLE NEW RETAINING WALL NEW RETAINING WALL UP MINISTRY TABLES (E) COURTYAR D DN DN (E) ENTRY COURT DN DN NO PAR K I N G NO PAR K I N G NO PARK I N G NO P A R K I N G MAIN T . B L D G 2 ST O R Y EL 13 2 . 5 0 (E) TUBU L A R S T L . G U A R D R A I L (E) TUBULAR STL. GUARDRAIL BOYS TOILETS 12' x 20' GIRLS TOILETS 12' x 20' NURSERY 12' x 40' TODDLERS 24' x 40' KIOSK 12' x 10' OFFICE 12' x 40' RAMP DECK RA M P RAMP TOP O F S L O P E (N) RE T A I N I N G W A L L (N) RE T A I N I N G W A L L STORAG E ROOM (MACH I N E ROOM ON LOWER LEVEL) ELEV. DN DN OBSERVA T I O N DECK DN (N) RE T A I N I N G W A L L (N) RE T A I N I N G W A L L PLAZA A R E A W.I. FE N C E W.I. FE N C E W.I . F E N C E TURF A R E A (FUTU R E P L A Y G R O U N D ) TEMPORARY M O D U L A R B U I L D I N G S A N D T E N T C. L . F E N C E ELEMENTARY 24' x 40' MODULAR ELEMENTARY 24' x 40' MODULAR RA M P DECK RA M P O V E R A L L M A S T E R S I T E P L A N TRUE NORTH W O R K I N G N O R T H EXISTING PARKING PROVIDED: PARKING TABULATION 160 SPACES (INCLUDING 5 ACCESSIBLE PARKING SPACES) NEW PARKING PROVIDED: 67 SPACES TOTAL PARKING PROVIDED: 227 SPACES (INCLUDING 7 ADA ACCESSIBLE STALLS) REFERENCE ORIGINAL DESIGN : CA 0.1 (E) F I R E H Y D R A N T TOTAL PARKING REQUIRED: 225 SPACES OVERALL MASTER SITE PLAN COLORED A1.1A 1" = 40' 2215 CALLE BARCELONA CARLSBAD, CALIFORNIA 92008 P: \ C o a s t l i n e C h i l d r e n s B u i l d i n g \ N E W M I N I S T R Y B U I L D I N G \ P l a n n i n g S u b m i t t a l D o c u m e n t \ 1 7 1 0 5 _ A 1 . 1 . 0 _ O v e r a l l M a s t e r S i t e P l a n _ R e v 1 _ C o l o r e d . d w g jo h n . a l v a r a d o A p r 2 2 , 2 0 1 9 - 7 : 4 7 a m COASTLINE CHURCH PLANNING SUBMITTAL PACKAGE MARCH 22, 2018 AMENDMENT 2018-0003 (DEV02116) FOR 17105 PLANNING SUBMITTAL AMEND 2018-0003 (DEV02116) - COASTLINE CHURCH PLANNING DEPT. SUBMITTAL #2 07-23-2018 PLANNING DEPT. SUBMITTAL #3 10-12-2018 FO R R E F E R E N C E O N L Y July 2, 2025 Item #1 27 of 30 1 /16" ~1' i~I :,~1 :1~1 :~II :Iii :::~::~aiiiiii~~~~~Iiiiii~ 0 .,1111 I I II jjjjjjjl 16 ,1111 I II iiiiiiil 32 ,111111 48 I I 8 I 16 1/4"~1· 24 0 4 8 12 0 2 4 6 0 2 4 1 "=1' --~ ~ 3"=1' 0 2 3 0 If this sheet • by 36" '\ . is not 24" . 