HomeMy WebLinkAbout2345 CAMINO VIDA ROBLE; ; CBC2025-0032; PermitPrint Date: 10/01/2025
Building Permit Finaled
Commercial Permit
CBC2025-0032Permit No:
Job Address:
Permit Type:
Parcel #:
Valuation:
Occupancy Group:
2345 CAMINO VIDA ROBLE, CARLSBAD, CA 92011-1505
BLDG-Commercial
2130502700
$539,279.84
Work Class:
Lot #:
Project #:
Tenant Improvement
Status:
Applied:
Issued:
01/30/2025
05/19/2025
Finaled Close Out:10/01/2025
#of Dwelling Units:
Track #:
Plan #:
Closed - Finaled
Plan Check #:
Orig. Plan Check #:Bathrooms:
Final Inspection:09/08/2025Bedrooms:Construction Type:
Occupant Load:
Code Edition:
Sprinkled:
INSPECTOR:Renfro, Chris
Kersch, Tim
9,356 S.F TI TO INCLUDE CEILING, ELECTRICAL, NON-STRUCTURAL WALLS AND MILLWORK AND FINISHES PER PLAN (E-REVIEW)Description:
Project Title:
Applicant: PERMITS IN MOTION
TERRY MONTELLO
4152 60TH ST
SAN DIEGO, CA 92115-6301(619) 994-5557
Property Owner: FIRST INDUSTRIAL FR CA PROPERTY HOLDING
3 LP
JERRY DEVON
898 PACIFIC COAST HWY, # STE 175EL SEGUNDO, CA 90245-2741
(310) 414-5400
Contractor: CREW BUILDERS INC
8130 COMMERCIAL ST
LA MESA, CA 91942-2926
(858) 587-0900
AMOUNTFEE
BUILDING PLAN CHECK $1,404.31
BUILDING PLAN REVIEW – MINOR PROJECTS (LDE)$204.00 BUILDING PLAN REVIEW – MINOR PROJECTS (PLN)$107.00
CERTIFICATE OF OCCUPANCY $21.00
COMM/IND TI – NON-STRUCTURAL $2,160.48
SB1473 – GREEN BUILDING STATE STANDARDS FEE $22.00 STRONG MOTION – COMMERCIAL (SMIP)$151.00
Total Fees:$4,069.79 Total Payments To Date:$4,069.79 Balance Due:$0.00
Please take NOTICE that approval of your project includes the "Imposition" of fees, dedications, reservations, or other exactions hereafter collectively referred to as "fees/exaction." You have 90 days from the date this permit was issued to protest imposition of these
fees/exactions. If you protest them, you must follow the protest procedures set forth in Government Code Section 66020(a), and file the
protest and any other required information with the City Manager for processing in accordance with Carlsbad Municipal Code Section
3.32.030. Failure to timely follow that procedure will bar any subsequent legal action to attack, review, set aside, void, or annul their imposition.
You are hereby FURTHER NOTIFIED that your right to protest the specified fees/exactions DOES NOT APPLY to water and sewer connection
fees and capacity changes, nor planning, zoning, grading or other similar application processing or service fees in connection with this project. NOR DOES IT APPLY to any fees/exactions of which you have previously been given a NOTICE similar to this, or as to which the
statute of limitation has previously otherwise expired.
1635 Faraday Avenue, Carlsbad CA 92008-7314 ï 442-339-2719 ï 760-602-8560 f ï www.carlsbadca.gov
Building Division Page 1 of 1
{"Cityof
Carlsbad
( City of
Carlsbad
COMMERCIAL
BUILDING PERMIT
APPLICATION
8-2
Plan Check
Est. Value
PC Deposit
Date
Suite: n/a APN: Job Address 2345 CAMINO VIDA ROBLE CARLSBAD CA 92011
Tenant Name#: cvr spec suite, available for lease
-----------------
Lot #: _____ Year Built: _________ _
Year Built: 2010 Occupancy: B-S1 Construction Type:_V_-B __ Fire sprinklers:@'ESQ NO A/C:{:)YESQ NO
BRIEF DESCRIPTION OF WORK: Tl IMPROVEMENTS PER PLAN. NON STRCTURAL. EXTENSION OF AN EXISTING VACANT FACILITY JUST PERMITED. AVAILABLE FOR LEASE
D Addition/New: _____________ New SF and Use, __________ New SF and Use
_______ SF Deck, SF Patio Cover, SF Other (Specify) ___ _
~Tenant Improvement: 9,356 SQ. FT SF,
_____ SF,
Existing Use: _B_-s_1 ______ Proposed Use: _B_-s_1 _____ _
Existing Use: Proposed Use: ______ _
D Pool/Spa: _____ SF Additional Gas or Electrical Features? _____________ _
D Solar: ___ KW, ___ Modules, Mounted: 0 Roof 0 Ground
D Re roof: ______________________________________ _
D Plumbing/Mechanical/Electrical
D Other:---------------------------------------
APPLICANT {PRIMARY CONTACT) PROPERTY OWNER
Name· PERMITS IN MOTION Name: Jerry Devon -First Industrial Realty Trust.
Address· 4715 60TH ST Address: 898 N. Pacific Coast Highway, Suite 175
City· SAN DIEGO State: CA Zip:_9_2_11_5 ___ City: El Segundo State: CA Zip:_9_0_24_5 ___ _
Phone· 619-994-5557 Phone: (310) 414-5400
Email· PERMITS@PERMITSINMOTION.COM Email: ---------------------
DES I G N PROFESSIONAL CONTRACTOR OF RECORD
Name_· __________________ Business Name:_c_re_w_B_u_ild_er_s_, 1_nc_. ___________ _
Address: Address: 8130 Commercial Street
City_· ________ State: ___ Zip: _____ City: La Mesa State:_c_A __ Zip: 91942
Phone: Phone: 858-587-0900
Email: Email: lauren@crewbuilders.com
Architect State License: CSLB License#: 753428 Class: 8 ----------------------------
Car Is bad Business License# (Required):_8_LO_5_1_22_6_52_4 ___ _
APPLICANT CERT/FICA TION: I certify that I have read the application and state that the above information is correct and that the
information on the plans is accurate. I agree to comply with all City ordinances and State laws relating to building
construction.
