HomeMy WebLinkAbout2807 VISTA MARIANA; ; CB920858; PermitP E R t-' I T
08/25/92 10:45
Page.-L of 1
Job Addres~: 2807 VISTA MARIANA Suite:
Permit Type: SINGLE FAMILY DWLNG -DETACHED
Pc1r,·el No: 216-460-2~ 00 ::..ot#: 116
Valuation: 212 ,693
Construction Type: VN
Occupancy Group: R'3/M" ReferenceU 'J2.:>, 'b
Description: 2365 SF+ 661 SF GARAGE PLAN 4
: PHASE 1
P0rmit No: CB920858
Project No: A9201918
Development No:
9010 08/25/92 0001 01
St <i:t-f'RMT
Ap[, 1 le . :
Apr/I::.::::aie:
Appl/Ownr : FIELDSTONE/LA COSTA ASSOC.
5465 MOREHOUSE DRIVE #250 •
SAN DIEGO, CA 92121
619
Validated By:
546-8226
02
!:i9J2ffl,0O
8/ 2 4 , 2
08/25/92
!'1DP
Fees Required *** Fees Collected & Credits
Fees:
Adjustments :
Total Fees:
Fee description
Building Permit
Plan Check
Strong Motion Fee
13 ,137 .
13 ,137.
or manually enter M.
Enter F.M.F./G .M.F .
Enter "Y" to le
Enter "Y" to Autoc
Enter "Y" to Autocal
* BUILDING TOTAL
Enter "Y" for Plumb i n
Each Plumbing Fixture o
Each Building Sewer
Each Water Heater and/or
Gas Piping System
Each Vacuum Breaker
* PLUMBING TOTAL
Enter "Y" for Electric Issue Fee >
Single Phase Per AMP >
* ELECTRICAL TOTAL
Enter 'Y' for Mechanical Issue
Install Furn/Ducts
Fee>
> >
>
Each Install/Reloc Ap,liance Vent
Each Hood/Fireplace
* MECHANICAL TOTAL
0
0
125
0
0
1
4
1
0
CITY OF CARLSBAD
.50
6 .50
2.50
2.50
2.50
.25
9.00
4 .50
6.50
2075 Las Palmas Dr., Carlsbad, CA 92009 (619) 438-1161
.00
350.00
12 ,787.00
Ext fee
1035.00
673.00
21 .CO
2200.00
310.00
3871.00
3573,00
362.00
408 ,00
530 .00
12983.00
7.50
40.00
6. 5 o
2. 5 0
2,50
5.00
64.00
10 .00
31 . 2 5
41.00
1S.OO
9.00
18.00
6.50
49.00
Dnta
06
y
y
y
y
y
y
"
PERMIT# CB920858
DESCRIPTION: 2638 SF+ 661 SF
PHASE 1
TYPE: SFD
CITY OF CARLSBAD
INSPECTION REQUEST
FOR 04/26/93
GARAGE PLAN 4
STE:
INSPECTOR AREA PY
PLANCK# CB920858
OCC GRP R3/Ml
CONSTR. TYPE VN
LOT: 116 JOB ADDRESS: 2807 VISTA MARIANA
APPLICANT: FIELDSTONE/LA COSTA ASSOC.
