Loading...
HomeMy WebLinkAbout1902 WRIGHT PL; 100; CB984458; PermitCity of Carlsbad 02/25/1999 Building Permit Permit No:CB984458 Building Inspection Request Line (760) 438-3101 Job Address: 1902 WRIGHT PL CBAD St: 100 Permit Type: ITI Sub Type: Parcel No: Status: Valuation: Applied: Occupancy Group: B Lot#: $136,461.00 Construction Type: 1111 Reference #: Entered By: Project Title: ADD WALLS TO CREATE OFFICE SPACES. SEWER PERMIT# CB990378 Appr/lssued: Inspect Area: ISSUED 12/23/1998 BT 02/25/1999 Applicant: BILBRO CONSTRUCTION Owner: 6811 02/'3/99 0001 01 C-PRMT 4209 JUTLAND 9211 7 Total Fees : $4,390.12 Total Payments To Date: $398.00 Balance Due: $3 ,992.12 ~~~~~~~=~~~-----------------------~~----~------- * ELECTRICAL TOTAL * MECHANICAL TOTAL ~• * PLUMBING TOTAL • BLDG PLAN CHECK BUILDING PMTS LIC TAX ON CONST STRNG MOTION TRAFFIC IMPACT lnspecto;=-fjZ FIN AL APPROVAL Date: q,4(@ Clearance: Fee 65 .00 78 .00 41 .00 487 .88 7 50 .58 1,784 .00 28.66 1 ,155.00 NOTICE: Please take NOTICE that approval of your project includes the "Imposition· of fees, dedications, reservations, or other exactions hereafter collectively referred to as 'fees/exactions." You have 90 days from the date this permit was issued to protest imposition of these fees/exactions. If you protest them, you must follow the protest procedures set forth in Government Code Section 66020(a), and file the protest and any other required information with the City Manager for processing in accordance with Carlsbad Municipal Code Section 3.32.030. Failure to timely follow that procedure will bar any subsequent legal action to attack, review, set aside, void, or annul their imposition. You are hereby FURTHER NOTIFIED that your right to protest the specified fees/exactions DOES NOT APPLY to water and sewer connection fees and capactiy changes, nor planning, zoning, grading or other similar application processing or service fees in connection with this project NOR DOES IT APPLY to any fees/exactions of which you have previously been qiven a NOTICE similar to this, or as to which the statute of limitations has oreviouslv otherwise exoired. CITY OF CARLSBAD 2075 Las Palmas Dr., Carlsbad, CA 92009 (760) 438-1161 02 3992-12 V !Q'?;, PERMIT APPLICATION CITY OF CARLSBAD BUILDING DEPARTMENT 2075 Las Palmas Dr., Carlsbad CA 92009 (760) 438-1161 Validated By_..:.£..4!~~..J-.~~.:::....-- Date. ___ -1--6L..+..:;...__,4-..J.-...u..---- 1. PROJE 9a 'L Address (include Bldg/Suite #I legal Description lot No. Subdivision Name/Number Unit No. Phase No. Total # of units Assessor· s Parcel # Existing Use 4~os\~iu1V96 0001 01 C-PRHT 398-00 ~;;J;Jf IMP #of Stories # of Bedrooms # of Bathrooms 2. CONTACT PERSON (if different from applicant) Name 3. A Name ICANT ,c,c_ Address 0 ~ntractor [J..Agent for C tractor .,..Q Owner ,?./e:")...} 0 tX> Address 4. ~P!_!!T)' ~~E!J. , J MEW ~~r tLl47lhv,1-t.. Name Address 5. CONTRACTOR • COMPANY NAME City State/Zip Telephone # Fax# ~Dor 0)2'<?,,/,4-Y City Telephone# :2.117 City State/Zip Telephone # (Sec. 7031.5 Business and Professions Code: Any City or County which requires a permit to construct, alter, improve, demolish or repair any structure, prior to its issuance, also requires the applicant for such permit to file a signed statement that he is licensed pursuant to the provisions of the Contractor's license l aw (Chapter 9, commending with Section 7000 of Division 3 of the Business and Professions Code} or that he is exempt therefrom, and the basis for the alleged exempt' n. L.,ny violation of S~IJ51 .5 by any a~lica;Jr a permit subjects the applicant to a civil penalty of not more than five hundred dollars ($5001). Na e Address 8 City State/Zip Telephone # State license # 7 t/ S 9 ~ t, license Class _________ City Business license # / ;:2. 0 Ct? CJ CJ G,:, l-11:6&E ift &Ut1 "'1-....$SC?C..., ,3r6tJ CHvfrlJo D&Lt<u? .5~ ✓, D, Designer Name Address City State/Zip Telephone State license # __________ _ 6. WORKERS' COMPENSATION Workers' Compensation Declaration: I hereby affirm under penalty of perjury one of the following declarations: 0 I have and will maintain a certificate of consent to self-insure for workers' compensation as provided by Section 3700 of the labor Code, for the performance of the work for which this permit is issued. C5t I have and will maintain workers' compensation, as required by Section 3700 of the labor Code, for the performance of the work for which this permit is issued. My worker's compensation insurance carrier and policy number are: Insurance Company ~ CUIVQ Policy No.0¥6'9~ t)OC)?.5// Expiration Date ______ _ (THIS SECTION NEED NOT BE COMPLETED IF THE PERMIT IS FOR ONE HUNDRED DOLLARS ($1001 OR LESS) 0 CERTIFICATE OF EXEMPTION: I certify that in the performance of the work for which this permit is issued, I shall not employ any person in any manner so as to become subject to the Workers' Compensation laws of California. WARNING: Failu • shall subject an employer to criminal penalties and civil fines up to one hundred ovided for in Section 3706 of the L d attorney's fees. SIGNATURE:_-JL:...:~:S~~~---+~+L~f-:.