Loading...
HomeMy WebLinkAboutCT 2018-0002; AVIARA APARTMENTS WEST; FINAL SOILS REPORT; 2025-06-13 GEOTECHNICAL | ENVIRONMENTAL | MATERIALS June 13, 2025 Project No. 3740-SD R&V Real Estate Services c/o Wermers Companies 5120 Shoreham Place, Suite 150 San Diego, California 92122 Attention: Mr. Austin Wermers Subject: Summary of Geotechnical Observation and Testing Post-Grading Operations Aviara Apartments West 1205 Aviara Parkway, Carlsbad, California 92009 References: See Page 5 Dear Mr. Wermers: GeoTek, Inc. (GeoTek) is pleased to present the results of geotechnical testing and observation services during post-grading construction associated with utility and pavement construction operations for the Aviara Apartments West Project. In accordance with your request, GeoTek, Inc. (GeoTek) has prepared this letter to certify the completion of the post-grading operations associated with the subject property. Rough grading of the project was completed under the observation of, and with selective testing by, GeoTek, and certified in the “Summary of Geotechnical Observation and Testing, Rough Grading, Building Pad, Aviara Apartments West…”, dated August 29, 2023. Post-grading construction operations of the project have been completed under the observation of, and with selective testing by GeoTek. It is to the best of GeoTek’s knowledge that post grading construction operations discussed in this report have been completed in general accordance with the approved geotechnical reports (see references) prepared for the site, applicable provisions of the 2019 and 2022 California Building Code (CBC) and City of Carlsbad guidelines. This report provides a brief summary of the post-grading operations observed and tested by GeoTek from June 2023, through May 2025. R&V Real Estate June 13, 2025 Building Pad Certification – Building Structures Project No. 3740-SD Aviara Apartments West, Carlsbad, California Page 2 SUMMARY OF GEOLOGIC AND SOILS CONDITIONS  Visual classification of the soil in the field, compared to the soil description from laboratory testing was the basis for determining the maximum dry density value and optimum moisture content applied to each soil density test.  Previously placed engineered fill and unstable alluvial materials were removed to required grading depths.  A GeoTek representative observed exposed soil bottoms and confirmed competency prior to receiving engineered fill.  Foundation footing excavations for retaining walls were qualitatively evaluated with a soil probe in random locations and found to be firm and unyielding. Retaining wall foundation excavations were found to be excavated in suitable compacted fill.  Trench backfills for the sewer, storm drain, and water lines were placed and compacted to at least 90% of the maximum dry density, at or slightly above optimum moisture content relative to ASTM D 1557.  Relative compaction of the upper one foot of subgrade and aggregate base for interior roads, driveway approaches, and adjacent street improvements were tested by GeoTek representatives to be at or slightly above optimum moisture content and compacted to at least 95% relative to ASTM D1557. Tests taken one foot below finish subgrade were tested to be at or slightly above optimum moisture content and compacted to at least 90% relative to ASTM D1557  Onsite materials and import materials were utilized to bring remedial grades to design grades. Heavy-duty earthmoving equipment, import trucks and water trucks were utilized to place, moisture condition (as needed), mix, and compact the engineered fills during post-grading operations.  Field density tests indicated the engineered fill was placed and compacted to at least 90% and near optimum moisture content relative to ASTM D 1557. FIELD AND LABORATORY TESTING FIELD TESTING Field density tests were taken at periodic intervals and random locations to check the compaction efforts by the grading contractor performing compaction of engineered fill. The R&V Real Estate June 13, 2025 Building Pad Certification – Building Structures Project No. 3740-SD Aviara Apartments West, Carlsbad, California Page 3 field density testing for the subject site was performed using a nuclear gauge, in general accordance with testing procedure ASTM D 6938 for soils. The results of the field density testing conducted are included in the attached Table 1 and presented on Figure 1. LABORATORY TESTING The laboratory maximum dry density and optimum moisture content for the soils were determined in general accordance with test method ASTM D 1557. The table below presents the soil type used for this project. SUMMARY OF LABORATORY MAXIMUM DRY DENSITY AND OPTIMUM MOISTURE CONTENT TEST RESULTS (ASTM D 1557) Soil Type Description Maximum Dry Density (pcf) Optimum Moisture Content (%) A Dark Brown Clayey Sand 125.8 11.5 B Light Brown Silty Sand w/ Clay 123.0 12.5 D Dark Brown Clayey Sand 127.0 9.5 E Light Brown Silty Clayey Sand 129.7 10.0 F Brownish F-M Silty Sand 127.5 10.0 G Reddish-Brown Fine to Clayey Sand 128.8 9.5 H Base Provided by Plant 117.6 11.9 AC-1 Asphalt Provided by Plant 148±2 - CONCLUSIONS Site grading has been completed in conformance with the approved geotechnical reports, applicable provisions of the 2019 and 2022 California Building Code (CBC) and City of Carlsbad guidelines. CLOSURE The purpose of this report is to present a summary of observation and testing services provided by GeoTek during the post grading construction operations that were performed on project. More specifically, the scope of this report includes a presentation of data obtained during post grading construction operations and a discussion of operations performed by the contractor. R&V Real Estate June 13, 2025 Building Pad Certification – Building Structures Project No. 3740-SD Aviara Apartments West, Carlsbad, California Page 4 Post grading construction observations for the project has been completed under the observation of, and with selective testing by, GeoTek. GeoTek’s observations were performed in such a manner as to be reasonably certain that the soils tested are representative of the work, and that the work, in general, essentially complies with the job requirements. GeoTek’s services were performed in accordance with engineering principles generally accepted at this time and in this area. No warranty is expressed or implied. It should be understood that field data, including density (compaction) test locations and elevations, as well as the location of compacted fill, are only approximately described. The accuracy of the field technician's estimated locations will vary depending on the survey control available at the time the estimations were made. No warranty as to the actual extent of the filled area, nor of its relationship to the planned structural improvements, is expressed or implied. This report is subject to review by the controlling authorities for this project. GeoTek accepts neither responsibility nor liability for work, testing, or recommendations performed or provided by others. The opportunity to be of service is sincerely appreciated. If you should have any questions, please do not hesitate to call our office. Respectfully submitted, GeoTek, Inc. Christopher D. Livesey CEG 2733, Exp. 5/30/27 Vice President Edwin R. Cunningham RCE 81687, Exp. 3/31/26 Project Engineer Distribution: (1) Addressee via email Enclosures: Figure 1 – As-Graded Compaction Test Maps Table 1 – Field Density Tests Grading R&V Real Estate June 13, 2025 Building Pad Certification – Building Structures Project No. 3740-SD Aviara Apartments West, Carlsbad, California Page 5 REFERENCES GeoTek, Inc. 2021, Geotechnical Evaluation Report, Proposed Aviara Apartments Development, 6145 Laurel Tree Lane, Carlsbad, California 92122, Project No. 3740-SD, November 11, 2021. , 2022a, Geotechnical Review of Construction plans, Project No. 3740-SD, March 21, 2022 ,2022b, Geotechnical Addendum and Review of Public Improvement Construction plans: Plan review of grading and improvement plans along Laurel Tree Lane, Project No. 3740-SD, March 24, 2022 , 2022c, Geotechnical Review of Construction plans: Plan review of parking structure building foundations, Project No. 3740-SD, March 25, 2022 , 2022d, Response to Geotechnical Review Comments and Second Review of Public Improvement Construction Plans, Project No. 3740-SD, May 6, 2022. , 2022e, Response to Geotechnical Review Comments, Project No. 3740-SD, May 20, 2022 , 2022f, Review – On-Site Storm Water Disposal and Retaining Wall Design, Project No. 3740-SD, August 18, 2022 , 2022g, Response to Geotechnical Review Comments: Project No. 3740-SD, September 27, 2022 , 2022h, Temporary Excavations for Catch Basins Along the South and West Grading Daylight Project No. 3740-SD, September 27, 2022. _____, 2023g, Summary of Geotechnical Observation and Testing, Rough Grading, Aviara Apartments West, 1205 Aviara Parkway, Carlsbad, California 92009,” Project No. 3740-SD, dated May 23, 2023. SB&O, Inc. “Precise Grading Plans for: Aviara Apartments West,” Delta A, dated April 7, 2023. 1384 Poinsettia Avenue, Suite A Vista, California 92081 Aviara, LP Aviara West Carlsbad, CA PN: 3740-SD June 2025 Figure 1 Post-Graded Compaction Test Map Approximate Location of Field Density Test - Retaining Wall Approximate Location of Field Density Test – Storm Drain Approximate Location of Field Density Test - Sewer Approximate Location of Field Density Test – Dry Utility RW-1 SD-1 Approximate Location of Field Density Test – Wet Utility S-1 D-1 W-1 RW- 72 RW- 71 RW- 70 RW- 69 RW- 68 RW- 67 RW- 66 RW- 65 RW- 64 RW- 63 RW- 62 RW- 61 RW- 60 RW- 59 RW- 58 RW- 57 RW- 56 RW- 55 RW- 54 RW- 53 RW- 52 RW- 51 RW- 50 RW- 49 RW- 48 RW- 47 RW- 46 RW- 45 RW- 44 RW- 43 RW- 42 RW- 41 RW- 40 RW- 39 RW- 38 RW- 37 RW- 36 RW- 35 RW- 34 RW- 33 RW- 32 RW- 31 RW- 30 RW-1RW-2RW-3RW-4RW-5RW-6 RW-7RW-8RW-9RW- 10 RW- 11 RW- 12 RW- 13 RW- 14 RW- 15 RW- 16 RW- 17 RW- 18 RW- 19 RW- 20 RW- 21 RW- 22 RW- 23 RW- 24 RW- 25 RW- 26 RW- 27 RW- 28 RW- 29 SD-1 SD-2 SD-3 SD-5 SD-4 SD-7 SD-6 SD-8 SD-9 SD- 10 SD- 11 SD- 12 SD- 13 SD- 14 SD- 15 SD- 16 SD- 17 SD- 18 SD- 19 SD- 20 SD- 21 SD- 22 SD- 23 SD- 24 SD- 25 SD- 26 SD- 27 SD- 28 SD- 29 SD- 30 SD- 31 SD- 32 SD- 33 SD- 34 SD- 35 SD- 36 SD- 37 SD- 38 SD- 39 SD- 40 SD- 41 SD- 42 SD- 43 SD- 44 SD- 45 SD- 46 SD- 47 SD- 48 SD- 49 SD- 50 SD- 51 SD- 52 SD- 53 SD- 54SD- 55 SD- 56 SD- 57 SD- 58 SD- 59 SD- 60SD- 61 SD- 62 SD- 63 SD- 64 SD- 65 S-1 S-2 S-3 S-4 S-5 S-6 S-7 S-8 S-9 S-10 S-11 S-12 S-13 S-14 S-15 S-16 S-17 S-18 S-19 S-20 S-21 S-22 S-23 S-24 S-25 S-26 S-27 S-28 S-29 S-30 S-31 S-32 S-33S-34 S-35 S-36 S-37 S-38 S-39 S-40 S-41 S-42 S-43 S-44 D-1D-2 D-3 D-4 D-5 D-6 D-7 D-8 D-9 D-10 D-11 D-12 D-13 D-14 D-15 D-16 D-17 D-18 D-19 D-20 D-21D-22 D-23D-24 D-25 D-26D-27 D-28 