NAME(PRINT): JESUS GOMEZ SIGN: ~&ISPf<J DATE:_0_12_9_2_5 __ _
1635 Faraday Ave Carlsbad, CA 92008 Ph: 442-339-2719 Fax: 760-602-8558 Email: Building@carlsbadca.gov
REV. 07/21
THIS PAGE REQUIRED AT PERMIT ISSUANCE PLAN CHECK NUMBER: ______ _
A BUILDING PERMIT CAN BE ISSUED TO EITHER A STATE LICENSED CONTRACTOR OR A PROPERTY OWNER. IF THE PERSON
SIGNING THIS FORM IS AN AGENT FOR EITHER ENTITY AN AUTHORIZATION FORM OR LETTER IS REQUIRED PRIOR TO
PERMIT ISSUANCE.
(OPTION A): LICENSED CONTRACTOR DECLARATION:
lherebyaffirmunderpenaltyofperjurythatlamlicensedunderprovisionsofChapter9(commencingwithSection7000)ofDivision3
of the Business and Professions Code, and my license is in full force and effect. I also affirm under penalty of perjury one of the
following declarations(CHOOSE ONE):
[!]11 have and will maintain a certificate of consent to self-insure for workers' compensation provided by Section 3700 of the Labor Code, for the performance of the
work which this permit is issued. PolicyNo._w_c,_804_97_50_3 -----------------------------------
-OR-
D 1 have and will maintain worker's compensation, as required by Section 3700 of the Labor Code, for the performance of the work for which this permit is issued.
My workers' compensation insurance carrier and policy number are: Insurance Company Name: ____________________ _
Policy No. __________________________ Expiration Date: ______________ _
-OR-
Ocertificate of Exemption: I certify that in the performance of the work for which this permit is issued, I shall not employ any person in any manner so as to become
subject to the workers' compensation Laws of California. WARNING: Failure to secure workers compensation coverage is unlawful and shall subject an employer to
criminal penalties and civil fines up to $100,000.00, in addition the to the cost of compensation, damages as provided for in Section 3706 of the Labor Code,
interest and attorney's fees.
CONSTRUCTION LENDING AGENCY, IF ANY:
I hereby affirm that there is a construction lending agency for the performance of the work this permit is issued (Sec. 3097 (i) Civil Code).
Lender's Name:_N_iA ___________________ Lender'sAddress: ___________________ _
CONTRACTOR CERTIFICATION: I certify that I have read the application and state that the above information is correct and that
the information on the plans is accurate. I agree to comply with all City ordinances and State laws relating to building
construction. ~
NAME (PRINT): Jeff Salewsky SIGNATURE:_~_/_~----• __ DATE: 112312025
Note: If the person signing above is an authorized agent for the contractor provide a letter of authorization on contractor letterhead.
-OR -
(OPTION B): OWNER-BUILDER DECLARATION:
I hereby affirm that I am exempt from Contractor's License Law for the following reason: n I, as owner of the property or my employees with wages as their sole compensation, will do the work and the structure is not intended or offered for sale (Sec.
~44, Business and Professions Code: The Contractor's License Law does not apply to an owner of property who builds or improves thereon, and who does such
work himself or through his own employees, provided that such improvements are not intended or offered for sale. If, however, the building or improvement is sold
within one year of completion, the owner-builder will have the burden of proving that he did not build or improve for the purpose of sale).
-OR-
0 1, as owner of the property, am exclusively contracting with licensed contractors to construct the project (Sec. 7044, Business and Professions Code: The
Contractor's License Law does not apply to an owner of property who builds or improves thereon, and contracts for such projects with contractor(s) licensed
pursuant to the Contractor's License Law).
-OR-□1 am exempt under Business and Professions Code Division 3, Chapter 9, Article 3 for this reason:
AND, D FORM B-61 "Owner Builder Acknowledgement and Verification Form" is required for any permit issued to a property owner.
By my signature below I acknowledge that, except for my personal residence in which I must have resided for at least one year prior to completion of the
improvements covered by this permit, I cannot legally sell a structure that I have built as an owner-builder if it has not been constructed in its entirety by licensed
contractors./ understand that a copy of the applicable law, Section 7044 of the Business and Professions Code, is available upon request when this application is
submitted or at the following Web site: http:/lwww.leginfo.ca.gov/ ca/aw.html.
OWNER CERTIFICATION: I certify that I have read the application and state that the above information is correct and that the
information on the plans is accurate. I agree to comply with all City ordinances and State laws relating to bui {ding
construction.
NAME (PRINT): SIGN: DATE: ----------------------Note: If the person signing above is an authorized agent for the property owner include form B-62 signed by property owner.
1635 Faraday Ave Carlsbad, CA 92008 Ph: 442-339-2719 Fax: 760-602-8558 Email: Building@carlsbadca.gov
2 REV. 07/21
Building Permit Inspection History Finaled
PERMIT INSPECTION HISTORY for (CBC2025-0032)
BLDG-Commercial 01/30/2025Application Date:Permit Type:Owner:FIRST INDUSTRIAL FR CA PROPERTY
HOLDING 3 LP
Tenant Improvement 05/19/2025Work Class:Issue Date:Subdivision:CARLSBAD TCT#79-01
02/10/2026Expiration Date:Status:
IVR Number: 61452
Closed - Finaled 2345 CAMINO VIDA ROBLE
CARLSBAD, CA 92011-1505
Address:
Scheduled
Date
Inspection Type Inspection No. Inspection
Status
Primary Inspector Reinspection InspectionActual
Start Date
06/03/2025 06/03/2025 BLDG-81 Underground
Combo(11,12,21,31)
286583-2025 Failed Tim Kersch Reinspection Incomplete
COMMENTS PassedChecklist Item
BLDG-Building Deficiency Failed with multiple correction ADA.
Pluming electrical mech. Corrections on
card.