#'./l,l,.::!<:k::~~==-----DATE 7. I hereby affirm that I am exempt from the Contractor's license Law for the following reason: 0 I, as owner of the property or my employees with wages as their sole compensation, will do the work and the structure is not intended or offered for sale (Sec. 7044, Business and Professions Code: The Contractor's license Law does not apply to an owner of property who builds or improves thereon, and who does such work himself or through his own employees, provided that such improvements are not intended or offered for sale. If, however, the building or improvement is sold within one year of completion, the ow ner-builder will have the burden of proving that he did not build or improve for the purpose of sale). 0 I, as owner of the property, am exclusively contracting with licensed contractors to construct the project (Sec. 7044, Business and Professions Code: The Contractor's license law does not apply to an owner of property who builds or improves thereon, and contracts for such projects with contractor(s) licensed pursuant to the Contractor's license law). 0 I am exempt under Section ______ Business and Professions Code for this reason: 1. I personally plan to provide the major labor and materials for construction of the proposed property improvement. 0 YES ONO 2. I (have/ have not) signed an application for a building permit for the proposed work. 3. I have contracted with the following person (firm) to provide the proposed construction (include name / address / phone number / contractors license number): 4. I plan to provide portions of the work, but I have hired the following person to coordinate, supervise and provide the major work (include name/ address / phone number/ contractors license number): _________________________________________________ _ 5. I will provide some of the work, but I have contracted (hired) the following persons to provide the work indicated (include name/ address / phone number / type of work): ____________________________________________________________ _ PROPERTY OWNER SIGNATURE _______________________ _ DATE __________ _ COMPLETE THIS SECTION FOR NON-RESIDENnAL BUILDING PERMITS ONLY Is the applicant or future building occupant required to submit a business plan, acutely hazardous materials registration form or risk management and prevention program under Sections 25505, 25533 or 25534 of the Presley-Tanner Hazardous Substance Account Act7 0 YES O NO Is the applicant or future building occupant required to obtain a permit from the air pollution control district or air quality management district? 0 YES O NO Is the facility to be constructed within 1,000 feet of the outer boundary of a school site7 0 YES O NO IF ANY OF THE ANSWERS ARE YES, A FINAL CERTIFICATE OF OCCUPANCY MAY NOT BE ISSUED UNLESS THE APPLICANT HAS MET OR IS MEETING THE REQUIREMENTS OF THE OFFICE OF EMERGENCY SERVICES AND THE AIR POLLUTION CONTROL DISTRICT. 8. CONSTRUCTION LENDING AGENCY I hereby affirm that there is a construction lending agency for the performance of the work for which this permit is issued (Sec. 3og7(i) Civil Code). LENDER'S NAME ______________ _ LENDER'S ADDRESS. _________________________ _ 9. APPLICANT CERTIFICATION I certify that I have read the application and state that the above information is correct and that the information on the plans is accurate. I agree to comply with all City ordinances and State laws relating to building construction. I hereby authorize representatives of the Cit\' of Carlsbad to enter upon the above mentioned property for inspection purposes. I ALSO AGREE TO SAVE, INDEMNIFY AND KEEP HARMLESS THE CITY OF CARLSBAD AGAINST ALL LIABILITIES, JUDGMENTS, COSTS AND EXPENSES WHICH MAY IN ANY WAY ACCRUE AGAINST SAID CITY IN CONSEQUENCE OF THE GRANTING OF THIS PERMIT. OSHA: An OSHA permit is required for excavations over 5'0" deep and demolition or construction of structures over 3 stories in height. EXPIRATION: Every permit issued by the Building Official under the provisions of this Code shall expire by limitation and become null and void if the building or work authorized by such permit is t"co mence ithin 365 days from the date of such permit or if the building or