Loading...
HomeMy WebLinkAbout2025-07-22; City Council; Resolution 2025-173Exhibit 1 RESOLUTION NO. 2025-173 . A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF CARLSBAD, CALIFORNIA, ADOPTING THE PLANS, SPECIFICATIONS AND CONTRACT DOCUMENTS, AUTHORIZING THE CITY CLERK TO ADVERTISE FOR CONSTRUCTION BIDS AND APPROPRIATING ADDITIONAL FUNDS FOR THE HARDING COMMUNITY CENTER HEATING VENTILATION AND AIR CONDITIONING REFURBISHMENT PROJECT WHEREAS, the City Council of the City of Carlsbad, California has determined it necessary, desirable and in the public interest to construct the Harding Community Center Heating Ventilation and Air Conditioning, or HVAC, Refurbishment Project, or Project; and WHEREAS, this Project will replace the existing gas heaters with a new energy-efficient combination heat pump HVAC system at the Harding Community Center Auditorium; and WHEREAS, this Project is the final phase of the Harding Center Refurbishment Project, Capital Improvement Program Project No. 4708; and WHEREAS, the plans, specifications and contract documents for the Project have been prepared, are on file at the City Clerk’s office and are incorporated herein by reference; and WHEREAS, staff reviewed the building plans, specifications and cost estimates developed by a consultant and determined that the proposed design meets the city’s engineering codes, standards and policies and that the proposed construction work would ameliorate conditions associated with aging heating systems and the lack of air conditioning; and WHEREAS, Carlsbad Municipal Code Section 3.28.080(E) requires the City Council to approve plans, specifications and contract documents for all construction projects that are to be formally bid upon when the value exceeds $220,000; and WHEREAS, the total cost of the Project is estimated to be $630,644 including construction contingency, construction management and inspection; and WHEREAS, staff request an additional appropriation of $212,000 from the Infrastructure Replacement Fund to fund construction of the Project. NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Carlsbad, California, as follows: 1.That the above recitations are true and correct. July 22, 2025 Item #3 Page 4 of 7 Docusign Envelope ID: 914F708F-608E-4D5C-916D-6006BEE20D2B 2. That the City Council has determined that the proposed action for construction to replace the existing gas heaters with a new energy-efficient combination heat pump HVAC system is categorically exempt from environmental review under the California Environmental Quality Act, or CEQA, Guidelines Section 15301 because it involves the maintenance, repair or minor alteration of existing facilities with negligible or no expansion of the existing or former use. No exceptions to the categorical exemption as set forth in CEQA Guidelines Section 15300.2 or Carlsbad Municipal Code Section 19.04.070(C) apply. 3.That the plans, specifications and contract documents for the Harding Community Center HVAC Refurbishment Project are hereby approved and the City Clerk is authorized to advertise for bids. 4.That the City Manager or designee is authorized to appropriate $212,000 from the Infrastructure Replacement Fund to fund construction of the Project. PASSED, APPROVED AND ADOPTED at a Regular Meeting of the City Council of the City of Carlsbad on the 22nd day of July, 2025, by the following vote, to wit: AYES: Blackburn, Bhat-Patel, Acosta, Burkholder, Shin. NAYS: None. ABSTAIN: None. ABSENT: None. ______________________________________ KEITH BLACKBURN, Mayor ______________________________________ SHERRY FREISINGER, City Clerk (SEAL) July 22, 2025 Item #3 Page 5 of 7 Docusign Envelope ID: 914F708F-608E-4D5C-916D-6006BEE20D2B