No
BLDG-11 Foundation-Ftg-Piers
(Rebar)
No
BLDG-12 Steel-Bond Beam No
BLDG-21
Underground-Underfloor
Plumbing
No
BLDG-31
Underground-Conduit Wiring
No
NOTES Created By TEXT Created Date
Angie Teanio 619-371-6673 / HECTOR 06/02/2025
BLDG-84 Rough
Combo(14,24,34,44)
286584-2025 Failed Tim Kersch Reinspection Incomplete
COMMENTS PassedChecklist Item
BLDG-Building Deficiency No
BLDG-14
Frame-Steel-Bolting-Welding
(Decks)
No
BLDG-24 Rough-Topout No
BLDG-34 Rough Electrical No
BLDG-44
Rough-Ducts-Dampers
No
NOTES Created By TEXT Created Date
Angie Teanio 619-371-6673 / HECTOR 06/02/2025
06/09/2025 06/09/2025 BLDG-21
Underground/Underflo
or Plumbing
287175-2025 Passed Tim Kersch Complete
COMMENTS PassedChecklist Item
BLDG-Building Deficiency Yes
BLDG-84 Rough
Combo(14,24,34,44)
287176-2025 Passed Tim Kersch Complete
Wednesday, October 1, 2025 Page 1 of 4
{cityof
Carlsbad
PERMIT INSPECTION HISTORY for (CBC2025-0032)
BLDG-Commercial 01/30/2025Application Date:Permit Type:Owner:FIRST INDUSTRIAL FR CA PROPERTY
HOLDING 3 LP
Tenant Improvement 05/19/2025Work Class:Issue Date:Subdivision:CARLSBAD TCT#79-01
02/10/2026Expiration Date:Status:
IVR Number: 61452
Closed - Finaled 2345 CAMINO VIDA ROBLE
CARLSBAD, CA 92011-1505
Address:
Scheduled
Date
Inspection Type Inspection No.Inspection
Status
Primary Inspector Reinspection InspectionActual
Start Date
COMMENTS PassedChecklist Item
BLDG-Building Deficiency Yes
BLDG-14
Frame-Steel-Bolting-Welding
(Decks)
Yes
BLDG-24 Rough-Topout Yes
BLDG-34 Rough Electrical Yes
BLDG-44
Rough-Ducts-Dampers
Yes
06/11/2025 06/11/2025 BLDG-11
Foundation/Ftg/Piers
(Rebar)
287496-2025 Partial Pass Chris Renfro Reinspection Incomplete
COMMENTS PassedChecklist Item
BLDG-Building Deficiency Slab patch back work. Ok to pour Yes
06/19/2025 06/19/2025 BLDG-16 Insulation 288182-2025 Partial Pass Chris Renfro Reinspection Incomplete
COMMENTS PassedChecklist Item
BLDG-Building Deficiency Partial pass insulation in walls only Yes
06/24/2025 06/24/2025 BLDG-17 Interior
Lath/Drywall
288617-2025 Partial Pass Chris Renfro Reinspection Incomplete
COMMENTS PassedChecklist Item
BLDG-Building Deficiency Partial pass drywall in walls only. Hard lids,
pending in restrooms.
Yes
07/08/2025 07/08/2025 BLDG-16 Insulation 289798-2025 Passed Chris Renfro Complete
COMMENTS PassedChecklist Item
BLDG-Building Deficiency Yes
BLDG-31
Underground/Conduit -
Wiring
289797-2025 Passed Chris Renfro Complete
COMMENTS PassedChecklist Item
BLDG-Building Deficiency Yes
07/23/2025 07/23/2025 BLDG-17 Interior
Lath/Drywall
291084-2025 Passed Chris Renfro Complete
COMMENTS PassedChecklist Item
BLDG-Building Deficiency Yes
08/01/2025 08/01/2025 BLDG-85 T-Bar, Ceiling
Grids, Overhead
291901-2025 Failed Chris Renfro Reinspection Incomplete
Wednesday, October 1, 2025 Page 2 of 4
PERMIT INSPECTION HISTORY for (CBC2025-0032)
BLDG-Commercial 01/30/2025Application Date:Permit Type:Owner:FIRST INDUSTRIAL FR CA PROPERTY
HOLDING 3 LP
Tenant Improvement 05/19/2025Work Class:Issue Date:Subdivision:CARLSBAD TCT#79-01
02/10/2026Expiration Date:Status:
IVR Number: 61452
Closed - Finaled 2345 CAMINO VIDA ROBLE
CARLSBAD, CA 92011-1505
Address:
Scheduled
Date
Inspection Type Inspection No.Inspection
Status
Primary Inspector Reinspection InspectionActual
Start Date
COMMENTS PassedChecklist Item
BLDG-Building Deficiency Need fire sprinkler sign up prior to
overhead T bar ceiling grids inspection
No
BLDG-14
Frame-Steel-Bolting-Welding
(Decks)
No
BLDG-24 Rough-Topout No
BLDG-34 Rough Electrical No
BLDG-44
Rough-Ducts-Dampers
No
08/12/2025 08/12/2025 BLDG-85 T-Bar, Ceiling
Grids, Overhead
292773-2025 Passed Chris Renfro Complete
COMMENTS PassedChecklist Item
BLDG-Building Deficiency Yes
BLDG-14
Frame-Steel-Bolting-Welding
(Decks)
Yes
BLDG-24 Rough-Topout Yes
BLDG-34 Rough Electrical Yes
BLDG-44
Rough-Ducts-Dampers
Yes
08/14/2025 08/14/2025 BLDG-85 T-Bar, Ceiling
Grids, Overhead
293025-2025 Passed Chris Renfro Complete
COMMENTS PassedChecklist Item
BLDG-Building Deficiency Yes
BLDG-14
Frame-Steel-Bolting-Welding
(Decks)
Yes
BLDG-24 Rough-Topout Yes
BLDG-34 Rough Electrical Yes
BLDG-44
Rough-Ducts-Dampers
Yes
09/04/2025 09/04/2025 BLDG-Final Inspection 294702-2025 Failed Chris Renfro Reinspection Incomplete
COMMENTS PassedChecklist Item
BLDG-Building Deficiency Need final paperwork, test & balance, B59
Construction Waste Management form and
trash/recycling receipts
No
BLDG-Plumbing Final No
BLDG-Mechanical Final No
BLDG-Structural Final No
BLDG-Electrical Final No
09/08/2025 09/08/2025 BLDG-Final Inspection 294948-2025 Passed Chris Renfro Complete
Wednesday, October 1, 2025 Page 3 of 4
PERMIT INSPECTION HISTORY for (CBC2025-0032)
BLDG-Commercial 01/30/2025Application Date:Permit Type:Owner:FIRST INDUSTRIAL FR CA PROPERTY
HOLDING 3 LP
Tenant Improvement 05/19/2025Work Class:Issue Date:Subdivision:CARLSBAD TCT#79-01
02/10/2026Expiration Date:Status:
IVR Number: 61452
Closed - Finaled 2345 CAMINO VIDA ROBLE
CARLSBAD, CA 92011-1505
Address:
Scheduled
Date
Inspection Type Inspection No.Inspection
Status
Primary Inspector Reinspection InspectionActual
Start Date
COMMENTS PassedChecklist Item
BLDG-Building Deficiency Yes
BLDG-Plumbing Final Yes
BLDG-Mechanical Final Yes
BLDG-Structural Final Yes
BLDG-Electrical Final Yes
Wednesday, October 1, 2025 Page 4 of 4
True North Compliance Services, Inc.
