Loading...
HomeMy WebLinkAboutSDP 2019-0009; PALOMAR BUILDING REMODEL; TDM PLAN FOR PALOMAR BUILDING REMODEL; 2020-04-07TRANSPORTATION DEMAND MANAGEMENT (TDM) PLAN TIER 3 PALOMAR BUILDING REMODEL SDP 2019-0009 Carlsbad, California April 7, 2020 LLG Ref. 3-19-3168 Prepared by: Under the Supervision of: Román Lopez, PTP Walter Musial, PE Transportation Planner II Principal Permit No.: TDM2024-0017 LINSCOTT, LAW & GREENSPAN, engineers I LLG Ref. 3-19-3168 Palomar Building Remodel N:\3168\TDM\3168 TDM Plan.docm Tiered Requirements TDM requirements for new developments vary by development type and the expected average daily employee trips (see Table 1 TDM Plan Applicability). Table 1 TDM Plan Applicability ADT New Development Tenant Improvement <110 Exempt 110 – 220 Tier 1 Tier 1 221 – 275 Tier 2 Tier 2 >275 Tier 3 Tier 2 Table 2 Employee ADT Estimation for Various Commercial Uses Use Employee ADT, 1st 1,000 SF Employee ADT/1,000 SF thereafter Office – all uses 13.0 13.0 Restaurant 11.0 11.0 Retail 8.0 4.5 Industrial 4.0 3.5 Footnotes: a. Unless otherwise noted, rates estimated from ITE Trip Generation Manual, 10th edition. b. For all office categories. Calibrated based on typical number of employees/square foot for office uses. c. Retail uses include shopping center, variety store, supermarket, gyms, pharmacy, etc. Employee ADT Calculation The Project is a Tenant Improvement involving 71,590 sf within an existing 183,410 sf building. The following employee ADT calculation is based on the total square footage subject to tenant improvements, without deducting employees associated with the existing space. Land Use: Office Size: 71,590 SF 13 trips – first 1,000 SF 13 trips - Emp ADT / 1,000 SF thereafter 71,590 SF – 1,000 SF = 70,590 SF (70,590 / 1,000) x 13 = 918 918 + 13 = 931 employee ADT Tier Determination The Project is calculated to generate 931 employee ADT. While primarily an interior remodel or tenant improvement, the Project includes significant exterior improvements, including the addition of parking spaces. Therefore, a Tier 3 TDM was prepared requiring strategies that add up to 18 points (which includes 4 points for required strategies and 14 points from elective strategies). LINSCOTT, LAW & GREENSPAN, engineers II LLG Ref. 3-19-3168 Palomar Building Remodel N:\3168\TDM\3168 TDM Plan.docm How to Use this Document: Non-residential developments that meet trip generation thresholds specified in the city’s TDM Ordinance must submit a TDM Plan. This template applies to projects identified as Tier 2 and Tier 3 projects. The average new development is required to submit and implement a TDM plan that achieves 18 points. The average redevelopment/tenant improvement is required to submit and implement a plan that achieves 9 points. The Carlsbad Transportation Administrator (TA) is available to support developers with TDM Ordinance compliance and completion of your plan. To get started or for questions, please contact: Jennifer Horodyski at (760) 602-2747 or via email at Jennifer.horodyski@carlsbadca.gov The process for non-residential development is outlined graphically below. The TDM plan process is organized into two separate parts: 1. All developments subject to the ordinance must submit Part I: Project Background, Existing Conditions and Infrastructure TDM Strategies of the TDM plan prior to building permit issuance. 2. Part II of the TDM Plan consists of non-infrastructure strategies and must be submitted and approved prior to certificate of occupancy issuance. Build-to-suit projects and tenant improvements may submit Part II along with Part I prior to building permit issuance. Lastly, all developments are required to begin to monitor the alternative mode share of commute trips to the site through employee surveys within 12 months of reaching 75 percent occupancy or within 18 months of initial occupancy, whichever comes first. Developments with multiple buildings or phases are required to conduct employee surveys within 12 months of reaching 75 percent occupancy of the first building or within 18 months of initial occupancy of the first building, whichever occurs first. For more detailed information please refer to section 2, Non-Residential Developer TDM Plan Guidelines within the TDM Handbook LINSCOTT, LAW & GREENSPAN, engineers III LLG Ref. 3-19-3168 Palomar Building Remodel N:\3168\TDM\3168 TDM Plan.docm LINSCOTT, LAW & GREENSPAN, engineers IV LLG Ref. 3-19-3168 Palomar Building Remodel N:\3168\TDM\3168 TDM Plan.docm TABLE OF CONTENTS SECTION PAGE 1.0 Project Background, Existing Conditions and Infrastructure TDM Strategies ..................... 1 1.1 Developer Profile ................................................................................................................ 1 1.2 Project Information ............................................................................................................. 1 1.2.1 Project Interim Transportation Coordinator ............................................................ 2 1.2.2 Land Use and Area.................................................................................................. 2 1.2.3 Automobile Parking ................................................................................................ 2 1.3 Existing Conditions & TDM Context ................................................................................. 3 1.4 Infrastructure TDM Selections ........................................................................................... 6 1.5 Authorization for Building Permit Issuance ..................................................................... 11 2.0 Non-Infrastructure TDM Strategies, Implementation and Monitoring Plan .................... 12 2.1 Non-Infrastructure TDM Selection ................................................................................... 12 2.1.1 Required Strategies ............................................................................................... 12 2.1.2 Elective Strategies ................................................................................................. 13 2.2 Implementation (New Developments Only) ..................................................................... 19 2.3 Monitoring ........................................................................................................................ 20 2.4 Authorization for Certificate of Occupancy ..................................................................... 21 APPENDICES APPENDIX A. Site Plan with TDM Features LINSCOTT, LAW & GREENSPAN, engineers 1 LLG Ref. 3-19-3168 Palomar Building Remodel N:\3168\TDM\3168 TDM Plan.docm 1.0 PROJECT BACKGROUND, EXISTING CONDITIONS AND INFRASTRUCTURE TDM STRATEGIES Submission Date: April 7, 2020 Prepared By: Linscott, Law & Greenspan Engineers This section must be completed prior to building permit issuance and is required to be updated prior to issuance of certificate of occupancy. 1.1 Developer Profile 1.2 Project Information Project Name: Palomar Building Remodel Project Address: 2051 Palomar Airport Rd Number Street Suite Carlsbad CA 92011 City State Zip Code Developer Name: Steel Wave LLC Property Manager Name: STEEL WAVE L.P. Developer Mailing Address: 3335 Susan St Suite 250 Number Street Suite Costa Mesa CA 92626 City State Zip Code Primary Contact TYLER PHELPS Email: TPHELPS@STEELWAVELLC.COM Phone: (949) 863-0387 LINSCOTT, LAW & GREENSPAN, engineers 2 LLG Ref. 3-19-3168 Palomar Building Remodel N:\3168\TDM\3168 TDM Plan.docm 1.2.1 Project Interim Transportation Coordinator ☒ Developer agrees to provide an on-site Interim Transportation Coordinator responsible for ensuring the infrastructure is developed as agreed upon with the City of Carlsbad, development and execution of TDM Plan requirements, and transitioning Transportation Coordinator duties to new owners or property managers upon occupancy. Provide name, title, and contact information. This individual may be the primary contact listed above for the project. 1.2.2 Land Use and Area Complete the chart below to include each non-residential use, gross floor area and expected number of employees allocated to each use. Land Use GFA Employees H-0 Hospital C-1 Neighborhood Commercial C-2 General Commercial C-T Commercial Tourist C-M Heavy Commercial C-L Local Shopping Center O Office 71,590 143 V-R Village Review L-C Limited Control M Industrial P-M Planned Industrial Total 71,590 143 Technical Note: 2 employees per 1,000 GFA office assumed. Total employees associated with Project square footage when fully leased, not reduced for existing uses. 1.2.3 Automobile Parking Automobile Parking Existing # of Allocated Spaces Proposed # of Allocated Spaces Proposed # of New Allocated Parking Spaces Surface Parking Spaces 221 286 65 Structure Parking Spaces 0 0 0 Total Parking Spaces 221 286 65 Note: Parking spaces shown above are for the Project area subject to renovations within the 2051 Palomar Airport Road site. David Cookmeyer Property Manager (949) 863-0386 - DCookmeyer@steelwavellc.com 3335 Susan Street, Suite 250 Costa Mesa, CA 92626 LINSCOTT, LAW & GREENSPAN, engineers 3 LLG Ref. 3-19-3168 Palomar Building Remodel N:\3168\TDM\3168 TDM Plan.docm 1.3 Existing Conditions & TDM Context Complete the following section to establish existing conditions and TDM context. Relevant Existing TDM Infrastructure Network Please provide a brief discussion or map that describes the alternative transportation infrastructure available that serves the project site. Include the following items: • Pedestrian Infrastructure adjacent to the site (e.g. sidewalks, nearby crosswalks or signalized crossings) • Bike infrastructure by type (e.g. Class I, II, or III) adjacent to the site • Transit or shuttle services serving the site with a stop/station within ¼ mile (or a 5-minute walk) Relevant Project-Specific TDM Infrastructure (Tenant Improvements Only) Please provide a brief discussion and site plan describing the onsite TDM infrastructure currently available: • Number of public bike racks and approximate location with regards to building entrance • Average utilization of bike racks (in %) • Number secure bike racks (specify whether in bike cage, bike room or bike lockers) • Average utilization of bike racks (in %) • Number of designated carpool/vanpool spaces and location with regards to building entrance • Average utilization of carpool/vanpool spaces (in %) • Any other infrastructure or services available to property tenants that encourage the use of public transit, carpooling, vanpooling, walking and biking, such as a bike repair station, an onsite shelter or waiting area for buses or shuttles, etc. • Continuous sidewalks are provide along Palomar Airport Road, but are lacking on Corte Del Nogal, which provides alternate access to the site. • Class II bike lanes are provided in both directions on Palomar Airport