HomeMy WebLinkAboutMS 2022-0003; 1098 MAGNOLIA AVENUE; FINAL SOILS REPORT; 2024-10-07October 7, 2024
Mehrdad Dokhanchy
1098 Magnolia A venue
Carlsbad, California 92008
SUBJECT: File No. 1106F6-21
Dear Mr. Dokhanchy:
Report of Field Density Tests
Residential Building Site
Next to 1098 Magnolia Avenue
City of Carlsbad
P.O. Box 1195
Lakeside, California
92040
(619) 443-0060
In accordance with your request, this is the Final As-Graded Geotechnical Report. The
following items apply:
A. Soils encountered during grading were substantially the same as those encountered in
our Site Inspection Reports dated October 29, 2021, amended July 19, 2022 and
January 12, 2023. We have included the final version of this report.
B. Compacted soil placement has been observed and tested. Test results are presented in
our Report of Compacted Filled Ground dated June 29, 2023.
C. The backfill and asphalt cap for the utility trenches have been observed and tested. Test
results are presented in our Report of Field Density Tests dated September 27, 2024.
D. The footing excavations we inspected extend to the proper depth and bearing strata as
recommended in our reports.
E. Site preparation is in substantial conformance with the recommendations contained in
the above referenced soil reports.
If you have any questions, please do not hesitate to contact our office.
Respectfully submitted,
Chin C. Chen, RPE C 34442
CCC/mlj
January 12, 2023
Mehrdad Dokhanchy
1098 Magnolia Avenue
Carlsbad, California 92008
SUBJECT: File No. 1106F6-21
SITE INSPECTION
Dear Mr. Dokhanchy:
SCOPE
(Original Report July 19, 2022)
Proposed Residential Building Site
Next to 1098 Magnolia A venue
City of Carlsbad
PD 2021-0046
DWG 555-6A
P.O. Box 1195
Lakeside, California
92040
(619) 443-0060
In accordance with your request, a Site Inspection has been performed at the subject site. The
purpose of this investigation was to examine existing site conditions and provide engineering
recommendations for the proposed two story single family residence with raised floor
construction and attached garage.
If project details vary significantly from those described, Soil Testers should be notified
prior to final submittal for revision and possible revision of the recommendations
presented herein.
This report is issued with the understanding that it is the responsibility of the owner or the
owner's representative to ensure that the information and recommendations contained herein
are brought to the attention of the architect and engineer for the project and incorporated into
the plans, and the necessary steps are taken to see that the contractor and subcontractors carry
out such recommendations in the field.
We conclude that the proposed development of the site is feasible from a geotechnical
standpoint provided the recommendations in this report are incorporated into the design and
construction of the project. The proposed grading and development should have no geologic
or geotechnical impact on adjacent properties or improvements.
1
Mehrdad Dokhanchy File No. 1106F6-21 January 12, 2023
VICINITY MAP
e
9 L:tt!c FrP.e Library
:J Senior Center
HJ1du1y Ga1d•:n:. ;q:anm~nt;;
99
Pine Avenue Park P1tX .,.,,!:l"i an 1rrontr.t.attr, ;p.r~.f~J
Casa d~~~::i:G~d Q
00~:~f~~i9
Chase Field
9 M.Jtpoiia J\w,~
Maqnoila \il;JCO( ,..,pd,,m __ f'l<,
SH•PGos9
1 H01 U$: Top Busi::~_,,;:; Srcki2ts in Sc.:1 Dit:go
9
l Hou,;e 3311 D:cao ReJI E5tate 9
Tavawa Semor, Apanm~nts
9
Hyland Inn .-i N.ear LegoLand TJ➔•C:!~s)
2-ztar !'!O~ael
m
~
I\ Mindful Movers T Nor\h County
e
Moon;:n;.; • V-/ellnes$ Cer.tfi
9
'
1098 Magnolia Ave. Carlsbad, CA 92008
',.,·inag,: Kitcn,.~n
P.i Pie S!10ppf.'
,:./''.,•.!''-'.:,Y!•': fl 9 St Patnck i:a:holi•: Church
c1rt::,ba.:J Manufac~uri:d
Hom~ Builder~
9
Ed,·at.rds Tilx & Financial S~Plice-;
9
B I:!
e
:-iorth Coun1
9
El e
Ch
Carlsbc
The property is generally level, with elevations ranging from 83 to 85 feet mean sea level
(msl).
REGIONAL and SITE GEOLOGY
The subject property is underlain by Old Paralic Deposits (Qop2-4). The Old Paralic
Deposits, Units 2-4, are late to middle Pleistocene in age. These sedimentary rock deposits
are poorly sorted, moderately permeable, reddish brown, interfingered strandline, beach, estuarine
and colluvial deposits composed of siltstone, sandstone and conglomerate.
Generally, these deposits possess moderate to firm cementation, and good to very good
bearing strength values.
2
Mehrdad Dokhanchy File No. 1106F6-21 January 12, 2023
REGIONAL AND LOCAL SEISMICITY
San Diego's tectonic setting includes north and northwest striking fault zones, the most
prominent and active of which is the Newport-Inglewood-Rose Canyon Fault Zone.
Activity along active faults within this fault zone present the most immediate seismic
hazards to San Diego. Other Fault zones including the Elsinore fault zone lie in eastern
and northern San Diego County.
Fault rupture hazard would affect a property if an active fault trace or traces traverse the
property. The subject property is not within an Alquist-Priolo Earthquake Fault Zone
(Special Studies Zone). The nearest active fault segment is the offshore Oceanside section
within the active Newport-Inglewood-Rose Canyon Fault Zone, 4.8 miles southwest of the
site. This section is considered fault type A, well constrained, latest Quaternary in age,
with right-lateral slip of 1 to 5 n:im/yr.
The site is approximately 24 miles southwest of faults within the active Elsinore Fault
Zone (Temecula section).
Even though direct ground rupture from faulting directly underneath the subject property is
not likely, the property may be subjected to considerable ground acceleration and shaking
from an earthquake event along nearby faults. The intensity of ground shaking is
dependent on distance from faults, earthquake magnitude and duration, and seismic
characteristics of foundation soils and bedrock.
The effective ground acceleration at the site is associated with the part of significant
ground motion, which contains repetitive strong-energy shaking, and which may produce
structural deformation. As such, the effective or "free field" ground acceleration is referred
to as the Repeatable High Ground Acceleration (RHGA). It has been determined by
Ploessel and Slosson (1974) that the RHGA is approximately equal to 65 percent of the
Peak Ground Acceleration for earthquakes occurring within 20 miles of a site. Based on
the above, the calculated Credible RHGA at the site is 0.36g.
The current California Building Code includes parameters for assessing the effects of
seismic shaking and ground acceleration on structures. Below we provide a table
summarizing near-source factors and seismic coefficients, which are used by structural
engineers in building and foundation design. We have utilized a web-based tool
(https://asce7hazardtool.online/) to derive seismic factors for site seismicity.
3
Mehrdad Dokhanchy File No. 1106F6-21 January 12, 2023
Table 1. Site Seismic Parameters from asce7hazardtool.online
Parameters Values
Site Class D
Mapped Short Period Spectral Acceleration, Ss 1.2
Mapped One-Second Period Spectral Acceleration, S 1 0.38
Short Period Spectral Acceleration Adjusted For Site Class, SMS 1.44
One-Second Period Spectral Acceleration Adjusted For Site Class, SMl 0.96
Design Short Period Spectral Acceleration, SDS 0.96
Design One-Second Period Spectral Acceleration, SD 1 0.64
Modified Peak Ground Acceleration, PGAm 0.56g
-LIQUEFACTION AND LATERAL SPREADING HAZARD
The subject property is underlain by dense to very dense, well indurated formational
sedimentary marine and nearshore sandstones and claystones and siltstones of the Old
Paralics Formation, at shallow depths. In situ density and particle size characteristics of
these sedimentary rocks indicate negligible risk of liquefaction or lateral spreading during
major seismic events on nearby active earthquake faults.
LANDSLIDE HAZARDS
There are no known active or ancient landslides underlying the subject property. The
property is within an extensively graded, well developed suburban residential area.
TSUNAMIS AND SEICHES
Tsunami indundation maps for emergency planning, compiled by the California Geological
Survey, show that the property does not lie within a projected inundation area.
According to the CGS' website, the largest recorded tsunami to hit San Diego was 3 .6
meters (approximately 10 feet) in the year 1856, from a seismic event in Japan.
A seiche is a wave generated in a standing body of water by an earthquake or a landslide.
Agua Hedionda, a natural estuary bay, lies some 0.60 miles to the south. It is unlikely that
4
Mehrdad Dokhanchy File No. 1106F6-21 January 12, 2023
a seiche, locally generated by an earthquake or landslide, in this body of water, would
affect the property.
FLOODING
The site is in an area of minimal flooding as defined by FEMA (map no. 06073C0764H,
dated 12/20/2019.)
SITE SUIT ABILITY
The subject property does not lie within a state or City -designated Earthquake Fault zone,
and there is no evidence of active or potentially active fault traces underlying the site. The
site is developable from a geologic standpoint. Development will not result in undue risk
from geologic and erosional forces and flood hazards.
FIELD INSPECTION
In order to accomplish this purpose, a representative of this firm visited the site, reviewed the
topography and site conditions and visually and texturally classified the surface and near
surface soils. Representative samples of the on-site soils were obtained from 2 test
explorations utilizing a mini-ex approximately 4 feet in depth and tested for density, shear
strength and expansive characteristics.
SITE CONDITIONS
The subject site is located on the northerly side of Magnolia A venue. The site is a relatively
level vacant lot with a wood fence along the north and west property lines. A hedge lines the
front of the property and ground cover lines the driveway to the east. Neighboring properties
are occupied by single family residential structures. Fill materials were not encountered, and
compressible native soils were encountered to a depth of approximately 3 to 4 feet during the
course of this inspection.
