HomeMy WebLinkAbout2520 EL CAMINO REAL; ; CBC2025-0043; PermitPrint Date: 11/10/2025
Building Permit Finaled
Commercial Permit
CBC2025-0043Permit No:
Job Address:
Permit Type:
Parcel #:
Valuation:
Occupancy Group:
2520 EL CAMINO REAL, CARLSBAD, CA 92008-1201
BLDG-Commercial
1670305000
$375,000.00
Work Class:
Lot #:
Project #:
Tenant Improvement
Status:
Applied:
Issued:
02/10/2025
05/21/2025
Finaled Close Out:10/30/2025B
#of Dwelling Units:
Track #:
Plan #:
Closed - Finaled
Plan Check #:
Orig. Plan Check #:Bathrooms:
Final Inspection:10/30/2025Bedrooms:Construction Type:V-B
Occupant Load:
2022Code Edition:
NoSprinkled:
INSPECTOR:de Roggenbuke, Dirk
WELLS FARGO: INTERIOR RENOVATION OF AN EXISTING BUILDING INCLUDING EXTERIOR WALK-UP ATM AND NIGHT DEPOSIT.
NEW INTERIOR WALL PARTITIONS, MILLWORK AND TELLER LINE, BREAKROOM, I.T. ROOM, WORK ROOM, NEW RESTROOMS
WITH NEW CEILING AND LIGHT FIXTURES. (E-REVIEW)
Description:
Project Title:
Applicant:
THE SAMUEL GROUPSHANE SMITH
8828 N STEMMONS FWY, # STE 500
DALLAS, TX 75247-3727
(214) 922-8012
Property Owner:
CARLSBAD PLAZA, LLC23 CORPORATE PLAZA DR, # SUITE 245
NEWPORT BEACH, CA 92660-7991
(949) 759-9531
AMOUNTFEE
BUILDING PLAN CHECK $1,773.52
BUILDING PLAN REVIEW – MINOR PROJECTS (LDE)$204.00
BUILDING PLAN REVIEW – MINOR PROJECTS (PLN)$107.00 CERTIFICATE OF OCCUPANCY $21.00
COMM/IND TI – STRUCTURAL $1,722.80
SB1473 – GREEN BUILDING STATE STANDARDS FEE $15.00
STRONG MOTION – COMMERCIAL (SMIP)$105.00
Total Fees:$3,948.32 Total Payments To Date:$3,948.32 Balance Due:$0.00
Please take NOTICE that approval of your project includes the "Imposition" of fees, dedications, reservations, or other exactions hereafter
collectively referred to as "fees/exaction." You have 90 days from the date this permit was issued to protest imposition of these fees/exactions. If you protest them, you must follow the protest procedures set forth in Government Code Section 66020(a), and file the
protest and any other required information with the City Manager for processing in accordance with Carlsbad Municipal Code Section
3.32.030. Failure to timely follow that procedure will bar any subsequent legal action to attack, review, set aside, void, or annul their
imposition.
You are hereby FURTHER NOTIFIED that your right to protest the specified fees/exactions DOES NOT APPLY to water and sewer connection
fees and capacity changes, nor planning, zoning, grading or other similar application processing or service fees in connection with this
project. NOR DOES IT APPLY to any fees/exactions of which you have previously been given a NOTICE similar to this, or as to which the statute of limitation has previously otherwise expired.
1635 Faraday Avenue, Carlsbad CA 92008-7314 ï 442-339-2719 ï 760-602-8560 f ï www.carlsbadca.gov
Building Division Page 1 of 1
{"Cityof
Carlsbad
Page 1 of 6 rev 11/24
COMM. BUILDING
PERMIT APPLICATION
B-2
FOR CITY USE ONLY
Plan Check No.: ______________
PC Deposit: _____________
Date: _____________
This form shall be completed to initiate a non-residential building permit application.
Job Address: Unit #: APN:
Description of Work:
Project Valuation: $______________ Is there an active code enforcement violation on this site? ☐ Y ☐ N
Are Planning permits required?: ☐ Y ☐ N Case File Nos.: ___________________________________
Please indicate the type of application(s) requested and provide the applicable information: ☐ Addition/New: Addition SF and Use, . New SF and Use, .
SF Deck, . SF Patio Cover, . SF Other (Specify)
Occupancy Group/Rating Type: . Construction Type: . ☐Tenant Improvement:SF, Existing Use: Proposed Use:
Occupancy Group/Rating Type: . Construction Type: . ☐Pool/Spa:SF. Additional Gas or Electrical Features? ☐Solar: KW, Modules. Mounted: ☐ Roof ☐ Ground. Tilt: ☐ Y ☐ N. RMA: ☐ Y ☐ N.
