HomeMy WebLinkAbout; DEMPSEY CONSTRUCTION TENANT IMPROVEMENT; TDM PLAN FOR DEMPSEY CONSTRUCTION TENANT IMPROVEMENT; 2024-02-05(city of
Carlsbad
C alifornia
TDM Plan Template for
Ordinance Projects
Instructions
City of Carlsbad
Land Development Engineering
1635 Faraday Ave
Carlsbad, CA 92008
How to Use the Template: Non-residential developments that meet trip generation thresholds
specified in the city's TDM Ordinance must submit a TDM Plan. This template shall be used to
prepare a Non-Residential TDM plan compliant with the requirements of the TDM Ordinance.
The Carlsbad Transportation Administrator (TA) is available to support developers with TDM
Ordinance compliance and completion of your plan. To get started or for questions, please contact
landdev@carlsbadca.gov or call 442-339-2750.
TDM Plan Development and Approval Process
Discretio11a,y Permits (if applicable)
1) Prior to submitting a permit -
, • application, confirm applicability of
·-TOM ordinance
. '•Use the Development Permits P-2 form to
determine if the project is subject to the
TDM ordinance.
•All projects subject to the TDM Ordinance
are required to complete a preliminary
TDM plan for review and approval prior to
discretionary approval.
4) Requirements Following
P.reliminary P.lan ApJ>roval
•The project will be conditioned,to subm!t
a final TDM !)Ian to the satisfaction ot tlie
City Engineer prior to occupancy~ot a_n . ,
, ~ associated building permit. This st"ep ·_·: .. :.;~~ ~ t,allows for updates to the l)reliminary plan·: __
,?d_nc:E?_?f.r:ied __ orE~t~r.?.l:t ~~~n.fi:~,ie~'.~~~:·\ . 1 entI Ie .. . , , . . ,. _ ,--w .
~ :TDM.req.ui~ements f~llo~ihg,•/ •. ·' •••
discretionary approval are outlined in the .. ··•·jd.,;.· . · .• Building Permit process below,.· ·: · . -•
/ 2) Pre-ap,plic~ticiX Consult;t·i~{· -
•, ~ ' ~ -• . ' ' .
ro•Appiis~nt_s.'.shoul~ en1ai('_·:,:,,:·: ' : • .:
'. ~ landdev carlsbadca. ovto sc~edul~ a ..
:":· cons_ultation'and coor~ina_te•TDM . ·, •· •• --; :
:~'Tequirements related to the project prior.;s.,;;
'.·; to submittal of their draft plan, · " ; ' ' ~ ·. : • . .
. .
3) PreliminaryTDM Plan Review
• The preliminary TDM plan is reviewed
along with other application materials in
the Planning division submittal package.
Comments will be provided via the
submittal package comment letter.
•Once the preliminary plan has addressed
all city comments, it will be approved as a
preliminary TOM plan.
Building Permits -Projects with a Preliminmy Plan 011 File
PRIOR TO BUILDING PERMIT
ISSUANCE
1) iTDM P.lan Consultation
•For projects that nave an approved
preliminary TDM plan, a consultation
between a developer reRresentative
and city staff must occur. and
infrastructure strategies shall l:je
incorporated into the building Rian set
To request a consultation, email
landdev@carlsbadca.gov.
• 4) Plan Approval and
Implementation . . .
•After all comments have been addressed ':
and infrastructure strategies have been
verified at the pre-occupancy site
inspection, the TDM plan will be signed
by a city representative. The city will
distribute the approved TDM plan to
appropriate individuals.
•The city provides implementation and
monitoring assistance to applicants via •
the TDM business outreach program
Carlsbad Commuter.
PRIOR TO FINAL BUILDING PERMIT
AND OCCUPANCY
~--!~--~~.:•~_:, :i'•~·-:-~ ,~ .. •:•,A·.:.,< ~~1-.)t,::~~~c>_;,.:••~:-;':-... r 3) P,re-Occ.upa'!CY SiteJn.spectioti :. : : '.?
~:-: .. , •• ·-.• •. -·.: :_ :: ; --'·, .• ·a •. _:-.... •
~ •TDM plans must complete a succ~ssful_
;·-: pre-occupancy inspection priortO -• ........ • -~ ... · ·-...
, _._approval.During the insp_ection;'the .
presence and proper installation·; of. • •
infrastructure and physicai e_lements are
verified .. • •• ••
··•If the infrastructure has not been , : .
installed per the TDM plan,·. : · , . • • ;·
modifications to the infrastructure or to
the TDM plan may be require~._.
Building Permits -Projects with 110 Prelimillmy Plan 011 File
PRIOR TO BUILDING PERMIT ISSUANCE
1) TDM Plan Consultation
•Prior to issuance of a building permit, all
projects subject to the TOM ordinance •
must complete a consultation with city
staff regarding submittal of the TOM plan.
To request a consultation, email
landdev carlsbadca. • ov ..