SOIL CONDITIONS
Soils encountered in the test explorations were native soils consisting of loose to firm, brown,
moist, fine, silty sands to the bottom of the explorations at approximately 4 feet.
The soils we encountered were not considered to be detrimentally expansive with respect to
change in volume with change in moisture content.
5
Mehrdad Dokhanchy File No. 1106F6-21 January 12, 2023
CONCLUSIONS AND RECOMMENDATIONS
1. A representative sample of the foundation soil was remolded to 90% of maximum
dry density. Based on the following test results, a safe allowable bearing value of
at least 2000 pounds per square foot for 12 inch deep footings may be used in
designing the foundations and slab for the proposed structures. This value may be
increased by one third for wind and/or seismic loading. This value may be
increased by 20 percent for each additional foot of depth and or width to a
maximum of 3 times the designated value.
Maximum Dry Density
Optimum Moisture
Angle of internal friction
Cohesion
Unit weight
Expansion Index
131.9 pcf
8.6%
30°
164 psf
120.2 pcf
21
2. The soils we encountered were considered to be Low-Expansive Index (EI), (with
the value ranging from 21 to 50) with respect to change in volume along with
change in moisture content. For the remaining indexes: Low (EI=21-50), medium
(EI=Sl-90), high (EI=91-130), and very high (EI >130).
3. Lateral resistance to horizontal movement may be provided by the soil passive
pressure and friction of concrete to soil. An allowable passive pressure of 250
pounds per square foot per foot of depth may be used. A coefficient of friction of
0.35 is recommended. The soils passive pressure may be increased by 1/3 for wind
and seismic loading.
4. Total and differential settlement is expected to be within industry adopted standards as
long as the recommendations presented in our report are adhered to. Total settlement
is expected to be less than 1 inch and differential settlement is expected to be less than
1/2 inch in 30 feet for foundations bearing on bedrock or the softer natural soils or fill
soils.
5. The loose, compressible native soils we encountered should not be utilized to support
the proposed new structure. They should be removed to competent native soils and
recompacted to at least 90 percent of maximum dry density in accordance with the
Grading Specifications in this report in order to provide adequate support for the
proposed new structures. The recompaction should extend at least five feet outside
the proposed building footprints. Organic materials and roots must be removed
6
Mehrdad Dokhanchy File No. 1106F6-21 January 12, 2023
from the soils before replacement. A representative of Soil Testers should be
onsite to approve the removal of the loose soils prior to placement of fill soils.
6. Some of the loose soils may be removed from under the proposed house for the
crawl space. As an alternative to the remove and recompact recommendations for
the loose soils, the footing excavations for the raised floor area may be deepened a
minimum of 12 inches into competent native soils.
7. Conventional spread footings founded a minimum of 12 inches below lowest adjacent
grade and having a width determined by the allowable soil bearing value as detailed
above are recommended for foundation support. Footing widths should be at least 12
inches for continuous footings and 24 inches for square footings due to practical
considerations as well as Building Code requirements. These recommendations are
based entirely upon the soil types and do not take into consideration the requirements
of the proposed structure.
8. Reinforcing in footings should consist of at least one #4 steel bar placed continuously
in the top and bottom of continuous footings regardless of structural requirements.
Reinforcing for isolated footings is dictated by the structural requirements. These
recommendations are based upon on the soil type encountered and do not take into
consideration the proposed bearing load.
9. Concrete Slab-On-Grade, SOG, should be designed by the project's structural
engineer based on anticipated loading conditions. We recommend that
conventional reinforced concrete SOG for this project be founded on 4 inches of
Class II Virgin Aggregate Base (with approximately 2% +/-over optimum moisture
content and 90% compaction, relative to the lab maximum dry density, ASTM D
1557), overlying a 12 inch thick zone of adequately placed and compacted
structural fill. The structural zone under the slab will be accomplished during the
grading operation.
We recommend that a moisture barrier be provided by a membrane, visqueen 10
mils in minimum thickness or equivalent, be placed at top of well compacted Class
II Aggregate Base, then covered with 2 inches of moist clean sand having a
minimum sand equivalent of 30 when tested in accordance with the American
Society of Testing and Materials test method 'ASTM D2419.
Floor slabs, as a minimum, should be 5 inches thick with #4 reinforcing steel at 16"
on-center each way. Reinforcement should be placed at mid-height of the slab. The
final slab thickness and reinforcement should be determined by the structural
7
Mehrdad Dokhanchy File No. 1106F6-21 January 12, 2023
design engineer. Control joints should be provided m accordance with the
recommendations of the structural design engineer.
10. The design civil engineer needs to look at the surrounding flat work concrete
conditions. We recommend the soils under the flatwork be removed to competent
native and recompacted during the grading operation. A minimum of 5.5 inches with
#3 rebar at 12 inches on center each way. Reinforcement should be placed at mid-
height of the concrete.
SITE EROSION CONTROL
During the construction, surface water should be controlled via berms, gravel bags and/or
sandbags, silt fence, straw wattles, siltation basins, while maintaining positive surface
grades or other methods to avoid damage to the finish work or adjoining properties. All
site entrances and exits must have coarse gravel or steel shaker plates to minimize offsite
sediment tracking. Best management Practices (BMP's) must be used to protect storm
drains and minimize pollution. The contractor should take measures to prevent erosion of
graded areas until such time as permanent drainage and erosion control measures have
been installed. After completion of grading, all excavated surfaces should exhibit
positive drainage and eliminate areas where water might pond.
SITE AND SURFACE DRAINAGE
Drainage at the site should be directed away from foundations, collected and tight lined to
appropriate discharge points. Consideration may be given to collecting roof drainage by
eave gutters and directing it away from foundations via non-erosive devices. Water, either
natural or from irrigation, should not be permitted to pond, saturate the surface soils or
flow towards the foundation. Landscaping requiring a heavy irrigation schedule should not
be planted adjacent to foundations or paved areas. The type of drainage issues found within
the project and materials specified and used should be determined by the Engineer of
Record.
GROUNDWATER AND SURFACE WATERS
There was no indication of a near-surface groundwater table within our exploratory trench
or perched groundwater. Although groundwater is not expected to be a significant
constraint to the proposed development, our experience indicates that near-surface
groundwater conditions can develop in areas where no such groundwater conditions
previously existed, especially in areas where a substantial increase in surface water
infiltration results from landscape irrigation or unusually heavy precipitation. It is
anticipated that site development will include appropriate drainage provisions for control
8
Mehrdad Dokhanchy File No. 1106F6-21 January 12, 2023
and discharge of surface water runoff. The type of drainage issues found within the project
and materials specified and used should be determined by the Civil Engineer. The type of
plants and soil specified along with proper irrigation used should be determined by the
Landscape Architect.
The following grading specifications should be utilized if grading is proposed.
RECOMMENDED GRADING SPECIFICATIONS
For
Proposed Residential Building Site
Next to 1098 Magnolia Avenue
City of Carlsbad
GENERAL: Soil Testers and 'Engineer' are synonymous hereinafter and shall be employed
to inspect and test earthwork in accordance with these specifications, the accepted plans, and
the requirements of any jurisdictive governmental agencies. They are to be allowed adequate
access so that the inspections and tests may be performed. The Engineer shall be apprised of
schedules and any unforeseen soil conditions.
Substandard conditions or workmanship, inadequate compaction, adverse weather, or
deviation from the lines and grades shown on the plans, etc., shall be cause for the engineer
to either stop construction until the conditions are corrected or recommend rejection of the
work. Refusal to comply with these specifications or the recommendations and/or
interpretations of the engineer will be cause for the engineer and/or his representative to
immediately terminate his services.
A pre-construction meeting or conference with the developer, contractor, civil engineer,
soil engineer, and the agency inspector in attendance should be held at the site prior to the
beginning of the grading operations. Special soil handling requirements can be discussed at
that time.
Grading of the site should commence with the removal of all vegetation and existing
improvements from the area to be graded. Deleterious material and debris such as broken
asphalt and concrete, underground pipe materials, wires, trash, etc. if encountered, should
be exported from the site and should not be mixed with the fill soils.
Abandoned foundations and buried septic tanks or cisterns (if encountered) should be
removed and the subsequent depressions and /or trenches should be filled with properly
compacted materials as part of the remedial grading.
All fill and backfill soils should be placed in horizontal loose layers approximately 8 inches
9
Mehrdad Dokhanchy File No. 1106F6-21 January 12, 2023
thick, moisture conditioned to a water content of one to three percent above optimum
moisture content, and compacted to at least 90 percent relative compaction, as determined
by ASTM Test Method D 1557-00.
The excavation bottom should then be scarified to a depth of approximately 6 to 8
inches, moisture-conditioned to 1 to 3 percent above optimum moisture content, and re-
compacted to a minimum relative compaction of 90 percent in accordance with ASTM
D 1556-00 or D6938-17.ael. Excavated sandy or clayey soils should then be uniformly
moisture conditioned at above optimum moisture content, placed in 8-inch-thick loose
layers and compacted to a relative compaction of at least 90 percent.
Import fill soil, if required, should consist of granular materials with low expansion
potential (EI less than 50 or stated by the soil engineer) and should be compacted as
indicated herein. Soil Testers should be notified of the import source and should
perform laboratory testing of the soil prior to its arrival at the site to determine its
suitability as fill material.
Deviations from the recommendations of the Soil Report, from the plans, or from these
Specifications must be approved in writing by the owner and the contractor and
endorsed by the engineer.
SOIL TEST METHODS:
Maximum Density & Opt Moisture
Density of Soil In-Place
--ASTM Dl557-70
--ASTM Dl556, D2922 and D3017
Soil Expansion
Shear Strength
Gradation & Grain Size
Capillary Moisture Tension
Organic Content
--UBC STANDARD 29-2
--ASTM D3080-72
--ASTM Dl 140-71
--ASTM D2325-68
--% Weight loss after heating for 24 hours
at 300° F and after deducting soil moisture.