Battery: ☐ Y ☐ N. Panel Upgrade: ☐ Y ☐ N. Electric Meter Number:☐Reroof:☐Plumbing, Mechanical, Electrical:☐Other:
APPLICANT (PRIMARY CONTACT):
Name: __________________________________
Address: ________________________________
City: _______________State: ____ Zip: _______
Phone: _________________________________
Email: __________________________________
DESIGN PROFESSIONAL:
Name: _________________________________
Address: ________________________________
City: _______________State: ____ Zip: _______
Phone: _________________________________
Email: __________________________________
State License: ____________________________
PROPERTY OWNER:
Name: _________________________________
Address: ________________________________
City: _______________State: ____ Zip: _______
Phone: _________________________________
Email: __________________________________
CONTRACTOR:
Name: _________________________________
Address: ________________________________
City: _______________State: ____ Zip: _______
Phone: _________________________________
Email: __________________________________
CSLB License #: _______________Class:_______
City Business License #: ___________________
Billing Party: ☐ Applicant ☐ Property Owner ☐ Contractor ☐ Other: ________________
2520 El Camino Real 1670305000
Interior renovation T.I. of a Wells Fargo retail branch in an existing building.
375,000
B - Bank4,353 B - Bank
B
Mesfin Samuel Carlsbad Plaza, LLC
8828 N. Stemmons FWY. Suite 500 23 Corporate Plaza Suite 245
Dallas TX 75247 Newport Beach CA 92660
214-922-8012 949-759-9531
msamuel@samuelgroup.net
Dave Powyszynski Grafflin Construction
8828 N. Stemmons Fwy. Suite 500 2028 2nd Street
Dallas TX 75247 Norco CA 92860
214-922-8012 951-479-5633
llubin@samuelgroup.net projects@grafflinconstruction.com
C-11879 895320 B
BLOS010252-08-2021
( City of
Carlsbad
■
■
--
Page 2 of 6 rev 11/24
The construction, addition, or alteration of buildings is governed by the California Contractors License Law
(commencing with Business Professions Code section 7000). The law has an exemption that allows a person
who is not a California Licensed Contractor to construct a single-family residential structure provided they
meet certain requirements. Permits for commercial or industrial projects are only to be issued to California
Licensed Contractors. The city does not accept letters of Property Owner authorization or any other form of
authorization other than the approved Contractor proxy statement below. The signatures on the application,
permit, and licenses will be expected to match. Refer to Form B-16 for other frequently asked questions.
CONTRACTOR CERTIFICATIONS:
CHECK EACH BOX
☐I will be in responsible charge for the day-to-day oversight of the construction, which may include
scheduling inspections, receiving notices of failed inspections, permit expirations or revocation
hearings. I hereby authorize the city and its officials, officers, agents and employees to conduct a site
visit of this property as part of the city’s review of this application, making all portions of the interior
and exterior accessible through completion of construction, and in response to any conditions.
☐I understand that State law mandates the Applicant to provide an estimated value of all work
proposed (B-29 form). I hereby certify the construction valuation provided is accurate and includes all
proposed work such as all structural work, finish work, painting, roofing, electrical, plumbing, heating,
air conditioning, elevator, labor costs, and all permanent equipment and systems. If the valuation is
underestimated, the permit may be denied, unless the Applicant can show detailed estimates to meet
the approval of the Building Official.
☐If the person or persons other than me is designated as Applicant on this application form, I authorize
the Agent listed on this application (as Applicant) to submit the initial application, receive all city
correspondences and be notified if any corrections are needed, and will be responsible for
transmitting all relevant and material application and permit records to the city. If the Applicant quits
or is discharged then Form B-23 must be completed to change assignment of project Applicant.
☐I have read this application form in its entirety and reviewed the building permit application and the
information I have provided is true and correct to the best of my knowledge correct. Grade lines as
shown on drawings accompanying this application are assumed to be correct. This also certifies that
the description of the project and all the plans and supporting documentation; including the location
and labeling of all existing and proposed buildings, structures, access roads, and utilities and
easements; are accurate in all material respects as of the date when made. I understand that it is my
responsibility to ensure that statements and representations are not misleading. I agree to promptly
remove, correct, or add information as needed to correct any misleading or materially inaccurate
information. I understand that any misstatement or omission of the requested information or of any
information subsequently requested might be grounds for rejecting the application, denying the
application, suspending or revoking a permit issued on the basis of these or subsequent
representations, or for the seeking of such other and further relief as deemed appropriate by the City
of Carlsbad.
☐If a digital submittal is made or required, I/we certify that the submittal package includes digital files
that follow the city’s electronic submissions standards.) Failure to submit correctly formatted
electronic files may result in the submittal being returned, which will delay intake and/or review.
☐I certify that I am aware of all permit requirements and, as Contractor, will not willfully deviate from
the approved plan. I agree to comply with all applicable city and county ordinances and state laws
relating to building construction. I assume full responsibility for the satisfactory completion of all work
authorized under the permit(s), including work performed prior to assuming control.
4
4
4
4
4
4
□
□
□
□
□
□
Page 3 of 6 rev 11/24
☐ I hereby affirm under penalty of perjury that I am a licensed under provisions of Chapter 9
(commencing with section 7000) of Division 3 of the Business and Professions Code, and the license is
in full force and effect.