•In addition, a consultation between the
plan preparer and city staff or _the Carlsbad
TA must occur prior to building p·ermit
issuance. • -• ~ '
. • If the property has an ~pproveci TOM plan
on file, applicants may choose to sign on to
the property's plan, unless a highertier is.
• required. • • :~~-i;(::=-:-~t:> ::
4) Pre-Occupancy Site Inspection
•TOM plans must complete a successful pre-
occupancy inspection prior to approval.
During the inspection, the presence and
proper installation of infrastructure and
physical elements are verified.
• If the infrastructure has not been installed
per the TOM plan, modifications to the
infrastructure or to the TOM plan may be
required.
S) Plan Approval and Implementation
2) Infrastructure Selection
•Applicants who develop their own plan
must identify infrastructure strategies
before building permit issuance and discuss
and email them with an early draft plan to
the Carlsbad TA for preliminary approval.
These infrastructure strategies will need to
be incorporated into the building plan set.
• PRIOR TO FINAL BUILDING PERMIT AND
OCCUPANCY
3) TOM Plan Development
• The Carlsbad TA is available to assist with
the completion of the plan.
•Applicants/plan preparers submits a draft of
the final plan using the template in
Appendix C with supporting documentation
to the Carlsbad TA for review and receives
feedback at the latest six weeks before
occupancy is expected.
•The final plan must address all comments
received and must be submitted with the
required signatures prior to approval.
•After all comments have been addressed and infrastructure strategies have been verified at the
pre-occupancy site inspection, the TOM plan will be signed by a city representative. The city will
distribute the approved TOM plan to appropriate individuals.
• The city provides implementation and monitoring assistance to applicants via the TOM business
outreach program Carlsbad Commuter.
C-3
Additional Information
All developments are required to begin to monitor the alternative mode share of commute trips to
the site through employee surveys within 12 months of reaching 7 5 percent occupancy or within 18
months of initial occupancy, whichever occurs first. Developments with multiple buildings or
phases are required to conduct employee surveys within 12 months of reaching 75 percent
occupancy of the first building or within 18 months of initial occupancy of the first building,
whichever occurs first.
For more detailed information please refer to section 2, Non-Residential Developer TDM Plan
Guidelines within the TDM Handbook.
TDM Plan for
Ordinance Projects
Submittal Date: 215124
□ Preliminary Plan (Discretionary Review Phase Only)
0 Final Plan
SECTION 1: Applicant Profile
Applicant Name: Dempsey Construction
Property Manager
Name: Darla Kooiman ----------------------------
Applicant Mailing 1835 Aston Avenue Address: -N-•u-m-be,-------St-ree_t _____________ S_u-itc ____ _
Carlsbad CA 92008
City State Zip Code
Primary Contact: Armin Latifi Email: alatifi@dempseyconstructi~
Phone: 760-918-6900
SECTION 2: Project Information
Project Name: 1825 Aston Avenue
Permit Number: CBC2023-0402 I LDE2024-0100
Project Address: 1825 Aston Avenue
Number Street
Carlsbad CA
City State
Project Description and Site Map
Suite
92008
Zip Code
Please include a description of the project. If the project is a tenant improvement that does not apply
to the whole building/site, please include a site map that shows which areas of the site are subject to
the improvement.
Second generation tenant improvement for one tenant on an entire floor of an existing 1
story building.
TOM Plan Tier
Refer to Table 2-1 of the handbook for tier levels based 011 ADET and development type.
0 Tier 1
D Tier 2
C-5
□ Tier 3
Number of Employees
Specify the expected number of employees at this location at move-in and at full capacity.
Move-In Full Capacity
Number of Full-Time
Employees 50 73
Number of Part-Time
Employees 0 0
Number of Contract Employees 0 0
Total Number of Employees 50 73
Average Daily Traffic (ADET) Calculations
Refer to Table 2-2 of the handbook for ADETISF and additional information. The square footage
used to calculate the trip generation estimate for tenant improve111e11ts is based 011 the floor area of
the improvement, not the square footage of the entire building.
GFA (SF) ADET
Office -All Uses
Restaurant
Retail
Industrial
W~·eh~using
Manufacturing
Other
Automobile Parking
Automobile Parking
Total
15,653
2,468
18,121
Existing # of
Allocated
Spaces*
_§_urface _parking Spaces 78
Structur~Parking Spaces _ _o_
* Allocated spaces are the spaces assigned to the building or suite.
** New parking spaces are those added as part of this project.
Project Schedule
Anticipated Occupancy Date: 10/20/2024
Project Interim Transportation Coordinator
204
5
209
Proposed # of Proposed# of
Allocated Spaces* New Parking
S aces**
105
0
27
0
0 Developer agrees to provide an Interim Transportation Coordinator responsible for ensuring the
infrastructure is developed as agreed upon with the City of Carlsbad, development, and
execution of TDM Plan requirements, and transitioning Transportation Coordinator duties to
new owners or property managers upon occupancy using the TC Designation Form in Appendix
F.
