HomeMy WebLinkAbout2025-07-02; Planning Commission; 01; Coastline Church – Amendment to a Site Development Plan (SDP 02-16/AMEND 2018-0003) to update and modify the development phases of a worship center addition, café restroo Meeting Date: July 2, 2025 Item
To: Planning Commission
Staff Contact: Kyle Van Leeuwen, Associate Planner; 442-339-2611;
kyle.vanleeuwen@carlsbadca.gov
Subject: Coastline Church – Amendment to a Site Development Plan (SDP 02-16/AMEND
2018-0003) to update and modify the development phases of a worship center
addition, café restroom addition, new maintenance building, and parking lot
expansion.
Location: 2215 Calle Barcelona / APN: 255-273-07-00 / District 4
Numbers: AMEND 2025-0001 (DEV02116)
Applicant/Representative: James E. Grant, Grant General Contractors, 760-438-1500, jgrant@grantgc.com
CEQA Recommendation: ☐ Not a Project ☐ Exempt ☐ IS/ND or IS/MND ☐ EIR ☒ Other: Consistent with a prior environmental document (i.e. Certified Final
Program Environmental Impact Report (EIR, SCH# 1988041323) and Mitigation
Monitoring and Reporting Program for the Arroyo La Costa Master Plan)
pursuant to CEQA Guidelines §15162 through §15168
Permit Type(s): ☐ SDP ☐ CUP ☐ CDP ☐ TM/TPM ☐ GPA ☐ REZ ☐ LCPA ☐ Other: AMEND (Amendment to SDP)
Commission Action: ☒ Decision ☐ Recommendation to City Council ☐ Informational (No Action)
Recommended Actions
That the Planning Commission ADOPT the Planning Commission Resolution (Exhibit 1) APPROVING a Site
Development Plan Amendment, AMEND 2025-0001, based on the findings and subject to the conditions
contained therein.
1
July 2, 2025 Item #1 1 of 30
PLANNING COMMISSION
Staff Report . 0
Existing Conditions & Project Description
Existing Setting
The project site is located on the south side of Calle
Barcelona and east of Paseo Aliso (Exhibit 2), and
comprises the 6.43-acre “Village J” of the Arroyo La
Costa Master Plan (MP 88-01). The site (Village J) was
designated for church use in MP 88-01 and is currently
developed as Coastline Church. The church campus
includes a worship center, café, and children’s ministry
building. The site currently provides 193 parking
spaces for the existing church campus uses.
Site Map
Table “A” below includes the General Plan and Zoning designations, and current land uses of the subject site and
surrounding properties.
TABLE A – SITE AND SURROUNDING LAND USE
Location General Plan Designation Zoning Designation Current Land Use
Site Residential (R-4) Planned Community (P-C) Church Campus
North Open Space (OS) P-C Open Space
South OS; R-4 P-C HOA Open Space; Single-
Family Residential
East Public (P) P-C Athletic Fields/Park
West
OS; R-4
P-C
HOA Open Space; Single-
Family Residential
General Plan Designation(s)
Zoning Designation(s)
July 2, 2025 Item #1 2 of 30
Background
The site, Village J of the Arroyo La Costa Master Plan (MP 88-01), was designated in the master plan for church
use. Although churches are typically processed as conditional use permits, MP 88-01 designated a Site
Development Plan (SDP) as the required discretionary action to develop the site. Development of the church
campus was originally approved in January 2004 under project number SDP 02-16. SDP 02-16 allowed for a
37,318 square foot church campus, built in phases. The phased buildout approved also allowed the use of
temporary modular buildings during specific phases. In November 2012, the first Site Development Plan
amendment was requested and approved (SDP 02-16(A)), which extended the period of time the temporary
modular building could be utilized on site. A second, minor amendment, to the Site Development Plan was
approved in May of 2016 (CD 16-07), which expanded the availability of parking on site.
In March 2018, the church submitted for a third Site Development Plan amendment (AMEND 2018-0003). The
Planning Commission adopted Planning Commission Resolution No. 7333 on May 15, 2019, approving the third
amendment to Site Development Plan SDP 02-16. At that time, only one permanent structure was developed on
site: the worship center and café building located in the northeast portion of the site. The amended Site
Development plan allowed for the continued development of the church campus in two phases: 1) a new two-
story 23,746 square foot children’s ministry center and a total of 193 on-site parking spaces; and 2) a 2,141
square foot expansion to the worship center, a 442 square foot expansion to the café, a two-story 1,374 square
foot maintenance/storage building and the addition of 34 parking spaces for a total of 227 on-site parking
spaces. The Planning Commission Staff report and Planning Commission Resolution No. 7333 are provided as
Exhibit 4. Of the two-phase approved under AMEND 2018-0003, only Phase 1 has been carried out and
completed.
The proposed amendment updates and modifies the second phase of the development plan and adds Phase 3.
This staff report will focus on the newly proposed changes.
Proposed Project
The applicant proposes to modify the timeline for developments approved under Phase 2 to allow for the
parking lot expansion to occur as a Phase 3. Allowing the expansion of the parking lot to be deferred until after
the other facility improvements would allow for the church’s financial resources to be utilized first for facility
expansion. The facility expansion will accommodate the steadily increasing membership of the church without
the immediate added cost associated with the parking lot expansion. The proposed change in phasing for the
project is shown on project plans, Exhibit 6.
The applicant has provided confirmation from two properties adjacent or near the church allowing Coastline
Church to utilize their parking lots to meet the increased parking demands of the expanded church facilities. The
two sites, El Camino Creek Elementary (Encinitas Union School District) and the San Dieguito Sports Complex
(San Dieguito Union School District), would each provide at least 34 parking spaces to utilize on Sundays during
church services (El Camino Creek Elementary has approximately 90 parking spaces and the San Dieguito Sports
Complex has approximately 175 parking spaces). The applicant has also stated that a shuttle will be utilized to
take members to and from the off-site parking lots at one or both of these locations. According to the applicant,
the lease agreements proposed with the off-site parking facilities would be for approximately 10 years.
To address concerns of parking availability if off-site parking leases expire prior to the parking lot expansion, the
applicant has suggested and agreed to a specific condition or approval to reduce any parking impact concerns.
Those conditions include: 1) securing an extension to the proposed parking lease agreements with one or both
of the School Districts; 2) entering into a new lease agreement for an alternate, off-site parking location; or 3)
reducing the available seating within the expanded worship center to meet the seating limit accommodated by
the onsite parking spaces. Notwithstanding, Phase 3 (expansion of the parking lot) must be completed within a
20-year build-out timeframe. This condition of approval is included in the draft resolution (Exhibit 1).
July 2, 2025 Item #1 3 of 30
The city’s development regulations provide a three-year life for entitlement approvals. If an approved project is
not initiated (i.e., the applicant has “performed substantial work” and incurred substantial liabilities in good
faith reliance upon such permit(s), CMC Chapter 21.58.030, as amended by Ord. CS-474) within the three-year
period, the permit(s) expire unless an application for the extension of the entitlement(s) has been submitted
prior to expiration and granted by the designated approving authority. Thus, should the Planning Commission
approve the applicant’s request, entitlement approvals for the worship center and café, and new
maintenance/storage building would be valid until July of 2028. If substantial construction work has not been
performed, the applicant would need to resubmit the project for new entitlements. However, should the
applicant complete the constructive improvements for Phase 2 on schedule, shuttle service operations would be
allowed to continue until 2045, at which point the expansion of the parking lot must be completed (Phase 3).
Public Outreach & Comment
The Developer has completed the Early Public Notice procedures pursuant to City Council Policy No. 84
(Development Project Public Involvement Policy). A notice of project application was mailed on Feb. 6, 2025, to
all owners of property located within a 600-foot radius of the project site. A two-foot-tall by three-foot-wide
yellow sign was also posted at the project site on Feb.13, 2025, notifying all pass-by traffic of the project, which
provides project name, application numbers, description, as well as both Developer and city staff contact
information. A total of 85 property owners were notified by mail through the notice of project application. No
comments were received by city staff in response to the provided notifications.
Project Analysis
General Plan Consistency
Village J of the Arroyo La Costa Master Plan has a General Plan Land Use designation of Residential (R-4).
Village J is designated for a church use consistent with the General Plan, which requires new and, as
appropriate, existing master plan and specific plan developments to provide land designated for community
facilities such as worship uses. An analysis of the project's compliance with the general plan is included in
the Planning Commission Staff Report, dated May 15, 2019 (Exhibit 4). No change in the scope of physical
development is proposed with this application.
Municipal Code Consistency
The project site is zoned Planned Community (P-C). The PC Zone does not contain development standards. The
P-C Zone requires a master plan, including development standards, to be established for parcels of land under
the P-C zoning designation. The Arroyo La Costa Master Plan is the approved master plan for the site, and it
includes the development standards applicable to the property. Therefore, no additional analysis is needed with
respect to the project’s compliance with the P-C Zone. Parking standards applicable to the site have not changes
since approval of the current scope of development. The original analysis of the projects compliance with the
parking standards is included in the Planning Commission Staff Report, dated May 15, 2019 (Exhibit 4).
Arroyo La Costa Master Plan (MP 88-01)
The project site is located within Village J of the Arroyo La Costa Master Plan. Area J is designated as a
church site within the Master Plan. Pursuant to the Master Plan, Coastline Church has been developed on
the site. An analysis of the project's compliance with the Arroyo La Costa Master Plan is included in the
Planning Commission Staff Report, dated May 15, 2019 (Exhibit 4). No change in the scope of physical
development is proposed with this application, and the Arroyo La Costa Master Plan does not address or
interfere with the proposed phasing schedule or provisions for shuttling and off-site parking.
July 2, 2025 Item #1 4 of 30
Discretionary Actions & Findings
The following discretionary actions are requested.
Amendment to Site Development Permit AMEND 2025-0001
Pursuant to the Arroyo La Costa Master Plan (MP 88-01), development of the project site (Village J) requires the
approval of a Site Development Plan (SDP), processed pursuant to Chapter 21.06 (Q-Overlay Zone).
This fourth amendment to the Site Development Plan (SDP 02-16) is presented to update and modify the second
phase of the development plan. Phase 2 was initially scheduled to include expansion of the worship center,
expansion of the café, a new maintenance/storage building, and additional parking. Phase 2 is proposed to be
restructured to defer the expansion of the parking lot. All phases to be completed within a 20-plus-year build-
out timeframe. All aspects of the development plan that are not specifically amended herein shall remain in
effect as previously approved. Staff finds that the required findings for this application can be met (Exhibit 1).
Environmental Review
The project has been reviewed pursuant to the California Environmental Quality Act (CEQA). The potential
environmental effects of the project were adequately analyzed by the previously certified Final Program
Environmental Impact Report (EIR) and Mitigation Monitoring and Reporting Program (MMRP) for the Arroyo La
Costa Master Plan (EIR 86-02), dated July 31, 1990. The project has no new significant environmental effect not
analyzed as significant in the EIR and MMRP; none of the circumstances requiring further environmental
compliance under CEQA Guidelines Sections 15162 or 15163 exist; and all feasible mitigation measures
identified in the EIR and MMRP, which are appropriate to this subsequent project, will be incorporated. The
approved EIR and MMRP are on file for review at the Planning Division.
Conclusion
Considering the information above and in the referenced Exhibits, staff has found that the proposed project is
consistent with all applicable policies of the General Plan, Arroyo La Costa Master Plan, and provisions of the
Municipal Code, and Local Facilities Management Zone 12. All required public improvements and utilities are
available to serve the proposed development. In addition, there are no environmental issues associated with the
project.
The project is conditioned to ensure the proposed project’s compatibility with the surrounding properties and
that the public health, safety, and welfare of the community are maintained. The project would be required to
comply with all applicable California Building Standards Codes and engineering standards through the standard
building permit and civil improvement plan checking process. Staff recommends that the Planning Commission
adopt the resolution approving the project, as described in this staff report.
Exhibits
1. Planning Commission Resolution
2. Location Map
3. Disclosure Statement
4. Planning Commission Staff Report and Resolution No. 7333, May 15, 2019 (on file in the Office of the
City Clerk)
5. List of Acronyms and Abbreviations
6. Reduced Exhibits
7. Full Size Exhibit(s) “A” – “F” dated July 2, 2025 (On file in the Planning Division)
July 2, 2025 Item #1 5 of 30
A RESOLUTION OF THE PLANNING COMMISSION OF THE CITY OF
CARLSBAD, CALIFORNIA, APPROVING THE FOURTH AMENDMENT TO SITE
DEVELOPMENT PLAN SDP 02-16 TO UPDATE AND MODIFY THE
DEVELOPMENT PHASES OF A WORSHIP CENTER ADDITION, CAFÉ
RESTROOM ADDITION, NEW MAINTENANCE BUILDING, AND PARKING
LOT EXPANSION ON THE 6.43-ACRE COASTLINE CHURCH CAMPUS
LOCATED AT 2215 CALLE BARCELONA IN LOCAL FACILITIES
MANAGEMENT ZONE 12.
CASE NAME: COASTLINE CHURCH
CASE NO.: AMEND 2025-0001 (DEV02116)
WHEREAS, James E. Grant, “Applicant,” has filed a verified application with the City of
Carlsbad regarding property described as:
PARCEL: 255-273-07-00
LOT 482 OF CARLSBAD TRACT NO. 88-03-2, ARROYO LA COSTA, UNIT 2
(VILLAGES G, H, J, P, Q, R AND S), IN THE CITY OF CARLSBAD, COUNTY
OF SAN DIEGO, STATE OF CALIFORNIA, ACCORDING TO MAP THEREOF
NO. 13386, FILED IN THE OFFICE OF THE COUNTY RECORDER OF SAN
DIEGO COUNTY, DEC. 20, 1996
(“the Property”); and
WHEREAS, said verified application constitutes a request for a Site Development Plan
(SDP) Amendment as shown on Exhibit(s) “A” – “F” dated July 2, 2025, on file in the Planning Division,
AMEND 2025-0001 (DEV02116) – COASTLINE CHURCH, as provided by Chapters 21.06 and 21.38 of the
Carlsbad Municipal Code; and
WHEREAS, the Planning Commission did, on July 2, 2025, hold a duly noticed public
hearing as prescribed by law to consider said request; and
WHEREAS, at said public hearing, upon hearing and considering all testimony and
arguments, if any, of all persons desiring to be heard, said Commission considered all factors relating to
the amended SDP.
PLANNING COMMISSIO N RESOLUTION NO. 7546
July 2, 2025 Item #1 6 of 30
Exhibit 1
NOW, THEREFORE, BE IT HEREBY RESOLVED by the Planning Commission of the City of
Carlsbad as follows:
A) That the foregoing recitations are true and correct.
B) Compliance with CEQA. The potential environmental effects of the project were
adequately analyzed by the previously certified Final Program Environmental Impact
Report (EIR) and Mitigation Monitoring and Reporting Program (MMRP) for the Arroyo La
Costa Master Plan (EIR 86-02), dated July 31, 1990. The project has no new significant
environmental effect not analyzed as significant in the EIR and MMRP; none of the
circumstances requiring further environmental compliance under CEQA Guidelines
Sections 15162 or 15163 exist; and all feasible mitigation measures identified in the EIR
and MMRP, which are appropriate to this subsequent project, will be incorporated.