1 IS a d print, scale re uced accordingly 7--------- 1 I I I 419 51 R E M I N C T O N AVf. TEMECULA , SUITE 250 , CALIFORNIA (TEL) 911-296 92590 • 2 8 28 • 1 --www.bdg-architect . __ __.ARI\K s.com CHITECT OF RECORD ►1---__ _JPi'l<RtCOFESSIONAL SEAL •1= -==:g~~m=== CONSULT ANTS ►1-===::J~~c::=== REVISIONS APPROVALL __ _ ei -=-=--_--_ ~~~----w.. ►1-==~~r::IB~== PROl:CT PHASE PROJECT NAME ►1 PROJECT NUMBER SI-EET TITLE ►1 SHEET NUMBER SCALE I ►I DATE POLE POLE 135 135 135 135 130 125 120 1 1 5 13 0 12 5 12 0 13 0 12 5 120 115 110 105 100 95 130 125 120 115 110 105 100 95 130 130 12 5 12 0 115 11 0 10 5 10 0 130 12 5 120 115 11 0 105 140 135 140 135 130 160 155 150 145 185 180 175 170 165 195 190 195 190 185 180 175 170 165 160 155 150 145 140 190 185 180 175 170 165 160 155 150 145 140 185 180 175 170 165 160 155 150 145 140 135 145 140 13 5 130 125 120 115 110 105 100 95 90 85 125 120 115 110 105 100 95 90 100 95 90 100 95 90 90 90 90 85 85 95 90 105 10 0 125 120 115 110 100 95 90 85 10 0 95 90 85 110 120 115 130 125 120 115 110 13 0 120 11 5 110 100 130 125 12 0 90 PA S E O A L I S O 80 75 85 80 85 80 85 85 80 85 90 80 1 0 0 9 5 9 0 85 105 1 0 5 110 110 10 5 C A L L E B A R C E L O N A P A S E O A L I S O P A S E O A L I S O 100 95 90 105 110 (E ) S I D E W A L K EXISTING CAFE BUILDING EL 104.00 EXISTING WORSHIP CENT E R BUILDING EL 104.00 W.I. FE N C E MINIST R Y BUILD I N G EL 100 . 0 0 NEW CO V E R E D W A L K W A Y PLAZA A R E A SI D E W A L K UP RA M P U P UP UP UP UP 12' x 24' VIDEO WALL CHAPEL (E) COURTYARD DN NEW R E T A I N I N G W A L L PLAZA A R E A NEW RETAIN I N G W A L L 24' WIDE D R I V E A I S L E NEW RETAIN I N G W A L L 24' WIDE DRIVE AISLE NEW RETAINING WALL NEW RETAINING WALL UP MINISTRY TABLES (E) COURTYAR D DN DN (E) ENTRY COURT DN DN NO PAR K I N G NO PAR K I N G NO PARK I N G NO P A R K I N G MAIN T . B L D G 2 ST O R Y EL 13 2 . 5 0 (E) TUBU L A R S T L . G U A R D R A I L (E) TUBULAR STL. GUARDRAIL BOYS TOILETS 12' x 20' GIRLS TOILETS 12' x 20' NURSERY 12' x 40' TODDLERS 24' x 40' KIOSK 12' x 10' OFFICE 12' x 40' RAMP DECK RA M P RAMP TOP O F S L O P E (N) RE T A I N I N G W A L L (N) RE T A I N I N G W A L L STORAG E ROOM (MACH I N E ROOM ON LOWER LEVEL) ELEV. DN DN OBSER V A T I O N DECK DN (N) RE T A I N I N G W A L L (N) RE T A I N I N G W A L L 13 0 1 3 0 1 2 5 120 130 125 130 133 1 3 2 132 132 131 12 7 12 6 1 2 8 12 9 1 3 1 12 5 110115 10 0 102 100 102 107106 100 107 106PLAZA A R E A W.I. FE N C E W.I. FE N C E W. I . F E N C E TURF A R E A (FUT U R E P L A Y G R O U N D ) TEMPORARY M O D U L A R B U I L D I N G S A N D T E N T C. L . F E N C E ELEMENTARY 24' x 40' MODULAR ELEMENTARY 24' x 40' MODULAR RA M P DECK RA M P S I T E P H A S I N G P L A N TRUE NORTH W O R K I N G N O R T H A1.4 PHASE 1 NEW BUILT UP TURF AREA FOR FUTURE 'PLAYGROUND "UNDER SEPARATE PERMIT" PHASE 2 RESTROOM ADDITION (SEE SHEET A2.4) A1.3 REFERENCE ORIGINAL DESIGN : CA 0.1 (E) F I