CONTRACTOR:
PHONE: 619 546-8226
PHONE:
OWNER:
REMARKS: RS/ALLISON/438-0468
SPECIAL INSTRUCT:
TOTAL TIME:
CD
19
29
39
49
LVL DESCRIPTION
ST Final Structural
PL Final Plumbing
EL Final Electrical
ME Final Mechanical
*****
DATE DESCRIPTION
020993 Exterior Lath/Drywall
020893 Exterior Lath/Drywall
020493 Exterior Lath/Drywall
012993 Exterior Lath/Drywall
012693 Gas/Test/Repairs
012593 Interior Lath/Drywall
012193 Interior Lath/Drywall
011193 Insulation
122192 Rough Combo
121892 Shear Panels/HD's
121892 Rough/Topout
121092 Roof/Reroof
100892 Ftg/Foundation/Piers
100692 Ftg/Foundation/Piers
092292 Underground/Under Floor
PHONE:
INSPECTOR
ACT COMMENTS
INSPECTION HISTORY *****
ACT INSP COMMENTS
AP PY
NR PY
NR PY
NR PY
AP PY
AP PY
AP PY 1ST LAYER GARAGE LID
AP MP
AP MP
NS PY
AP PY
AP PY LOT 116
AP MP
NR MP NO PLANS
AP MP
DEPT: BUILDING
FINAL BUILDING INSPECTION
ENGINEERING -~FI~ PLANNING U/M
PLAN CHECK#: CB920858
PERMIT#: CB920858
PROJECT NAME: 2638 SF+ 661 SF GARAGE PLAN 4
PHASE 1
ADDRESS: 2807 VISTA MARIANA
CONTACT PERSON/PHONE#: ALLISON/438-0468
SEWER DIST: LC WATER DIST: CA
RECEIVED APR -7 1993
WATER
DATE: 04/05/93
PERMIT TYPE: SFD
==================~===============--====--===================================
~~~PECTEDQ,, 6~ DATE 1/J,3/93 INSPECTED: APPROVED ~ DISAPPROVED
INSPECTED DATE
BY: INSPECTED: APPROVED DISAPPROVED
INSPECTED DATE
BY: INSPECTED: APPROVED DISAPPROVED
========================='°'"==================================================
COMMENTS:
..
DEPT: BUILDING
FINAL BUILDING INSPECTION
NGINEER~ FIRE PLANNING U/M
PLAN CHECK#: CB920858
PERMIT#: CB920858
PROJECT NAME: 2638 SF+ 661 SF GARAGE PLAN 4
PHASE 1
ADDRESS: 2807 VISTA MARIANA
CONTACT PERSON/PHONE#: ALLISON/438-0468
SEWER DIST: LC WATER DIST: CA
WATER
DATE: 04/05/93
PERMIT TYPE: SFD
===-======---===--------------==------------------------=====================
IN~PECTE~ ,~'4,--DATE 1(t#,9J --X INSPECTED: APPROVED DISAPPROVED BY. ~~
INSPECTED ~ DATE 4/23b _K-BY: at INSPECTED: APPROVED DISAPPROVED
INSPECTED DATE
BY: INSPECTED: APPROVED DISAPPROVED
===================--======---=====----===------=============================
COMMENTS:
DEPT: BUILDING
FINAL BUILDING INSPECTION
------' ENGINEERING FIRE ~NING U/M
T,AN CHECK#: CB920858
aMIT#: CB920858
PROJECT NAME: 2638 SF+ 661 SF GARAGE PLAN 4
PHASE 1
ADDRESS: 2807 VISTA MI\RIANA
CONTACT_ PERSON/PHONE#: ALLISON/438-0468
SEWER DIST: LC WATER DIST: CA
WATER
DATE: 04/05/93
PERMIT TYPE: SFD
=======================-=====-=====-==========-==============================
~~~PECTED ffe ' DATE _j)nµ;; / fv' INSPECTED: APPROVED DISAPPROVED
INSPECTED DATE
BY: INSPECTED: APPROVED DISAPPROVED
INSPECTED DATE
BY: INSPECTED: APPROVED DISAPPROVED
======================--===---====--===--====--==============================
COMMENTS:
FINAL BUILDING INSPECTION
DEPT: BUILDING ENGINEERING
PLAN CHECK#: CB920858
PERMIT#: CB920858
FIRE PLANNING
PROJECT NAME: 2638 SF+ 661 SF GARAGE PLAN 4
PHASE 1
ADDRESS: 2807 VISTA MARIANA
CONTACT PERSON/PHONE#: ALLISON/438-0468
SEWER DIST: LC WATER DIST: CA
U/M WATER
ATE: 04/05/93
PERMIT TYPE: SFD
======================================-=======-==============================
INSPECTED/,Q If 'ti DATE ✓ INSPECTED: ~..:Z,1s...r) APPROVED DISAPPROVED BY: ✓ -"
INSPECTED DATE
BY: INSPECTED: APPROVED DISAPPROVED
INSPECTED DATE
BY: INSPECTED: APPROVED DISAPPROVED
====================-======---===--------------=======--=====================
COMMENTS:
FINAL BUILDING INSPECTION
DEPT: BUILDING ENGINEERING FIRE PLANNING ~ WATER
PLAN CHECK#: CB920858 DATE: 04/05/93
PERMIT#: CB920858 PERMIT TYPE: SFD
PROJECT NAME: 2638 SF+ 661 SF GARAGE PLAN 4
PHASE 1
ADDRESS: 2807 VISTA MARIANA
CONTACT PERSON/PHONE#: ALLISON/438-0468
SEWER DIST: LC WATER DIST: CA
i~~;;~;i~u=~==~~~~:::::~==;:~~;=:::::::D=J =-·:::::::::::===
INSPECTED DATE BY: __________ INSPECTED: ____ APPROVED DISAPPROVED
INSPECTED
BY:
DATE
INSPECTED: APPROVED DISAPPROVED
======================--====--===---==---====--=====-========================
COMMENTS:
PROFESSIONAL REGISTERED INSPECTIONS, INC . 7895 Convoy Court
San Diego, California 92111
Phone 292 Ou'
INSPECTORS WEEKLY REPORT
OE l "FO P(EO CON C RETE
rwF S~F ' I/I I 1r,~PF r,.,.u I:'"
No. 4911 I FOR WEEK
ENOING ON
~Tl"UC r, STEEL ASSEM B LY
nEtNFORCED GYPSUM
Ofl.E O~IVll'JG
FINAL . !')
