Loading...
HomeMy WebLinkAboutPRE 06-06; LA COSTA RESORT & SPA PA 1; Admin Decision Letter-• M/1,wd ;,,./1 j Ol/ City of Carlsbad l@Fil•••••l·■•J§•E•ilbi§■1 i February 7, 2006 KSL Resort Company c/o Jennifer Tapia 2100 Costa Del Mar Carlsbad CA 92009 SUBJECT: PRE 06-06 -LA COSTA RESORT VILLAS {Planning Area 1, Phase 5A and B - PUD 03-06) The Planning Director has completed a review of your application for a Consistency Determination for the La Costa Resort Villas (Planning Area 1), (APN: 216-590-02-00). After careful consideration of the circumstances surrounding this request, the Planning Director has determined that the application qualifies for a consistency determination with the approved permit and therefore, approves the architectural and building location changes to the project based on Planning Director Administrative Policy No. 35. The parking spaces located along the northerly property line adjacent to Arenal Road shall maintain a landscaped setback of 10 feet from the property line. This would allow area to provide the Pedestrian Trial as shown on Drawing 2-76A of the Master Plan Trail Program. The following comments are issues regarding the consistency of the plans with the approved map and grading plans. 1. Proposed development does not match the recorded lot lines of Map 14984. If fewer than four lots are required for the proposed development change, a minor subdivision (MS) could be submitted and processed administratively, with a Tentative Parcel Map and a Fir:ial Parcel Map. A possible alternative would be to prepare and process a Substantial Conformance Exhibit (SCE) to change the phasing on the tentative map, and then process a Final Map to reflect the new lots. Applicant should prepare exhibits of a redlined SCE (using the approved CT 03-01 Tentative Map), if they wish to pursue this possibility. There are complications to lot numbering that may not make iLpossible, especially since the Unit 2 final map has already recorded. If there is not a way to make that option work, the applicant would have to process a CT application for a Tentative Map, which would go to public hearing. 2. 3. 4. An analysis of traffic, sewer and water demand would have to be submitted to verify if additional fees were required . ... Please be advised that in order to make a more in-depth review of the proposed development, a more complete design of the project is required. Please indicate all existing utilities along adjacent streets (i.e., storm drain, water, sewer, etc.) that will serve the development. 5. Depict all proposed sewer and water faci'lities (onsite) and all their appurtenances (access holes, valves, fire hydrants, blow-offs, air-release valves). 6. Revise the plan to indicate the ADT (traffic), EDU's (sewer), GPM (potable water), and GPM (reclaimed water) generated or required by the proposed development. 7. Meet with the Fire Department to identify the necessary fire protection measures required for this project (access, fire hydrants, sprinklering, etc.). All proposed fire hydrants must be .J 1635 Faraday Avenue a Carlsbad, CA 92008-7314 • (760) 602-4600 ° FAX (760) 602-8559 • www.ci.carlsbad.ca.us @ • served by public water mains. . ... , 8. Show all existin£1 and proposed topography and drainage patterns for the site. Identify the location, alignment, and discharge of the proposed and existing drainage system. 9. Indicate the legal description of the proposed·development and short legal descriptions of all adjacent properties. 10. Provide a Vicinity Map on the site plan. 11. A recent Preliminary Title Report ·(PR) issued with"in 6 months of formal application submittal will be required for the proposed project. 12. All easements and encumbrances as identified in Schedule "B" of the PR must be indicated on the site plan. The future dispo~ition of any easements and encumbrances must also be identified. 13. This preliminary review does not constitute a complete· review of the proposed project and additional items of concern may be identified upon formal project application submittal. If you have any questions regarding the Engineering comments. above, please call Glen Van Peski at 760-420-0500. Fire: 1. All dwelling units shall be provided. with Automatic Fire Sprinklers (NFPA 13). 2. No other uses. or occupancies shall be permitted in the sub-grade areas other than dwellings. No maintenance, housekeeping. 3. Fire Department shall review and approve of evacuation plans for all levels and areas in accordance with Title 19, 3.09. 4. KNOX® Key box at each entrance from street and at the enclosures for the fire alarm and sprinkler systems. 5. Provide proposed PSAP (Public Safety Answering Point) addressing for Fire Department comment and approval. 6. Provide building addressing and identification scheme for comment and approval. Please submit One (1) blueline copy (24" X 36") of all applicable exhibits for the project file of the amended building floor plans, elevations, buil~i~g sections and roof plans to adequately supercede the approved exhibits for Planning Area One of Planned Unit Development Permit 03-06. This approval is for architectural consistency only and this project will require an application through the Engineering Department to modify the Tentative Tract Map CT 03.0·1 to reflect the adjustment of the parcel lines for the placement of the buildings. ~51:D DON NEU Assistant Planning Director DN:VL:bd c: Project Engineer, Glen Van Peski File Copy Data Entry /