Loading...
HomeMy WebLinkAbout1514 WHITE SAGE WAY; ; CB122156; PermitCity of Carlsbad 1635 Faraday Av Carlsbad, CA 92008 12-27-2012 Residential Permit Permit No: CB122156 Building Inspection Request Line (760) 602-2725 Job Address: Permit Type: Parcel No: Valuation: Occupancy Group: # Dwelling Units: Bedrooms: Project Title: Applicant: 1514 WHITE SAGE WY CBAD RESDNTL Sub Type: CONDO 2150403' <i O .2. Lot#: 17 $224,822.00 Constuction Type: 5B 1 3 Reference #: CT060027 Structure Type: SFD Bathrooms: 2 Orig PC #: PC 110027 VISTA DEL MAR: PHASE 5/PLAN 2X 2046 SF LIV//434 SF GAR Owner: Status: ISSUED Applied: 10/19/2012 Entered By: JMA Plan Approved: 12/27/2012 Issued: 12/27/2012 Inspect Area : Plan Check #: PC120060 TAYLOR MORRISON OF CA LLC TAYLOR MORRISON OF CA, LLC STE 1450 #1450 8105 IRVINE CENTER DR. 8105 IRVINE CENTER DR IRVINE CA 92618 IRVINE CA 92618 949-341-1200 949-341-1239 Building Permit $1 ,185.62 Meter Size FS1 Add'I Building Permit Fee $0.00 Add'I Reel. Water Con. Fee $0.00 Plan Check $829.93 Meter Fee $414.00 Add'I Plan Check Fee ($500.00) SDCWA Fee $4,492.00 Plan Check Discount ($66.39) CFO Payoff Fee $2,571 .34 Strong Motion Fee $22.48 PFF (3105540) $4,091.76 Park in Lieu Fee $5,728.00 PFF (4305540) $0.00 Park Fee $0.00 License Tax (3104193) $0.00 LFM Fee $0.00 License Tax (4304193) $0.00 Bridge Fee $0.00 Traffic Impact Fee (3105541) $2,810.00 Other Bridge Fee $0.00 Traffic Impact Fee (4305541) $0.00 BTD #2 Fee $16,910.00 Sidewalk Fee $0.00 BTD #3 Fee $0.00 PLUMBING TOTAL $172.00 Renewal Fee $0.00 ELECTRICAL TOTAL $83.00 Add'I Renewal Fee $0.00 MECHANICAL TOTAL $80.33 Other Building Fee $0.00 Housing Impact Fee $0.00 HMP Fee $0.00 Housing lnlieu Fee $0.00 Pot. Water Con. Fee $3,549.00 Housing Credit Fee $0.00 Meter Size FS1 Master Drainage Fee $0.00 Add'I Pot. Water Con. Fee $0.00 Sewer Fee $2,466.00 Reel. Water Con. Fee $0.00 Additional Fees $0.00 Green Bldg Stands (SB 14 73) Fee $8.00 Fire Sprinkler Fees $204.00 Green Bldg Stands Plan Chk Fee $0.00 TOTAL PERMIT FEES $45,051.07 Total Fees: $45,051.07 Total Payments to Date: $45,051 .07 Balance Due: $0.00 FINAL A L Inspector: Date: 7 J3 Clearance: ------ at approval of your project includes the ·imposition· of fees, dedications, reservations, or other exactions hereafter collectively referred to as "fees/exactions." You have 90 days from the date this permit was issued to protest imposition of these fees/exactions. If you protest them, you must follow the protest procedures set forth in Government Code Section 66020(a), and file the protest and any other required information with the City Manager for processing in accordance with Carlsbad Municipal Code Section 3.32 030. Failure to timely follow that procedure will bar any subsequent legal action to attack, review, set aside, void, or annul their imposition. You are hereby FURTHER NOTIFIED that your right to protest the specified fees/exactions DOES NOT APPLY to water and sewer connection fees and capacity changes, nor planning, zoning, grading or other similar application processing or service fees