HomeMy WebLinkAboutMCUP 08-13; T-MOBILE SD06914 MONOPINE EXISTING; Minor Conditional Use Permit (MCUP)•
LETTER OF AUTHORIZATION
May 12, 2008
City of Carlsbad
Planning & Building Departments
2075 Las Palmas Drive
Carlsbad, California 92009
Re: Letter of Authorization for Existing Communications Facility at 1966 Olivenhain Road, Carlsbad.
I, owner/~ of the below-described property, do hereby appoint T-Mobile my agent for the purpose of
consummating any application necessary to insure their ability to continue to use the property for its existing
communications facility. I understand that this application may be denied, modified or approved with conditions and
that such conditions or modifications must be complied with prior to issuance of building permits.
Address:
Assessor's Parcel Number:
$D06914-01
1966 Olivenhain Road
Carlsbad, California 92009
255-031-03
Ol-' vbJHA, IV Mv~,c.. ,PAL \..ut\--TEIZ-q~ ~ pr$,-t2te-C-
By:
Name:
Title:
Date:
~tt:>~~£ "j2:. 13fZ-,es-r. fE ...
@.l(=r1tv6€:P-11'J4, /.ANJ~
£/(tt,fo~
i l
RECEIVED
JUL 2 1 2008
CITY OF CARLSBAD
PLANNING DEPT
Part B: Determine Standard Permanent Storm Water Requirements.
Does the project propose: Yes No
1. New impervious areas, such as roof tops, roads, parking lots, driveways, paths and □ [l] sidewalks?
2._ New pervious landscape areas and irrigation systems? □ [l]
3. Permanent structures within 100 feet of any natural water body? □ [l]
4. Trash storage areas? □ [l]
5. Liquid or solid material loading and unloading· areas? □ [l]
6. Vehicle or equipment fueling, washing, or maintenance areas? □ [l]
7. Require a General NP DES Permit for Storm Water Discharges Associated with Industrial □ [l] Activities (Except construction)?*
8. Commercial or industrial waste handling or storage, excluding typical office or household □ [l] waste?
9. Any grading or ground disturbance during con struction? □ [l]
10. Any new storm drains, or alteration to existing storm drains? □ [l]
*To find out if your project is required to obtain an individual General NPDES Permit for Storm Water
Discharges Associated with Industrial Activities, visit the State Water Resources Control Board web site
at, www.swrcb.ca.aov/stormwtr/industrial.htm I
Section 2. Construction Storm Water BMP Requirements:
If the answer to question 1 of Part C is answered "Yes," your project is subject to Section IV, "Construction
Storm Water BMP Performance Standards," and must prepare a Storm Water Pollution Prevention Plan
(SWPPP). If the answer to question 1 is "No," but the answer to any of the remaining questions is "Yes,"
your project is subject to Section IV, "Construction Storm Water BMP Performance Standards," and must
prepare a Water Pollution Control Plan (WPCP). If every question in Part C is answered "No," your project
is exempt from any construction storm water BMP requirements. If any of the answers to the questions in
Part Care "Yes," complete the construction site prioritization in Part D, below.
Part C· Determine Construction Phase Storm Water Reauirements.
Would the project meet any of these criteria during construction? Yes No
1. Is the project subject to California's statewide General NPDES Permit for Storm Water □ [l] Discharges Associated With Construction Activities?
2. Does the project propose grading or soil disturbance? □ [l]
3. Would storm water or urban runoff have the potential to contact any portion of the □ [l] construction area, includina washina and staging areas?
4. Would the project use any construction materials that could negatively affect water quality □ [l] if discharged from the site (such as, paints, solvents, concrete, and stucco)?