8369 Vickers Street, Suite 207, San Diego, CA 92111
T | 562.733.8030
April 10, 2025
City of Carlsbad City of Carlsbad– SECOND REVIEW
Community Development Department - Building Division City Permit No: CBC2025-0032
1635 Faraday Ave. True North No.: 25-018-133
Carlsbad, CA 92008
Plan Review: TI CVR Spec Suite
Address: 2345 Camino Vida Roble, Carlsbad CA
Applicant Name: Jesus Gomez Applicant Email: Permits@permitsinmotion.com
True North Compliance Services, Inc. has completed the review of the following documents for the project
referenced above on behalf of the City of Carlsbad. Our comments can be found on the attached list.
1. Drawings: Electronic copy dated March 25, 2025, by Pitman Design, inc..
2. CAP B-50: Electronic copy dated March 4, 2025, by Jesus Gomez
3. Other Documents: Electronic copy of response letter.
Attn: Permit Technician, the scope of work on the plans has been reviewed for coordination with the scope of
work on the permit application. See below for information if the scope of work on plans differs from the permit
application:
Valuation: See Notes Below
Scope of Work: Confirmed
Floor Area: Confirmed
Notes: No valuation given
Our comments follow on the attached list. Please call if you have any questions or if we can be of further
assistance.
Sincerely,
True North Compliance Services
Review By: Ed Dion - Plan Review Engineer
Quality Review By: Areli Sanchez - Plan Review Supervisor
.JTrue North ~ COMPLI ANCE SERV ICES
TI CVR Spec Suite City of Carlsbad– SECOND REVIEW
2345 Camino Vida Roble City Permit No.: CBC2025-0032
April 10, 2025 True North No.: 25-018-133
Page 2
Plan Review Comments
ELECTRONIC - RESUBMITTAL INSTRUCTIONS:
Please do not resubmit plans until all departments have completed their reviews. For status, please
contact building@carlsbadca.gov
Please make all corrections, as requested in the correction list. Corrected sets can be submitted as follows:
Email the revised plans and comment response letter(s) to building@carlsbadca.gov for continued
review.
Note: If this project requires FIRE PREVENTION review, ensure that you follow their specific
instructions for resubmittal review. The city will not route plans back to Dennis Grubb &
Associates for continued Fire Prevention review.
GENERAL INFORMATION:
A. The following comments are referred to the 2022 California Building, Mechanical, Plumbing, Electrical
Codes, California Green Building Standards Code, and Energy Code (i.e., 2021 IBC, UMC, UPC, and 2020
NEC, as amended by the State of California).
B. There may be other comments generated by the Building Division and/or other City departments that will
also require your attention and response. This attached list of comments, then, is only a portion of the plan
review. Contact the City for other items.
C. Respond in writing to each comment by marking the attached comment list or creating a response letter.
Indicate which details, specification, or calculation shows the required information. Your complete and
clear responses will expedite the re-check.
D. Where applicable, be sure to include the architect and engineer’s stamp and signature on all sheets of the
drawings and on the coversheets of specifications and calculations per CBPC 5536.1 and CBPC 6735. This
item will be verified prior to plan approval.
E. If you have any questions regarding the comments below, please contact Ed Dion via email
edion@tncservices.com or telephone (562) 733-8030.
OCCUPANCY & BUILDING SUMMARY:
Occupancy Groups: B, S-1
Occupant Load: 64
Type of Construction: VB
Sprinklers: Yes
Stories: 1
Area of Work (sq. ft.): 9,356 sq. ft.
TI CVR Spec Suite City of Carlsbad– SECOND REVIEW
2345 Camino Vida Roble City Permit No.: CBC2025-0032
April 10, 2025 True North No.: 25-018-133
Page 3
MECHANICAL COMMENTS:
PC2: Mechanical sheet index in PC2 has been revised to omit the proposed mechanical plan. Furthermore,
mechanical sheets were not included. As a mechanical demolition plan is still shown on the index, we assume
that work is proposed, as such, please provide.
GREEN BUILDING COMMENTS:
G1. Climate Action Plan requirements apply to all new structures, residential additions/remodels equal to or
exceeding $60,000 in valuation, and commercial projects exceeding $200,000 in valuation. City of Carlsbad
requires that all projects that qualify for CAP compliance will require a completed Climate Action Plan
(CAP) Consistency Checklists (city forms B-50) to be completed by the APPLICANT.
https://www.carlsbadca.gov/home/showpublisheddocument/6878/638225157825900000
PC2: Complete part 1B Revise part B-55 accordingly and incorporate Part B-55 into plan set
If you have any questions regarding the above comments, please contact Ed Dion via email
edion@tncservices.com or telephone (562) 733-8030.
[END]
B. 0 New Nonresidential construction (Including additions over 1,000sf), new hotel/motel construction AND alterations~
$200,000 building permit valuation. See Section 18.21.050 of the CMC and CALGreen Appendix AS.
At least one measure from each applicable building compcnent required. □ N/A ________ _
AS.203.1. 1 Choose one:
□ Outdoor lighting □ Restaurant service water heating (Section 140.5 of the CEC)
□ Warehouse dock seal doors D Daylight design PAFs D Exhaust air heat recovery
AS.203.1.2.1 Choose one: D .95 Energy budget
(Projects with indoor lighling OR mechanical)
D .90 Energy budget
(Projects llith indoor lighting AND medlanical)
AS.211. 1-D On-site renewable energy:
AS.211 .3" □ Green power: (If offered by local utility provider, 50% minimum renewable sources)
AS.212.1 □ Elevators and escalators:(Project with more than one elevator or two escalators)
AS.213.1 D Steel framing: (Provide details on plans for options 1-4 chosen)
• High-rise residential buildings are 4 or more stories.
0 N/A ________ _
□ N/A _______ _
□ N/A
0 N/A
□ N/A
□ N/A ________ _
•• For alterations2: $1 ,000,000BPV and affecting> 75%existing gross floor area, OR alterations that add 2,000 square feet of new roof addition: comply
with Section 18.030.040 of the CMC (section 28 below) instead.
True North Compliance Services, Inc.
8369 Vickers Street, Suite 207, San Diego, CA 92111
T | 562.733.8030
February 19, 2025
City of Carlsbad City of Carlsbad– FIRST REVIEW
Community Development Department - Building Division City Permit No: CBC2025-0032
1635 Faraday Ave. True North No.: 25-018-133
Carlsbad, CA 92008
Plan Review: TI CVR Spec Suite
Address: 2345 Camino Vida Roble, Carlsbad CA
Applicant Name: Jesus Gomez Applicant Email: Permits@permitsinmotion.com
True North Compliance Services, Inc. has completed the review of the following documents for the project
referenced above on behalf of the City of Carlsbad. Our comments can be found on the attached list.