☐ WARNING: FAILURE TO SECURE WORKERS’ COMPENSATION COVERAGE IS UNLAWFUL AND SHALL
SUBJECT AN EMPLOYER TO CRIMINAL PENALTIES AND CIVIL FINES UP TO ONE HUNDRED THOUSAND
DOLLARS ($100,000), IN ADDITION TO THE COST OF COMPENSATION, DAMAGES AS PROVIDED FOR IN
SECTION 3706 OF THE LABOR CODE, INTEREST, AND ATTORNEY’S FEES. Place a check mark next to the
declaration regarding the workers’ compensation coverage that applies. Check only one (A), (B), or (C):
☐ A. I have and will maintain a certificate of consent to self-insure for workers’
compensation, issued by the Director of Industrial Relations as provided for by Section
3700 of the Labor Code, for the performance of the work for which this permit is
issued. ☐ B. I have and will maintain workers’ compensation insurance, as required by
Section 3700 of the Labor Code, for the performance of the work for which this permit
is issued. My workers’ compensation insurance carrier and policy number are:
______________________________________________________________________ ☐ C. I certify that, in the performance of the work for which this permit is issued, I
shall not employ any person in any manner so as to become subject to the workers'
compensation laws of California, and agree that, if I should become subject to the
workers’ compensation provisions of Section 3700 of the Labor Code, I shall forth with
comply with those provisions.
☐ I hereby affirm under penalty of perjury that there is a construction lending agency for the
performance of the work for which this permit is issued (Civil Code section 3097). If not using a
construction lending agency write N/A: Lender: ____________________________________________
☐ I understand that I will need a current Carlsbad business license to obtain the building permit.
☐ I understand that a building permit application will expire If a permit has not been issued/obtained
within one year from the application date (original filing date), unless an extension of time has been
granted (Form B-25). With some limited exceptions, if a building permit application expires and there
is interest in proceeding with the same project, a new application will be required and the project will
be subject to new fees and regulations that are in effect at the time the new application is submitted.
☐ After submitting the application, the Billing Party designated as part of the application will be sent
future city invoices for above referenced building permit(s). I understand that if a permit fee or
development impact fee refund is issued, the check will be mailed to the financial responsible party
(the actual person or company that paid the invoice). If the information on file for the financially
responsible party is outdated or inaccurate, it must be corrected before the refund can be sent. Form
B-49B may be completed to update the financially responsible party’s contact information (e.g.
change of address).
☐ I/We agree to waive, release, and discharge the City of Carlsbad ("City") and its officers, elected or
appointed officials, employees, volunteers and agents (the "Indemnified Parties") from all claims and
demands, rights and causes of action of any kind with respect to the building permit application, the
purpose of which is to challenge, attack set aside, void, modify, or annul the approval or denial of the
application, or the processing thereof, except liability caused by the Indemnified Parties’ sole
negligence or willful misconduct, in which case the indemnity received by the city shall be reduced by
the amount: (a) that the city’s active negligence contributed to the liability on a comparative basis; or
(b) such other amount as may be required by law. This obligation is effective without reference to the
existence or applicability of any insurance coverages which may have been required by city or any
additional insured endorsements which may extend to Indemnified Parties. Contractor on behalf of
Everest 7600026905251
N/A
4
4
4
4
4
4
4
□
□
□
□
□
□
□
■
Page 4 of 6 rev 11/24
themselves and all parties claiming under or through them, waive all rights of subrogation and
contribution against the Indemnified Parties while acting within the scope of their duties, from all
claims, losses and liabilities arising out of or incident to activities or operations performed, regardless
of any prior, concurrent or subsequent passive negligence by the Indemnified Parties.
By signing below, I acknowledge that I have completely read, understand, and agree to the declarations above
and accept all terms set forth herein.
_______________________________________________ Date:______________________
Signature of Contractor
PROPERTY OWNER CERTIFICATIONS:
CHECK EACH BOX
☐I certify that the Contractor listed on this application will be in responsible charge for the day-to-day
oversight of the construction, which may include scheduling inspections, receiving notices of failed
inspections, permit expirations or revocation hearings. If the Contractor quits or is discharged then
Form B-23 must be completed to change assignment of project Contractor.
☐A Grant Deed is required if the ownership does not match city records. If the owner noted on the
Grant Deed does not match the person signing as Property Owner, provide paperwork documenting
the person signing is authorized to sign as a Property Owner.
☐I authorize representatives of Carlsbad to enter the above-identified property for inspection purposes.
☐A building permit application may be withdrawn or cancelled by filing a written request signed by all
persons who signed the original application, or their successors in interest.
☐I understand that prior to the submission of the application, I have been advised to check any
approved plans that had been previously issued for the subject property. The plans will show
construction that was allowed by previous building permits. This certifies that to the best of my
knowledge that all improvements existing on the property were completed in accordance with all
regulations in existence at the time of their construction, unless otherwise noted. I understand that if
there is a code violation on the property, building permit application review may be delayed. Any
unpermitted structures or uses must either be removed or legalized as part of this application.
☐I agree to indemnify, defend and hold harmless the city and its officials, officers, agents and
employees (“Indemnified Parties”) for any claims, causes of action or damages/cost arising from the
building permit application or building permit if issued. I waive all rights of subrogation and
contribution against the Indemnified Parties while acting within the scope of their duties, from all
claims, losses and liabilities arising out of or incident to activities or operations performed, regardless
of any prior, concurrent or subsequent passive negligence by the Indemnified Parties.