D-29 D-30 D-31 D-32 D-33 D-34 D-35 D-36 W-63 W-64 W-65 W-66 W-67 W-68 W-69 W-70 W-62 W-1 W-2 W-3 W-4 W-5 W-6 W-7 W-8 W-9 W-10 W-11 W-12 W-13 W-14 W-15 W-16 W-17 W-18W-19 W-20 W-21 W-22 W-23 W-24 W-25 W-26 W-27W-28W-29 W-30 W-31 W-32 W-33 W-34 W-35 W-36 W-37 W-38 W-39 W-40 W-41 W-42 W-43 W-44 W-45 W-46 W-47 W-48 W-49 W-50 W-51 W-52 W-53 W-54 W-55 W-56 W-57 W-58 W-59 W-60 W-61 W-73 W-74 W-75 W-76W-77 W-78 W-79 W-80 W-72 W-71 W-83 W-84 W-85 W-86 W-87 W-88 W-89 W-90 W-82W-81 W-93 W-94 W-95 W-96 W-97 W-98 W-99 W- 100 W-92W-91 W- 101 W- 102 W- 103 W- 104 W- 105 RW- 73 RW- 74 RW- 75 RW- 76 RW- 77 RW- 78 RW- 79 RW- 80 RW- 81 RW- 82 RW- 83 RW- 84RW- 85 RW- 86 RW- 87 LEGEND LEGEND 1384 Poinsettia Avenue, Suite A Vista, California 92081 Aviara, LP Aviara West Carlsbad, CA PN: 3740-SD June 2025 Figure 1 Post-Graded Compaction Test Map 73 Approximate Location of Field Density Test - Subgrade Approximate Location of Field Density Test - Base Approximate Location of Field Density Test - Asphalt 12 34 5 6 7 8 9 10 11 12 13 14 41 15 16 17 18 20 21 22 23 24 25 26 27 40 34 19 29 30 31 32 33 28 35 36 37 38 39 1 234 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 2021 22 23 24 25 26272829303132 33 34 35 36 3738 39 40 41 42 43 44 45 46 47 48 49 86 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 343536 373839 40 414243 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 42 43 4445 46 4748 49 50 51 5352 54 55 56 57 58 59 61 60 62 63 64 65 66 67 68 69 70 71 72 7374 75 76 77 78 79 80 81 82 83 84 85 86 87 88 89 90 91 92 93 94 95 96 97 98 99 100 101 102 103 104 104 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80 81 82 83 84 85 86 51 52 53 54 55 56 57 58 59 60 6162 63 64 65 66 67 68 69 70 50 71 72 73 R&V Real Estate June 13, 2025 Building Pad Certification – Building Structures Project No. 3740-SD Aviara Apartments West, Carlsbad, California Page 6 Table 1 Field Density Test Results Aviara Apartments West 1205 Aviara Pkwy Carlsbad, CA GeoTek, Inc.6/13/2025 Project No.: 3740-SD Page 1 of 16 DATE Test No.Location Elev/ Depth Moisture Content (%) Dry Density (pcf) Soil Type Maximum Density (pcf) Test Type Relative Compaction (%) 9/27/23 1 Wall #7 18+04 -3' 11.5 116.2 B 123.0 N 94 2 Wall #7 18+04 -2' 12.5 118.8 B 123.0 N 97 3 Wall #7 19+59 -3' 13.2 115.9 B 123.0 N 94 4 Wall #7 19+59 -2' 12.2 117.5 B 123.0 N 96 5 Wall #7 21+34 -3' 11.9 115.9 B 123.0 N 94 6 Wall #7 21+34 -2' 12.4 117.1 B 123.0 N 95 9/28/23 7 Wall #7 18+04 -1' 13.2 117.2 B 123.0 N 95 8 Wall #7 18+04 -1' 14.1 114.8 B 123.0 N 93 9 Wall #7 19+59 -1' 13.2 115.9 B 123.0 N 94 10 Wall #7 21+32 -1' 12.2 114.5 B 123.0 N 93 11 Wall #7 21+34 -1' 12.9 118.9 B 123.0 N 97 9/29/23 12 Wall #7 19+60 -1' 13.2 115.9 B 123.0 N 94 13 Wall #7 21+34 -1.5' 12.8 116.5 B 123.0 N 95 14 Wall #7 18+04 -1' 12.5 117.9 B 123.0 N 96 10/3/23 15 Wall #7 19+60 -0.5' 11.6 112.9 Import 120.3 N 94 16 Wall #7 19+60 -0.5' 12.1 114.5 Import 120.3 N 95 17 Wall #7 20+19 -0.5' 11.4 115.1 Import 120.3 N 96 18 Wall #7 20+34 -0.5' 12.5 113.8 Import 120.3 N 95 19 Wall #7 20+34 -0.5' 10.9 112.8 Import 120.3 N 94 10/4/23 20 Wall #7 20+34 -0.5' 11.6 111.9 Import 120.3 N 93 21 Wall #7 21+19 -0.5' 12.1 112.8 Import 120.3 N 94 22 Wall #7 21+32 -0.5' 11.4 113.4 Import 120.3 N 94 12/15/23 23 Wall #1 13+69 -2' 13.5 115.7 B 123.0 N 94 24 Wall #1 13+82 SG 12.5 117.2 B 123.0 N 95 25 Wall #1 14+22 SG 13.0 118.3 B 123.0 N 96 12/18/23 26 Wall #1 13+69 -2' 12.3 116.3 B 123.0 N 95 27 Wall #1 13+82 -1' 13.5 118.2 B 123.0 N 96 28 Wall #1 14+22 SG 14.1 117.8 B 123.0 N 96 12/19/23 29 Wall #1 13+69 -2' 12.3 115.9 B 123.0 N 94 30 Wall #1 13+82 -1' 13.5 117.2 B 123.0 N 95 31 Wall #1 14+22 SG 14.1 117.0 B 123.0 N 95 32 Trash Screen Sta. 10+07 SG 13.4 118.2 B 123.0 N 96 33 A-8 Box Sta. 17+96 SG 12.6 119.0 B 123.0 N 97 12/20/23 34 Wall #5 10+57 -11' 14.2 114.7 B 123.0 N 93 35 Wall #110+67 -9' 13.5 115.4 B 123.0 N 94 36 Wall #1 10+98 -9' 12.8 116.1 B 123.0 N 94 12/21/23 37 Wall #1 10+57 -8' 14.1 116.1 B 123.0 N 94 38 Wall #1 10+67 -7' 13.7 115.4 B 123.0 N 94 39 Wall #1 10+98 -6' 14.4 117.8 B 123.0 N 96 12/26/23 40 Wall #1 10+56 -5' 13.4 115.1 B 123.0 N 94 41 Wall #1 10+67 -4' 12.7 114.8 B 123.0 N 93 42 Wall #1 10+98 -2' 13.9 116.8 B 123.0 N 95 12/27/23 43 Wall #5 10+57 -2' 13.4 115.1 B 123.0 N 94 44 Wall #5 10+67 -2' 12.7 114.8 B 123.0 N 93 TABLE 1 SUMMARY OF FIELD DENSITY TESTS RETAINING WALL Note: N = Nuclear Gauge Test FG = Finished Grade Test All elevations are approximate Aviara Apartments West 1205 Aviara Pkwy Carlsbad, CA GeoTek, Inc.6/13/2025 Project No.: 3740-SD Page 2 of 16 DATE Test No.Location Elev/ Depth Moisture Content (%) Dry Density (pcf) Soil Type Maximum Density (pcf) Test Type Relative Compaction (%) TABLE 1 SUMMARY OF FIELD DENSITY TESTS RETAINING WALL 45 Wall #5 10+98 -1' 13.9 116.8 B 123.0 N 95 1/4/24 46 Wall #3 12+43 SG 10.7 115.9 B 123.0 N 94 47 Wall #3 13+24 SG 11.3 118.2 B 123.0 N 96 1/5/24 48 Wall #1 16+22 SG 9.8 117.9 B 123.0 N 96 49 Wall #1 15+65 SG 8.7 119.0 B 123.0 N 97 1/8/24 50 Wall #1 15+08 -6" 10.3 119.8 B 123.0 N 97 51 Wall #1 15+46 -6" 11.2 120.2 B 123.0 N 98 52 Wall #1 16+15 -6" 12.2 118.2 B 123.0 N 96 1/10/24 53 Wall #7 14+00 -5' 9.0 114.6 B 123.0 N 93 54 Wall #7 13+00 -4' 12.6 117.8 B 123.0 N 96 55 Wall #7 12+00 -3' 13.1 118.2 B 123.0 N 96 1/19/24 56 Wall #7 14+00 -3' 12.0 115.6 B 123.0 N 94 57 Wall #7 13+50 -2' 12.6 116.8 B 123.0 N 95 58 Wall #7 12+70 -1' 11.9 117.2 B 123.0 N 95 5/4/24 59 Wall #2/#9 Footings SG 11.3 117.4 E 126.8 N 93 60 Wal #2/#9 Footings SG 10.5 116.3 E 126.8 N 92 5/9/24 61 CMU Wall NE Corner Subgrade SG 10.2 116.2 E 126.8 N 92 62 CMU Wall NE Corner Subgrade SG 11.6 116.9 E 126.8 N 92 7/2/24 63 Wall #8 11+20 85.5 9.3 116.7 D 127.0 N 92 64 Wall #8 11+50 84.0 9.7 115.9 D 127.0 N 91 65 Wall #8 12+10 83.5 10.0 116.3 D 127.0 N 92 66 Wall #8 12+60 85.0 11.2 114.7 D 127.0 N 90 67 Wall #8 11+30 85.5 9.5 116.8 D 127.0 N 92 68 Wall #8 11+70 86.0 9.9 117.5 D 127.0 N 93 69 Wall #8 12+00 86.0 10.3 115.2 D 127.0 N 91 70 Wall #8 12+45 87.0 9.1 113.0 D 127.0 N 89 71 Wall #8 12+45 87.0 10.5 117.2 D 127.0 N 92 72 Wall #8 12+30 87.5 9.8 115.5 D 127.0 N 91 6/28/24 73 Wall#2 10+20 RFG 10.4 114.1 A 125.8 N 91 74 Wall#2 10+40 <2' 10.0 116.7 A 125.8 N 93 75 Wall#2 10+88 <4' 10.8 118.2 A 125.8 N 94 76 Wall#2 10+40 RFG 9.5 117.2 A 125.8 N 93 77 Wall#2 10+60 <2' 10.2 114.4 A 125.8 N 91 78 Wall#2 10+88 RFG 9.5 119.4 A 125.8 N 95 7/3/24 79 RW#8 STA.# 11+55 88' 10.7 115.8 D 127.0 N 91 80 RW#8 STA.# 12+20 87.5' 9.3 116.6 D 127.0 N 92 81 RW#8 STA.# 10+90 84' 10.9 117.4 D 127.0 N 92 82 RW#8 STA.# 10+10 83.5' 9.5 114.9 D 127.0 N 90 83 RW#8 STA.# 10+50 84.5' 9.2 116.3 D 127.0 N 92 10/2/23 84 RW#7 18+04.12 <1'-.05' 12.5 113.9 Import 120.3 N 95 85 RW#7 18+04.12 <1'-.05' 11.5 112.5 Import 120.3 N 94 86 RW#7 19+59.81 <1'-.05' 10.4 114.9 Import 120.3 N 96 87 RW#7 19+59.81 <1'-.05' 12.1 115.2 Import 120.3 N 96 Note: N = Nuclear Gauge Test FG = Finished Grade Test All elevations are approximate Aviara Apartments West 1205 Aviara Pkwy Carlsbad, CA GeoTek, Inc.6/13/2025 Project No.: 3740-SD Page 3 of 16 DATE Test No.Location Elev/ Depth Moisture Content (%) Dry Density (pcf) Soil Type Maximum Density (pcf) Test Type Relative Compaction (%) 7/12/2023 1 Sidewalk EB of Access Road to Aviara SG 11.8 113.5 B 123 N 92 2 Sidewalk EB of Access Road to Aviara SG 13.5 112.9 B 123 N 92 3 Sidewalk EB of Access Road to Aviara SG 12.6 114.1 B 123 N 93 4 Sidewalk EB of Access Road to Aviara SG 13.1 111.9 B 123 N 91 7/27/2023 5 Sidewalk WB of Access Road to Aviara SG 12.4 118.3 A 125.8 N 94 6 Sidewalk WB of Access Road to Aviara SG 12.9 120.1 A 125.8 N 95 7 Sidewalk WB of Access Road to Aviara SG 13.1 117.6 A 125.8 N 93 10/6/23 8 Laurel Tree Lane Curb & Gutter 11+13 SG 11.9 114.1 B 120.3 N 95 9 Laurel Tree Lane Curb & Gutter 11+90 SG 12.5 113.8 B 120.3 N 95 10 Laurel Tree Lane Curb & Gutter 13+26 SG 10.8 114.9 B 120.3 N 96 10/10/23 11 Laurel Tree Lane Curb & Gutter 10+93 SG 13.1 118.7 B 120.3 N 99 12 Laurel Tree Lane Curb & Gutter 11+70 SG 13.5 119.2 B 120.3 N 99 13 Laurel Tree Lane Curb & Gutter 12+29 SG 12.7 119.4 B 120.3 N 99 14 Laurel Tree Lane Curb & Gutter 13+07 SG 12.4 118.8 B 120.3 N 99 10/12/23 15 Aviara & Laurel, Curb & Gutter NE CornerSG 12.7 113.8 B 120.3 N 95 16 Aviara & Laurel, Curb & Gutter NE CornerSG 11.8 114.2 B 120.3 N 95 17 Aviara & Laurel, Curb & Gutter NE CornerSG 13.1 115.1 B 120.3 N 96 10/13/23 18 Aviara & Laurel, Curb & Gutter NE CornerSG 11.9 118.8 B 120.3 N 99 19 Aviara & Laurel, Curb & Gutter NE CornerSG 12.1 119.2 B 120.3 N 99 20 Aviara & Laurel, Curb & Gutter NE CornerSG 10.6 120.1 B 120.3 N 100 10/24/23 21 Aviara & Laurel, Curb & Gutter NE CornerSG 12.1 118.0 B 120.3 N 98 22 Aviara & Laurel, Curb & Gutter NE CornerSG 13.0 117.8 B 120.3 N 98 12/8/23 23 Aviara & Laurel C&G, 6+26 SG 12.4 116.4 B 123.0 N 95 24 Aviara & Laurel C&G, 7+73 SG 13.2 118.2 B 123.0 N 96 12/12/23 25 NB Aviara Sidewalk 6+26.5 SG 13.3 117.4 B 123.0 N 95 26 NB Aviara Sidewalk 7+50 SG 14.1 118.4 B 123.0 N 96 12/27/23 27 Driveway "A" Western Perimeter SG 13.2 117.2 B 123.0 N 95 28 Driveway "A" Eastern Perimeter SG 12.2 118.3 B 123.0 N 96 29 Driveway "A" Northern Perimeter SG 14.1 116.9 B 123.0 N 95 30 Driveway "A" Northern Perimeter SG 12.8 119.1 B 123.0 N 97 1/8/24 31 Driveway @ 14+43 SG 12.6 120.1 B 123.0 N 98 32 Curb and Gutter @ 13+45 SG 13.1 118.2 B 123.0 N 96 33 Sidewalk @ 13+50 SG 12.8 119.5 B 123.0 N 97 4/2/24 34 Aviara Pkwy C&G Across Site SG 12.4 120.9 B 123.0 N 98 35 Aviara Pkwy C&G Across Site SG 11.6 121.2 B 123.0 N 99 36 Aviara Pkwy C&G Across Site SG 10.1 120.5 B 123.0 N 98 4/23/24 37 C&G SW Edge of Site SG 10.2 121.1 E 126.8 N 96 38 C&G SW Edge of Site SG 9.8 121.5 E 126.8 N 96 7/11/24 39 Sidewalk @ SE Corner of Aviara SG 12.2 111.9 B 123.0 N 91 40 Sidewalk @ SE Corner of Aviara SG 11.8 110.9 B 123.0 N 90 41 NE Slope From Access Road SG 10.2 120.1 G 129.7 N 93 2/11/25 42 NE Corner of site facing Laurel tree SG 8.45 122.8 A 127.5 N 96 43 NE Corner of site facing Laurel tree SG 8.09 126.5 A 127.5 N 99 44 NE Corner of site facing Laurel tree SG 8.79 119.6 A 127.5 N 94 TABLE 1 SUMMARY OF FIELD DENSITY TESTS SUBGRADE Note: N = Nuclear Gauge Test FG = Finished Grade Test All elevations are approximate Aviara Apartments West 1205 Aviara Pkwy Carlsbad, CA GeoTek, Inc.6/13/2025 Project No.: 3740-SD Page 4 of 16 DATE Test No.Location Elev/ Depth Moisture Content (%) Dry Density (pcf) Soil Type Maximum Density (pcf) Test Type Relative Compaction (%) TABLE 1 SUMMARY OF FIELD DENSITY TESTS SUBGRADE 45 NE Corner of site facing Laurel tree SG 8.66 125 A 127.5 N 98 46 NE Corner of site facing Laurel tree SG 7.39 115.6 A 127.5 N 91 47 NE Corner of site facing Laurel tree SG 7.9 126.3 A 127.5 N 99 48 NE Corner of site facing Laurel tree SG 8.2 122.9 A 127.5 N 96 49 NE Corner of site facing Laurel tree SG 7.1 118.1 A 