Provide name, title, email, and phone number. This individual may be the primc11y contact listed
above (or tl,e vroiect.
Armin Latifi
Project Manager
A Latif i@dempseyconstruction.com
858-735-8172
SECTION 3: Existing Conditions & TDM Context
Complete the following section to establish existing conditions and TDM context. Expand boxes as
needed.
Existing Transportation Infrastructure Network
Please provide a brief discussion or map that describes transportation options that serve the project site. Include the
following items:
• Pedestrian infrastructure adjacent to the side (e.g., sidewalks, nearby crosswalks, or signalized crossings)
• Bike il,ji·astructure by type (e.g., Class I, II, fl, or IV) adjacent to the site
• Transit or shuttle services serving the site with a stop/station within a ¼ mile (or a 5-minute walk)
Adjacent to the site there are sidewalks along Aston Avenue. Approximately 500 feet
down Aston Avenue is a signalized crossing at the intersection of College Blvd. This
intersection has a crosswalk. Also, approximately 486 feet away (towards the
intersection of College Blvd) is a Bus Stop. There are an additional 2 bus stops within
approximately 550 feet of walking distance. See attached map 1.1 for reference.
Project-Specific TDM Infrastructure (Tenant Improvements Only)
Please provide a brief discussion and site plan describing the onsite TDM infrastructure c111'/'e11tly available:
• Number of public bike racks and approxi111ate location with regards to building entrance
• Average utilization of bike rach (in%)
• Nu111ber secure bike racks (specify whether in bike cage, bike room or bike lockers)
• Average utilization of bike racks (in%)
• Number of designated cwpool/vanpool spaces and location with regards to building entrance
• Average utilization of ca,pool/vanpool spaces (in %)
• Any other infrastructure or services available to property tenants that encourage the use of public transit,
ca,pooling, va11pooling, walking, and biking, such as a bike repair station, a,1 onsite shelter or waiting area
for buses or shuttles, etc.
N/A
Environmental
111 the box below, please provide 111aps of the relevant topogrnphical and experiential conditions that will i11jlue11ce
travel bel,aviors to the project site. At a 111ini111u111, provide thefollowi11g:
• A Google 111ap wit!, termin view and bike lanes showing approxi111ately a 2-mile radius around the site
• Pl,otos (or street view screens/wt) of tl,e roads adjacent to t!,e property
• ff relevant, discuss additional e11viron111ental aspects tl,at may i111pact use of active and alternative
trnnsportation, sue!, as traffic speeds, pedestrian safety, lig!,ting, etc.)
See attached "Carlsbad TDM Ordinance Environmental Backup" Ref 1.2
Project-Specific and/or Nearby Amenities
Count and report the nu111ber of project-specific and neighboring amenities onsite or within a 5-minute walk (J/4
111ile) of the project site and provide 111ap.
• Report the nu111ber of amenities or establishments by type. Include 11u111ber of food establishments, cl,ild-care
facilities,fitness/healthcarefacilities and other relevant services such as d1y-cleaning that can impact trip
generation.
Please see included Ref 1.3 for nearby amenities.
Anticipated Workforce and Commute Patterns
Tl,e 111akeup of the existing or anticipated worJ..force will help sl,ape the approach to TDMfor a given site. Include
the following:
• Existing or anticipated typical work hours or shifts
• Existing or anticipated percentage of part-ti111e e111ployees
• If available, any existing commuting i11formatio11, such as the percentage of employees using different
commute modes and the avemge commute distance.
-Typical Work Hours are Monday through Friday, 7am to 5pm.
-There are zero (0) part-time employees.
-Estimated average commute distance: 10.5 miles
-0% employees use different commute modes
SECTION 4: TOM Strategy Selections
Please reference section 2 of the handbook for available points and appendix A for a detailed
description and guidance for each strategy. Required strategies add 4 points towards the total
required number of points. Tier 3 TDM plans must achieve a minimum of 6 points through
infrastrncture strategies unless otherwise agreed upon with city staff.
To select strategies for inclusion in the TDM plan, check the box to the left of the strategy, provide
information as requested in the box below the strategy, and indicate the points requested. For
strategies with a range of points, work with the TA who will assist in determining the appropriate
number of points based on the unique context of the site and the proposed project.
Claiming Points for Existing Amenities (Te11a11t Improvements Only)
If the tenant has access to an existing infrastructure amenity available at the site, the tenant can
claim that amenity in their plan unless that amenity does not meet minimum standards or is, on
average, fully utilized, such as two carpool spaces that are both occupied on most weekdays. The
capacity of an existing infrastructure amenity will be evaluated at the time the strategy is proposed.
Strategies Used to Fulfill CEQA Requirements
Any TDM strategies that will be used to fulfill both TDM Plan and CEQA requirements must be
identified in the description and the strategy summary in Section 5. In addition, CEQA
documentation related to the strategy must be attached as an appendix to this template.
