Loading...
HomeMy WebLinkAbout1207 WIND STAR WAY; ; CB973336; PermitB U I L D I N G P E R M J T Page 1 of 1 Permit No: CB973336 Project No: A970 ~292 Development No : F200500 2 Job Address: 1207 WIND STAR WY Suite: P~rmit .Type: SINGLE FAMILY DWLNG -DETACHED Parcel No: 212-212-12-00 Lot#: 49 Valuation: 249,817 Construction Type: VN Occupancy Group: Reference#: CT95-05 Status: ISSUED 10/20/97 01/12/98 RMA Description: PLAN 2 ,3054 SF+490 GAR+75 DECK Applied: : PHASE 2,SALTAIRE,MONARCH COMMUNITIES Apr/Issue: Appl/Ownr : MONARCH COMMUNITIES 30012 IVY GLENN DR LAGUNA NIGUEL CA Entered By: 714 363-7010 Plan Check Numbers STE 180 92677 > ORIG CB971266,PC 973156 *** Fees Required *** *** Fees Collec:28~0.W~,llJe~~ 01 02 *** --------------------------------HRtff ---ffi3r-B3 Fees: 16,081.83 Adjustments: .00 Total Fees: 16,081.83 Fee description Number of Bedrooms Number of Bathrooms Building Permit Plan Check Strong Motion Fee or Enter Park-in-Lieu Fee & Enter "Y" to Autocalc P.F.F. Enter "Y" to Autocalc T .I.F. Payoff Fee for CFO > > Acct#) > > > Enter #Units & Code-Potable Water > > > Enter "Y" for Plumbing Issue Fee Each Plumbing Fixture or Trap Each Building Sewer > Each Install/Repair Water Line Each Water Heater and/or Vent Gas Piping System Each Vacuum Breaker > > > > Enter "Y" for Electric Issue Fee > Single Phase Per AMP Enter 'Y' for Mechanical Issue Install Furn/Ducts/Heat Pumps Each Install Fireplace Each Exhaust Fan Each Install/Reloc Vent > Fee> > > > > Total Credits: Total Payments: Balan ce Due: Units Fee/Unit 5 3.00 1575 4698.83 1 22 1 ,1 1 1 2 200 3 2 4 2 7.00 15.00 7 .00 7.00 7.00 7.00 .25 9 .00 6.50 6 .50 4.50 CITY OF CARLSBAD 2075 Las Palmas Dr., Carlsbad, CA 92009 (619) 438-1161 .00 350.00 15,731.83 Ext fee Data 5.00 3.00 1165.00 757.00 25.00 1575.00 3 4547 .00 Y 540.00 Y 4698.83 2400.00 D5/8 20.00 Y 154.00 15.00 7.00 7 .00 7.00 14 .00 10.00 Y 50.00 15.00 Y 27.00 13.00 26.00 9.00 CITY OF CARLSBAD INSPECTION REQUEST PERMIT# CB973336 FOR 08/25/98 DESCRIPTION: PLAN 2,3054 SF+490 GAR+75 DECK PHASE 2,SALTAIRE,MONARCH COMMUNITIES TYPE: SFD STE: INSPECTOR AREA RB PLANCK# ORIG CB9 OCC GRP CONSTR . TYPE VN LOT: 49 JOB ADDRESS: 1207 APPLICANT: MONARCH CONTRACTOR: WIND STAR WY COMMUNITIES PHONE: 714 363-7010 PHONE: OWNER: REMARKS: C/FRANZ/929-0257 SPECIAL INSTRUCT: TOTAL TIME: CD LVL DESCRIPTION 19 ST Final Structural 29 PL Final Plumbing 39 EL Final Electrical 49 ME Final Mechanical 19 ST Final Structural 29 PL Final Plumbing 39 EL Final Electrical 49 ME Final Mechanical PHONE: INSPECTOR b(3 ACT COMMENTS ***** INSPECTION HISTORY***** DATE 082198 082098 081998 080598 071498 071498 071398 071398 070298 063098 062998 062698 062598 060898 060598 060398 060398 060298 042798 041598 032598 032398 032398 DESCRIPTION Final Electrical Final Electrical Final Electrical Gas/Test/Repairs Interior Lath/Drywall Exterior Lath/Drywall Interior Lath/Drywall Exterior Lath/Drywall Insulation Rough Combo Rough Combo Rough Combo Rough combo Roof Sheathing/Ext Shear Roof Sheathing/Ext Shear