C) That based on the evidence presented at the public hearing, the Commission APPROVES
AMEND 2025-0001 – COASTLINE CHURCH, based on the following findings and subject to
the following conditions:
Findings:
1. That the proposed development or use is consistent with the General Plan and any applicable
master plan (as amended) or specific plan, complies with all applicable provisions of Chapter 21.06
of the Carlsbad Municipal Code, and all other applicable provisions of this code, in that the
project’s design complies with the requirements of the Zoning Ordinance (Title 21) and Arroyo
La Costa Master Plan as discussed in the findings below. The project complies with the General
Plan in that the property is designated for a church use in the Arroyo La Costa Master Plan and
the General Plan requires new and, as appropriate, existing master plan and specific plan
developments to provide land designated for community facilities such as worship uses. The
proposed amendment to change the phasing of development is consistent with the General
Plan. The existing use and the proposed amendment are compatible with surrounding
residential, park, and open space uses, and the project will meet all required Building and Fire
Codes.
The proposed development plan provides an orderly framework for the overall development of
worship center, café, new maintenance/storage building, and parking lot expansion. and
addresses larger planning issues such as building locations, traffic circulation, drainage, access,
and site function. The conditions of approval establish provisions that apply to the overall
project site and all development phases, and remain valid until the completion of all
development phases.
2. That the requested development or use is properly related to the site, surroundings and
environmental settings, will not be detrimental to existing development or uses or to
development or uses specifically permitted in the area in which the proposed development or use
is to be located, and will not adversely impact the site, surroundings or traffic circulation, in that
the 6.43-acre site is adequate in size and shape to accommodate the church campus design.
The site does not have any constraints that would impede development or require significant
site alterations. The church campus and off-site parking lots utilized on a temporary basis
July 2, 2025 Item #1 7 of 30
comply with all applicable requirements, including but not limited to building setback,
landscaping, lot coverage, parking requirements, and architectural design standards. The
application shows that there is no substantial conflict in the principal operating hours of the
buildings or uses for which the joint use of a parking facility is proposed. The existing
surrounding streets which are fully improved have adequate capacity to accommodate the
1,397 Average Daily Trips (ADT) generated by the project.
3. That the site for the intended development or use is adequate in size and shape to accommodate
the use, in that the project complies with all development standards of the Arroyo La Costa
Master Plan, including setbacks, building coverage, landscaping requirements, parking, and
height restrictions. This fourth amendment to the Site Development Plan (SDP 02-16) is
presented to update and modify the second phase of the development plan and add Phase 3
(deferring the expansion of the parking lot). All phases to be completed within a 20-plus year
build-out timeframe.
4. That all yards, setbacks, walls, fences, landscaping, and other features necessary to adjust the
requested development or use to existing or permitted future development or use in the
neighborhood will be provided and maintained, in that the proposed church campus and other
necessary improvements can fit within the developable area of the lot and all applicable
development standards are met. Adequate vehicle circulation has been provided to
accommodate safety and truck turning movements. Access to the site will continue to be
provided by Calle Barcelona. The church campus satisfies all applicable requirements, including
but not limited to building setbacks, landscaping, lot coverage, and architectural design
standards.
5. That the street systems serving the proposed development or use is adequate to properly handle
all traffic generated by the proposed use, in that the project site and off-site parking lots
proposed to be used temporarily will continue to be accessed off Calle Barcelona, which can
accommodate the 1,397 ADT expected to be generated by the proposed church campus. The
project is not anticipated to impact the existing levels of service on Calle Barcelona and El
Camino Real. Updating and modifying the development phases of the worship center addition,
café restroom addition, new maintenance building, and parking lot expansion, and the addition
of a shuttle service, does not change the traffic system. There are adequate roads, bridges,
highways, and related infrastructure to accommodate the ultimate build-out of the church
campus.
General:
6. The project is consistent with the Citywide Facilities and Improvements Plan, the Local Facilities
Management Plan for Zone 12 and all city public facility policies and ordinances. The project
includes elements or has been conditioned to construct or provide funding to ensure that all
facilities and improvements regarding sewer collection and treatment; water; drainage;
circulation; fire; schools; parks and other recreational facilities; libraries; government
administrative facilities; and open space, related to the project will be installed to serve new
development prior to or concurrent with need.
7. That the project is consistent with the city’s Landscape Manual and Water Efficient Landscape
Ordinance (Carlsbad Municipal Code Chapter 18.50).
July 2, 2025 Item #1 8 of 30
8. The Planning Commission has reviewed each of the exactions imposed on the Developer
contained in this resolution and hereby finds, in this case, that the exactions are imposed to
mitigate impacts caused by or reasonably related to the project, and the extent and the degree
of the exaction is in rough proportionality to the impact caused by the project.
Conditions:
NOTE: Unless otherwise specified herein, all conditions shall be satisfied prior to issuance of a grading
permit or building permit, whichever occurs first.
1. If any of the following conditions fail to occur, or if they are, by their terms, to be implemented
and maintained over time, if any of such conditions fail to be so implemented and maintained
according to their terms, the city shall have the right to revoke or modify all approvals herein
granted; deny or further condition issuance of all future building permits; deny, revoke, or further
condition all certificates of occupancy issued under the authority of approvals herein granted;
record a notice of violation on the property title; institute and prosecute litigation to compel their
compliance with said conditions or seek damages for their violation. No vested rights are gained
by Developer or a successor in interest by the city’s approval of this Site Development Plan
Amendment.
2. Staff is authorized and directed to make, or require the Developer to make, all corrections and
modifications to the Site Development Plan Amendment, documents, as necessary to make them
internally consistent and in conformity with the final action on the project. Development shall
occur substantially as shown on the approved Exhibits. Any proposed development different from
this approval, shall require an amendment to this approval.
3. Developer shall comply with all applicable provisions of federal, state, and local laws and
regulations in effect at the time of building permit issuance.
4. If any condition for construction of any public improvements or facilities, or the payment of any
fees in-lieu thereof, imposed by this approval or imposed by law on this Project are challenged,
this approval shall be suspended as provided in Government Code Section 66020. If any such
condition is determined to be invalid, this approval shall be invalid unless the City Council
determines that the project without the condition complies with all requirements of law.
5. Developer/Operator shall and does hereby agree to indemnify, protect, defend, and hold
harmless the City of Carlsbad, its Council members, officers, employees, agents, and
representatives, from and against any and all liabilities, losses, damages, demands, claims and
costs, including court costs and attorney’s fees incurred by the city arising, directly or indirectly,
from (a) city’s approval and issuance of this Site Development Plan Amendment, (b) city’s
approval or issuance of any permit or action, whether discretionary or nondiscretionary, in
connection with the use contemplated herein, and (c) Developer/Operator’s installation and
operation of the facility permitted hereby, including without limitation, any and all liabilities
arising from the emission by the facility of electromagnetic fields or other energy waves or
emissions. This obligation survives until all legal proceedings have been concluded and continues
even if the city’s approval is not validated.
July 2, 2025 Item #1 9 of 30
6. Prior to the issuance of a building permit, the Developer shall provide proof to the Director from
the Encinitas Union School District that this project has satisfied its obligation to provide school
facilities.
7. This project shall comply with all conditions and mitigation measures which are required as part
of the Zone 12 Local Facilities Management Plan and any amendments made to that Plan prior to
the issuance of building permits.
8. Building permits will not be issued for this project unless the local agency providing water and
sewer services to the project provides written certification to the city that adequate water service
and sewer facilities, respectively, are available to the project at the time of the application for the
building permit, and that water and sewer capacity and facilities will continue to be available until
the time of occupancy.
9. This approval shall become null and void if building permits for Phase 2 are not issued for this
project within 36 months from the date of project approval. Phase 3 is to be constructed in the
future. All phases must be completed within a 20-year build-out timeframe.
10. All roof appurtenances, including air conditioners, shall be architecturally integrated and
concealed from view and the sound buffered from adjacent properties and streets, in substance
as provided in Building Department Policy No. 80-6, to the satisfaction of the Directors of
Community Development and Planning.
11. Developer shall pay the Citywide Public Facilities Fee imposed by City Council Policy #17, the
License Tax on new construction imposed by Carlsbad Municipal Code Section 5.09.030, and CFD
#1 special tax (if applicable), subject to any credits authorized by Carlsbad Municipal Code Section
5.09.040. Developer shall also pay any applicable Local Facilities Management Plan fee for Zone
12, pursuant to Chapter 21.90. All such taxes/fees shall be paid at issuance of building permit. If
the taxes/fees are not paid, this approval will not be consistent with the General Plan and shall
become void.
12. Prior to the issuance of a building or grading permit, the Developer shall submit to the city a
Notice of Restriction to be filed in the office of the County Recorder, subject to the satisfaction of
the City Planner, notifying all interested parties and successors in interest that the City of Carlsbad
has issued a Site Development Plan Amendment by Resolution on the property. Said Notice of
Restriction shall note the property description, location of the file containing complete project
details and all conditions of approval as well as any conditions or restrictions specified for
inclusion in the Notice of Restriction. The City Planner has the authority to execute and record an
amendment to the notice which modifies or terminates said notice upon a showing of good cause
by the Developer or successor in interest.
13. No outdoor storage of materials shall occur onsite unless required by the Fire Chief. When so
required, the Developer shall submit and obtain approval of the Fire Chief and the City Planner of
an Outdoor Storage Plan, and thereafter comply with the approved plan.
14. Developer shall submit and obtain Planning Director approval of an exterior lighting plan including
parking areas. All lighting shall be designed to reflect downward and avoid any impacts on
adjacent homes or property.
July 2, 2025 Item #1 10 of 30
15. The applicant or property owner shall provide a copy of the executed off-site parking agreement
or agreements with Encinitas Union School District and/or San Dieguito Union High School
District for the use of no less than 34 parking spaces at El Camino Creek Elementary School
(Encinitas Union School District) and/or the San Dieguito Sports Complex (San Dieguito Union
High School District). Parties involved in the parking agreement(s) shall provide evidence of
agreement and shall be recorded in the office of the County Recorder.
Nothing in this resolution shall be construed to prevent the applicant or property owner from
developing a joint use agreement to share existing facilities at an alternate location, subject to
Chapter 21.44.080 of the CMC.
16. The previously amended Site Development Plan (AMEND 2018-0003) allowed for the continued
development of the church campus in two phases: 1) a new two-story 23,746 SF children’s
ministry center and a total of 193 on-site parking spaces; and 2) a 2,141 SF expansion to the
worship center, a 442 SF expansion to the café, a two-story 1,374 SF maintenance/storage
building, and the addition of 34 parking spaces for a total of 227 on-site parking spaces. The
development of the 34 additional parking spaces on the Coastline Church campus will now be
required as “Phase 3” of the development plan and must be completed within a 20-year build-
out. Moreover, the development of 34 additional parking spaces on the Coastline Church
campus must be completed prior to the expiration of any off-site parking agreements. In the
event that offsite parking agreement(s) expire and the additional parking spaces have not been
completed, the applicant or property shall execute one of the following:
a. Secure an extension to an off-site parking lease agreement for no less than 34 spaces;
b. Enter into a new lease agreement for an alternate off-site parking location of no less
than 34 parking spaces on a site no more than 0.25 miles from the church campus; or c. Reduce the available seating within the expanded worship center to meet the seating
limit accommodated by the onsite parking spaces, to the satisfaction of the City
Planner.
Engineering:
General
17. Prior to hauling dirt or construction materials to or from any proposed construction site within
this project, the developer shall apply for and obtain approval from the city engineer for the
proposed haul route.
18. This project is approved upon the express condition that building permits will not be issued for
the development of the subject property unless the district engineer has determined that
adequate water and sewer facilities are available at the time of permit issuance and will continue
to be available until the time of occupancy.
19. Developer shall install sight distance corridors at all street intersections and driveways in
accordance with City Engineering Standards. The property owner shall maintain this condition.
July 2, 2025 Item #1 11 of 30
Fees/Agreements
20. Developer shall cause property owner to execute and submit to the city engineer for recordation,
the city’s standard form Geologic Failure Hold Harmless Agreement.
21. Developer shall cause property owner to execute and submit to the city engineer for recordation
the city’s standard form Drainage Hold Harmless Agreement.
22. Developer shall cause property owner to submit an executed copy to the city engineer for
recordation a city standard Permanent Stormwater Quality Best Management Practice
Maintenance Agreement.
Grading
23. Based upon a review of the proposed grading and the grading quantities shown on the site plan,
a grading permit for this project is required. Developer shall prepare and submit plans and
technical studies/reports as required by city engineer, post security and pay all applicable grading
plan review and permit fees per the city’s latest fee schedule.
24. Prior to issuance of a building permit, supplemental grading plans are required for precise
grading associated with this project. Developer shall prepare, and submit for approval, grading
plans for the precise grading as shown on the site plan all subject to city engineer approval.
25. If shoring is determined to be required, Developer shall include shoring plans as part of the
grading plans to the satisfaction of the city engineer and building official. Structural calculations
for all shoring shall be submitted for review and approval by the building division. The developer shall pay all deposits necessary to cover any 3rd party review.
Storm Water Quality
26. Developer shall comply with the city's Stormwater Regulations, the latest version, and shall
implement best management practices at all times. Best management practices include but are
not limited to pollution control practices or devices, erosion control to prevent silt runoff during
construction, general housekeeping practices, pollution prevention and educational practices,
maintenance procedures, and other management practices or devices to prevent or reduce the
discharge of pollutants to stormwater, receiving water or stormwater conveyance system to the
maximum extent practicable. Developer shall notify prospective owners and tenants of the above
requirements.
27. Developer shall complete and submit to the city engineer a Determination of Project’s SWPPP Tier
Level and Construction Threat Level Form pursuant to City Engineering Standards. Developer shall
also submit the appropriate Tier level Storm Water Compliance form and appropriate Tier level
Storm Water Pollution Prevention Plan (SWPPP) to the satisfaction of the city engineer. Developer
shall pay all applicable SWPPP plan review and inspection fees per the city’s latest fee schedule.
28. This project is subject to ‘Priority Development Project’ requirements. Developer shall prepare
and process a Storm Water Quality Management Plan (SWQMP), subject to city engineer
approval, to comply with the Carlsbad BMP Design Manual latest version. The final SWQMP
July 2, 2025 Item #1 12 of 30
required by this condition shall be reviewed and approved by the city engineer with final grading
plans. Developer shall pay all applicable SWQMP plan review and inspection fees per the city’s
latest fee schedule.
29. Developer is responsible to ensure that all final design plans (grading plans, improvement plans,
landscape plans, building plans, etc) incorporate all source control, site design, pollutant control
BMP and applicable hydromodification measures.
30. Ponding depths exceeding 12” in any stormwater basin will require a fence to be installed
around the stormwater basin to the satisfaction of the city engineer.