R E H Y D R A N T (E) F I R E H Y D R A N T PHASE 2 WORSHIP CENTER EXPANSION (SEE SHEET A2.4) PHASE 2 RELOCATED CHAPEL STRUCTURE PHASE 1 13 STALL PARKING EXPANSION AND 6 STALLS RECONFIGURED PHASE 2 NEW DRIVE AISLE "C" WITH 32 STALL PARKING EXPANSION PHASE 1 REMOVE EXISTING MODULAR CLASSROOM BUILDINGS ON THIS PAD AND REPLACE WITH A NEW 2-STORY CHILDREN'S MINISTRY BUILDING AS SHOWN (SEE FLOOR PLAN ON SHEET A2.1 & A2.2) PHASE 1 22 STALL PARKING EXPANSION AND LOCATION FOR TEMPORARY MODULAR BUILDINGS A1.5 A1.5 PHASE 2 RE-STRIPE FOR 15 PARKING STALLS AND 2 NEW STALLS (E) CAFE (E) WORSHIP CTR AUDIO SUPPORT (N) MINISTRY CTR PARKING TABULATON 16 54 2 3 66 16 86 2 15 106 PARKING REQUIRED 141 225 PARKING PROVIDED 193 227 (E) CAFE (E) WORSHIP CTR AUDIO SUPPORT (N) MINISTRY CTR PARKING REQUIRED PARKING PROVIDED PHASE 1 PHASE 2 PHASE 2 2-STORY MAINTENANCE / STORAGE BUILDING SEE SHEET A2.6 PROJECT PHASING PLAN A1.2 1" = 40' 2215 CALLE BARCELONA CARLSBAD, CALIFORNIA 92008 P: \ C o a s t l i n e C h i l d r e n s B u i l d i n g \ N E W M I N I S T R Y B U I L D I N G \ P l a n n i n g S u b m i t t a l D o c u m e n t \ 1 7 1 0 5 _ A 1 . 2 _ S i t e P h a s i n g P l a n _ R e v 1 . d w g jo h n . a l v a r a d o A p r 1 1 , 2 0 1 9 - 4 : 3 4 p m COASTLINE CHURCH PLANNING SUBMITTAL PACKAGE MARCH 22, 2018 AMENDMENT 2018-0003 (DEV02116) FOR 17105 PLANNING SUBMITTAL AMEND 2018-0003 (DEV02116) - COASTLINE CHURCH PLANNING DEPT. SUBMITTAL #2 07-23-2018 PLANNING DEPT. SUBMITTAL #3 10-12-2018 DONE DONE DONE DONE THIS BUILD-OUT WILL BECOME PHASE 3 PHASE 3 FO R R E F E R E N C E O N L Y July 2, 2025 Item #1 28 of 30 1 /16" ~1' 1=~~~::::;:::;==-,-----0=::· 11 11::11 ! ":'.:"" 1;:I ~~I~~ 1~1111111111111111111111 I 32 1111111 1/8"~1' 48 0 8 16 I I I ' I I I I I I \ I I I I \ I \ I I I I I I l' , I , I I , I , ;' , I I I ~ ,.:, ,'.,:·,: ·." :" .• " ,, ... " .... :.~-·-.-. • ;: ·. ~ • ' ~I .---1 _i, .,,.,r • '___-A~~~-~ -- ----------------------------;:J --- - ' \ ~-------- --- _)<> -. -· -·\:/ ._'·<<>i>:; .~•-:•::<_ ;<~.-; ,,-/·-,,:_< .· < -_./_-·--./". . . / -/ ._.--/ x/ • . ., < /')' •·· •·. ><55 -:::,; . __ .---,;;" ~ -"-.'-_• I", ::...--:=::----J ~ ~:::;;--:: - 24 0 4 8 12 - 0 2 ,. , - 4 6 0 2 - 1 "=1' 3"=1' 4 0 2 3 0 /~~/-✓ /~~ ~=~~ , J/~ d~ ~~ ~~~~,;=+ If this she • by 36" . _et is not 24" . it 1s O d print, scale re uced accordingly ~ ,;::;p~-~~~ // -~~ ~ / ~~ ~~~ ~~~ -:,ef~P ~~ -~_/ -~~ @$~ ~ ,/,../ / /,,,:1.i' ,.,.,.,,,.,-~~~~y ~ ~ ~-4'-,.,-"---~".~ ~~;• ~--::;::.::.// ----- -~------ '8' - _-1---- 1 I ,,,,,,-;_,,,.,,,,, /./ .,,..,,,, ---_,,.,,.,----___ .,...,,.. ,- / I l-- ■ ■ ■ B u R ·c. H. A. R. o ?