work authorized by such permit is suspended or abandoned at any time after t ,,..,....1/6,-.d for a period of 180 days (Section 106.4.4 Uniform Building Code). APPLICANT'S SIGNATURE DATE WHITE: File YELLOW: Applicant PINK: Finance City of Carlsbad Inspection Request For: 4/20/99 Permit# CB984458 Inspector Assignment: TP Title: ADD WALLS TO CREATE OFFICE Description: SPACES. SEWER PERMIT# CB990378 Type: ITI Job Address: Suite: Location: Sub Type: 1902 WRIGHT PL 100 Lot C\PPLICANT : BILBRO CONSTRUCTION Owner: Remarks: Total Time: Phone: 7604312840 Inspector: L Requested By: JOHN BATISTE Entered By: CHRISTINE CD Description Act Comments 19 Final Structural 29 Final Plumbing 39 Final Electrical 49 Final Mechanical ..A/!_ _________ _ +--- Inspection History Date Description Act lnsp Comments 3/15/99 34 Rough Electric AP TP MAIN, SUB, TRANS 3/11/99 14 Frame/Steel/Bolting/Welding AP TP T-BAR CEIL 3/11/99 24 Rough/Topout WC TP 3/11/99 34 Rough Electric AP TP CEIL LITES 3/11/99 44 Rough/Ducts/Dampers AP TP DUCTS, PLMN, H PS 3/10/99 84 Rough Combo co TP SEE NOTICE/CARD 3/5/99 14 Frame/Steel/Bolting/Welding AP TP 3/5/99 24 Rough/Topout AP TP ADDED SINK 3/5/99 34 Rough Electric AP TP WALLS 3/5/99 44 Rough/Ducts/Dampers WC TP 03/10199 16: 27 SOUTHUND IND. Southland SOUTMLAND INDUSTRIES 1661 East 32nd Street Long Beacn. CA 90807 (© 002 ;S6i:) 4Z+6638 Fa1t /562) 490-0767 ~taee Col'ltrJctor'~ License 114040 10 March, 1999 John Batis Bilbro Construction Company 42C4 Juthmt.l Drive Sau Diego, CA 921 17-365.5 Project: R.am:ho S:1n.l1:1 F1: National Bank (SI #53 10564-01) Subject: Modifications to Outside Air Duct to Accommutlatt: Light Dci!l" Mr. Batis: 1 have reviewed the attach~ sketch regarding modification~ made to the outside air duct to acconunodate the installation of II down lii:ht, It is my understanding that this condition occurs in one place only. While the notc!l Imposes II resrrlctlon In the S)'Stern, we do not cJCpcct a significant degrada1ic111 in the performanct of the 5)'~etll. The existini outside air fan ha.s sufficie.;1l additional capacity and is equipped with an adjustable pitch drive. lf you hnve questions or ccmment3 regerding this matter plense fee! free to call. Sincere'.y: ~,1~6- Cynthia A. Callaway, P.E, Lead Senior Engineer Cc: Jason Pavlick -Si San Diego l:'.Adinin\Pt'Ojccts\~3 1001) 140 ran~ho s.."11::. fe b:mk\99031 Oitr_osa~utlll·YClulo• 50 Yeat"! Of C'l'flJtir.g C:mome'l'S For Life ' 03/10/99 16 :2i 03/10/1959 22:29 'a' 619-546-:085 l"'li!ll"1 : B!LBRJ C:O-.STRUCTlCNUCTICl-1 J F'AX NC. A-rt,, c::,__ SOUTHLAl'l> IJ\'D . ~lt-fLANl) INCUSTRIES (UJ003 PAGE 02 17604312738 ::r ,a.J" rJ Ma,.-. 11 t 999 10: 22PM -P1 p I) Ct-~ -r I---, I ·, of~l'll n<f I ... -J. 10'' X 3 fl. II I CJ , , I!.. 0 M Lil 0 I st N (D I IJ} ID fl Cl 4' IIJ .... 0 0 fl fl a: E IO ...... w .... +J ~ Cl lD u !11 :I: ll. r- lO (T) 0 Ul en 0 _, L IO l: JI -]'/1. f').O f;,-,A. S . ~, t.?d' o,e,. --ro ~µ.1.u:.Tu l4:':. A17-AO-l~t:> T o Cl2a56 e fl.,O..C.I ~-, 0 , M AAO E I fl El.AM ~S SOCI AT E~ 3160 CAMINO Oi.l AIO SOUTH SUfTE 2:01 &AN OlfO(l CA 92108 t-lllX 619 ,&Z4.0S3!> DATE: 1/6/99 JURISDICTION: Carlsbad PLAN CHECK NO.: 98-4458 EsGil Corporation 1n Partnusfiip witfi (jovemTTUnt for 'lJuifaing Safety SET: I PROJECT ADDRESS: 1902 Wright Place Ste. 100 PROJECT NAME: Rancho Santa Fe National Bank TI ~CANT ~) 0 PLAN REVIEWER 0 FILE D The plans transmitted herewith have been corrected where necessary and substantially comply with the jurisdiction's building codes. The plans transmitted herewith will substantially comply with the jurisdiction's building codes when minor deficiencies identified in Remarks below are resolved and checked by building department staff. D The plans transmitted herewith have significant deficiencies identified on the enclosed check list and should be corrected and resubmitted for a complete recheck. D The check list transmitted herewith is for your information. The plans are being held at Esgil Corporation until corrected plans are submitted for recheck. D The applicant's copy of the check list is enclosed for the jurisdiction to forward to the applicant contact person. D The applicant's copy of the check list has been sent to: Esgil Corporation staff did not advise the applicant that the plan check has been completed. D Esgil Corporation staff did advise the applicant that the plan check has been completed. Person contacted: Telephone#: Date contacted: (by: Fax#: Mail Telephone Fax In Person ■ REMARKS: Please make the notes as in red on sheets A 1, A3, A5.1, E-2.1, E-3.1 on the Own er Set I to the City Set I. By: Mike Puckett Esgil Corporation 0 GA O MB O EJ O PC Enclosures: 