HomeMy WebLinkAboutSDP 94-03; POINSETTIA SHORES PA E & M; Site Development Plan (SDP)OWNER
NAME (PRINT OR TYPE)
Kaiza Poinsettia Corporation
MAILING ADDRESS
7220 A venida Encinas, Ste. 200
CITY AND STATE
Carlsbad, CA.
TELEPHONE
(619) 931-9100
ZIP
92009
I CERTIFY THAT I AM THE LEGAL OWNER
AND THAT ALL Tim ABOVE INFORMATION IS
TRUE AND CORRECT TO THE BEST OF MY
KNOWLEDGE.
,.
APPLICANT
NAM:E (PRINT OR TYPE)
Kaiza Poinsettia Corporation
MAILING ADDRESS
7220 A venida Encinas, Ste. 200
CITY AND STATE
Carlsbad, CA.
TELEPHONE
{619) 931-9100
ZIP
92009
I CERTIFY THAT I AM THE LEGAL OWNER'S
REPRESENTATIVE AND THAT ALL THE
ABOVE INFORMATION IS TRUE AND
CORRECT TO THE BEST OF MY KNOWLEDGE.
SIGNATURE DATE SIGNATURE DATE
~0J2+
REVISED
ATTACHMENT TO ALL PLANNING APPLICATIONS
AND
ENGINEERING APPLICATION FOR REVERSION TO ACREAGE
AND STREET VACATION
EFFECTIVE AUGUST 15, 1992 A NOTICE FEE SHALL BE COLLECTED AT
TIME OF APPLICATION TO COVER THE COST OF PUBLICATION OF
NOTICES IN THE NEWSPAPER FOR ANY PROJECT.
FOR SINGLE FAMILY THE FEE IS $100.00
FOR ALL OTHERS THE FEE IS $500.00.
If the cost to publish all notices required for the project exceed the amount
initially collected, the applicant will be billed. If funds are remaining at the
end of the project,· a refund will be prepared.
•
NOTE
ADDmONAL FEES, SfATE DEPARTMENT OF FISH & GAME
City's and Counties throughout California have recently been notified of new legislation
(AB 3158, Chapter 1706, Statutes of 1990) which became effective on January l, 1991.
This law requires that the State of California Department of Fish and Game levy a fee to
all project applicants (public and private) subject to the California Environmental Quality
Act (CEQA) to defray the cost of managing and protecting fish and wildlife trust resources.
Projects which are categorically exempt from CEQA which have no adverse impact on fish
and wildlife or projects which are denied are not subject to the fee.
All other projects are subject to the following fees:
FEES Projects with Negative Declarations
Projects with BR's
$1,275.00
$ 875.00
Due to State Law constraints the City of Carlsbad will collect the fee where applicable and
pass it to the County of San Diego.
After submission the City of Carlsbad Planning Department will make an Environmental
Assessment of your application. After this initial assessment the Planning Department will
notify you· if the fee is required.
State Department of Fish and Game
PO Box 944209
Sacramento, CA 94244-2090
(916) 445-3531
Fee.ltr
..
1.
{Please be Specifi. Attach Additional Pages or Ex.its, if necessary)
Please describe the project site, including distinguishing natural and,
manmade characteristics. Also provide precise slope analysis when a slope
of 15' or higher and 15% grade or greater is present on the site.
The site will be mass graded a flat pad as part of the master tentative
map C. T. 94-01.
2. Please describe energy conservation measures incorporated into the design
and/or operation of the project.
The applicable architectural design and materials will be incorporated
into the building design.
3. PLEASE ATTACH A PROJECT SUMMARY SHEET WHICH SHOWS THE FOLLOWING:
a. If a residential project identify the number of units, type of units,
schedule of unit sizes, range of sale prices or rents, and type of
household size expected, average daily traffic generation (latest SANDAG
rates).
N/A
b. If a commercial project, indicate the exact type, activity(ies),
square footage of sales area, average daily traffic generation
(latest SANDAG rates), parking provided, and loading facilities.
N/A
c. If an industrial project, indicate the exact type or industry(ies),
average daily traffic generation .(latest SANDAG rates), estfmated
employment per shift, time of shifts, and loading facilities.
N/A
d. If an institutional project, indicate the major project/site
function, estimated employment per shift, estimated occupancy,
loading facilities, and community benefits to be derived from the
project.
N/A
3
..
I. ENVIRONMENTAL IMPACT ANALYSIS
1)
2)
3)
4)
Please Answer each of the following questions by placing a check in the
appropriate space. Then, fully discuss and explain why each item was
checked yes or no. Provide supporting data if applicable. Attach
additional sheets as necessary.
Could the project significantly impact or change
present or future land uses in the vicinity of the
activity?
EXPLANATION: These areas are designated for the
recreational area and R.V. parking.
Could the activity affect the use of a recreational
area, or area of aesthetic value?
EXPLANATION: Site is presently vacant land,
mass graded per C.T. 94-01.
Could the activity affect the functioning of an
established community or neighborhood?
EXPLANATION: This area is identified and is a
part of Poinsettia Shores master pJan MP J75(U),
Could the activity result in the displacement of
community residents?
EXPLANATION: The site is presently vacant land.
