Loading...
HomeMy WebLinkAbout2025-07-15; City Council; Resolution 2025-170Exhibit 1 RESOLUTION NO. 2025-170 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF CARLSBAD, CALIFORNIA, APPROVING THE CONCEPTUAL PLAN FOR CAPITAL IMPROVEMENT PROGRAM PROJECT NO. 6103, RENAMING THE PROJECT TITLE TO THE TYLER STREET SIDEWALK IMPROVEMENT PROJECT AND AUTHORIZING THE CITY MANAGER OR DESIGNEE TO PROCEED WITH ITS FINAL DESIGN AND ENGINEERING WHEREAS, the City Council of the City of Carlsbad, California, has determined that improving conditions on Tyler Street between Oak Avenue and Chestnut Avenue is necessary and desirable to support people walking and biking throughout the surrounding residential neighborhood; and WHEREAS, the Village and Barrio Master Plan, which the City Council adopted on July 24, 2018, and amended in 2019, 2021 and 2023, highlights a number of street design projects including the exploration of Tyler Street improvements; and WHEREAS, on July 1, 2024, staff presented two options to the Traffic Safety & Mobility Commission, and the commission did not support staff’s recommendation; and WHEREAS, staff request approval of a modified scaled-back Option 1 that focuses on sidewalk improvements, renaming the project title to Tyler Street Sidewalk Improvement Project, and authorizing the City Manager or designee to proceed with final design and engineering for the project; and WHEREAS, staff estimate that the modified scaled-back Option 1 would cost approximately $551,000 for design and construction; and WHEREAS, sufficient funding is available in the Tyler Street Sidewalk Improvement Project, Capital Improvement Program Project No. 6103; and WHEREAS, on July 7, 2025, the Traffic Safety & Mobility Commission supported staff’s recommendation to approve the scaled-back Option 1. NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Carlsbad, California, as follows: 1.That the above recitations are true and correct. 2.That the City Council has determined that the proposed action is not a “project” as defined by the California Environmental Quality Act, or CEQA, Section 21065 and CEQA Guidelines Section 15378(a) and does not require environmental review under CEQA Guidelines Section 15060(c)(2) because the action is limited to approval of a conceptual July 15, 2025 Item #15 Page 8 of 127July 15, 2025 Item #15 Page 8 of 127 Docusign Envelope ID: 255919EC-5F85-415E-BAEE-02EE38FD844F plan, renaming a project title and authorization to proceed with preparing final design and engineering for a project. The action has no potential to cause either a direct physical change in the environment or a reasonably foreseeable indirect physical change in the environment. 3.That the City Council approves the conceptual plan of the scaled-back Option 1 in the Tyler Street Complete Streets Plan, attached hereto as Attachment A. 4.That the City Council authorizes renaming the project title of Capital Improvement Program Project No. 6103 to Tyler Street Sidewalk Improvement Project. 5.That the City Council authorizes the City Manager or designee to proceed with final design and engineering for the Tyler Street Sidewalk Improvement Project, Capital Improvement Program Project No. 6103. PASSED, APPROVED AND ADOPTED at a Regular Meeting of the City Council of the City of Carlsbad on the 15th day of July, 2025, by the following vote, to wit: AYES: Blackburn, Bhat-Patel, Acosta, Burkholder, Shin. NAYS: None ABSTAIN: None. ABSENT: None. ______________________________________ KEITH BLACKBURN, Mayor ______________________________________ SHERRY FREISINGER, City Clerk (SEAL) July 15, 2025 Item #15 Page 9 of 127July 15, 2025 Item #15 Page 9 of 127 Docusign Envelope ID: 255919EC-5F85-415E-BAEE-02EE38FD844F 50 5 0 A v e n i d a E n c i n a s Su i t e 2 6 0 Ca r l s b a d , C A 9 2 0 0 8 Ph o n e : ( 7 6 0 ) 4 7 6 - 9 1 9 3 MB A K E R I N T L . C O M Attachment A July 15, 2025 Item #15 Page 10 of 127July 15, 2025 Item #15 Page 10 of 127 EX I S T I N G A D A CU R B R A M P EX I S T I N G A D A CU R B R A M P EX I S T I N G S I D E W A L K RE C O N S T R U C T D R I V E W A Y WI T H 3 " R O L L E D C U R B AP P R O X I M A T E R O W RE C O N S T R U C T S I D E W A L K WI T H D R I V E W A Y RE P L A C E M E N T Docusign Envelope ID: 255919EC-5F85-415E-BAEE-02EE38FD844F 50 5 0 A v e n i d a E n c i n a s Su i t e 2 6 0 Ca r l s b a d , C A 9 2 0 0 8 Ph o n e : ( 7 6 0 ) 4 7 6 - 9 1 9 3 MB A K E R I N T L . C O M July 15, 2025 Item #15 Page 11 of 127July 15, 2025 Item #15 Page 11 of 127 EX I S T I N G A D A CU R B R A M P EX I S T I N G A D A CU R B R A M P EX I S T I N G S I D E W A L K RE C O N S T R U C T D R I V E W A Y WI T H 3 " R O L L E D C U R B AP P R O X I M A T E R O W RE C O N S T R U C T S I D E W A L K WI T H D R I V E W A Y RE P L A C E M E N T Docusign Envelope ID: 255919EC-5F85-415E-BAEE-02EE38FD844F 50 5 0 A v e n i d a E n c i n a s Su i t e 2 6 0 Ca r l s b a d , C A 9 2 0 0 8 Ph o n e : ( 7 6 0 ) 4 7 6 - 9 1 9 3 MB A K E R I N T L . C O M July 15, 2025 Item #15 Page 12 of 127July 15, 2025 Item #15 Page 12 of 127 EX I S T I N G A D A CU R B R A M P EX I S T I N G A D A CU R B R A M P EX I S T I N G S I D E W A L K RE C O N S T R U C T D R I V E W A Y WI T H 3 " R O L L E D C U R B AP P R O X I M A T E R O W RE C O N S T R U C T S I D E W A L K WI T H D R I V E W A Y RE P L A C E M E N T Docusign Envelope ID: 255919EC-5F85-415E-BAEE-02EE38FD844F