Road adjacent to the site. • NCTD Route 445 serves stops at Palomar Airport Road at Yarrow Drive and at Camino Vida Roble. These stops are generally further than ¼ mile (5-minute walk) but less than ½ mile (10 minute walk) There is no existing TDM infrastructure onsite. LINSCOTT, LAW & GREENSPAN, engineers 4 LLG Ref. 3-19-3168 Palomar Building Remodel N:\3168\TDM\3168 TDM Plan.docm Environmental In the box below, please provide maps of the relevant topographical and experiential conditions that will influence travel behaviors to the project site. At a minimum, provide the following: • A Google map with terrain view and bike lanes showing approximately a 2-mile radius around the site • Photos (or street view screenshot) of the roads adjacent to the property • If relevant, discuss additional environmental aspects that may impact use of active and alternative transportation, such as traffic speeds, pedestrian safety, lighting, etc.) The local topography and presence of the McClellan-Palomar Airport restricts the density of the street network in the area. Palomar Airport Rd is the major east-west route with north-south connections at College Blvd/Aviara Pkwy and El Camino Real. While bike lanes are provided on these roadways, those arterials may discourage some bicycle users. Bike lanes/terrain within approx. 2 miles of site: Palomar Airport Road, primary access to site Corte Del Nogal, secondary access to site LINSCOTT, LAW & GREENSPAN, engineers 5 LLG Ref. 3-19-3168 Palomar Building Remodel N:\3168\TDM\3168 TDM Plan.docm Project-Specific and/or Nearby Amenities Count and report the number of project-specific and neighboring amenities onsite or within a 5-minute walk (1/4 mile) of the project site and provide map. • Report the number of amenities or establishments by type. Include number of food establishments, child-care facilities, fitness/healthcare facilities and other relevant services such as dry-cleaning that can impact trip generation. Anticipated Workforce and Commute Patterns The makeup of the existing or anticipated workforce will help shape the approach to TDM for a given site. Include the following: • Existing or anticipated commute hours based on shifts or typical work hours • Existing or anticipated percentage of part-time employees • If available, any existing commuting information, such as the percentage of employees using different commute modes and the average commute distance. • The surrounding land uses in the area is largely office/ business park development and limited neighborhood amenity-type businesses. Within ¼ mile there are the following: o Chase Bank (2219 Palomar Airport Road) o 2051 Café (2051 Palomar Airport Road [on-site]) • Within ½ mile there is: o City National Bank (2011 Palomar Airport Road) o Judy’s Deli (2035 Corte Del Nogal). The Project’s anticipated workforce is expected to be up to 143 employees. The Project is expected to have typical 8am-5pm business hours with a mix of full-time and part-time shifts. The average mode split for the City of Carlsbad is shown below. The information is based on Census data and the Project is expected to have similar travel patterns. LINSCOTT, LAW & GREENSPAN, engineers 6 LLG Ref. 3-19-3168 Palomar Building Remodel N:\3168\TDM\3168 TDM Plan.docm 1.4 Infrastructure TDM Selections The developer will work with the TA to determine infrastructure strategies applicable to the site and the appropriate placement of TDM infrastructure. Please reference Table 2-4 Menu of TDM Strategies, Part I: Infrastructure found in the Non- Residential Developer TDM Plan Guidelines within the TDM handbook for infrastructure strategies and points. An average project is required to achieve a total of 18 points, while a redevelopment/tenant improvement is required to achieve 9 points. Required strategies add 4 points towards the total required number of points. New developments must achieve a minimum of 6 points through infrastructure strategies unless otherwise agreed upon with city staff. Tenant improvement projects are eligible to achieve all required points in Part II. In case of a tenant improvement, if the tenant has access to any infrastructure amenity below, the tenant can claim that amenity in their plan unless that amenity does not meet minimum standards or is, on average, full utilized, such as two carpool spaces are both occupied on most weekdays. The capacity of an existing infrastructure amenity will need to be evaluated at the time the strategy is proposed. Points not earned through infrastructure strategies will be expected to be earned in Part II. Reference Part II strategies to ensure the appropriate infrastructure is selected to support desired amenities or programs. Infrastructure strategies must be selected and approved prior to building permit issuance. Programmatic strategies in Part II may be submitted after the building permit has been issued, but must be approved prior to occupancy. Check the box to the left of the strategy to include it in the plan. Provide information as requested in the box below the strategy and indicate the points requested for the strategy, using the handbook as a guide. For strategies with a range of points, work with the TA who will assist in determining the appropriate number of points based on the unique context of the site and the proposed project. Refer to the Carlsbad TDM Handbook for details about each strategy. Infrastructure TDM selections