Dedications/Improvements
31. Developer shall design the private drainage systems, as shown on the site plan to the satisfaction
of the city engineer. All private drainage systems (12” diameter storm drain and larger) shall be
inspected by the city. Developer shall pay the standard improvement plan check and inspection
fees for private drainage systems.
32. Prior to any work in city right-of-way or public easements, Developer shall apply for and obtain
a right-of-way permit to the satisfaction of the city engineer.
33. Developer shall design, and obtain approval from the city engineer, the structural section for the
access aisles with a traffic index of 5.0 in accordance with city standards due to truck access
through the parking area and/or aisles with an ADT greater than 500. Prior to completion of
grading, the final structural pavement design of the aisle ways shall be submitted together with
required R-value soil test information subject to the review and approval of the city engineer.
Utilities
34. Developer shall meet with the fire marshal to determine if fire protection measures (fire flows,
fire hydrant locations, building sprinklers) are required to serve the project. Fire hydrants, if
proposed, shall be considered public improvements and shall be served by public water mains to
the satisfaction of the district engineer.
35. The developer shall design and agree to construct public water, sewer, and recycled water
facilities substantially as shown on the site plan to the satisfaction of the district engineer and city
engineer.
36. Sizes and locations of water service, water meter, and backflow preventer shall be shown on
the grading plans and shall be provided to the satisfaction of the district engineer and city
engineer.
37. The developer shall meet with and obtain approval from the Leucadia Wastewater District
regarding sewer infrastructure available or required to serve this project.
38. The developer shall meet with and obtain approval from the Olivenhain Municipal Water District
regarding potable water infrastructure available or required to serve this project.
July 2, 2025 Item #1 13 of 30
39. The developer shall meet with and obtain approval from the Olivenhain Municipal Water District
regarding recycled water infrastructure available or required to serve this project.
Code Reminders:
40. Developer acknowledges new forthcoming requirements related to the city’s Climate Action Plan
(CAP) will likely impact development requirements of this project, and may be different than what
is proposed on the project plans or in the project’s CAP Checklist. Developer acknowledges new
CAP requirements are related to energy efficiency, photovoltaic, electric vehicle charging, water
heating and traffic demand management requirements, as set forth in City Council Ordinance Nos.
CS-347, CS-348, CS-349 and CS-350 and City Council Resolution No. 2019-024, are available on the
city’s website. CAP requirements may impact, but are not limited to, site design and local building
code requirements. If incorporating new CAP requirements results in substantial modifications
to the project, then prior to issuance of development permits, Developer may be required to
submit and receive approval of a Consistency Determination or Amendment for this project
through the Planning Division. Once adopted as part of Title 18 and in effect, compliance with the
new CAP requirements must be demonstrated on or with the construction plans prior to issuance
of the applicable development permits.
41. Developer shall pay traffic impact and sewer impact fees based on Section 18.42 and Section
13.10 of the City of Carlsbad Municipal Code, respectively. The Average Daily Trips (ADT) and floor
area contained in the staff report and shown on the (SITE PLAN/TENTATIVE MAP) are for planning
purposes only.
42. Prior to the issuance of a building permit, Developer shall pay a Public Facility fee as required by
Council Policy No. 17.
43. Prior to the issuance of a building permit, Developer shall pay the Local Facilities Management
fee for Zone 12 as required by Carlsbad Municipal Code Section 21.90.050.
44. Approval of this request shall not excuse compliance with all applicable sections of the Zoning
Ordinance and all other applicable city ordinances in effect at time of building permit or
occupancy permit issuance, except as otherwise specifically provided herein.
45. The project shall comply with the latest nonresidential disabled access requirements pursuant to
Title 24 of the California Building Code.
46. Premise identification (addresses) shall be provided consistent with Carlsbad Municipal Code
Section 18.04.320.
47. Any signs proposed for this development shall at a minimum be designed in conformance with
the city’s Sign Ordinance and shall require review and approval of the City Planner prior to
installation of such signs.
48. Developer shall pay a landscape plancheck and inspection fee as required by Section 20.08.050 of
the Carlsbad Municipal Code.
July 2, 2025 Item #1 14 of 30
49. Developer shall pay planned local area drainage fees in accordance with Section 15.08.020 of the
City of Carlsbad Municipal Code to the satisfaction of the City Engineer.
NOTICE
Please take NOTICE that approval of your project includes the “imposition” of fees, dedications,
reservations, or other exactions hereafter collectively referred to for convenience as “fees/exactions.”
You have 90 days from date of final approval to protest imposition of these fees/exactions. If you protest
them, you must follow the protest procedure set forth in Government Code §66020(a) and file the protest
and any other required information with the City Manager for processing in accordance with Carlsbad
Municipal Code Section 3.32.030. Failure to timely follow that procedure will bar any subsequent legal
action to attack, review, set aside, void, or annul their imposition.
You are hereby FURTHER NOTIFIED that your right to protest the specified fees/exactions DOES NOT
APPLY to water and sewer connection fees and capacity charges, nor planning, zoning, grading, or other
similar application processing or service fees in connection with this project; NOR DOES IT APPLY to any
fees/exactions of which you have previously been given a NOTICE similar to this, or as to which the statute
of limitations has previously otherwise expired.
PASSED, APPROVED, AND ADOPTED at a regular meeting of the Planning Commission of
the City of Carlsbad, California, held on July 2, 2025, by the following vote, to wit:
AYES:
NAYES:
ABSENT:
ABSTAIN:
ROY MEENES, Chairperson
Carlsbad Planning Commission
ATTEST:
ERIC LARDY
City Planner
July 2, 2025 Item #1 15 of 30
49.Developer shall pay planned local area drainage fees in accordance with Section 15.08.020 of theCity of Carlsbad Municipal Code to the satisfaction of the City Engineer.
NOTICE
Please take NOTICE that approval of your project includes the "imposition" of fees, dedications, reservations, or other exactions hereafter collectively referred to for convenience as "fees/exactions."
You have 90 days from date of final approval to protest imposition of these fees/exactions. If you protest them, you must follow the protest procedure set forth in Government Code §66020{a) and file the protest and any other required information with the City Manager for processing in accordance with Carlsbad Municipal Code Section 3.32.030. Failure to timely follow that procedure will bar any subsequent legal action to attack, review, set aside, void, or annul their imposition.
You are hereby FURTHER NOTIFIED that your right to protest the specified fees/exactions DOES NOT APPLY to water and sewer connection fees and capacity charges, nor planning, zoning, grading, or other similar application processing or service fees in connection with this project; NOR DOES IT APPLY to any fees/exactions of which you have previously been given a NOTICE similar to this, or as to which the statute of limitations has previously otherwise expired.
PASSED, APPROVED, AND ADOPTED at a regular meeting of the Planning Commission of
the City of Carlsbad, California, held on July 2, 2025, by the following vote, to wit:
AYES: NAYES: ABSENT:
ABSTAIN:
Meenes, Burrows, Foster, Hubinger. None. Lafferty, Merz, Stine. None.
RQjMEENES, Chairperson
Carlsbad Planning Commission
ATTEST:
ERIC LARDY City Planner
July 2, 2025 Item #1 15 of 30
PA
S
E
O
A
L
I
S
O
CALLE
B
A
R
C
E
L
O
N
A
LA PLANCHALN
P
A
SEOTULIPERO
AR
B
U
S
T
O
C
T
VI
S
T
A
CH A P ARRAL
COR T E ACEB
O
CORTE
C
I
D
R
O
E
L
C
AMINO
R
E
A
L
LA COSTA AV
A L G A R D
C
A
R
L
S
B
A
D
B
L
AMEND-2025-0001(DEV02116)
Coastline Church
SITE MAP
J
SITE
Map generated on: 5/6/2025
Exhibit 2
July 2, 2025 Item #1 16 of 30
Exhibit 3
July 2, 2025 Item #1 17 of 30
C cityof
Carlsbad
AUTHORIZATION, CONSENT, AND
DISCLOSURE STATEMENT
P-1(A)
.Development Services
Planning Division
1635 Faraday Avenue
442-339-2600
www.carlsbadca.gov
§) APPLICATION AND ACKNOWLEDGEMENT INFORMATION
This submittal form {Part A through Part F) must be completed as part of your application with the City
of Carlsbad. Your project cannot be reviewed until this information is completed.
PART A. Owner Authorization and Consent
NOTE: This Consent and Disclosure Form must list the name of the principal owners {10% or greater) and
attach a copy of the current corporate articles, partnership agreement, or trust document, as applicable.
Provide name(s} of the person(s) authorized to sign on behalf of the organization. (A separate page may
be attached if necessary.) IF NO INDIVIDUALS OWN MORE THAN 10% OF THE SHARES, PLEASE IND/CA TE
NOT-APPLICABLE (N/A) IN THE SPACE BELOW.
This is to certify under penalty of perjury that the undersigned is/are the record owner(s) of the
property known as:
Assessor's Map Book, Page and Parcel (APN/APNs): _2_2_5_-2_7_3_-0_7_-_oo ___________ _
________________________________ ; and
St t Add (.f 1. bl ) 2215 Calle Barcelona ree ress I app Ica e : _______________________ _
that I/we (full legal name of all record owners) consent to the filing of the Land Use Review Application
on our property for processing by the City of Carlsbad Planning Division. I/We declare under penalty of
perjury that I/we have reviewed this Affidavit and the information is tru0'"2.
1. Name: Joel Aaron Jayne Signature: ~
Signature, c;;,~------1----... -------
Phone Number: 760-7Za6 • Email: jaj@coastlinechurch.org
Contact Address: __ 2_21_s_c_a_l_le_B_a_rc_e_lo_n_a ______________ _
2. Name: ___________ Signature: ____________ _
Phone Number: ___________ Email : __________ _
Contact Address: ______________________ _
NOTE: For additional names, please use a separate sheet of paper. J'
MAP 1 0 7.0l Page 1 of 6
P-1(A) Form Rev4/2024
July 2, 2025 Item #1 18 of 30
IMPORTANT: A Grant Deed is required if the ownership does not match city records. Ownership on the
deed must correspond exactly with the ownership listed. If the owner noted on the Grant Deed does not
match the person signing as Property Owner, provide paperwork documenting the person signing is
authorized to sign as a Property Owner.
Whenever any excavation, fill, or other project-related improvement requires entry onto adjacent
property for any reason, the Land Use Review Application shall include the written consent or legal
easements or other property rights of the adjacent property owner or their authorized representative,
and shall include such consent with the application package. The application will not be deemed
complete unless and until all necessary consent documents are so filed. The consent shall be in a form
acceptable to the City Planner. If the proposed improvements on the adjacent property change the
nature of the property's development rights (or implied bundle of rights), the city might require
recordation of a Covenant and Agreement for Offsite Improvements and Release of Liability as a
condition of project approval.
Does the project's limits of disturbance encroach on property not owned by the Property Owner?
□ Yes ~ No If yes, attach adjacent owner authorization.
PART B. Owner Declarations (to be signed by Property Owner)
I/We hereby certify that I/we have read the information below and that:
1. I/We understand that it is the responsibility of the Applicant to substantiate the request through
the requirements of the application.
2. I/We understand that if there is a zoning violation on the property, application review may be
delayed. Any unpermitted structures or uses must either be removed or legalized at part of this
application.
3. I/We understand that if this application is approved, I/we may be required to record a covenant
with the County Recorder's Office, the form and content that is satisfactory to the City and its
City Attorney, to notify future owners of the project approval and restrictions.
4. If this Land Use Review Application is approved or conditionally approved, I/we hereby certify
that I/we will comply with all conditions attached to the approval action. I/We understand that
the failure to comply with any conditions shall constitute grounds for the revocation or
modification of the approval, permit, or other authorizations provided.
5. Prior to any use of the project site pursuant to the permit issued, all conditions of approval (if
any) will be c~mpleted or securM~ or required.
Property Owner S1gnature(s): ~ ......,
J I A J 3/6/25 Name(s): __ o_e __ a_ro_n_a_y_n_e _______________ Date:--------
Page 2 of 6
P-1 (A) Form Rev 4/2024
July 2, 2025 Item #1 19 of 30
PART C. Project Team Information (complete all applicable fields)
Applicant: □ Same as Owner 0 Different from Owner
Name (if different from Owner): __ J_a_m_e_s_E_._G_r_a_nt _________________ _
Grant General Contractors Company or Firm: _____________________________ _
Phone Number: 760-438-7500 Email: ___ ig_ra_n_t@_g_ra_n_t_gc_._co_m _______ _
Contact Address: 1545 Faraday Ave. City: Carlsbad CA 92008
State: __ Zip Code: ___ _
Agent or Representative: 0:Same as Applicant □ Different from Applicant ON/A
Name (if different from Applicant): _______________________ _
Company or Firm: ____________________________ _
Phone Number: Email: ----------------------------
Contact Address: ___________ City: ______ State: __ Zip Code: ___ _
Other (specify Architect, Engineer, CEQA Consultant, etc.): ______________ _
N Al Burghard
ame: ---------------------------------
BOG Architects, Inc. Company or Firm: ____________________________ _
Phone Number: _9_5_1-_9_7_0-_6_8_5_5 ______ Email: ___ a_e_b@_b_d_g_-a_rc_h_it_e_ct_s_.c_o_m _____ _
C t t Add 27450 Ynex Rd. c· Temecula CA d 92591 on ac ress: ___________ Ity: ______ State:_ Zip Co e: ___ _
NOTE: A Letter of Authorization (LOA) from the Property Owner empowering a person or persons to act
on the behalf of the Property, is required if anyone other than the Property Owner signs the Land Use
Review Application as the Applicant or Agent. The authorized person (Applicant or Agent) on the LOA
must correspond with the name and signature, above.
PART D. Single "Point of Contact,, Designation
A single "point of contact" is an individual that handles all communications with the city and its review
team for the purposes of sending and receiving application materials, information, reports, etc. The
point of contact is to be the single individual elected on the Land Use Review Application form for all
communications and to remain as the primary contact for all status updates relating to the Land Use
Review Application.
Single Point of Contact: 0 Applicant □ Property Owner □ Agent □ Other ________ _
Page 3 of 6
P-1 (A) Form Rev 4/2024
July 2, 2025 Item #1 20 of 30
PART E. Contribution Disclosure
Has the Property Owner, Applicant, or Agent had more than $900 worth of business transacted with any
member of city staff, Boards, Commissions, Committees and/or Council within the past 12 months?
□ Yes I[] No If yes, indicate person(s): ___________________ _
NOTE: Attach additional sheets if necessary.
PART F. Applicant Declarations (to be signed by Applicant)
I hereby certify that I have read the information below and that:
1. I have carefully reviewed and prepared the application and plans in accordance with the
instructions.
2. I understand that the specific information needed to initiate planning case processing
corresponds to those items listed in the application form's "Minimum Submittal Intake
Requirements Checklist." I also understand that even if the application is duly filed and
accepted for intake processing, each application submitted to the Planning Division is
required to have specified information included in the application packet before it is
determined to be complete. The specific information to determine completeness is in
"Completeness Determination Requirements Checklist."