LIMITING SOIL CONDITIONS:
Minimum Compaction
Expansive Soils
Insufficient fines
Oversized Particles
90% for 'disturbed' soils. (Existing fill,
newly placed fill, plowed ground, etc.)
84% for natural, undisturbed soils.
95% for pavement subgrade within 2' of
finish grade and pavement base course.
Expansion index exceeding 20
Less than 40% passing the #4 sieve.
Rocks over 6" in diameter.
10
Mehrdad Dokhanchy File No. l 106F6-2 l January 12, 2023
PREPARATION OF AREAS TO RECEIVE FILL:
Brush, trash, debris and detrimental soils shall be cleared from the areas to receive fill.
Detrimental soils shall be removed to firm competent soil. Slopes exceeding 20% should be
stepped uphill with benches 1 O' or greater in width. Scarify area to receive fill to 6" depth and
compact.
FILL MATERIAL shall not contain insufficient fines, oversized particles, or excessive
organics. On-site disposition of oversized rock or expansive soils is to be at the written
direction of the Engineer. Select fill shall be as specified by the engineer. All fills shall be
compacted and tested.
SUBDRAINS shall be installed if required by and as directed by and detailed by the engineer
and shall be left operable and unobstructed. They shall consist of 3" plastic perforated pipe set
in a minimum cover of 4" of filter rock in a 'vee' ditch to intercept and drain free ground from
the mass fills. Perforated pipe shall be schedule 40, Poly-Vinyl-Chloride or Acrylonitrile
Butadienne Styrene plastic. Rock filter material shall conform to the following gradation:
Sieve size:
¾Passing:
3/4"
90-100
#4
25-50
#30
5-20
#200
0-7
Subdrains shall be set at a minimum gradient of 0.2% to drain by gravity. Drains found
inoperable shall be excavated and replaced.
CAPPING EXPANSIVE SOILS: If capping expansive soils with non-expansive soil to
mitigate the expansive potential is used, the cap should be compacted, non-expansive, select
soil placed for a minimum thickness 3' over the expansive soil and for a minimum distance of
8' beyond the exterior perimeter of the structure. Special precautions should be taken to
ensure that the non-expansive soil remains uncontaminated and the minimum thickness and
dimensions around the structure are maintained. The expansive soils underlying the cap of
non-expansive cap should be pre-saturated to a depth of 3' to obtain a degree saturation
exceeding 90% before any construction supported by the compacted cap.
The non-expansive soil comprising the cap should conform to the following:
Minimum Compaction
Maximum Expansion Index
Minimum Angle of Internal Friction
Cohesion Intercept
11
90%
30
33 Deg
100 psf
Mehrdad Dokhanchy File No. l 106F6-21 January 12, 2023
UNFORESEEN CONDITIONS: Soil Testers assume no responsibility for conditions,
which differ from those, described in the applicable current reports and documents for this
property. Upon termination of the engineer's services for any reason, his fees up to the time of
termination become due and payable. If it is necessary for the engineer to issue an
unfavorable report concerning the work that he has been hired to test and inspect, the engineer
shall not be held liable for any damages that might result from his 'unfavorable report'.
If we can be of any further assistance, please do not hesitate to contact our office. This
opportunity to be of service is sincerely appreciated.
Plate I through III, Detail 1 and Standard Grading Guidelines are part of this report.
Respectfully submitted,
Bryan Miller-Hicks, CEG 1323, PG 4130
CCC/mlj
12
Mehrdad Dokhanchy File No. 1106F6-21 January 12, 2023
REFERENCES
1. Kennedy, M.P., and Tan, S.S. 2007, Geologic Map of the Oceanside 30' x 60'
Quadrangle, California, California Geological Survey.
2. Lindvall, S. C., and T. K. Rockwell (1995), Holocene activity of the Rose Canyon fault
zone in San Diego,Califomia ,J.Geophys.Res., IO0(B12),24,121-24,132.
3. (https://asce7hazardtool.online/), USGS Seismic Design Maps based on ASCE/SEI 7-22
and ASCE/SEI 7-22 Table 1.5-2
LOCATION OF
EXPLORATION TRENCHES
NO SCALE
Cd EXPLORATION TRENCH
PLATE I
JOB NO.
1106F6-21
BY
1-11-23
Mehrdad Dokhanchy
Plate No. II
EXPLORATION NUMBER 1
Date Logged:
Date Reported:
09/22/2021
10/29/2021
Depth Unified Classifications
0 to 4' SM Brown,
File No. 1106F6-21 January 12, 2023
Equipment Used: Backhoe
Groundwater: Not Encountered
Soil Description Soil Type
dry, loose, SILTY SANDS 1
(Native)
moist, firm
bottom of excavation
Mehrdad Dokhanchy
Plate No. III
EXPLORATION NUMBER 2
Date Logged:
Date Reported:
09/22/2021
10/29/2021
Depth Unified Classifications
0 to 4' SM Brown,
File No. 1106F6-21 January 12, 2023
Equipment Used: Backhoe
Groundwater: Not Encountered
Soil Description Soil Type
dry, loose, SILTY SANDS 1
(Native)
moist, firm
bottom of excavation
5" SLAB
= z
co ~ /;7;~~~~~~~~d---2" TO 4" SAND
:c !J: w 0
(!). z i== 0 0 LL
l.. PER PLAN .. I
-=-: SCARIFY, MOISTURIZE AND -=
=-=--COMPACT 12" ZONE OF .-..::.-
=====-= STRUCTURAL FILL:-~==
NON-GRADED LOT
* LOWEST ADJACENT GRADE OF STRUCTURAL FILL OR COMPACTED BASE
-= -= -=-STRUCTURAL FILL -= -= -= -------
I .. PER PLAN .. I
GRADED LOT
4" TO 6" VIRGIN
CLASS II BASE
5" SLAB
2"TO4" SAND
4" TO 6" VIRGIN
CLASS II BASE
* * LOWEST ADJACENT GRADE OF OUTSIDE GRADE OR COMPACTED BASE/INSIDE GRADE
NO SCALE
SLAB AND FOOTING DETAILS
DETAIL 1
Mehrdad Dokhanchy File No. 1106F6-21 January 12, 2023
Standard Grading Guidelines
GENERAL
The guideline contained herein and the standard details attached hereto represent this
firm's standard recommendations for grading and other associated operations on
construction projects. These guidelines should be considered a portion of the project
specifications.
All plates attached hereto shall be considered as part of these guidelines.
The Contractor should not vary from these guidelines without prior recommendation by
the Geotechnical Consultant and the approval of the Client or his authorized representative.
Recommendation by the Geotechnical Consultant and/or Clients should not be considered
to preclude requirements for approval by the controlling agency prior to the execution of
any changes.
These Standard Grading Guidelines and Standard Details may be modified and/or
superseded by recommendations contained in the text of the preliminary geotechnical
report and/or subsequent reports.
If disputes arise out of the interpretation of these grading guidelines or standard details, the
Geotechnical Consultant shall provide the governing interpretation.
DEFINITIONS OF TERMS
ALLUVIUM -Unconsolidated soil deposits resulting from flow of water, including
sediments deposited in river beds, canyons, flood plains, lakes, fans and estuaries.
AS-GRADED (AS-BUILT) -The surface and subsurface conditions at completion of
grading.
BACKCUT -A temporary construction slope at the rear of earth retaining structures such
as buttresses, shear keys, stabilization fills or retaining walls.
BACKDRAIN -Generally a pipe and gravel or similar drainage system placed behind
earth retaining structures such buttresses, stabilization fills, and retaining walls.
BENCH -A relatively level step and near vertical rise excavated into sloping ground on
which fill is to be placed.
BORROW (Import) -Any fill material hauled to the project site from off-site areas.
BUTTRESS FILL -A fill mass, the configuration of which is designed by engineering
calculations to retain slope conditions containing adverse geologic features. A buttress is
generally specified by minimum key width and depth and by maximum back cut angle. A
buttress normally contains a back-drainage system.
CIVIL ENGINEER -The Registered Civil Engineer or consulting firm responsible for
preparation of the grading plans, surveying and verifying as-graded topographic
conditions.
CLIENT -The Developer of his authorized representative who is chiefly in charge of the
project. He shall have the responsibility of reviewing the findings and recommendations
Mehrdad Dokhanchy File No. 1106F6-21 January 12, 2023
made by the Geotechnical Consultant and shall authorize the Contractor and/or other
consultants to perform work and/ or provide services.
COLLUVIUM -Generally loose deposits usually found near the base of slopes and
brought there chiefly by gravity through slow continuous downhill creep ( also see Slope
Wash).
COMPACTION -Densification of man-placed fill by mechanical means
CONTRATOR -A person or company under contract or otherwise retained by the Client
to perform demolition, grading and other site improvements.
DEBRIS -All products of clearing, grubbing, demolition, contaminated soil materials
unsuitable for reuse as compacted fill and/or any other material so designated by the
Geotechnical Consultant.
ENGINEERING GEOLOGIST -A licensed Engineering Geologist who applies scientific
methods, engineering and geologic principles and professional experience to the
acquisition, interpretation and use of knowledge of materials of the earth's crust for the
evaluation of engineering problems. Geotechnical Engineering encompasses many of the
engineering aspects of sil mechanics, rock mechanics, geology, geophysics, hydrology and
related sciences.
ENGINEERED FILL -A fill of which the Geotechnical Consultant or his representative,
during grading, has made sufficient tests to enable him to conclude that the fill has been
placed in substantial compliance with the recommendations of the Geotechnical Consultant
and the governing agency requirements.
EROSION -The wearing away of the ground surface as a result of the movement of wind
and/ or water.
EXCAVATION -The mechanical removal of earth materials.