12/29/98 tmsmU.dot 9320 Chesapeake Drive, Suite 208 ♦ San Diego, California 92123 ♦ (619) 560-1468 ♦ Fax (619) 560-1576 Carlsbad 98-4458 1/6/99 PLAN REVIEW CORRECTION LIST TENANT IMPROVEMENTS PLAN CHECK NO.: 98-4458 OCCUPANCY: B TYPE OF CONSTRUCTION: III-lhr. ALLOWABLE FLOOR AREA: SPRINKLERS?: Yes REMARKS: DATE PLANS RECEIVED BY JURISDICTION: 12/23/98 DATE INITIAL PLAN REVIEW COMPLETED: 1/6/99 FOREWORD (PLEASE READ): JURISDICTION: Carlsbad USE: Office ACTUAL AREA: 3,499sfTI STORIES: 2 HEIGHT: OCCUPANT LOAD: 49 TI DATE PLANS RECEIVED BY ESGIL CORPORATION: 12/29/98 PLAN REVIEWER: Mike Puckett This plan review is limited to the technical requirements contained in the Uniform Building Code, Uniform Plumbing Code, Uniform Mechanical Code, National Electrical Code and state laws regulating energy conservation, noise attenuation and access for the disabled. This plan review is based on regulations enforced by the Building Department. You may have other corrections based on laws and ordinances enforced by the Planning Department, Engineering Department, Fire Department or other departments. Clearance from those departments may be required prior to the issuance of a building permit. Code sections cited are based on the 1994 USC. The following items listed need clarification, modification or change. All items mu st be satisfied before the plans will be in conformance with the cited codes and regulations. Per Sec. 106.4.3, 1994 Uniform Building Code, the approva l of the plans does not permit the violation of any state, county or city law. To speed up the recheck process, please note on this list (or a copy) where each correction item has been addressed, i.e., plan sheet number, specification section, etc. Be sure to enclose the marked up list when you submit the revised plans. LIST NO. 40, TENANT IMPROVEMENTS WITHOUT SPECIFIC ENERGY DATA OR POLICY SUPPLEMENTS (1994UBC) tiforw.dot Carlsbad 98-4458 1/6/99 VALUATION AND PLAN CHECK FEE JURISDICTION: Carlsbad PLAN CHECK NO.: 98-4458 PREPARED BY: Mike Puckett DATE: 1/6/99 BUILDING ADDRESS: 1902 Wright Place Ste. 100 BUILDING OCCUPANCY: B TYPE OF CONSTRUCTION: III-lhr. BUILDING PORTION BUILDING AREA VALUATION VALUE (ft. 2) MULTIPLIER ($) Tenant Improvement 3,499 39.00 136,461.00 Air ConditioninQ Fire Sprinklers TOTAL VALUE 136,461.00 D 1994 UBC Building Permit Fee ■ Bldg. Permit Fee by ordinance: $ 750.58 D 1994 UBC Plan Check Fee ■ Plan Check Fee by ordinance: $ 487.88 Type of Review: D Complete Review D Structural Only D Hourly D Repetitive Fee Applicable D Other: Esgil Plan Review Fee: $ 390.30 Comments: Sheet 1 of 1 macvalue.doc 5196 Cit~ of Carlsbad • ¥i ,, •• ; ,t44 a; ,t-1-2u-1u;;, ,tu,, 1 BUILDING PLANCHECK CHECKLIST DATE: ' }2'S /t1 PLANCHECK NO.: CB 9 SJ, Lf'-l'>g- BUILDING ADDRESS: _____ l-'-CJ_o_.2.._ __ U--'---'-r -r','0 __ r-_-'-P--'--1. __ #_t_o_0 ______ _ PROJECT DESCRIPTION: r.--r.-V ---'--=~-------------------------ASSESSOR'S PARCEL NUMBER: EST. VALUE: ENGINEERING DEPARTMENT APPROVAL DENIAL The item you have submitted for review has been approved. The approval is based on plans, information and/or specifications provided in your submittal; therefore any changes to these items after this date, including field modifications, must be reviewed by this office to insure continued conformance with applicable codes. Please review carefully all comments attached, as failure to comply with instructions in this report can result in suspension of permit to build. A Right-of-Way permit is required prior to construction of the following improvements: Please see the attached report of deficiencies marked with □. Make necessary corrections to plans or specifications for compliance with applicable codes and standards. Submit corrected plans and/or specifications to this office for review. By: Date: By: Date: By: Date: FOR OFFICIAL USE ONLY EERING AUTHORIZATION TO ISSUE BUILDING PERMIT: ATTACHMENTS Dedication Application Dedication Checklist Improvement Application Improvement Checklist Future Improvement Agreement Grading Permit Application Grading Submittal Checklist Right-of-Way Permit Application Right-of-Way Permit Submittal Checklist and Information Sheet Sewer Fee Information Sheet Date: ENGINEERING DEPT. CONTACT PERSON Name: David Rick City of Carlsbad Address: 2075 Las Palmas Dr., Carlsbad, CA 92009 Phone: (619) 438-1161 , ext. 4324 CFO INFORMATION Parcel Map No: Lots: Recordation: Carlsbad Tract: A-4 \\LASPALMA$\SY$\l.18RARY\ENG\WOB0\OOCS\CHKLST\Buildinq Plancheck Cklst BPOOOl Eoan PB doc , Rev 913197 2075 Las Palmas Dr.• Carlsbad, CA 92009-~576 • (619) 438-11 6 1 • FAX (619) 438-0894 ... 0 0 0 0 0 0 0 0 BUILDING PLANCHECK CHECKLIST SITE PLAN 1. Provide a fully dimensioned site plan drawn to scale. Show: A North Arrow 8. Existing & Proposed Structures C. Existing Street Improvements 2. Show on site plan: A Drainage Patterns D. Property Lines E. Easements F. Right-of-Way Width & Adjacent Streets G. Driveway widths 1. Building pad surface drainage must maintain a minimum slope of one percent towards an adjoining street or an approved drainage course. 2. ADD THE FOLLOWING NOTE: "Finish grade will provide a minimum positive drainage of 2% to swale 5' away from building ." 8. Existing & Proposed Slopes and Topography 3. Include on title sheet: A Site address B. Assessor's Parcel Number C. Legal Description For commercial/industrial buildings and tenant improvement projects, include: total building square footage with the square footage for each different use, existing sewer permits showing square footage of different uses (manufacturing, warehouse, office, etc.) previously approved. EXISTING PERMIT NUMBER DESCRIPTION DISCRETIONARY APPROVAL COMPLIANCE 4a. Project does not comply with the following Engineering Conditions of approval for Project No. _________________________ _ 4b. All conditions are in compliance. Date: ___________ _ \\LASPALMAS\SYS\LIBRARY\ENG\WORO\OOCS'ICHKLST\Buitding Plancheek Cklsl BP0001 Form OR.doc Rev. 913197 2 1 ST✓ 0 0 0 0 0 0 0 BUILDING PLANCHECK CHECKLIST DEDICATION REQUIREMENTS 5. Dedication for all street Rights-of-Way adjacent to the building site and any storm drain or utility easements on the building site is required for all new buildings and for remodels with a value at or exceeding $ ______ , pursuant to Carlsbad Municipal Code Section 18.40.030. Dedication required as follows: __________________ _ Dedication required. Please have a registered Civil Engineer or Land Surveyor prepare the appropriate legal description together with an 8 ½" x 11 " plat map and submit with a title report. All easement documents must be approved and signed by owner(s) prior to issuance of Building Permit. Attached please find an application form and submittal checklist for the dedication process. Submit the completed application form with the required checklist items and fees to the Engineering Department in person. Applications will not be accept by mail or fax. Dedication completed by: ____________ _ Date: ____ _ IMPROVEMENT REQUIREMENTS 6a. All needed public improvements upon and adjacent to the building site must be constructed at time of building construction whenever the value of the construction exceeds $ _______ , pursuant to Carlsbad Municipal Code Section 18.40.040. Public improvements required as follows: ______________ _ Attached please find an application form and submittal checklist for the public improvement requirements. A registered Civil Engineer must prepare the appropriate improvement plans and submit them together with the requirements on the attached checklist to the Engineering Department through a separate plan check process. The completed application form and the requirements on the checklist must be submitted in person. Applications by mail or fax are not accepted. Improvement plans must be approved, appropriate securities posted and fees paid prior to issuance of building permit. Improvement Plans signed by: __________ _ Date: ____ _ 6b. Construction of the public improvements may be deferred pursuant to Carlsbad Municipal Code Section 18.40. Please submit a recent property title report or current grant deed on the property and processing fee of $ ________ so we may prepare the necessary Future Improvement Agreement. This agreement must be signed, notarized and approved by the City prior to issuance of a Building permit. Future public improvements required as follows: \IJ..ASPALMAS\SYS\LIBRARY\ENG\WORO\DOCS\CHKLST\Suildlng P~nchedt Cklsl BP0001 Form OR.doc Rev. 9/3197 3 1 st✓ 2nd✓ 3rd✓ 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 BUILDING PLANCHECK CHECKLIST 6c. Enclosed please find your Future Improvement Agreement. Please return agreement signed and notarized to the Engineering Department. Future Improvement Agreement completed by: Date: 6d. No Public Improvements required. SPECIAL NOTE: Damaged or defective improvements found adjacent to building site must be repaired to the satisfaction of the City Inspector prior to occupancy. GRADING PERMIT REQUIREMENTS The conditions that invoke the need for a grading permit are found in Section 11 .06.030 of the Municipal Code. 7a. Inadequate information available on Site Plan to make a determination on grading requirements. Include accurate grading quantities (cut, fill import, export). 7b. Grading Permit required. A separate grading plan prepared by a registered Civil Engineer must be submitted together with the completed application form attached. NOTE: The Grading Permit must be issued and rough grading approval obtained prior to issuance of a Building Permit. Grading Inspector sign off by: Date: ----------- 7c. Graded Pad Certification required. (Note: Pad certification may be required even if a grading permit is not required.) 7d.No Grading Permit required. 7e.lf grading is not required, write "No Grading" on plot plan. MISCELLANEOUS PERMITS 8. A RIGHT-OF-WAY PERMIT is required to do work in City Right-of-Way and/or private work adjacent to the public Right-of-Way. Types of work include, but are not limited to: street improvements, tree trimming, driveway construction, tieing into public storm drain, sewer and water utilities. Right-of-Way permit required for: H:\WORO\OOCS\CHKlST\Buileling Plancheck Cktsl 8P0001 Fom, MM.dOc 4 R8". 09f03/97 1 st✓ 2nd✓ 3rd✓ 0 0 0 0 0 0 0 0 0 0 0 0 0 BUILDING PLANCHECK CHECKLIST 9. A SEWER PERMIT is required concurrent with the building permit issuance. The fee is noted in the fees section on the following page. 10. INDUSTRIAL WASTE PERMIT If your facility is located in the City of Carlsbad sewer service area, you need to contact the Carlsbad Municipal Water District, located at 5950 El Camino Real, Carlsbad, CA 92008. District personnel can provide forms and assistance, and will check to see if your business enterprise is on the EWA Exempt List. You may telephone (760) 438-2722, extension 153, for assistance. Industrial Waste permit accepted by : Date: 11 . NPDES PERMIT Complies with the City's requirements of the National Pollutant Discharge Elimination System (NPDES) permit. The applicant shall provide best management practices to reduce surface pollutants to an acceptable level prior to discharge to sensitive areas. Plans for such improvements shall be approved by the City Engineer prior to issuance of grading or building permit, whichever occurs first. 12. Z.quired fees are attached 0 No fees required 13. Additional Comments: \\LASPALMAS\SYS\LIBRARY\ENG\V'.JORO\OOCS\CHKLST\Buikting Plancheck CklSI BP0001 Form DR.doc Rev. Q/3/97 5 ENGINEERING DEPARTMENT FEE CALCULATION WORKSHEET □ Estimate based on unconfirmed information from applicant. □ Calculation based on building plancheck plan submittal. . Address: / C/02._ Prepared by: j)_ I?_.• LJ(o\.it 'i='i. "'1°" Bldg. Pe,mlt No. Cr]qg, 4'-/ 515 Date: I /2-$" /e,1 Checked by: ____ Date: ____ _ r I EDU CALCULATIONS: List types and square footages for all uses. Types of Use: 6t+ire... C,e~~pes of Use:~\..ov)~ Sq. Ft./Units: Sq. Ft./Units: 374~c,w 3,'f 't{eob ADT CALCULATIONS: List types and square footages for all uses. EDU's: _I_. _qt{ __ EDU's: ~,,.J:t) ci .2. 4 Types of Use: 6/,n' ,_L... Sq. Ft./Units: '34qq y. 1..¼00 ADT's: 70 00 Types of Use:cteJ.',+-\.JJNe"'.c....,~Sq. Ft./Units: 3'-f CfC[ t ~ ... o, ADT's: - / 7 . yo FEES REQUIRE_Q;_ / 5 ~ · ) O WITHIN CFD: ~ES (no bridge & thoroughfare fee in District #1, reduced Traffic Impact Fee) D NO fv'~ARK-IN-LIEU FEE PARK AREA & #: ___ _ / FEE/UNIT: ~2. TRAFFIC IMPACT FEE ~NITS: 5'2. 5"""0 X FEE/ADT: __ )....cL,=--- /./4--3. BRIDGE AND THOROUGHFARE FEE (DIST. #1 X NO. UNITS: __ _ DIST. #2 ADT's/UNITS: ____ _ ~FACILITIES MANAGEMENT FEE X FEE/ADT: ___ _ ZONE:--=_5;..__ __ =$ zf 7 =$ I 15~ DIST. #3 --) =$ ·?a / UNIT/SQ.FT.: X FEE/SQ.FT./UNIT: ___ _ =$ f1 cl 5. SEWER FEE PERMIT No~ CJ''J'0.378 EDU's: /. ~ 1-f X FEE/EDU: BENEFIT AREA: fvh-1 DRAINAGE BASIN: __ _ EDU's: X FEE/EDU: ~-SEWER LATERAL ($2,500) ✓7. DRAINAGE FEES PLDA HIGH ACRES: X FEE/AC: =$ J-2q~.qe, =$ f% . =$ 0' /LOW =$ ff ' TOTAL OF ABOVE FEES•:$ _____ _ * NOTE: This calculation sheet is NOT a complete list of all fees which may be due. Dedications and Improvements may also be required with Building Permits. P:\DOCS\MISFORMS\FEE CALCULATION WORKSHEET REV 7 /13/98 (r rr- I l,o I "' iii a .J (D. >, .0 .;: i5 "' .c u C: "' a: er ~ "' 1,j 0 ~ (9. >, .0 N .. .:,c (.) ., s= u C: "' C: >, .0 M .. ~ s= u C: .. a: PLANNING DEPARTMENT BUILDING PLAN CHECK REVIEW CHECKLIST Plan Check No. CB :\ '6' lfl1 S" 1( Planner @or.bcdc-... I<~~ APN: Address 140 d-/,Jndl--..::t P /au_ Phone (619) 438-1161 , extension 4 ~':::>- -------------------------------- Type of Project & Use: I. \ . Net Project Density: DU/AC -------- Zoning: P-M General Plan : Facilities Management Zone: ___ _ CFD tin/nut\ # Date of participation: Remaining net dev acres: Circle One ---------- (For non-residential development : Type of land used created by this permit: _____________________ ) Legend: ~ Item Complete ©J Item Incomplete -Needs