3. The Planning Division has developed policies to help ensure that discretionary permit
applications are timely processed. The Permit Streamlining Act shot clock starts on the intake
date the Planning staff accepts a duly filed application.
4. I understand that once an application is determined to be complete, project or design changes
that will increase the number of units, add uses that were not previously listed, substantially
change the site plan, or other changes that trigger the need for additional discretionary
approvals will require a new application, or the filing of other application permit types, which
would restart the review "clock" and extend processing timelines.
5. I understand that upon city review, additional information, documents, reports, entitlements
and fees might be required, including any referral fees. I understand that all fees and deposits
submitted with this application will be refunded only as provided for by the ordinances,
regulations, or policies in effect at the time of the application submittal.
6. I certify that the description of the development and all the plans and supporting
documentation are accurate in all material respects as of the date when made. I understand
that it is my responsibility to ensure that statements and representations are not misleading.
Furthermore, I agree to promptly remove, correct, or add information as needed to correct any
misleading or materially inaccurate information. I understand that any misstatement or
omission of the requested information or of any information subsequently requested might be
Page 4 of 6
P-1(A) Form Rev 4/2024
July 2, 2025 Item #1 21 of 30
grounds for rejecting the application, deeming the application incomplete, denying the
application, suspending or revoking a permit issued on the basis of these or subsequent
representations, or for the seeking of such other and further relief as deemed appropriate by
the City of Carlsbad.
7. If discrepancies exist between the architectural plans and the structural plans, the architectural
plans shall take precedence. Ultimately, the scope of work, as described on the permit that
authorizes construction, takes precedence over the plans. If there is a discrepancy between the
plans and the description on the permit, the permit governs.
8. I understand that all materials submitted in connection with this application might become
public record subject to inspection and copying by the public. I acknowledge and understand
that the public might inspect and copy these materials and that some or all of the materials
might be posted on the city website or elsewhere on line, outside of the city's control.
9. I understand there are no assurances at any time, implicitly or otherwise, whether provided to
me in writing or by oral communications regarding final staff recommendations to the decision-
making body about this application or the determination of any decision-making body.
10. I understand that the overall design process consists of several steps, each with increasingly
more detail. The planning phase is one of the first steps in the design process. A Land Use
Review Application (or "planning application") consists only of a schematic design package. If
the project is approved or conditionally approved, the schematic design phase is immediately
followed by a design development phase (with construction drawings). Construction drawings,
such grading and drainage plans, are much more comprehensive and provide additional detail,
specificity, and instructions on how to build and implement the project.
Review comments, statements, or approvals from the City of Carlsbad concerning a Land Use
Review Application are based on the representations of the intent of design and construction.
City comments and statements are believed to be accurate; however, such accuracy is not
guaranteed when implementing the intended design solution. I understand that the approval or
conditional approval of a Land Use Review Application does not replace the more thorough
review of the construction drawings by the city or another agency during the design
development phase; or services or recommendations provided by design professionals, such as
architects, engineers, code professionals, etc. Furthermore, the approval or conditional approval
of a Land Use Review Application does not relieve the Applicant of the obligation from
complying with all applicable regulations, standards, policies, and guidelines applicable to the
design development phase. Therefore, the ultimate design solutions required in construction
drawings may differ from the project's initial schematic design.
The approved plan set of project drawings, civil plans/grading, sections, site plans, floor plans,
architectural elevations, and landscape plans shall not be altered without express authorization
by the City Planner. Once a permit has been issued, the Applicant may request permit
modifications. "Minor" modifications might be granted if found by the City Planner to be in
substantial conformity with the approved plan set, including all exhibits and permit conditions.
Page 5 of 6
P-1(A) Form Rev 4/2024
July 2, 2025 Item #1 22 of 30
Modifications beyond the scope described in the approved plan set might require submittal of
an amendment to the permit and approval by the authorized review body.
11. Should any proponent of the project fail to file a timely and valid appeal of the permit within the
applicable appeal period, such inaction shall be deemed to constitute acceptance of the permit
by the Applicant; and agreement by the Applicant to be bound by, to comply with, and to do all
things required of or by the Applicant pursuant to all of the terms, provisions, and conditions of
the issued permit or other approval.
12. As part of this application, the Applicant hereby agrees to defend, indemnify, and hold harmless
the City of Carlsbad, its Council, boards and commissions, officers, employees, volunteers, and
agents from any claim, action, or proceeding against the City of Carlsbad, its Council, boards and
commissions, officers, employees, volunteers and agents, to attack, set aside, void or annul an
approval of the application or related decision, including environmental documents, or to
challenge a denial of the application or related decisions. This indemnification shall include, but
not be limited to, damages awarded against the city, if any, costs of suit, attorneys' fees, and
other expenses incurred in connection with such claim, action, causes of action, suit or
proceeding whether incurred by Applicant, city, and/or the parties initiating or bringing such
proceeding. The Applicant shall indemnify the city for all of the city's costs, attorneys' fees, and
damages that the city incurs in enforcing the indemnification provisions set forth herein. The
Applicant shall pay to the city upon demand any amount owed to the city pursuant to the
indemnification requirements prescribed.
By signing below, I acknowledge that I have complete! read, understand, and agree to the declarations
above and accept all terms set fort
Name: ___ J_o_e_l _A_a_ro_n_J_a_y_n_e ______________ Date: __ 31_6_12_5 ____ _
This form must be stapled/attached to the application and shall be effective until replaced or
revoked in writing.
Page 6 of 6
P-1 (A) Form Rev 4/2024
Exhibit 4
Planning Commission Staff Report and Resolution No.
7333, May 15, 2019
(on file in the Office of the City Clerk)
July 2, 2025 Item #1 23 of 30
LIST OF ACRONYMS AND ABBREVIATIONS Exhibit 5
This is a list of acronyms and abbreviations (in alphabetical order) that are commonly used in staff
reports.
Acronym Description Acronym Description
APA American Planning Association LCPA Local Coastal Program Amendment
APN Assessor Parcel Number LOS Level of Service
AQMD Air Quality Management District MND Mitigated Negative Declaration
BMP Best Management Practice NCTD North County Transit District
CALTRANS California Department of Transportation ND Negative Declaration
CC City Council PC Planning Commission
CCR Conditions, Covenants and Restrictions PDP Planned Development Permit
CEQA California Environmental Quality Act PEIR Program Environmental Impact Report
CFD Community Facilities District PUD Planned Unit Development
CIP Capital Improvement Program ROW Right of Way
COA Conditions of Approval RWQCB Regional Water Quality Control Board
CofO Certificate of Occupancy SANDAG San Diego Association of Governments
CT Tentative Parcel Map SDP Site Development Permit
CUP Conditional Use Permit SP Specific Plan
DIF Development Impact Fee SWPPP Storm Water Pollution Prevention Program
DISTRICT City Council Member District Number TM Tentative Map
EIR Environmental Impact Report ZC Zone Change
EIS Environmental Impact Statement (federal)
EPA Environmental Protection Agency
FEMA Federal Emergency Management Agency
GP General Plan
GPA General Plan Amendment
GIS Geographic Information Systems
HCA Housing Crisis Act 2019
IS Initial Study
July 2, 2025 Item #1 24 of 30
PLANNING SUBMITTAL PACKAGE
2215 Calle Barcelona
Carlsbad, California 92008
COASTLINE CHURCH
ARCHITECT
OWNER
ARCHITECTURAL DRAWINGS
CIVIL DRAWINGS
CIVIL ENGINEER
VICINITY MAP
NORTH
T1.0
C-1.0
A1.1
A1.3
A2.1
A2.2
A2.3
A2.4
SITE DATABUILDING DATA PROJECT DIRECTORY SHEET INDEX
AMENDMENT 2018-0003 (DEV02116)
FOR
MAINTENANCE / STORAGE BUILDING - [FUTURE PHASE]
A2.5
A2.6
A4.2
LANDSCAPE DRAWINGS
L1.0
(E) WORSHIP CENTER EXPANSION - [FUTURE PHASE]
(E) CAFE ADDITION - [FUTURE PHASE]
LANDSCAPE ARCHITECT
PROJECT OVERVIEW
(E) WORSHIP CENTER / CAFE SPACE:
MASTER PLAN PARKING TABULATION
LA COSTA AVE.
5 EL
C
A
M
I
N
O
R
E
A
L
E
L
C
A
M
I
N
O
R
E
A
L
CA
L
L
E
BA
R
C
E
L
O
N
A
OLIV
E
N
H
A
I
N
R
D
LA COS
T
A
A
V
E
.
SA
X
O
N
Y
R
D
Q
U
A
I
L
G
A
R
D
E
N
S
D
R
.
LEUCADIA BLVD
GA
R
D
E
N
V
I
E
W
R
D
CAL
L
E
BAR
C
E
L
O
N
A
TOTAL SITE DEVELOPMENT BUILDING FLOOR AREA:
A1.4
A1.2
L2.0
L2.1
L3.0
L3.1
A1.1.1
A4.1
A4.3
C-2.0
C-2.1
CHILDREN'S MINISTRY CENTER:
CHILDREN'S MINISTRY BUILDING
MAINTENANCE / STORAGE BUILDING
EXISTING WORSHIP CENTER EXPANSION
EXISTING CAFE EXPANSION
SITE AND PARKING
GOVERNING CODES
A4.4
A1.5
A1.0
A5.1
NEW CHILDREN'S MINISTRY BUILDING - [PHASE 1]
C-2.2
C-3.0
TITLE SHEET
T1.0
NTS
2215 CALLE BARCELONA
CARLSBAD, CALIFORNIA 92008
P:
\
C
o
a
s
t
l
i
n
e
C
h
i
l
d
r
e
n
s
B
u
i
l
d
i
n
g
\
N
E
W
M
I
N
I
S
T
R
Y
B
U
I
L
D
I
N
G
\
P
l
a
n
n
i
n
g
S
u
b
m
i
t
t
a
l
D
o
c
u
m
e
n
t
\
1
7
1
0
5
_
T
1
.
0
_
T
i
t
l
e
S
h
e
e
t
.
d
w
g
jo
h
n
.
a
l
v
a
r
a
d
o
A
p
r
1
1
,
2
0
1
9
-
4
:
3
0
p
m
COASTLINE CHURCH
PLANNING SUBMITTAL
PACKAGE
MARCH 22, 2018
AMENDMENT 2018-0003
(DEV02116)
FOR
17105
PLANNING SUBMITTAL
AMEND 2018-0003 (DEV02116) - COASTLINE CHURCH
PLANNING DEPT. SUBMITTAL #2 07-23-2018
PLANNING DEPT. SUBMITTAL #3 10-12-2018
FO
R
R
E
F
E
R
E
N
C
E
O
N
L
Y
Exhibit 6
July 2, 2025 Item #1 25 of 30
1 /1 6"-1' I I I I I 111 I I I I I I I I I I I I I 111 I I I I I I I I I I I I 1111 I I I I I I I I I
0 16 32 48 0 8
THE 5COFE OF l.lk:lRK 15 PLANNED TO 6E COMPLETED DURING Tl.lk:l
SEPARATE PHASES. PHASE I INCLUDES A NEW CHILDREN'S MINISTRY
CENTER WHICH WILL REPLACE, IN THE SAME APPROXIMATE LOCATION, THE
EXISTING MODULAR 6UILDING5 WHICH HAVE: 6EEN USED FOR
CLA55ROOM5 AND 5T AFF OFFICES. THE 6UILDING PAD FOR THE NEW
CHILDREN'S MINISTRY 6UILDING WILL 6E LOWERED APPROXIMATELY 48"
FROM IT'S CURRENT PAD ELEVATION. THIS PHASE ALSO INCLUDES
PARKING EXPANSION AT THE CUL-DE-SAC AT THE WEST END OF DRIVE:
"A". THIS AREA WILL 6E USED ON A TEMPORARY 6A5I5 TO LOCATE
MODULAR CLASSROOM 6UILDING5 UNTIL THE MINISTRY CENTER 15
COMPLETED. PHASE 2 INCLUDES A 2,141 5F EXPANSION OF THE EXISTING
l.lk:lRSHIF CENTER, A 442 5F EXPANSION TO THE EXISTING CAFE 6UILDING,
A Tl.lk:l-5TORY 1,314 5F MAINTENANCE/STORAGE 6UILDING AND THE
ADDITIONAL NEW PARKING AREA SHOWN ON THE PLANS AS DRIVE: ISLE
"C". PORTIONS OF PHASE 2 MAY 6E 5EPARATEL Y PERMITTED WITH
REQUIRED PARKING PROVIDED. IMPLEMENTATION OF PHASE I 15 PLANNED
TO COMMENCE WITHIN THE NEXT YEAR, HOWEVER, THE ANTICIPATED
CONSTRUCTION DATE FOR PHASE 2 15 NOT KNOWN AT THIS TIME.
THE PROPOSED 2-5TORY MINISTRY CENTER 15 COMPRISED OF
CLA55ROOM5 AND 6REAK-OUT ROOMS FOR FRE-5CHOOL TO JR HIGH
AGE CHILDREN. THE YOUNGER CHILDREN ARE ON THE LOWER LEVEL. THE
MUL Tl -PURPOSE ROOM ON THE GROUND FLOOR 15 DESIGNED FOR KIDS
WORSHIP AND 15 PROVIDED 1111TH MUSIC AND VIDEO CAPA6ILITIE5 TO
ENHANCE THEIR LEARNING EXPERIENCE. THE UPPER LEVEL HAS
CLA55ROOM5 FOR OLDER KIDS AND A VERY LARGE MUL Tl -PURPOSE
ROOM DESIGNED FOR SPECIAL EVENTS THAT WILL ACCOMMODATE A
VARIETY OF FUNCTIONS. THE SIZE OF THE ROOM LENDS ITSELF WELL TO
LARGE GROUP l.lk:lRSHIP, LIVE: MUSIC PERFORMANCES, LARGE FORMAT
VIDEO STREAMING, AND KID'S EASTER AND CHRISTMAS FLAYS. THIS
FLOOR 15 ALSO THE HOME FOR ADMINISTRATIVE OFFICES WHICH OVERSEE
MANAGEMENT AND DAY TO DAY OPERATION OF THE CHURCH. EXTERIOR
DECKS ARE PROVIDED AT EACH END OF THE 6UILDING WHICH CAN 6E
USED AS A DESTINATION PLACE FOR SMALL GROUP GATHERINGS,
OUTDOOR 6I6LE STUDIES, 66Q'5 ETC. THE CORE AREA OF EACH FLOOR
15 PROVIDED 1111TH A LARGE L066Y 1111TH SELF CHECK-IN AND RECEPTION
STATIONS FOR NEIii ATTENDEES AND VISITORS. SECURITY 15 A HIGH
PRIORITY 50 RECEPTION ALSO FUNCTIONS AS A CHECK-POINT FOR
ANYONE ENTERING OR LEAVING. THE ARCHITECTURE OF THE MINISTRY
CENTER 15 CONSISTENT 1111TH THE CRAFTSMAN-INFLUENCED ARCHITECTURE
THAT IIIA5 APPROVED FOR THE ORIGINAL 5DF 02-IE> IN 2004. WE ARE
FROF05ING USE OF THE SAME EXTERIOR FINISH MATERIALS, COLORS AND
DETAILS THAT WERE USED ON THE EXISTING COMMUNITY CENTER AND
CAFE. THIS MINISTRY CENTER 15 NOT DESIGNED TO FUNCTION A5 A
SCHOOL OR DAY-CARE FACILITY DURING THE WEEK.
THE PROPOSED 2-5TORY MAINTENANCE 6UILDING 15 LOCATED AT THE
50UTH-IIIE5T CORNER OF THE PROPERTY ADJACENT TO DRIVE "A". THE
PRIMARY FURF05E OF THIS BUILDING 15 TO PROVIDE SHELTER FROM THE
ELEMENTS FOR GOLF-TYPE CARTS THAT ARE USED ON THE CAMPUS. IT
WILL ALSO 6E USED FOR STORAGE OF LAWN MOWER AND GARDENING
EQUIPMENT, AND WHEN NECESSARY TO DO MINOR MAINTENANCE ON CARTS
AND MOWERS. THE UPPER LEVEL WILL 6E USED FOR LONG-TERM
STORAGE ITEMS SUCH AS PROPS AND DECORATIONS THAT ARE USED
DURING THE EASTER AND CHRISTMAS SEASON. THE 6UILDING HAS A 10'
FLOOR TO FLOOR HEIGHT, DESIGNED IN THE SAME VERNACULAR AS
OTHER 6UILDING5 ON CAMPUS. IIIE WILL USE THE SAME COLORS AND
FINISH MATERIALS.
THE EXISTING WORSHIP CENTER 1111TH A SEATING CAPACITY OF 280 15 IN
NEED OF REMODEL AND AN INCREASE IN SEATING CAPACITY. THE STYLE
OF PREACHING, THE CURRRENT TECHNOLOGY, AUDIONIDEO/LIGHTING
UPGRADES AND A GROWTH IN MEMBERSHIP ARE ALL DRIVING FACTORS.
THE GOAL 15 TO PROVIDE ROUGHLY 430 5EAT5 6UT IN ORDER TO GET TO
THIS 06JECTIVE, THE STAGE AND SEATING ORIENTATION NEEDS TO 6E
ROTATED 90 DEGREES. IT 15 IMPORTANT TO KEEP THE STREET SIDE
ELEVATION UNCHANGED. FOR THI& REA&ON THE EXFAN&ION WA& MOVED
TO THE SOUTH SIDE WHERE CHANGE& ARE NOT vl5I6LE FROM CALLE
6ARCELONA. THIS EXPAN&ION INCLUDES A MUCH DEEPER &TAGE, ADA
ACCE55I6LE RAMP, AND A/VIL CONTROL ROOM FOR NEW EQUIPMENT, AND
A &TORAGE ROOM. OF COUR&E, IN ORDER TO GET THE HEIGHT REQUIRED
FOR LIGHT 6AR5 AND &PEAKER ARRAYS, A PORTION OF THE EXl&TING
ROOF WILL 6E REMOVED. AT THE EXTERIOR, THE EXPANSION
NECE55ITATE5 MODIFICATION& TO THE RETAINING WALLS AT THE PATIO.
AND IN ORDER TO KEEF THE PATIO AS OPEN AS P055I6LE, A NEIii STAIR
UF TO DRIVE: "13" 15 PROPO&ED. ELEVATION WISE, THERE ARE NO
CHANGES ON THE STREET SIDE OF THE 6UILDING. ONLY THE 50UTHERL Y
PORTION OF THE 6UILDING 15 AFFECTED 61 THE EXFAN&ION. THAT
PORTION OF THE 6UILDING WILL NOW HAVE A FARAFET ROOF WHICH WILL
&GREEN ROOF-TOP EQUIPMENT. IIIE WILL INCORPORATE U&E OF THE SAME
FINl&H MATERIAL&, COLORS AND DETAILS CURRENTLY EMPLOYED. ON THE
SOUTH SIDE WE ARE PROPOSING A TRELLI& FOR A SHADED &EATING
AREA 6ELOW AND WE HAVE: MAINTAINED THE FOCAL POINT OF A
FIREPLACE AT THE VERY CENTER THE COM6INATION OF STONE, &TUCCO
AND Uk:lOD SIDING HELF5 TO 6REAK UP THE MA55 INTO SMALLER PIECES.
THIS 15 FURTHER EMPHASIZED 61 CHANGING PLANES FOR EACH FINl&H
MATERIAL.
THE EXl&TING CAFE WILL REMAIN LARGELY UNCHANGED. THERE ARE NO
CHANGES TO THE STREET SIDE ELEVATION, THE EAST SIDE, AND MOST OF
THE IIIE&T SIDE ELEVATION. THE ADDITION TO THI& 6UILDING 15
COMPRISED OF MUL Tl-STALL TOILET ROOM& ONLY. WHILE TOILET ROOM&
ARE ALREADY PROVIDED WITHIN THE CAFE, THEY HAVE PROVEN TO 6E
SOMEWHAT INCONVENIENT, E&FECIALL Y AFTER A CHURCH &ERVICE WHEN
THE NEED 15 THE GREATE&T. THE ADDITION 6LEND5 WELL INTO EXISTING
ARCHITECTURE SINCE THE &OUTH, WE&T AD A PORTION OF THE NORTH
WALL ARE ALL FINISHED WITH THE &AME &TONE.
1/4"-1'
16 24 0 4 8 12 0 2 4 6 0
PROJECT NAME, COASTLINE CHURCH
PROJECT ADDl'<l:55, 2215 CALLE 6ARCELONA
OCCUPANCY GROUP, (C6C 201&, SECTION 303.4)
CON&TRUCTION TYFE, (C6C 201&, TA6LE E>OI)
FIRE PROTECTION,
A-3 CARL56AD, CALIFORNIA 'il200S
111-13
FULLY SPRINKLERED
NUMBER OF STORIES, (C6C 201&, SECTION 504, TA6LE 504.4!
ALLOWED,
ACTUAL,
2
2
BUILDING HEICirHT, (C6C 201&, &ECTION 504, TA6LE 504.3!
ALLOWED,
ACTUAL,
BUILDING Al'i!EA,
1ST FLOOR,
AREA OF FIR&T FLOOR
35 FEET
35 FEET
EXTERIOR ELEVATOR 4 ELEV. MACHINE ROOM.
TOTAL,
I3,E,1& SQ. FT.
142 SQ. FT.
13,818 SQ. FT.
2ND FLOOR,
AREA OF SECOND FLOOR
OPEN DECK 4 6ALCONIE5,
TOTAL,
6UILDING TOT AL FLOOR AREA,
I0,070 SQ. FT.
E>,03i!> &Q. FT.
Ii!> ,IOi!> &Q. FT.
13,&1& + 10,010 • 23,14& SQ. FT.
OCCUPANCY GROUP, (C6C 201&, SECTION 3113!
CON&TRUCTION TYPE,
5-2
V-13
FULLY SPRINKLERED
2
FIRE PROTECTION,
NUM6ER OF &TORIES,
6UILDING HEIGHT,
FLOOR AREA,
1ST FLOOR,
2ND FLOOR,
STAIRS /NOT ENCLO&ED!
6UILDING TOTAL FLOOR AREA,
25 FEET
&81 &Q. FT.
&81 SQ. FT.
138 SQ. FT.
(E! GARDEN CHAPEL AREA (OPEN GAZE60!,
&81 + E>S1 • 1,314 SQ. FT.
342 SQ. FT.
PROJECT DESCRIPTION,
A 2,141 5F FUTURE EXPANSION TO THE EXISTING WORSHIP CENTER
NUM6ER OF STORIE&,
/E! 6UILDINC:i HEIC:!HT,
!E! TYPE OF CON&TRUCTION,
/E) FIi'<!: PROTECTION,
OCCUPANCY GROUP,
OCCUPANCY LOAD,
TOT AL AS5EM6L Y &EATING PROVIDED,
!E) 6UILDINC:i FLOOR Al'<EA,
I
22'-E>" TO TOP OF ROOF PARAPET
V-6
FULLY &PRINKLEl'<ED
A-3
/ A2.I) 3,'il2E> &Fl 1 • 5&1
429 SEAT&
FUTUl'<E PHASE 6UILDING EXPAN&ION FLOOR Al'<EA
4,320 &QFT.
2,141 &QFT.
6UILDINC:i TOTAL FLOOR AREA E> ,461 &QFT.
PROJECT DESCRIPTION,
A 442 &F FUTURE TOILET ROOM ADDITION TO THE EXISTING CAFE
NUM6ER OF STORIES,
(E) 6UILDINC:i HEIC:!HT,
I
22'-E>" TO TOP OF ROOF PARAPET
!E) 6UILDINC:i 6UILDING TYPE OF CON&TRUCTION,
!E) FIi'<!: PROTECTION,
OCCUPANCY C:!ROUP,
OCCUPANCY LOAD,
!E) 6UILDINC:i FLOOR Al'<EA,
FUTUl'<E PHASE l'<E&TROOM ADDITION FLOOR A!'<EA,
6UILDINC:i TOTAL FLOOR AREA
V-6
FULLY &PRINKLEl'<ED
A-3
l,SII &F/I5 • IOI
2,S'ilO SQFT.
442 SQFT.
3,032 &QFT.
23,14& + 1,314 + E>,4&I + 3,032 • 34,E,I3 &Q. FT.I
A5SE550R'5 PARCEL NO, 255-213-01-00
LEC:!AL DE&CRIFTION,
TOT AL LOT Al'<EA,
IE! ZONING,
!E) LAND U&E,
5ET6ACK5,
LOT COvERAC:!E,
6UILDING HEIC:!HT,
SEWER Dl&TRICT,
WATER Dl&TRICT,
&CHOOL Dl&TRICT,
LOT 482 OF CARL56AD TRACT NO. 88-03-2,
ARROYO LA COSTA, UNIT 2 (VILLAGES G, H, J, P,
Q, RAND 5), IN THE CITY OF CARL56AD, COUNTY
OF &AN DIEGO, STATE OF CALIFORNIA,
ACCORDING TO MAP THEREOF NO. 1338"', FILED
IN THE OFFICE OF THE COUNTY RECORDER OF
SAN DIEGO COUNTY, DECEMBER 20, l99i!>.
E>.43 ACl'<l:5 • 2S0,09I &F.
PLANNED COMMUNITY /FC)
ARROYO LA CO&TA MASTER PLAN
!MP 88-01) IN VILLAGE "J"
CHURCH / EDUCATION / COMMUNITY CENTER
R-4 RESIDENTIAL
FRONT, 20'-0"
~AR.: 101-0 11
&IDE, I0'-0"
ALLOIIIED, 50% MAXIMUM
ACTUAL, 123&% (34,E,I4 / 280,0'ill)
3&'-011
LEUCADIA WASTEWATER Dl&TRICT
(1i!>O) 153-0155>
OLIVE:NHAIN MUNICIPAL WATER DISTRICT
/1&0) 15>3-&4&&
ENCINITA& UNION &CHOOL Dl&TRICT
/1&0) 944-4300
(E! PARKING 5TALL5,
PROPO&ED PARKING 5TALL5,
160 EXl&TING FULL SIZE 5T ALLS
221 FULL &IZE 5TALL5
CAFE, !E! LOUNGE
COMMON AREA,
SANCTUARY,
COMMON AREA,
I,S49 SF / 100 5F
1,483 &F I 25>0 5F
429 &EATS/ 5
2242 &F I 250 5F
2 PERSON/ AUDIO 1300TH
TOT AL WORSHIP CENTER/CAFE PARKING REQUIRED
CLA55ROOM,
ADMIN STAFF,
COMMON AREA,
A55EM6L Y AREA,
A55EM6L Y AREA,
A55EM6L Y AREA,
(9) CLA55ROOM5
(2 TEACHERS / CLA55ROOM)
2,024 &F. I 250 &F
8,3&5> SF I 250 5F
I SPACE PER TEACHER
2 PERSONS / AUDIO 1300TH
ADULT U&E-200 &EAT& I 5>
TOTAL MINl&TRY CENTER PARKING REQUIRED
!&EE FLOOR PLAN FOR AREA BREAKDOWN)
IE> SPACES
E> SPACES
8& SPACES
9 SPACES
2 SPACES
119 &PACE&
18 &PACE&
8 &PACE&
34 &PACE&
2 &PACE&
4 &PACE&
40 SPACE&
IOi!> &PACES
TOTAL PARKING l'<EGlUll'<ED, 225 &PACE&
TOTAL PARKING PROVIDED, 221 &PACES
NOTE, TOTAL PARKING COUNT OF 221 5TALL5 INCLUDE& 1 ACCE55I6LE SPACE&
PERCENT AGE OF &ITE TO 6E LANDSCAPED,
PERCENT AGE OF PARKINC:i Al'<EA TO 6E LANDSCAPED,
!SEE LANDSCAPE DRAWING -SHEET L2.I!
43,01E> 5F (3E,%)
i!>,I28 SF /11%!
AvERAGE DAILY TRAFFIC C:!ENERATED -6A5ED ON TRAFFIC l'<EPORT OF 11-10-2003
CHURCH -36,ISI TOTAL S.F. (IIIEEKDAY5) 344
CHURCH -3S,1SI TOTAL S.F. !&ATURDAY! 310
CHURCH -3S,1SI TOT AL S.F. (5UNDAY) 1,391
!SEE TRAFFIC LETTER l'<EPORT INCLUDED WITH THIS SU6MITT AL!
PROPOSED WATER DEMAND,
PROPOSED SEWER C:!ENERATION,
PROPOSED DRAINAGE DISCHARGE,
EARTHWORK VOLUMES,
5>3 GPM
1,i!>OO GPD
22.4 CF&
CUT -Ea ,250 CY
FILL -3,i!>OO CY
REMEDIAL GRADING -900 CY
EXPORT -2,E,50 CY
1 "=1'
2 4
COA&TLINE CHURCH
2215 CALLE BARCELONA
CARL56AD, CALIFORNIA 92008
/1&0) 438-1500 VOICE
/1&0! 438-305>& FAX
MR. JAME& GRANT
0
6URGHARD DE&IGN GROUP ARCHITECT&, INC.
41951 REMINGTON AVE:, &UITE 250
TEMECULA, CALIFORNIA 92590
/951) 29&-2828 VOICE
MR. AL 6URGHARD
FU&COE ENGINEERING, INC.
&390 GREENWICH DRIVE:, &UITE 110
&AN DIEGO, CALIFORNIA 92122
(858) 554-1500 VOICE
/85>8) 5>91-0335> FAX
MR. ERIC ARM&TRONG
MIii PELTZ + A550CIATE, INC.
