HomeMy WebLinkAbout2025-07-17; Citywide Facility Condition Assessment (Districts All); Gomez, PazTo the members of the:
CITY COUNCIL
Datet) \I ~A .d_ CC v
CM __,_,,cAC ~CM (3) ~
July 17, 2025
Council Memorandum
To:
From:
Honorable Mayor Blackburn and Members of the City Council
Paz Gomez, Deputy City Manager, Public Works
Via: Sheila Cobian, Assistant City Manager ~
Re: Citywide Facility Condition Assessment (Districts -All)
{city of
Carlsbad
Memo ID# 2025040
This memorandum provides information related to a citywide facility condition assessment that
was completed in December 2024.
Background
In 2012, the city retained a consultant to perform a Facility Condition Assessment, or FCA, of
select city-owned buildings. The recommended interval based on industry standards and best
practices for an FCA is, at a minimum, every 10 years. On December 13, 2022, the City Council
adopted Resolution No. 2022-284, authorizing an agreement with Atkins North America, Inc., dba
Faithful+Gould, to conduct an updated FCA.
Discussion
FCA overview
An FCA is a comprehensive evaluation of a building's physical condition, systems and
infrastructure to determine its current state and identify necessary maintenance, repairs and
upgrades. The assessment typically includes an inspection of structural elements, mechanical,
electrical and plumbing systems as well as safety features and code compliance. The purpose is
to provide facility managers and stakeholders with accurate data to identify and prioritize
potential improvements, estimate the costs of those improvements, and support long-term
capital planning.
While the FCA provides the data from an assessment, a Facility Condition Index, or FCI, provides
the means of interpreting that data. The FCI is a quantitative metric derived from the results of
an FCA. It is used to express the relative condition of a facility in a simple, standardized format. It
is calculated by dividing the total cost of necessary repairs and maintenance needed to keep it in
good condition by the current replacement value of the facility. The resulting ratio-expressed as
a decimal or percentage-helps organizations objectively compare the condition of different
buildings.
A lower FCI indicates that a facility is in better condition, while a higher FCI suggests more
significant deterioration or maintenance needs. This index is commonly used in capital planning
to prioritize investments and allocate resources effectively, generally in a range of 0-100, or
0%-100%, as described in the table below.
Public Works Branch
Fleet & Facilities Department
405 Oak Avenue I Carlsbad, CA 92008 I 442-339-2856 t
Council Memo -Citywide Facility Condition Assessment (Districts -All)
July 17, 2025
Page 2
Acceptable ranges of an FCI score vary by building type. As a general guideline, Faithful+Gould
uses the following scoring system:
Condition Description Percentage Value
Good In a new or well-maintained condition, with no visual Oto 5 evidence of wear, soiling or other deficiencies
Fair Subject to wear and soiling but is still in a serviceable and 5 to 10 functioning condition
Poor Subject to hard or long-term wear; nearing the end of its Greater than 10 useful or serviceable life
Very Poor Subjected to hard or long-term wear; reached the end of Greater than 60 its useful or serviceable life; renewal is now necessary
FCI results
Of the 98 buildings surveyed, the FCI range was mostly between zero and 52, not including the
two outliers with FCls of 110 and 126 for the portable trailer at the Leo Carrillo Ranch Historic
Park and the Parks Maintenance Yard Administrative Building, respectively. The Leo Carrillo Park
trailer has an FCI of 110 because the facility replacement cost is only $12,000 for the portable
trailer, which is used mostly for tool storage and a breakroom, as compared to the repair and
maintenance needs of over $13,000.
The Parks Maintenance Building would otherwise have an FCI of 11 instead of 126, if the parking
lot and perimeter fencing condition costs estimated at almost $384,000 were removed. This
facility will be completely vacated by Parks Maintenance staff when the Orion Center is
constructed, which is currently under design and is expected to have construction completed in
late 2028.
The next lowest FCI of 52 was for the Fleet Maintenance Facility, which is part of a current capital
improvement project that will renovate it. Staff expect to seek City Council authorization to bid in
spring 2026.