in connection with this project. NOR DOES IT APPLY to any r City of Carlsbad 1635 Faraday Av Carlsbad, CA 92008 12-27-2012 Storm Water Pollution Prevention Plan (SWPPP) Permit Permit No:SW120457 Job Address: Permit Type: Parcel No: Reference #: CB#: Project Title: Applicant: 1514 WHITE SAGE WY CBAD SWPPP 2150402917 PC120060 CB122156 VISTA DEL MAR (MUROYA) Phase 4 TAYLOR MORRISON OF CA LLC STE 1450 8105 IRVINE CENTER DR. IRVINE CA 92618 949-341-1200 Emergency Contact: TOM BAINE 714-920-3525 SWPPP Plan Check SWPPP Inspections Additional Fees TOTAL PERMIT FEES Status: Lot#: 17 Applied: Entered By: Issued: Inspect Area: Tier: Priority: Owner: TAYLOR MORRISON OF CA, LLC #1450 8105 IRVINE CENTER DR. IRVINE CA 92618 949-341-1200 ISSUED 10/19/2012 JMA 12/27/2012 1 M $0.00 $216.00 $0.00 $216.00 Total Fees: $216.00 Total Payments To Date: $216.00 Balance Due: FINAL APPROVAL DATE ¥r&:EARANCE ~------ SIGNATURE ___ f;c,--.,;.-=---- $0.00 Inspection List Permit#: CB122156 Type: RESDNTL CONDO Date Inspection Item Inspector Act 07/19/2013 89 Final Combo RI 07/19/2013 89 Final Combo PY AP 06/25/2013 39 Final Electrical PY PA 05/06/2013 82 Drywall/Ext Lath/Gas Test PY AP 04/30/2013 23 Gas/Test/Repairs PY NR 04/29/2013 16 Insulation PY AP 04/23/2013 84 Rough Combo PY AP 04/22/2013 84 Rough Combo PY NR 04/15/2013 13 Shear Panels/HD's PY AP 04/15/2013 13 Shear Panels/HD's PY NR 02/07/2013 11 Ftg/Foundation/Piers PD AP 01/23/2013 21 Underground/Under Floor PY AP 01/23/2013 22 Sewer/Water Service PY AP Monday, July 22, 2013 VISTA DEL MAR: PHASE 5/PLAN 2X 2046 SF LIVl/434 SF GAR Comments COF Page 1 of 1 ~(:tl'Y Of ------··-·-· -~------, .. ___ ------------------· CARLSBAD Building Division INSPECTION RECORD ' INSr•cnoN REC0"D CARD WITH APl'lt0\faD CB122158 1514 WHITE SAGE WY VISTA DEL MAR: PHASE 5/PLAN 2X 2046 SF LIV//434 SF GAR RESDNTL CONDO ----l'lANs ltUST I• OP'T ON TN• JO• &!I CALL ·••oRE l;IQ-l'0lt NUT WORI( DAY INSPi"cnON ~ ti21POR ■UILDINGINSl'•cnONCAU.:760-602-Z7ZS RECORD CO -• -r--' OIi GO TO: www,Cld(•zqpv/llylflArM .ANO CUCJC ON -L_, -.ettuen tnspectJon" l ct#: 17 TAYLOR MORRISON OF CA U.C DATar / 2-z_ 7/;7 Fir~ P~•ntlon MASONRY ':I GIOUT □ WAll DIIAINS 1llTPAMELS POUlfflll'S COLUMN FOOllNGS SUBFRAME D Fl.DOR □ CEIUNG IOOF' SHOTHIN0 EXT, SHW PANELS FRAME INSULATION Dl!IIIOR LATH INTtRIOII LATH & DRYW~ □SEWER&& 760-944-846.3 760-438-.3891 760 .. 02-4660 Date tor l'\IIOw411!oun ROUGH EUCTalC WAll.$ IOUGH IUCTIIIC CEil.iNG D rl!CTIIC SERVICE □ TEM,OllAl'f 0 BONDING D l'OOL PHOTO ~01.TAIC UNDERGROUND oum & PIPING □ DUCU l'LENUM □ IU. ,i,tNG HIAT-Atl C0ND, SYSTtMS VENllLATI0N IYfflMI RIW. f ll(l UNDDlGIIOUND A/I UNDEHIOUND HYDIO WAnl A/S UNDEIIGIOUND fWSN 10P OUT □ WAffl CJ WATH A/S OVHHW VISUAL TUI & SHOWflt PAN A/S OVHNW IIYDIOSTATIC 0 GASTlST □ GASl'l,iNG A/SF'INAL STORMWATC"R $00 -PRE-CONSTRUCTION MrmNC: IOI -FOUOW UP IOI -NOTICE TO CLEAN 07 -WltmtN WMINll4G -· 10t -NOTICE OF VIOI.ATI0N 110 -~IIIAL WMIIUNG FINAi. FDIID EXTING SYSTIM HYDROSTATIC TUT FIXED EXTINGUISHING SYSTEM ANAL MEOICAL GAS PIUSUREltST MEDICAL US FINAL Ins tor