EXISTING GRADE -The ground surface configuration prior to grading.
FILL -Any deposits of soil, rock, soil-rock blends or other similar materials placed by
man.
FINISH GRADE -The ground surface configuration at which time the surface elevations
conform to the approved plan.
GEOFABRIC -Any engineering textile utilized in geotechnical applications including
subgrade stabilization and filtering.
GEOLOGIST -A representative of the Geotechnical Consultant educated and trained in
the field of geology.
GEOTECHNICAL CONSUL TANT -The Geotechnical Engineering and Engineering
Geology consulting firm retained to provide technical services for the project. For the
purpose of these specifications, observations by the Geotechnical Consultant include
observations by the Soil Engineer, Geotechnical Engineer, Engineering Geologist and
those performed by persons employed by and responsible to the Geotechnical Consultant.
GEOTECHNICAL ENGINEER -A licensed Geotechnical Engineer or Civil Engineer who
applies scientific methods, engineering principles and professional experience to the
acquisition, interpretation and use of knowledge of materials of the earth's crust for the
Mehrdad Dokhanchy File No. 1106F6-21 January 12, 2023
evaluation of engineering problems. Geotechnical Engineering encompasses many of the
engineering aspects of soil mechanics, rock mechanics, geology, geophysics, hydrology
and related sciences.
GRADING -Any operation consisting of excavation, filling or combinations thereof and
associated operations.
LANDSLIDE DEBRIS -Material, generally porous and of low density, produced from
instability of natural of man-made slopes.
MAXIMUM DENSITY -Standard laboratory test for maximum dry unit weight. Unless
otherwise specified, the maximum dry unit weight shall be determined in accordance with
ASTM Method of Test D 1557-09.
OPTIMUM MOISTURE -Soil moisture content at the test maximum density.
RELATIVE COMP ACTION -The degree of compaction ( expressed as a percentage) of
dry unit weight of a material as compared to the maximum dry unit weight of the material.
ROUGH GRADE -The ground surface configuration at which time the surface elevations
approximately conform to the approved plan.
SITE -The particular parcel of land where grading is being performed.
SHEAR KEY -Similar to buttress, however, it is generally constructed by excavating a
slot within a natural slope in order to stabilize the upper portion of the slope without
grading encroaching into the lower portion of the slope.
SLOPE -An inclined ground surface the steepness of which is generally specified as a
ratio of horizontal: vertical ( e.g.,2: 1 ).
SLOPE WASH -Soil and/or rock material that has been transported down a slope by
action of gravity assisted by runoff water not confined by channels ( also see Colluvium).
SOIL -Naturally occurring deposits of sand, silty, clay, etc., or combinations thereof.
SOIL ENGINEER -Licensed Geotechnical Engineer or Civil Engineer experienced in soil
mechanics (also see Geotechnical Engineer).
STABILIZATION FILL -A fill mass, the configuration of which is typically related to
slope height and is specified by the standards of practice for enhancing the stability of
locally adverse conditions. A stabilization fill is normally specified by minimum key width
and depth and by maximum backcut angle. A stabilization fill may or may not have a back
drainage system specified.
SUBDRAIN -Generally a pipe and gravel or similar drainage system placed beneath a fill
in the alignment of canyons or former drainage channels.
SLOUGH -Loose, non-compacted fill material generated during grading operations.
TAILINGS -Non-engineered fill which accumulates on or adjacent to equipment haul-
roads.
TERRACE -Relatively level step constructed in the face of graded slope surface for
drainage control and maintenance purposes.
TOPSOIL -The presumable fertile upper zone of soil which is usually darker in color and
loose.
Mehrdad Dokhanchy File No. 1106F6-21 January 12, 2023
WINDROW -A string of large rocks buried within engineered fill in accordance with
guidelines set forth by the Geotechnical Consultant.
OBLIGATIONS OF PARTIES
The Geotechnical Consultant should provide observation and testing services and should
make evaluations in order to advise the Client on geotechnical matters. The Geotechnical
Consultant should report his findings and recommendations to the Client or his authorized
representative.
The client should be chiefly responsible for all aspects of the project. He or his authorized
representative has the responsibility of reviewing the findings and recommendations of the
Geotechnical Consultant. He shall authorize or cause to have authorized the Contractor
and/or other consultants to perform work and/or provide services. During grading the
Client or his authorized representative should remain on-site or should remain reasonably
accessible to all concerned parties in order to make decisions necessary to maintain the
flow of the project.
The Contractor should be responsible for the safety of the project and satisfactory
completion of all grading and other associated operations on construction projects,
including but not limited to, earthwork in accordance with the project plans specifications
and controlling agency requirements. During grading, the Contractor or his authorized
representative should remain onsite. Overnight and on days off, the Contractor should
remain accessible.
SITE PREPARATION
The Client, prior to any site preparation or grading, should arrange and attend a meeting
among the Grading Contractor, the Design Engineer, the Geotechnical Consultant,
representatives of the appropriate governing authorities as well an any other concerned
parties. All parties should be given at least 48 hours notice.
Clearing and grubbing should consist of the removal of vegetation such as brush, grass,
woods, stumps, trees, roots of trees and otherwise deleterious natural materials from the
areas to be graded. Clearing and grubbing should extend to the outside of all proposed
excavation and fill areas.
Demolition should include removal of buildings, structures, foundations, reservoirs,
utilities (including underground pipelines, septic tanks, leach fields, seepage pits, cisterns,
mining shafts, tunnels, etc.) and other man-made surface and subsurface improvements
from the areas to be graded. Demolition of utilities should include proper capping and/or
rerouting pipelines at the governing authorities and the recommendations of the
Geotechnical Consultant at the time of demolition.
Trees, plants or man-made improvements not planned to be removed or demolished should
be protected by the Contractor from damage or injury.
Debris generated during clearing, grubbing and/or demolition operations should be wasted
from areas to be graded and disposed off-site. Clearing, grubbing and demolition
Mehrdad Dokhanchy File No. 1106F6-21 January 12, 2023
operations should be performed under the observation of the Geo technical Consultant.
The Clients or Contractor should obtain the required approvals from the controlling
authorities for the project prior, during and/or after demolition, site preparation and
removals, etc. The appropriate approvals should be obtained prior to proceeding with
grading operations.
SITE PROTECTION
Protection of the site during the period of grading should be the responsibility of the
Contractor. Unless other provisions are made in writing and agreed upon among the
concerned parties, completion of a portion of the project should not be considered to
preclude that portion or adjacent areas from the requirements for site protection until such
time as the entire project is complete as identified by the Geotechnical Consultant, the
Client and the regulating agencies.
The Contractor should be responsible for the stability of all temporary excavations.
Recommendations by the Geotechnical Consultant pertaining to temporary excavations
(e.g., back cuts) are made in consideration of stability of the completed project and,
therefore, should not be considered to preclude the responsibilities of the Contractor.
Recommendations by the Geotechnical Consultant should not be considered to preclude
more restrictive requirements by the regulating agencies.
Precautions should be taken during the performance of site clearing, excavations and
grading to protect the work site from flooding, ponding, or inundation by poor or improper
surface drainage. Temporary provisions should be made during the rainy season to
adequately direct surface drainage away from and off the work site. Where low areas
cannot be avoided, pumps should be kept on hand to continually remove water during
periods of rainfall.
During periods of rainfall, plastic sheeting should be kept reasonable accessible to prevent
unprotected slopes from becoming saturated. Where necessary during periods of rainfall,
the Contractor should install check dams, desilting basins, riprap, sandbags or other
devices or methods necessary to control erosion and provide safe conditions.
During periods of rainfall, the Geotechnical Consultant should be kept informed by the
Contractor as to the nature of remedial or preventative work being performed ( e.g.,
pumping, placement of sandbags or plastic sheeting, other labor, dozing, etc.).
Following periods of rainfall, the Contract or should contract the Geotechnical Consultant
and arrange a walk-over of the site in order to visually asses rain related damage. The
Geotechnical Consultant may also recommend excavations and testing in order to aid in his
assessment. At the request of the Geotechnical Consultant, the Contractor shall make
excavations in order to evaluate the extend of rain related damage.
Rain related damage should be considered to include, but may not be limited to, erosion,
silting, saturation, swelling, structural distress and other adverse conditions identified by
the Geotechnical Consultant. Soil adversely affected should be classified to Unsuitable
Materials and should be subject to over-excavation and replacement with compacted fill or
Mehrdad Dokhanchy File No. 1106F6-21 January 12, 2023
other remedial grading as recommended by the Geotechnical Consultant.
Relatively level areas, where saturated soils and/ or erosion gullies exist to depths of
greater than I-foot, should be over-excavated to unaffected, competent material. Where
less than 1-foot in depth, unsuitable materials may be processed in-place to achieve near
optimum moisture conditions, then thoroughly recompacted in accordance with the
applicable specifications. If the desired results are not achieved, the affected materials
should be over-excavated, then replaced in accordance with the applicable specifications.
In slope areas, where saturated soil and/ or erosion gullies exist to depths of greater than I -
foot, they should be over-excavated and replaced as compacted fill in accordance with the
applicable specifications. Where affected materials exist to depths of I-foot or less below
proposed finished grade, remedial grading by moisture conditioning in-place, followed by
thorough recompaction in accordance with the applicable grading guidelines herein may be
attempted. If the desired results are not achieved, all affected materials should be over-
excavated per recommendations herein. As field conditions dictate, other slope repair
procedures may be commended by the Geotechnical Consultant.
EXCAVATIONS
Unsuitable Materials
Materials which are unsuitable should be excavated under observation and
recommendations of the Geotechnical Consultant. Unsuitable materials include, but may
not be limited to, dry, loose, soft, wet, organic compressible natural soils and fractured,
weathered, soft bedrock and non-engineered or otherwise deleterious fill materials.