1. Drawings: Electronic copy dated January 30, 2025, by Pitman Design, inc..
2. Other Documents: Electronic copy of Permit Application.
Attn: Permit Technician, the scope of work on the plans has been reviewed for coordination with the scope of
work on the permit application. See below for information if the scope of work on plans differs from the permit
application:
Valuation: See Notes Below
Scope of Work: Confirmed
Floor Area: Confirmed
Notes: No valuation given
Our comments follow on the attached list. Please call if you have any questions or if we can be of further
assistance.
Sincerely,
True North Compliance Services
Review By: Ed Dion - Plan Review Engineer
Quality Review By: Areli Sanchez - Plan Review Supervisor
.JTrue North ~ COMPLI ANCE SERV ICES
TI CVR Spec Suite City of Carlsbad– FIRST REVIEW
2345 Camino Vida Roble City Permit No.: CBC2025-0032
February 19, 2025 True North No.: 25-018-133
Page 2
Plan Review Comments
ELECTRONIC - RESUBMITTAL INSTRUCTIONS:
Please do not resubmit plans until all departments have completed their reviews. For status, please
contact building@carlsbadca.gov
Please make all corrections, as requested in the correction list. Corrected sets can be submitted as follows:
Email the revised plans and comment response letter(s) to building@carlsbadca.gov for continued
review.
Note: If this project requires FIRE PREVENTION review, ensure that you follow their specific
instructions for resubmittal review. The city will not route plans back to Dennis Grubb &
Associates for continued Fire Prevention review.
GENERAL INFORMATION:
A. The following comments are referred to the 2022 California Building, Mechanical, Plumbing, Electrical
Codes, California Green Building Standards Code, and Energy Code (i.e., 2021 IBC, UMC, UPC, and 2020
NEC, as amended by the State of California).
B. There may be other comments generated by the Building Division and/or other City departments that will
also require your attention and response. This attached list of comments, then, is only a portion of the plan
review. Contact the City for other items.
C. Respond in writing to each comment by marking the attached comment list or creating a response letter.
Indicate which details, specification, or calculation shows the required information. Your complete and
clear responses will expedite the re-check.
D. Where applicable, be sure to include the architect and engineer’s stamp and signature on all sheets of the
drawings and on the coversheets of specifications and calculations per CBPC 5536.1 and CBPC 6735. This
item will be verified prior to plan approval.
E. If you have any questions regarding the comments below, please contact Ed Dion via email
edion@tncservices.com or telephone (562) 733-8030.
OCCUPANCY & BUILDING SUMMARY:
Occupancy Groups: B, S-1
Occupant Load: 64
Type of Construction: VB
Sprinklers: Yes
Stories: 1
Area of Work (sq. ft.): 9,356 sq. ft.
TI CVR Spec Suite City of Carlsbad– FIRST REVIEW
2345 Camino Vida Roble City Permit No.: CBC2025-0032
February 19, 2025 True North No.: 25-018-133
Page 3
ARCHITECTURAL COMMENTS:
A1. Sheet Index
a) Add plumbing and mechanical sheet index to title page
b) Sheet P111 missing from plumbing index
c) Sheet M11 missing from mechanical sheet index
A2. Sheet A0.9: Please update the occupant load summary/analysis to include gross floor area such as restrooms
and storage rooms. Refer to definitions.
A3. Sheet A0.9: Identify location of tactile signage. General not provided on plans is not sufficient.
A4. At electrical rooms, provide panic hardware or fire exit hardware where the door services an electrical room
with equipment rated at 800 amperes or more. CBC 1010.2.9.2
a) Reverse swing of door.
ACCESSIBILITY COMMENTS:
D1. CBC 11B-202.3 requires that accessibility be provided to the altered spaces. This accessibility shall include
the requirements of CBC 11B-202.4, which entails: a primary entrance, a primary path of travel, sanitary
facilities serving the area, a drinking fountain, and signs. Please address the following:
a) Extend accessible path of travel to the public way.
i) On the site plan, specify the accessible route to be 5% maximum running slope with 2%
maximum cross slope per CBC 11B-403.3.
ii) Specify the accessible route to be at least 48” in width. CBC 11B-403.5.1
b) Provide dimensioned plans and details for the restrooms serving the area to verify that it meets
requirements of CBC 11B Division 6. (accessibility required in restroom 6 and 7 and at least one
of 14 or 15 Per CBC 11B213.2)
c) Show the location and provide details for the drinking fountain serving this area (if provided) to
verify that it meets the requirements of CBC 11B-211.1 and CBC 11B-602.
d) If the cost of providing or upgrading the items above exceeds 20% of the total cost, not including
accessibility upgrades, CBC 11B-202.4 Exception 8 may apply. If this exemption is taken,
accessibility upgrades of 20% minimum of the cost shall be made. An unreasonable hardship form
EXISTING f,fl)f)
$11TCll(;EARl1$A
CD
EXISTING 2fl)f)
PlscatECT FOR
PANEL a•
TI CVR Spec Suite City of Carlsbad– FIRST REVIEW
2345 Camino Vida Roble City Permit No.: CBC2025-0032
February 19, 2025 True North No.: 25-018-133
Page 4
shall be submitted documenting the upgrades, items that are not compliant, and the amount of
money it requires to make each item compliant. The upgrade shall be made with the following
priorities:
i) The main entrance to the building
ii) The primary path of travel (including upgrades to elevator, corridors, doors, etc.)
iii) The accessible restroom.
iv) Accessible phones
v) Drinking fountains
vi) Other elements (such as parking)
D2. Sheet A4.4: Cross-reference standard restroom details from sheet A0.10.
D3. Revise the parallel curb ramps to include the following dimensions shown in CBC Figure 11B-705.1.2.2.2:
a) Dimension the detectable warnings to start 6 inches minimum and 8 inches maximum from the
demarcation line at the face of the curb. CBC 11B-705.1.2.2.2
b) Provide a minimum 36” from the rear edge of the detectable warnings to back of the curb ramp as
shown in CBC Figure 11B-705.1.2.2.2 below.
D4. Provide information for the existing and proposed doors that are within the area of work.
a) Confirm the clear width of the doorways are 32” minimum per CBC 11B-404.2.3. A 3 ft wide door
provides 32” clear width.
b) Specify door thresholds, if provided at doorways, to be ½ inch high maximum. Raised thresholds
and changes in level at doorways shall comply with CBC Section 11B-302 and 11B-303. CBC
11B-404.2.5.
c) Door opening hardware is mounted 34” to 44” above the finish floor per CBC 11B-404.2.7.
d) Door hardware are operable with one hand and do not require tight grasping, pinching, or twisting
of the hand. CBC 11B-404.2.7 and 11B-309.4.
e) Door opening force is 5-pounds maximum for interior and exterior doors per CBC 11B-404.2.9.
f) Lower 10 inch of the door surface is provided with a smooth surface for the full width of the door,
at the push side of the door per CBC 11B-404.2.10.