~SIGN GROUP ■ ■ ■ ■ ■ A R C H I T E C T s, I ~ C 41951 REMINGTON T EM E C U L A C AVE , 5 U I T E 2 5 o I ALIFORNIA (TEL)951·296 92590 • 2 8 2 8 • .-I -www.bdg-architect . AR s.com --'" OIITECT OF RECORD ►1'-­~-_!:'P'RR<OFESSIONAL SEAL cONsUL TANTS e,i --- ►~i,====~~rlSI REVISIOQt_N~s=====-:J APPROVArL __ _ e ~Cl ===~_t,._---...~&QIY} ►1r---=::Jfil~r:::ffi~== -PROJECT PHASE PROJECT NAME ►1 PROJECT NUMBER SHEET TITLE ►1 SHEET NUMBER SCALE 1►1 DATE 135 135 135 130 125 120 1 1 5 1 3 0 1 2 5 12 0 1 3 0 1 2 5 120 115 110 10 5 100 95 90 110 120 115 130 125 1 2 0 90 110 (E ) S I D E W A L K EXISTING CAFE BUILDI N G EL 104.00 EXISTING WORSHIP CE N T E R BUILDING EL 104.00 W.I. F E N C E NEW C O V E R E D W A L K W A Y S I D E W A L K UP RA M P U P UP UP UP UP 12' x 24' VIDEO W A L L (E) COURTY A R D NEW RET A I N I N G W A L L 24' WIDE D R I V E A I S L E T AI NI N G W AL L 24' WIDE DRIVE AISLE NEW RETAINING WALL NEW RETAINING WALL MINISTRY TABL E S (E) COURTY A R D DN DN (E) ENTRY COURT DN DN NO PA R K I N G NO PA R K I N G NO PAR K I N G NO P A R K I N G (E) TUB U L A R S T L . G U A R D R A I L (E) TUBULAR STL. GUARDR A I L TOP O F S L O P E (N) R E T A I N I N G W A L L (N) R E T A I N I N G W A L L STORA G E ROOM (MACH I N E ROOM O N LOWER LEVEL ) ELEV. DN DN OBSER V A T I O N DECK DN (N) R E T A I N I N G W A L L (N) R E T A I N I N G W A L L 1 3 0 1 3 0 1 2 5 12 0 13 0 125 1 3 2 13 2 1 2 7 12 6 1 2 8 1 2 9 1 3 1 12 5 110115 10 0 102 100 102 100 107 06 W.I. F E N C E W.I. F E N C E W . I . F E N C E TURF A R E A (FUT U R E P L A Y G R O U N D ) SETB A C K L I N E PROP E R T Y L I N E P A R T I A L E N L A R G E D S I T E P L A N TRUE NORTH W O R K I N G N O R T H C A L L E B A R C E L O N A REFERENCE ORIGINAL DESIGN : CA 0.2 GENERAL NOTES KEY NOTES "FUTURE PHASE" "FUTURE PHASE" "PHASE 1" SETB A C K L I N E PARTIAL ENLARGED SITE PLAN A1.3 2215 CALLE BARCELONA CARLSBAD, CALIFORNIA 92008 P: \ C o a s t l i n e C h i l d r e n s B u i l d i n g \ N E W M I N I S T R Y B U I L D I N G \ P l a n n i n g S u b m i t t a l D o c u m e n t \ 1 7 1 0 5 _ A 1 . 3 _ E n l a r g e d S i t e . d w g jo h n . a l v a r a d o A p r 1 1 , 2 0 1 9 - 4 : 3 6 p m COASTLINE CHURCH PLANNING SUBMITTAL PACKAGE MARCH 22, 2018 AMENDMENT 2018-0003 (DEV02116) FOR 17105 PLANNING SUBMITTAL AMEND 2018-0003 (DEV02116) - COASTLINE CHURCH PLANNING DEPT. SUBMITTAL #2 07-23-2018 PLANNING DEPT. SUBMITTAL #3 10-12-2018 1/16" = 1'-0" FO R R E F E R E N C E O N L Y July 2, 2025 Item #1 29 of 30 1/16"~1' I II I 1111 I 1111111 I II I 1111 I 1111111 I II I 1111 I 1111111 0 16 32 48 1/ .