127.5 N 92 50 NE Corner of site facing Laurel tree SG 8.9 128.5 A 127.5 N 100 51 NE Corner of site facing Laurel tree SG 8.9 115.6 A 127.5 N 91 3/6/25 52 NE Corner of site facing Laurel tree SG 12.2 121.0 A 127.5 N 95 53 NE Corner of site facing Laurel tree SG 10.5 120.6 A 127.5 N 95 54 NE Corner of site facing Laurel tree SG 7.4 126.6 A 127.5 N 99 4/11/25 55 Pool Decking SG 9.9 110.6 B 123.0 N 90 56 Pool Decking SG 8.8 110.5 B 123.0 N 90 57 Sidewalk On-Site SG 11.8 118.1 B 123.0 N 96 58 Sidewalk On-Site SG 12.9 118.8 B 123.0 N 96 59 Sidewalk On-Site SG 12.5 119.2 B 123.0 N 97 60 Sidewalk On-Site SG 12.6 119.5 B 123.0 N 97 4/9/24 61 Median Subgrade Aviara SG 10.4 121.2 E 126.8 N 96 62 Median Subgrade Aviara SG 9.8 120.9 E 126.8 N 95 5/4/24 63 Site wall 2-9 footings SG 11.3 116.3 E 126.8 N 91 64 Site wall 2-9 footings SG 10.5 117.4 E 126.8 N 92 5/9/24 65 CMU Block Wall Subgrade SG 10.2 116.2 E 126.8 N 92 66 CMU Block Wall Subgrade SG 11.6 116.9 E 126.8 N 92 7/15/24 67 60ftX25ft section of Access Rd NE 83' 13.7 106.7 H 117.6 N 91 68 60ftX25ft section of Access Rd NE 84' 12.9 107.4 H 117.6 N 91 69 60ftX25ft section of Access Rd NE 85' 13.7 124.0 G 129.7 N 96 70 60ftX25ft section of Access Rd NE 86' 12.9 125.8 G 129.7 N 97 7/16/24 71 Key way for toe of access Rd Slope 84' 11.8 107.3 H 117.6 N 91 72 Key way for toe of access Rd Slope 85' 12.2 107.5 H 117.6 N 91 73 Key way for toe of access Rd Slope 86' 13.3 120.3 G 129.7 N 93 74 Key way for toe of access Rd Slope 87' 11.6 122.8 G 129.7 N 95 75 Key way for toe of access Rd Slope 88' 12.6 121.2 G 129.7 N 93 76 Key way for toe of access Rd Slope 89' 10.8 122.7 G 129.7 N 95 77 65ftX25ft section of Access Rd NE 87' 10.1 121.3 G 129.7 N 94 78 65ftX25ft section of Access Rd NE 88' 9.8 122.1 G 129.7 N 94 7/17/24 79 Access Rd. NE enterance 87' 12.3 106.1 H 117.6 N 90 80 Access Rd. NE enterance 88' 11.8 106.9 H 117.6 N 91 81 Access Rd. NE enterance 89' 11.4 122.3 G 129.7 N 94 82 Access Rd. NE enterance 90' 12.1 123.2 G 129.7 N 95 7/19/24 83 Slope (Basin2 N) south of Access Rd.84' 12.6 107.1 H 117.6 N 91 84 Slope (Basin2 N) south of Access Rd.86' 11.3 107.5 H 117.6 N 91 85 Slope (Basin2 N) south of Access Rd.88' 9.6 121.7 G 129.7 N 94 86 Slope (Basin2 N) south of Access Rd.90' 9.3 120.8 G 129.7 N 93 87 Slope (Basin2 N) south of Access Rd.91' 10.4 121.4 G 129.7 N 94 7/22/24 88 Slope NE from Access Rd. 84' 12.6 107.1 H 117.6 N 91 Note: N = Nuclear Gauge Test FG = Finished Grade Test All elevations are approximate Aviara Apartments West 1205 Aviara Pkwy Carlsbad, CA GeoTek, Inc.6/13/2025 Project No.: 3740-SD Page 5 of 16 DATE Test No.Location Elev/ Depth Moisture Content (%) Dry Density (pcf) Soil Type Maximum Density (pcf) Test Type Relative Compaction (%) TABLE 1 SUMMARY OF FIELD DENSITY TESTS SUBGRADE 89 Slope NE from Access Rd. 86' 11.3 107.5 H 117.6 N 91 90 Slope NE from Access Rd. 88' 9.6 121.7 G 129.7 N 94 91 Slope NE from Access Rd. 90' 9.3 120.8 G 129.7 N 93 7/23/24 92 Finsihed Slope Near Access Rd. N FS 10.4 124.6 G 129.7 N 96 93 Finsihed Slope Near Access Rd. N FS 11.1 119.4 G 129.7 N 92 94 Finsihed Slope Near Access Rd. N FS 9.2 125.1 G 129.7 N 96 95 Finsihed Slope Near Access Rd. N FS 9.8 124.3 G 129.7 N 96 3/7/25 96 NE Corner of site facing Laurel tree SG 8.3 127.5 A 127.5 N 100 97 NE Corner of site facing Laurel tree SG 7.8 121.8 A 127.5 N 96 98 NE Corner of site facing Laurel tree SG 7.6 120.8 A 127.5 N 95 3/27/25 99 NE Corner of site facing Laurel tree SG 14.6 120.6 A 127.5 N 95 100 NE Corner of site facing Laurel tree SG 14.9 121.7 A 127.5 N 95 101 NE Corner of site facing Laurel tree SG 10.9 120.0 A 127.5 N 95 5/22/25 102 C&G Site Enterance 9+40 SG 10.3 122.8 A 127.5 N 96 103 C&G Site Enterance 9+65 SG 10.2 123.0 A 127.5 N 96 104 C&G Site Enterance 9+50 SG 10.8 122.2 A 127.5 N 96 Note: N = Nuclear Gauge Test FG = Finished Grade Test All elevations are approximate Aviara Apartments West 1205 Aviara Pkwy Carlsbad, CA GeoTek, Inc.6/13/2025 Project No.: 3740-SD Page 6 of 16 DATE Test No.Location Elev/ Depth Moisture Content (%) Dry Density (pcf) Soil Type Maximum Density (pcf) Test Type Relative Compaction (%) 10/10/23 1 Laurel Tree Lane Curb & Gutter 10+93 AB 13.1 118.7 BC 125.5 N 95 2 Laurel Tree Lane Curb & Gutter 11+70 AB 13.5 119.2 BC 125.5 N 95 3 Laurel Tree Lane Curb & Gutter 12+29 AB 12.7 119.4 BC 125.5 N 95 4 Laurel Tree Lane Curb & Gutter 13+07 AB 12.4 118.8 BC 125.5 N 95 10/13/23 5 Aviara & Laurel, Curb & Gutter NE AB 11.9 118.8 BC 125.5 N 95 6 Aviara & Laurel, Curb & Gutter NE AB 12.1 119.2 BC 125.5 N 95 7 Aviara & Laurel, Curb & Gutter NE AB 10.6 120.1 BC 125.5 N 96 10/17/23 8 Curb & Gutter near Laurel AB 12.7 119.1 BC 125.5 N 95 9 Curb & Gutter near Laurel AB 11.8 119.5 BC 125.5 N 95 10 Curb & Gutter near Laurel AB 12.1 118.8 BC 125.5 N 95 12/8/23 11 Backfill @ 7+32 AB 14.5 118.7 BC 117.6 N 101 12 Backfill @ 7+32 AB 13.5 120.1 BC 117.6 N 102 12/27/23 13 Driveway "A" Northern Perimeter AB 13.4 120.1 BC 123.0 N 98 14 Driveway "A" Western Perimeter AB 12.7 118.1 BC 123.0 N 96 1/10/24 15 Curb & Gutter 13+43 AB 12.2 120.2 BC 119.7 N 100 16 Curb & Gutter 14+43 AB 13.1 119.2 BC 119.7 N 100 1/11/24 17 Curb & Gutter 14+43 AB 12.0 120.1 BC 119.7 N 100 18 Curb & Gutter 14+43 AB 12.6 122.8 BC 119.7 N 103 1/16/24 19 Westbound Laurel Tree Ln 15+86 AB 12.2 112.1 BC 117.9 N 95 20 Westbound Laurel Tree Ln 14+45 AB 13.4 114.2 BC 117.9 N 97 21 Westbound Laurel Tree Ln, intersection AB 12.8 113.9 BC 117.9 N 97 1/18/24 22 Laurel Tree Lane Approach 14+43 AB 13.1 118.7 BC 119.7 N 99 23 Laurel Tree Lane Approach 14+43 AB 13.5 119.2 BC 119.7 N 100 5/28/2024 24 Private Driveway "A" Sta. 17+00 AB 11.6 116.3 BC 120.7 N 96 25 Private Driveway "A" Sta. 17+25 AB 10.9 115.3 BC 120.7 N 96 26 Private Driveway "A" Sta. 17+40 AB 11.3 115.9 BC 120.7 N 96 27 Private Driveway "A" Sta. 17+85 AB 12.1 117.8 BC 120.7 N 98 28 Private Driveway "A" Sta. 18+30 AB 11.2 116.2 BC 120.7 N 96 29 Private Driveway "A" Sta. 19+65 AB 11.8 115.8 BC 120.7 N 96 30 Private Driveway "A" Sta. 20+10 AB 10.7 115.5 BC 120.7 N 96 31 Private Driveway "A" Sta. 20+85 AB 11.6 118.2 BC 120.7 N 98 32 Private Driveway "A" Sta. 21+20 AB 12 116.6 BC 120.7 N 97 5/29/24 33 SE Corner of Main Building AB 12.0 114.6 BC 120.5 N 95 34 SE Corner of Main Building AB 11.8 120.2 BC 120.5 N 100 35 SE Corner of Main Building AB 13.2 114.5 BC 120.5 N 95 36 SW Corner of Main Building AB 10.1 118.1 BC 120.5 N 98 37 SW Corner of Main Building AB 12.6 114.5 BC 120.5 N 95 38 SW Corner of Main Building AB 11.0 115.6 BC 120.5 N 96 39 SW Corner of Main Building AB 12.1 114.8 BC 120.5 N 95 40 NW Corner of Main Building AB 14.9 115.0 BC 120.5 N 95 41 NW Corner of Main Building AB 12.2 119.7 BC 120.5 N 99 42 NW Corner of Main Building AB 12.8 114.9 BC 120.5 N 95 43 NW Corner of Main Building AB 9.3 119.3 BC 120.5 N 99 44 NE Corner of Main Building AB 9.2 118.3 BC 120.5 N 98 TABLE 1 SUMMARY OF FIELD DENSITY TESTS BASE Note: N = Nuclear Gauge Test FG = Finished Grade Test All elevations are approximate Aviara Apartments West 1205 Aviara Pkwy Carlsbad, CA GeoTek, Inc.6/13/2025 Project No.: 3740-SD Page 7 of 16 DATE Test No.Location Elev/ Depth Moisture Content (%) Dry Density (pcf) Soil Type Maximum Density (pcf) Test Type Relative Compaction (%) TABLE 1 SUMMARY OF FIELD DENSITY TESTS BASE 6/11/24 45 Garage Approach AB 12.2 116.8 BC 121.5 N 96 46 Driveway U-3 AB 10.8 117.0 BC 121.5 N 96 47 Garage Approach AB 11.2 115.9 BC 121.5 N 95 48 Garage Approach AB 10.6 116.2 BC 121.5 N 96 49 Driveway U-1 AB 10.3 115.8 BC 121.5 N 95 3/24/25 50 Curb and Gutter AB 17.2 109.4 BC 122.0 N 90 51 Curb and Gutter AB 17.9 110.3 BC 122.0 N 90 52 Curb and Gutter AB 16.4 116.3 BC 122.0 N 95 53 Curb and Gutter AB 15.2 114.6 BC 122.0 N 94 54 Curb and Gutter AB 16.3 112.0 BC 122.0 N 92 55 Curb and Gutter AB 14.8 110.2 BC 122.0 N 90 5/8/25 56 Driveway Paver sections NE of Bldg AB 11.7 118.0 BC 122.0 N 97 57 Driveway Paver sections NE of Bldg AB 12.0 119.0 BC 122.0 N 98 58 Driveway Paver sections NE of Bldg AB 12.2 120.0 BC 122.0 N 98 59 Driveway Paver sections NE of Bldg AB 11.9 118.0 BC 122.0 N 97 60 Driveway Paver sections NE of Bldg AB 11.8 119.0 BC 122.0 N 98 5/16/25 61 AB PVT Driveway "B" 24+00 (IB) AB 12.7 113.8 BC 117.6 N 97 62 AB PVT Driveway "B" 24+30 (OB) AB 13.3 113.5 BC 117.6 N 97 63 AB PVT Driveway "B" 24+70 (IB) AB 12.0 112.2 BC 117.6 N 95 64 AB PVT Driveway "B" 25+10 (OB) AB 12.5 113.1 BC 117.6 N 96 65 AB PVT Driveway "B" 25+60 (IB) AB 12.9 112.9 BC 117.6 N 96 66 AB PVT Driveway "B" 26+00 (OB) AB 13.1 113.6 BC 117.6 N 97 67 AB PVT Driveway "B" 26+60 (IB) AB 12.6 114.2 BC 117.6 N 97 68 AB PVT Driveway "B" 27+00 (OB) AB 13.2 112.8 BC 117.6 N 96 5/23/25 69 Courtyard Round About AB 12.3 112.8 BC 117.6 N 96 70 Courtyard Round About AB 12.8 113.7 BC 117.6 N 97 71 Round About Handicap Stalls AB 13.2 113.1 BC 117.6 N 96 72 PVT Driveway "A" 23+00 AB 13.0 112.4 BC 117.6 N 96 73 PVT Driveway "A" 22+50 AB 12.5 113.6 BC 117.6 N 97 Note: N = Nuclear Gauge Test FG = Finished Grade Test All elevations are approximate Aviara Apartments West 1205 Aviara Pkwy Carlsbad, CA GeoTek, Inc.6/13/2025 Project No.: 3740-SD Page 8 of 16 DATE Test No.Location Elev/ Depth Moisture Content (%) Dry Density (pcf) Soil Type Maximum Density (pcf) Test Type Relative Compaction (%) 10/30/2023 1 Fire @ SB Aviara 9+02 -2" - 143.1 AC 148.0 N 97 2 Fire @ SB Aviara 9+02 AC - 146.2 AC 148.0 N 99 3 Water @ SB Aviara 7+73 -2" - 141.5 AC 148.0 N 96 4 Water @ SB Aviara 7+73 AC - 60.0 AC 148.0 N 41 5 Fire @ SB Aviara 7+61 -2" - 147.0 AC 148.0 N 99 6 Fire @ SB Aviara 7+61 AC - 146.2 AC 148.0 N 99 7 Irrigation @ SB Aviara 7+68 -2" - 141.8 AC 148.0 N 96 8 Irrigation @ SB Aviara 7+68 AC - 142.5 AC 148.0 N 96 10/31/23 9 Fire @ SB Aviara 9+02 -2" - 143.9 AC 148.0 N 97 10 Fire @ SB Aviara 9+02 AC - 146.3 AC 148.0 N 99 11 Water @ SB Aviara 7+73 -2" - 141.5 AC 148.0 N 96 12 Water @ SB Aviara 7+73 AC - 142.4 AC 148.0 N 96 13 Fire @ SB Aviara 7+61 -2" - 144.9 AC 148.0 N 98 14 Fire @ SB Aviara 7+61 AC - 147.0 AC 148.0 N 99 15 Irrigation @ SB Aviara 7+68 -2" - 141.8 AC 148.0 N 96 16 Irrigation @ SB Aviara 7+68 AC - 148.5 AC 148.0 N 100 11/2/23 17 Electrical Line Along Aviara Pkwy -6" - 142.5 AC 148.0 N 96 18 Electrical Line Along Aviara Pkwy -4" - 146.8 AC 148.0 N 99 19 Electrical Line Along Aviara Pkwy -2" - 144.9 AC 148.0 N 98 20 Electrical Line Along Aviara Pkwy AC - 141.4 AC 148.0 N 96 21 Gas Line Along Aviara Pkwy -6" - 142.0 AC 148.0 N 96 22 Gas Line Along Aviara Pkwy -4" - 141.1 AC 148.0 N 95 23 Gas Line Along Aviara Pkwy -2" - 143.0 AC 148.0 N 97 24 Gas Line Along Aviara Pkwy AC - 143.7 AC 148.0 N 97 12/27/23 25 Driveway "A" Entrance Area (East) AC - 143.1 AC 145.6 N 98 26 Driveway "A" Entrance Area (East) AC - 142.8 AC 145.6 N 98 27 Driveway "A" Eastern Perimeter AC - 144.2 AC 145.6 N 99 1/5/23 