HomeMy WebLinkAboutCT 2017-0005; GRAND WEST; FINAL SOILS REPORT; 2024-11-01Report of Testing & Observations -Geo Final Report
November 1, 2024
City of Carlsbad
1625 Faraday Avenue
Carlsbad, CA 92008
Attn: City Building Department
Subject: Report of Testing and Observations -Geo Final
972 & 988 Grand Avenue
Carlsbad, CA 92008
Permit# GR2018-0036
City Building Official:
Jlmichal@aol.com
(760)-473-5052
In accordance with the request and authorization of the owner, representatives of Ghostrider Inspection,
Inc. have performed observation and testing services at the subject site during the period of July 22, 2022
to October 3, 2024 Please be advised that on 10/3/2024 Ghostrider Inspection, Inc. completed testing
and observations of the building pads for Building A & Building B, driveway area, retaining walls,
electrical/water/sewer trench backfill and street improvements on project that has the street address of
972 & 988 Grand Avenue, Carlsbad, CA.
Field Observation & Testing Summary:
• Earthwork construction observed and tested was performed by Top Shelf Contractors, Inc.
• Existing vegetation and improvements were removed within the proposed limits of the subject
building pads.
• Contractor over-excavated proposed Building A and Building B building pads to a depth of 2' -6".
All bottoms of excavations were checked for compaction with a½" dia. soil probe and were found
to be firm and unyielding. Native and imported soils were utilized to backfill and were placed in
approximately 61
' to 8" uniform lifts under the observation and testing of a representative of
Ghostrider Inspection, Inc., who was onsite on a full-time basis. (Density Results Table
1/Appendix A).
• Contractor utilized native and imported soils to backfill for retaining walls, electrical/water/sewer
trench backfill and street improvements. Soils were placed in approximately 6" to 8" uniform lifts
under the observation and testing of a representative of Ghostrider Inspection, Inc., who was
onsite on a full-time basis. (Density Results Table 1/Appendix A)
• Field density tests were taken at periodic intervals and random locations to check the compaction
efforts by the contractor. Field density testing was performed in accordance with the sand cone
and nuclear gauge methods. Based on our observations, the test results presented herein (Table
1/Appendix A) should be considered representative of the level of compaction achieved during
overall preparation of the building pads. Approximate field density test locations are shown in
(Figure 1/Appendix B).
• Our field density and laboratory test results indicate that the fill materials were compacted to at
least 90% relative compaction for Building A and Building B building pads (Based on ASTM D1557).
Location and results of compaction tests are present in Figure 1/Appendix B & Table 1/Appendix
A respectively.
Conclusion:
Jlmichal@aol.com
(760)-473-5052
It is our opinion that the excavation, backfill and compaction of soils for the proposed Building A &
Building B building pads, driveway area, retaining walls, electrical/water/sewer trench backfill and street
improvements mentioned herein has been completed in substantial conformance with the approved
plans, the City of Carlsbad specifications and the permit.