• '.,. .·.-Y .. / ·?;v 1/ 11/ ' ·•· : • 4. ·• • ·• •. • . . . •• •. •. .,d4 • • •ll • . .,.4 ~ ·..•.. . * . • . . '# .• ·~ :~; •. 1;~ .., --D·-..,·-7,#. •-' '· • / 7/ -•. /.,, • -· -,,~ ii ./... 4· • _/Q .d-' /-. • .... •. 4,: .. 4 • . ;. -· . ~ '* • . . . . * • . • .?.#. .... _ .,,, •. -... • • .. n 0 8 16 24 0 4 ~ 8 12 ---- g g 0 2 4 ' ' ----- 31 2\ ---- 6 C I I 1'"--! c;J ki ;__ __ -I I I I :=di-°:---- ' I I I I I 11---0 II _ J ~ -, I _, 0 0 + ----, I----~ I \ '-- ' ---- 1 2 3 \'-£," - 2 1 "=1' 4 0 ______ _1.-- .... --... ' 2 2 I ' \ 0 I t/~-~,s.--'"-.\ /i',',-~.,✓ ' I ' I \ I ' I I I '--I I ' ' ' 1'-8 , ----- 4 ---, ' I I I I ' I I --_-"I-.----------' ' ___ .,,. •. 3 g I ' ' \ \ I I I ' (EJ 24'-111 -~~·,_ DRIVE AISLE (24'-011 MIN.) i 3"=1' 0 I I I. 2. 0 0 0 0 0 0 0 0 0 @ @ @ @ @ @ @ @ @ @ @ @ @ @ @ @ @ @ @ @ ® @ ® @ ® @ @ @ @ ® @ @ @ @ @ @ @ @ @ @ @ @ @ @ @ @ @ ® @ ® @ @ @ @ @ If this sheet is not 24" by 36" it is a reduced print, scale accordingly 6EE CIVIL ENGINEERING DRAWINGS FOR EXACT 6COFE OF WOf<K AND EXTENT OF SITE AND GRADING MODIFICATIONS. INFORMATION SHOWN ON CIVIL DRAWINGS WILL TAKE PRECEDENCE OVER INFOl'!"tATION SHOWN ON ARCI-IITECTURAL DRAWINGS SEE LANDSCAPE DRAWINGS FOR EXACT SCOPE OF WOl'l<. WI-IILE SOME EXISTING TREES AND SI-IRU66ERY 15 TO REMAIN, MANY NEW TREES AND OTI-IER PLANTING 15 6EING INSTALLED. LANDSCAPE DRAWINGS WILL TAKE PRECEDENCE OVER ANY PLANTING 51-!OWN ON ARCI-IITECTURAL DRAWINGS 51-iADED / SCREENED AREAS INDICATE FLOOR FLAN AND SITE MODIFICATION (E! DRIVEWAY APRON !E! CONCRETE CUR6 (E! CONCRETE SIDEWALK /E! EASEMENT LINE, SEE CIVIL DRAWINGS /E! FIRE I-IYDRANT <EJ CONCRETE FAD W/ 6ACKFLOW VALVE (E! CONCRETE FAD W/ POST INDICATOR VALVES !E! TRANSFORMER (E! OFF-STREET PARKING SIGN /E! MONUMENT SIGN (E! ASFI-IAL T PAVING DRIVE AISLE !E! CONCRETE GUTTER (E! LANDSCAPE AREA (E! 36" SQUARE FAINTED I-IANDICAF LOGO (E! ACCE55I6LE FAf<KING LOADING AISLE !E! CONCRETE WI-IEEL 6TOF !E! POST MOUNTED I-IANDICAF ACCE55I6ILITY SIGN (EJ ":ZE~" CURe FACE (E) TRUNCATED DOMES FER cec II336.S AND FIGURE I16-23A !E! ROUTE OF ACCESSI6LE ACCESS FAT!-1 OF TRAVEL . 2'-0" VEI-IICLE 6UMFER OVERI-IANG !E! TRAS!-1 ENCLOSURE !E! CONCRETE WALKWAY !E! CONCRETE SITE ST AIRS (E! COURTYARD I PATIO I PLAZA /E! TRELLIS COLUMN < TRELLIS A6OVE (E! MANHOLE !E! FAf<KWAY PROPOSED , CI-IILDREN'S MINISTRY 6UILDING LOCATION. 