Loading...
HomeMy WebLinkAboutSDP 94-03; POINSETTIA SHORES PA E & M; Site Development Plan (SDP)OWNER NAME (PRINT OR TYPE) Kaiza Poinsettia Corporation MAILING ADDRESS 7220 A venida Encinas, Ste. 200 CITY AND STATE Carlsbad, CA. TELEPHONE (619) 931-9100 ZIP 92009 I CERTIFY THAT I AM THE LEGAL OWNER AND THAT ALL Tim ABOVE INFORMATION IS TRUE AND CORRECT TO THE BEST OF MY KNOWLEDGE. ,. APPLICANT NAM:E (PRINT OR TYPE) Kaiza Poinsettia Corporation MAILING ADDRESS 7220 A venida Encinas, Ste. 200 CITY AND STATE Carlsbad, CA. TELEPHONE {619) 931-9100 ZIP 92009 I CERTIFY THAT I AM THE LEGAL OWNER'S REPRESENTATIVE AND THAT ALL THE ABOVE INFORMATION IS TRUE AND CORRECT TO THE BEST OF MY KNOWLEDGE. SIGNATURE DATE SIGNATURE DATE ~0J2+ REVISED ATTACHMENT TO ALL PLANNING APPLICATIONS AND ENGINEERING APPLICATION FOR REVERSION TO ACREAGE AND STREET VACATION EFFECTIVE AUGUST 15, 1992 A NOTICE FEE SHALL BE COLLECTED AT TIME OF APPLICATION TO COVER THE COST OF PUBLICATION OF NOTICES IN THE NEWSPAPER FOR ANY PROJECT. FOR SINGLE FAMILY THE FEE IS $100.00 FOR ALL OTHERS THE FEE IS $500.00. If the cost to publish all notices required for the project exceed the amount initially collected, the applicant will be billed. If funds are remaining at the end of the project,· a refund will be prepared. • NOTE ADDmONAL FEES, SfATE DEPARTMENT OF FISH & GAME City's and Counties throughout California have recently been notified of new legislation (AB 3158, Chapter 1706, Statutes of 1990) which became effective on January l, 1991. This law requires that the State of California Department of Fish and Game levy a fee to all project applicants (public and private) subject to the California Environmental Quality Act (CEQA) to defray the cost of managing and protecting fish and wildlife trust resources. Projects which are categorically exempt from CEQA which have no adverse impact on fish and wildlife or projects which are denied are not subject to the fee. All other projects are subject to the following fees: FEES Projects with Negative Declarations Projects with BR's $1,275.00 $ 875.00 Due to State Law constraints the City of Carlsbad will collect the fee where applicable and pass it to the County of San Diego. After submission the City of Carlsbad Planning Department will make an Environmental Assessment of your application. After this initial assessment the Planning Department will notify you· if the fee is required. State Department of Fish and Game PO Box 944209 Sacramento, CA 94244-2090 (916) 445-3531 Fee.ltr .. 1. {Please be Specifi. Attach Additional Pages or Ex.its, if necessary) Please describe the project site, including distinguishing natural and, manmade characteristics. Also provide precise slope analysis when a slope of 15' or higher and 15% grade or greater is present on the site. The site will be mass graded a flat pad as part of the master tentative map C. T. 94-01. 2. Please describe energy conservation measures incorporated into the design and/or operation of the project. The applicable architectural design and materials will be incorporated into the building design. 3. PLEASE ATTACH A PROJECT SUMMARY SHEET WHICH SHOWS THE FOLLOWING: a. If a residential project identify the number of units, type of units, schedule of unit sizes, range of sale prices or rents, and type of household size expected, average daily traffic generation (latest SANDAG rates). N/A b. If a commercial project, indicate the exact type, activity(ies), square footage of sales area, average daily traffic generation (latest SANDAG rates), parking provided, and loading facilities. N/A c. If an industrial project, indicate the exact type or industry(ies), average daily traffic generation .(latest SANDAG rates), estfmated employment per shift, time of shifts, and loading facilities. N/A d. If an institutional project, indicate the major project/site function, estimated employment per shift, estimated occupancy, loading facilities, and community benefits to be derived from the project. N/A 3 .. I. ENVIRONMENTAL IMPACT ANALYSIS 1) 2) 3) 4) Please Answer each of the following questions by placing a check in the appropriate space. Then, fully discuss and explain why each item was checked yes or no. Provide supporting data if applicable. Attach additional sheets as necessary. Could the project significantly impact or change present or future land uses in the vicinity of the activity? EXPLANATION: These areas are designated for the recreational area and R.V. parking. Could the activity affect the use of a recreational area, or area of aesthetic value? EXPLANATION: Site is presently vacant land, mass graded per C.T. 94-01. Could the activity affect the functioning of an established community or neighborhood? EXPLANATION: This area is identified and is a part of Poinsettia Shores master pJan MP J75(U), Could the activity result in the displacement of community residents? EXPLANATION: The site is presently vacant land. 4 YES x X X X 5) 6) 7) 8) 9) Could the activity increase the number of low and moderate