Respectfully submitted,
JLM Consulting
c} ~ -J W\_,Jl,J
Jerry L. Michal
Consulting Geotechnical Engineer
GE2515
Appendix A
Log of Density Test Results
972 & 988 Grand Avenue
Jlmichal@aol.com
(760)-473-5052
Maximum Dry Optimum Field Relative Required
Date Test No. Test Type Area of Work Elevation D1;rsity (pcf) Density (pcf) Moisture(%) Moisture(%) Compaction (%) Compaction (%) -9/1/22 1 SC Building A Bottom O.X. 126.8 115.3 9.6 8.3 90.9 90.0
9/1/22 2 SC Building A Bottom O.X. 126.8 115.3 9.6 10.8 90.9 90.0
9/1/22 3 SC Building A Bottom O.X. 126.8 115.5 9.6 9.0 91.1 90.0
9/2/22 4 SC Building A -24" 126.8 114.9 9.6 9.6 90.6 90.0
9/2/22 5 SC Building A -24" 126.8 117.9 9.6 7.7 93.1 90.0
9/2/22 6 SC Building A -18" 126.8 118.2 9.6 5.5 93.3 90.0
9/6/22 7 SC Building A -12" 126.8 116.1 9.6 9.9 91 .6 90.0
9/6/22 8 SC Building A -18" 126.8 116.1 9.6 7.5 91 .6 90.0
9/7/22 9 SC Building A Bottom O.X. 126.8 116.6 9.6 5.8 91 .9 90.0
9/7/22 10 SC Building A -12" 126.8 116.5 9.6 5.4 91 .8 90.0
9/7/22 11 SC Building A -12" 126.8 114.2 9.6 8.3 90.1 90.0
9/7/22 12 SC Driveway Bottom O.X. 126.8 120.7 9.6 6.4 95.2 90.0
9/7/22 13 SC Driveway Bottom O.X. 126.8 115.0 9.6 8.9 90.7 90.0
9/8/22 14 SC Building A -10" 126.8 116.0 9.6 8.0 91 .5 90.0
9/8/22 15 SC Building B -10" 126.8 120.1 9.6 7.6 94.8 90.0
9/8/22 16 SC Building A Pad 126.8 114.6 9.6 8.9 90.4 90.0
9/9/22 17 SC Driveway Bottom O.X. 126.8 115.0 9.6 5.5 90.7 90.0
9/10/22 18 SC Building B Bottom O.X. 126.8 116.0 9.6 3.1 91 .5 90.0
9/10/22 19 SC Building B Bottom O.X. 126.8 116.6 9.6 15.6 91 .9 90.0
9/12/22 20 SC Building B -36" 126.8 114.7 9.6 8.1 90.4 90.0
9/12/22 21 SC Building B -36" 126.8 114.9 9.6 8.7 90.6 90.0
9/12/22 22 SC Building B -24" 126.8 117.6 9.6 5.7 92.7 90.0
9/13/22 23 SC Building B -24" 128.5 117.9 10.0 7.6 91 .7 90.0
9/13/22 24 SC Building B -12" 128.5 117.1 10.0 7.4 91 .2 90.0
9/13/22 25 SC Building B -12" 126.8 115.8 9.6 7.2 91 .3 90.0
9/13/22 26 SC Building B -24" 126.8 114.3 9.6 7.6 90.2 90.0
9/14/22 27 SC Building B -12" 126.8 115.2 9.6 5.8 90.8 90.0
9/14/22 28 SC Building B -6" 126.8 115.4 9.6 6.5 91 .0 90.0
9/15/22 29 SC Building B -6" 126.8 114.7 9.6 8.2 91 .3 90.0
9/15/22 30 NG Building A Pad 126.8 119.1 9.6 9.4 93.9 90.0
9/15/22 31 NG Building B -6" 126.8 126.1 9.6 10.6 99.9 90.0
9/15/22 32 NG Building B -6" 126.8 119.8 9.6 13.6 94.5 90.0
9/15/22 33 NG Building B -6" 126.8 119.2 9.6 9.2 94.0 90.0
9/16/22 34 NG Building B Pad 126.8 126.0 9.6 10.1 99.4 90.0
9/16/22 35 NG Building B Pad 126.8 118.9 9.6 10.7 93.8 90.0
9/16/22 36 NG Building B Pad 126.8 123.0 9.6 7.4 97.1 90.0
9/16/22 37 NG Building B Pad 126.8 118.7 9.6 7.8 93.6 90.0
9/16/22 38 NG Building B Pad 126.8 119.9 9.6 10.4 94.6 90.0
9/16/22 39 NG Building B Pad 126.8 116.0 9.6 10.4 91 .5 90.0
9/16/22 40 NG Building A Pad 126.8 125.8 9.6 7.6 99.2 90.0
9/16/22 41 NG Building A Pad 126.8 126.0 9.6 8.4 99.4 90.0
9/16/22 42 NG Building A Pad 126.8 119.7 9.6 10.5 94.4 90.0
9/16/22 43 NG Building A Pad 126.8 117.0 9.6 7.7 92.3 90.0
10/12/22 44 SC Driveway -1.5' Subgrade 126.8 121.6 9.6 7.5 95.9 95.0
10/12/22 45 SC Driveway -1.5' Subgrade 126.8 125.2 9.6 8.8 98.7 95.0
10/12/22 46 SC Driveway Subgrade 126.8 122.3 9.6 6.2 96.4 95.0
10/31/22 47 NG Driveway -10' Subgrade 126.8 120.7 9.6 9 95.2 90.0
10/31/22 48 NG Driveway -1 0' Subgrade 126.8 123.9 9.6 5.6 97.7 90.0
10/31/22 49 NG Driveway Subgrade 126.8 122.1 9.6 7.6 96.3 95.0
10/31/22 50 NG Driveway Subgrade 126.8 120.6 9.6 7.3 95.1· 95.0
10/13/23 51 NG Trench Backfill (Streetwork) -1' 126.8 122.7 9.6 9.9 96.8 95.0
10/16/23 52 NG Trench Backfill (Streetwork) -1' 126.8 123.9 9.6 10.4 97.7 95.0
1/24/24 53 SC Retaining Wall Backfill (E) -5' 126.7 120.0 10.5 10.7 94.7 90.0
3/6/24 54 NG Retaining Wall Backfill (E) --4' 126.7 120.9 10.5 11.1 95.4 90.0 .