GL 'JE • L J\U F-" A 9q1C A .. ':)•1
O THER
~ ,~-~-~-jJ' ~R~~-N_A_& -~~~N_;~;-;~L_E_RA ___ -__ --_-_-_ -_------.-:-, :-~_S-, i-~-~-..,-;_;_L_~-~-.,-, ,-.,-, ,-"-o_E_P~,-.,-L-.-,-, -~-, ,-E-.,-.-.• -= -,;: ,,--
.,,.,, 1, ., , 1., • •, '·'" l\1>(:111 r EC T
FAIRWAYS -PHASE I BERKUS GROUP
~--· •,•· 'f,, ''Ii•' I ! .I I. , I\ ----,----::-,:,-------------------' L~;~ ~~-'''." ~·~~~~;•~·-·~~;~~--·•_·~-~-~-r,-•~-I_I _______________ _ CONCRETE ------------·· -·-~';,("1,•fl,f_ •ti\ •• , l••t• • • , •••. ur.n.t.u (;P Arl f, •,,r,;n,. ,,rt r.-POD, F I C.• cr•1EnAL C-:>~ r~AC TO f'l
1/2" r/J, 7 STRAND, 270 KSI CABLE, MIX 116525, FIELDSTONE COMPANY
GAUGE /IC826, GAUGE IIC8105 MUELLER LEWIS CONCRETE
INSP'N.
DATE
--------------l«fl.B. nECEIVltJ(j & TESTl~iG <.:o,..,,srR. ~-•A r ' __ SA'.'"LE'S
i'. R._I., INC.
L:J•.•TtO tlSOF' wo n1< INSPl;,rEo . TEST SAMPLES TIIKFN, W()RK REJECTED, JOB PROBLEM S, PROGRESS, REM ARKS, ETC.
l 'J,-l _•['IE''5 i,1r0 n11..1A r,o·, b.~OIJ r -/'d,IOUN f5 OF" M A I EnlAL r'L h C E O OR IIORI-' PEnCQR~IEO: t,u ,.AeER, T Y PE , & •OE'I -. ·io '5 .
,.,, 1c5 ,,. 4-/1.,,tr, c-. "l\v r ►1. ,;,n,.,..r r0•1,1(?.C f •:'.'>"IS t .•1Ft r ~•-~/\r F. •t.r. Pf':)L T5 t ,::,nou C Ol ':~◄C'C ~CC'. ETr .
The post tension concrete work requiring special inspection was,
to the best of my knowledge, in conformance with the approved
plans and specifications and t he applicable workmanship provisions
of the Uniform Building Code, 1988 Edition. Inspection reports
II 3 thru 11.