Scope of Strategies for Te11a11t Improvements
While physical improvements tend to be tied to the size and scope of the tenant improvement,
programmatic improvements are expected to be available to all of the employer's employees at the
site.
Required Strategies
0 Transportation Coordinator Points: 1
Designate an on-site transportation coordinator responsible for ensuring that infrastructure is
maintained, policies and programs are implemented, and amenities and partnerships are maintained
as described in the approved TDM Plan. The TC ensures compliance with City of Carlsbad TDM
Plan requirements and must attend an introducto1y meeting and complete a TC h·aining.
Complete the TC Designation Form in Appendix F and add as an appendix to this plan.
0 Distribute New Hire Transportation Information Points: 1
Distribute transportation options information to new employees during the hiring and orientation
process.
0 Citywide TDM Program Points: 2
Meet with the citywide TDM programs outreach staff on a regular basis (at least annually) and
participate in/promote at least two events held by the citywide TDM program.
□ (SHELL BUILDINGS AND MULTI-TENANT BUILDINGS ONLY)
TDM in Leases Points: 1
Applies to shell b11ildi11gs mu/ 11111/ti-te11a11t buildings. Plan Guidance: Provide language that will be included in the
lease that details the requirements laid out in Section 2, describes for which strategies the te11a11t(.v) will be responsible,
and 11otes that lease agreements will be accompanied by the approved TDM plan. Tenant TC contacts must be provided
prior to the pre-occupancy inspection.
N/A
Infrastructure Strategies
D Secure Bike Parking Points Requested:
Secure bike parking must be made available to employees at 110 cost. Indicate the number of secure, long-term bike
parking spaces to be provided, how they will be accessed and where they will be located 011 the project site (include
011 building/site plan). Refer to the handbook for the number of spaces required to eam points. Please consult
"Essentials of Bike Parking" by the Association for Pedestrian and Bicycle Professionals for approved types of bike
parking and installation guidance and provide guidance to the installer. Unapproved types of secure bike parking or
poorly installed facilities may 1101 pass inspection.
N/A
D Public Bike Parking Points Requested:
Indicate the number of short-term spaces and the type of bike rack to be provided and include the location 011 the
building/site plan. Refer to the handbook for the number of spaces required to eam points and guidance 011
installation. Please consult "Essentials of Bike Parking" by the Association for Pedestrian and Bicycle Professionals
for approved types of bike parking and installation guidance and provide the type of bike rack and installation
guidance to the installer. Unapproved bike rack types or poorly installed racks may 1101 pass inspection.
N/A
D Bicycle Repair Station Points Requested:
Describe what items will be i11c/11ded i11 the bicJ1c/e repair statio11 a11d illclude the locatio11 011 the b11ildi11~/site pla11.
N/A
D Micromobility Parking Points Requested:
J11dicate where micromobility parki11g alld chargi11g will be located Oil the project site. fllclude locatio11 Oil the
b11ildi11f!lsite vlall.
N/A
D Preferential Parking for Car/Vanpools Points Requested:
J11dicate the 1111111ber of cmpool a11d va11pool reserved spaces to be provided a11d where they will be located 011 the
project site (011 the b11ildi11g/site pla11). Refer to Appe11dix A of the ha11dbookfor g11ida11ce 011 the required 11u111ber of
spaces a11d copy the g11ida11ce i11to the space below to e11s11re proper i111ple111e11tatio11. lvfaxi11111111 poi11ts will be awarded
whe11 offered i11 co11i1111ctio11 with ridematchillf! services.
N/A
D Car Share Parking and Vehicles Points Requested:
J11dicate the 1111111ber of vehicles a11d reserved spaces to be provided a11d where they will be located 011 the project site
i11c/11de i11 b11ildi11f!lsite pla11).
N/A
0 End of Trip Facilities Points Requested: 1
J11dicate the 1111mber of showers, lockers, a11d chanf!illf! rooms and where thev will be located on the b11ildiludsite plan.
Please see included reference 1 .5 for on site shower and changing room locations.
D On-site Amenities Points Requested:
Discuss the on-site amenities that will be located at the development and explain how these offerings will mitigate trips
rather than serve as trip-generators. Discuss discou11ts available to tenants if applicable. Show the location of the
amenities 011 the buildiludsite vlan.
N/A
D Bicycle and Pedestrian Connections Points Requested:
Provide a map showi11g proposed pedestrian and bicycle infrastructure and connections to existingfacilities and within
the site.
N/A
D Passenger Loading Zone Points Requested:
Describe location of and denote loading zone 011 building/site plan.
N/A
0 Innovation (Infrastructure-Based) Points Requested:
Describe the strategy and discuss how it will lead to reduced single-occupancy vehicle trips to and from the site and
include locations 011 the buildinf!lsite vlan.