143 5. CEDR05 AVE:., &UITE 6104
SOLANA 6EACH, CALIFORNIA 'il2015>
/858) 481-0888 VOICE
/858) 481-&808 FAX
MR. MICHAEL PELTZ
I
\\ )
2 3
PROJECT
a
3" -1' t======:::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::J
0
COVER &HEET
DETAIL&
GRADING PLAN
GRADING PLAN
GRADING PLAN
EROSION CONTROL PLAN
EXISTING VEGETATION
CONCEPTUAL LANDSCAPE PLAN
CONCEPTUAL LANDSCAPE PLAN NOTES
CONCEPTUAL IRRIGATION PLAN
WATER EFFICIENT LAND&CAPE CALCULATION&
EXISTING &ITE PLAN
OVERALL MA&TER &ITE PLAN
&TREET VIEW ELEVATIONS
PROJECT PHASING PLAN
PARTIAL ENLARGED SITE PLAN
PARTIAL ENLARGED SITE PLAN
PARTIAL ENLARGED SITE PLAN
If this sheet is not 24"
by 36" it is a reduced
print, scale accordingly
CHILDREN'S MINl&TRY 6UILDING -FIR&T FLOOR PLAN
CHILDREN'& MINl&TRY 6UILDING -SECOND FLOOR PLAN
CHILDREN'& MINl&TRY 6UILDING -ROOF PLAN
l.lk:lRSHIP CENTER 6UILDING EXPAN&ION -FLOOR PLAN
l.lk:lRSHIP CENTER 6UILDING EXPAN&ION -ROOF PLAN
MAINTENANCE 6UILDING -FLOOR, ROOF PLAN 4 6LDG ELEVATION&
CHILDREN'& MINl&TRY 6UILDING -6UILDING ELEVATION&
CHILDREN'S MINl&TRY 6UILDING -ELEVATOR TOWER ELEVATIONS
l.lk:lRSHIP CENTER 6UILDING -EXl&TING 6UILDING ELEVATIONS
l.lk:lRSHIP CENTER 6UILDING EXPAN&ION -6UILDING ELEVATIONS
CHILDREN'& MINl&TRY 6UILDING -&ITE SECTION&
CHURCH /EDUCATION/ COMMUNITY CENTER
THE CONTRACTOR SHALL 6E 50LEL Y AND COMPLETELY RE5PON5I6LE
FOR COMPLYING WITH ALL GOVERNING 6UILDING CODE&, INCLUDING, 6UT
NOT LIMTIED TO,
201E> CALIFORNIA 6UILDING CODE (Cl3C!
201& CALIFORNIA MECHANICAL CODE (CMC)
201E> CALIFORNIA PLUM6ING CODE (CFC!
201& CALIFORNIA ELECTRICAL CODE /CEC!
201E> CALIFORNIA FIRE CODE (CFC!
201E> CALIFORNIA ENERGY EFFICIENCY 5TANDARD5
CURRENT CITY OF CARL56AD MUNICIPAL CODE
A PPROVED
TIIIS IS THE APPROVED TENTATIVE MAP/SITE
PLAN FOR PROJECT NO. PER
CONDITION NO. OF PLANNING
COMMISSION RESOLUTION NO.
PLA.'INlNG VlVlSlON DATb EJ\GlNEERING UlVlSlON DATE
■ ■ ■ ■ ■ ■ ■ ■ ■
B U R G H A R D
DESIGN GROUP
■ ■ ■ ■ ■ ■ ■ ■ ■
A R C H I T E C T 5, I N C
4 19 51 R E M I N G T O N AVE. , S U I T E 2 5 0
TEMECULA, CALIFORNIA 92590
(TEL) 951 • 296 • 2828
www.bdg-architects.com
• ~I -~A=R=CHTE~=C~T~O_F_R_EC_OR_D __ _
►~I --~PR=O=FE=S=S~IO~N_A_L _SE_A_L __ ~
• ~I ___ C_ON_SUL_TA_NT_S __ _
►~I ____ RE_V_IS_IO_N_S ___ _
• ~I ---~AP~PR~O~V_A_L ___ ~
►~I ___ P_R_O_JEC_T_PH_ASE ___ ~
• ~I --~P~R~O~JEC~T_NA_M_E ___ ~
►~I ___ PR_O_JE_C_T_N_U_MB_ER ___ _
e1 SHEET TITLE
►1 SHEET NUMBER
•1 SCALE ►1
DATE
POLE
POLE
DENSE
TREES
GNV
135
135
135
135
130
125
120
1
1
5
13
0
12
5
12
0
13
0
12
5
120
115
110
105
100
95
130
125
120
115
110
105
100
95
130
130
12
5
12
0
115
11
0
10
5
10
0
130
12
5
120
115
11
0
105
140
135
140
135
130
160
155
150
145
185
180
175
170
165
195
190
195
190
185
180
175
170
165
160
155
150
145
140
190
185
180
175
170
165
160
155
150
145
140
185
180
175
170
165
160
155
150
145
140
135
180
175
170
165
160
155
150
145
140
13
5
130
125
120
115
110
105
100
95
90
85
125
120
115
110
105
100
95
90
105
100
95
90
100
9
5
105
100
95
90
90
90
90
85
85
95
90
105
10
0
125
120
115
110
100
95
90
85
10
0
95
90
85
110
110
110
115
110
120
115
130
125
120
115
110
13
0
120
11
5
110
100
130
125
12
0
90
PA
S
E
O
A
L
I
S
O
80
75
85
80
85
80
85
85
80
85
90
80
1
0
0
9
5
9
0
85
105
1
0
5
110
110
10
5
C A
L
L
E
B
A
R
C
E
L
O
N
A
P
A
S
E
O
A
L
I
S
O
P
A
S
E
O
A
L
I
S
O
100
95
90
105
110
E X I S T I N G S I T E P L A N
TRUE
NORTH
W
O
R
K
I
N
G
N
O
R
T
H
REFERENCE ORIGINAL DESIGN : CA 0.1
EXISTING PLAY AREA PAD
TO BE RAISED AND USED
AS A TURF AREA
SEE SHEET A1.2
EXISTING WORSHIP
CENTER AND CAFE TO BE
EXPANDED,
SEE SHEET A1.2
(E) F
I
R
E
H
Y
D
R
A
N
T
(E) F
I
R
E
H
Y
D
R
A
N
T
EXISTING MODULAR CLASSROOM BUILDINGS
TO BE REMOVED AND REPLACED WITH NEW
MINISTRY CENTER
SEE SHEET A1.2 FOR LOCATION OF NEW
TEMPORARY MODULAR BUILDINGS
EXISTING CHAPEL
STRUCTURE
TO BE RELOCATED,
SEE SHEET A1.2
(E) R
A
M
P
D
N
.
(E)
WATER QUALITY
BASIN
EXISTING PARKING AREA
TO BE RECONFIGURED,
SEE SHEET A1.2
PROPOSED LOCATION
FOR NEW DRIVE 'C'
PARKING AISLE,
SEE SHEET A1.2
PROPOSED PARKING
EXPANSION AREA
SEE SHEET A1.1
EXISTING AMPHITHEATER
TO BE REMOVED
SEE SHEET A1.2
EXISTING STAIR
TO BE REPLACED WITH
NEW STAIR
SEE SHEET A1.2
EXISTING STAIR
TO BE RECONFIGURED,
SEE SHEET A1.2
EXISTING SITE PLAN
A1.0
1" = 40'
2215 CALLE BARCELONA
CARLSBAD, CALIFORNIA 92008
P:
\
C
o
a
s
t
l
i
n
e
C
h
i
l
d
r
e
n
s
B
u
i
l
d
i
n
g
\
N
E
W
M
I
N
I
S
T
R
Y
B
U
I
L
D
I
N
G
\
P
l
a
n
n
i
n
g
S
u
b
m
i
t
t
a
l
D
o
c
u
m
e
n
t
\
1
7
1
0
5
_
A
1
.
0
_
E
x
i
s
t
i
n
g
S
i
t
e
P
l
a
n
.
d
w
g
jo
h
n
.
a
l
v
a
r
a
d
o
A
p
r
1
5
,
2
0
1
9
-
8
:
5
7
a
m
COASTLINE CHURCH
PLANNING SUBMITTAL
PACKAGE
MARCH 22, 2018
AMENDMENT 2018-0003
(DEV02116)
FOR
17105
PLANNING SUBMITTAL
AMEND 2018-0003 (DEV02116) - COASTLINE CHURCH
PLANNING DEPT. SUBMITTAL #2 07-23-2018
PLANNING DEPT. SUBMITTAL #3 10-12-2018
FO
R
R
E
F
E
R
E
N
C
E
O
N
L
Y
July 2, 2025 Item #1 26 of 30
1/16"-1' 1 o1" iii i I Iii iii i I I 1~1111111111111 ~d" 1111 I 11 1111 ~81 __ 11 _s .. -_,.~o':_~:=~~:5ir=~:'E~~~~=~~;'s'~ 16
I
I
24
• --- --
I
I
I
' I '
I
I
I
I
'
\
'
\
'
,
I
I
\
' I
' I
' I
l' '
I
:-------•
I ;'
,
I ,
I ,
I ,
~~~ \ »~. \ ~-1\ ~i,~ \\\ .--, ~
~ .·T!---i-..i
0
1 "=1'
2 4 6 0 2 4 0 2
3"=1'
3 0
If this she • by 36" . _et is not 24"
. it 1s O d print, scale re uced accordingly
/
I l--
■■■---8 u R ·c. H. A. R. o
?~SIGN GROUP
■ ■ ■ ■ ■
A R C H I T E C T s, I ~ C
41951 REMINGTON T EM E C U L A C AVE , 5 U I T E 2 5 o
I ALIFORNIA
(TEL)951·296 92590 • 2 8 2 8
• .--I_ www.bdg-architect . AR s.com
-'" OIITECT OF RECORD
►1,----~-l'PRK(OFESSIONAL SEAL
cONsUL TANTS e,1--
►~1,====~VISI REVISIO~NIS:::S ====~
APPROVA.C-L --e ~Cl ===-~_1,._---...~&QIY}
►1r---=::Jfil~r:::ffi~== -PROJECT PHASE
PROJECT NAME
►1 PROJECT NUMBER
SHEET TITLE
►1 SHEET NUMBER
e I SCALE 1►1
DATE
CHAPEL
POLE
POLE
DENSE
TREES
GNV
DENSETREESGNV
DENSETREESGNV
DENSE
TREES
GNV
DENSETREESGNV
DENSETREESGNVDENSETREESGNV
DENSETREESGNV
DENSE
TREESGNV
DENSETREESGNV
DENSETREESGNV
DENSE
TREES
GNV
DENSETREESGNV
DENSE
TREES
GNV
DENSE
TREESGNV
DENSE
TREES
GNV
DENSETREESGNV
DENSE
TREESGNV
DENSE
TREES
GNV
DENSETREESGNV
DENSETREESGNV DENSETREESGNV
DENSETREESGNV
40001
1971821.57
6252196.5482.59
400041971699.48
6252861.48
134.80
135
135
135
135
130
125
120
1
1
5
13
0
12
5
12
0
13
0
12
5
120
115
110
105
100
95
130
125
120
115
110
105
100
95
130
130
12
5
120
115
11
0
10
5
10
0
130
12
5
12
0
115
11
0
105
140
135
140
135
130
160
155
150
145
175
170
165
160
155
150
145
140
190
185
180
175
170
165
160
155
150
145
140
185
180
175
170
165
160
155
150
145
140
135
180
175
170
165
160
155
150
145
140
13
5
130
125
120
115
110
105
100
95
90
85
125
120
115
110
105
100
95
90
100
95
90
100
95
90
90
90
90
85
85
95
90
105
10
0
125
120
115
110
100
95
90
85
10
0
95
90
85
110
120
115
130
125
120
115
110
13
0
120
11
5
110
100
130
125
12
0
90
PA
S
E
O
A
L
I
S
O
TREES
TREES
TREES
TREES
TREES
TREES
TREES
TREES
TREES
TREES
80
75
85
80
85
80
85
85
80
85
90
80
1
0
0
9
5
9
0
85
105
10
5
110
110
TREES
TREES
10
5
C A
L
L
E
B
A
R
C
E
L
O
N
A
P
A
S
E
O
A
L
I
S
O
P
A
S
E
O
A
L
I
S
O
100
95
90
105
110
(E
)
S
I
D
E
W
A
L
K
EXISTING
CAFE BUILDING
EL 104.00
EXISTING
WORSHIP CENT
E
R
BUILDING
EL 104.00
W.I. FE
N
C
E
MINIST
R
Y
BUILD
I
N
G
EL 10
0
.
0
0
NEW CO
V
E
R
E
D
W
A
L
K
W
A
Y
PLAZA
A
R
E
A
SI
D
E
W
A
L
K
UP
RA
M
P
U
P
UP
UP
UP
UP
12' x 24' VIDEO WALL
(E) COURTYAR
D
DN
NEW
R
E
T
A
I
N
I
N
G
W
A
L
L
PLAZA
A
R
E
A
NEW RETAIN
I
N
G
W
A
L
L
24' WIDE D
R
I
V
E
A
I
S
L
E
NEW RETAIN
I
N
G
W
A
L
L
24' WIDE DRIVE AISLE
NEW RETAINING WALL
NEW RETAINING WALL
UP
MINISTRY TABLES
(E) COURTYAR
D
DN
DN
(E)
ENTRY
COURT
DN
DN
NO
PAR
K
I
N
G
NO
PAR
K
I
N
G
NO PARK
I
N
G
NO
P
A
R
K
I
N
G
MAIN
T
.
B
L
D
G
2 ST
O
R
Y
EL 13
2
.
5
0
(E) TUBU
L
A
R
S
T
L
.
G
U
A
R
D
R
A
I
L
(E) TUBULAR STL. GUARDRAIL
BOYS
TOILETS
12' x 20'
GIRLS
TOILETS
12' x 20'
NURSERY
12' x 40'
TODDLERS
24' x 40'
KIOSK
12' x 10'
OFFICE
12' x 40'
RAMP
DECK RA
M
P
RAMP
TOP O
F
S
L
O
P
E
(N) RE
T
A
I
N
I
N
G
W
A
L
L
(N) RE
T
A
I
N
I
N
G
W
A
L
L
STORAG
E
ROOM
(MACH
I
N
E
ROOM ON
LOWER
LEVEL)
ELEV.
DN
DN
OBSERVA
T
I
O
N
DECK
DN
(N) RE
T
A
I
N
I
N
G
W
A
L
L
(N) RE
T
A
I
N
I
N
G
W
A
L
L
PLAZA
A
R
E
A
W.I. FE
N
C
E
W.I. FE
N
C
E
W.I
.
F
E
N
C
E
TURF
A
R
E
A
(FUTU
R
E
P
L
A
Y
G
R
O
U
N
D
)
TEMPORARY
M
O
D
U
L
A
R
B
U
I
L
D
I
N
G
S
A
N
D
T
E
N
T
C.
L
.