By signing below, I acknowledge that I have completely read, understand, and agree to the declarations above
and accept all terms set forth herein.
Date:______________________
Signature of Property Owner
FOR CITY USE ONLY
Receipt Acknowledgement: _______________________ Date:_______________________
BUILDING STAFF
4
4
4
Geoffrey Reeslund Digitally signed by Geoffrey Reeslund
Date: 2025.05.06 09:03:54 -07'00'5/6/25
Digitally signed by Jessie Robertson
DN: cn=Jessie Robertson, o=Grafflin Construction, ou,
email=jgrafflin@grafflinconstruction.com, c=US
Date: 2025.05.01 13:51:59 -07'00'5/1/25
□
□
□
□
□
□
Building Permit Inspection History Finaled
PERMIT INSPECTION HISTORY for (CBC2025-0043)
BLDG-Commercial 02/10/2025Application Date:Permit Type:Owner:CARLSBAD PLAZA, LLC
Tenant Improvement 05/21/2025Work Class:Issue Date:Subdivision:
04/14/2026Expiration Date:Status:
IVR Number: 61617
Closed - Finaled 2520 EL CAMINO REAL
CARLSBAD, CA 92008-1201
Address:
Scheduled
Date
Inspection Type Inspection No. Inspection
Status
Primary Inspector Reinspection InspectionActual
Start Date
07/08/2025 07/08/2025 BLDG-21
Underground/Underflo
or Plumbing
289792-2025 Passed Dirk de Roggenbuke Complete
COMMENTS PassedChecklist Item
BLDG-Building Deficiency Yes
BLDG-31
Underground/Conduit -
Wiring
289793-2025 Passed Dirk de Roggenbuke Complete
COMMENTS PassedChecklist Item
BLDG-Building Deficiency Yes
07/31/2025 07/31/2025 BLDG-14
Frame/Steel/Bolting/We
lding (Decks)
291957-2025 Partial Pass Dirk de Roggenbuke Reinspection Incomplete
COMMENTS PassedChecklist Item
BLDG-Building Deficiency 7/31/25 metal stud framing partial ok to one
side drywall
Yes
BLDG-24 Rough/Topout 291773-2025 Passed Dirk de Roggenbuke Complete
COMMENTS PassedChecklist Item
BLDG-Building Deficiency Yes
08/04/2025 08/04/2025 BLDG-84 Rough
Combo(14,24,34,44)
292043-2025 Partial Pass Dirk de Roggenbuke Reinspection Incomplete
COMMENTS PassedChecklist Item
BLDG-Building Deficiency Yes
BLDG-14
Frame-Steel-Bolting-Welding
(Decks)
Yes
BLDG-24 Rough-Topout Yes
BLDG-34 Rough Electrical Yes
BLDG-44
Rough-Ducts-Dampers
No
08/11/2025 08/11/2025 BLDG-44
Rough/Ducts/Dampers
292634-2025 Passed Dirk de Roggenbuke Complete
COMMENTS PassedChecklist Item
BLDG-Building Deficiency Yes
08/25/2025 08/25/2025 BLDG-14
Frame/Steel/Bolting/We
lding (Decks)
294046-2025 Passed Dirk de Roggenbuke Complete
Monday, November 10, 2025 Page 1 of 3
{cityof
Carlsbad
PERMIT INSPECTION HISTORY for (CBC2025-0043)
BLDG-Commercial 02/10/2025Application Date:Permit Type:Owner:CARLSBAD PLAZA, LLC
Tenant Improvement 05/21/2025Work Class:Issue Date:Subdivision:
04/14/2026Expiration Date:Status:
IVR Number: 61617
Closed - Finaled 2520 EL CAMINO REAL
CARLSBAD, CA 92008-1201
Address:
Scheduled
Date
Inspection Type Inspection No.Inspection
Status
Primary Inspector Reinspection InspectionActual
Start Date
COMMENTS PassedChecklist Item
BLDG-Building Deficiency 7/31/25 metal stud framing partial ok to one
side drywall
8/25/25 hard lid framing
Yes
BLDG-16 Insulation 294044-2025 Passed Dirk de Roggenbuke Complete
COMMENTS PassedChecklist Item
BLDG-Building Deficiency Yes
BLDG-17 Interior
Lath/Drywall
293912-2025 Passed Dirk de Roggenbuke Complete
COMMENTS PassedChecklist Item
BLDG-Building Deficiency Yes
BLDG-18 Exterior
Lath/Drywall
294045-2025 Passed Dirk de Roggenbuke Complete
COMMENTS PassedChecklist Item
BLDG-Building Deficiency Yes
BLDG-34 Rough
Electrical
293911-2025 Passed Dirk de Roggenbuke Complete
COMMENTS PassedChecklist Item
BLDG-Building Deficiency Yes
09/16/2025 09/16/2025 BLDG-85 T-Bar, Ceiling
Grids, Overhead
295629-2025 Passed Dirk de Roggenbuke Complete
COMMENTS PassedChecklist Item
BLDG-Building Deficiency Yes
BLDG-14
Frame-Steel-Bolting-Welding
(Decks)
Yes
BLDG-24 Rough-Topout Yes
BLDG-34 Rough Electrical Yes
BLDG-44
Rough-Ducts-Dampers
Yes
10/16/2025 10/16/2025 BLDG-24 Rough/Topout 298422-2025 Passed Dirk de Roggenbuke Complete
COMMENTS PassedChecklist Item
BLDG-Building Deficiency Yes