6EE 61-!EET A2.I , A22 FOR 6COFE OF WORK PROPOSED , RESTROOM ADDITION. SEE SI-IEET A2.4 FOR 6COFE OF WORK PROPOSED , WORSI-IIF CENTER 6UILDING EXPANSION, SEE 51-!EET A2.4 FOR SCOPE OF WOf<K (E! CI-IILDREN'S FLAY AREA TO REMAIN !E! CONCRETE RAMP NEW FENCE AND GATES FER LANDSCAPE DRAWINGS. NEW RETAINING WALL FER CIVIL DRAWINGS. NEW SEATWALL FER CIVIL DRAWINGS. NEW STEPPED RETAINING WALL FER CIVIL DRAWINGS. NEW PLANTER FER LANDSCAPE DRAWINGS . NEW DRIVEWAY FER CIVIL DRAWINGS. NEW FAf<KING STALLS FER CIVIL DRAWINGS. NEW RAISED TURF AREA OVER WI-IAT WAS FREVIOUSL Y A RECESSED FLAY AREA NEW CONCRETE WALKWAY FER CIVIL DRAWINGS. NEW CONCRETE SIDEWALK FER CIVIL DRAWINGS. NEW CONCRETE CUR6 FER CIVIL DRAWINGS. NEW CONCRETE SITE STAIR FER CIVIL DRAWINGS NEW SITE ACCESS RAMP WIT!-1 I2,i MAX SLOFE AND GUARDRAIL. SEE CIVIL DRAWINGS NEW WALKWAY WITI-I A CANOPY COVER TRELLIS, COLUMN • TRE~LIS A6OVE FER ELEVATIONS NEW ELEVATOR SPARE NEW FENCE AND GATE AS REQUIRED 6Y FIRE DEPARTMENT LINE OF DECK/ 6ALCONY A6OVE (E) Ci-lAIN LINK FENCE (N! CONCRETE WI-IEEL STOP (N! OUTDOOR FIREPLACE (NJ CONCRETE CURE, RAMF w/ Tl-cl.lNCATED DOMES /NJ STRIPED PEDESTRIAN FAT!-1 OF TRAVEL /NJ 36" SQUARE FAINTED I-IANDICAF LOGO (N) STRIPED LOADING AISLE FOR 1-1/C FAf<KING /NJ WATER QUALITY 6ASIN, &EE CIVIL DRAWINGS /NJ TEMPORARY MODULAR CLASSROOM 6UILDING6 SPARE /NJ LANDSCAPE VINE POCKET, SEE LAND6CAFE FLANS (N) FERMEA6LE PAYERS, SEE CIVIL DRAWINGS ■ ■ ■ ■ ■ ■ ■ ■ ■ B U R G H A R D DESIGN GROUP ■ ■ ■ ■ ■ ■ ■ ■ ■ A R C H I T E C T S, I N C 419 51 R EM I N G T O N AVE , S U I T E 2 5 0 TEMECULA, CALIFORNIA 92590 (TEL) 951 • 296 • 2828 www.bdg-architects.com ►1 PROFESSIONAL SEAL •1 CONSULTANTS ►1 REVISIONS e1 APPROVAL ►1 PROJECT PHASE •1 PROJECT NAME ►1 PROJECT NUMBER •1 SHEET TITLE ►1 SHEET NUMBER • ~I _SC_ALE_~ ►~I _D_A_TE_~ Exhibit 7 Full Size Exhibit(s) “A” – “F” dated July 2, 2025 (On file in the Planning Division) July 2, 2025 Item #1 30 of 30 Kyle Van Leeuwen, Senior Planner Planning Division July 2, 2025 Coastline Church AMEND 2025-0001 C cityof Carlsbad ITEM 1 - Project Site 2215 Calle Barcelona •6.43 Acres •Arroyo La Costa Master Plan – “Village J” •Access from Calle Barcelona •Not in Coastal Zone • Church AME~~~~!~~~01(DEV02116) 8 "" 0 70 140 280 Feet ( City of Carlsbad ITEM 1 – Project History •Master Plan -Site for Church Use •2004 - SDP for church campus approved •2012 – Amendment (#1) •2016 – Minor Amendment (#2) •2019 – Amendment (#3) •New ministry center (Phase 1) •Additions & parking lot expansion (Phase 2) C cityof Carlsbad ITEM 1 – Project Proposal •Request to modify development phases •Allow expansion of parking lot to occur after building additions •Use of off-site parking to meet parking needs •No physical changes to site development approved in 2019 C cityof Carlsbad ITEM 1 - Site Plan (city of Carlsbad ITEM 1 - Site Plan I - • -~.:----_ ---~---------~------T------ -.