3Bmin I [Ji,,
i
(aj
one ,entrance/exit point ...
TI CVR Spec Suite City of Carlsbad– FIRST REVIEW
2345 Camino Vida Roble City Permit No.: CBC2025-0032
February 19, 2025 True North No.: 25-018-133
Page 5
MECHANICAL COMMENTS:
No Comment
ELECTRICAL COMMENTS:
See comment P1
PLUMBING COMMENTS:
P1. Provide water heater energy compliance forms. See link for forms resources.
https://energycodeace.com/content/get-forms
GREEN BUILDING COMMENTS:
G1. Climate Action Plan requirements apply to all new structures, residential additions/remodels equal to or
exceeding $60,000 in valuation, and commercial projects exceeding $200,000 in valuation. City of Carlsbad
requires that all projects that qualify for CAP compliance will require a completed Climate Action Plan
(CAP) Consistency Checklists (city forms B-50) to be completed by the APPLICANT.
https://www.carlsbadca.gov/home/showpublisheddocument/6878/638225157825900000
a) For plans submitted to the City the following Climate Action Plan requirements apply, per Carlsbad
ordinance:
b) The applicant is to fill out the B-50 CAP Consistency Checklist. The scope of work and project
valuation will determine which sections of the CAP are required.
c) Plan examiners review the B-50 CAP Consistency Checklist for completion. For example: If new
residential construction is the scope of work, CAP sections 2A, 3A, and 4A are required to be filled
on the B-50 checklist.
ENERGY COMPLIANCE COMMENTS:
No Comment
STRUCTURAL COMMENTS:
No Comment
If you have any questions regarding the above comments, please contact Ed Dion via email
edion@tncservices.com or telephone (562) 733-8030.
[END]
CLIMATE ACTION PLAN
CONSISTENCY CHECKLIST B-50
Development Services
Building Division
1635 Faraday Avenue
442-339-2719
www.carlsbadca.gov
PURPOSE
This checklist is intended to help building permit applicants identify which Climate Action Plan (CAP) ordinance requirements apply to their project. This completed checklist (B-50) and summary (B-55) must be included with the building permit application. The Carlsbad Municipal Code (CMC) can be referenced during completion of this document.
NOTE: The following type of permits are not required to fill out this form
Patio Decks PME (w/o panel upgrade) Pool
The B-50 checklist was originally developed several years ago to support implementation of the CAP. Recent updates to the California Building Standards Code have imposed newer performance standards on building permit applications. Therefore, the applicant is advised to review all applicable code sections and apply the maximum performance standard,
which may exceed the CAP consistency checklist requirements
Consultation with a certified Energy Consultant is encouraged to assist in filling out this document. Appropriate certification includes, but is not limited to: Licensed, practicing Architect, Engineer, or Contractor familiar with Energy compliance, IECC/HERS Compliance Specialist, ICC G8 Energy Code Specialist, RESNET HERS rater certified, certified
ICC Residential Energy Inspector/Plans Examiner, ICC Commercial Energy Inspector and/or Plans Examiner, ICC CALgreen Inspector/Plans Examiner, or Green Building Residential Plan Examiner.
If an item in the checklist is deemed to be not applicable to a project, or is less than the minimum required by ordinance, check N/A and provide an explanation or code section describing the exception.
The project plans must show all details as stated in the applicable Carlsbad Municipal Code (CMC) and/or Energy Code and
Green Code sections.
Application Information
Project Name/Building Permit No.: BP No.: Date:
Property Address/APN:
Applicant Name/Co.:
Applicant Address:
Contact Phone: Contact Email:
Contact information of person completing this checklist (if different than above):
Name: Contact Phone:
Company
name/address: Contact Email:
B-50 Page 1 of 7 Revised 12/22
CVR SPEC SUITE-CBC2025-0018 03/03/25
213-050-27-00
JESUS GOMEZ
3900 5TH AVE SAN DIEGO, CA 92103
6192990011 X2 JESUS@DPDESIGNINC.COM
C cityof
Carlsbad
I I I
3
Use the table below to determine which sections of the Ordinance checklist are applicable to your project. For alterations and additions to existing buildings, attach a Permit Valuation breakdown on a separate sheet. For purposes of determining valuation, the amount should be upon either the actual contract price for the work to be permitted or shall be determined with the use of the current “ICC Building Valuation Data” as published by the International Code Council, whichever is higher (refer to Section 18.04.035 of the CMC).
Building Permit Valuation (BPV) $ breakdown
Construction Type Complete Section(s) Notes:
Residential
☐New construction 2A*, 3A*, 4A* *Includes detached, newly constructed ADU
☐Additions and alterations:
☐BPV < $60,000 N/A All residential additions and alterations
☐BPV ≥ $60,000☐Electrical service panel upgrade only 1A, 4A 1-2 family dwellings and townhouses with attached garagesonly.
☐BPV ≥ $200,000 1A, 4A*
2B*
*Multi-family dwellings only where interior finishes areremoved and significant site work and upgrades to structuraland mechanical, electrical, and/or plumbing systems areproposed
BPV ≥ $1,000,000 *Multi-family dwellings only where ≥$1,000,000 BPV ANDaffecting ≥75% existing floor area
Nonresidential and hotels/motels
☐New construction 1B, 2B, 3B, 4B and 5
☐Alterations:
☐BPV ≥ $200,000 or additions ≥1,000 square feet 1B, 5
☐BPV ≥ $1,000,000 1B, 2B, 5 Building alterations of ≥ 75% existing gross floor area
≥ 2,000 sq. ft. new roof addition 2B, 5 1B also applies if BPV ≥ $200,000
Instructions: 1.Choose first between residential or non-residential based on the type of project being submitted.2.Next chose between new construction or addition/alteration for residential or non-residential.3.The columns to the right of your selection will determine which sections of the CAP program are applicable to your project.4.Appropriate details must be included on the plans for selections made.
EXAMPLE: Scope of work includes a new, 2 story, single family residential structure. The selections would be: Residential and New construction in the table above. For a 2-story structure, CAP sections 2A, 3A and 4A would be applicable. (Solar PV, water heating, EV charging) The * indicates that new detached ADU’s are included.