28 Waterline Removal, Aviara Pkwy AC - 146.8 AC 147.0 N 100 29 Waterline Removal, Aviara Pkwy AC - 144.9 AC 147.0 N 99 30 Waterline Removal, Aviara Pkwy AC - 141.4 AC 147.0 N 96 1/16/23 31 Westbound Laurel Tree Ln, 15+86 AC - 148.3 AC 149.0 N 100 32 Westbound Laurel Tree Ln, 14+45 AC - 142.7 AC 149.0 N 96 33 Westbound Laurel Tree Ln, intersect AC - 145.4 AC 149.0 N 98 5/14/24 34 Laurel Tree Lane AC - 136.7 AC 145.0 N 94 35 Laurel Tree Lane AC - 138.7 AC 145.0 N 96 36 Laurel Tree Lane AC - 140.2 AC 145.0 N 97 37 Laurel Tree Lane AC - 138.7 AC 145.0 N 96 38 Laurel Tree Lane AC - 140.2 AC 145.0 N 97 39 Laurel Tree Lane AC - 138.4 AC 145.0 N 95 40 Laurel Tree Lane AC - 143.0 AC 145.0 N 99 5/30/24 41 SE Corner of Main Building AC - 137.1 AC 145.0 N 95 42 SE Corner of Main Building AC - 137.2 AC 145.0 N 95 43 SE Corner of Main Building AC - 136.8 AC 145.0 N 94 44 South Garage Entrance AC - 140.5 AC 145.0 N 97 TABLE 1 SUMMARY OF FIELD DENSITY TESTS ASPHALT Note: N = Nuclear Gauge Test FG = Finished Grade Test All elevations are approximate Aviara Apartments West 1205 Aviara Pkwy Carlsbad, CA GeoTek, Inc.6/13/2025 Project No.: 3740-SD Page 9 of 16 DATE Test No.Location Elev/ Depth Moisture Content (%) Dry Density (pcf) Soil Type Maximum Density (pcf) Test Type Relative Compaction (%) TABLE 1 SUMMARY OF FIELD DENSITY TESTS ASPHALT 45 SW Corner of Main Building AC - 140.6 AC 145.0 N 97 46 SW Corner of Main Building AC - 136.7 AC 145.0 N 94 47 SW Corner of Main Building AC - 136.9 AC 145.0 N 94 48 SW Corner of Main Building AC - 136.8 AC 145.0 N 94 49 NW Corner of Main Building AC - 136.8 AC 145.0 N 94 50 NW Corner of Main Building AC - 137.5 AC 145.0 N 95 51 NW Corner of Main Building AC - 139.5 AC 145.0 N 96 52 NW Corner of Main Building AC - 140.1 AC 145.0 N 97 53 North Garage Entrance AC - 138.4 AC 145.0 N 95 54 NE Corner of Main Building AC - 136.9 AC 145.0 N 94 6/14/24 55 Laurel Tree Ln SE Corner Intersect AC - 131.8 AC 136.5 N 97 56 Aviara Pkwy 26+25 AC - 132.6 AC 136.5 N 97 57 Aviara Pkwy 26+05 AC - 131.0 AC 136.5 N 96 58 Aviara Pkwy 26+60 AC - 132.2 AC 136.5 N 97 59 Aviara Pkwy 26+90 AC - 133.4 AC 136.5 N 98 60 Aviara Pkwy 26+95 AC - 132.1 AC 136.5 N 97 3/27/25 61 Laurel tree Ln. AC - 142.4 AC 145.0 N 98 62 Laurel tree Ln. AC - 139.4 AC 145.0 N 96 63 Laurel tree Ln. AC - 137.5 AC 145.0 N 95 5/16/25 64 AC PVT Driveway "B" 24+05 (OB) AC - 142.7 AC 147.5 N 97 65 AC PVT Driveway "B" 24+25 (IB) AC - 141.4 AC 147.5 N 96 66 AC PVT Driveway "B" 24+35 (OB) AC - 142.1 AC 147.5 N 96 67 AC PVT Driveway "B" 24+70 (OB) AC - 141.6 AC 147.5 N 96 68 AC PVT Driveway "B" 25+15 (IB) AC - 142.5 AC 147.5 N 97 69 AC PVT Driveway "B" 25+85 (OB) AC - 141.3 AC 147.5 N 96 70 AC PVT Driveway "B" 26+30 (IB) AC - 142.0 AC 147.5 N 96 71 AC PVT Driveway "B" 26+80 (OB) AC - 141.8 AC 147.5 N 96 72 AC PVT Driveway "B" 27+00 (OB) AC - 142.9 AC 147.5 N 97 73 AC PVT Driveway "B" 27+10 (IB) AC - 140.8 AC 147.5 N 95 5/30/25 74 Aviara Parkway STA.# 6+15 AC - 143.4 AC 147.6 N 97 75 Aviara Parkway STA.# 6+85 AC - 142.8 AC 147.6 N 97 76 Aviara Parkway STA.# 7+40 AC - 143.1 AC 147.6 N 97 77 Aviara Parkway STA.# 7+90 AC - 142.3 AC 147.6 N 96 78 Aviara Parkway STA.# 8+50 AC - 143.0 AC 147.6 N 97 79 Aviara Parkway STA.# 9+35 AC - 142.7 AC 147.6 N 97 80 Aviara Parkway STA.# 6+50 AC - 142.9 AC 147.6 N 97 81 Aviara Parkway STA.# 7+40 AC - 141.8 AC 147.6 N 96 82 Aviara Parkway STA.# 8+80 AC - 141.6 AC 147.6 N 96 83 Aviara Parkway STA.# 9+40 AC - 142.3 AC 147.6 N 96 84 Aviara Parkway STA.# 6+70 AC - 141.7 AC 147.6 N 96 85 Aviara Parkway STA.# 7+80 AC - 141.5 AC 147.6 N 96 86 Aviara Parkway STA.# 9+00 AC - 142.0 AC 147.6 N 96 Note: N = Nuclear Gauge Test FG = Finished Grade Test All elevations are approximate Aviara Apartments West 1205 Aviara Pkwy Carlsbad, CA GeoTek, Inc.6/13/2025 Project No.: 3740-SD Page 10 of 16 DATE Test No.Location Elev/ Depth Moisture Content (%) Dry Density (pcf) Soil Type Maximum Density (pcf) Test Type Relative Compaction (%) 7/10/23 1 Storm Drain Line "B" Sta. 9+95 -1.5' 11.8 116.6 A 125.8 N 93 2 Storm Drain Line "B" Sta. 9+96 SG 12.4 119.4 A 125.8 N 95 3 Bypass Storm Drain Line Sta. 11+06 SG 10.3 123.6 A 125.8 N 98 4 Bypass Storm Drain Line Sta. 11+89 SG 11.1 121.1 A 125.8 N 96 7/12/23 5 Sewer Line @ Parking GL N/3.5 -2' 12.4 116.9 A 125.8 N 93 6 Sewer Line @ Parking GL N/3.5 SG 13.2 119.8 A 125.8 N 95 7 Sewer Line @ Parking GL K.5/6 -2' 12.8 118.7 A 125.8 N 94 8 Sewer Line @ Parking GL K.5/6 SG 14.1 120.3 A 125.8 N 96 9 Sewer Line @ Parking GL K.5/8.6 -2' 11.9 116.8 A 125.8 N 93 10 Sewer Line @ Parking GL K.5/8.6 SG 12.3 121.1 A 125.8 N 96 11 Sewer Line @ Parking GL J/8.6 -2' 14.3 117.5 A 125.8 N 93 12 Sewer Line @ Parking GL J/8.6 SG 12.7 119.7 A 125.8 N 95 7/14/23 13 Bypass Storm Drain Line Sta. 14+94 -2' 13.1 114.8 B 123.0 N 93 14 Bypass Storm Drain Line Sta. 14+94 SG 12.2 117.5 B 123.0 N 96 15 Bypass Storm Drain Line Sta. 15+13 -2' 14.3 113.5 B 123.0 N 92 16 Bypass Storm Drain Line Sta. 15+13 SG 12.8 118.2 B 123.0 N 96 17 Bypass Storm Drain Line Sta. 15+65 -2' 13.5 112.8 B 123.0 N 92 18 Bypass Storm Drain Line Sta. 15+65 SG 11.9 117.2 B 123.0 N 95 7/17/23 19 Bypass Storm Drain Line Sta. 11+31 -2' 11.8 112.5 B 123.0 N 91 20 Bypass Storm Drain Line Sta. 11+31 SG 12.4 119.4 B 123.0 N 97 21 Bypass Storm Drain Line Sta. 13+54 -2' 10.3 113.5 B 123.0 N 92 22 Bypass Storm Drain Line Sta. 13+54 SG 11.1 117.1 B 123.0 N 95 7/19/23 23 Storm Drain Line 1 Sta. 15+22 -2' 12.5 114.2 B 123.0 N 93 24 Storm Drain Line 1 Sta. 15+22 SG 12.5 118.2 B 123.0 N 96 25 Storm Drain Line 1 Sta. 16+34 -2' 11.9 115.1 B 123.0 N 94 26 Storm Drain Line 1 Sta. 16+34 SG 13.2 120.8 B 123.0 N 98 27 Catch Basin Box Sta 13+54 -2' 12.9 116.1 B 123.0 N 94 28 Catch Basin Box Sta 13+54 SG 13.3 120.5 B 123.0 N 98 7/20/23 29 Storm Drain Box Sta. 13+54 -2' 12.1 115.1 B 123.0 N 94 30 Storm Drain Box Sta. 13+54 SG 11.6 116.4 B 123.0 N 95 31 Storm Drain Box Sta. 13+54 -2' 12.3 114.5 B 123.0 N 93 32 Storm Drain Box Sta. 13+54 SG 13 118.1 B 123.0 N 96 7/21/2023 33 Storm Drain Box Sta. 13+54 -2' 12.1 114.8 B 123.0 N 93 34 Storm Drain Box Sta. 13+54 SG 11.6 117.1 B 123.0 N 95 35 Storm Drain Box Sta. 13+54 -2' 12.3 114.6 B 123.0 N 93 36 Storm Drain Box Sta. 13+54 SG 13 117.4 B 123.0 N 95 7/24/2023 37 Storm Drain Box Sta. 13+54 -2' 12.1 115.4 B 123.0 N 94 38 Storm Drain Box Sta. 13+54 SG 11.6 117.3 B 123.0 N 95 39 Storm Drain Box Sta. 13+54 SG 12.3 118.2 B 123.0 N 96 40 Interior Line C/8.5 SG 13.1 114.2 B 123.0 N 93 41 Interior Line D/8.5 SG 12.8 116.2 B 123.0 N 94 7/31/2023 42 Storm Drain Box Sta. 16+76 -2' 12.6 114.8 B 123.0 N 93 43 Storm Drain Box Sta. 16+76 SG 11.9 117.6 B 123.0 N 96 44 Storm Drain Box Sta. 16+22 -2' 10.9 113.9 B 123.0 N 93 TABLE 1 SUMMARY OF FIELD DENSITY TESTS STORM DRAIN Note: N = Nuclear Gauge Test FG = Finished Grade Test All elevations are approximate Aviara Apartments West 1205 Aviara Pkwy Carlsbad, CA GeoTek, Inc.6/13/2025 Project No.: 3740-SD Page 11 of 16 DATE Test No.Location Elev/ Depth Moisture Content (%) Dry Density (pcf) Soil Type Maximum Density (pcf) Test Type Relative Compaction (%) TABLE 1 SUMMARY OF FIELD DENSITY TESTS STORM DRAIN 45 Storm Drain Box Sta. 16+22 SG 12.9 116.1 B 123.0 N 94 46 Storm Drain Box Sta. 15+12 -2' 11.3 114.4 B 123.0 N 93 47 Storm Drain Box Sta. 15+12 SG 12.4 116.2 B 123.0 N 94 8/2/2023 48 Storm Drain Box Sta. 15+22 -2' 12.6 113.4 B 123.0 N 92 49 Storm Drain Box Sta. 15+22 SG 11.9 116.8 B 123.0 N 95 50 Storm Drain Box Sta. 16+94 -2' 10.9 114 B 123.0 N 93 51 Storm Drain Box Sta. 16+94 SG 12.9 116.6 B 123.0 N 95 10/26/23 52 Cleanout @ 21+38 -2' 14.2 112.5 B 123.0 N 91 53 Cleanout @ 21+38 SG 13.4 117.8 B 123.0 N 96 54 Cleanout @ 67+91 -2' 12.9 114.9 B 123.0 N 93 55 Cleanout @ 67+91 SG 13.6 119.4 B 123.0 N 97 11/28/23 56 Line 17+67 -2' 12.2 114.7 B 123.0 N 93 57 Line 17+67 SG 10.6 117.5 B 123.0 N 96 58 Line 17+68 -2' 12.8 114.3 B 123.0 N 93 59 Line 17+69 SG 11.2 116.5 B 123.0 N 95 12/4/23 60 Catch Basin 22+52 -2' 14.2 114.7 B 123.0 N 93 61 Catch Basin 22+52 SG 12.5 118.1 B 123.0 N 96 62 Catch Basin 22+56 -2' 13.1 115.6 B 123.0 N 94 63 Catch Basin 22+56 SG 12.7 118.9 B 123.0 N 97 64 Catch Basin 20+40 -2' 12.2 116.2 B 123.0 N 94 65 Catch Basin 20+40 SG 11.3 120.2 B 123.0 N 98 Note: N = Nuclear Gauge Test FG = Finished Grade Test All elevations are approximate Aviara Apartments West 1205 Aviara Pkwy Carlsbad, CA GeoTek, Inc.6/13/2025 Project No.: 3740-SD Page 12 of 16 DATE Test No.Location Elev/ Depth Moisture Content (%) Dry Density (pcf) Soil Type Maximum Density (pcf) Test Type Relative Compaction (%) 1 Sewer Line @ Parking GL N/3.5 -2' 12.4 116.9 A 125.8 N 93 2 Sewer Line @ Parking GL N/3.5 SG 13.2 119.8 A 125.8 N 95 3 Sewer Line @ Parking GL K.5/6 -2' 12.8 118.7 A 125.8 N 94 4 Sewer Line @ Parking GL K.5/6 SG 14.1 120.3 A 125.8 N 96 5 Sewer Line @ Parking GL K.5/8.6 -2' 11.9 116.8 A 125.8 N 93 6 Sewer Line @ Parking GL K.5/8.6 SG 12.3 121.1 A 125.8 N 96 7 Sewer Line @ Parking GL J/8.6 -2' 14.3 117.5 A 125.8 N 93 8 Sewer Line @ Parking GL J/8.6 SG 12.7 119.7 A 125.8 N 95 7/12/23 9 Sewer Line @ Parking GL C/8.6 -2' 13.1 114.9 A 125.8 N 91 10 Sewer Line @ Parking GL C/8.6 SG 12.8 120.5 A 125.8 N 96 11 Sewer Line @ Parking GL E/8.6 -2' 14.1 115.2 A 125.8 N 92 12 Sewer Line @ Parking GL E/8.6 SG 13.8 119.6 A 125.8 N 95 13 Sewer Line @ Parking GL H/8.6 -2' 12.6 115.9 A 125.8 N 92 14 Sewer Line @ Parking GL H/8.6 SG 12.1 121.1 A 125.8 N 96 15 Sewer Line @ Parking GL J/8.6 -2' 13.5 116.1 A 125.8 N 92 16 Sewer Line @ Parking GL J/8.6 SG 12.2 119.9 A 125.8 N 95 7/24/23 17 Interior Sewer Line (J/4.5) SG 11.8 114.8 B 123 N 93 18 Interior Sewer Line (H/4.5) SG 12.4 115.2 B 123 N 94 9/26/23 19 Sewer Pump Station, Wall 7 10+00 -4' 13.4 114.4 B 123.0 N 93 20 Sewer Pump Station, Wall 7 10+00 -2' 12.8 116.1 B 123.0 N 94 21 Sewer Pump Station, Wall 7 10+00 SG 14.1 117.8 B 123.0 N 96 10/4/23 22 Aviara Pkwy SB Sewer Line -2' 12.6 115.9 Base 117.6 N 99 23 Aviara Pkwy SB Sewer Line SG 13.1 116.8 Base 117.6 N 99 10/6/23 24 Aviara Pkwy East of SB Sewer Line -2' 13.5 117.2 Base 117.6 N 100 25 Aviara Pkwy East of SB Sewer Line SG 12.9 116.8 Base 117.6 N 99 10/18/23 26 Sewerline SB of Aviara Pkwy -2' 12.3 117.1 Base 117.6 N 100 27 Sewerline SB of Aviara Pkwy SG 12.8 116.7 Base 117.6 N 99 10/24/23 28 BMT, Wall 7 21+18.5 SG 12.1 118.9 B 123.0 N 97 29 BMT, Wall 7 21+32 SG 13.0 117.9 B 123.0 N 96 11/14/23 30 Sewer Line 21+55 -2' 14.0 115.6 B 123.0 N 94 31 Sewer Line 21+55 SG 12.6 118.1 B 123.0 N 96 32 Sewer Line 22+15 -2' 13.2 114.7 B 123.0 N 93 33 Sewer Line 22+15 SG 12.8 118.9 B 123.0 N 97 11/15/23 34 Manhole Sta. 2+57 SG 13.0 120.1 B 123.0 N 98 35 Manhole Sta. 20+33 SG 14.2 119.2 B 123.0 N 97 12/14/23 36 Sewer Pump Station @ 14.37 -2' 13.5 115.7 B 123.0 N 94 37 Sewer Pump Station @ 14.37 SG 12.5 117.2 B 123.0 N 95 38 Sewer Pump Station @ 14.37 SG 14.2 118.3 B 123.0 N 96 8/21/24 39 North Line, Wall to Aviara 12+55 SG 7.7 119.0 A 125.8 N 95 40 North Line, Wall to Aviara 13+10 SG 9.8 120.0 A 125.8 N 95 41 North Line, Wall to Aviara 13+60 SG 8.0 119.0 A 125.8 N 95 42 North Line, Wall to Aviara 13+90 SG 8.5 119.0 A 125.8 N 95 43 North Line, Wall to Aviara 12+05 SG 9.7 120.0 A 125.8 N 95 44 North Line, Wall to Aviara 11+50 SG 10.0 120.0 A 125.8 N 95 TABLE 1 SUMMARY OF FIELD DENSITY TESTS SEWER Note: N = Nuclear Gauge Test FG = Finished Grade Test All elevations are approximate Aviara Apartments West 1205 Aviara Pkwy Carlsbad, CA GeoTek, Inc.6/13/2025 Project No.: 3740-SD Page 13 of 16 DATE Test No.Location Elev/ Depth Moisture Content (%) Dry Density (pcf) Soil Type Maximum Density (pcf) Test Type Relative Compaction (%) 7/17/2023 1 Water Line Trench Sta. 26+16 -2' 12.6 115.4 A 125.8 N 92 2 Water Line Trench Sta. 26+16 SG 13.1 120.1 A 125.8 N 95 3 Water Line Trench Sta. 24+75 -2' 11.9 116.6 A 125.8 N 93 4 Water Line Trench Sta. 24+75 SG 12.4 121.1 A 125.8 N 96 7/25/2023 5 Water Line Trench 23+52 SG 13.1 117.5 B 123.0 N 96 6 Water Line Trench 24+63 SG 11.8 116.9 B 123.0 N 95 7 Water Line Trench 24+75 SG 12.1 118.1 B 123.0 N 96 7/26/2023 8 Water Line Trench 23+52 SG 13.1 118.1 B 123.0 N 96 9 Water Line Trench 24+63 SG 11.8 117.3 B 123.0 N 95 10 Water Line Trench 24+75 SG 12.1 117.8 B 123.0 N 96 7/27/2023 11 Water Line Trench #22 N26'16'45 SG 13.1 118.1 B 123.0 N 96 12 Water Line Trench #22 N26'16'45 SG 11.8 117.3 B 123.0 N 95 13 Water Line Trench #22 N26'16'45 SG 12.1 117.8 B 123.0 N 96 8/2/2023 14 Water Line 24+73 SG 11.3 114.2 B 123.0 N 93 15 Water Line 24+88 SG 12.4 116.9 B 123.0 N 95 8/14/2023 16 Water Line 7+66 -2' 13.3 117.3 B 123.0 N 95 17 Water Line 7+66 SG 12.2 116.9 B 123.0 N 95 8/15/2023 18 Fire Water Line Trench 9+02 -2' 13.3 114.3 B 123.0 N 93 19 Fire Water Line Trench 9+02 SG 12.2 116.9 B 123.0 N 95 20 Water Line Trench 7+73 -2' 12.6 115.2 B 123.0 N 94 21 Water Line Trench 7+73 SG 13.1 117.1 B 123.0 N 95 8/16/2023 22 Fire Water Line 7+61 -2' 10.5 116.7 B 123.0 N 95 23 Fire Water Line 7+61 SG 9.8 117.5 B 123.0 N 96 24 Fire Water Line 9+02 -2' 11.8 119.1 B 123.0 N 97 25 Fire Water Line 9+02 SG 11.2 117.1 B 123.0 N 95 8/17/2023 26 Water Line SB 7+73 SG 10.5 117.2 BC 117.6 N 100 27 Water Line SB 7+73 -2' 12.5 119.8 BC 117.6 N 102 28 Water Line SB 7+73 SG 11.8 115.9 BC 117.6 N 99 29 Water Line SB 7+61 SG 11.2 116.9 BC 117.6 N 99 30 Water Line SB 7+61 -2' 10.9 117.8 BC 117.6 N 100 31 Water Line SB 7+61 SG 12.4 116.2 BC 117.6 N 99 8/18/2023 32 Irrigation Water Line NB 7+66 -2' 11.9 118.3 BC 117.6 N 101 33 Irrigation Water Line NB 7+66 SG 12.5 119.8 BC 117.6 N 102 34 Irrigation Water Line NB 7+66 -2' 12.1 117.9 BC 117.6 N 100 35 Irrigation Water Line NB 7+66 SG 11.5 119.5 BC 117.6 N 102 36 Irrigation Water Line NB 7+66 SG 12.3 120.5 BC 117.6 N 102 8/23/2023 37 Fire Water Line NB 9+02 SG 12.1 117.9 BC 117.6 N 100 38 Fire Water Line NB 9+02 SG 12.9 118.4 BC 117.6 N 101 39 Fire Water Line NB 9+02 SG 13.1 118.1 BC 117.6 N 100 8/24/2023 40 Fire Water Line NB 7+61 -2' 11.8 117.8 BC 117.6 N 100 41 Fire Water Line NB 7+61 SG 12.1 116.9 BC 117.6 N 99 42 Fire Water Line NB 7+61 SG 13 118.3 BC 117.6 N 101 8/25/2023 43 Irrigation Water Line NB 7+66 SG 11.8 117.8 BC 117.6 N 100 44 Irrigation Water Line NB 7+66 SG 10.1 119.7 BC 117.6 N 102 TABLE 1 SUMMARY OF FIELD DENSITY TESTS WET UTILITIES Note: N = Nuclear Gauge Test FG = Finished Grade Test All elevations are approximate Aviara Apartments West 1205 Aviara Pkwy Carlsbad, CA GeoTek, Inc.6/13/2025 Project No.: 3740-SD Page 14 of 16 DATE Test No.Location Elev/ Depth Moisture Content (%) Dry Density (pcf) Soil Type Maximum Density (pcf) Test Type Relative Compaction (%) TABLE 1 SUMMARY OF FIELD DENSITY TESTS WET UTILITIES 45 Irrigation Water Line NB 7+66 SG 9.8 118.3 BC 117.6 N 101 9/11/23 46 Fire Water Line N Bound 9+02.08 -2' 12.1 117.4 BC 117.6 N 100 47 Fire Water Line N Bound 9+02.09 SG 12.5 117.0 BC 117.6 N 99 48 Fire Water Line N Bound 7+61.69 -2' 13.1 116.9 BC 117.6 N 99 49 Fire Water Line N Bound 7+61.70 SG 12.0 117.5 BC 117.6 N 100 9/20/23 50 Waterline (West) N72 15'56"E -2' 12.4 117.4 B 123.0 N 95 51 Waterline (Middle) N72 15'56"E -2' 11.8 117.1 B 123.0 N 95 52 Waterline (East) N72 15'56"E -2' 13.1 115.8 B 123.0 N 94 9/21/23 53 Waterline (West) N72 15'56"E SG 12.4 117.2 B 123.0 N 95 54 Waterline (Middle) N72 15'56"E SG 11.8 118.0 B 123.0 N 96 55 Waterline (East) N72 15'56"E SG 13.1 116.8 B 123.0 N 95 56 Fire Waterline N72 10'53"E -1.0 14.1 116.7 B 123.0 N 95 57 Fire Waterline N72 10'53"E SG 12.9 120.1 B 123.0 N 98 9/24/23 58 Waterline (Northbound) 7+73.11 -2' 12.5 116.9 Base 117.6 N 99 59 Waterline (Northbound) 7+73.12 SG 11.8 117.1 Base 117.6 N 100 60 Waterline (Northbound) 7+73.13 SG 13.1 117.5 Base 117.6 N 100 10/10/23 61 Waterline @ Aviara & Laurel -2' 10.5 110.2 Base 117.6 N 94 62 Waterline @ Aviara & Laurel SG 12.2 117.1 Base 117.6 N 100 10/30/23 63 Fire Line @ SB Aviara 9+02.08 SG 8.5 115.7 Base 117.6 N 98 64 Water Line @ SB Aviara 7+73.11 SG 7.4 118.9 Base 117.6 N 101 65 Fire Line @ SB Aviara 9+02.08 SG 6.9 122.0 Base 117.6 N 104 66 Irrigation Line @ SB Aviara 7+61.69 SG 9.2 120.6 Base 117.6 N 103 67 Sewer Line @ SB Aviara 6+64.01 SG 5.9 118.2 Base 117.6 N 101 10/31/23 68 Fire Line @ SB Aviara 9+02.08 SG 7.0 117.0 Base 117.6 N 99 69 Water Line @ SB Aviara 7+73.11 SG 8.1 119.1 Base 117.6 N 101 70 Fire Line @ SB Aviara 9+02.08 SG 9.3 120.2 Base 117.6 N 102 71 Irrigation Line @ SB Aviara 7+61.69 SG 6.7 118.3 Base 117.6 N 101 72 Sewer Line @ SB Aviara 6+64.01 SG 7.2 121.2 Base 117.6 N 103 11/3/23 73 Fire Water Line @ 22+81 -2' 13.2 115.1 B 123.0 N 94 74 Fire Water Line @ 22+81 SG 12.8 119.5 B 123.0 N 97 75 Fire Water Line @ 24+75 -2' 12.1 118.8 B 123.0 N 97 76 Fire Water Line @ 24+75 SG 13.7 120.4 B 123.0 N 98 11/6/23 77 Fire Water Line @ 17+9 -2' 13.2 115.1 B 123.0 N 94 78 Fire Water Line @ 17+9 SG 14.2 117.8 B 123.0 N 96 79 Fire Water Line @ 21+54 -2' 12.8 118.7 B 123.0 N 97 80 Fire Water Line @ 21+54 SG 13.7 116.4 B 123.0 N 95 11/8/2023 81 Fire Water Line @ 22+38 -2' 13.2 114.1 B 123.0 N 93 82 Fire Water Line @ 22+38 SG 14.2 117.8 B 123.0 N 96 83 Fire Water Line @ 23+26 -2' 12.8 113.7 B 123.0 N 92 84 Fire Water Line @ 23+26 SG 13.7 116.4 B 123.0 N 95 11/9/23 85 Fire Water Line @ 23+26 -2' 10.2 116.6 B 123.0 N 95 86 Fire Water Line @ 23+26 SG 12.3 120.1 B 123.0 N 98 87 Fire Water Line @ 24+13 -2' 11.4 117.2 B 123.0 N 95 88 Fire Water Line @ 24+13 SG 12.0 119.3 B 123.0 N 97 Note: N = Nuclear Gauge Test FG = Finished Grade Test All elevations are approximate Aviara Apartments West 1205 Aviara Pkwy Carlsbad, CA GeoTek, Inc.6/13/2025 Project No.: 3740-SD Page 15 of 16 DATE Test No.Location Elev/ Depth Moisture Content (%) Dry Density (pcf) Soil Type Maximum Density (pcf) Test Type Relative Compaction (%) TABLE 1 SUMMARY OF FIELD DENSITY TESTS WET UTILITIES 11/3/23 89 Fire Water Line @ 22+81 -2' 13.2 115.1 B 123.0 N 94 90 Fire Water Line @ 22+81 SG 12.8 119.5 B 123.0 N 97 91 Fire Water Line @ 24+75 -2' 12.1 118.8 B 123.0 N 97 92 Fire Water Line @ 24+75 SG 13.7 120.4 B 123.0 N 98 11/6/23 93 Fire Water Line @ 17+9 -2' 13.2 115.1 B 123.0 N 94 94 Fire Water Line @ 17+9 SG 14.2 117.8 B 123.0 N 96 95 Fire Water Line @ 21+54 -2' 12.8 118.7 B 123.0 N 97 96 Fire Water Line @ 21+54 SG 13.7 116.4 B 123.0 N 95 11/8/2023 97 Fire Water Line @ 22+38 -2' 13.2 114.1 B 123.0 N 93 98 Fire Water Line @ 22+38 SG 14.2 117.8 B 123.0 N 96 99 Fire Water Line @ 23+26 -2' 12.8 113.7 B 123.0 N 92 100 Fire Water Line @ 23+26 SG 13.7 116.4 B 123.0 N 95 11/9/23 101 Fire Water Line @ 23+26 -2' 10.2 116.6 B 123.0 N 95 102 Fire Water Line @ 23+26 SG 12.3 120.1 B 123.0 N 98 103 Fire Water Line @ 24+13 -2' 11.4 117.2 B 123.0 N 95 104 Fire Water Line @ 24+13 SG 12.0 119.3 B 123.0 N 97 1/5/23 105 Waterline Removal Along Aviara Pkwy SG 8.3 120.2 Base 123.0 N 98 Note: N = Nuclear Gauge Test FG = Finished Grade Test All elevations are approximate Aviara Apartments West 1205 Aviara Pkwy Carlsbad, CA GeoTek, Inc.6/13/2025 Project No.: 3740-SD Page 16 of 16 DATE Test No.Location Elev/ Depth Moisture Content (%) Dry Density (pcf) Soil Type Maximum Density (pcf) Test Type Relative Compaction (%) 10/4/23 1 Electrical Line @ Segment 3 -2' 11.8 114.1 B 123.0 N 93 2 Electrical Line @ Segment 3 SG 12.2 116.1 B 123.0 N 94 10/18/23 3 Electrical Line @ WB Laurel Tree SG 13.1 117.7 B 123.0 N 96 4 Electrical Line @ WB Laurel Tree SG 14.2 116.4 B 123.0 N 95 10/19/23 5 Electrical Line @ WB Laurel Tree SG 14.1 118.1 B 123.0 N 96 6 Electrical Line @ WB Laurel Tree SG 13.2 116.7 B 123.0 N 95 10/24/23 7 Corner of Property 17+68 -10' 11.7 115.9 B 123.0 N 94 8 Corner of Property 17+68 -8' 13.2 116.7 B 123.0 N 95 9 Corner of Property 17+68 -7' 12.7 117.7 B 123.0 N 96 10 Corner of Property 17+68 -5' 13.4 116.9 B 123.0 N 95 11 Gas Line NB Avaria Pkwy SG 14.2 118.8 Base 117.6 N 101 12 Gas Line NB Avaria Pkwy SG 13.5 120.2 Base 117.6 N 102 10/25/23 13 Electrical Line @ SB Aviara Pkwy SG 13.2 117.1 Base 117.6 N 100 14 Electrical Line @ SB Aviara Pkwy SG 12.9 117.1 Base 117.6 N 100 15 Corner of Property 17+68 -5' 14.2 115.7 B 123.0 N 94 16 Corner of Property 17+68 -2' 13.4 118.9 B 123.0 N 97 17 Corner of Property 17+68 SG 12.9 122.0 B 123.0 N 99 10/26/23 18 Electrical Line @ NB Aviara Pkwy -2' 12.2 118.2 Base 117.6 N 101 19 Electrical Line @ NB Aviara Pkwy SG 13.0 120.1 Base 117.6 N 102 20 Electrical Line @ NB Aviara Pkwy SG 12.7 117.1 Base 117.6 N 100 12/21/23 21 Electrical Line @ 11+85 SG 13.4 118.6 B 123.0 N 96 22 Electrical Line @ 13+12 SG 12.6 119.2 B 123.0 N 97 12/29/23 23 Electrical Line @ 11+85 -2' 12.9 115.7 B 123.0 N 94 24 Electrical Line @ 11+85 SG 14.1 117.1 B 123.0 N 95 25 Electrical Line @ 26+86 -2' 13.4 117.8 B 123.0 N 96 26 Electrical Line @ 26+86 SG 12.8 118.1 B 123.0 N 96 1/8/24 27 Electrical & Gas Line 11+85 SG 13.1 120.2 B 123.0 N 98 28 Electrical & Gas Line 26+86 SG 12.2 117.8 B 123.0 N 96 1/12/24 29 Electrical & Gas Line 11+85 SG 13.3 116.5 B 123.0 N 95 30 Electrical & Gas Line 26+86 SG 12.6 117.3 B 123.0 N 95 1/17/24 31 Dry Line @ 23+72 SG 12.2 117.1 B 123.0 N 95 32 Dry Line @ 24+38 SG 13.4 118.2 B 123.0 N 96 33 Dry Line @ 26+53 SG 12.6 117.8 B 123.0 N 96 3/13/24 34 Electrical Trench Backfill (South) SG 9.5 116.5 F 127.5 N 91 35 Electrical Trench Backfill (South) SG 10.4 115.4 F 127.5 N 91 36 Electrical Trench Backfill (South) SG 10.9 115.8 F 127.5 N 91 TABLE 1 SUMMARY OF FIELD DENSITY TESTS DRY UTILITIES Note: N = Nuclear Gauge Test FG = Finished Grade Test All elevations are approximate GEOTECHNICAL | ENVIRONMENTAL | MATERIALS August 29, 2023 Revised August 31, 2023 Project No. 3740-SD R&V Real Estate Services c/o Wermers Companies 5120 Shoreham Place, Suite 150 San Diego, California 92122 Attention: Mr. Austin Wermers Subject: Summary of Geotechnical Observation and Testing Rough Grading Building Pad Aviara Apartments West 1205 Aviara Parkway, Carlsbad, California 92009 Dear Mr. Wermers: In accordance with your request, GeoTek, Inc. (GeoTek) has prepared this letter to certify the completion of the earthwork construction associated with the rough grading of the building pad at the subject property. GeoTek previously reported on the rough grading for the parking structure in the “Summary of Geotechnical Observation and Testing, Rough Grading, Parking Structure, Aviara Apartments West…”, dated May 23, 2023. It is to the best of GeoTek’s knowledge that remedial grading of the subject pad presented in this report has been completed, as noted on the dates of observations and field testing, in conformance with the approved geotechnical reports (see references) for the site, applicable provisions of the 2019 California Building Code (CBC) and City of Carlsbad guidelines. This report provides a summary of site conditions observed during the rough grading for the subject pad. SUMMARY OF GEOLOGIC AND SOILS CONDITIONS  Remedial grading of the subject building pads was performed under the observation of, and with selective testing, by GeoTek, Inc. (GeoTek) between the approximate dates of March 3, 2023 and August 28, 2023.  