Material identified by the Geotechnical Consultant as unsatisfactory due to its moisture
conditions should be over-excavated, watered or dried, as needed, and thoroughly blended
to a uniform near optimum moisture condition (per Moisture guidelines presented herein)
prior to placement as compacted fill.
Cut Slopes
Unless otherwise recommended by the Geotechnical Consultant and approved by the
regulating agencies, permanent cut slopes should not be steeper than 2: I (horizontal:
vertical).
If excavations for cut slopes exposed loose, cohesion less, significantly fractured or
otherwise unsuitable material, over-excavation and replacement of the unsuitable materials
with a compacted stabilization fill should be accomplished as recommended by the
Geotechnical Consultant. Unless otherwise specified by the Geotechnical Consultant,
stabilization fill construction should conform to the requirements of the Standard Details.
The Geotechnical Consultant should review cut slopes during excavation. The
Geotechnical Consultant should be notified by the contractor prior to beginning slope
excavations.
If, during the course of grading, adverse or potentially adverse geotechnical conditions are
encountered which were not anticipated in the preliminary report, the Geotechnical
Consultant should explore, analyze and make recommendations to treat these problems.
Mehrdad Dokhanchy File No. 1106F6-21 January 12, 2023
When cut slopes are made in the direction of the prevailing drainage, a non-erodible
diversion swale (brow ditch) should be provided at the top-of-cut.
Pad Areas
All lot pad areas, including side yard terraces, above stabilization fills or buttresses should
be over-excavated to provide for a minimum of 3-feet (refer to Standard Details) of
compacted fill over the entire pad area. Pad areas with both fill and cut materials exposed
and pad areas containing both very shallow (less the 3-feet in thickness (refer to Standard
Details).
Cut areas exposing significantly varying material types should also be over-excavated to
provide for at least a 3-foot thick compacted fill blanket. Geotechnical conditions may
require greater depth of over-excavation. The actual depth should be delineated by the
Geotechnical Consultant during grading.
For pad areas created above cut or natural slopes, positive drainage should be established
away from the top-of-slope. This may be accomplished utilizing a berm and/ or an
appropriate pad gradient. A gradient in soil area away from the top-of-slope of 2 percent or
greater is recommended.
Compacted Fill
All fill materials should be compacted as specified below or by other methods specifically
recommended by the Geotechnical Consultant. Unless otherwise specified, the minimum
degree of compaction (relative compaction) should be 90 percent of the laboratory
maximum density.
Placement
Prior to placement of compacted fill, the Contractor should request a review by the
Geotechnical Consultant of the exposed ground surface. Unless otherwise recommended,
the exposed ground surface should then be scarified (6-inches minimum), watered or dried
as needed, thoroughly blended to achieve near optimum moisture conditions, then
thoroughly compacted to a minimum of 90 percent of the maximum density. The review
by the Geotechnical Consultant should not be considered to preclude requirements of
inspection and approval by the governing agency.
Compacted fill should be placed in thin horizontal lifts not exceeding 8-inches in loose
thickness prior to compaction. Each lift should be watered or dried as needed, thoroughly
blended to achieve near optimum moisture conditions then thoroughly compacted by
mechanical methods to a minimum of 90percent of laboratory maximum dry density. Each
lift should be treated in a like manner until the desired finished grades are achieved.
The Contactor should have suitable and sufficient mechanical compaction equipment and
watering apparatus on the job site to handle the amount of fill being placed in
consideration of moisture retention on the job site to handle the amount of fill being placed
in consideration of moisture retention properties of the materials. If necessary, excavation
equipment should be "shut down" temporarily in order to permit proper compaction of
fills. Earth moving equipment should only be considered a supplement and not substituted
for conventional compaction equipment.
Mehrdad Dokhanchy File No. 1106F6-21 January 12, 2023
When placing fill in horizontal lifts adjacent to areas sloping steeper than 5: 1 (horizontal:
vertical), horizontal keys and vertical benches should be excavated into the adjacent slope
area. Keying and benching should be sufficient to provide at least 6-foot wide benches and
minimum of 4-feet of vertical bench height within the firm natural ground, firm bedrock or
engineered compacted fill. No compacted fill should be placed in an area subsequent to
keying and benching unit the area has been reviewed by the Geotechnical Consultant.
Material generated by the benching operation should be moved sufficiently away from the
bench area to allow for the recommended review of the horizontal bench prior to
placement of fill. Typical keying and benching details have been included within the
accompanying Standard Details.
Within a single fill area where grading procedures dictate two or more separate fills,
temporary slopes (false slopes) may be created. When placing fill adjacent to a false slope,
benching should be conducted in the same manner as above described. At least a 3-foot
vertical bench should be established within the firm core of adjacent approved compacted
fill prior to placement of additional fill. Benching should proceed in at least 3-foot vertical
increments until the desired finished grades are achieved.
Fill should be tested for compliance with the recommended relative compaction and
moisture conditions. Field density testing should conform to ASTM Method of Test D
1556-07, and/or D 6938-10. Test should be provided for about every 2 vertical feet or
1,000 cubic yards of fill placed. Actual test intervals may vary as field conditions dictate.
Fill found not to be in conformance with the grading recommendations should be removed
or otherwise handled as recommended by the Geotechnical Consultant.
The Contractor should assist the Geotechnical Consultant and/or his representative by
digging test pits for removal determinations and/or for testing compacted fill.
As recommended by the Geotechnical Consultant, the Contractor should "shut down" or
remove grading equipment from an area being tested.
The Geotechnical Consultant should maintain a plan with estimated locations of field tests.
Unless the client provides for actual surveying of test locations, the estimated locations by
the Geotechnical Consultant should only be considered rough estimates and should not be
utilized for the purpose of after-the-fact evaluating of the sequence of fill placement.
Moisture
For field testing purposes, " near optimum" will vary with material type and other factors
including compaction procedures. " Near optimum" may be specifically recommended in
Preliminary Investigation Report and/or may be evaluated during grading.
Prior to placement of additional compacted fill following an overnight or other grading
delay, the exposed surface or previously compacted fill should be processed by
scarification, watered or dried as needed, thoroughly blended to near-optimum moisture
conditions, then recompacted to a minimum of 90 percent of laboratory maximum dry
density. Where wet or other dry or other unsuitable materials exist to depths of greater than
1 foot, the unsuitable materials should be over-excavated.
Following a period of flooding, rainfall or overwatering by other means, no additional fill
Mehrdad Dokhanchy File No. 1106F6-21 January 12, 2023
should be placed until damage assessments have been made and remedial grading
performed as described herein.
Fill Material
Excavated on-site materials which are acceptable to the Geotechnical Consultant may be
utilized as compacted fill, provided trash, vegetation and other deleterious materials are
removed prior to placement.
Where import materials are required for use on-site, the Geotechnical Consultant should be
notified at least 72 hours in advance of importing, in order to sample and test materials
from proposed borrow sites. No import materials should be delivered for use on-site
without prior sampling and testing by Geotechnical Consultant.
Where oversized rock or similar irreducible material is generated during grading, it is
recommended, where practical, to waste such material off-site or on-site in area designated
as "nonstructural rock disposal area". Rock placed in disposal areas should be placed with
sufficient fines to fill voids. The rock should be compacted in lifts to an unyielding
condition. The disposal area should be covered with at least 3 feet of compacted fill which
is free of oversized material. The upper 3 feet should be placed in accordance with the
guidelines for compacted fill herein.
Rocks 8 inches in maximum dimension and smaller may be utilized within the compacted
fill, provided they are placed in such a manner that nesting of the rock is avoided. Fill
should be placed and thoroughly compacted over and around all rock. The amount of rock
should not exceed 40 percent by dry weight passing the ¾ -inch sieve size. The 12-inch
and 40 percent recommendations herein may very as field conditions dictate.
During the course of grading operations, rocks or similar irreducible materials greater than
8-inches maximum dimension (oversized material) may be generated. These rocks should
not be placed within the compacted fill unless placed as recommended by the Geotechnical
Consultant.
Where rocks or similar irreducible materials of greater than 8 inches but less than 4 feet of
maximum dimension are generated during grading, or otherwise desired to be placed
within an engineered fill, special handling in accordance with the accompanying Standard
Details is recommended. Rocks greater than 4 feet should be broken down or disposed off-
site. Rocks up to 4 feet maximum dimension should be placed below the upper 10 feet of
any fill and should not be closer than 20-feet to any slope face. These recommendations
could vary as locations of improvements dictate. Where practical, oversized material
should not be placed below areas where structures or deep utilities are proposed.
Oversized material should be placed in windrows on a clean, over-excavated or unyielding
compacted fill or firm natural ground surface. Select native or imported granular soil (S.E.
3 0 or higher) should be placed and thoroughly flooded over and around all windrowed
rocks, such that voids are filled. Windrows of oversized material should be staggered so
that successive strata of oversized material are not in the same vertical plane.
It may be possible to dispose of individual larger rock as field conditions dictate and as
recommended by the Geotechnical Consult and at the time of placement. Material that is
Mehrdad Dokhanchy File No. 1106F6-21 January 12, 2023
considered unsuitable by the Geotechnical Consultant should not be utilized in the
compacted fill.
During grading operations, placing and mixing the materials from the cut and/or borrow
areas may result in soil mixtures which possess unique physical properties. Testing may be
required of samples obtained directly from the fill areas in order to verify conformance
with the specifications. Processing of these additional samples may take two or more
working days. The Contractor may elect to move the operation to other areas within the
project, or may continue placing compacted fill pending laboratory and field test results.
Should he elect the second alternative, fill placed is done so at the Contractor's risk.
Any fill placed in areas not previously reviewed and evaluated by the Geotechnical
Consultant, and/or in other areas, without prior notification to the Geotechnical Consultant
may require removal and recompaction at the Contractor's expense. Determination of over
excavations should be made upon review of field conditions by the Geotechnical
Consultant.