EXAMPLE: Scope of work includes a tenant improvement (i.e., alterations) valued at over one million dollars. The selections would be: Non-residential and Alteration BPV ≥ $1,000,000. CAP sections 1B, 2B and 5 would be applicable to this project. (Energy efficiency, Solar PV and Transportation Demand Management (TDM)*)
It may be necessary to supplement the completed checklist with supporting materials, calculations or certifications, to demonstrate full compliance with CAP ordinance requirements. For example, projects that propose or require a performance approach to comply with energy-related measures will need to attach to this checklist separate calculations and documentation as specified by the ordinances.
393,231
□
Ii I
■
■
4
CAP Ordinance Compliance
Checklist Item
Check the appropriate boxes, explain all not applicable and exception items, and provide supporting calculations and documentation as necessary.
1. Energy Efficiency
Please refer to Section 18.30.060 of the Carlsbad Municipal Code (CMC) and Section 150.2 of the CEC for more information. Appropriate details and notes must be placed on the plans according to selections chosen in the design. A. Residential addition or alteration ≥ $60,000 building permit valuation. Details of selection chosen below must be placed on the plans referencing CMC 18.30.060.
☐ N/A ☐ Exception: Home energy score ≥ 7 (attach certification)
B. New Nonresidential construction (including additions over 1,000sf), new hotel/motel construction AND alterations ≥ $200,000 building permit valuation. See Section 18.21.050 of the CMC and CALGreen Appendix A5.
At least one measure from each applicable building component required. ☐ N/A
A5.203.1.1 Choose one:
☐ Outdoor lighting ☐ Restaurant service water heating (Section 140.5 of the CEC)
☐ Warehouse dock seal doors ☐ Daylight design PAFs ☐ Exhaust air heat recovery ☐ N/A
A5.203.1.2.1 Choose one: ☐ .95 Energy budget (Projects with indoor lighting OR mechanical) ☐ .90 Energy budget (Projects with indoor lighting AND mechanical) ☐ N/A
A5.211.1** ☐ On-site renewable energy:
A5.211.3** ☐ Green power: (If offered by local utility provider, 50% minimum renewable sources)
A5.212.1 ☐ Elevators and escalators:(Project with more than one elevator or two escalators)
A5.213.1 ☐ Steel framing: (Provide details on plans for options 1-4 chosen)
* High-rise residential buildings are 4 or more stories.
☐ N/A _____________________
☐ N/A ☐ N/A ☐ N/A
** For alterations≥ $1,000,000BPV and affecting> 75%existing gross floor area, OR alterations that add 2,000 square feet of new roof addition: comply with Section 18.030.040 of the CMC (section 2B below) instead.
Year Built Single-family Requirements Multi-family Requirements
☐ Before 1978 Select one option: ☐ Duct sealing ☐ Attic insulation ☐ Cool roof ☐ Attic insulation
☐ 1978 and later Select one option: ☐ Lighting package ☐ Water heating package
☐ Between1978 -1991 Select one option: ☐ Duct sealing ☐ Attic insulation ☐ Cool roof
☐ 1992 and later Select one option: ☐ Lighting package ☐ Water- heating package
r--
,__
L
□
□
□
□
□
□
□
□
□
7
5
2.Photovoltaic Systems
A. Residential new construction. Refer to Section 150.1(c)14 of the CEC for single-family requirements and Section 170.2(d) of the CEC for multi-family requirements. If project includes installation of an electric heat pump water heater pursuant to CAP section 3 below (residential water heating), increase system size by .3kWdc if PV offset option is selected.
Floor Plan ID (use additional
sheets if necessary)
CFA or SARA #d.u. Calculated kWdc* Exception
☐
☐
☐
☐
Total System Size: __________ kWdc
kWdc = (CFAx.572) / 1,000 + (1.15 x #d.u.)
*Formula calculation where CFA = conditional floor area, #du = number of dwellings per plan type
If proposed system size is less than calculated size, please explain.
B. Nonresidential, hotel/motel and multifamily additions, alterations and repairs of these projects ≥$1,000,000 BPV AND affecting ≥75% existing floor area, OR addition that increases roof area by ≥2,000 square feet. Please refer to Section 18.30.040 and 18.30.070 of the CMC when completing this section.
Choose one of the following methods: (Gross floor area or Time-Dependent Valuation method)
☐Gross Floor Area (GFA)Method
GFA:
☐If < 10,000s.f. Enter: 5 kWdc
Min.System Size: kWd
☐If ≥ 10,000s.f. calculate: 15 kWdc x (GFA/10,000) **
**Round building size factor to nearest tenth, and round system size to nearest whole number.
☐Time- Dependent Valuation Method
C.
Annual TDV Energy use:*** x .80= Min. system size: kWdc
***Attach calculation documentation using modeling software approved by the California Energy Commission.
*All newly constructed non residential, hotel/motel and highrise multifamily buildings that are required by CEC section140.10(a) to have a PV system shall also have a battery storage system meeting CEC section 140.10(b). Nonresidential, hotel/motel and multifamily additions, alterations or repairs that trigger solar due to the Carlsbad Climate ActionPlan will NOT require battery storage. Battery storage is required when triggered by CEC section 140.10(a) and/or 170.2(g).
□
□
□
□
□
-
□
□
6
3.Water Heating
A. Residential. Refer to Section 18.30.050 of the CMC and Sections 150.1(c)8 or 170.2(d) of the CEC when completing thissection. Provide complete details on the plans.
Residential new construction and alterations: ☐Required: 60% of energy needed for service water heating from on-site solar or recovered energy.
For systems serving individual units, choose one system:
☐Single 240-volt heat pump water heater AND compact hot water distribution AND Drain water heat recovery (low-riseresidential only)☐Single 240-volt heat pump water heater AND PV system .3 kWdc larger than required.☐Heat pump water heater meeting NEEA Advanced Water Heating Specification Tier 3 or higher.☐Solar water heating system that is either .60 solar savings fraction or 40 s.f. solar collectors☐Gas or propane system with a solar water hearing system and recirculation system.
For systems serving multiple units, choose one system:
☐Heat pump water heating system with recirculation loop tank and electric backup.☐Solar water heating system that is either:☐.20 solar savings fraction ☐ .15 solar savings fraction, plus drain water heat recover
OR:
☐System meets performance compliance requirements of section 150.1(d) or 170.2(d) and deriving at least 60% of energy fromon-site solar or recovered energy.
☐Exception:
B.Nonresidential and hotel/motel new construction. This section also applies to high-rise residential. Refer to Sections 18.030.020 and 18.040.030 of the CMC and Sections 140.5 and 170.2 of the CEC when completing this section. Provide complete detailson the plans.