NIA
Non-Infrastructure Strategies
Non-infrastructure strategies for tenant improvements must be made available to all employees at
the worksite, not only those in the improved space.
Amenities
0 Car Share Vehicles Points Requested:
Identify the number of car share vehicles that will be provided 011-site and if these vehicles will be provided by an
existing car share operator or by the employer/property owner. Indicate whether membership will be fully or partially
subsidized for emplo)lees/te11a11ts. Must be vrovided in co11iu11ctio11 with car share varkinf!.
N/A
D Micromobility Fleet Points Requested:
Describe the 111icromobility devices (e-bikes, e-scooters, etc.) that will be available for use by employees/tenants, the
number of devices, and the location where devices will be stored. Include the location 011 building/site plan. Indicate if
all emvlovees/te11a11ts will have access to the devices and how emvlovees/te11a11ts will reserve/check out devices.
N/A
D Real-Time Travel Information Points Requested:
Describe the proposed location of the resources and the real-time travel information made available.
N/A
0 Mobile On-site Amenities Points Requested: 1
Discuss the 111obile on-site amenities that will be located at the development and e.xplain how these offerings will
mitigate trips rather than serve as trip-generators. Discuss discounts available to tenants. Provide a 111ap showing the
proposed location of these a111enities and discuss af[reements between vendors and schedules.
Dempsey Construction will have mobile on site amenities twice a week in the form of
food trucks to reduce mid-day trips.
Developer/Employer Programs
D Transportation Subsidy/Incentives Budget Points Requested:
Include details of program including the subsidy that will be offered (.rnch as transit pass subsidy), how the program
will be administered. Indicate the total annual budget, describe what percentage of the workforce will be eligible to
rxrrticipate, how the prof[ra,11 will be 111arketed and how participation will be 111011itored.
N/A
D Ridematching Services Points Requested:
Plan Guidance: Discuss plans to create and µro111ote ride111atchi11f[ µrof!)·am.
N/A
D Guaranteed Ride Home (GRH) Services Points Requested:
Discuss plans to create an intemal GRH program. At a 111i11im11m, developer will promote existing services, such as
SANDAG's iCommuteservice.
N/A
D Marketing and Outreach Points Requested:
Include details of marketing and outreach efforts.
N/A
Employer Programs
D Telework Program Points Requested:
Include information about the program, such as the infrastructure and policies that will be available to support
teleworking, the anticipated percentage of employees that will be eligible and any limits or guidance 011 the number of
days employees can telework per week or month. The number of points is tied to the e,\pected number of telework days
and associated trip reductions (see handbook for further Quidcmce).
N/A
D Flexible/Alternative Work Schedules Points Requested:
/11clude information about the program, such as the anticipated percentage of employees that will be eligible and any
limits or f!.Uidance 011 the mra11f!.eme11ts that are accevtable.
N/A
D Alternative Transportation Incentive Points Requested:
Include details of program including how the program will be administered. Indicate the total annual budget, describe
what percentage of the worlforce will be eligible to participate, how the program will be marketed and how
µarticipation will be monitored.
N/A
D Commuter Tax Benefits Points Requested:
Include how the vrof!.ram will be marketed to emvlovees.
N/A
D Customized Travel Plans Points Requested:
Identify departme11t/positio11 that will be responsible for implementation.
N/A
Partnerships
D Establish and Maintain Partnerships with Area Businesses Points Requested:
Identify partner business(es) or entities and the TDM resource(~) that will he provided through the partnership.
Describe how costs will he shared.
N/A
D Establish and Maintain Partnerships with Private Vendors Points Requested:
Jdenti , artner business es or entities and the TDM resources that will be rovided throu h the artnershi .
N/A
Innovation
D Innovation (Non-Infrastructure-Based) Points Requested:
Describe the stratef!v and discuss how it will lead to reduced sinf!le-occuvm1cv vehicle trivs to and from the site.
N/A
SECTION 5: Strategy Summary and Site Plan
1. Provide a summary of selected strategies and points requested in this table and mark any
strategies that are used as VMT reduction sh·ategies to comply with the California
Environmental Quality Act (CEQA). TDM measures used to meet CEQA requirements
must remain in perpetuity with the project.