described below are shown on the Project site plan included in Appendix A. LINSCOTT, LAW & GREENSPAN, engineers 7 LLG Ref. 3-19-3168 Palomar Building Remodel N:\3168\TDM\3168 TDM Plan.docm ☐ Secure Bike Parking Points Requested: 0 Indicate the number of secure, long-term bike parking spaces to be provided, how they will be accessed and where they will be located on the project site. Refer to the handbook for the number of spaces required to earn points. If practical, include location on the site map. ☒ Public Bike Parking Points Requested: 1 Indicate the number of short-term spaces and the type of bike rack to be provided and where they will be located on the project site. Refer to the handbook for the number of spaces required to earn points and guidance on installation. If practical, include location on the site map. N/A Short-term bicycle parking will be provided for the project site. The applicant will work with the Architect to determine an appropriate and available location. A location visible or in close proximity to the entrance is ideal. Bike parking for office use shall be provided at a rate of 1 space per 5,000 sf, which amounts to 15 spaces. The bicycle rack shall meet minimum performance criteria which include a) supports bike upright without putting stress on wheels, b) accommodates a variety of bicycles and attachments, c) allows locking of frame and at least one wheel with a u-lock, d) provides security and longevity with a sturdy and well-anchored rack, and e) rack use is intuitive. Below are potential rack styles that typically meet the performance criteria and will be considered for the project. Inverted U or Post & Ring racks can be used as double-sided requiring 8 racks for 15 spaces. Wheelwell-secure racks would require 15 racks for the same number of spaces. LINSCOTT, LAW & GREENSPAN, engineers 8 LLG Ref. 3-19-3168 Palomar Building Remodel N:\3168\TDM\3168 TDM Plan.docm ☒ Bicycle Repair Station Points Requested: 1 Describe what items will be included in the bicycle repair station and where it will be located within the project site. ☐ Micromobility Parking Points Requested: 0 Indicate where micromobility parking space (or interim bike racks) will be located on the project site. If practical, include location on the site map. ☐ Transit Shelter Additions or Improvements Points Requested: 0 Describe the location of transit stops and what types of additions/improvements are being proposed. ☒ Preferential Parking for Car/Vanpools Points Requested: 2 Indicate the number of carpool and vanpool reserved spaces to be provided and where they will be located on the project site. Refer to the handbook for guidance on the required number of spaces. Maximum points will be awarded when offered in conjunction with ride-matching services. A fixed bicycle repair station will be provided on-site in close proximity to the bike parking areas. The bicycle repair station will provide on-site tools and will include at a minimum a repair stand, air pumps, and other hand tools to quickly complete minor bicycle repairs. The project Day Porter will be the caretaker of the repair station. Information of the bicycle repair station will be posted in the common area of the project entrance to ensure tenants are aware of this resource. N/A N/A The project will provide preferential parking for carpool and vanpools. Carpool or vanpool serve one or more employees to share a ride to the same destination. There are also online marketplaces or ride-matching to assist employees secure a ride. A minimum of fourteen (14) parking spaces will be designated (as part of the total supply) at a rate of 5% of the total 286 parking stalls allocated to Tenant Improvement area. The spaces will be provided close to and visible from the building entrance to encourage use. LINSCOTT, LAW & GREENSPAN, engineers 9 LLG Ref. 3-19-3168 Palomar Building Remodel N:\3168\TDM\3168 TDM Plan.docm ☐ Parking Spaces for Car Share Vehicles Points Requested: 0 Indicate the number of reserved spaces to be provided for car share vehicles and where they will be located on the project site. Should be offered in conjunction with car share vehicles. ☐ End of Trip Facilities Points Requested: 0 Indicate the number of showers and changing rooms and where they will be located on the site/building plan. ☐ On-site Amenities Points Requested: 0 Discuss the on-site amenities that will be located at the development and explain how these offerings will mitigate trips rather than serve as trip-generators. Discuss discounts available to tenants if applicable. Provide a map showing the location of these amenities. ☐ Bicycle and Pedestrian Connections Points Requested: 0 Provide a map showing proposed pedestrian and bicycle infrastructure and connections to existing facilities. ☒ Passenger Loading Zone Points Requested: 1 Describe location of and denote loading zone on building/site plan. N/A N/A N/A N/A A passenger loading zone will be provided by the project. The loading zone will provide a formalized area for passenger, ride-hailing (i.e. Uber, Lyft), or other transportation service pick-up/drop-off. The loading zone will provided at the main entrance or other suitable location. A minimum of 20 linear feet or one (1) passenger vehicle loading will be provided. LINSCOTT, LAW & GREENSPAN, engineers 10 LLG Ref. 3-19-3168 Palomar Building Remodel N:\3168\TDM\3168 TDM Plan.docm ☐ Innovation (Infrastructure-Based) Points