---'W=.__/ - (city of arlsbad ITEM 1 – Off-S ite Parking C cityof Carlsbad ITEM 1 –Parking Building Use Parking Required Parking Total/Provided Worship Center & Café Public Assembly 86 spaces 119 Total Spaces Café Lounge 16 spaces Office Space/ Common Area 15 spaces Audio Booth 2 spaces Ministry Center Classroom 18 spaces (70 Spaces typical) 106 Total Spaces Office Space/ Common Area 42 spaces Public Assembly (Youth) & Youth Activity 2 spaces Public Assembly (Youth) - Overflow Adult Worship* (4 spaces youth) 40 spaces adults Audio Booth 4 spaces Total –(189 spaces typical) 225 spaces required 193 Spaces - Now 227 Spaces - Buildout *Overflow only needed on major holidays ITEM 1 – CEQA Exemption Staff has reviewed the scope of the project. The environmental effects of the project were adequately analyzed by the Arroyo La Costa Master Plan EIR and MMRP; no circumstances requiring further environmental compliance exist (CEQA Guidelines Sections 15162 or 15163). C cityof Carlsbad ITEM 1 – RECOMMENDATION ADOPT a resolution APPROVING the Amendment to a Site Development Plan , based on the findings and subject to conditions. C cityof Carlsbad ITEM 1 –Parking The applicant or property owner shall provide a copy of the executed off-site parking agreement or agreements with Encinitas Union School District and/or San Dieguito Union High School District for the use of no less than 34 parking spaces at El Camino Creek Elementary School (Encinitas Union School District) and/or the San Dieguito Sports Complex (San Dieguito Union High School District). Parties involved in the parking agreement(s) shall provide evidence of agreement and shall be recorded in the office of the County Recorder Condition #15 C cityof Carlsbad ITEM 1 –Parking In the event that offsite parking agreement(s) expire and the additional parking spaces have not been completed, the applicant or property shall execute one of the following: a.Secure an extension to an off-site parking lease agreement for no less than 34 spaces; b.Enter into a new lease agreement for an alternate off-site parking location of no less than 34 parking spaces on a site no more than 0.25 miles from the church campus; or c.Reduce the available seating within the expanded worship center to meet the seating limit accommodated by the onsite parking spaces, to the satisfaction of the City Planner. Condition #16 C cityof Carlsbad