Fill Slopes
Unless otherwise recommended by the Geotechnical Consultant and approved by the
regulating agencies, permanent fill slopes should not be steeper than 2: 1 (horizontal to
vertical).
Except as specifically recommended otherwise or as otherwise provided for in these
grading guideline (Reference Fill Materials), compacted fill slopes should be overbuilt and
cut back to grade, exposing the firm, comp acted fill inner core. The actual amount of
overbuilding may vary as field conditions dictate. If the desired results are not achieved,
the existing slopes should be over-excavated and reconstructed under the guideline of the
Geotechnical Consultant. The degree of overbuilding shall be increased until the desired
compacted slope surface condition is achieved. Care should be taken by the Contractor to
provide thorough mechanical compaction to the outer edge of the overbuilt slope surface.
Although no construction procedure produces a slope free from risk of future movement,
overfilling and cutting back of slope to a compacted inner core is, given no other
constraints, the most desirable procedure. Other constraints, however, must often be
considered. These constraints may include property line situations ,access, the critical
nature of the development and cost. Where such constrains are identified, slope face
compaction may be attempted by conventional construction procedures including back
rolling techniques upon specific recommendation by the Geotechnical Consultant.
As a second-best alternative for slopes of 2: 1 (horizontal to vertical) or flatter, slope
construction may be attempted as outlined herein. Fill placement should proceed in thin
lifts, (i.e., 6 to 8-inch loose thickness). Each lift should be moisture conditioned and
thoroughly compacted. The desired moisture condition should be maintained and/or
reestablished, where necessary, during the period between successive lifts. Selected lifts
should be tested to ascertain that desired compaction is being achieved. Care should be
taken to extend compactive effort to the outer edge of the slope. Each lift should extend
horizontally to the desired finished slope surface or more as needed to ultimately establish
Mehrdad Dokhanchy File No. 1106F6-21 January 12, 2023
desired grades. Grade during construction should not be allowed to roll off at the edge of
the slope. It may be helpful to elevate slightly the outer edge of the slope.
Slough resulting from the placement of the individual lifts should not be allowed to drift
down over previous lifts. At intervals not exceeding 4 feet in vertical slope height or the
capability of available equipment, whichever is less, fill slopes should be thoroughly back
rolled utilizing a conventional sheeps foot-type roller. Care should be taken to maintain the
desired moisture conditions and/or reestablishing same as needed prior to back rolling.
Upon achieving final grade, the slopes should gain be moisture conditioned and thoroughly
back rolled. The use of a side-boom roller will probably be necessary and vibratory
methods are strongly recommended. Without delay, so as to avoid (if possible) further
moisture conditioning, the slopes should then be grid-rolled to achieve a relatively smooth
surface and uniformly compact condition.
In order to monitor slope construction procedure, moisture and density tests will be taken
at regular intervals. Failure to achieve the desired results will likely result in a
recommendation by the Geotechnical Consultant to over-excavate the slope surfaces
followed by reconstruction of the slopes utilizing overfilling and cutting back procedures
and/or further attempt at the conventional back rolling approach. Other recommendations
may also be provided which would be commensurate with field conditions.
Where placement of fill above a natural slope or above a cut slope in proposed, the fill
slope configuration as presented in the accompanying Standard Details should be adopted.
For pad areas above fill slope, positive drainage should be established away from the top-
of-slope. This may be accomplished utilizing a berm and pad gradients of at least 2 percent
in so 1 areas.
Off-Site Fill
Off-site fill should be treated in the same manner as recommended in these specifications
for site preparation, excavation, drains, compaction, etc.
Off-site canyon fill should be placed in preparation for future additional fill, as shown in
the companying Standard Details.
Off-site fill subdrains temporarily terminated (up canyon) should be surveyed for future
relocation and connection.
STAKING
In all fill areas, the fill should be compacted prior to the placement of the stakes. This
particularly is important on fill slopes. Slopes stakes should not be placed until the slope is
thoroughly compacted (back rolled). If stakes must be placed prior to the completion of
compaction procedures, it must be recognized that they will be removed and/or demolished
at such time as compaction procedures resume.
In order to allow for remedial grading operations, which could include over-excavations or
slope stabilization, appropriate staking offsets should be provided. For finished slope and
stabilization backcut areas, we recommend at least a 10-feet setback from proposed toes
and tops-of-cut.
Mehrdad Dokhanchy File No. 1106F6-21 January 12, 2023
DRAINAGE
Canyon subdrain systems specified by the Geotechnical Consultant should be installed in
accordance with the Standard Details.
Typical subdrains for compacted fill buttresses, slope stabilization or side hill masses,
should be installed in accordance with the specifications of the accompanying Standard
Details.
Roof, pad and slope drainage should be directed away from slopes and areas of structures
to suitable disposal areas via non-erodible devices (i.e., gutters, downspout, concrete
swales).
For drainage over soil areas immediately away from structures (i.e., within 4 feet), a
minimum of 4 percent gradient should be maintained. Pad drainage of at lease 2 percent
should be maintained over soil areas. Pad drainage may be reduced to at least 1 percent for
projects where no slopes exist, either natural or man-made, or greater than 10-feet in height
and where no slopes are planned, either natural or man-made, steeper than 2: 1 (horizontal
to vertical slope ratio).
Drainage patterns established at the time of fine grading should be maintained throughout
the life of the project. Property owners should be made aware that altering drainage
patterns can be detrimental to slope stability and foundation performance.
SLOPE MAINTENANCE
Landscape Plants
In order to enhance Surficial slope stability, slope planting should be accomplished at the
completion of grading. Slope planting should consist of deep-rooting vegetation requiring
little watering. Plants native to the Southern California area and plants relative to native
plants are generally desirable. Plants native to other semi-arid and arid areas may also be
appropriate. A Landscaping Architect would be the bast party to consult regarding actual
types of plants and planting configuration.
Irrigation
Irrigation pipes should be anchored to slope faces, not placed in trenches excavated into
slope faces.
Slope irrigation should be minimized. If automatic timing devices are utilized or irrigation
systems, provisions should be made for interrupting normal irrigation during periods of
rainfall.
Though not a requirement, consideration should be given to the installation of near-surface
moisture monitoring control devices. Such devices can aid in the maintenance of relatively
uniform and reasonably constant moisture conditions.
Property owners should be made aware that overwatering of slopes is detrimental to slope
stability.
Maintenance
Periodic inspections of landscaped slope areas should be planned and appropriate measures
should be taken to control weeds and enhance growth of the landscaping plants. Some
areas may require occasional replanting and/or reseeding.
Mehrdad Dokhanchy File No. 1106F6-21 January 12, 2023
Terrace drains and down drains should be periodically inspected and maintained free of
debris.
Damage to drainage improvements should be repaired immediately.
Property owners should be made aware that burrowing animals can be detrimental to slope
stability. A preventative program should be established to control burrowing animals.
As a precautionary measure, plastic sheeting should be readily available, or kept on hand,
to protect all slope areas from saturation by periods of heavy or prolonged rainfall. This
measure is strongly recommended, beginning with the period of time prior to landscape
planting.
Repairs
If slope failures occur, the Geotechnical Consultant should be contracted for a field review
of site conditions and development or recommendations for evaluation and repair.
If slope failures occur as a result of exposure to periods of heavy rainfall, the failure area
and currently unaffected area should be covered with plastic sheeting to protect against
additional saturation.
In the accompanying Standard Details, appropriate repair procedures are illustrated for
superficial slope failures (I.e., occurring typically within the outer 1 foot to 3 feet of a
slope face).
TRENCH BACKFILL
Utility trench backfill should, unless otherwise recommended, be compacted by
mechanical means. Unless otherwise recommended, the degree of compaction should be a
minimum of 90 percent of the laboratory maximum density.
Backfill of exterior and interior tranches extending below a 1: 1 projection from the outer
edge of foundations should be mechanically compacted to a minimum of 90 percent of the
laboratory maximum density.
In cases where clean granular materials are proposed for use in lieu of native materials or
where flooding or jetting is proposed, the procedures should be considered subject to
review by the Geotechnical Consultant.
Clean Granular backfill and/or bedding are not recommended in slope areas unless
provisions are made for a drainage system to mitigate the potential build-up of seepage
forces.
STATUS OF GRADING
Prior of proceeding with any grading operation, the Geotechnical Consultant should be
notified at least two working days in advance in order to schedule the necessary
observation and testing services.
Prior to any significant expansion or cut back in the grading operation, the Geotechnical
Consultant should be provided with adequate notice (i.e., two days) in order to make
appropriate adjustments in observation and testing services.
Following completion of grading operations and/or between phase of a grading operation,
the Geotechnical Consultant should be provided with at least two working days notice in
advance of commencement of additional grading operations.
June 29, 2023
. Mehrdad Dokhanchy
1098 Magnolia A venue
Carlsbad, California 92008
SUBJECT:
Dear Mr. Dokhanchy:
File No. 1106F6-21
Report of Compacted Filled Ground
Proposed Residential Building Site
Next to 1098 Magnolia Avenue
City of Carlsbad
PD 2021-0046
DWG555-6A
P.O. Box 1195
Lakeside, California
92040
(619) 443-0060
In accordance with your request, our firm has inspected the grading operation and tested the fill
soils that were placed and compacted during the preparation of the subject site. This is to report
the results of our soil tests. The work was performed between June 20, 2023 through June 26,
2023. The site is located Next to 1098 Magnolia Avenue, City of Carlsbad.
To briefly summarize the work, we found the compaction of the current fill soils to conform to
the recommended and approved grading specifications and current standard practices.
SECTION No. 1. SCOPE
Our function consisted of providing the engineering services involved with determining the
degree of compaction of fill placed on the site.
The results of the field density tests are presented on Page T-1 under "Table of Test Results".