BLDG-43 Air
Cond./Furnace Set
298421-2025 Passed Dirk de Roggenbuke Complete
COMMENTS PassedChecklist Item
BLDG-Building Deficiency Yes
Monday, November 10, 2025 Page 2 of 3
PERMIT INSPECTION HISTORY for (CBC2025-0043)
BLDG-Commercial 02/10/2025Application Date:Permit Type:Owner:CARLSBAD PLAZA, LLC
Tenant Improvement 05/21/2025Work Class:Issue Date:Subdivision:
04/14/2026Expiration Date:Status:
IVR Number: 61617
Closed - Finaled 2520 EL CAMINO REAL
CARLSBAD, CA 92008-1201
Address:
Scheduled
Date
Inspection Type Inspection No.Inspection
Status
Primary Inspector Reinspection InspectionActual
Start Date
10/30/2025 10/30/2025 BLDG-Final Inspection 299713-2025 Passed Dirk de Roggenbuke Complete
COMMENTS PassedChecklist Item
BLDG-Building Deficiency Yes
BLDG-Plumbing Final Yes
BLDG-Mechanical Final Yes
BLDG-Structural Final Yes
BLDG-Electrical Final Yes
Monday, November 10, 2025 Page 3 of 3
Moa Inspections, LLC
Deputy Special Inspections & Testing
website: www.moainspectionsllc.com
email: moainspections@gmail.com
phone: {949)616-8287
PAGE: 1 OF 1
STATUS: Acceptable
REPORT NUMBER: 1 City of Carls __ b._ad ____________ _
PROJECT NAME Wells Fargo Plaza 1111 n ~ 2Q" INSPECTION "UL I) t L5
ADDRESS 2520 El Camino Real O CONCRETE
MATERIAL IDENTIFICATION
CONG. MIX NO. & lb/in2
Carlsbad, Ca 92008 BUILDING DIV!St§)N REINF . STEEL GROUT MIX NO. & lb/in2
ARCHITECT The Samuel Group O MASONRY MORTAR TYPE & lb/in2
ENGINEER MAP/ Sivaram Nagarajan 0 P.T. CONCRETE REINF. STEEL GR./SIZE #4A615, Gr 60.
CONTRACTOR Grafflin -------------
0 THE R Winklers ---------------
1 NS PE CT ION DATE 07-14-2025 ------------
PLAN FILE/OTHER N/A ------------
BLDG. PERMIT/OTHER CBC2025-0043 ----------
0 FIELD WELDING STRUCTURAL STEEL
0 SHOP WELDING HIGH-STRENGTH BOLT
□
□
~
BATCH PLANT
EXP.ANCHOR
MASONRY BLOCK
OTHER
OTHER Epoxy C881
MATERIAL SAMPLING
□ CONCRETE □ MORTAR □ GROUT □ FIREPROOFING □ MASONRY BLOCK
□ REINFORCING STEEL □ STRUCTURAL STEEL □ BOLTS ~ OTHER NIA -------
INSPECTIONS PERFORMED, MATERIAL IDENTIFICATION, PROGRESS, WORK REJECTED, REMARKS
PLEASE NOTE ANY RE-INSPECTION, TESTING, OR OTHER PROJECT ISSUES.
Work inspected & observed is in compliance, per approved plan & ESR-4057.
Certification of Compliance: All work, unless otherwise noted, complies with applicable codes and the approved plans and specifications.
PRINTED NAME Robert Calderon
CERTIFICATION NO. SD #1371 , ICC #8869530 U1--
Main Office: 23392 Ancia lane Mission Viejo, CA 92691
True North Compliance Services, Inc.
8369 Vickers Street, Suite 207, San Diego, CA 92111
T | 562.733.8030
April 11, 2025
City of Carlsbad City of Carlsbad – FINAL REVIEW
Community Development Department - Building Division City Permit No: CBC2025-0043
1635 Faraday Ave. True North No.: 25-018-137
Carlsbad, CA 92008
Plan Review: TI Wells Fargo
Address: 2520 El Camino Real, Carlsbad CA
Applicant Name: Mesfin Samuel Applicant Email: msamuel@samuelgroup.net
OCCUPANCY AND BUILDING SUMMARY:
Occupancy Groups: B Occupant Load: 65
Type of Construction: vb Sprinklers: No
Stories: 1 Area of Work (sq. ft.): 4,145 sq. ft.
The plans have been reviewed for coordination with the permit application.
Valuation: Confirmed Scope of Work: Confirmed Floor Area: Confirmed
Attn: Building & Safety Department,
True North Compliance Services, Inc. has completed the final review of the following documents for the project
referenced above on behalf of the City of Carlsbad:
1. Drawings: Electronic copy dated April 2, 2025, by D. Powsynski.
2. Structural Calculations: Electronic copy dated February 7, 2025, by S. Nagarajan.
3. CAP-B50: Electronic copy dated April 2, 2025, by Lorna Robinson.
The 2022 California Building, Mechanical, Plumbing, and Electrical Codes (i.e., 2021 IBC, UMC, UPC, and 2020
NEC, as amended by the State of California), 2022 California Green Building Standards Code, 2022 California
Existing Building Code, and 2022 California Energy Code, as applicable, were used as the basis of our review.