4
YES
x
X
X
X
5)
6)
7)
8)
9)
Could the activity increase the number of low and
moderate cost housing units in the city?
EXPLANATION: The area "D" site is presently identified
YES
for affordable housing on the Poinsettia Shores master
plan MP 175(D).
Could the activity significantly affect existing
housing or create a demand for additional housing?
EXPLANATION: These areas are identified in the
Poinsettia. Shores master Plan MP 175(D).
Are any of the natural or man-made features in the
activity area unique, that is, not found in other
parts of the county, state or nation?
EXPLANATION: The site will be mass graded
per C. T. 94-01. •
Could the activity significantly affect an
historical or archaeological site or its settings?
EXPLANATION: An archaeologist will be observing
the grading process as part of C.T. 94-01.
Could the activity significantly affect the
potential use, extraction, or conservation of a
scarce natural resource?
EXPLANATION: The site will be graded per C.T. 94-01.
5
NO
X
X
X
X
X
10)
11)
12)
13)
14)
Could the activity significantly affect fish,
wildlife or plant resources? •
EXPLANATION: The site is vacant now. The site
will be mass graded with C.T. 94-01 with
temporary and permanent desilt basins.
Are there any rare or endangered plant or animal
species in the activity area?
EXPLANATION: The site will be.mass graded with
C. T. 94-01.
Could the activity change existing features of any
of the city's stream, lagoons, bays, tidelands
or beaches?
EXPLANATION: Mass grading with C.T. 94-01
will include erosion control measures.
Could the act.ivity result in the erosion or elimin-
ation of agricultural lands?
EXPLANATION: Site will be mass graded with
C.T. 94-Q_l with erosion control measures and
temporary and permanent desi]t basins,
Could the activity serve to encourage development
of presently undeveloped areas or intensify develop-
ment of already developed areas?
EXPLANATION: This area is part of Poinsettia
Shores master plan MP_ 175(D),
6
YES NO
X
X
x
X
X
15) Will the activity require a variance from estab-
lished environmental standards (air, water, noise,
etc.)?
16)
EXPLANATION: These sites are for recreation
(pool, tennis, basketball) and R.V. storage.
Is the activity carried out as part of a larger
project or series of projects?
EXPLANATION: Site is part of C.T. 94-01
and Poinsettia Shores master plan MP 175(D).
17) Will the activity require certification, authoriza-
tion or issuance of a permit by any local, state
or federal environmental control agency?
EXPLANATION: City of Carlsbad, CA Coastal
Commission.
18) Will the activity require issuance of a variance or
conditional use permit by the City?
EXPLANATION: Site development plan.
19) Will the activity involve the application, use, or
disposal of potentially hazardous materials?
EXPLANATION: __ N_o_rm_a_l_c_o_n_s_tr_u_c_t_i_o_n_a_n_d_b_u_il_d_i_n~g ___ _
materials, swimming pool chemicals.
7
YES
X
X
x
X
X
20) YES
Will the activity involve construction of facilities
in a flood plain?
EXPLANATION: This site is not in a flood plain
per F.E.M.A. map.
21) Will the activity involve construction of facilities
in the area of an active fault?
EXPLANATION:
None identified in our soils report.
22) C~uld the activity result in the generation of
significant amounts of dust?
EXPLANATION:: Will use extensive dust
control measures during construction.
23) Will the activity involve the burning of brush,
trees, or other materials? • '
EXPLANATION: Site will be mass graded with
C. T. 94-01.
24) Could the activity result in a significant change
in the quality of any portion of the region's air
or water resources? (Should note surface, ground
water, off-shore.)
EXPLANATION: Storm water will be directed to a
desilt basin before entering the lagoon.
8
NO
X
X
X
X
X
25)
26)
27)
28)
Will the project substantially increase fuel
consumption (electricity, oil, natural gas, etc.)?
EXPLANATION: Normal for recreational facilities
and R.V. storage.
Will the activity involve construction of facilities
on a slope of 25 percent or greater?
EXPLANATION: Site will be mass graded
per C,T. 94-o'i ,·
Will there be a significant change to existing
1 and form?
Lot 6
(a) Indicate estimated grading to be done i~
YES
cubic yards: CUT: 0 CY FILL: 3.60D CY ·IMPORT: 3,600 CY
(b) Percentage of alteration to the present
1 and farm: 100% -.
(c) Maximum height of cut or fill slopes: 1 Feet.
EXPLANATION: Site is vacant and will be mass graded
with C. T. 94:...01.
Will the activity result in substantial increases
in the -use of utilities, sewers, drains or streets?
EXPLANATION: Normal for recreatmon facilities
and R.v .. storage.
9
NO
X
X
X
LOT.7
CUT: 200 CY
FILL: 0 CY
EXPORT: 200 CY
x
•. I •
29) Will the project significantly increase wind or
water erosion of soils?
30)
EXPLANATION: Grading operation will include
erosion control.
Could the project significantly affect existing
fish or wildlife habitat?
EXPLANATION: Permanent desilt basin will be built
with C.T. 94-01.
31) Will the project significantly produce new light
or glare?
EXPLANATION: Normal for recreational facilities
and R.V. storage,
10
YES NO
X
X
X