Requested: 0 Describe the strategy and discuss how it will lead to reduced single-occupancy vehicle trips to and from the site. N/A LINSCOTT,LAW &GREENSPAN, engineers 11 LLG Ref. 3-19-3168 Palomar Building Remodel N:\3168\TDM\3168 TDM Plan.docm 1.5 Authorization for Building Permit Issuance By signing below, Developer certifies that the information provided in this document is complete and accurate. By signing this document, a developer is committing to build/provide the infrastructure strategies identified in this document. Failure to provide the identified infrastructure may result in a building not obtaining an occupancy permit until such infrastructure is constructed or other commitments are made to reduce vehicle trips by an amount equivalent to the trips that would have likely been reduced by constructing and providing the listed infrastructure strategies. The developer also acknowledges that commitments to implement additional TDM strategies and monitor and report on those strategies must be made prior to the issuance of an occupancy permit. These commitments can be made by completing Part 2 of this document and obtaining subsequent approval of the proposed strategies and monitoring plan. Name and Signature of Developer Representative or Designated Applicant: Printed Name Signature Date Name and Signature of Interim Transportation Coordinator (if different from above): Printed Name Signature Date Name and Signature of City of Carlsbad Representative: Printed Name Signature Date AG-SW PALOMAR OWNER, L.P, OWNERBy: SteelWave CDS, LLC As: Construction Manager for Owner By: Jonathan Hastanan Jonathan Hastanan David Cookmeyer 6/4/21 06.04.21 LINSCOTT, LAW & GREENSPAN, engineers 12 LLG Ref. 3-19-3168 Palomar Building Remodel N:\3168\TDM\3168 TDM Plan.docm 2.0 NON-INFRASTRUCTURE TDM STRATEGIES, IMPLEMENTATION AND MONITORING PLAN Submission Date: April 7, 2020 Prepared by: Linscott, Law & Greenspan, Engineers. This section must be completed prior to issuance of certificate of occupancy. 2.1 Non-Infrastructure TDM Selection The developer will work with the TA to determine strategies applicable to the site. Please reference Table 2-5 Menu of TDM Strategies, Part II: Non-Infrastructure found in the Developer TDM Plan Guidelines within the TDM handbook for relevant infrastructure strategies and points. It is expected that Part II will contain a sufficient number of strategies to earn the remaining required points not earned through infrastructure strategies. A total of 18 points is required from Part I and Part II combined for new developments and 9 points for redevelopments/tenant improvements. Required strategies add 4 points towards the required total. The non-infrastructure strategies are organized into the following categories: amenities, policies, developer/employer programs, employer programs, partnerships and innovation. A well-rounded, effective and sustainable TDM plan should include strategies from multiple categories and be applicable to the anticipated workforce and commute patterns. Check the box to the left of the strategy if it will be included in the development. Provide information as requested in the box below the strategy. Additionally, indicate the points requested for the strategy. Refer to the Carlsbad TDM Handbook for additional guidance and for the number of points available for each strategy. 2.1.1 Required Strategies ☒ Transportation Coordinator Points: 1 All developments subject to the TDM ordinance are required to designate an on-site transportation coordinator responsible for ensuring that infrastructure is maintained, policies and programs are implemented, and amenities and partnerships are maintained as described in the approved TDM Plan and otherwise ensuring compliance with City of Carlsbad TDM Plan requirements. Provide the name, title and contact information for the TC. David Cookmeyer Property Manager (949) 863-0386 - DCookmeyer@steelwavellc.com 3335 Susan Street, Suite 250 Costa Mesa, CA 92626 LINSCOTT, LAW & GREENSPAN, engineers 13 LLG Ref. 3-19-3168 Palomar Building Remodel N:\3168\TDM\3168 TDM Plan.docm ☒ Distribute New Hire Transportation Information Points: 1 All development subject to the TDM ordinance are required to ensure that transportation options information is distributed to new employees during the hiring and orientation process. ☒ Citywide TDM Program Points: 2 Transportation Coordinators of all developments subject to the TDM ordinance are required to meet with the citywide TDM programs outreach staff on a regular basis (at least annually) and participate in at least one event held by the citywide TDM program (if available). 