Shear Panels/HD's Roof/Reroof Roof Sheathing/Ext Shear Sewer/Water Service Underground Combo Underground/Under Floor Underground/Under Floor Sewer/Water Service ACT INSP AP RB AP RB NR RB AP RB AP RB AP RB CO PD CO PD AP RB AP RB CO RB NR RB NS RB AP RB CA RB CA RB AP RB NR RB AP RB AP PS CA RB AP RB PA RB COMMENTS ELEC METER REL NO TOP OUT APPROVED ON 3-23-98 HAS B.W. VALVE SEWER ONLY DEPT: BUILDING FI~DING INSPECTION ENGINEERING ~ PLANNING CMWD ST LITE PLAN CHECK#: CB973336 PERMIT#: CB973336 PROJECT NAME: PLAN 2,3054 SF+490 GAR+75 DECK DATE: 08/19/98 PERMIT TYPE: SFD PHASE 2,SALTAIRE,MONARCH COMMUNITIES ADDRESS: 1207 WIND STAR WY Lot# 49 CONTACT PERSON/PHONE#: C/FRANZ/92909257 SEWER DIST: CA WATER DIST: CA INSPECL'D ~ DATE 2?J\1:t INSPECTED: APPROVED _h_ DISAPPROVED BY: . a,O ch- INSPECTED DATE BY: INSPECTED: APPROVED DISAPPROVED INSPECTED DATE BY: INSPECTED: APPROVED DISAPPROVED COMMENTS: DEPT: BUILDING FIRE PLANNING CMWD ST LITE PLAN CHECK#: CB973 PERMIT#: CB973336 PROJECT NAME: PLAN 2,3054 SF+490 GAR+75 DECK PHASE 2,SALTAIRE,MONARCH COMMUNITIES ADDRESS: 1207 WIND STAR WY ~ Lot# CONTACT PERSON/PHONE#: C/FRANZ/92909257 SEWER DIST: CA WATER DIST: CA INSPECTED BY: COMMENTS: DATE INSPECTED: APPROVED 49 DATE: 08/19/98 PERMIT TYPE: SFD 1 9 DISAPPROVED .. DEPT: BUILDING ENGINEERING PLAN CHECK#: CB973336 PERMIT#: CB973336 FIRE PROJECT NAME: PLAN 2,3054 SF+490 GAR+75 DECK CMWD ST LITE DATE: 08/19/98 PERMIT TYPE: SFD PHASE 2,SALTAIRE,MONARCH COMMUNITIES ADDRESS: 1207 WIND STAR WY Lot# 49 CONTACT PERSON/PHONE#: C/FRANZ/92909257 SEWER DIST: CA WATER DIST: CA =============-----------======-----=-===========--=========================== INSPECTED DATE v-----BY: W?2 INSPECTED: ~ .,z..1-1l APPROVED DISAPPROVED INSPECTED DATE BY: INSPECTED: APPROVED DISAPPROVED INSPECTED DATE BY: INSPECTED: APPROVED DISAPPROVED =============----=-========================================================== COMMENTS: FINAL BUILDING INSPECTION DEPT: BUILDING ENGINEERING PLAN CHECK#: CB973336 PERMIT#: CB973336 FIRE PLANNING a LITE DATE: 08/19/98 PERMIT TYPE: SFD PROJECT NAME: PLAN 2,3054 SF+490 GAR+75 DECK PHASE 2,SALTAIRE,MONARCH COMMUNITIES ADDRESS: 1207 WIND STAR WY CONTACT PERSON/PHONE#: C/FRANZ/92909257 SEWER DIST: CA WATER DIST: CA INSPECTED BY: INSPECTED BY: DATE INSPECTED: DATE INSPECTED: Lot# 49 APPROVED APPROVED DISAPPROVED DISAPPROVED =======------===--------------======-=-=-==---=============================== COMMENTS: FINAL BUILDING INSPECTION DEPT: BUILDING ENGINEERING PLAN CHECK#: CB973336 PERMIT#: CB973336 FIRE PLANNING PROJECT NAME: PLAN 2,3054 SF+490 GAR+75 DECK CMWD PHASE 2,SALTAIRE ,MONARCH COMMUNITIES 8/19/98 PERMIT TYPE : SFD ADDRESS: 1207 WIND STAR WY Lot# 49 CONTACT PERSON/PHONE#: C/FRANZ/92909257 SEWER DIST: CA WATER DIST: CA ==============-=------------------=========================================== INSPECTED ~ DATE i ~ 20--9 ~ APPROVED ~ BY: INSPECTED: DISAPPROVED INSPECTED DATE BY: INSPECTED: APPROVED DISAPPROVED INSPECTED DATE BY: INSPECTED: APPROVED DISAPPROVED COMMENTS: