HomeMy WebLinkAboutPD 2022-0007; HAGUE RESIDENCE; FINAL SOILS REPORT; 2025-03-18 Project No 216614-1,4 Date: March 18, 2025 To: Jeff Hague 3019 Via De Paz Carlsbad, California 92010 Re: Propose New Residence located at 1355 Cynthia Lane, Carlsbad, California. Subject: As-Graded Summary Letter Grading Plan: DWG No. 536-9A Ref: 1. Preliminary Geotechnical Recommendations Proposed New Single-Family Residence to be Located at Cynthia Lane (APN: 156-231-70), Carlsbad, California, dated October 18, 2021. 2. Grading Plans Prepared by Engineering Design Group, Drawing No. 536-9A, dated 3/12/2025. 3. Addendum No. 1 – Response to Comments, June 10, 2022. 4. Addendum No. 2 – Updated Recommendations and Response to Comments, dated September 6, 2022. 5. Structural Plan Review Letter, prepared by Engineering Design Group, dated June 7, 2022. 6. Compaction Report, prepared by Engineering Design Group, dated June 5, 2023. 7. Footing Observation Summary, prepared by Engineering Design Group, dated March 10, 2023. 8. Footing Observation Summary, prepared by Engineering Design Group, dated July 19, 2023. We have prepared this summary letter, as requested by City of Carlsbad as part of project completion. Onsite quality control services, provided by Engineering Design Group, are summarized in the above referenced reports and inspections summaries. Engineering Design Group certifies that the soil engineering and engineering geologic aspects of the grading, is in compliance with the referenced Geotechnical Report (Reference No. 1), and Grading Plan, Drawing No. 536-9A (Reference No. 2). As part of ongoing maintenance, the efficacy of newly constructed systems should be diligently monitored and where systems are not operating as intended, erosion is occurring, conditions should be addressed immediately. Respectfully Submitted, ENGINEERING DESIGN GROUP Steve Norris GE #2590 Edg Project No. 216614-1,4 Date: June 5, 2023 To: Jeff Hague 3019 Via De Paz Carlsbad, California 92010 Re: Proposed New Residence located at APN: 156-231-70-00 Cynthia Lane, Carlsbad, California Subject: Compaction Report – Rough Grading INTRODUCTION In accordance with your request and authorization we have provided limited earthwork observation and compaction testing services during the rough grading at the above referenced site. The results of our limited quality control and compaction testing operations are summarized below. We understand the proposed improvements include the construction of a new single-family residence, with typical landscape and hardscape improvements. GRADING OPERATIONS The scope of rough grading operations for this project consisted of retaining wall backfill operations along the south, west, and north property lines, and the removal and re-compaction of existing fill and weathered profiles in the area of proposed building pad for the new residence. Rough grading at the subject site was conducted during May 2023. As part of the creation of the building pad, unsuitable fill and weathered soil profiles were removed to competent material. Removals extended to a depth of 3-4 feet below adjacent finish grade and extended a distance of 5 feet outside the building footprint, as delineated in the field by the contractor. Removal bottoms were ripped to a minimum depth of 12 inches and moisture conditioned, prior to the placement of fill. Onsite and import soil was utilized as graded fill. Prior to re-compaction, soils were generally cleaned of vegetative and other debris and moisture conditioned. Onsite soil consisted of a range of greyish brown to reddish brown, moist, medium dense, silty sands and sandy silts with organics. Based upon our observation and experience, onsite soils possess a low potential for expansion. Import soils consisted of a range of brown to reddish brown, silty sands and sandy silts. Based upon our observation and experience, import soils possess a low potential for expansion. Soil was moisture conditioned with a fire hose and placed utilizing a combination of an excavator, CAT 814 loader, and remote-controlled sheep foot roller. Edg Project No. 216614-1,4 FIELD AND LABORATORY TESTING Limited field density tests were performed in accordance with D2922 (Nuclear Gauge Method). Our test results indicate that, in the locations tested, soils have been compacted to at least 90% relative compaction, as determined by ASTM D1557, (Procedure A). The reported test results are representative of the soil conditions at the locations tested. Our observation and field density testing methods are in accordance with normally accepted procedures. The accuracy of the relative compaction values is subject to the precision limitations of the ASTM test methods. The accuracy of the maximum dry density determination (ASTM D1557) is discussed in the Annual Book of ASTM Standards, Section 4, Volume 04.08, entitled, Soil and Rock; Building Stones. Variations of relative compaction values should be expected, laterally and vertically, from actual test locations. TESTING SUMMARY In general, it is our opinion, based on the placement procedure and the test data collected, the fill soils tested, at the locations tested, were compacted to a minimum of 90% relative compaction (based on ASTM D1557, Procedure A). If you have any questions regarding this report, or if we can be of further service, please do not hesitate to contact us. We hope the report provides you with the necessary information to continue with the development of the project. Sincerely, ENGINEERING DESIGN GROUP Steven B. Norris California GE# 2590 Attachments: 1) Table 1 & 2: “Laboratory and Field Test Results” 2) Figure 1: “Approximate Location of Compaction Tests” Edg Project No. 216614-1,4 LABORATORY AND FIELD TEST RESULTS TABLE NO. 1 Laboratory Test Results SOIL TYPE (#) SOIL TYPE MAXIMUM DENSITY (PCF) OPTIMUM MOISTURE (%) U.S.C.S. CLASSIFICATION 1 Brown Silty Sand/Sandy Silt 129.2 8.3 SW - SM 2 Reddish Brown Silty Sand/Sandy Silt IMPORT 128.2 10.3 SW - SM TABLE NO. 2 Field Test Results TEST NO. DATE ELEVATION (FT) SOIL TYPE DRY DENSITY (PCF) FIELD MOISTURE (%) RELATIVE COMPACTION (%) COMMENT 1 5/18/2023 BTM + 2 1 121.9 7.3 94 2 5/18/2023 BTM + 2 1 119.6 7.2 93 3 5/18/2023 BTM + 2 1 116.1 8.4 90 4 5/25/2023 BTM + 2 1 116.0 6.6 90 5 5/25/2023 BTM + 2 1 121.7 8.1 94 6 5/25/2023 BTM + 2 1 116.8 8.6 90 7 5/25/2023 BTM + 2 1 116.6 8.2 90 8 5/30/2023 FG 2 124.9 8.4 97 9 5/30/2023 FG 2 115.9 6.2 90 10 5/30/2023 FG 2 116.2 8.8 91 11 5/30/2023 FG 2 115.6 7.5 90 12 5/30/2023 FG 2 119.0 8.5 93 13 5/30/2023 FG 2 119.2 8.0 93 14 5/30/2023 FG 2 118.8 8.1 93 Edg Project No. 216614-1,4 TEST NO. DATE ELEVATION (FT) SOIL TYPE DRY DENSITY (PCF) FIELD MOISTURE (%) RELATIVE COMPACTION (%) COMMENT 15 5/30/2023 FG 2 126.2 7.4 98 16 5/30/2023 FG 2 119.9 8.4 94 17 5/30/2023 FG 2 125.0 8.9 98 FIGURE 1 Approximate Location of Compaction Test Project: Hague Residence Address: APN: 156-231-70, Cynthia Lane, Carlsbad, California EDG Project No:216614-1,4 ●1 ●3 ●2 ●4 ●5 ●6 Not to Scale ●7 ●8 ●9 ●10 ●11 ●12 ●13 ●14 ●15 ●16 ●17