Several buildings such as Fire Station No. 2, Pine Avenue Community Center, Safety Training
Center and Alga Norte Aquatic Center had the best score possible (good condition), FCl=0.
Of all the buildings surveyed, 51% were in good condition, 10% in fair condition, 37% in poor
condition and 2% in very poor condition. The FCI for each building surveyed is shown in
Attachment A, which is also color coded as green for good condition, yellow for fair, orange for
poor and red for very poor.
The total replacement value of all the buildings surveyed was estimated at just under
$248 million. Using the combined replacement value and the value of the recommended
necessary repairs, the inventory of buildings surveyed was rated in good condition, with an
average FCI of 4.1.
Council Memo -Citywide Facility Condition Assessment (Districts -All)
July 17, 2025
Page 3
Expenditure forecast
In addition to the FCI score, Faithful+Gould also provided an expenditure forecast for each facility
covering the duration of the study period (2023 to 2032), which covers the time until the next
expected FCA. Charts are also provided to show the anticipated effects on the FCI when the
deferred maintenance is addressed versus cumulative effects when it is not.
An example of this would be Fire Station No. 4. This facility has an FCI of 4.4 (good condition).
The consultant estimates $123,801 will be needed for repairs during the first year of the study
period and an additional $125,223 over the following nine years. Addressing the deferred
maintenance will maintain an FCI score for the facility of less than 2 over the study period.
Conversely, not addressing the deferred maintenance will have a cumulative effect resulting in
an estimated FCI score of 8.9 at the end of the study period.
Anticipated Fire Station No. 4 FCI if needed repairs are funded and implemented:
4%
3%
u LL 2,, "
1%
O" "
Year by Year Effects of FCI
2023 2024 2025 2026 2027 2028 2029 2030 2031 2032
Year
■ Good
Fair ■ Poor ■ Very Poor
Anticipated Fire Station No. 4 FCI if needed repairs are not funded or implemented:
8" "
6" " u LL 4%
2%
0%
Cumulative Effects of FCI
.... -~ • ~ ' -• ~ • J ( ------------------------------------------
2023 2024 2025 2026 2027 2028 2029 2030 2031 2032
Year
■ Good
Fair ■ Poor
• Very Poor
Council Memo -Citywide Facility Condition Assessment (Districts -All)
July 17, 2025
Page 4
As demonstrated above, implementing the recommended repairs would result in an FCI of 1.3 in
2032, whereas deferring as-needed repairs would result in the FCI increasing from 4.4 to 8.9.
Enterprise asset management
In anticipation of the implementation of the city's new enterprise asset management system,
Cartegraph, staff expanded the FCA scope of work beyond what is ordinarily included in a typical
assessment. The increased scope required the consultant to provide updated facility floor plans
and an ArcGIS database with facility assets geospatially located with all pertinent information.
Staff have begun to integrate this additional information into Cartegraph so that future data
collected from daily maintenance activities on facilities and their assets (such as mechanical
systems, roofing systems, etc.) will be consolidated into one repository. This will allow the
Facilities Maintenance Division access to real-time analysis of a building's FCI, providing staff the
data to strategically make recommendations for future capital expenditures.
Next Steps
Staff will utilize the results of the citywide FCA to develop a comprehensive capital improvement
plan for city facilities over the next 10 years to assist in forecasting and budgeting for facility
repair and maintenance needs. Staff will also continue to integrate the data collected from the
assessment into Cartegraph.