2.1.2 Elective Strategies Amenities ☐ Car Share Vehicles Points Requested: 0 Identify the number of car share vehicles that will be provided on-site and if these vehicles will be provided by an existing car share operator or by the employer/property owner. Indicate whether membership will be fully or partially subsidized for employees/tenants. Indicate the number of reserved spaces to be provided for car share vehicles and where they will be located on the project site. ☐ Micromobility Service Credits Points Requested: 0 Describe the micromobility service that will be available for use by employees/tenants and the level of service credits/subsidy. Indicate if all employees/tenants will have access to the service credits and how the program will be administered. N/A N/A LINSCOTT, LAW & GREENSPAN, engineers 14 LLG Ref. 3-19-3168 Palomar Building Remodel N:\3168\TDM\3168 TDM Plan.docm ☒ Real-Time Travel Information Points Requested: 1 Describe the proposed location of the resources and any other relevant information (i.e., range of the WiFi hotspot, location of real-time travel information screens or kiosk). ☒ Mobile On-site Amenities Points Requested: 1 Discuss the mobile on-site amenities that will be located at the development and explain how these offerings will mitigate trips rather than serve as trip-generators. Discuss discounts available to tenants. Provide a map showing the location of these amenities if applicable and discuss agreements between vendors and schedules. Policies ☒ TDM in Leases and Purchase Agreements Points Requested: 3 Applies to new developments only. Provide language that will be included in the lease that will allow for TDM supporting roles. ☐ Non-Standard Vehicle Policies Points Requested: 0 Applies to new developments only. Describe the site’s non-traditional vehicle management plan. This strategy may be implemented with the non-standard vehicle parking infrastructure strategy (micromobility/ bicycle/etc.). Travel information and mobility options will be provided to tenants on a daily basis. The information will be provided at the entrance common areas of the building or other suitable location. The travel information/mobility options information screen or bulletin board will provide a community map that shows area businesses/parks/community centers, information on existing area bicycle lanes and on-site parking/repair station, transit stops/service/timetables, car/vanpool information and on-site preferential parking, ride-matching services and car sharing preferential parking, micromobility options and on-site parking, mobile on-site amenities, and online resources or “apps” that may assist employee transportation planning. The Transportation Coordinator’s (TC) contact information will also be provided. The project will provide access to on-site amenities which focus on reducing employee discretionary trips to/from the site. The applicant will explore opportunities with vendors to provide food trucks, mobile cafes, mobile dry cleaning, and other services based on tenant demand. The applicant will use online booking platforms and coordinate with vendors directly. The mobile amenities will be provided near the building entrance and the Transportation Coordinator (TC) will assist in facilitating services without disrupting on-site circulation. The applicant shall establish requirements in leases that bind tenants to comply and support the current project TDM strategies to the satisfaction of the City. Specific requirements may include provided TDM information within a tenant space, participate in transportation surveys and focus groups, potential fines for infringement on preferential parking, and identify a liaison to the Transportation Coordinator (TC) for future communications. N/A LINSCOTT, LAW & GREENSPAN, engineers 15 LLG Ref. 3-19-3168 Palomar Building Remodel N:\3168\TDM\3168 TDM Plan.docm Developer/Employer Programs ☐ Mobility Services Incentives Budget Points Requested: 0 Include details of program including how the program will be administered. Indicate the total annual budget, describe what percentage of the workforce will be eligible to participate, how the program will be marketed and how participation will be monitored. ☒ Ride-matching Services Points Requested: 1 Developer should discuss plans to create an internal ride-matching program. At a minimum, developer will promote existing ride-matching platform. ☒ Guaranteed Ride Home (GRH) Services Points Requested: 1 Developer should discuss plans to create an internal GRH program. At a minimum, developer will promote existing services, such as SANDAG’s iCommute. N/A The project shall promote existing ride-matching platforms such as Waze Carpool through on-going outreach and the travel information/mobility options bulletin board. The City is working on implementing a city-wide ride-matching software that will be made available to property owners and employers. The project shall promote existing Guaranteed Ride Home services such as SANDAG’s iCommute. LINSCOTT, LAW & GREENSPAN, engineers 16 LLG Ref. 3-19-3168 Palomar Building Remodel N:\3168\TDM\3168 TDM Plan.docm ☒ Marketing and Outreach Points Requested: 2 Include details of marketing and outreach efforts. Employer Programs ☐ Telework Program Points Requested: 0 Include information about the program, such as the infrastructure policies that will be available to support teleworking, the anticipated percentage of employees that will be eligible and any limits or guidance on the number of days employees can telework per week or month. The number of points range based on the expected number of telework days and associated trip reductions (see handbook for further guidance. ☐ Flexible/Alternative Work Schedules Points Requested: 0 Include information about the program, such as the anticipated percentage of employees that will be eligible and any limits or guidance on the arrangements that are acceptable. The project will provide marketing and outreach to encourage tenants to make sustainable travel choices. As part of these efforts, a travel information/mobility options information screen or bulletin board will be provided at the entrance common areas of the building or other suitable