Unsuitable previously placed (undocumented) fill and alluvial materials were removed to recommended remedial grading depths or groundwater. R&V REAL ESTATE August 29, 2023, Revised August 31, 2023 Building Pad Certification – Building Structures Project No. 3740-SD Aviara Apartments West, Carlsbad, California Page 2  Groundwater was encountered at an elevation of 75 feet. Upon reaching this depth in the initial remedial removal bottom, remedial grading bottoms were elevated approximately two to four feet above the elevation of 75 feet to facilitate the use of heavy duty grading equipment at or near the wet remedial bottom.  A GeoTek representative observed exposed soil bottoms and tested the compaction to confirm a minimum 90 percent relative compaction prior to receiving engineered fill.  Onsite overexcavated materials and import materials were utilized to bring remedial grades to design grades. Caterpillar 637 scrapers, a Caterpillar D8, a Caterpillar 844 loader, import trucks and water trucks were utilized to place, moisture condition (as needed), mix, and compact the engineered fills during rough grading.  Visual classification of the soil in the field, compared to the soil description from laboratory testing was the basis for determining the maximum dry density value and optimum moisture content applied to each soil density test.  Field density tests indicated the engineered fill was placed and compacted to at least 90% and near optimum moisture content relative to ASTM D 1557. FIELD AND LABORATORY TESTING FIELD TESTING Field density tests were taken at periodic intervals and random locations to check the compaction efforts by the grading contractor performing compaction of engineered fill. The field density testing for the subject site was performed using a nuclear gauge, in general accordance with testing procedure ASTM D 6938 for soils. The results of the field density testing conducted are included in the attached Table 1 and presented on Figure 1. LABORATORY TESTING The laboratory maximum dry density and optimum moisture content for the soils were determined in general accordance with test method ASTM D 1557. The table below presents the soil type used for this project. R&V REAL ESTATE August 29, 2023, Revised August 31, 2023 Building Pad Certification – Building Structures Project No. 3740-SD Aviara Apartments West, Carlsbad, California Page 3 SUMMARY OF LABORATORY MAXIMUM DRY DENSITY AND OPTIMUM MOISTURE CONTENT TEST RESULTS (ASTM D 1557) Soil Type Description Maximum Dry Density (pcf) Optimum Moisture Content (%) A Dark Brown Clayey SAND 125.8 11.5 B Light Brown Silty SAND w/ clay 123.0 12.5 E Light Brown Silty Clayey SAND (Vista Sorrento Mix) 126.8 9.5 G Reddish Brown F-C Clayey SAND 129.7 10.0 I-1 Brown F-M Silty SAND 125.7 10.5 I-2 Brown F-M Silty SAND 128.8 9.5 The laboratory testing for the presence of sulfates and chloride content of near surface soils were obtained and delivered to GeoTek’s subconsultant for analysis. Results are presented in Appendix A. The results indicate that the water-soluble sulfate result is considered “negligible” per Table 4.2.1 of ACI 318. Based on the test results and Table 4.3.1 of ACI 318, no special recommendations for concrete are required for this project due to soil sulfate exposure. CONCLUSIONS Site grading has been completed in conformance with the approved geotechnical reports, applicable provisions of the 2019 California Building Code (CBC) and City of Carlsbad guidelines. FINAL FOUNDATION RECOMMENDATIONS Expansion index testing within the upper foot of building pad grade indicates the building pads exhibit a low expansion potential (EI less than 50). Preliminary foundations recommendations presented in GeoTek’s 2019 report remain applicable. R&V REAL ESTATE August 29, 2023, Revised August 31, 2023 Building Pad Certification – Building Structures Project No. 3740-SD Aviara Apartments West, Carlsbad, California Page 4 Closure The opportunity to be of service is sincerely appreciated. If you should have any questions, please do not hesitate to call our office. Respectfully submitted, GeoTek, Inc. Christopher D. Livesey CEG 2733, Exp. 5-31-25 Vice President Edwin R. Cunningham RCE 81687, Exp. 3-31-24 Project Engineer Distribution: (1) Addressee via email Enclosures: Figure 1 – As-Graded Compaction Test Map Table 1 – Field Density Tests Grading Appendix A – Corrosion Test Results R&V REAL ESTATE August 29, 2023, Revised August 31, 2023 Building Pad Certification – Building Structures Project No. 3740-SD Aviara Apartments West, Carlsbad, California Page 5 REFERENCES GeoTek, Inc. 2021, Geotechnical Evaluation Report, Proposed Aviara Apartments Development, 6145 Laurel Tree Lane, Carlsbad, California 92122, Project No. 3740-SD, November 11, 2021. , 2022a, Geotechnical Review of Construction plans, Project No. 3740-SD, March 21, 2022 ,2022b, Geotechnical Addendum and Review of Public Improvement Construction plans: Plan review of grading and improvement plans along Laurel Tree Lane, Project No. 3740-SD, March 24, 2022 , 2022c, Geotechnical Review of Construction plans: Plan review of parking structure building foundations, Project No. 3740-SD, March 25, 2022 , 2022d, Response to Geotechnical Review Comments and Second Review of Public Improvement Construction Plans, Project No. 3740-SD, May 6, 2022. , 2022e, Response to Geotechnical Review Comments, Project No. 3740-SD, May 20, 2022 , 2022f, Review – On-Site Storm Water Disposal and Retaining Wall Design, Project No. 3740-SD, August 18, 2022 , 2022g, Response to Geotechnical Review Comments: Project No. 3740-SD, September 27, 2022 , 2022h, Temporary Excavations for Catch Basins Along the South and West Grading Daylight Project No. 3740-SD, September 27, 2022. _____, 2023g, Summary of Geotechnical Observation and Testing, Rough Grading, Aviara Apartments West, 1205 Aviara Parkway, Carlsbad, California 92009,” Project No. 3740-SD, dated May 23, 2023. R&V REAL ESTATE August 29, 2023, Revised August 31, 2023 Building Pad Certification – Building Structures Project No. 3740-SD Aviara Apartments West, Carlsbad, California Page 6 SB&O, Inc. “Precise Grading Plans for: Aviara Apartments West,” Delta A, dated April 7, 2023. LEGEND FIELD DENSITY TEST LOCATION REMOVAL BOTTOM LOCATION LIMITS OF FILL THIS REPORT 75’ 1384 Poinsettia Avenue, Suite A Vista, California 92081 Aviara, LP Aviara West Carlsbad, California GeoTek Project No. 3740-SD PN: 3740-SD August 2023 Figure 1 Building Pad As-Graded Compaction Test Map 2 1 3 4 5 6 7 8 910 1112 13 14 15 16 17 18 19 20 21 22 23 24 25 26 272829 30 31 32 33 34 35 36 37 38 39 40 4142 43 44 45 46 47 48 49 50 51 5253 54 55 5657 58 59 60 6162636465 6667686970 71 72 73 74 75 78 76 77 79 80 81 82 83 84 85 86 87 88 89 90 91 92 93 94 95 96 97 98 99 100 101102 103 104 105 106 107 108109 110 111 112 113 114 115 116 117 118 119 110 75’ 75’ 77’ 77’ Qal Af Tsa Engineered Fill, This Report Alluvium, Circled Where Buried Santiago Formation, Circled Where Buried Af Af AfAf Af Af Af Af Af Af Af Qal Qal Qal Qal Qal Qal Qal Qal Tsa Tsa 77’ 77’ 77’ 75’ 75’75’75’ R&V REAL ESTATE August 29, 2023, Revised August 31, 2023 Building Pad Certification – Building Structures Project No. 3740-SD Aviara Apartments West, Carlsbad, California Page 7 Table 1 Field Density Test Results AVIARA LP Aviara Apartments Carlsbad, CA GeoTek, Inc. Grading 8/31/2023 Project No.: 3740-SD DATE Test No.Location Lot No. Sta No. Elev/ Depth Moisture Content (%) Dry Density (pcf) Soil Type Maximum Density (pcf) Test Type Relative Compaction (%) 3/6/23 1 East of parking structure 75.0 15.1 111.1 A 123.0 N 90 2 Parking structure 74.0 15.9 113.6 A 125.8 N 90 3 West of parking structure 75.5 13.9 115.7 A 125.8 N 92 3/7/23 4 West of parking structure 77.5 15.3 110.7 A 123.0 N 90 5 Parking structure 77.5 16.5 112.7 A 125.8 N 90 6 Parking structure 76.5 15.1 114.0 A 125.8 N 91 3/8/23 7 West of parking structure 78.0 14.4 115.0 A 125.8 N 91 8 Parking structure 78.0 15.2 111.6 B 123.0 N 91 3/10/23 9 West of parking structure 77.5 15.0 115.7 E 126.8 N 91 10 West of parking structure 79.0 16.9 110.7 A 123.0 N 90 4/12/23 11 East of parking structure 79.0 13.4 113.4 A 125.8 N 90 12 Parking structure 79.0 12.8 114.1 A 125.8 N 91 4/14/23 13 West of parking structure 80.6 13.1 114.9 A 125.8 N 91 14 East of parking structure 80.5 12.5 115.4 A 125.8 N 92 15 West of parking structure 79.5 12.8 113.9 B 123 N 93 16 Parking structure 81.5 12.9 112.7 B 123 N 92 17 West of parking structure 81.7 13.7 113.1 B 123 N 92 4/17/23 18 Parking structure 86.0 12.4 115.2 B 123 N 94 19 Parking structure 86.0 12.2 114.1 B 123 N 93 20 South Area 86.0 14.7 114.3 I-1 125.7 N 91 21 Parking structure 86.0 14.3 115.4 B 123 N 94 22 Parking structure 89.0 14.8 116.7 B 123 N 95 23 West of parking structure 89.0 15.9 114.8 I-1 125.7 N 91 24 East of parking structure 89.0 13.6 113.4 I-1 125.7 N 90 25 Parking structure 89.0 14.1 115.3 B 123 N 94 26 West of parking structure 71.0 13.7 116.3 I-1 125.7 N 93 27 North of the parking structure 71.0 12.8 117.7 I-1 125.7 N 94 28 North of the parking structure 71.0 12.5 118.6 I-1 125.7 N 94 29 North of the parking structure 71.0 13.2 117.4 I-1 125.7 N 93 4/18/23 30 Parking structure 75.0 13.4 118.3 B 123 N 96 31 Parking structure 75.0 14.7 115.0 G 127.5 N 90 32 West of parking structure 75.0 13.6 116.9 I-1 128.8 N 93 33 Parking structure 75.0 13.5 117.2 I-2 128.8 N 91 34 Parking structure 75.0 13.4 115.4 G 127.5 N 90 35 South of