HomeMy WebLinkAbout1513 WHITE SAGE WAY; ; CB122158; PermitCity of Carlsbad
1635 Faraday Av Carlsbad, CA 92008
12-27-2012 Residential Permit Permit No: CB1 22158
Job Address:
Building Inspection Request Line (760) 602-2725
1513 WHITE SAGE WY CBAD
Permit Type: RESDNTL Sub Type: CONDO
21504C 30. 05 Lot#: 20
Status: ISSUED
Applied : 10/19/2012
Entered By: JMA
Parcel No:
Valuation: $226,537.00 Constuction Type: 5B
Occupancy Group:
# Dwelling Units:
Bedrooms:
1
3
Reference #: CT060027
Structure Type: SFD
Bathrooms: 2
Orig PC #: PC 110027
Plan Approved: 12/27/2012
Issued: 12/27/2012
Inspect Area: PY
Plan Check #: PC 120060
Project Title: VISTA DEL MAR : PHASE 5
PLAN 2-2046 SF LV//434 SF GAR//179 SF PATIO
Applicant:
TAYLOR MORRISON OF CA, LLC
APRIL TORNILLO
8105 IRVINE CENTER DR.
STE. 1450 92618
949-341-1200
Building Permit
Add'I Building Permit Fee
Plan Check
Add'I Plan Check Fee
Plan Check Discount
Strong Motion Fee
Park in Lieu Fee
Park Fee
LFM Fee
Bridge Fee
Other Bridge Fee
BTD #2 Fee
BTD #3 Fee
Renewal Fee
Add'I Renewal Fee
Other Building Fee
HMP Fee
Pot. Water Con. Fee
Meter Size
Add'I Pot. Water Con. Fee
Reel. Water Con. Fee
Green Bldg Stands (SB1473) Fee
Green Bldg Stands Plan Chk Fee
$1 ,193.46
$0.00
$835.42
($500.00)
($66.83)
$22.65
$5,728.00
$0.00
$0.00
$0.00
$0.00
$16,910.00
$0.00
$0.00
$0.00
$0.00
$0.00
$3,549.00
FS1
$0.00
$0.00
$8.00
$0.00
Total Fees: $45,064.84 Total Payments to Date:
In spector:
Owner:
TAYLOR MORRISON OF CA, LLC
#1450
8105 IRVINE CENTER DR
IRVINE CA 92618
949-341 -1239
Meter Size
Add'I Reel. Water Con. Fee
Meter Fee
SDCWA Fee
CFD Payoff Fee
PFF (3105540)
PFF (4305540)
License Tax (31041 93)
License Tax (43041 93)
Traffic Impact Fee (3 105541 )
Traffic Impact Fee (4305541 )
Sidewalk Fee
PLUMBING TOTAL
ELECTRICAL TOTAL
MECHAN ICAL TOTAL
Housing Impact Fee
Housing lnlieu Fee
Housing Credit Fee
Master Drainage Fee
Sewer Fee
Additional Fees
Fire Sprinkler Fees
TOTAL PERMIT FEES
$45,064 .84 Balance Due:
Clearance:
FS1
$0.00
$41 4.00
$4,492.00
$2,540.84
$4,122.97
$0.00
$0.00
$0.00
$2,810.00
$0.00
$0.00
$172.00
$83.00
$80.33
$0.00
$0.00
$0.00
$0.00
$2,466.00
$0.00
$204.00
$45,064.84
$0.00
NOTICE: Please take NOTICE that approval of your project includes the 'Imposition" of fees. dedications, reservations, or other exactions hereafter collectively
referred to as "fees/exactions.· You have 90 days from the date this permit was issued to protest imposition of these fees/exactions. If you protest them, you must
follow the protest procedures set forth in Government Code Section 66020(a), and file the protest and any other required information with the City Manager for
processing in accordance with Carlsbad Municipal Code Section 3.32.030. Failure to timely follow that procedure will bar any subsequent legal action to attack,
review. set aside, void, or annul their imposition.
You are hereby FURTHER NOTIFIED that your right to protest the specified fees/exactions DOES NOT APPLY to water and sewer connection fees and capacity
changes, nor planning, zoning, grading or other similar application processing or service fees in connection with this project. NOR DOES IT APPLY to any
City of Carlsbad
1635 Faraday Av Carlsbad, CA 92008
12-27-201 2
Storm Water Pollution Prevention Plan (SWPPP) Permit
Permit No:SW120460
Job Address:
Permit Type:
Parcel No:
Reference #:
CB#:
Project Title:
Applicant:
1513 WHITE SAGE WY CBAD
SWPPP
2150402920
PC120060
CB122158
VISTA DEL MAR (MUROYA)
Phase 4
TAYLOR MORRISON OF CA LLC
STE 1450
8105 IRVINE CENTER DR.
IRVINE CA 92618
949-341-1200
Emergency Contact:
TOM BAINE
714-920-3525
SWPPP Plan Check
SWPPP Inspections
Additional Fees
TOTAL PERMIT FEES
Status:
Lot#: 20 Applied:
Entered By:
Issued:
Inspect Area:
Tier:
Priority:
Owner:
TAYLOR MORRISON OF CA, LLC
#1450
8105 IRVINE CENTER DR.
IRVINE CA 92618
949-341-1200
ISSUED
10/19/2012
JMA
12/27/2012
1
M
$0.00
$216.00
$0.00
$216.00
Total Fees: $216.00 Total Payments To Date: $216.00 Balance Due:
FINAL APPROVAL
DATE!· f.-f~r.~NCE __ _
SIGNATURE ~ --·--·
$0.00
"ll.lO~ <..,,o .cr-_l)?_l.'.:'l,L ._, __ ---------. -· . ·-·--·-·-·--
~ ~ CITW Of
CARLSBAD
CB122158
VISTA DEL MAR : PHASE 5
PLAN 2-2046 SF LV//434SF= GAA//179 SF PATIO Builclln9 OIVkk>n
INSPECTION RECORD
1513 WHITE SAGE WY
RESDNTL CONDO
• INSPECTloN lt■COltD CARD Wrnt APPROViD Let#: 20 TAYLOR MORRISON OF CA, LLC
---JIII.ANSMUST••u"ONTHl!.JO■ RECORD co~ lrl CALL ■IPOIII l;IO I"' ,011 Nin WORK DAY INSPIC'flON I'/' T T
lrl FOR •u&DING INSPiCTION CALL: 760-60Z .. 27ZS __t_,,
OIi 60 TO: www,c;a,t•btdrr •Y!IMNdlN AND CUCK ON
11e411uen 'l•~•"~
DAff: / 2-Z-7 /l-V-
Plar,n,ng / l..lndscape 7 60.94+8463
llltN,OIICD ffllL
MASONRY
'J 01101/T O WAU. DWNS
. ,1L1'AIIILI
POUlllffllPS
COLUMN fOOT1NGS
SUIFUME □ FlOOII O CtlUNG
11oor INfATNING
EXT, $MW PANELS
Flt.W!
INSULATION
QffltlOI lATN
INTEIIOll lAlN I Dll'YWAll
□SEWl!II Al co
UNOIIIGIIOUNO
WATU
TOI' OUT O WASTI □WAl'H
l111 f, SHOMI PAN
CG.UJUT □WNttNCI
0 W.Aln lfrAlIR 0 SOI.All WATEII
fOO-l'ttf-COlilfflUCTlON M!mNa
50l-Fou.owu,
SOS • 'fOllCE TO Clf'.A/11
_ 0'7-wtmu WARNING
tot -NOJJCI 0FVJ0LA'10111
HO. YlltlAL WAINIIIIG
l'tl!v &'2012 FIN.Al
16()-l,02-4660
Allow48~,s
Call before 2 pm
NIOW •• hours
IIOUCN RIC'TIIC WALLS
IIIOUIH El£C111C CEIUNG
0 EL£Cflt1C St:IIYICIE □ TIMPOIIAIY
□ BONDING □ li'OOL
l'HOTO VOLTAIC
FINAL
UNDENIOUND DUClS & l'INflQ
0 DUCT I l'L!NUM □ IIIEF. PIPING
HQT,AIII COIID. IYITIMS
VENTILATION fflllMS
FINAL
Date
A/S UNDIEIGltOUND fMHIO
5 UNDE:IIIIOUND flUSH
A/S OVHHW WSUAL y.~ :,· A/S OVDNUD IIYDINISTA11C ·,
A/SFIN.AL -1/, ··: ·: / ·.,:
f/A IOUGH-IN .. /·;,
F AJ'IIW,
:: EX1'1118UISHIN8 SYSTEl9 IIOIJGN-IN ' \ EXrlNG IVfflM fn'DI0STAJJC JEST
~£0 fXnNGUISlflNG hlT£II F1NAI,
MEDIC.Al GAS l'IIWUtrTUT
MEDICU GAS fl,-Al
ln1 or
•,-'",,;'l'
' \,
\
Inspection List
Permit#: CB122158 Type: RESDNTL CONDO VISTA DEL MAR : PHASE 5
PLAN 2-2046 SF LV//434 SF GAR//179 SF
Date Inspection Item Inspector Act Comments
08/08/2013 89 Final Combo RI VISTA DEL MAR -COF
08/08/2013 89 Final Combo PD AP
07/15/2013 39 Final Electrical PY PA
05/10/2013 17 Interior Lath/Drywall PY AP
05/10/2013 18 Exterior Lath/Drywall PY AP
05/06/201 3 16 Insulation PY AP
05/01/2013 84 Rough Combo PY AP
04/30/2013 84 Rough Combo PY NR
04/29/2013 31 Underground/Conduit-Wirin PY AP
04/29/2013 84 Rough Combo PY NR
04/16/2013 13 Shear Panels/HD's PY AP
03/26/2013 15 Roof/Reroof PY AP
02/11 /2013 11 Ftg/F oundation/Piers PD AP
01/30/2013 21 Underground/Under Floor PY AP
01/30/2013 22 Sewer/Water Service PY AP
Friday, August 09, 2013 Page 1 of 1