2. Attach a site plan that displays the location of all physical elements of the TDM plan. This
plan will be used by city staff to verify all physical elements at the pre-occupancy
inspection. The site plan must:
a. Include locations and quantities of all infrash·ucture elements and any physical
elements of non-infrash·ucture strategies (i.e., real-time information screens or
transportation kiosks)
b. Differentiate between existing and proposed elements and clearly mark the elements
for which points are requested
c. Be legible and on a sheet no larger than 11" by 17"
Strategy Points CEQA Notes (Admin Use Only)
Secure Bike Parking
Public Bike Parking
Bicycle Repair Station
M icromobility Parking
Preferential Parking for Car/Van pools
Parking Spaces for Carshare Vehicles
End of Trip Facilities 1
On-Site Amenities
Bicycle and Pedestrian Connections
Passenger Loading Zone
Innovation (Infrastructure-Based)
Carshare Vehicles
Micromobility Fleet
Real-Time Travel Information
Mobile On-Site Amenities 1
Transportation Subsidy/Incentives Budget
Ridematching Services
Guaranteed Ride Home (GRH) Services
Marketing and Outreach
Telework Program
Flexible/ Alternative Work Schedules
Alternative Transportation Incentive
Commuter Tax Benefits
Customized Travel Plans
Establish and Maintain Partnerships with
Area Businesses
Establish and Maintain Partnerships with
Private Vendors
Innovation (Non-Infrastructure-Based)
Total Points
SECTION 6: Transfer of Ownership (New Developments Only)
By signing below, owner agrees to inform the city of a sale and provide contact information for a
new owner to ensure that the plan will continue throughout the life of the project.
Name and Signature of Developer Representative or Designated Applicant:
Printed Name Signature Date
Organization Email Phone Number
SECTION 7: Monitoring
By signing below, applicant agrees to distribute commute surveys to employees every two years
following the baseline survey conducted within 12 months of occupancy reaching 7 5 percent or
within 18 months of initial occupancy, whichever occurs first. Alternatively, applicant may provide
a copy of the signed lease that stipulates that the employer tenant(s) will administer employee
commute surveys on the same schedule.
In addition, applicant acknowledges the interim and final alternative mode share goals, listed below,
that the development is required to achieve. Should the goals not be achieved, transportation
coordinator agrees to work with the citywide program to replace ineffective measures or identify
additional measures suitable for implementation at the project site.
Period in which Alternative Mode Share Goal
Reporting Falls
New Existing
Developments Buildings/Tenant
Improvements
Present till 2025 25% 24%
2025 -2029 30% 26%
2030 -2034 35% 28%
2035 on 40% 30%
Linda Ontiveros 10/24/24
SECTION 8: Signatures
By signing below, applicant and transportation coordinator certify that the information provided
in this document is complete and accurate. By signing this document, the transportation
coordinator is committing to providing the strategies identified in this document and to
participate in monitoring activities described in Section 7.
Name and Signature of Developer Representative or Designated Applicant:
Armin Latifi
Printed Name Signature
Dempsey Construction alatifi@dem pseyco nstruction. com
Organization Email
Name and Signature of Building Owner:
Bryce Raleigh
Printed Name
Dempsey Construction
Organization
Signature
braleigh@dempseyconstruction.com
Email
Name and Signature of (Interim or Final) Transportation Coordinator:
Darla Kooiman
1/24/2024
Date
Phone
Number
1/24/2024
Date
Phone
Number
Printed Name
Dempsey Construction
Signature Date
dkooiman@dempseyconstruction.com
Organization Email Phone
Number
Name and Signature of City of Carlsbad Representative:
Printed Name Signature Date
(AD MIN USE ONLY)
Estimated Occupancy Date: __
For TDM in Leases Strategy, tenant TC contacts have been provided: Y /N
Applicable Docs
References
1.1 Existing Transportation Infrastructure Network
1.2 Environmental
1.3 Project-Specific and/or nearby amenities
1.4 Mobile On-Site Amenities_,
1.5 End of Trip Facilities
Appendix
F-3 Transportation Coordinator Designation Form
Existing Transportation Infrastructure
Network
Legend
t' -
,t' -,·
t' ,,, --•
-t' ,·I. , ... ' .....
-r
"i ,•
_I ____ ___.I Future Dempsey Construction Office
_I _____ I Current Dempsey Construction Office
Carlsbad Poinsettia Station Bus Stop
REF
1 .1
Environmental REF 1.2
-Dedic~ned lane!. -DirVunpJved t~ils
~~'1onA« C
,, 1..:.:.-.o
Adjacent Road To Site
---A·ston-Jtven u_e -~ ----.; ---
REF 1.2
Cont.
_________ N_e_a_rb_y_A_m_e_n_i_ti _e_s _______ __,JII REF 1.3
odsft
nalT
Cobra Puma Golf9
SIS Wholesale ft
Insurance Services T
7-Elevenfri) Enjoy 5 Bone-lnl!J
\'lings for $5
El
SMAC Moving
Coil Actuators
B
B
9 Evnroll Putters
9 c~\,~~~i,
i ft
e<c T
~erii lmpediMed, Inc vo '
Grand Pacific Resorts
B Henry Schein 'f Orthodontics '
' Blink Charging Station
Prologis Carlsbad ft
Distribution Center .. T
' 9
9 i\stonAve-
Full Swing Golf ~ 9
:; Qoolabs
Dempsey Construction
,
(l ,,
Navigate Biopharma
9
Residence Inn by Marriott San Diego ..