location. The travel information/mobility options information screen or bulletin board will provide a community map that shows area businesses/parks/community centers, information on existing area bicycle lanes and on-site parking/repair station, transit stops/service/timetables, car/vanpool information and on-site preferential parking, ride-matching services and car sharing preferential parking, micromobility options and on-site parking, mobile on-site amenities, and online resources or “apps” that may assist employee transportation planning. The Transportation Coordinator’s (TC) contact information will also be provided. The project shall conduct an annual event for employees where they can learn about their travel options and interact with their neighbors and fellow employees, e.g., barbeques, food truck events. On-going outreach between the TC and tenants to educate employees about their travel options and encourage them to commute using sustainable travel modes. N/A N/A LINSCOTT, LAW & GREENSPAN, engineers 17 LLG Ref. 3-19-3168 Palomar Building Remodel N:\3168\TDM\3168 TDM Plan.docm ☐ Alternative Transportation Incentive Points Requested: 0 Include details of program including how the program will be administered. Indicate the total annual budget, describe what percentage of the workforce will be eligible to participate, how the program will be marketed and how participation will be monitored. ☐ Commuter Tax Benefits Points Requested: 0 Include how the program will be marketed to employees. ☐ Customized Travel Plans Points Requested: 0 Identify department/position that will be responsible for implementation. Partnerships ☐ Establish and Maintain Partnerships with Area Businesses Points Requested: 0 Identify partner business(es) or entities and the TDM resource(s) that will be provided through the partnership. Describe how costs will be shared. N/A N/A N/A N/A LINSCOTT, LAW & GREENSPAN, engineers 18 LLG Ref. 3-19-3168 Palomar Building Remodel N:\3168\TDM\3168 TDM Plan.docm ☐ Establish and Maintain Partnerships with Private Vendors Points Requested: 0 Identify partner business(es) or entities and the TDM resource(s) that will be provided through the partnership. Innovation ☐ Innovation (Non-Infrastructure-Based) Points Requested: 0 Describe the strategy and discuss how it will lead to reduced single-occupancy vehicle trips to and from the site. SUMMARY OF TDM STRATEGIES & REQUESTED POINTS Infrastructure Strategies Strategy Points Public Bike Parking 1 Bicycle Repair Station 1 Preferential Parking for Car/Vanpools 2 Passenger Loading Zone 1 Sub-total Infrastructure 5 Non-Infrastructure Strategies Strategy Points Required Strategies Transportation Coordinator 1 Distribute New Hire Transportation Information 1 Citywide TDM Program 2 Elective Strategies Real-Time Travel Information 1 Mobile On-Site Amenities 1 TDM in Leases and Purchase Agreements 3 Ride-matching Services 1 Guaranteed Ride Home 1 Marketing and Outreach 2 Sub-total Non-Infrastructure 13 Grand Total 18 N/A N/A LINSCOTT,LAW &GREENSPAN, engineers 19 LLG Ref. 3-19-3168 Palomar Building Remodel N:\3168\TDM\3168 TDM Plan.docm 2.2 Implementation (New Developments Only) By signing below, developer agrees to inform the city of a sale and provide contact information for a new owner to ensure that the plan will continue throughout the life of the project. Name and Signature of Developer Representative or Designated Applicant: Printed Name Signature Date AG-SW PALOMAR OWNER, L.P, OWNER By: SteelWave CDS, LLC As: Construction Manager for Owner By: Jonathan Hastanan Jonathan Hastanan 06.04.21 LINSCOTT,LAW &GREENSPAN, engineers 20 LLG Ref. 3-19-3168 Palomar Building Remodel N:\3168\TDM\3168 TDM Plan.docm 2.3 Monitoring By signing below, developer agrees to distribute commute surveys to employees every two years following the baseline survey conducted within 12 months of occupancy reaching 75 percent or within 18 months of initial occupancy. Alternatively, developer may provide a copy of the signed lease that stipulates that the employer tenant(s) will administer employee commute surveys on the same schedule. In addition, developer acknowledges the interim and final alternative mode share goals, listed below, that the development is required to achieve. Should the goals not be achieved, transportation coordinator agrees to work with the citywide program to identify and implement additional measures suitable to the project site. Period in which Reporting Falls Alternative Mode Share Goal New Developments Existing Buildings/ Tenant Improvements Present till 2025 25% 24% 2025 - 2029 30% 26% 2030 -2034 35% 28% 2035 on 40% 30% Name and Signature of Developer Representative or Designated Applicant: Printed Name Signature Date AG-SW PALOMAR OWNER, L.P, OWNER By: SteelWave CDS, LLC As: Construction Manager for Owner By: Jonathan Hastanan Jonathan Hastanan 06.04.21 TECHNICAL APPENDICES – TDM PLAN PALOMAR BUILDING REMODEL SDP 2019-0009 Carlsbad, California April 7, 2020 LLG Ref. 3-19-3168 LINSCOTT, LAW & GREENSPAN, engineers LLG Ref. 3-19-3168 Palomar Building Remodel APPENDIX A SITE PLAN WITH TDM FEATURES CA R P O O L PA R K I N G CA R P O O L PA R K I N G CA R P O O L PA R K I N G CA R P O O L PA R K I N G CA R P O O L PA R K I N G CA R P O O L PA R K I N G CA R P O O L PA R K I N G CA R P O O L PA R K I N G CAR P O O L PARK I N G CAR P O O L PARK I N G CAR P O O L PARK I N G CAR P O O L PARK I N G CAR