F
E
N
C
E
ELEMENTARY
24' x 40'
MODULAR
ELEMENTARY
24' x 40'
MODULAR
RA
M
P
DECK
RA
M
P
O V E R A L L M A S T E R S I T E P L A N
TRUE
NORTH
W
O
R
K
I
N
G
N
O
R
T
H
EXISTING PARKING PROVIDED:
PARKING TABULATION
160 SPACES (INCLUDING 5 ACCESSIBLE PARKING SPACES)
NEW PARKING PROVIDED: 67 SPACES
TOTAL PARKING PROVIDED: 227 SPACES (INCLUDING 7 ADA ACCESSIBLE STALLS)
REFERENCE ORIGINAL DESIGN : CA 0.1
(E) F
I
R
E
H
Y
D
R
A
N
T
TOTAL PARKING REQUIRED: 225 SPACES
OVERALL
MASTER SITE PLAN
COLORED
A1.1A
1" = 40'
2215 CALLE BARCELONA
CARLSBAD, CALIFORNIA 92008
P:
\
C
o
a
s
t
l
i
n
e
C
h
i
l
d
r
e
n
s
B
u
i
l
d
i
n
g
\
N
E
W
M
I
N
I
S
T
R
Y
B
U
I
L
D
I
N
G
\
P
l
a
n
n
i
n
g
S
u
b
m
i
t
t
a
l
D
o
c
u
m
e
n
t
\
1
7
1
0
5
_
A
1
.
1
.
0
_
O
v
e
r
a
l
l
M
a
s
t
e
r
S
i
t
e
P
l
a
n
_
R
e
v
1
_
C
o
l
o
r
e
d
.
d
w
g
jo
h
n
.
a
l
v
a
r
a
d
o
A
p
r
2
2
,
2
0
1
9
-
7
:
4
7
a
m
COASTLINE CHURCH
PLANNING SUBMITTAL
PACKAGE
MARCH 22, 2018
AMENDMENT 2018-0003
(DEV02116)
FOR
17105
PLANNING SUBMITTAL
AMEND 2018-0003 (DEV02116) - COASTLINE CHURCH
PLANNING DEPT. SUBMITTAL #2 07-23-2018
PLANNING DEPT. SUBMITTAL #3 10-12-2018
FO
R
R
E
F
E
R
E
N
C
E
O
N
L
Y
July 2, 2025 Item #1 27 of 30
1 /16" ~1' i~I :,~1 :1~1 :~II :Iii :::~::~aiiiiii~~~~~Iiiiii~ 0
.,1111 I I II jjjjjjjl 16 ,1111 I II iiiiiiil 32 ,111111 48
I I
8
I
16
1/4"~1·
24 0 4 8 12 0 2 4 6 0 2 4
1 "=1'
--~
~
3"=1'
0 2 3 0
If this sheet • by 36" '\ . is not 24"
. 1 IS a d print, scale re uced accordingly
7---------
1
I
I
I
419 51 R E M I N C T O N AVf. TEMECULA , SUITE 250 , CALIFORNIA
(TEL) 911-296 92590 • 2 8 28
• 1
--www.bdg-architect . __ __.ARI\K s.com CHITECT OF RECORD
►1---__ _JPi'l<RtCOFESSIONAL SEAL
•1= -==:g~~m=== CONSULT ANTS
►1-===::J~~c::=== REVISIONS
APPROVALL __ _ ei -=-=--_--_ ~~~----w..
►1-==~~r::IB~== PROl:CT PHASE
PROJECT NAME
►1
PROJECT NUMBER
SI-EET TITLE
►1
SHEET NUMBER
SCALE I ►I
DATE
POLE
POLE
135
135
135
135
130
125
120
1
1
5
13
0
12
5
12
0
13
0
12
5
120
115
110
105
100
95
130
125
120
115
110
105
100
95
130
130
12
5
12
0
115
11
0
10
5
10
0
130
12
5
120
115
11
0
105
140
135
140
135
130
160
155
150
145
185
180
175
170
165
195
190
195
190
185
180
175
170
165
160
155
150
145
140
190
185
180
175
170
165
160
155
150
145
140
185
180
175
170
165
160
155
150
145
140
135
145
140
13
5
130
125
120
115
110
105
100
95
90
85
125
120
115
110
105
100
95
90
100
95
90
100
95
90
90
90
90
85
85
95
90
105
10
0
125
120
115
110
100
95
90
85
10
0
95
90
85
110
120
115
130
125
120
115
110
13
0
120
11
5
110
100
130
125
12
0
90
PA
S
E
O
A
L
I
S
O
80
75
85
80
85
80
85
85
80
85
90
80
1
0
0
9
5
9
0
85
105
1
0
5
110
110
10
5
C A
L
L
E
B
A
R
C
E
L
O
N
A
P
A
S
E
O
A
L
I
S
O
P
A
S
E
O
A
L
I
S
O
100
95
90
105
110
(E
)
S
I
D
E
W
A
L
K
EXISTING
CAFE BUILDING
EL 104.00
EXISTING
WORSHIP CENT
E
R
BUILDING
EL 104.00
W.I. FE
N
C
E
MINIST
R
Y
BUILD
I
N
G
EL 100
.
0
0
NEW CO
V
E
R
E
D
W
A
L
K
W
A
Y
PLAZA
A
R
E
A
SI
D
E
W
A
L
K
UP
RA
M
P
U
P
UP
UP
UP
UP
12' x 24' VIDEO WALL
CHAPEL
(E) COURTYARD
DN
NEW
R
E
T
A
I
N
I
N
G
W
A
L
L
PLAZA
A
R
E
A
NEW RETAIN
I
N
G
W
A
L
L
24' WIDE D
R
I
V
E
A
I
S
L
E
NEW RETAIN
I
N
G
W
A
L
L
24' WIDE DRIVE AISLE
NEW RETAINING WALL
NEW RETAINING WALL
UP
MINISTRY TABLES
(E) COURTYAR
D
DN
DN
(E)
ENTRY
COURT
DN
DN
NO
PAR
K
I
N
G
NO
PAR
K
I
N
G
NO PARK
I
N
G
NO P
A
R
K
I
N
G
MAIN
T
.
B
L
D
G
2 ST
O
R
Y
EL 13
2
.
5
0
(E) TUBU
L
A
R
S
T
L
.
G
U
A
R
D
R
A
I
L
(E) TUBULAR STL. GUARDRAIL
BOYS
TOILETS
12' x 20'
GIRLS
TOILETS
12' x 20'
NURSERY
12' x 40'
TODDLERS
24' x 40'
KIOSK
12' x 10'
OFFICE
12' x 40'
RAMP
DECK RA
M
P
RAMP
TOP O
F
S
L
O
P
E
(N) RE
T
A
I
N
I
N
G
W
A
L
L
(N) RE
T
A
I
N
I
N
G
W
A
L
L
STORAG
E
ROOM
(MACH
I
N
E
ROOM ON
LOWER
LEVEL)
ELEV.
DN
DN
OBSER
V
A
T
I
O
N
DECK
DN
(N) RE
T
A
I
N
I
N
G
W
A
L
L
(N) RE
T
A
I
N
I
N
G
W
A
L
L
13
0
1
3
0
1
2
5
120
130
125
130
133
1
3
2
132
132
131
12
7
12
6
1
2
8
12
9
1
3
1
12
5
110115
10
0
102
100
102
107106
100
107
106PLAZA
A
R
E
A
W.I. FE
N
C
E
W.I. FE
N
C
E
W.
I
.
F
E
N
C
E
TURF
A
R
E
A
(FUT
U
R
E
P
L
A
Y
G
R
O
U
N
D
)
TEMPORARY
M
O
D
U
L
A
R
B
U
I
L
D
I
N
G
S
A
N
D
T
E
N
T
C.
L
.
F
E
N
C
E
ELEMENTARY
24' x 40'
MODULAR
ELEMENTARY
24' x 40'
MODULAR
RA
M
P
DECK
RA
M
P
S I T E P H A S I N G P L A N
TRUE
NORTH
W
O
R
K
I
N
G
N
O
R
T
H
A1.4
PHASE 1
NEW BUILT UP TURF AREA
FOR FUTURE 'PLAYGROUND
"UNDER SEPARATE PERMIT"
PHASE 2
RESTROOM ADDITION
(SEE SHEET A2.4)
A1.3
REFERENCE ORIGINAL DESIGN : CA 0.1
(E) F
I
R
E
H
Y
D
R
A
N
T
(E) F
I
R
E
H
Y
D
R
A
N
T
PHASE 2
WORSHIP CENTER EXPANSION
(SEE SHEET A2.4)
PHASE 2
RELOCATED
CHAPEL STRUCTURE
PHASE 1
13 STALL PARKING EXPANSION
AND 6 STALLS RECONFIGURED
PHASE 2
NEW DRIVE AISLE "C" WITH
32 STALL PARKING EXPANSION
PHASE 1
REMOVE EXISTING MODULAR CLASSROOM
BUILDINGS ON THIS PAD AND REPLACE WITH
A NEW 2-STORY CHILDREN'S MINISTRY
BUILDING AS SHOWN
(SEE FLOOR PLAN ON SHEET A2.1 & A2.2)
PHASE 1
22 STALL PARKING EXPANSION
AND LOCATION FOR TEMPORARY
MODULAR BUILDINGS
A1.5
A1.5
PHASE 2
RE-STRIPE FOR 15 PARKING STALLS
AND 2 NEW STALLS
(E) CAFE
(E) WORSHIP CTR
AUDIO
SUPPORT
(N) MINISTRY CTR
PARKING TABULATON
16
54
2
3
66
16
86
2
15
106
PARKING REQUIRED 141 225
PARKING PROVIDED 193 227
(E) CAFE
(E) WORSHIP CTR
AUDIO
SUPPORT
(N) MINISTRY CTR
PARKING REQUIRED
PARKING PROVIDED
PHASE 1 PHASE 2
PHASE 2
2-STORY
MAINTENANCE / STORAGE BUILDING
SEE SHEET A2.6
PROJECT PHASING
PLAN
A1.2
1" = 40'
2215 CALLE BARCELONA
CARLSBAD, CALIFORNIA 92008
P:
\
C
o
a
s
t
l
i
n
e
C
h
i
l
d
r
e
n
s
B
u
i
l
d
i
n
g
\
N
E
W
M
I
N
I
S
T
R
Y
B
U
I
L
D
I
N
G
\
P
l
a
n
n
i
n
g
S
u
b
m
i
t
t
a
l
D
o
c
u
m
e
n
t
\
1
7
1
0
5
_
A
1
.
2
_
S
i
t
e
P
h
a
s
i
n
g
P
l
a
n
_
R
e
v
1
.
d
w
g
jo
h
n
.
a
l
v
a
r
a
d
o
A
p
r
1
1
,
2
0
1
9
-
4
:
3
4
p
m
COASTLINE CHURCH
PLANNING SUBMITTAL
PACKAGE
MARCH 22, 2018
AMENDMENT 2018-0003
(DEV02116)
FOR
17105
PLANNING SUBMITTAL
AMEND 2018-0003 (DEV02116) - COASTLINE CHURCH
PLANNING DEPT. SUBMITTAL #2 07-23-2018
PLANNING DEPT. SUBMITTAL #3 10-12-2018
DONE
DONE
DONE
DONE
THIS BUILD-OUT WILL BECOME PHASE 3
PHASE 3
FO
R
R
E
F
E
R
E
N
C
E
O
N
L
Y
July 2, 2025 Item #1 28 of 30
1 /16" ~1' 1=~~~::::;:::;==-,-----0=::· 11 11::11 ! ":'.:"" 1;:I ~~I~~ 1~1111111111111111111111 I 32 1111111 1/8"~1'
48 0 8 16
I
I
I
' I
I
I
I
I
I
\
I
I
I
I
\
I
\
I
I
I
I
I
I
l'
,
I ,
I
I ,
I ,
;' ,
I
I
I
~ ,.:, ,'.,:·,: ·." :" .• " ,, ... " ....
:.~-·-.-. • ;: ·. ~ •
' ~I
.---1
_i,
.,,.,r • '___-A~~~-~ --
----------------------------;:J
--- -
' \
~--------
---
_)<> -. -· -·\:/
._'·<<>i>:; .~•-:•::<_
;<~.-; ,,-/·-,,:_< .· < -_./_-·--./".
. . / -/ ._.--/ x/ • . ., < /')' •·· •·. ><55
-:::,; . __ .---,;;" ~ -"-.'-_• I",
::...--:=::----J ~ ~:::;;--:: -
24 0 4 8 12
-
0 2
,.
,
-
4 6 0 2
-
1 "=1' 3"=1'
4 0 2 3 0
/~~/-✓ /~~ ~=~~ ,
J/~ d~ ~~ ~~~~,;=+
If this she • by 36" . _et is not 24"
. it 1s O d print, scale re uced accordingly
~ ,;::;p~-~~~ // -~~ ~ / ~~ ~~~
~~~ -:,ef~P ~~ -~_/ -~~ @$~ ~ ,/,../ / /,,,:1.i' ,.,.,.,,,.,-~~~~y ~ ~ ~-4'-,.,-"---~".~ ~~;•
~--::;::.::.// -----
-~------
'8' -
_-1----
1
I
,,,,,,-;_,,,.,,,,, /./ .,,..,,,, ---_,,.,,.,----___ .,...,,.. ,-
/
I l--
■ ■ ■ B u R ·c. H. A. R. o
?~SIGN GROUP
■ ■ ■ ■ ■
A R C H I T E C T s, I ~ C
41951 REMINGTON T EM E C U L A C AVE , 5 U I T E 2 5 o
I ALIFORNIA
(TEL)951·296 92590 • 2 8 2 8
• .-I -www.bdg-architect . AR s.com --'" OIITECT OF RECORD
►1'-~-_!:'P'RR<OFESSIONAL SEAL
cONsUL TANTS e,i ---
►~i,====~~rlSI REVISIOQt_N~s=====-:J
APPROVArL __ _ e ~Cl ===~_t,._---...~&QIY}
►1r---=::Jfil~r:::ffi~== -PROJECT PHASE
PROJECT NAME
►1 PROJECT NUMBER
SHEET TITLE
►1 SHEET NUMBER
SCALE
1►1
DATE
135
135
135
130
125
120
1
1
5
1
3
0
1
2
5
12
0
1
3
0
1
2
5
120
115
110
10
5
100
95
90
110
120
115
130
125
1
2
0
90
110
(E
)
S
I
D
E
W
A
L
K
EXISTING
CAFE BUILDI
N
G
EL 104.00
EXISTING
WORSHIP CE
N
T
E
R
BUILDING
EL 104.00
W.I. F
E
N
C
E
NEW
C
O
V
E
R
E
D
W
A
L
K
W
A
Y
S
I
D
E
W
A
L
K
UP
RA
M
P
U
P
UP
UP
UP
UP
12' x 24' VIDEO W
A
L
L
(E) COURTY
A
R
D
NEW RET
A
I
N
I
N
G
W
A
L
L
24' WIDE
D
R
I
V
E
A
I
S
L
E
T AI NI N G W AL L
24' WIDE DRIVE AISLE
NEW RETAINING WALL
NEW RETAINING WALL
MINISTRY TABL
E
S
(E) COURTY
A
R
D
DN
DN
(E)
ENTRY
COURT
DN
DN
NO
PA
R
K
I
N
G
NO
PA
R
K
I
N
G
NO PAR
K
I
N
G
NO
P
A
R
K
I
N
G
(E) TUB
U
L
A
R
S
T
L
.