Lot 112 3203 Sitio Rosalia CB920-840 Lot If 109 2825 Vista Mariana CB920-839 113 3207 Sitio Rosalia CB920-848 II 110 2823 Vista Mariana CB920-866
114 3212 Sitio Rosalia CB920-855 11111 2821 Vista Mariana CB920-844
ti 5 3208 Sitio Rosalia CB920-859 11112 2817 Vista Mariana CB920-854
116 3204 Sitio Rosalia CB920-849 11113 2815 Vista Mariana CB920-834
117 2808 Avenida Valera CB920-841 l/114 2811 Vista Mariana CB920-85 7
118 2810 Avenida Valera CB920-836 11115 2809 Vista Mariana CB920-846
119 2812 Avenida Valera CB920-860 1 116 2807 Vista Mariana CB920-858
(110 2814 Avenida Valera CB920-850 II 117 2805 Vista Mariana CB920-835
till 2816 Avenida Valera CB920-861 11 118 2803 Vista Mariana CB920-847
1112 2818 Avenida Valera CB920-843 II 126 281 1 Avenida Valera CB920-845
1113 2820 Avenida Valera CB920-837 11127 2813 Avenida Valera CB920-853
II 14 2822 Avenida Valera CB920-862 11128 2815 Avenida Valera CB920-838
1115 2826 Avenida Valera CB920-851 II 129 2817 Avenida Valera CB920-865
1116 2828 Avenida Valera CB920-863 /1130 2819 Avenida Valera CB920-852 ti 17 2830 Avenida Valera CB920-864
28 Day Compression test that did not reach the required PSI
Lot 113 -2940 -45 Days
116 -2970 -60 Days
Remaining lots did meet required PSI. /"'1 ,£lf ~7S-
---·-
4/12/93 280
l"1ATE OF REPO "lf
;;;;:..,;., ..,
0 -
GEOCON
INCORPORATED
FOUNDATION OBSERVATION REPORT
JOB NAME: fJJ/1\.,,/A f_f '-}?.YS· ~.,.J -5" FILE N0.: __ 2'--'-::;....;.."""'""-'---..;;;;.....---=--
LOCATION: ,,.ot-:. 2., :l , /12 ti! 3,,, Li./, 11 r, 11~-, 111 ,{ II/> DATE: /0 -i -/2-
FOUNDATION LOCATION (if not entire building), __________________ _
I I I □ ADDmONAL OBSERVATION REQUIRED
PERMIT NO.: PIAN FILE NO.:
L. ___________ ._ ___________ ----J .:S.SUBSfANTIAL CONFORMANCE
e PURPOSE OF OBSERVATION:
,Bf Verify soil conditions exposed are similar to those anticipated.
,.Jia' Verify footing excavations extend to minimum depth recommended in soil report.
□ Verify foundation reinforcement complies with minimum recommended in soil report.
□ Verily slab reinforcement, sand bedding and moisture barrier comply with minimum
recommended in soil report. . □ Other: •I'/ 1.. t 7,-, 't• / .Gut@~ pf,/ L -> t ttl r. , ; .... , r , , , 1 / / /
e APPLICABLE SOIL REPORT: TITLE:~r~:....u..~::::..a,· *~" ~, .L.....;,i:°..-/-~u..::.i...~....;ill.i..L:.:..o..::ru:.:;~.:....._L..d..lL.Mi.~-,
e SOIL REPORT RECOMMENDATIONS BASED ON: ·) 2:::
□ Expansion Condition; □ VERY LOW □ LOW 121 MEDIUM 18 HIGH 0 VERY HIGH
□ Fill Geometry
• ~I~~~~ FOUND--A-TI-0--,~ ..... .;,-RE-L\_c_o_' ·tfi-,M-_E-, -~-,,.-~-TI-0-~,N-: k-. ,-t -\._-_;,-, .,...~~----( .... · 6.-,r---r-, _v_t_.-w----. -,-. -----
Footing Depth: 0 12 INCHES 31 18 INCHES □ 24 INCHES OTIIER:. ___________ _
Footing Reinforcement: □ NO. 4 T&B O 2-NO.4 T&B □ NO.5 T&B OTHER: _________ _
Interior Slab Reinforcement: □ 6x6-10/10 □ 6x6-fi/6 □ NO. 3 @ 24 INCHES □ NO. 3 @ 18 INCHES
Slab Bedding Material and Thickness: ___________ Vapor Barrier: _______ _
Foundation Width: •
e FOUNDATION PLAN REVIEWED: YES □ NOia
If yes, identify and describe:
• OBSERVATIONS: ' ! I • L ~-~ Substantial conformance ~th Soil Report (see "Purpose of Observation"). I □ Substantial conformance Wjth foundation Plans. ~
□ Other: _______ ..;,.-'--------------------------
e COMMENTS: ______________________________ _
NOTE: IT IS ASSUMED THAT ALL FOOTING EXCAVATIONS WILL BE CLEANED OF LOOSE MATERIAL PRIOR TO
PLACING CONCRETE AND THAT TIIE SOIL MOISTURE CONTENT WILL BE MAINTAINED.