The laboratory determinations of the maximum dry densities and optimum moisture contents of
the fill soils are set forth on Page L-1 under "Laboratory Test Results". The approximate
locations of the filled ground and the field density tests are presented on Plate No. 1 entitled
"Location of Field Density Tests".
1
Mehrdad Dokhanchy File No. 1106F6-21 June 29, 2023
The grading was performed for the purpose of recompacting loose native soils and creating a
level building pad for the proposed two story single family residence with raised floor construction
and attached garage.
SECTION No. 2. SOIL CONDITIONS
Soils used in the fill were those generated from the on-site grading operation.
EARTHWORK
Preparation: Prior to placement of fill, the areas to receive fill were scarified, watered and
compacted to 90 percent. Natural ground to receive fill was tested to determine its relative
compaction. Native soils having a relative compaction of less than 85 percent were removed,
replaced and compacted to 90 percent.
Placing and compacting fill: Fill soil was placed, watered and mechanically densified in the
areas indicated on attached Plate No. 1. During grading, any fill found to have a relative
compaction of less than 90 percent was reworked until the proper density of 90 percent had been
achieved.
Field density test results: To verify compaction, field density tests were performed in
accordance with applicable American Society of Testing and Materials (ASTM) test methods.
Test method ASTM D1556-82 was used at the indicated locations.
SECTION No. 3. SUMMARY AND RECOMMENDATIONS
Based on the work and tests described hereinbefore and work description set forth in Section 1,
'Scope', we conclude:
1. The filled ground has been compacted to 90%.
2. The placement of fill has been accomplished in accordance with the grading
specifications and with current standard practices.
3. Spread footings will have a minimum allowable bearing value of at least 2000
pounds per square foot. The allowable bearing value will be considerably more
for footings larger than 12 inches wide and/or 12 inches deep. This value may be
increased by one third for wind and/or seismic loading. This value may be
increased by 20 percent for each additional foot of depth and or width to a
maximum of 3 times the designated value.
2
Mehrdad Dokhanchy File No. 1106F6-21 June 29, 2023
4. Detrimentally expansive soils were not encountered. Conventional spread footings
founded a minimum of 12 inches below lowest adjacent grade and having a width
determined by the allowable soil bearing value as detailed above are recommended
for foundation support. Footing widths should be at least 12 and 24 inches for
continuous and square footings respectively due to practical considerations as well
as Building Code requirements.
5. Reinforcing in footings should consist of at least one #4 steel bar placed
continuously in the top and bottom of continuous footings regardless of structural
requirements. Reinforcing for isolated footings is dictated by the structural
requirements. These recommendations are based upon the soil type encountered and
do not take into consideration the proposed bearing load.
6. Concrete Slab-On-Grade, SOG, should be designed by the project's structural
engineer based on anticipated loading conditions. Soil Testers recommends that
conventional reinforced concrete SOG for the garage area be founded on 4 inches
of Class II Virgin Aggregate Base (With approximately 2% +/-of optimum
moisture content and 95% compaction, relative to the lab maximum dry density,
ASTM D 1557), overlying a 12 inch thick zone of adequately placed and
compacted structural fill.
We also recommend that a moisture barrier be provided by a membrane, visqueen
10 mils in minimum thickness or equivalent, be placed at top of well compacted
Class II Aggregate Base, then covered with 2 inches of moist clean sand.
Floor slabs, as a minimum, should be 5 inches thick with #3 reinforcing steel at
18" on-center each way. Reinforcement should be placed at mid-height of the
slab. The final slab thickness and reinforcement should be determined by the
structural design engineer. Control joints should be provided in accordance with
the recommendations of the structural design engineer.
SITE EROSION CONTROL
During construction, surface water should be controlled via berms, gravel bags and/ or
sandbags, silt fence, straw wattles, siltation basins, or other methods to avoid damage to the
finish work or adjoining properties, while maintaining positive surface grades. All site
entrances and exits must have coarse gravel or steel shaker plates to minimize offsite sediment
tracking. Best management Practices (BMP's) must be used to protect storm drains and
minimize pollution. The contractor should take measures to prevent erosion of graded areas
until such time as permanent drainage and erosion control measures have been installed. After
3
Mehrdad Dokhanchy File No. 1106F6-21 June 29, 2023
completion of grading, all excavated surfaces should exhibit positive drainage and eliminate
areas where water might pond.
SITE AND SURFACE DRAINAGE
Drainage at the site should be directed away from foundations, collected and tight lined to
appropriate discharge points. Consideration may be given to collecting roof drainage by eave
gutters and directing it away from foundations via non-erosive devices. Water, either natural or
from irrigation, should not be permitted to pond, saturate the surface soils or flow towards the
foundation. Landscaping requiring a heavy irrigation schedule should not be planted adjacent to
foundations or paved areas. The type of drainage issues found within the project and materials
specified and used should be determined by the Engineer of Record.
GROUNDWATER AND SURF ACE WATERS
There was no indication of a near-surface groundwater table or perched groundwater. Although
groundwater is not expected to be a significant constraint to the proposed development, our
experience indicates that near-surface groundwater conditions can develop in areas where no
such groundwater conditions previously existed, especially in areas where a substantial increase
in surface water infiltration results from landscape irrigation or unusually heavy precipitation. It
is anticipated that site development will include appropriate drainage provisions for control and
discharge of surface water runoff. The type of drainage issues found within the project and
materials specified and used should be determined by the Civil Engineer. The type of plants and
soil specified along with proper irrigation used should be determined by the Landscape
Architect.
SECTION No. 4. LIMITATIONS
UNIFORMITY OF SOIL CONDITIONS:
The values presented in this report are based on our evaluation of the observed, exposed soil
conditions. We have assumed that the soil conditions in the remaining portions of the site can be
interpolated without significant deviation in physical properties. We have made a conscientious
effort to select representative test locations and to provide enough tests for a statistically
adequate population in excess of current standard practices. However, parameter values may be
substantially different in other areas due to unforeseeable variations in the soils. Also, the
parameters are affected in time by the moisture-expansion (volume)-pressure changes that
seriously affect the tested values.
4
Mehrdad Dokhanchy File No. 1106F6-21 June 29, 2023
ENGINEERING INTERPRETATION:
We are available for consultation and should be made aware of any pertinent condition or
problem. Our conclusions will be re-evaluated and any problem or potential problem solved
with a minimum effort and cost before it gets out-of-hand.
TIME LIMITS:
This report presents conclusions and findings that are valid as of this date. Changes on this site
and adjacent property including grading, improvements, drainage, erosion, etc. may directly
affect the findings, conclusions and recommendations presented herein. Subsequent alterations
or conditions may invalidate these recommendations and values. The values in this report will
probably remain applicable for one year provided the site conditions remain unaltered. After this
period, we should be contacted to inspect the site and review this report so that we may verify its
validity.
WARRANTY:
Certain risks are involved with geotechnical and soil engineering work, which should be
recognized by those involved. We have performed our services in accordance with current
standard practices and procedures. These practices and procedures are those presently utilized
by members of our profession in this reg10n. We do not express or imply a warranty or
guarantee regarding these services.
OUTSIDE RESPONSIBILITY:
It is the responsibility of the client (firm or person to whom this report is submitted) to ensure
that the information presented herein is made available to the concerned parties. In addition, it is
the client's responsibility to make certain that any construction reflects any applicable
requirements and conforms with the current codes of jurisdictive governmental agencies.
PROJECT CONCEPT:
We should be notified of any changes in the proposed structures, construction, or site grading, or
project concept so that any addendum or modifications to this report may be provided as
necessary.
SOIL TEST METHODS:
Summary of the
GRADING SPECIFICATIONS USED
for
Proposed Residential Building Site
Next to 1098 Magnolia Avenue
City of Carlsbad
Maximum Density & Opt Moisture
Density of Soil In-Place
ASTM D1557-78
ASTM D1556-82
5
Mehrdad Dokhanchy
Soil Expansion
Shear Strength
Gradation & Grain Size
Capillary Moisture Tension
LIMITING SOIL CONDITIONS:
Minimum Compaction
Expansive Soils
Insufficient Fines
Oversized Particles
PREPARATION FOR FILL:
File No. 1106F6-21
UBC STANDARD 29-2
ASTM D3080-72
ASTM Dl 140-71
ASTM D2325-68
90% for "disturbed" soils. (Existing
fill, newly placed fill, plowed ground, etc.)
85% for natural, undisturbed soils.
June 29, 2023
95% for pavement subgrade within 2' of finish grade and
pavement base course.
Expansion index exceeding 20
Less than 40% passing the #4 sieve.
Rocks over 10" in diameter.
Brush, trash, debris and detrimental soils were cleared from the area to receive fill. Detrimental
soil was removed to competent soil. Slopes exceeding 20% were stepped with benches 1 O' or
greater in width. The area to be filled was scarified to a 6" depth and compacted.
FILL MATERIAL:
Contained sufficient fines and did not contain oversized particles or excessive organics. Special
attention was given to the disposition of any oversized rock, organic soils and expansive soils.
Please read this report carefully. If you have any questions, please contact our office. This
opportunity to be of service is sincerely appreciated.
Page L-1, Page T-1 and Plate I are parts of this report.
Respectfully submitted,
CCC/mlj
6
Mehrdad Dokhanchy File No. 1106F6-21 June 29, 2023
Page L-1
LABORATORY TEST RESULTS
The maximum dry densities and optimum moisture contents of the fill materials as determined by the
A.S.T.M., Dl557-78, Method A, which uses 25 blows of a 10 pound rammer falling from a height of 18
inches on each of 5 layers in a 4 inch diameter 1/30 cubic foot compaction cylinder, are presented as
follows:
Soil Type
1 Brown, fine to coarse, silty sands
Maximum
Dry Density
lb./cu.ft.
131.9
Optimum
Moisture
Content dry wt.