parking structure 78.0 13.9 116.7 I-1 125.7 N 93 36 Parking structure 78.0 14.2 115.7 G 125.7 N 92 37 Parking structure 78.0 12.8 117.2 I-2 128.8 N 91 38 Parking structure 78.0 13.3 116.1 I-2 128.8 N 90 4/19/23 39 East of parking structure 83.0 13.1 118.6 I-1 125.7 N 94 40 South of parking structure 83.0 13.6 116.4 I-1 125.7 N 93 41 South of parking structure 83.0 14.5 116.3 I-1 125.7 N 93 42 South of parking structure 85.0 13.7 116.1 I-1 125.7 N 92 43 Parking structure 85.0 12.6 118.5 G 129.7 N 91 44 East of parking structure 85.0 13.2 115.8 I-1 125.7 N 92 4/20/23 45 South of parking structure 87.0 13.7 116.2 I-1 125.7 N 92 46 East of parking structure 87.0 12.8 117.1 I-1 125.7 N 93 47 West of parking structure 87.0 13.9 117.4 I-1 125.7 N 93 TABLE 1 SUMMARY OF FIELD DENSITY TESTS Grading Note: N = Nuclear Guage Test FG = Finished Grade Test All elevations are approximate AVIARA LP Aviara Apartments Carlsbad, CA GeoTek, Inc. Grading 8/31/2023 Project No.: 3740-SD DATE Test No.Location Lot No. Sta No. Elev/ Depth Moisture Content (%) Dry Density (pcf) Soil Type Maximum Density (pcf) Test Type Relative Compaction (%) TABLE 1 SUMMARY OF FIELD DENSITY TESTS Grading 4/21/23 48 East of parking structure 89.0 14.2 115.8 I-1 125.7 N 92 49 South of parking structure 89.0 13.5 116.4 I-1 125.7 N 93 50 West of parking structure 81.0 13.6 116.8 I-1 125.7 N 93 51 West of parking structure 81.0 14.1 115.7 I-1 125.7 N 92 52 North of the parking structure 83.0 12.7 117.6 I-1 125.7 N 94 53 North of the parking structure 83.0 13.4 117.2 I-1 125.7 N 93 4/25/23 54 Parking structure 84.0 13.0 117.8 G 129.7 N 91 55 North of the parking structure 86.0 13.3 116.4 I-1 125.7 N 93 56 West of parking structure 89.0 12.4 116.8 I-1 125.7 N 93 4/27/23 57 West of parking structure 78.0 12.8 116.4 I-1 125.7 N 93 58 South of parking structure 78.0 13.3 116.1 I-1 125.7 N 92 59 South of parking structure 78.0 13.7 115.2 I-1 125.7 N 92 4/28/23 60 West of parking structure 78.0 13.7 115.3 I-1 125.7 N 92 61 South of parking structure 78.0 12.9 116.7 I-1 125.7 N 93 62 South of parking structure 78.0 13.4 115.9 I-1 125.7 N 92 5/11/23 63 South Edge Area 80.0 13.8 115.1 I-1 125.7 N 92 64 South Edge Area 80.0 13.4 115.4 I-1 125.7 N 92 65 South Edge Area 80.0 11.6 115.8 I-1 125.7 N 92 66 South Edge Area 80.0 12.3 115.9 I-1 125.7 N 92 5/12/23 67 South Edge Area 85.0 11.5 114.3 I-1 125.7 N 91 68 South Edge Area 85.0 12.2 114.7 I-1 125.7 N 91 69 South Edge Area 85.0 11.8 116.1 I-1 125.7 N 92 70 South Edge Area 85.0 10.9 115.4 I-1 125.7 N 92 5/15/23 71 West Edge Area 75.0 11.3 114.7 I-1 125.7 N 91 72 West Edge Area 75.0 11.8 115.5 I-1 125.7 N 92 73 West Edge Area 75.0 11.2 115.2 I-1 125.7 N 92 74 West Edge Area 75.0 10.7 114.4 I-1 125.7 N 91 5/16/23 75 East Edge Area 75.0 12.1 114.6 I-1 125.7 N 91 76 East Edge Area 75.0 10.7 115.8 I-1 125.7 N 92 77 East Edge Area 75.0 10.8 114.7 I-1 125.7 N 91 78 East Edge Area 75.0 11.3 114.4 I-1 125.7 N 91 5/17/23 79 West Edge Area 78.0 11.6 115.3 I-1 125.7 N 92 80 West Edge Area 78.0 11.4 115.6 I-1 125.7 N 92 81 West Edge Area 78.0 11.7 114.1 I-1 125.7 N 91 82 West Edge Area 78.0 10.9 114.2 I-1 125.7 N 91 5/15/23 83 West Edge Area 79.0 11.9 113.9 I-1 125.7 N 91 84 West Edge Area 79.0 11.1 115.7 I-1 125.7 N 92 85 West Edge Area 79.0 13.2 114.5 I-1 125.7 N 91 86 West Edge Area 80.0 10.5 115.1 I-1 125.7 N 92 5/19/23 87 West Edge Area 79.0 12.4 113.7 I-1 125.7 N 90 88 West Edge Area 80.0 13.9 115.0 I-1 125.7 N 91 89 West Edge Area 80.0 10.8 115.3 I-1 125.7 N 92 90 West Edge Area 80.0 12.7 117.9 I-1 125.7 N 94 5/4/23 91 West Area 81.0 13.1 116.9 I-1 125.7 N 93 92 West Area 81.0 13.5 117.2 I-1 125.7 N 93 93 South Area 81.0 12.8 114.3 I-1 125.7 N 91 94 South Area 81.0 13.2 115.8 I-1 125.7 N 92 Note: N = Nuclear Guage Test FG = Finished Grade Test All elevations are approximate AVIARA LP Aviara Apartments Carlsbad, CA GeoTek, Inc. Grading 8/31/2023 Project No.: 3740-SD DATE Test No.Location Lot No. Sta No. Elev/ Depth Moisture Content (%) Dry Density (pcf) Soil Type Maximum Density (pcf) Test Type Relative Compaction (%) TABLE 1 SUMMARY OF FIELD DENSITY TESTS Grading 5/5/23 95 West Area 85.0 12.8 114.7 I-1 125.7 N 91 96 West Area 85.0 13.6 115.2 I-1 125.7 N 92 97 South Area 85.0 12.5 116.9 I-1 125.7 N 93 98 South Area 85.0 12.3 115.4 I-1 125.7 N 92 4/25/23 99 West Area 75.0 13.4 117.2 I-1 125.7 N 93 100 South Area 75.0 14.5 115.3 I-1 125.7 N 92 101 South Area 75.0 14.3 116.3 I-1 125.7 N 93 4/14/23 102 South Side 82.1 15.7 113.9 A 125.8 N 90 8/25/23 103 west-middle of parking structure 88.1 10.1 118.2 B 123.0 N 96 104 North-middle of parking structure 88.1 11.0 116.9 B 123.0 N 95 105 South-middle of parking structure 88.1 10.5 115.2 B 123.0 N 94 8/28/23 106 SE Pad FG 10.4 123.9 A 125.8 N 98 107 SE Pad FG 7.9 125.0 A 125.8 N 99 108 South of Parking structure FG 7.0 125.1 A 125.8 N 99 109 South of Parking Structure FG 10.2 126.9 A 125.8 N 100 110 Southwest of Parking Structure FG 9.8 125.0 A 125.8 N 99 111 Southwest of Parking Structure FG 9.9 125.5 A 125.8 N 99 112 West of Parking Structure FG 10.1 124.8 A 125.8 N 99 113 West of Parking Structure FG 13.1 123.9 A 125.8 N 98 114 West of Parking Structure FG 11.6 124.5 A 125.8 N 99 115 West of Parking Structure FG 10.9 123.5 A 125.8 N 98 116 North Side of Parking Structure FG 11.3 123.8 A 125.8 N 98 117 North Side of Parking Structure FG 9.9 124.1 A 125.8 N 98 118 East side of Parking Structure FG 10.1 123.4 A 125.8 N 98 119 East side of Parking Structure FG 11.4 125.1 A 125.8 N 99 Note: N = Nuclear Guage Test FG = Finished Grade Test All elevations are approximate R&V REAL ESTATE August 29, 2023, Revised August 31, 2023 Building Pad Certification – Building Structures Project No. 3740-SD Aviara Apartments West, Carlsbad, California Page 8 Appendix A Corrosion Test Results Project X REPORT S230522A Corrosion Engineering Page 1 Corrosion Control – Soil, Water, Metallurgy Testing Lab 29990 Technology Dr, Suite 13, Murrieta, CA 92563 Tel: 213-928-7213 Fax: 951-226-1720 www.projectxcorrosion.com Results Only Soil Testing for Aviara West May 22, 2023 Prepared for: Lesley White GeoTek, Inc. 1384 Poinsettia Ave, Suite A Vista, CA, 92081 lwhite@geotekusa.com Project X Job#: S230522A Client Job or PO#: 3740-SD Respectfully Submitted, Eduardo Hernandez, M.Sc., P.E. Sr. Corrosion Consultant NACE Corrosion Technologist #16592 Professional Engineer California No. M37102 ehernandez@projectxcorrosion.com Project X REPORT S230522A Corrosion Engineering Page 2 Corrosion Control – Soil, Water, Metallurgy Testing Lab 29990 Technology Dr., Suite 13, Murrieta, CA 92563 Tel: 213-928-7213 Fax: 951-226-1720 www.projectxcorrosion.com Soil Analysis Lab Results Client: GeoTek, Inc. Job Name: Aviara West Client Job Number: 3740-SD Project X Job Number: S230522A May 22, 2023 Method Bore# / Description Depth (ft)(mg/kg)(wt%)(mg/kg)(wt%) FG-5 Brown sandy silt 0-12 2.2 0.0002 10.3 0.0010 ASTM D4327 ASTM D4327 Sulfates SO42- Chlorides Cl- Cations and Anions, except Sulfide and Bicarbonate, tested with Ion Chromatography mg/kg = milligrams per kilogram (parts per million) of dry soil weight ND = 0 = Not Detected | NT = Not Tested | Unk = Unknown Chemical Analysis performed on 1:3 Soil-To-Water extract PPM = mg/kg (soil) = mg/L (Liquid) Note: Sometimes a bad sulfate hit is a contaminated spot. Typical fertilizers are Potassium chloride, ammonium sulfate or ammonium sulfate nitrate (ASN). So this is another reason why testing full corrosion series is good because we then have the data to see if those other ingredients are present meaning the soil sample is just fertilizer-contaminated soil. This can happen often when the soil samples collected are simply surface scoops which is why it's best to dig in a foot, throw away the top and test the deeper stuff. Dairy farms are also notorious for these items. Ai Corrosion Engmeenng i utnHKm CoMwl • Soii U'tf tt mi itcutlufxy ta^- • Lab Request Sheet Chain of Custody : Phone: (213) 928-7213 • Fax (951) 226-1720 • www.projectxcoiT05ion.com Ship Samples To: 29990 Technology Dr, Suite 13, Murrieta, CA 92563 h»j«rt X Job Number 2740-s•^ Ay/krab/ IMPORTANT: Please complete Project and Sample Identification Data as you would like it to appear in report & include this form with samples. Company Name: Mailing Address: Acconnting Contact: Client Project No; P.O.#: GeoTek, Inc. 1384 Polsettia Ave, Suite A, Vista, CA 92081 Suzen Clark 3-5 Day Standard 3 Day Guarantee S0% mark-up 24 Hour RUSH lOOTfi marlt-un Contact Name: Contact Email; Invoice Email: Project Name: Lesley White Phone No:760-599-0509 lwhite@geotekusa.com ap@geotekusa.com METHOD ANALYSIS RE<(^t^SI^D (Please (Business Days) Turn Around Time:A £siCorrosion Control Recommendations (350g soil sample): (1) Groundwater depth and '2) Soil Sample Locations Map fan THERMAL RESISTIVTTY PROVIDE (l,500g soil sample) Default Method S Oj (h Optimal Moisture % (2) Dry Density{PCF} 0) Desired Compaction jOate & Received By: Full Corrosion Series Geo Quad SAMPLE ID - BORE # - Description DEPTH (R) ^~I2"ym DATE COLLECTED m <s w « ^ S a § Reports t: 8- g.2 a 1 rr rto >CO U) s a s .s ^ s In? o I -5 GEOTECHNICAL | ENVIRONMENTAL | MATERIALS May 23, 2023 Project No. 3740-SD R&V Real Estate Services c/o Wermers Companies 5120 Shoreham Place, Suite 150 San Diego, California 92122 Attention: Mr. Austin Wermers Subject: Summary of Geotechnical Observation and Testing Rough Grading Parking Structure Aviara Apartments West 1205 Aviara Parkway, Carlsbad, California 92009 Dear Mr. Wermers: In accordance with your request, GeoTek, Inc. (GeoTek) has prepared this letter to certify the completion of the earthwork construction associated with the remedial grading of the parking structure at the subject property. It is to the best of GeoTek’s knowledge that remedial grading of the subject pad presented in this report has been completed, as noted on the dates of observations and field testing, in general accordance with the approved geotechnical reports (see references) for the site, applicable provisions of the 2019 California Building Code (CBC) and City of Carlsbad guidelines. This report provides a summary of site conditions observed during the rough grading for the subject pad. SUMMARY OF GEOLOGIC AND SOILS CONDITIONS  Remedial grading of the subject building pads was performed under the observation of, and with selective testing, by GeoTek, Inc. (GeoTek) between the approximate dates of March 3, 2023 and April 25, 2023.  Unsuitable previously placed (undocumented) fill and alluvial materials were removed to recommended remedial grading depths or groundwater.  