your action Environmental Review Required: YES NO ~ TYPE ---- DATE OF COMPLETION: ______ _ Compliance with conditions of approval? If not, state condit ions which require action. Conditions of Approval: ~ D D Discretionary Action Required: YES __ NO _L TYPE ___ _ APPROVAL/RESO. NO. _____ DATE ___ _ PROJECT NO. f l f i 1 ~ o '-{ OTHER RELATED CASES: ___________________ _ Compliance with conditions or approval? If not, state conditions which require action. Conditions of Approval: ------------------------ Coastal Zone Assessment/Compliance Project site located in Coastal Zone? YES CA Coastal Commission Authority? YES N0_6. NO If Ca lifornia Coastal Commission Authority: Contact them at -3111 Camino Del Rio North, Suit e 200, San Diego CA 92108-1725; (619) 521-8036 Determine status (Coastal Permit Required or Exempt): Coastal Permit Determination Form already completed? YES NO If NO, complete Coast al Permit Determination Form now. Coastal Permit Determination Log #: Follow-Up Actions: 1) Stamp Building Plans as "Exempt" or "Coastal Permit Required" (at minimum Floor Plans). 2) Complete Coastal Permit Determination Log as needed. }il □ □ □ lnclusionary Housing Fee required: YES __ NO K_ (Effective date of lnclusionary Housing Ordinance -May 21 , 1993.) Data Entry Completed? YES NO , (A/P/Ds, Activity Maintenance, enter CB#, toolbar, Screens, Housing Fees, Construct Housing Y/N, Enter Fee, UPDATE!) Site Plan: 1. Provide a fully dimensional site plan drawn to scale. Show: North arrow, property lines, easements, existing and proposed structures, streets, existing street improvements, right-of-way width, dimensional setbacks and existing topographical lines. 2. Provide legal description of property and assessor's parcel number. Zoning: 1. Setbacks: Front: Interior Side: Street Side: Required -------Required -------Required ------- Shown -------Shown -------Shown -------Rear: Required ______ _ Shown ------- Accessory structure setbacks: Front: Required -------Interior Side: Required Shown -------Shown -------Street Side: Required -------Rear: Required -------Structure separation: Required ------- -------Shown -------Shown -------Shown ------- 3 . Lot Coverage: Required -------Shown ------- □ 4 . Height: Required Shown -------------- orf')Ce: -fM ud.. c> I/~~ 5. Parking: Spaces Required _______ Shown ______ _ Guest Spaces Required ,--------Shown r,:;---~ee., ~ -Qi\1\.../c. . i 5 ~ ~--r -rt'.:-~--,.:'--,\ C<,C<,c-~ Additional Comments ~Vl'\.W CAt-A 'oa~t:. v0 h.bt (:'::0: ~.ij-CA!l '"" ::\'h-e_ e-t--( --Z,,O(J.. • E-r, ~·uH1..-+e.. -+tll.e,,,z... W1V\d ow O,('-t'.~ • CA/ r~ o.f...K-c-e_.. OK TO ISSUE AND ENTERED APPROVAL INTO COMPUTER $ -~.,_,~ATE J-/ 5-'.J"i Feb 05 99 ll:45a m a g q e t t i e 1 a m a s s 0 C i a t e s • • • m e a Ma~~etti E lam Associates MAGGETTI ELAM 3 160 C .\M I l C O~L ,,;O SOUTH SUI T: 207 S.~N Cl :GC CA 92108 619 6 2 4.0521 F AX 519.6 24 .3 53J FACSIMILE TRANSMITTAL 619-624-0530 ::OM~~t=1~C8 q~4'+S8, FAX~ NUMBER OF PAGES SUBMITTED (I NCLUDING THIS COVER PAGE): l.f: SPECIAL INSTRUCTlONS: 12Q,,v\C,V\c) 3a-..0J9' f=e..,__is~ct-=~--------- prepe<z1. °' \01te.x:: of bw i:Y\QAc e) t-f:;ce \ c, y:, 1 n w\ti I c.½ \ ~ ) ~ cl u de:~ ) ~ ±~ 1 s ir:cx n>m,5-& \W) , Y L1m" s h:,v I d h<,e d: a. 11 ~ m) e ,I <;,e,. -p I e0 <c a,Jj ~- Feb 05 99 11:46a Ma~~etti Elam Associates 619 -624-0530 P. 02 ~ FEB-04-99 THU 09:31 02/04/1999 09:13 NN £,197562980 FAX NO. 7607274432 RSFNB BOYCE PAGE 02 February 3. 1999 Scott R. Brneseau President Newport National Corporntion 2117 Industrial Court, Suite C Vista, CA 92083 ~&r Scott; This letter is in response to your request for a letter from the bank describing the design and operation or our proposed office to be located in the Cornerstone Corporate Centre. Rancho Santa Fe Nation al Bank eervee a somewhat narrow market niche consistin11: of small to medium busincsees, professionals, real estate developers and investors, and private banking for individuals. Each of our four offices is designed to serve one or more of those markets relative to deposit and/ or loan oriented servicu. For instance, in the Rancho Santa Fe Office we have a combination of individual communicy-banking chcnts as well as business custome:n. Our Golden Triangle Office ii. primarily corpor-ate with very few individual clients. Our Carleba.d Office was established initially as a loan production office in it& current location, 2111 Piaomar Airport Road. Jn February, 1997, the office -was converted to a full-service banking office which aJlowcd the offering of depo&t and general banking services. Although lt was recognized that the Carlsbad Office would emphasize loan