8.6
Mehrdad Dokhanchy
Page T-1
TEST SOIL
NO. TYPE
1 1
2 1
3 1
4 1
5 1
6 1
7 1
f.g. = finish grade
DEPTH
OFFILL
ATTEST
IN FEET
+2
+2
+2
f.g.
f.g.
f.g.
f.g.
File No. 1106F6-21
TABLE OF TEST RESULTS
A.S.T.M., D1556-82
FIELD
MOISTURE
%
7.6
7.2
7.1
6.6
5.9
5.5
6.8
DRY
DENSITY
P.C.F.
122.7
125.5
128.9
124.0
126.4
127.9
120.2
MAXIMUM
DRY
June 29, 2023
DENSITY PERCENT
P.C.F. COMPACTION
131.9 93.0
131.9 95.1
131.9 97.7
131.9 93.9
131.9 95.9
131.9 96.9
131.9 91.1
.,,,,.
\ \
\ \
' \
\
\
\
\ ' \
\
' ' \
' \
\
' \
LOCATION OF
FIELD DENSITY TESTS
NO SCALE
\
\ \
\ \
\
\
\
PLATE I
7-10-23
•
\
FIELD DENSITY TEST
COMPACTED FILL
September 27, 2024
Mehrdad Dokhanchy
1098 Magnolia Avenue
Carlsbad, California 92008
SUBJECT: File No. 1106F6-21
Dear Mr. Dokhanchy:
Report of Field Density Tests
Residential Building Site
Next to 1098 Magnolia Avenue
City of Carlsbad
P.O. Box 1195
Lakeside, California
92040
(619) 443-0060
This is to present the results of the compaction tests performed at the subject site. In accordance
with your request, in-place field density tests were taken in conformance with and D693 8-17 in
the subgrade for the sewer and waterline trench backfill, base in the sidewalk and driveway section
as well as the base and asphalt for sewer, water, gas, electric and spectrum trenches. We did not
observe the backfill for the gas, electric and Spectrum trenches.
The results of the field density tests are presented on Page T-1 through T-5 under "Table of Test
Results". The laboratory determinations of the maximum dry densities and optimum moisture
contents of the tested soils are set forth on Page L-1 under "Laboratory Test Results".
Please read this report carefully. If you have any questions, please do not hesitate to call our office.
This opportunity to be of service is sincerely appreciated.
Page L-1, Page T-1 through T-5 and Plates I through III are parts of this report.
Respectfully submitted,
CCC/mlj
Mehrdad Dokhanchy File No. 1106F6-21 September 27, 2024
Page L-1
LABORATORY TEST RESULTS
The maximum dry density and optimum moisture contents of the tested materials as provided by the
material supplier are as follows:
Maximum Optimum
Dry Density Moisture
Soil Type lb./cu.ft. Content dry wt.
1 Brown, fine to coarse, silty sands 131.9 8.6
2 Recycled Class II Base 124.0 8.0
3 Recycled Class II Base 117.8 13.0
4 Asphalt (9112) 150.0 NIA
5 Asphalt (9/13) 148.3 NIA
Mehrdad Dokhanchy File No. 1106F6-21 August 14, 2024
Page T-1
TABLE OF TEST RESULTS
A.S.T.M., D1556-82 & D6938-17
MAXIMUM
DEPTH FIELD DRY DRY
TEST SOIL ATTEST MOISTURE DENSITY DENSITY PERCENT
NO. TYPE IN FEET % P.C.F. P.C.F. COMPACTION
Sidewalk
1 2 base 5.8 118.1 122.9 96.1
2 2 base 5.3 116.3 122.9 94.6
3 2 base 8.7 119.4 122.9 97.2
4 2 base 9.1 120.2 122.9 97.8
5 2 base 9.3 118.8 122.9 96.7
Driveway
6 1 base 10.3 120.5 122.9 98.1
7 1 base 9.4 120.3 122.9 97.8
Sewer
8 1 -5 9.7 122.4 131.9 92.8
9 1 -4 7.2 124.5 131.9 94.4
10 1 -3 10.1 115.6 131.9 87.6 see# 4
11 1 -3 10.2 122.2 131.9 92.6 retest# 3
12 1 -18 9.6 118.9 131.9 90.1
Mehrdad Dokhanchy File No. 1106F6-21 August 14, 2024
Page T-2
TABLE OF TEST RESULTS
A.S.T.M., D1556-82 & D6938-17
MAXIMUM
DEPTH FIELD DRY DRY
TEST SOIL ATTEST MOISTURE DENSITY DENSITY PERCENT
NO. TYPE IN FEET % P.C.F. P.C.F. COMPACTION
Sewer continued
13 1 -18 9.1 131.9 131.9 91.9
14 1 s.g. 14.3 112.7 131.9 95.7
15 3 base 13.1 113.5 117.8 96.4
16 3 base 12.8 115.1 117.8 97.7
17 3 base 13.1 114.2 117.8 96.94
18 4 a.c. 5.9 144.1 150.0 96.1
19 4 a.c. 6.4 142.8 150.0 95.2
20 4 a.c. 6.1 143.5 150.0 95.6
21 4 a.c. 5.9 142.9 150.0 95.3
22 4 a.c. 6.3 144.6 150.0 96.4
23 4 a.c. 5.8 145.5 150.0 97.0
24 4 a.c. 6.4 147.7 150.0 98.5
25 4 a.c. 6.1 144.5 150.0 96.3
26 5 a.c. 6.8 144.7 148.3 96.5
27 5 a.c. 6.6 144.1 148.3 97.2
28 5 a.c. 6.1 143.4 148.3 96.7
Mehrdad Dokhanchy
Page T-3
DEPTH
TEST SOIL ATTEST
NO. TYPE IN FEET
Waterline
29 1 +2
30 1 +2
31 1 +2
32 2 s.g.
33 2 s.g.
34 3 base
35 3 base
36 4 a.c.
37 4 a.c.
38 4 a.c.
39 4 a.c.
40 4 a.c.
41 4 a.c.
File No. 1106F6-21
TABLE OF TEST RESULTS
A.S.T.M., D1556-82 & D6938-17
FIELD DRY
MOISTURE DENSITY
% P.C.F.
9.1 125.7
8.0 127.8
8.6 126.3
5.6 118.3
5.7 118.3
12.9 113.2
13.2 114.7
5.9 145.5
6.3 142.4
6.4 144.8
5.8 147.8
5.3 145.3
6.3 142.5
August 14, 2024
MAXIMUM
DRY
DENSITY PERCENT
P.C.F. COMPACTION
131.9 95.3
131.9 96.9
131.9 95.7
122.9 96.1
122.9 95.3
117.8 96.1
117.8 97.4
150.0 97.0
150.0 95.0
150.0 96.5
150.0 98.5
150.0 96.9
150.0 95.0
Mehrdad Dokhanchy
Page T-4
DEPTH
TEST SOIL ATTEST
NO. TYPE IN FEET
Waterline continued
42 4 a.c
43 4 a.c
44 4 a.c
45 4 a.c
46 5 a.c.
47 5 a.c.
48 5 a.c.
Gas
49 3 base
50 4 a.c.
51 4 a.c.
52 4 a.c.
53 4 a.c.
54 5 a.c.
File No. 1106F6-21
TABLE OF TEST RESULTS
A.S.T.M., D1556-82 & D6938-17
FIELD DRY
MOISTURE DENSITY
% P.C.F.
5.8 143.6
5.5 142.6
6.4 143.8
6.1 143.3
5.1 144.0
5.3 144.5
7.2 143.7
14.3 112.7
5.5 143.2
5.6 144.3
6.3 142.5
6.3 144.0
6.0 142.1
August 14, 2024
MAXIMUM
DRY
DENSITY PERCENT
P.C.F. COMPACTION
150.0 95.7
150.0 95.1
150.0 95.8
150.0 95.5
148.3 97.1
148.3 97.4
148.3 96.9
117.8 95.7
150.0 95.5
150.0 96.2
150.0 95.0
150.0 96.0
148.3 95.8
Mehrdad Dokhanchy
Page T-5
DEPTH
TEST SOIL ATTEST
NO. TYPE IN FEET
File No. 1106F6-21
TABLE OF TEST RESULTS
A.S.T.M., D1556-82 & D6938-17
FIELD DRY
MOISTURE DENSITY
% P.C.F.
Electrical & Specturm continued
55 3 base 13.2 114.0
56 4 a.c. 7.0 143.2
57 4 a.c. 6.1 143.5
58 4 a.c. 7.0 143.5
59 4 a.c. 6.5 142.9
60 3 base 12.8 113.3
61 4 a.c. 6.2 144.0
62 4 a.c. 6.0 143.0
63 4 a.c. 6.7 144.8
64 5 a.c. 6.4 143.3
65 5 a.c. 5.8 145.4
66 5 a.c. 5.3 144.4
67 5 a.c. 6.3 142.7
s.g.= subgrade
base= class II base
a.c. = asphalt concrete
August 14, 2024
MAXIMUM
DRY
DENSITY PERCENT
P.C.F. COMPACTION
117.8 96.7
150.0 95.6
150.0 95.6
150.0 95.6
150.0 95.2
117.8 96.2
150.0 96.0
150.0 95.3
150.0 96.5
150.0 95.5
148.3 98.1
148.3 97.4
148.3 96.2
LOCATION OF
FIELD DENSITY TESTS
NO SCALE
PLATE I
JOBNO.
DATE
9-255-24
P.O. BOX 1195 LAKESIDE, CA 92040
• FIELD DENSITY TEST
COMPACTED FILL
LOCATION OF
FIELD DENSITY TESTS
NO SCALE
PLATE II
P.O. BOX 1195 LAKESIDE, CA92040
9-27-24
LOCATION OF
FIELD DENSITY TESTS
NO SCALE
PLATE III
JQBNO.
DATE
9-27-24 -~, .: ... •J',j•-:,.:f/•;.
~, 0 <)
P.O. BOX 1195 LAKESIDE, CA92040