Please note that our review has been completed and we have no further comments, however, we bring the
following to your attention:
1. The CAP B-50 and 55 is integrated into the plan set..
We have enclosed the above noted documents bearing our review stamps for your use. Please call if you have any
questions or if we can be of further assistance.
Sincerely,
True North Compliance Services
Review By: Ed Dion - Plan Review Engineer
Quality Review By: Areli Sanchez - Plan Review Supervisor
True orth
'/. COMPLIANCE SERVICES
True North Compliance Services, Inc.
8369 Vickers Street, Suite 207, San Diego, CA 92111
T | 562.733.8030
February 24, 2025
City of Carlsbad City of Carlsbad– FIRST REVIEW
Community Development Department - Building Division City Permit No: CBC2025-0043
1635 Faraday Ave. True North No.: 25-018-137
Carlsbad, CA 92008
Plan Review: TI Wells Fargo
Address: 2520 El Camino Real, Carlsbad CA
Applicant Name: Mesfin Samuel Applicant Email: msamuel@samuelgroup.net
True North Compliance Services, Inc. has completed the review of the following documents for the project
referenced above on behalf of the City of Carlsbad. Our comments can be found on the attached list.
1. Drawings: Electronic copy dated February 10, 2025, by D. Powsynski.
2. Structural Calculations: Electronic copy dated February 7, 2025, by S. Nagarajan.
3. Other Documents: Electronic copy of Permit Application.
Attn: Permit Technician, the scope of work on the plans has been reviewed for coordination with the scope of
work on the permit application. See below for information if the scope of work on plans differs from the permit
application:
Valuation: Confirmed
Scope of Work: Confirmed
Floor Area: Confirmed
Our comments follow on the attached list. Please call if you have any questions or if we can be of further
assistance.
Sincerely,
True North Compliance Services
Review By: Ed Dion - Plan Review Engineer
Quality Review By: Areli Sanchez - Plan Review Supervisor
.JTrue North ~ COMPLI ANCE SERV ICES
TI Wells Fargo City of Carlsbad– FIRST REVIEW
2520 El Camino Real City Permit No.: CBC2025-0043
February 24, 2025 True North No.: 25-018-137
Page 2
Plan Review Comments
ELECTRONIC - RESUBMITTAL INSTRUCTIONS:
Please do not resubmit plans until all departments have completed their reviews. For status, please
contact building@carlsbadca.gov
Please make all corrections, as requested in the correction list. Corrected sets can be submitted as follows:
Email the revised plans and comment response letter(s) to building@carlsbadca.gov for continued
review.
Note: If this project requires FIRE PREVENTION review, ensure that you follow their specific
instructions for resubmittal review. The city will not route plans back to Dennis Grubb &
Associates for continued Fire Prevention review.
GENERAL INFORMATION:
A. The following comments are referred to the 2022 California Building, Mechanical, Plumbing, Electrical
Codes, California Green Building Standards Code, and Energy Code (i.e., 2021 IBC, UMC, UPC, and 2020
NEC, as amended by the State of California).
B. There may be other comments generated by the Building Division and/or other City departments that will
also require your attention and response. This attached list of comments, then, is only a portion of the plan
review. Contact the City for other items.
C. Respond in writing to each comment by marking the attached comment list or creating a response letter.
Indicate which details, specification, or calculation shows the required information. Your complete and
clear responses will expedite the re-check.
D. Where applicable, be sure to include the architect and engineer’s stamp and signature on all sheets of the
drawings and on the coversheets of specifications and calculations per CBPC 5536.1 and CBPC 6735. This
item will be verified prior to plan approval.
E. If you have any questions regarding the comments below, please contact Ed Dion via email
edion@tncservices.com or telephone (562) 733-8030.
OCCUPANCY & BUILDING SUMMARY:
Occupancy Groups: B
Occupant Load: 65
Type of Construction: VB
Sprinklers: ??? (Provide this information)
Stories: 1
Area of Work (sq. ft.): 4145 sq. ft.
ARCHITECTURAL COMMENTS:
A1. Under the Project Information section, provide the following building data:
a) Note on plan whether the building is equipped with automatic fire sprinklers or not. CBC 107.2.1.