;· ,-, -: 1t 1 • L .r r,,, c {__ -r ,, 1 /, /r-,~'7/ I {('_1/-'1 ,4.,:r (. . / _,.,.-7,·t
/ -; .. [. .
I ~? \ ,, .~ _, I •¼'.-,<: ,. ~
FIELD COPIES TO d"'EOCON Kl3PRES~NTATIVE
n:\ wpjob\draft\fdnobrpt.frm (2/27 /91)
PROFESSIONAL REGISTERED INSPECTIONS, INC I
7895 Convoy Court
INSPECTORS WEEKLY REPORT
COVERING WO RK PERF'O RMED
WHICH REQUIRED APPROV AL B Y
THE SPECIAL INSPECTO R O F'
CJ REINF'O RC ED CONC RETE
..&'J PRE-STRESSED CONCRETE 'd REINF'ORCED MASONRY
No.
0 STRUCT. STEEL ASSEMBLY
Cl REINFORCED GYPSUM
0 PILE DRIVING
San Diego, California 92111
Phone 292-066
D GLUE. L AM. FABRICA T IO N
D OTHER
JO e A DD R E SI / e u I _L D I N C p 7 R ... I T N u ... e E R
,L.';5 f &' fe=:Ld t,(..) L./.5 "t.'--?i /4-d,,,u
J-.,,o"'vi'"'N,...~;:;R:.. o=R-cP~R=O:.J:.t._C_T_N_A_"4.:..;E---------------------+-;-;;;~;;';;--;--;:-.;
PLAN FILE NU"411ER
INSP'N,
DATE
AOE. [TC,)
I cj-fi}
LOCATIONS OF WORK INSPECTED, TEST SAMPLES TAKEN, WORK REJECTED, JOB PROBLEMS, PROGRESS; REMARKS, ETC.
INCLUDES INFOR"4ATION ABOUT -A"'OUNT S OF "'ATICRIAL PLACED OR WORK Pl:RFOR"41:O; NU,..81:R, T VPC, • IOCNT, NO'S,
OF TCST SA ... PLES TAKEN; STRUCT, CONNECTIONS IWELDS "4AOE, M,T, BOLTS TORQUED! CHECKED; ETC,
SIG N EREO INSPEC TOR
112-12-12-
PROFESSIONAL REGISTER INSPECTIONS, INC,
7895 Convoy Court 115
San Diego, Ca. 92111 JOB NO.: 11911
.JOB: FAIRWAYS
ADDRESS:
OWNER:
2807 VISTA MARI AN A
FI EL DSTONE COMPANY CONTRACTOR: MUELLER LEWIS CONCRETE
CLIENT: MUELLER LEWIS CONCRETE ENGINEER: JEM III
ARCHITECT: BERKUS GROUP BLDG AUTH: CITY OF CAR LS BAD
INSPECTOR: JEFFREY GAYLER
FIELD
SAMPLE OF : CO NCRE TE
PERMIT NO.: CB92-0858 PLAN FILE:
LOCATION OF SPECIMEN
IN JOB OR STRUCTURE: LOT #11 6
MIX NO.: 6525 MADE BY: ,..IEFFREY GAY LER
PROPORTION S:
ADMIXTURE:
TYPE OF CEMENT: II
CONC. SUPeLIER: NELSON & SLOAN
TICKET NO. : /.103226
DATE MADE: 10 /13/92
DATE RECEIVED: 10/111/92
SOURCE OF ROCK:
INSPECTOR SIGN:
LABORATORY TEST DATA
7 DAYS 1~ DAYS
SPECIMEN MARKINGS:
DATE TESTED:
AREA -SQ . IN.:
ULTIMATE LOAD -LBS:
UNIT STRESS-LBS:
SPECIFIED STRENGTH
AT 28 DAYS -PSI:
DISTRIBUTION : MUELLER LEWIS CONCRE TE
FIELDSTONE COMPANY
J H1 I I I
CITY OF CARLSBAD
92 7 1 0
10/23
28.28
53500
1890
28 DAYS
9 2 7 1 1
1 1 / 1 0
28.28
7 15 0 0
2530
2500