4 2t 3·star ho!!I
~
B El
Aqualung Group
9 Medtronic
Genoptix Medical
Laboratory
99
Neogenomics
True Diagnostics Inc ti s
El
El
t ft
i '
El
"-Carlsbad Tech
CalAmp
9 9
Ario
--•=LEUS Beach Towels
~Available· Vi!w Ou_
' California Cafe
Callaway Golf'
Rutherford Ro-
GKN Addili
(Forecast 3
Amenities In Walking Distance
Dining
El Cubano
California Cafe
Recreational
Callaway Golf
Aston Pond
Anytime Fitness
Other
?-Eleven
Full Swing Golf
Grand Pacific Resorts
Residence Inn Marriott
.3 mi 7 min
.7 mi 15 min
.5 mi 10 min
.6 mi 13 min
.6 mi 12 min
.5 mi 10 min
.1 mi 1min
.1 mi 2 min
.4 mi 10 min
Amenities In Driving Distance
Dining
Sams Kitchen
Origen Coffee Roasters
Board and Brew
Pizza Port
Recreational
Bressi Ranch Rec Center
Alga Norte Park
The Crossing at Carlsbad
LEGOLAND California
Other
1.4 mi 4 min
1.2 mi 4 min
2.8 mi 8 min
3.1 mi 8min
3.2 mi 9 min
3.1 mi 7 min
1.9 mi 4 min
3.9 mi 11 mir
Concentra Urgent Care 1.2 mi 4 min
Standard Cleaning Services 2.5 mi 5.1 mir
McClellan-Palomar Airport 2.3 mi 5 min
Proposed Parking and Mobile On-site Amenities Location
New Stripped Parking Stalls
Handicapped Parking Stalls
Proposed EV Charging Parking
Stalls
Mobile On-site Amenities
Location
L~
·--·-·-~i, ... too.....o~o.. (?~ ;:'.\',!,."'=~' ~ y _, __
...,....,0000,.,c,os• .. .o...,"'uaoo-•~s-.
I
I
I )
I
I
I
I
I
I
I
I I
H ti I § I
< I
I
I
I
E]
~ z Ll.J ~ Ll.J
>->w
Ll.J 0~ (/) Cl:: z 0.... 0.... 0 ~ ~?! W-~ 0 Cl::~
0 62
Ll.J f-x Ll.J
~'[)'~,;~~~f~.c~,.-~ES:S:IB:L:E::S::TA::L:L:S:Y:M:B:O:L'.:::=:::;:::._,----::,-------i!_.(i)l £'.Sf,!:j~~r~LA=N::::-::::P:::R:O:P~O:S:E:D:::EX:::T::E:::Rl:O:R:l:M::P::R:O:V:E:M:E::N:T==::;::============:::;=============;::::::=~•~'•~"'~~.,.~~~~~,.~(:9~ •~ ~,..,.~
PROJECT DATA GENERAL NOTES ACCESSIBILITY STATEMENT ACCESSIBILITY STATEMENT STORM WATER LEGEND
"""""""' O,tiQUl"ACl.lll'llll.llr
~~:.-cr11tu1ur
1'(.,t,,lr._..lhG_ ......OC,.rl!ol.lJ!...CU.OWIOIIOl-1.1
,,,,.,,o.,,
_., ....... !(lot ...... ·~-101 .. 0,c,,,c,i...::,ro..c,..o. =~~
IOo~oCr. .
,<;II' ~OJl'-~-NlJ,11,0,111,oCO,,,,Oi,;>J~-•"~"""J!I' l"l:~ .. ,..o.c,c,u,._1
KEYNOTES
0 =-'°~~~~~~:;:o~~=W'"~"ll"-o:wt
0 Ull\lloo01•,.,..,,..C,C\L~
0 .ai;w,1-i,o,..,(lo,ICit,ou
0 -"'-'..C,.'!'OW,,,,.,C,
<!>--.. -,-00)11\""l)lll)tWAl(l()lft--o,,tO'CtWAll\ttDt.ll(';o;
0 !'90l'O'.ttl-~ -,OO'lll,,o,(l~C,.-A~
SANITARY FACILITIES
-•-r,w"'6--•
.. ,--~-• .. OCl"C)t,r',.ll0-..-11' __ .,.. __ ""'OAClt""''°"~ltOl'C
-r.""'D0lll._1><Al'Pol,l....:l~I..00,,,1 ,_.-.pt.o)o,"""'""',_,,.n_ .. f\"4 ::~=L1~~~-~~ ~~-=t-
ACCESSIBILITY REQUIREMENTS
l.fl11C~IHWC!Qe011(-..01Wt.l'VU.~l
-~lllff..Ccnwoun'o-lS..m---ol'0.-.-1""-~AOOMlOv,f"-"°" ~""'"--occ,..,,,,.a,,,o
:-..::=:=~=--~=-IM~JCN1Nt.-C.•l~f~~•• ~ =°=========:~~~ ~
'"'°CC-,,!'l..C,0,-11.~'0lf~C,,,M.LW.....:>..W°"' ~, .. ,s.,.rr111.o..w10~~VIMCl.~Ol'•"""OIW"COOIS~
AC•"'T'All>,i;VC,C,i,,,,C,o-D.o.•.Qo..r1VA\J(,,Ml'Vloll ..... l~\A~ ----.,_IM.l.l'D~?'IICl!C,oo.....SW>olCNMA•CO,,,~Pc,ty"'"ll90i/AllN
-..... ~1"ltlr-1.•~1...WWCOol',r•UCIIO-<t'11T...,TKfloi.laf01'1'1.Yllfl co,,\1WVC11(,o<VU,,,0.Ur:,,,tL"""""'l"1'0'(IM1~-"0lll<-"'Ul>r:,,,t,,.._lc..;IO"'l\'"lCI, ■••
!·~~~.~,~~;:~~~==-~1~'°"' =.i~~~.:o0f•l'OIWOO'\N(i0,.Y_ .. ,,...)l)AT•-
~~~~~.:~~.:.=,t~=;:;...~.!:!o.o..