1.Non-residential:☐Required: Water heating system derives at least 40% of its energy from one of the following:
☐Solar-thermal ☐ Photovoltaics ☐ Recovered energy
☐Required: High-capacity service water heating system
2.Water heating system is (choose one):☐Heat pump water heater☐Electric resistance water heater(s)☐Solar water heating system with .40 solar savings fraction
3.Hotel/motel:
☐Required: High-capacity service water heating system (meeting Section 170.2(d) of the CEC)
☐Required: Located in garage or conditioned space
Exception:
□
□
7
4.Electric Vehicle Charging
A.Residential - New construction and major alterations.* This section also applies to hotel/motel projects. Refer to Section 18.21.030 of the CMC and Section 4.106.4 of the GBSC when completing this section. Choose one: ☐One and two-family residential dwelling alterations with no electrical panel upgrade (No EV space required)☐ADU (no EV space required when no additional parking facilities are added)☐One and two-family residential dwellings with attached garage and electrical panel upgrade☐One EV Ready parking space required ☐Exception:☐New and major alterations to multi-family and hotel/motel projects: ☐ Exception: ______________________________________________
Total Parking Spaces Proposed EVSE Spaces
EV Capable (10% of total) EV Ready (25% of Total) EV chargers (5% of Total)
*Major alterations are:
(1) for one and two-family dwellings and for town houses with an attached garage, alterations have a building permit valuation≥ $60,000 or includean electrical service panel upgrade.(2) for multifamily dwellings (three units or more without attached garages), alterations have a building permit valuation ≥ $200,000, interior finishes areremoved and significant site work and upgrades to structural and mechanical, electrical, and/or plumbing systems are proposed.
B. Non-Residential - New construction ☐Exception :
Please refer to Section 18.21.040 of the CMC when completing this section
Total Parking Spaces
Proposed EV Capable EVCS (Installed with EVSE) EV Ready (optional) EV Space (optional)
Calculation: Refer to the table below:
Total Number of Parking Spaces provided Number of required EV Capable Spaces Number of required EVCS (Installed with EVSE) ☐0-9 1 1 ☐10-25 4 1 ☐26-50 8 2 ☐51-75 13 3 ☐76-100 17 5 ☐101-150 25 6 ☐151-200 35 9 ☐201 and over 20 percent of total 25 percent of Required EV Spaces
Calculations: Total EV Capable spaces = .20 x Total parking spaces proposed (rounded up to nearest whole number)
EVSE Installed = Total EVSE Spaces x .25 (rounded up to nearest whole number)
EVSE other may be “EV Ready” or “EV Space”
□
□
□
□
□
□
□
□
□
□
8
5. Transportation Demand Management (TDM): Nonresidential ONLY
An approved Transportation Demand Management (TDM) Plan is required for all nonresidential projects that meet a threshold of employee-generated ADT.
City staff will use the table below based on your submitted plans to determine whether your permit requires a TDM plan. If TDM is applicable to your permit, staff will contact the applicant to develop a site-specific TDM plan based on the permit details.
Employee ADT Estimation for Various Commercial Uses
Use
Emp ADT for
first 1,000 s.f.
Emp ADT/
1000 s.f.1
Office (all)2 20 13
Restaurant 11 11
Retail3 8 4.5
Industrial 4 3.5
Manufacturing 4 3
Warehousing 4 1
1 Unless otherwise noted, rates estimated from ITE Trip Generation Manual, 10thEdition
2 For all office uses, use SANDAG rate of 20 ADT/1,000 sf to calculate employee ADT
3 Retail uses include shopping center, variety store, supermarket, gyms, pharmacy, etc.
Other commercial uses may be subject to special
consideration
Sample calculations:
Office: 20,450 sf
1. 20,450 sf / 1000 x 20 = 409 Employee ADT
Retail: 9,334 sf
1.First 1,000 sf = 8 ADT
2. 9,334 sf - 1,000 sf = 8,334 sf
3.(8,334 sf / 1,000 x 4.5) + 8 = 46 Employee ADT
Acknowledgment:
I acknowledge that the plans submitted may be subject to the City of Carlsbad’s Transportation Demand Management Ordinance. I agree to be contacted should my permit require a TDM plan and understand that an approved TDM plan is a condition of permit issuance.
Applicant Signature: ________________________________
Name: __________________________________________
Date: ___________________________________________
Phone No.: ______________________________________
JESUS GOMEZ
03/04/25
619-299-0011 X 2
□
N
CAP Building Plan Template
B-55
Development Services
Building Division
1635 Faraday Avenue
760-602-2719
www.carlsbadca.gov
CLIMATE ACTION PLAN (CAP) COMPLIANCE
The following summarizes project compliance with the applicable Climate Action Plan ordinances of the Carlsbad Municipal Code and California
Green Building Standards Code (CALGreen), current version. The following certificate shall be included on the plans for all building permits that
are required to comply with the CAP measures:
1.ENERGY EFFICIENCY APPLICABLE:
Complies with CMC 18.30.060 or 18.21.050 Existing Structure, year built:
YES NO
Yes N/A
Prepared Energy Audit?
Energy Score:
Efficiency Measures included in scope:
Yes No
2.PHOTOVOLTAIC SYSTEM APPLICABLE: YES NO
Complies with CMC section 18.30.040 and 2022 California Energy
Code section 150.1(c)14 Yes /A
Size of PV system (kWdc): Sizing PV by load calculations Yes No
If by Load Calculations:
Total calculated electrical load: 80% of load: Exception Requested Exception Approved Yes No Yes No
3.ALTERNATIVE WATER HEATING SYSTEM APPLICABLE:
Complies with CMC sections 18.30.020
18.20.030 and/or 18.30.050?
Alternative Source:
□Electric
□Passive Solar
Exception Requested
Yes
Yes
YES NO
N/A
No
Exception Approved Yes No
4.ELECTRIC VEHICLE (EV) CHARGING APPLICABLE: YES NO
s N/A
No
5.TRAFFIC DEMAND MANAGEMENT APPLICABLE:
Compliant?
TDM Report on file with city?
YES NO
Yes No
Yes No
Complies with CMC section 18.21.030?
Panel Upgrade? Required
Total EV Parking Spaces:
No. of EV Capable Spaces: No. of EV Ready Spaces: ________ No. of EV Installed Spaces:
Hardship Requested
Ye Yes
Provided
________
_______
Yes No
Hardship Approved Yes No
n
1981
n
n
n
4
4
4
C Cityof
Carlsbad
□ □
□ Iii
□ Ii]
□ □
□ ~
□ □
□ □ □ □
□ □
□ □
□ (-1
□ □
□ [j]
□ □ □ □
B B
□ □
□ □ □ □