P O O L PARK I N G CAR P O O L PARK I N G CAR P O O L PARK I N G CARP O O L PARK I N G CAR P O O L PARK I N G CARP O O L PARK I N G CARP O O L PARK I N G CAR P O O L PAR K I N G CAR P O O L PAR K I N G CAR P O O L PAR K I N G BICY C L E PAR K I N G & REP A I R STAT I O N BICY C L E PARK I N G EV P A R K I N G SPAC E EV P A R K I N G SPAC E EV P A R K I N G SPAC E EV P A R K I N G SPAC E EV P A R K I N G SPAC E EV P A R K I N G SPAC E EV P A R K I N G SPA C E EV P A R K I N G SPA C E EV P A R K I N G SPA C E EV P A R K I N G SPA C E EV P A R K I N G SPA C E EV P A R K I N G SPA C E EV P A R K I N G SPA C E EV P A R K I N G SPA C E EV P A R K I N G SPA C E EV P A R K I N G SPA C E EV P A R K I N G SPA C E EV P A R K I N G SPA C E EV EV EV EV EV EV EVEVEV EV EV EV PARKINGSPACE EV PARKINGSPACE PAS S E N G E R L O A D I N G UNAUTHORIZED CHANGES & USES:ENGINEERS NOTE TO CONTRACTOR:UNDERGROUND SERVICE ALERT TWO WORKING DAYS BEFORE YOU DIG Call: TOLL FREE 1-800-422-4133 KNOW WHAT'S BELOW. CALL BEFORE YOU DIG. SDP 2019-0009 OF JO B N O : DA T E : RE V I S I O N # : CH E C K E D : DA T E : DR A W N : DA T E : NO . D E S C R I P T I O N B Y D A T E C H K RE V I S I O N S 70 1 N . P a r k c e n t e r D r i v e Sa n t a A n a , C A 9 2 7 0 5 p: 7 1 4 / 5 6 0 / 8 2 0 0 f : 7 1 4 / 5 6 0 / 8 2 1 1 ww w . t a i t . c o m Si n c e 1 9 6 4 Lo s A n g e l e s On t a r i o Sa c r a m e n t o Sa n D i e g o Sa n F r a n c i s c o Bo i s e Da l l a s De n v e r Ph o e n i x Po r t l a n d 70 1 N . P a r k c e n t e r D r i v e Sa n t a A n a , C A 9 2 7 0 5 p: 7 1 4 / 5 6 0 / 8 2 0 0 f : 7 1 4 / 5 6 0 / 8 2 1 1 ww w . t a i t . c o m Si n c e 1 9 6 4 Lo s A n g e l e s On t a r i o Sa c r a m e n t o Sa n D i e g o Sa n F r a n c i s c o Bo i s e Da l l a s De n v e r Ph o e n i x Po r t l a n d 8 20 5 1 P A L O M A R - E X T E R I O R R E N O V A T I O N 20 5 1 P A L O M A R A I R P O R T R O A D CA R L S B A D , C A . 9 2 0 1 1 ST E E L W A V E 45 5 3 G L E N C O E A V E N U E MA R I N A D E L R E Y , C A 9 0 2 9 2 LEGEND:N EXISTING BUILDING TO REMAIN CO R T E D E L N O G A L ABBREVIATIONS: PR E L I M I N A R Y G R A D I N G P L A N 4 SEE SHEET 5 SHEET INDEX MAP P A L O M A R A I R P O R T R O A D SEE SHEET HEREON SEE SHEET 5 N CA R P O O L PA R K I N G CA R P O O L PA R K I N G CA R P O O L PA R K I N G CA R P O O L PA R K I N G CA R P O O L PA R K I N G CA R P O O L PA R K I N G BI C Y C L E PA R K I N G & RE P A I R ST A T I O N BI C Y C L E PA R K I N G EV P A R K I N G SP A C E EV P A R K I N G SP A C E EV P A R K I N G SP A C E EV P A R K I N G SP A C E EV P A R K I N G SP A C E EV P A R K I N G SP A C E EV P A R K I N G SP A C E EV P A R K I N G SP A C E EV P A R K I N G SP A C E EV P A R K I N G SP A C E EV P A R K I N G SP A C E EV P A R K I N G SP A C E EV P A R K I N G SP A C E EV P A R K I N G SP A C E EV P A R K I N G SP A C E EV P A R K I N G SP A C E EV P A R K I N G SP A C E EV P A R K I N G SP A C E EV EV EV EV EV EV EVEVEV EV EV EV PARKING SPACE EV PARKING SPACE PA S S E N G E R L O A D I N G CARP O O L PARK I N G CARP O O L PARK I N G CARP O O L PARK I N G CARP O O L PARK I N G CARP O O L PARK I N G CARP O O L PARK I N G CARP O O L PARK I N G CARP O O L PARK I N G CARP O O L PARK I N G CARP O O L PARK I N G CARP O O L PARK I N G CAR P O O L PAR K I N G CAR P O O L PAR K I N G CAR P O O L PARK I N G BICY C L E PAR K I N G & REP A I R STAT I O N BICY C L E PARK I N G EV PA R K I N G SPAC E EV PA R K I N G SPAC E EV PA R K I N G SPAC E EV PA R K I N G SPAC E EV PA R K I N G SPAC E EV P A R K I N G SPAC E EV P A R K I N G SPAC E EV P A R K I N G SPAC E EV P A R K I N G SPAC E EV P A R K I N G SPAC E EV P A R K I N G SPAC E EV P A R K I N G SPA C E EV P A R K I N G SPA C E EV P A R K I N G SPA C E EV P A R K I N G SPA C E EV P A R K I N G SPA C E EV P A R K I N G SPA C E EV P A R K I N G SPA C E EV EV EV EV EV EV EVEVEV EV EV EV PARKINGSPACE EV PARKINGSPACE PAS S E N G E R L O A D I N G UNAUTHORIZED CHANGES & USES:ENGINEERS NOTE TO CONTRACTOR:UNDERGROUND SERVICE ALERT TWO WORKING DAYS BEFORE YOU DIG Call: TOLL FREE 1-800-422-4133 KNOW WHAT'S BELOW. CALL BEFORE YOU DIG. SDP 2019-0009 OF JO B N O : DA T E : RE V I S I O N # : CH E C K E D : DA T E : DR A W N : DA T E : NO . D E S C R I P T I O N B Y D A T E C H K RE V I S I O N S 70 1 N . P a r k c e n t e r D r i v e Sa n t a A n a , C A 9 2 7 0 5 p: 7 1 4 / 5 6 0 / 8 2 0 0 f : 7 1 4 / 5 6 0 / 8 2 1 1 ww w . t a i t . c o m Si n c e 1 9 6 4 Lo s A n g e l e s On t a r i o Sa c r a m e n t o Sa n D i e g o Sa n F r a n c i s c o Bo i s e Da l l a s De n v e r Ph o e n i x Po r t l a n d 70 1 N . P a r k c e n t e r D r i v e Sa n t a A n a , C A 9 2 7 0 5 p: 7 1 4 / 5 6 0 / 8 2 0 0 f : 7 1 4 / 5 6 0 / 8 2 1 1 ww w . t a i t . c o m Si n c e 1 9 6 4 Lo s A n g e l e s On t a r i o Sa c r a m e n t o Sa n D i e g o Sa n F r a n c i s c o Bo i s e Da l l a s De n v e r Ph o e n i x Po r t l a n d 8 20 5 1 P A L O M A R - E X T E R I O R R E N O V A T I O N 20 5 1 P A L O M A R A I R P O R T R O A D CA R L S B A D , C A . 9 2 0 1 1 ST E E L W A V E 45 5 3 G L E N C O E A V E N U E MA R I N A D E L R E Y , C A 9 0 2 9 2 N EXISTING BUILDING TO REMAIN PA L O M A R A I R P O R T R O A D DRIVE ENTRY LEGEND: GRADING GENERAL NOTES PR E L I M I N A R Y G R A D I N G P L A N 5 STORM DRAIN CLEANOUT (D-10)A ABBREVIATIONS: SEE SHEET HEREON SHEET INDEX MAP P A L O M A R A I R P O R T R O A D SEE SHEET 4 SEE SHEET HEREON N