G
U
A
R
D
R
A
I
L
(E) TUBULAR STL. GUARDR
A
I
L
TOP O
F
S
L
O
P
E
(N) R
E
T
A
I
N
I
N
G
W
A
L
L
(N) R
E
T
A
I
N
I
N
G
W
A
L
L
STORA
G
E
ROOM
(MACH
I
N
E
ROOM
O
N
LOWER
LEVEL
)
ELEV.
DN
DN
OBSER
V
A
T
I
O
N
DECK
DN
(N) R
E
T
A
I
N
I
N
G
W
A
L
L
(N) R
E
T
A
I
N
I
N
G
W
A
L
L
1
3
0
1
3
0
1
2
5
12
0
13
0
125 1
3
2
13
2
1
2
7
12
6
1
2
8
1
2
9
1
3
1
12
5
110115
10
0
102
100
102
100
107
06
W.I. F
E
N
C
E
W.I. F
E
N
C
E
W
.
I
.
F
E
N
C
E
TURF
A
R
E
A
(FUT
U
R
E
P
L
A
Y
G
R
O
U
N
D
)
SETB
A
C
K
L
I
N
E
PROP
E
R
T
Y
L
I
N
E
P A R T I A L E N L A R G E D S I T E P L A N
TRUE
NORTH
W
O
R
K
I
N
G
N
O
R
T
H
C A
L
L
E
B
A
R
C
E
L
O
N
A
REFERENCE ORIGINAL DESIGN : CA 0.2
GENERAL NOTES
KEY NOTES
"FUTURE PHASE"
"FUTURE PHASE"
"PHASE 1"
SETB
A
C
K
L
I
N
E
PARTIAL
ENLARGED
SITE PLAN
A1.3
2215 CALLE BARCELONA
CARLSBAD, CALIFORNIA 92008
P:
\
C
o
a
s
t
l
i
n
e
C
h
i
l
d
r
e
n
s
B
u
i
l
d
i
n
g
\
N
E
W
M
I
N
I
S
T
R
Y
B
U
I
L
D
I
N
G
\
P
l
a
n
n
i
n
g
S
u
b
m
i
t
t
a
l
D
o
c
u
m
e
n
t
\
1
7
1
0
5
_
A
1
.
3
_
E
n
l
a
r
g
e
d
S
i
t
e
.
d
w
g
jo
h
n
.
a
l
v
a
r
a
d
o
A
p
r
1
1
,
2
0
1
9
-
4
:
3
6
p
m
COASTLINE CHURCH
PLANNING SUBMITTAL
PACKAGE
MARCH 22, 2018
AMENDMENT 2018-0003
(DEV02116)
FOR
17105
PLANNING SUBMITTAL
AMEND 2018-0003 (DEV02116) - COASTLINE CHURCH
PLANNING DEPT. SUBMITTAL #2 07-23-2018
PLANNING DEPT. SUBMITTAL #3 10-12-2018
1/16" = 1'-0"
FO
R
R
E
F
E
R
E
N
C
E
O
N
L
Y
July 2, 2025 Item #1 29 of 30
1/16"~1' I II I 1111 I 1111111 I II I 1111 I 1111111 I II I 1111 I 1111111
0 16 32 48
1/ .• '.,. .·.-Y
.. / ·?;v 1/
11/
' ·•· : • 4.
·• • ·• •. •
. . .
•• •.
•. .,d4 • • •ll •
. .,.4 ~ ·..•.. . * . • . . '#
.• ·~ :~; •. 1;~
.., --D·-..,·-7,#. •-' '· • / 7/ -•. /.,, • -· -,,~ ii ./... 4·
• _/Q .d-' /-. • ....
•.
4,: .. 4 • . ;. -· . ~ '* • . . . . *
• . • .?.#. .... _ .,,,
•. -...
• • ..
n
0 8 16 24 0 4
~
8 12
----
g
g
0 2 4
' '
-----
31
2\
----
6
C
I I
1'"--!
c;J
ki
;__ __ -I
I
I
I
:=di-°:----
' I I
I
I
I 11---0 II _ J ~ -,
I _,
0
0
+ ----, I----~
I \
'--
'
----
1 2 3
\'-£," -
2
1 "=1'
4 0
______ _1.--
.... --... '
2
2
I
' \
0
I t/~-~,s.--'"-.\ /i',',-~.,✓
' I ' I \ I ' I I I '--I I
' ' ' 1'-8 ,
-----
4 ---,
' I I
I
I
'
I I
--_-"I-.----------' ' ___ .,,.
•.
3
g
I
' ' \
\
I
I
I
'
(EJ 24'-111 -~~·,_
DRIVE AISLE (24'-011 MIN.)
i
3"=1'
0
I
I
I.
2.
0
0
0
0
0
0
0
0
0
@
@
@
@
@
@
@
@
@
@
@
@
@
@
@
@
@
@
@
@
®
@
®
@
®
@
@
@
@
®
@
@
@
@
@
@
@
@
@
@
@
@
@
@
@
@
@
®
@
®
@
@
@
@
@
If this sheet is not 24"
by 36" it is a reduced
print, scale accordingly
6EE CIVIL ENGINEERING DRAWINGS FOR EXACT 6COFE OF WOf<K
AND EXTENT OF SITE AND GRADING MODIFICATIONS. INFORMATION
SHOWN ON CIVIL DRAWINGS WILL TAKE PRECEDENCE OVER
INFOl'!"tATION SHOWN ON ARCI-IITECTURAL DRAWINGS
SEE LANDSCAPE DRAWINGS FOR EXACT SCOPE OF WOl'l<. WI-IILE
SOME EXISTING TREES AND SI-IRU66ERY 15 TO REMAIN, MANY NEW
TREES AND OTI-IER PLANTING 15 6EING INSTALLED. LANDSCAPE
DRAWINGS WILL TAKE PRECEDENCE OVER ANY PLANTING 51-!OWN ON
ARCI-IITECTURAL DRAWINGS
51-iADED / SCREENED AREAS INDICATE FLOOR
FLAN AND SITE MODIFICATION
(E! DRIVEWAY APRON
!E! CONCRETE CUR6
(E! CONCRETE SIDEWALK
/E! EASEMENT LINE, SEE CIVIL DRAWINGS
/E! FIRE I-IYDRANT
<EJ CONCRETE FAD W/ 6ACKFLOW VALVE
(E! CONCRETE FAD W/ POST INDICATOR VALVES
!E! TRANSFORMER
(E! OFF-STREET PARKING SIGN
/E! MONUMENT SIGN
(E! ASFI-IAL T PAVING DRIVE AISLE
!E! CONCRETE GUTTER
(E! LANDSCAPE AREA
(E! 36" SQUARE FAINTED I-IANDICAF LOGO
(E! ACCE55I6LE FAf<KING LOADING AISLE
!E! CONCRETE WI-IEEL 6TOF
!E! POST MOUNTED I-IANDICAF ACCE55I6ILITY SIGN
(EJ ":ZE~" CURe FACE
(E) TRUNCATED DOMES FER cec II336.S AND FIGURE I16-23A
!E! ROUTE OF ACCESSI6LE ACCESS FAT!-1 OF TRAVEL .
2'-0" VEI-IICLE 6UMFER OVERI-IANG
!E! TRAS!-1 ENCLOSURE
!E! CONCRETE WALKWAY
!E! CONCRETE SITE ST AIRS
(E! COURTYARD I PATIO I PLAZA
/E! TRELLIS COLUMN < TRELLIS A6OVE
(E! MANHOLE
!E! FAf<KWAY
PROPOSED , CI-IILDREN'S MINISTRY 6UILDING LOCATION.
6EE 61-!EET A2.I , A22 FOR 6COFE OF WORK
PROPOSED , RESTROOM ADDITION. SEE SI-IEET A2.4
FOR 6COFE OF WORK
PROPOSED , WORSI-IIF CENTER 6UILDING EXPANSION,
SEE 51-!EET A2.4 FOR SCOPE OF WOf<K
(E! CI-IILDREN'S FLAY AREA TO REMAIN
!E! CONCRETE RAMP
NEW FENCE AND GATES FER LANDSCAPE DRAWINGS.
NEW RETAINING WALL FER CIVIL DRAWINGS.
NEW SEATWALL FER CIVIL DRAWINGS.
NEW STEPPED RETAINING WALL FER CIVIL DRAWINGS.
NEW PLANTER FER LANDSCAPE DRAWINGS .
NEW DRIVEWAY FER CIVIL DRAWINGS.
NEW FAf<KING STALLS FER CIVIL DRAWINGS.
NEW RAISED TURF AREA OVER WI-IAT WAS FREVIOUSL Y A RECESSED
FLAY AREA
NEW CONCRETE WALKWAY FER CIVIL DRAWINGS.
NEW CONCRETE SIDEWALK FER CIVIL DRAWINGS.
NEW CONCRETE CUR6 FER CIVIL DRAWINGS.
NEW CONCRETE SITE STAIR FER CIVIL DRAWINGS
NEW SITE ACCESS RAMP WIT!-1 I2,i MAX SLOFE AND GUARDRAIL. SEE
CIVIL DRAWINGS
NEW WALKWAY WITI-I A CANOPY COVER
TRELLIS, COLUMN • TRE~LIS A6OVE FER ELEVATIONS
NEW ELEVATOR
SPARE
NEW FENCE AND GATE AS REQUIRED 6Y FIRE DEPARTMENT
LINE OF DECK/ 6ALCONY A6OVE
(E) Ci-lAIN LINK FENCE
(N! CONCRETE WI-IEEL STOP
(N! OUTDOOR FIREPLACE
(NJ CONCRETE CURE, RAMF w/ Tl-cl.lNCATED DOMES
/NJ STRIPED PEDESTRIAN FAT!-1 OF TRAVEL
/NJ 36" SQUARE FAINTED I-IANDICAF LOGO
(N) STRIPED LOADING AISLE FOR 1-1/C FAf<KING
/NJ WATER QUALITY 6ASIN, &EE CIVIL DRAWINGS
/NJ TEMPORARY MODULAR CLASSROOM 6UILDING6
SPARE
/NJ LANDSCAPE VINE POCKET, SEE LAND6CAFE FLANS
(N) FERMEA6LE PAYERS, SEE CIVIL DRAWINGS
■ ■ ■ ■ ■ ■ ■ ■ ■
B U R G H A R D
DESIGN GROUP
■ ■ ■ ■ ■ ■ ■ ■ ■
A R C H I T E C T S, I N C
419 51 R EM I N G T O N AVE , S U I T E 2 5 0
TEMECULA, CALIFORNIA 92590
(TEL) 951 • 296 • 2828
www.bdg-architects.com
►1 PROFESSIONAL SEAL
•1 CONSULTANTS
►1 REVISIONS
e1 APPROVAL
►1 PROJECT PHASE
•1 PROJECT NAME
►1
PROJECT NUMBER
•1 SHEET TITLE
►1 SHEET NUMBER
• ~I _SC_ALE_~ ►~I _D_A_TE_~
Exhibit 7
Full Size Exhibit(s) “A” – “F” dated July 2, 2025
(On file in the Planning Division)
July 2, 2025 Item #1 30 of 30
Kyle Van Leeuwen, Senior Planner
Planning Division
July 2, 2025
Coastline Church
AMEND 2025-0001
C cityof
Carlsbad
ITEM 1 - Project Site
2215 Calle Barcelona
•6.43 Acres
•Arroyo La Costa
Master Plan –
“Village J”
•Access from Calle
Barcelona
•Not in Coastal Zone
• Church
AME~~~~!~~~01(DEV02116)
8 "" 0 70 140 280
Feet
( City of
Carlsbad
ITEM 1 – Project History
•Master Plan -Site for Church Use
•2004 - SDP for church campus approved
•2012 – Amendment (#1)
•2016 – Minor Amendment (#2)
•2019 – Amendment (#3)
•New ministry center (Phase 1)
•Additions & parking lot expansion (Phase 2)
C cityof
Carlsbad
ITEM 1 – Project Proposal
•Request to modify development phases
•Allow expansion of parking lot to occur
after building additions
•Use of off-site parking to meet parking
needs
•No physical changes to site development
approved in 2019
C cityof
Carlsbad
ITEM 1 - Site Plan
(city of
Carlsbad
ITEM 1 - Site Plan
I
-
• -~.:----_
---~---------~------T------
-.---'W=.__/ -
(city of
arlsbad
ITEM 1 – Off-S ite Parking
C cityof
Carlsbad
ITEM 1 –Parking
Building Use Parking Required Parking Total/Provided
Worship Center
& Café
Public Assembly 86 spaces
119 Total Spaces
Café Lounge 16 spaces
Office Space/
Common Area
15 spaces
Audio Booth 2 spaces
Ministry Center Classroom 18 spaces
(70 Spaces typical)
106 Total Spaces
Office Space/
Common Area
42 spaces
Public Assembly (Youth) &
Youth Activity
2 spaces
Public Assembly (Youth)
- Overflow Adult Worship*
(4 spaces youth)
40 spaces adults
Audio Booth 4 spaces
Total –(189 spaces typical)
225 spaces required
193 Spaces - Now
227 Spaces - Buildout
*Overflow only needed on major holidays
ITEM 1 – CEQA Exemption
Staff has reviewed the scope of the project. The
environmental effects of the project were
adequately analyzed by the Arroyo La Costa
Master Plan EIR and MMRP; no circumstances
requiring further environmental compliance exist
(CEQA Guidelines Sections 15162 or 15163).
C cityof
Carlsbad
ITEM 1 – RECOMMENDATION
ADOPT a resolution APPROVING the Amendment
to a Site Development Plan , based on the
findings and subject to conditions.
C cityof
Carlsbad
ITEM 1 –Parking
The applicant or property owner shall provide a copy of the
executed off-site parking agreement or agreements with
Encinitas Union School District and/or San Dieguito Union High
School District for the use of no less than 34 parking spaces at El
Camino Creek Elementary School (Encinitas Union School
District) and/or the San Dieguito Sports Complex (San Dieguito
Union High School District). Parties involved in the parking
agreement(s) shall provide evidence of agreement and shall be
recorded in the office of the County Recorder
Condition #15
C cityof
Carlsbad
ITEM 1 –Parking
In the event that offsite parking agreement(s) expire and the
additional parking spaces have not been completed, the
applicant or property shall execute one of the following:
a.Secure an extension to an off-site parking lease agreement
for no less than 34 spaces;
b.Enter into a new lease agreement for an alternate off-site
parking location of no less than 34 parking spaces on a site
no more than 0.25 miles from the church campus; or
c.Reduce the available seating within the expanded worship
center to meet the seating limit accommodated by the onsite
parking spaces, to the satisfaction of the City Planner.
Condition #16
C cityof
Carlsbad