3/6/24 55 NG Retaining Wall Backfill (E) -2' 126.7 121.1 10.5 10.9 95.6 90.0
3/12/24 56 NG Utility Trench (E) Subgrade 126.7 121.1 10.5 11.0 95.6 95.0
3/12/24 57 NG Utility Trench (E) Subgrade 126.7 121.3 10.5 9.9 95.7 95.0
3/15/24 58 SC Utility Trench (E) Subgrade 126.7 120.7 10.5 11.8 95.3 95.0
3/15/24 59 SC Utility Trench (E) -1' 126.7 120.5 10.5 9.3 95.1 95.0
4/19/24 60 SC Storm Drain (SE) -.5' 126.7 121.1 10.5 9.3 95.6 95.0
5/15/24 61 SC Trench Backfill (Streetwork) -2' 126.7 125.2 10.5 5.8 98.8 95.0
5/15/24 62 SC Trench Backfill (Streetwork) -1' 126.7 123.8 10.5 6.9 97.7 95.0
5/16/24 63 SC Trench Backfill (Streetwork) SG 126.7 122.0 10.5 15.2 96.3 95.0
5/21/24 64 NG Trench Backfill (S) -1' 126.7 124.0 10.5 14.2 97.9 95.0
5/24/24 65 SC Trench Backfill (Streetwork) SG 126.7 120.5 10.5 11.1 95.1 95.0
10/03/24 66 NG Driveway Apron -1 ' 126.7 121.3 10.5 9.8 95.7 95.0
10/03/24 67 NG Driveway Apron SG 117.3 123.8 13.0 10.8 97.7 95.0
Appendix B
Map of Density Test Results
972 & 988 Grand Avenue
Jlmichal@aol.com
(760)-473-5052
,. . . . . .. . ., ~ ... ,_ "
... .-.10·· .... • .... · .. •. ·:.--~ ..-:. ~-
. . ' ·. M'.• ~"" . .. • • , : •. ~-·-··=-·•
Jlmichal@aol.com
(760)-473-5052
. : ' : : ~. . ; *6.· .. > • • • • • •
. 1 : • : ~ :· • • .: : • • • .. • • c_ •. '• • •' . • ' >• '.:: • . : : -~ .... ~ t:.U.'lllill·•MII
~ l"V<.,'Vl.><..JV 7 •+-:} . • ' , , • :'Ir;· .. l..(1
llri 23 : i . 5·4·. . -t~.:~ • " l ·_ . ~~ * :J~-:1. -..• , • : • --J~:;;, r,,rili. I
. • • Buildin B , · •. *1 (; 4
•• • *15 * ~~v~ • ..!V-.J<J : :_::i45.,;. I _. , *2~ ·f f ,
; . . ·,:::___::__ 29 *3 9 • ••••
l ~---1, ,-.. •2s * 3
,,,t · 28 tr.
1~ ~ ! • '
~: .~ ~I!\___ ~21 ·?
> • •, ·-w
,. ' ..