Loading...
HomeMy WebLinkAbout2025-07-15; City Council; Resolution 2025-164Exhibit 1 RESOLUTION NO. 2025-164 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF CARLSBAD, CALIFORNIA, ADOPTING THE PLANS, SPECIFICATIONS AND CONTRACT DOCUMENTS AND AUTHORIZING THE CITY CLERK TO ADVERTISE FOR BIDS FOR PHASE 2 OF THE BARRIO STREET LIGHTING PROJECT WHEREAS, the City Council of the City of Carlsbad, California has determined it necessary, desirable and in the public interest to construct Phase 2 of the Barrio Street Lighting Project, Capital Improvement Program, Project No. 4013; and WHEREAS, the project focuses on adding pedestrian lights to enhance pedestrian visibility and safety while creating a welcoming streetscape during evening hours; and WHEREAS, the plans, specifications and contract documents for the project have been prepared, are on file at the City Clerk’s office, and are incorporated herein by reference; and WHEREAS, staff reviewed the improvement plans, specifications, and cost estimates developed by a consultant and determined that the proposed design meets the city’s engineering codes, standards and policies and that the proposed construction work would improve the infrastructure and neighborhood; and WHEREAS, Carlsbad Municipal Code Section 3.28.080(E) requires the City Council to adopt plans, specifications and contract documents for all construction projects that are to be formally bid upon when the value exceeds $220,000; and WHEREAS, the cost of the project is estimated to be $3,585,370, including construction contingency, construction management, inspection and material testing services, and community outreach costs; and WHEREAS, sufficient funding from a federal grant program, gas tax, TransNet, and general capital construction funds is available to complete the project; and WHEREAS, the project appropriation includes $1 million of federal grant funding and was authorized to proceed with construction and bids by the California Department of Transportation on June 20, 2025. July 15, 2025 Item #7 Page 6 of 11 Docusign Envelope ID: BE740251-6484-477D-B5D0-6E9187B580C5 NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Carlsbad, California, as follows: 1.That the above recitations are true and correct. 2.That the City Council has determined that in accordance with the California Environmental Quality Act, or CEQA, and the Environmental Protection Act, the project was previously evaluated in the Final Initial Study/Mitigated Negative Declaration State Clearinghouse (Final IS/MND SCH No. 2016021056), dated April 2018, as part of the City of Carlsbad Village & Barrio Master Plan. The Final IS/MND evaluated the potential environmental effects of the project components described in the Carlsbad Village & Barrio Master Plan. The project is within the scope of the Final IS/MND, and no further CEQA documentation is required per CEQA guidelines Section 15162. All applicable mitigation measures contained in the prior environmental document have either been satisfied previously, or will be incorporated into the project, or are conditions of approval for the project. The Project is exempt from the National Environmental Policy Act, or NEPA, review as outlined in NEPA Regulation 23, which applies to federally funded projects receiving less than $5 million or with a total estimated cost of not more than $30 million. The California Department of Transportation’s determination of exclusion is recorded in a categorical exclusion determination form dated May 5, 2023. Additionally, the categorical exclusion determination was revalidated on May 21, 2025, to verify the environmental documents and decisions remained valid. 3.That the plans, specifications and contract documents for Phase 2 of the Barrio Street Lighting Project, CIP Project No. 4013, are hereby adopted and on file in the Office of the City Clerk. 4.That the City Clerk is authorized and directed to publish in accordance with state law, a notice to contractors inviting bids for construction of Phase 2 of the Barrio Street Lighting Project, CIP Project No. 4013, in accordance with the plans, specifications and contract documents referred to herein. July 15, 2025 Item #7 Page 7 of 11 Docusign Envelope ID: BE740251-6484-477D-B5D0-6E9187B580C5 PASSED, APPROVED AND ADOPTED at a Regular Meeting of the City Council of the City of Carlsbad on the 15th day of July, 2025, by the following vote, to wit: AYES: Blackburn, Bhat-Patel, Acosta, Burkholder, Shin. NAYS: None. ABSTAIN: None. ABSENT: None. ______________________________________ KEITH BLACKBURN, Mayor ______________________________________ SHERRY FREISINGER, City Clerk (SEAL) July 15, 2025 Item #7 Page 8 of 11 Docusign Envelope ID: BE740251-6484-477D-B5D0-6E9187B580C5