Loading...
HomeMy WebLinkAbout2025-11-04; City Council; 03; Awarding a Construction Contract for the Harding Community Center Refurbishment Project to Muscle Plumbing, Inc. d.b.a. Pro Team PlumbingCA Review TL Meeting Date: Nov. 4, 2025 To: Mayor and City Council From: Geoff Patnoe, City Manager Staff Contact: Si Phan, Associate Engineer si.phan@carlsbadca.gov, 442-339-5219 Subject: Awarding a Construction Contract for the Harding Community Center Refurbishment Project to Muscle Plumbing, Inc. d.b.a. Pro Team Plumbing District: 1 Recommended Action Adopt a resolution accepting the bids received, rejecting a bid protest and awarding a construction contract for the Harding Community Center Refurbishment Project to Muscle Plumbing, Inc. d.b.a. Pro Team Plumbing, in an amount not to exceed $492,500. Executive Summary The Harding Community Center Refurbishment Project was developed to refurbish certain aging elements of the facility, including the heating, ventilation and air conditioning system at the Heritage Hall auditorium. The City Council adopted the plans, specifications and contract documents on July 22, 2025, authorizing the City Clerk to advertise for bids for the project. Staff reviewed the bids the city received and determined that Muscle Plumbing, Inc. d.b.a. Pro Team Plumbing, submitted the lowest responsive bid in an amount not to exceed $492,500 and is a responsible bidder. Staff received a bid protest from the second lowest bidder. Following a review of the bid protest, staff found that the protest lacks merit. Staff request that the City Council accept the bids received, reject the bid protest and award a construction contract to Muscle Plumbing, Inc. d.b.a. Pro Team Plumbing, the lowest responsive and responsible bidder, in an amount not to exceed $492,500. Formally bid contracts with a value of more than $220,000 require the City Council’s approval under Carlsbad Municipal Code, or CMC, Sections 3.28.080(C) and 3.28.080(I)(6). Nov. 4, 2025 Item #3 Page 1 of 13 Docusign Envelope ID: F4418D8C-1B08-4CEE-94CF-240FEC8FC6EA Explanation & Analysis Overview The Harding Community Center, located at 3096 Harding St, as shown in Exhibit 5, consists of four buildings: the Recreation Hall, “D” Building, Administration Building and the Heritage Hall auditorium. The project, Capital Improvement Program Project No. 4708, will replace the existing forced air gas heaters with a new heating, ventilation and air conditioning system at the Heritage Hall auditorium. • The city received four bids for the construction work on Sept. 4, 2025. • Staff evaluated the bids and found that the lowest responsive bid was submitted by Pro Team Plumbing a responsible bidder, in an amount not to exceed $492,500. • The construction contract contains general performance standards and references to technical specifications, which if not met, allow the city to withhold payment. The contract also includes a one-year warranty period from the notice of completion. Bid protest The city received a bid protest from the second lowest bidder, GQ Builders, Inc., on Sept. 9, 2025, as shown in Exhibit 2. The protest asserted that the bid submitted by Muscle Plumbing was non-responsive to the city’s solicitation because a subcontractor was not listed for the fire protection and fire sprinkler work for the project, which is required by California Business and Professions Code Section 7057(c). The city received additional information from Pro Team Plumbing in response to the bid protest on Sept. 17, 2025, and Oct. 16, 2025, as shown in Exhibit 3. Staff reviewed the bid protest and rebuttal and determined that the protest lacked merit because bidders are not required to identify subcontractors when the subcontracted amount of the work is less than one-half of 1% of the total bid amount, in accordance with California Public Contract Code Section 4104(a). In response to a city inquiry, Pro Team Plumbing confirmed it will use an appropriately licensed fire protection system contractor and that the subcontractor’s work will constitute less than one-half of 1% of the total project cost. Based on Pro Team Plumbing’s response, staff issued a response to the bid protest to GQ Builders, Inc. on Sept. 23, 2025, as shown in Exhibit 4. Staff recommend the City Council reject the bid protest from GQ Builders, Inc. Fiscal Analysis The project is funded from the Infrastructure Replacement Fund. There are sufficient funds available to fund the project. The appropriations, total expenditures to date and budgeted allocations for construction are shown below: Nov. 4, 2025 Item #3 Page 2 of 13 Docusign Envelope ID: F4418D8C-1B08-4CEE-94CF-240FEC8FC6EA Harding Center Refurbishment Project Capital Improvement Program Project No. 4708 Total appropriation to date $817,000 Total expenditures and encumbrances to date -$185,613 Total available balance $631,387 Construction contract (Muscle Plumbing, Inc. d.b.a. Pro Team Plumbing) -$492,500 Construction contingency (12%) -$59,100 Construction management and inspection and staff time (estimated) -$30,000 Total estimated construction costs -$581,600 Remaining balance $49,787 Carlsbad Municipal Code Section 3.28.040(C)(5) authorizes the City Manager or designee to approve change orders in an amount equal to the contingency set at the time of project award, which for this project is $59,100. Next Steps Once the City Council accepts the bids received, rejects the bid protest and awards the construction contract to Muscle Plumbing, Inc. d.b.a. ProTeam Plumbing, staff will issue a purchase order and schedule a pre-construction meeting with the contractor to determine the amount of time that will be required to procure the project equipment. Staff will issue a notice to proceed to construct the project based on the anticipated equipment procurement period. Construction is expected to start in fall 2025 and be completed by early 2026. A notice of completion to release bonds issued for the project will be recorded once the project is complete. Environmental Evaluation The proposed action for the Harding Community Center Refurbishment Project is categorically exempt from environmental review under California Environmental Quality Act, or CEQA, Guidelines Section 15301 because it involves the maintenance, repair or minor alteration of existing facilities with negligible or no expansion of the existing or former use. No exceptions to the categorical exemption as set forth in CEQA Guidelines Section 15300.2 or Carlsbad Municipal Code Section 19.04.070(C) apply. Exhibits 1. City Council resolution 2. GQ Builders, Inc. bid protest letter dated Sept. 9, 2025 3. Muscle Plumbing, Inc. d.b.a. ProTeam Plumbing emails dated Sept. 17, 2025, and Oct. 16, 2025 4. City response letter to bid protest dated Sept. 23, 2025 5. Location map Nov. 4, 2025 Item #3 Page 3 of 13 Docusign Envelope ID: F4418D8C-1B08-4CEE-94CF-240FEC8FC6EA Exhibit 1 RESOLUTION NO. 2025-242 . A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF CARLSBAD, CALIFORNIA, ACCEPTING THE BIDS RECEIVED, REJECTING A BID PROTEST AND AWARDING A CONSTRUCTION CONTRACT FOR THE HARDING COMMUNITY CENTER REFURBISHMENT PROJECT TO MUSCLE PLUMBING, INC. D.B.A. PRO TEAM PLUMBING IN AN AMOUNT NOT TO EXCEED $492,500 WHEREAS, the City Council of the City of Carlsbad, California has determined it necessary, desirable and in the public interest to construct the Harding Community Center Refurbishment Project, Capital Improvement Program, or CIP, Project No. 4708, or Project, which includes the replacement of an aging heating, ventilation and air conditioning system in the Heritage Hall auditorium; and WHEREAS, on July 22, 2025, the City Council adopted Resolution No. 2025-173, adopting the plans, specifications and contract documents for the Project, authorizing the City Clerk to advertise the construction documents for bidding and appropriating additional funds; and WHEREAS, on Sept. 4, 2025, staff received four bids for construction of the Project; and WHEREAS, staff reviewed the bids and found Muscle Plumbing Inc. d.b.a. Pro Team Plumbing to be a responsible bidder with the lowest responsive bid in an amount not to exceed $492,500; and WHEREAS, on Sept. 9, 2025, the second lowest bidder, GQ Builders Inc., submitted a bid protest alleging the bid submitted by Muscle Plumbing Inc., d.b.a. Pro Team Plumbing, was non-responsive because a subcontractor was not listed for the fire protection and fire sprinkler work for the Project; and WHEREAS, on Sept. 17, 2025, and Oct. 16, 2025, staff received additional information from Muscle Plumbing Inc. d.b.a. Pro Team Plumbing in response to the bid protest, confirming that the fire protection and fire sprinkler work is less than one-half of 1% of its total bid amount and that Muscle Plumbing Inc., d.b.a. Pro Team Plumbing, will use an appropriately licensed fire protection system subcontractor; and WHEREAS, staff reviewed the bid protest and the additional information that was provided, and determined that Muscle Plumbing Inc., d.b.a. Pro Team Plumbing, was allowed by Public Contract Code Section 4104(a) to omit the identification of its fire protection system subcontractor from its bid because the value of the subcontractor’s work was less than one-half of one percent of Muscle Plumbing Inc., d.b.a. Pro Team Plumbing’s total bid amount; and Nov. 4, 2025 Item #3 Page 4 of 13 Docusign Envelope ID: F4418D8C-1B08-4CEE-94CF-240FEC8FC6EA WHEREAS, staff recommend that the City Council reject the bid protest for lack of merit and award the contract to Muscle Plumbing Inc., d.b.a. Pro Team Plumbing; and WHEREAS, Carlsbad Municipal Code, or CMC, Sections 3.28.040(C)(5) authorizes the City Manager or designee to approve change orders in an amount equal to the contingency set at the time of Project award, which is $59,100. NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Carlsbad, California, as follows: 1.That the above recitations are true and correct. 2.That the City Council has determined that the proposed action for the Harding Community Center Refurbishment Project is categorically exempt from environmental review under the California Environmental Quality Act, or CEQA, Guidelines Section 15301 because it involves the maintenance, repair or minor alteration of existing facilities with negligible or no expansion of the existing or former use, and that no exceptions to the categorical exemption as set forth in CEQA Guidelines Section 15300.2 or CMC Section 19.04.070(C) apply. 3.That the bid protest submitted by GQ Builders Inc. is rejected for lacking merit. 4.That the bid submitted by Muscle Plumbing Inc., d.b.a. Pro Team Plumbing, in an amount not to exceed $492,500 for construction of the Harding Community Center Refurbishment Project, CIP Project No. 4708, is accepted, and the Mayor is hereby authorized to execute a contract with Muscle Plumbing Inc. d.b.a. Pro Team Plumbing, subject to the contract’s review and approval as to form by the City Attorney’s Office. 5.That the City Manager or designee is hereby authorized to approve construction change orders for the Harding Community Center Refurbishment Project, CIP Project No. 4708, in an amount not to exceed $59,100. 6.That the award of this contract is contingent upon Muscle Plumbing Inc. d.b.a. Pro Team Plumbing executing the required contract and submitting the required bonds and insurance policies, as described in the contract, within 20 calendar days after adoption of this Resolution. The City Manager may grant reasonable extensions of time to execute the contract and assemble the required bonds and insurance policies. Nov. 4, 2025 Item #3 Page 5 of 13 Docusign Envelope ID: F4418D8C-1B08-4CEE-94CF-240FEC8FC6EA PASSED, APPROVED AND ADOPTED at a Regular Meeting of the City Council of the City of Carlsbad on the 4th day of November, 2025, by the following vote, to wit: AYES: Blackburn, Bhat-Patel, Acosta, Burkholder, Shin. NAYS: None. ABSTAIN: None. ABSENT: None. ______________________________________ KEITH BLACKBURN, Mayor ______________________________________ SHERRY FREISINGER, City Clerk (SEAL) Nov. 4, 2025 Item #3 Page 6 of 13 Docusign Envelope ID: F4418D8C-1B08-4CEE-94CF-240FEC8FC6EA PO Box 1488 Rancho Santa Fe, CA 92067 (858) 756-5001 GQBuilder@gmail.com September 09, 2025 To: City of Carlsbad Attn: Janean Hawney, Purchasing Department Re: Harding Center Refurbishment – HVAC Installation Project No. 4708 – PWS26-3897FAC Bid Opening Date: September 4, 2025 Subject: Bid Protest Dear Ms. Hawney, On behalf of GQ Builders, Inc., this letter serves as a formal bid protest concerning the apparent low bidder, Muscle Plumbing, Inc., on the above-referenced project. 1. Failure to List Required C-16 Subcontractor Under Public Contract Code §4104(a)(1), each bidder must list the name and location of each subcontractor performing work. The Fire Protection/Fire Sprinkler scope of work falls exclusively under the C-16 Fire Protection Contractor license as defined in Business & Professions Code §7026.12. A contractor must hold this classification to legally perform this work. Muscle Plumbing, Inc. failed to list a subcontractor holding a valid C-16 license to perform this scope of work. This omission is not clerical; it is a substantive failure to comply with statutory bidding requirements. Exhibit 2 Nov. 4, 2025 Item #3 Page 7 of 13 Docusign Envelope ID: F4418D8C-1B08-4CEE-94CF-240FEC8FC6EA 2. Public Interest and Purpose of Bid Protests The fundamental purpose of a bid protest under California’s public contracting framework is to safeguard the public interest by ensuring strict compliance with competitive bidding laws and protecting the integrity of the procurement process. A protest is not a vehicle for unsuccessful bidders to obtain access to competitors’ proposals or to seek reversal of an award for the sole purpose of securing the contract for themselves. Allowing a contractor without a qualified C-16 subcontractor to proceed would: • Violate state law (B&P §7026.12). • Jeopardize approvals required by the Deputy Fire Marshal and City Fire Department. • Expose the City to potential claims, project delays, and liability for noncompliance. By contrast, GQ Builders, Inc. properly listed COSTCO Fire Protection, a duly licensed C-16 contractor with all certifications required to provide documentation to the Deputy Fire Marshal and comply with City standards. For the reasons stated, Muscle Plumbing, Inc.’s bid should be considered non-responsive under the Public Contract Code and Business & Professions Code. We appreciate your prompt attention to this matter and await the City’s decision. Respectfully, Dmitriy Zagorodniy, CEO GQ Builders, Inc. Nov. 4, 2025 Item #3 Page 8 of 13 Docusign Envelope ID: F4418D8C-1B08-4CEE-94CF-240FEC8FC6EA Exhibit 3 From: Richard Sherman <proteamplumbing1@gmail.com> Sent: Thursday, October 16, 2025 6:26 PM To: Janean Hawney <janean.hawney@carlsbadca.gov> Subject: Re: consultant price fee Hi Janean, My apologies, Kristina Wall is a family member who transcribed the email for me while I was driving and sent me the message noted below for me to send to you and I forgot to take her name off. My mistake. Sincerely, Rochelle Sherman Sent from my iPhone On Oct 16, 2025, at 5:59 PM, Richard Sherman <proteamplumbing1@gmail.com> wrote: Sent from my iPhone Begin forwarded message: From: Janean Hawney <Janean.Hawney@carlsbadca.gov> Date: October 16, 2025 at 4:43:40 PM PDT To: Pro Team Plumbing Sherman <proteamplumbinginc@gmail.com> Cc: proteamplumbing1@gmail.com Subject: RE: consultant price fee Hi Richard, Can you please confirm who Kristina Wall <kristinawall223@gmail.com> is, see email below? We need to add the protest information to our staff report for council award and to clarification of who she is and how she is related to your company. Thank you, Nov. 4, 2025 Item #3 Page 9 of 13 Docusign Envelope ID: F4418D8C-1B08-4CEE-94CF-240FEC8FC6EA Janean Hawney Contract Administrator Public Works Branch City of Carlsbad 1635 Faraday Ave. Carlsbad, CA 92008-7314 www.carlsbadca.gov 442-339-2795| janean.hawney@carlsbadca.gov Facebook | Twitter | You Tube | Pinterest |Enews From: Pro Team Plumbing Sherman <proteamplumbinginc@gmail.com> Sent: Wednesday, September 17, 2025 4:05 PM To: Janean Hawney <janean.hawney@carlsbadca.gov> Subject: Fwd: consultant price fee Sent from my iPhone Begin forwarded message: From: Pro Team Plumbing Sherman <proteamplumbinginc@gmail.com> Date: September 17, 2025 at 3:02:20 PM PDT To: Janean Hawney <Janean.Hawney@carlsbadca.gov> Subject: Fwd: consultant price fee Sent from my iPhone Begin forwarded message: From: Kristina Wall <kristinawall223@gmail.com> Date: September 17, 2025 at 2:58:35 PM PDT To: Pro Team Plumbing Sherman <proteamplumbinginc@gmail.com>, proteamplumbing1@gmail.com Nov. 4, 2025 Item #3 Page 10 of 13 Docusign Envelope ID: F4418D8C-1B08-4CEE-94CF-240FEC8FC6EA To whom it may concern; ProTeam Plumbing, Inc will be consulted by George Robles with Legion Fire Protection for a total of $242 which is $121/hrs for a total of 2 hours for the Harding Center Refurb-HVAC project. Should you have any questions or concerns. CAUTION: Do not open attachments or click on links unless you recognize the sender and know the content is safe. Nov. 4, 2025 Item #3 Page 11 of 13 Docusign Envelope ID: F4418D8C-1B08-4CEE-94CF-240FEC8FC6EA Public Works Branch Contract Administration 1635 Faraday Avenue  Carlsbad, CA 92008 September 23, 2025 Via Email to: gqbuilder@gmail.com Mr. Dmitriy Zagorodniy GQ Builders, Inc. P.O. Box 1488 Rancho Santa Fe CA, California 92067 Re: Response to Protest for PWS26-3897FAC; Harding Center Refurbishment – HVAC Installation; Project No. 4708 The City of Carlsbad received your email dated September 12, 2025, with the attached letter dated September 9, 2025, protesting the City’s intent to award the contract for the Harding Center Refurbishment – HVAC Installation Project to Muscle Plumbing, Inc. Your protest asserts that Muscle Plumbing, Inc., did not comply with the Business & Professions Code §7026.12 because they did not list a subcontractor with a C-16 Fire Protection Contractor license. Please be assured that it is standard procedure for the City to verify the qualifications of all subcontractors, and this bid was no exception. City staff confirmed that Muscle Plumbing, Inc, will subcontract the fire protection scope of work and that the subcontract value will not exceed one-half of one percent (0.5%) of the total bid price. Based on this review, the City determined that Muscle Plumbing, Inc., submitted a responsive bid and satisfied all requirements set forth in the bid documents. City staff therefore intends to recommend that the City Council award the contract to Muscle Plumbing, Inc. We appreciate your participation in the bidding process and value your continued interest in City projects. We look forward to receiving future bids from GQ Builders, Inc. Sincerely, Janean Hawney Contract Administrator cc: Si Phan, Associate Engineer Steven Stewart, Municipal Projects Manager Exhibit 4 Nov. 4, 2025 Item #3 Page 12 of 13 Docusign Envelope ID: F4418D8C-1B08-4CEE-94CF-240FEC8FC6EA OAK AV I- 5 H A R D I N G S T PINE A V JE F F E R S O N S T A L L E Y JE F F E R S O N S T H O P E A V A L L E Y CARLS B A D V I L L A G E D R PLOTTED BY: Andy Chang PLOT DATE: 6/13/2025 PATH: J:\AC_Customers\Si_Phan\4078_HardingCtr_Refurbishment\4078_HardingCtr_Refurbishment.mxd PROJECT NAME EXHIBITPROJECTNUMBER47082HARDING COMMUNITY CENTER REFURBISHMENT PROJECT LOCATION MAP CARLSBAD VISTA SAN MARCOS ENCINITAS OCEANSIDE SITE VACINITY MAP 3096 HARDING ST Exhibit 5 Nov. 4, 2025 Item #3 Page 13 of 13 Docusign Envelope ID: F4418D8C-1B08-4CEE-94CF-240FEC8FC6EA