Groundwater was encountered at an elevation of 75 feet. Upon reaching this depth in the initial remedial removal bottom, remedial grading bottoms were elevated approximately two to four feet above the elevation of 75 feet to facilitate the use of heavy duty grading equipment at or near the wet remedial bottom. R&V REAL ESTATE May 23, 2023 Building Pad Certification – Parking Structure Project No. 3740-SD Aviara Apartments West, Carlsbad, California Page 2  A GeoTek representative observed exposed soil bottoms and tested the compaction to confirm a minimum 90 percent relative compaction prior to receiving engineered fill.  Onsite overexcavated materials and import materials were utilized to bring remedial grades to design grades. Caterpillar 637 scrapers, a Caterpillar D8, a Caterpillar 844 loader, import trucks and water trucks were utilized to place, moisture condition (as needed), mix, and compact the engineered fills during rough grading.  Visual classification of the soil in the field, compared to the soil description from laboratory testing was the basis for determining the maximum dry density value and optimum moisture content applied to each soil density test.  Field density tests indicated the engineered fill was placed and compacted to at least 90% and near optimum moisture content relative to ASTM D 1557. FIELD AND LABORATORY TESTING FIELD TESTING Field density tests were taken at periodic intervals and random locations to check the compaction efforts by the grading contractor performing compaction of engineered fill. The field density testing for the subject site was performed using a nuclear gauge, in general accordance with testing procedure ASTM D 6938 for soils. The results of the field density testing conducted are included in the attached Table 1 and presented on Figure 1. LABORATORY TESTING The laboratory maximum dry density and optimum moisture content for the soils were determined in general accordance with test method ASTM D 1557. The table below presents the soil type used for this project. SUMMARY OF LABORATORY MAXIMUM DRY DENSITY AND OPTIMUM MOISTURE CONTENT TEST RESULTS (ASTM D 1557) Soil Type Description Maximum Dry Density (pcf) Optimum Moisture Content (%) A Dark Brown Clayey SAND 125.8 11.5 B Light Brown Silty SAND w/ clay 123.0 12.5 G Reddish Brown F-C Clayey SAND 129.7 10.0 I-2 Brown F-M Silty SAND 128.8 9.5 R&V REAL ESTATE May 23, 2023 Building Pad Certification – Parking Structure Project No. 3740-SD Aviara Apartments West, Carlsbad, California Page 3 The laboratory testing for the presence of sulfates and chloride content of near surface soils were obtained and delivered to GeoTek’s subconsultant for analysis. Results are presented in Appendix A. The results indicate that the water-soluble sulfate result is considered “negligible” per Table 4.2.1 of ACI 318. Based on the test results and Table 4.3.1 of ACI 318, no special recommendations for concrete are required for this project due to soil sulfate exposure. CONCLUSIONS Site grading has been completed in general accordance with the approved geotechnical reports, applicable provisions of the 2019 California Building Code (CBC) and City of Carlsbad guidelines. FINAL FOUNDATION RECOMMENDATIONS Expansion index testing within the upper foot of building pad grade indicates the building pads exhibit a low expansion potential (EI less than 50). Preliminary foundations recommendations presented in GeoTek’s 2019 report remain applicable. The opportunity to be of service is sincerely appreciated. If you should have any questions, please do not hesitate to call our office. Respectfully submitted, GeoTek, Inc. Christopher D. Livesey CEG 2733, Exp. 5-31-25 Vice President Edwin R. Cunningham RCE 81687, Exp. 3-31-24 Project Engineer Distribution: (1) Addressee via email Enclosures: Figure 1 – Field Density Test Location Map Table 1 – Field Density Tests Grading Appendix A – Corrosion Test Results R&V REAL ESTATE May 23, 2023 Building Pad Certification – Parking Structure Project No. 3740-SD Aviara Apartments West, Carlsbad, California Page 4 REFERENCES GeoTek, Inc. 2021, Geotechnical Evaluation Report, Proposed Aviara Apartments Development, 6145 Laurel Tree Lane, Carlsbad, California 92122, Project No. 3740-SD, November 11, 2021. , 2022a, Geotechnical Review of Construction plans, Project No. 3740-SD, March 21, 2022 , 2022b, Geotechnical Addendum and Review of Public Improvement Construction plans: Plan review of grading and improvement plans along Laurel Tree Lane, Project No. 3740-SD, March 24, 2022 , 2022c, Geotechnical Review of Construction plans: Plan review of parking structure building foundations, Project No. 3740-SD, March 25, 2022 , 2022d, Response to Geotechnical Review Comments and Second Review of Public Improvement Construction Plans, Project No. 3740-SD, May 6, 2022. , 2022e, Response to Geotechnical Review Comments, Project No. 3740-SD, May 20, 2022 , 2022f, Review – On-Site Storm Water Disposal and Retaining Wall Design, Project No. 3740-SD, August 18, 2022 , 2022g, Response to Geotechnical Review Comments: Project No. 3740-SD, September 27, 2022 , 2022h, Temporary Excavations for Catch Basins Along the South and West Grading Daylight Project No. 3740-SD, September 27, 2022. SB&O, Inc. “Precise Grading Plans for: Aviara Apartments West,” Delta A, dated April 7, 2023. Figure 1 Parking Structure Field Density Test Location Map Aviara, LP Aviara West Carlsbad, California GeoTek Project No. 3740-SD LEGEND ARTIFICIAL FILL PLACED UNDER THE PURVIEW OF THIS REPORT ALLUVIUM CIRCLED WHERE BURIED APPROXIMATE LOCATION OF REMOVAL BOTTOM APPROXIMATE LOCATION OF FIELD DENSITY TEST - GRADING APPROXIMATE LIMITS OF GRADING UNDER PURVIEW OF THIS REPORT 54 75’ Qal Af 75’ 75’ 77’ 77’ Af Af Af Qal Qal Qal R&V REAL ESTATE May 23, 2023 Building Pad Certification – Parking Structure Project No. 3740-SD Aviara Apartments West, Carlsbad, California Page 5 Table 1 Field Density Test Results AVIARA LP Carlsbad, CA GeoTek, Inc. Grading 5/23/2023 Project No.: 3740-SD DATE Test No.Location Lot No. Sta No. Elev/ Depth Moisture Content (%) Dry Density (pcf) Soil Type Maximum Density (pcf) Test Type Relative Compaction (%) 3/6/24 2 Parking structure 74.0 15.9 113.6 A 125.8 N 90 3/7/24 5 Parking structure 77.5 16.5 112.7 A 125.8 N 90 3/7/25 6 Parking structure 76.5 15.1 114.0 A 125.8 N 91 3/9/23 8 Parking structure 78.0 15.2 111.6 B 123.0 N 91 4/12/24 12 Parking structure 79.0 12.8 114.1 A 125.8 N 91 4/14/26 16 Parking structure 81.5 12.9 112.7 B 123 N 92 4/17/23 18 Parking structure 86.0 12.4 115.2 B 123 N 94 4/17/24 19 Parking structure 86.0 12.2 114.1 B 123 N 93 4/17/26 21 Parking structure 86.0 14.3 115.4 B 123 N 94 4/17/27 22 Parking structure 89.0 14.8 116.7 B 123 N 95 4/17/30 25 Parking structure 89.0 14.1 115.3 B 123 N 94 4/18/23 30 Parking structure 75.0 13.4 118.3 B 123 N 96 4/18/24 31 Parking structure 75.0 14.7 115.0 G 127.5 N 90 4/18/26 33 Parking structure 75.0 13.5 117.2 I-2 128.8 N 91 4/18/27 34 Parking structure 75.0 13.4 115.4 G 127.5 N 90 4/18/29 36 Parking structure 78.0 14.2 115.7 G 125.7 N 92 4/18/30 37 Parking structure 78.0 12.8 117.2 I-2 128.8 N 91 4/18/31 38 Parking structure 78.0 13.3 116.1 I-2 128.8 N 90 4/19/27 43 Parking structure 85.0 12.6 118.5 G 129.7 N 91 4/25/23 54 Parking structure 84.0 13.0 117.8 G 129.7 N 91 TABLE 1 SUMMARY OF FIELD DENSITY TESTS Grading Note: N = Nuclear Guage Test FG = Finished Grade Test All elevations are approximate R&V REAL ESTATE May 23, 2023 Building Pad Certification – Parking Structure Project No. 3740-SD Aviara Apartments West, Carlsbad, California Page 6 Appendix A Corrosion Test Results Project X REPORT S230522A Corrosion Engineering Page 1 Corrosion Control – Soil, Water, Metallurgy Testing Lab 29990 Technology Dr, Suite 13, Murrieta, CA 92563 Tel: 213-928-7213 Fax: 951-226-1720 www.projectxcorrosion.com Results Only Soil Testing for Aviara West May 22, 2023 Prepared for: Lesley White GeoTek, Inc. 1384 Poinsettia Ave, Suite A Vista, CA, 92081 lwhite@geotekusa.com Project X Job#: S230522A Client Job or PO#: 3740-SD Respectfully Submitted, Eduardo Hernandez, M.Sc., P.E. Sr. Corrosion Consultant NACE Corrosion Technologist #16592 Professional Engineer California No. M37102 ehernandez@projectxcorrosion.com Project X REPORT S230522A Corrosion Engineering Page 2 Corrosion Control – Soil, Water, Metallurgy Testing Lab 29990 Technology Dr., Suite 13, Murrieta, CA 92563 Tel: 213-928-7213 Fax: 951-226-1720 www.projectxcorrosion.com Soil Analysis Lab Results Client: GeoTek, Inc. Job Name: Aviara West Client Job Number: 3740-SD Project X Job Number: S230522A May 22, 2023 Method Bore# / Description Depth (ft)(mg/kg)(wt%)(mg/kg)(wt%) FG-5 Brown sandy silt 0-12 2.2 0.0002 10.3 0.0010 ASTM D4327 ASTM D4327 Sulfates SO42- Chlorides Cl- Cations and Anions, except Sulfide and Bicarbonate, tested with Ion Chromatography mg/kg = milligrams per kilogram (parts per million) of dry soil weight ND = 0 = Not Detected | NT = Not Tested | Unk = Unknown Chemical Analysis performed on 1:3 Soil-To-Water extract PPM = mg/kg (soil) = mg/L (Liquid) Note: Sometimes a bad sulfate hit is a contaminated spot. Typical fertilizers are Potassium chloride, ammonium sulfate or ammonium sulfate nitrate (ASN). So this is another reason why testing full corrosion series is good because we then have the data to see if those other ingredients are present meaning the soil sample is just fertilizer-contaminated soil. This can happen often when the soil samples collected are simply surface scoops which is why it's best to dig in a foot, throw away the top and test the deeper stuff. Dairy farms are also notorious for these items. Ai Corrosion Engmeenng i utnHKm CoMwl • Soii U'tf tt mi itcutlufxy ta^- • Lab Request Sheet Chain of Custody : Phone: (213) 928-7213 • Fax (951) 226-1720 • www.projectxcoiT05ion.com Ship Samples To: 29990 Technology Dr, Suite 13, Murrieta, CA 92563 h»j«rt X Job Number 2740-s•^ Ay/krab/ IMPORTANT: Please complete Project and Sample Identification Data as you would like it to appear in report & include this form with samples. Company Name: Mailing Address: Acconnting Contact: Client Project No; P.O.#: GeoTek, Inc. 1384 Polsettia Ave, Suite A, Vista, CA 92081 Suzen Clark 3-5 Day Standard 3 Day Guarantee S0% mark-up 24 Hour RUSH lOOTfi marlt-un Contact Name: Contact Email; Invoice Email: Project Name: Lesley White Phone No:760-599-0509 lwhite@geotekusa.com ap@geotekusa.com METHOD ANALYSIS RE<(^t^SI^D (Please (Business Days) Turn Around Time:A £siCorrosion Control Recommendations (350g soil sample): (1) Groundwater depth and '2) Soil Sample Locations Map fan THERMAL RESISTIVTTY PROVIDE (l,500g soil sample) Default Method S Oj (h Optimal Moisture % (2) Dry Density{PCF} 0) Desired Compaction jOate & Received By: Full Corrosion Series Geo Quad SAMPLE ID - BORE # - Description DEPTH (R) ^~I2"ym DATE COLLECTED m <s w « ^ S a § Reports t: 8- g.2 a 1 rr rto >CO U) s a s .s ^ s In? o I -5