ENGINEER
28 DAYS
9 27 1 2
1 1 / 1 0
28.28
75000
2650
PROFESSIONAL REGISTERED INSPECTIONS, INC. 7895 Convoy Court
San Diego, California 92111
Phone 292-0GE
INSPECTORS WEEKLY REPORT
COV ERING WORK PERFORMED □ REINFORCED CONCRE TE
WHICH REQUIRED APPROVAL BY N PRE-STRESSED CON CRETE
THE SPECIAL INSPECTOR OF D REINFORCED MASONRY
O WNEl=t O R PRO Jl!C T NAME
~1.<'l-<. ·,q s
No. FOR WEEK J ',_ · . <
ENDING ON ... /.:.: ... ( .. , ....................... , 19.<
D STRUCT. STEEL ASSEMBLY
D REINFORCED GYPSUM
D PILE DRIVING
D GLUE. LAM. FABRICATION
D OTHER
BUILDING PERMIT NUMBER
,//·) ..f,,..;,/ -'1 ~·J : .. , ~ ..,, / .. ~ '-f /l_ LC-I•'·
PLAN FI LE NUMBER
,,<. ?'/
ARCHITECT
/ ,,,,..,,,, ,.,, r '-'✓,; L ,,-,
CONSTR.MAT"L .IT YP .GRADE,<TC.I DESIGN STRENGTH SOURCE OR MFGR.
J '/4 ;!,j'A' ~:f
INSP'N.
DATE
LOCATIONS OF WORK INSPECTED, TEST SAMPLES TAKEN, WORK REJECTED, JOB PROBLEMS, PRO GRESS; REMARKS, ETC,
INCLUDES INFORMATION A80UT -AMOUNTS OF MATERIAL PLACED OR WORK PERFORMED: NUMBER. TVPE, • 10ENT.NO'S.
OF TEST SAMPLES TAKEN: STRU CT. CONNEC TIO NS IWELDS MADE, H.T. BOL T S TORQUED) CHECKED: ETC,
/, .'.,/d I • '
/' . , I 1
•-:? <:). '7 Ir
£:. , ,:_ •
I , I
/' //
I• I t
I I
/1 //
~/4
PROFESSIONAL REGISTER INSPECTIONSt INC,
7895 Convoy Court 115
San Diegot ca. 92111 J OB NO . : 1, 9 1 1
JOB: F.A.IRWAYS
ADDRESS:
OWNER:
2807 VISTA MARI ANA
FIELDSTONE COM PANY CONTRACTOR: MUELLE R LEWIS CONCRETE
CLIENT: MU ELLER LEWI S CONCRETE ENGINEER: JEM III
ARCHITECT: BERKUS GROUP BLDG AUTH: CITY OF CARL SBAD
INSPECTOR: J EFFRE Y GAY LER
FIELD
SAMPLE OF: CONCRETE
PERMIT NO.: CB92-0858 PLAN FILE:
LOCATION OF SPECIMEN
IN JOB OR STRUCTURE: LOT #116
MIX NO.: 6525 MADE BY: ·-' E F F R E Y GAY L E R
PROPORTIONS:
ADMIXTURE:
TYPE OF CEMENT: II
CONC. SUPPLIER: NELSON & SLOAN
TICKET NO.: ,~ 0 3 2 2 6
DATE MADE: 10/13/92
DATE RECEIVED: 10 /11+/9 2
SOURCE OF ROCK:
INSPECTOR SIGN:
LABORATORY TEST DATA
7 DAYS 1~ DAYS
SPECIMEN MARKINGS:
DATE TESTED:
AREA-SQ.IN .:
ULTIMATE LOAD-LBS:
UNIT STRESS-LBS:
SPECIFIED STRENGTH
AT 28 DAYS-PSI:
DISTRIBUTION: MUELLER LEWIS CONCRE TE
FI EL DSTONE CO MPAN Y
.JEM III
CITY OF OCEANSIDE
92710
10/23
28.28
53500
1890
28 DAYS
9 2 7 1 1
1 1 / 1 0
28 .28
2500
ENGINEER
28 DAYS
9 2 7 1 2
1 1 / 1 0
28.28