origination, offering basic deposit services was conside:red essential to maintain a competitive position with other local institutions, including Grrossmont Bank, Home SaVinge of America, and the iwticipated establishment of an office by First National Bank of San Diego. Our e-val-u.ntion of the nuuket continues to indicate the Carlsbad Office will have very little in-branch activity. Ou:r bank does not promote individual accounts nor do we anticip:lte generating a large retail base of customers in contrast to the market focus of either Oros.smont Bank or Home Savings fnow Washington Mutual Savings). The :i:najorlty of our depos.lt business will be conducted by our cou.r-icr system by which deposits generated from the Carlsbad area -will be proces:,ed by our Escondido Office, As a result, we do not foresee a significant inc:rease in our office staffing which prc:,ently consists of the manager. operations 1mpervi11or, loan assistant, and pa,t-tiroe operations clerk. p .2 Ma~~etti E lam Associ ates 6 19 -624 -0530 FAX NO. 760727443? P. 03 Feb 05 99 11:4 6 a ' FEB 04-99 THU 09:32 02/04/1999 09:13 NN 61 97562980 RSFNB BOYCE PAGE 03 Scott R. gnassea11 J'~bn,"'7 2, I 999 P~z Although Rancho Santa Fe National Bank jg a business bank, it is possible that the p ropo3cd dc:sign of our Ce.clsbad Office in the Cornerstone Corporate Centre ~vcs the impiea:.ion of a retail banking office. The four operations des.ks in the center of the lobby are designed to serve a variety o! eustomet"s, including new account!'! activity, customu use for preparation of deposits and o ther documents. and d<iposit services. Of the four operations work positions indicated on the floor plno, we expect to otaff one position on a full-time basis with the other PQsitions available for expansion and/or other operations and loan uses. rt is importDnt to note that the positions are designed on a desk level -with both cuetomi:r and etafT bein£ seated. Such a configuration is feasible only when there is low volume customer activity and staffing that in corporates multiple clerical functions due to low cuRtome:r volumes. Further, the non-I"dail concept is supported by the fact that an automatic teller machine (ATM) 'f.'iH not be installed in the Carlsbad Office. In summary, the office "'as designed to be M attiactive, upecale facility which will appropl"ia.tely represent the bank'~ corporate iJnaee. The inclusion of four opcr-ations stations le more an issue of form over substan<:e in light of our experience in the market and our projection, for the future. If we anticipated t!Ven mod~ate custolXJcr lraffic in the facility, we would ha.ve ch osen a location that provided eaMer customer access and a larger operations area. If I can provide :my :tddition:al clarification regarding the de&ign or concept of our Carlsbad Office please contact me. Very tru]y yours, J ~esA. B Pr~idcnt J AB:JB·· ., p.3 Feb 05 99 l l :4 6a Ma~~et ti E lam As socia t e s 6 1 9 -624 -0530 p .4 ':,._ ______________ _,!;~a·.:..:-'3!...!.'t _____________ 7 I ~ ~ B i ? 8== m l iJi G .. ' ~ 8 ~ e: m ~ ~ ~ 0 ~ 0- ~ i Al.klN AL~ ~ e 5 '-1)' 11'-IIE)' t ~'-l)'t 5·.e,• ii! I (fil)G ~ ~ ~ !f -1)' 8 ~ --------.. --------- ~ I " .,, ~ ... ~ II ) ' \ ~ $ 00 ~- i is-. ~ ) ([) \I! ~ D F 7 City of Carlsbad 98399 Fire Department • Bureau of Prevention Plan Review: Requirements Category: Building Plan Check Reviewed by:. __ ~"""""""~#-=-::;__---Date of Report: Monday, January 11 , 1999 Contact Name Rick Lien Address P o Box 930 ------------------ City, State Poway CA 92064 Bldg. Dept. No. CB984458 Planning No. Job Name RSF Natn'I Bank/100 Job Address _1_9_02_w_ri .... 9h_t ______________ _ Ste. or Bldg. No. _1_00 ____ _ ~ Approved -The item you have submitted for review has been approved. The approval is based on plans; information and/or specifications provided in your submittal; therefore any changes to these items after this date, including field modifica- tions, must be reviewed by this office to insure continued conformance with applicable codes. Please review carefully all comments attached, as failure to comply with instructions in this report can result in suspension of permit to construct or install improvements. D Disapproved -Please see the attached report of deficiencies. Please make corrections to plans or specifications necessary to indicate compliance with applicable codes and standards. Submit corrected plans and/or specifications to this office for review. For Fire Department Use Only Review 1st. __ _ 2nd. __ _ 3rd. __ _ Other Agency ID CFO Job# __ 9-'-83c...c9....:c.9 __ File# ___ _ 2560 Orion Way • Carlsbad, California 92008 • (619) 931-2121