~~~~~~:"!,"',,.'?;~~¾-::--
..... lllO!f",l>•-r~CK•"r.)Ooo~l"Cc,,r.l""""'°"ACll'll"''"'IT.'•
PIIOII.C11Q"'°"",Ul<OIIOolN<0~"'11f-A!Al.l-
~~~.:ll,,l~~~c;>'~;:~~~:S."'1'1()1'1Cff1>
o ,-.,,
!l"l ... OO'Ao«"'/.-UU,CWl ,0,.0..A< ......,Lf 0C IOTAJ. OC001•~34'0IA.-.ClfA•-.._OCIC01,1ll
P•oJ•.:• ~~"': DO
txte"°'IW'ltOVCI
,,oJ•~I,; :J.I!
SITE PlAN -
PROPOSED
EXTERIOR
IMPROVEMEt
A 0.5f
~
End of Trip Facilities
Facilities On Site
Showers Four (4)
Changing Rooms Four ( 4)
rt-U -,-,
~'--.-, ___ s -----
0 9 ~ '? ~tr,~'<>
L 2 •
6.1 I
J' '-/ _.,, r , .
Q ! ALLWAY 5
;j_ 136
L
AC-2
TRAINING
ROOM [ill]
..,. STORAGE
~ Dill
a
18'-4"
Ref
1 .5
13'-11" -0
S HUDDLE
G~
-0 coJRM . ~
'? ffiQ]
0,.
Ee
+/-8'-4 I /2"'
1¥
TDM2024-0072
Carlsbad TOM Handbook
Transportation Coordinator Designation Form
Company Name: Dempsey Construction
Worksite/Property Address: 1825 Aston Ave Carlsbad, CA 92008
Company Phone Number: (760) 918-6900
TDM Plan Number: ---------
Transportation Coordinator (TC): -'D_a=r'--'-la"--'----'-K--'-'o'-o'-'-i-'m---'a-'-n _______ _
Title: Controller
Company name: Dempsey Construction
Email: dkooiman@dempseyconstruction.com
Phone Number: 760-918-6900
Percent of Time Dedicated to TC Duties: 1 0%
Instructions for the TC: Review and check the following requirements.
I have received and reviewed my company's/property's TDM plan
I fully understand the implementation and compliance duties
I commit to implementing the TDM plan commitments as described in the plan. If any of the
approved strategies cease to be available or appropriate at my worksite, I will contact the City of
Carlsbad to see whether a TDM plan amendment is needed.
Name and Signature of Transportation Coordinator:
Darla Kooiman 1/24/2024
Printed Name and Title Signature Date
Instructions for the supervisor of the TC: Review the duties described in the instructions. Indicate
your approval of the time co111111it111ent by signing belmv.
I have received and reviewed my company's/property's TDM plan
I conunit to filing a new transportation coordinator form within 60 days of designating a new
TC.
Name and Signature of TC Supervisor:
Bryce Raleigh 1/24/2024
Printed Name Signature Date
Dempsey Construction Braleigh@dempseyconstruction.com (760) 918-6900
Organization Email Phone
Number
Note: If the TC changes, please inform the city by submitting a new TC Designation Form.
DocuSign Envelope ID: 8EF7 AFAE-2F30-44F5-9084-B648D380E6F9
Strategy for Required and
Elective TDM Points
Impl ementation Plan
All employees including new hires will be provided
an updated employee handbook with the following
TOM information for reference;
1 .1 Existing Transportation Infrastructure Network
1.2 Environmental
1.3 Project-Specific and/or nearby amenities
1 .4 Mobile On-Site Amenities
1.5 End of Trip Facilities
The employee handbook will also have the contact of the TOM
coordinator for any additional questions they may have. The
TOM coordinator will meet with the City of Carlsbad's TOM
outreach staff annually as required, and will participate
in/promote at least two events held by the citywide TOM
program by distributing emails to employees so that they are
notified.