cost housing units in the city? EXPLANATION: The area "D" site is presently identified YES for affordable housing on the Poinsettia Shores master plan MP 175(D). Could the activity significantly affect existing housing or create a demand for additional housing? EXPLANATION: These areas are identified in the Poinsettia. Shores master Plan MP 175(D). Are any of the natural or man-made features in the activity area unique, that is, not found in other parts of the county, state or nation? EXPLANATION: The site will be mass graded per C. T. 94-01. • Could the activity significantly affect an historical or archaeological site or its settings? EXPLANATION: An archaeologist will be observing the grading process as part of C.T. 94-01. Could the activity significantly affect the potential use, extraction, or conservation of a scarce natural resource? EXPLANATION: The site will be graded per C.T. 94-01. 5 NO X X X X X 10) 11) 12) 13) 14) Could the activity significantly affect fish, wildlife or plant resources? • EXPLANATION: The site is vacant now. The site will be mass graded with C.T. 94-01 with temporary and permanent desilt basins. Are there any rare or endangered plant or animal species in the activity area? EXPLANATION: The site will be.mass graded with C. T. 94-01. Could the activity change existing features of any of the city's stream, lagoons, bays, tidelands or beaches? EXPLANATION: Mass grading with C.T. 94-01 will include erosion control measures. Could the act.ivity result in the erosion or elimin- ation of agricultural lands? EXPLANATION: Site will be mass graded with C.T. 94-Q_l with erosion control measures and temporary and permanent desi]t basins, Could the activity serve to encourage development of presently undeveloped areas or intensify develop- ment of already developed areas? EXPLANATION: This area is part of Poinsettia Shores master plan MP_ 175(D), 6 YES NO X X x X X 15) Will the activity require a variance from estab- lished environmental standards (air, water, noise, etc.)? 16) EXPLANATION: These sites are for recreation (pool, tennis, basketball) and R.V. storage. Is the activity carried out as part of a larger project or series of projects? EXPLANATION: Site is part of C.T. 94-01 and Poinsettia Shores master plan MP 175(D). 17) Will the activity require certification, authoriza- tion or issuance of a permit by any local, state or federal environmental control agency? EXPLANATION: City of Carlsbad, CA Coastal Commission. 18) Will the activity require issuance of a variance or conditional use permit by the City? EXPLANATION: Site development plan. 19) Will the activity involve the application, use, or disposal of potentially hazardous materials? EXPLANATION: __ N_o_rm_a_l_c_o_n_s_tr_u_c_t_i_o_n_a_n_d_b_u_il_d_i_n~g ___ _ materials, swimming pool chemicals. 7 YES X X x X X 20) YES Will the activity involve construction of facilities in a flood plain? EXPLANATION: This site is not in a flood plain per F.E.M.A. map. 21) Will the activity involve construction of facilities in the area of an active fault? EXPLANATION: None identified in our soils report. 22) C~uld the activity result in the generation of significant amounts of dust? EXPLANATION:: Will use extensive dust control measures during construction. 23) Will the activity involve the burning of brush, trees, or other materials? • ' EXPLANATION: Site will be mass graded with C. T. 94-01. 24) Could the activity result in a significant change in the quality of any portion of the region's air or water resources? (Should note surface, ground water, off-shore.) EXPLANATION: Storm water will be directed to a desilt basin before entering the lagoon. 8 NO X X X X X 25) 26) 27) 28) Will the project substantially increase fuel consumption (electricity, oil, natural gas, etc.)? EXPLANATION: Normal for recreational facilities and R.V. storage. Will the activity involve construction of facilities on a slope of 25 percent or greater? EXPLANATION: Site will be mass graded per C,T. 94-o'i ,· Will there be a significant change to existing 1 and form? Lot 6 (a) Indicate estimated grading to be done i~ YES cubic yards: CUT: 0 CY FILL: 3.60D CY ·IMPORT: 3,600 CY (b) Percentage of alteration to the present 1 and farm: 100% -. (c) Maximum height of cut or fill slopes: 1 Feet. EXPLANATION: Site is vacant and will be mass graded with C. T. 94:...01. Will the activity result in substantial increases in the -use of utilities, sewers, drains or streets? EXPLANATION: Normal for recreatmon facilities and R.v .. storage. 9 NO X X X LOT.7 CUT: 200 CY FILL: 0 CY EXPORT: 200 CY x •. I • 29) Will the project significantly increase wind or water erosion of soils? 30) EXPLANATION: Grading operation will include erosion control. Could the project significantly affect existing fish or wildlife habitat? EXPLANATION: Permanent desilt basin will be built with C.T. 94-01. 31) Will the project significantly produce new light or glare? EXPLANATION: Normal for recreational facilities and R.V. storage, 10 YES NO X X X