Attachment: A. Summary of FCls by facility
cc: Geoff Patnoe, City Manager
Cindie McMahon, City Attorney
Gary Barberio, Deputy City Manager, Community Services
Laura Rocha, Deputy City Manager, Administrative Services
Christie Calderwood, Police Chief
Michael Calderwood, Fire Chief
Tim Lyons, Assistant City Attorney
Zach Korach, Finance Director
Maria Callander, Information Technology Director
John Maashoff, Public Works Manager
Brian Bacardi, Public Works Superintendent
Megan Powers, Senior Management Analyst
Facility ComP.lex •
Alga Norte Aquatic Center
Aviara Community Park
Bauer Lumber Building/ New Village Arts
Beach Restroom -Pine
Beach Restroom -Tamarack
Calavera Community Park
Chase Field -Snack Bar/ Restroom
City Hall
CMWD Operations
Cole Library
Dove Library
Elmwood House
Faraday
Farmers Claims Building (Main Building Not Done)
Fire Station No. 1
ATTACHMENT A
Building
Building 1-Showers/ Pump Room
Building 2 -Administration
Building 3 -Showers/ Meeting/ Snack Bar
Building 4 -Ticket Booths
Building 5 -Shop/ Office
Building 6 -Snack Bar/ Restroom
Building 7 -Skate Park Restrooms
Overlook Catering Facility
East Restoom
West Restroom
Maintenance Shop/ Office
Main Building
Main Building
Main Building
Community Center
Snack Bar/ Restroom
Main Building
North Wing
South Wing
Council Chamber
Admin Building
Warehouse
Main Building
Main Building
Main Building
Main Building
Main Building
Main Building
Butler Building
FCI
0.0%
0.0%
1.3%
0.0%
0.0%
0.0%
0.0%
0.0%
1.2%
0.2%
1.8%
2.0%
33.5%
12.6%
13.0%
33.8%
7.8%
11.7%
12.8%
18.4%
13.3%
1.3%
9.6%
14.8%
18.9%
Legend:
Green= good
Yellow =fair
Orange = poor
Red = very poor
Facility Com~lex Building FCI
Fire Station No. 2
Main Building 0.0%
Fire Station No. 3
Main Building 0.0%
Hose Tower 0.0%
Fire Station No. 4
Main Building 4.4%
Fire Station No. 5
Main Building 4.9%
Hose Tower 0.0%
Storage Building 4.3%
Fire Station No. 6
Main Building
Apparatus Garage
Fleet Maintenance Building -Shop/ Office
Main Building 51.7%
Harding Community Center
Admin Building 5.0%
D Building 11.7%
Auditorium 11.8%
Rec Hall 9.4%
Hidden Canyon Park -Restroom
Main Building
Holiday Park
Holiday House 21.1%
Kruger House 10.7%
Scout House 0.3%
West Restroom 15.1%
East Restoom 1.0%
La Costa Canyon Park
Restroom 44.8%
Laguna Riviera Park
Restroom 9.3%
Las Palmas Building
Main Building 4.2%
Leo Carrillo Ranch Park
Barn / Visitor Center 1.8%
Cabana Restrooms 3.9%
Cantin a 0.9%
Caretaker's House Staff Office 5.1%
Carriage House 14.6%
Carrillo Parks Trailer
Chicken Coop Restrooms 0.0%
Deedie's House 34.1%
Caretaker's House Restrooms 20.0%
Hacienda 2.3%
Park Residence 0.6%
Stable 0.0%
Facility Complex Building FCI
Library Learning Center
Learning Center 0.2%
MACC Modular 10.1%
Magee Park
Magee House 7.1%
Barn 38.5%
Heritage Hall 6.1%
Granary 33.7%
Blockhouse Restroom 28.7%
Monroe Street Pool
Main Building 22.4%
Equipment Room 25.2%
Parks Maintenance
Admin Building
Breakroom 0.2%
Fertilizer Shed 27.3%
Modular Office 12.6%
Pine Community Center
Community Center 0.0%
Blockhouse Restroom 1.7%
Poinsettia Community Park
Ballfield Storage 8.7%
East Restoom 0.0%
North Restroom 15.0%
South Restroom 16.6%
Police & Fire Headquarters
Main Building
Public Works Operations -Oak Yard
Adm in Building 6.4%
Modular Building 1.9%
Supervisors Office 14.0%
Shops-Sign / Electric/ Concrete 25.7%
Railroad Depot
Main Building
Recycled Water Facility -CWRF
Main Building 12.5%
Safety Training Center
Main Building 1.1%
Commercial Prop 0.0%
Residential Prop 0.0 0
Senior Center
Main Building 2.3%
Stagecoach Community Center
Community Center 6.6%
East Restoom 37.3%
West Restroom 13.2%
Maintenance Shop/ Office 26.4%