TI Wells Fargo City of Carlsbad– FIRST REVIEW
2520 El Camino Real City Permit No.: CBC2025-0043
February 24, 2025 True North No.: 25-018-137
Page 3
A2. Roof mounted equipment must be screened and roof penetrations should be minimized. City Policy 80-6
A3. Revise door swing of door 126 to swing out of electrical room and add panic hardware Per CBC1010.2.9.2
ACCESSIBILITY COMMENTS:
D1. CBC 11B-202.3 requires that accessibility be provided to the altered spaces. This accessibility shall include
the requirements of CBC 11B-202.4, which entails: a primary entrance, a primary path of travel, sanitary
facilities serving the area, a drinking fountain, and signs. Please address the following:
a) Sheet G0.19: On the site plan, specify the accessible route to be 5% maximum running slope with
2% maximum cross slope per CBC 11B-403.3.
i) Provide detectable warning where the accessible route crosses or adjoins the vehicular path
of travel per CBC 11B-247.1.2.5. Provide detectable warning details in accordance with
CBC 11B-705.1.
ii) Show location and provide details for curb ramps in accordance with CBC 11B-406.
iii) Specify the accessible route to be at least 48” in width. CBC 11B-403.5.1
iv) Where the accessible route is contiguous to the vehicular way, the circulation path is
required to be physically separated from the vehicular way. The physical separation shall
be provided with circulation paths raised 4 inches minimum above the vehicular way. CBC
11B-250.1
b) Restrooms shall meet the requirements of CBC 11B Division 6.
i) G0.08B detail 604. Correct water closet placement to be 17”-18” from side wall not 16”-
18”.
ii) At the restroom, the door is swinging into the 60” diameter turning space. Ensure the
door does not encroach into the turning space by more than 12 inches per CBC 11B-
603.2.3.
c) Show the location and provide details for the drinking fountain serving this area (if provided) to
verify that it meets the requirements of CBC 11B-211.1 and CBC 11B-602.
d) Accessible parking, accessible aisles, markings, signage, etc., shall meet the requirements of CBC
11B Division 5.
i) Revise proposed accessible parking space to reflect angled or perpendicular parking per
CBC figure 11B-502.2
D2. Sheet G0.10: Revise note W to specify the door hardware to be mounted 34” minimum to 44” maximum.
D3. Dimension hall outside of door 112. Provide minimum 44” clearance per CBC Figure 11B-404.2.4.1 (f).
D4. Provide a turning space in the focus room per CBC 11B-304.3.
MECHANICAL COMMENTS:
No Comments
ELECTRICAL COMMENTS:
No Comments
TI Wells Fargo City of Carlsbad– FIRST REVIEW
2520 El Camino Real City Permit No.: CBC2025-0043
February 24, 2025 True North No.: 25-018-137
Page 4
PLUMBING COMMENTS:
No Comments
GREEN BUILDING COMMENTS:
G1. Climate Action Plan requirements apply to all new structures, commercial projects equal to or exceeding
$200,000 in valuation. City of Carlsbad requires that all projects that qualify for CAP compliance will
require a completed Climate Action Plan (CAP) Consistency Checklists (city forms B-50) to be completed
by the APPLICANT.
https://www.carlsbadca.gov/home/showpublisheddocument/6878/638225157825900000
a) For plans submitted to the City the following Climate Action Plan requirements apply, per Carlsbad
ordinance:
b) The applicant is to fill out the B-50 CAP Consistency Checklist. The scope of work and project
valuation will determine which sections of the CAP are required.
c) Plan examiners review the B-50 CAP Consistency Checklist for completion. For example: If new
residential construction is the scope of work, CAP sections 2A, 3A, and 4A are required to be filled
on the B-50 checklist.
ENERGY COMPLIANCE COMMENTS:
See Comment G1
STRUCTURAL COMMENTS:
No Comment
If you have any questions regarding the above comments, please contact Ed Dion via email
edion@tncservices.com or telephone (562) 733-8030.
[END]
THESE PLANS/DOCUMENTS HAVE BEENREVIEWED FOR COMPLIANCE WITH THEAPPLICABLE CALIFORNIA BUILDING STANDARDSCODES AS ADOPTED BY THE STATE OFCALIFORNIA AND AMENDED BY THEJURISDICTION. PLAN REVIEW ACCEPTANCE OFDOCUMENTS DOES NOT AUTHORIZECONSTRUCTION TO PROCEED IN VIOLATION OFANY FEDERAL, STATE, NOR LOCAL REGULATION.
BY: _________________ DATE: ________________
True North Compliance Services, Inc.
THIS SET OF THE PLANS AND SPECIFICATIONSMUST BE KEPT ON THE JOB SITE AT ALL TIMESAND IT IS UNLAWFUL TO MAKE ANY CHANGESOR ALTERATIONS WITHOUT PERMISSION FROMTHE CITY. OCCUPANCY OF STRUCTURE(S) ISNOT PERMITTED UNTIL FINAL APPROVAL ISGRANTED BY ALL APPLICABLE DEPARTMENTS.
Ed Dion 04/11/25
m:r:p planning co. 130.
STRUCTURAL CALCULATIONS
PROJECT
WELLS FARGO BANK
2520 EL CAMINO REAL
CARLSBAD, CA 92008
JOB# 24-209
CODE: 2022 CALIFORNIA BLDG. CODE
CONCRETE : 3000 PSI @ 28 DAYS
FOUNDATION: 1500 PSF@ 18" BELOW GRADE
LUMBER: DOUGLAS FIR LARCH
REINFORCING: ASTM A615, GRADE 60
STRUCTURAL STEEL : ASTM A992
Date Signed: 02-07-2025
entennial W-ay, #F
II~ f./ 3.. : .. !"'. (}, C-.;,.;; -PAGE NO: -------
'1--,,,, s t r u c t u r a I e n g i n e e r i n g
130 centennial way #F
PROJECT NAME:
JOB#: tustin, ca
(p) 714 -923 -8946
Cvt~ ~J \2,1,o, Ttw.u~ T() ~o~-.,-r (_N ) IL1J
w 1, Dt-UN\1"' \l .rv \~
l,\Vf-\...o,to ~vro v1v~ u~\7
I \ --;. rio ,~tx kS1-7-r
~ ~1 \1-l
NITT vST~ or VtJ\"[ "I.-\l &l> -C.1S-~ ~ \~
k, th?/ 1f'II i <; "' 0 S"h -\p ~ ''/r:~t !
-"t(W{S ~r~ .,_ :I r lo"
101,rv U>th'J(DVlttilfJffv Uk0\1t•:)
·, ~ ~ttW )i.!f 3f
1
":---'½:W ,.
'( Dt ~ V>/1'9 \'iii---T~" t o~i<\oo
--t:\J. ~ r/
ASCE.
AMERICAN SOCIETY OF CML Ei'¥ilNEERS
Address:
2520 El Camino Real
Carlsbad, California
92008
Wind
Results:
Wind Speed
10-year MRI
25-year MRI
50-year MRI
100-year MRI
Data Source:
Date Accessed:
ASCE Hazards Report
Standard: ASCE/SEI 7-16
Risk Category: II
Soil Class: D -Default (see
Section 11.4.3)
96 Vmph
66 Vmph
72 Vmph
77 Vmph
82 Vmph
Latitude: 33.179622
Longitude: -117.32635
Elevation: 32.87032625526248 ft
(NAVO 88)
'"••·-I•;
,·._,,•.L..W
\
l ,.ll f\ II
ASCE/SEI 7-16, Fig. 26.5-1B and Figs. CC.2-1-CC.2-4, and Section 26.5.2
Fri Feb 07 2025
Value provided is 3-second gust wind speeds at 33 ft above ground for Exposure C Category, based on linear
interpolation between contours. Wind speeds are interpolated in accordance with the 7-16 Standard. Wind speeds
correspond to approximately a 7% probability of exceedance in 50 years (annual exceedance probability =
0.00143, MRI = 700 years).
Site is not in a hurricane-prone region as defined in ASCE/SEI 7-16 Section 26.2.
https://ascehazardtool.org/ Page 1 of 3 Fri Feb 07 2025
ASCE.
AMBUCAN SOCIETY OF CML ENGINWlS
Seismic
Site Soil Class:
Results:
Ss:
s,
Fa :
Fv :
D -Default (see Section 11.4.3)
0.995 S o, N/A
0.364 T L : 8
1.2 PGA: 0.435
N/A PGA M: 0.522
SMs 1.194 F PGA 1.2
SM1 N/A 18 : 1
S os 0. 796 Cv : 1.298
Ground motion hazard analysis may be required. See ASCE/SEI 7-16 Section 11.4.8.
Data Accessed: Fri Feb 07 2025
Date Source: usGs Seismic Design Maps
https://ascehazardtool.org/ Page 2 of 3 Fri Feb 07 2025
MRP Planning CO.
130 Cenntennial Way, Suite F
Tustin, CA 92780
SHEET
JOB
SEISMIC DEMANDS ON NONSTRUCTURAL COMPONENTS
(ASCE 7-16, Chapter 13)
Project: Wells Fargo Bank
Location: Carlsbad, CA
Component Roof top unit
Weight of Component WP
Short Period Spectra l Response Acceleration
Sos Parameter
Component Amplification Factor aP
Component Response Modification Factor RP
Component Seismic Importance Factor IP
Height of Component Relative to Roof z
Height of Roof Structure h
Horizontal Distance from Edge of Component to
Center of Gravity X
Vertical Distance from Bottom of Component to
Center of Gravity y
Width of Component b
Fµ = 0.4*aµS05IpWp[1+2(z/h))
RP
Eq (13.3-1) =
Eq (13.3-2) =
Eq (13.3-3) =
=
Governing load combination: (0.9-0.2505)D+Qe
Overturning M oment = FPy =
Resisting Moment = (0.9-0.2S05)xWP =
y
'
= 1180 lbs
= 0.796
=
=
2.5
6.0
Table 13.5-1 or 13.6-1
Table 13.5-1 or 13.6-2
= 1.0 ASCE 7-16, Section 13.3.1
= 1.0
= 1.0
= 2.0 ft
= 3.0 ft
= 4.0 ft
0.398 x WP 469.6 lbs
1.274 x WP 1502.8 lbs
0.239 x WP 281.8 lbs
0.159 x WP = 187.9 lbs
1408.9 ft-lbs
1748.3 ft-lbs
C.G . ... =---+--+-FP
b
= (OTM -RM) NO NET The Resisting Moment is greater than the Uplift Force = b UPLIFT Overturning Moment
Number of Anchors to resist uplift = 2 Anchors
Number of Anchors to resist shear = 4 Anchors
Anchorage Force = Uplift Force = 0 lbs (Tension) Number of Anchors
= Fp Anchorage Force (Shear) = 117 lbs Number of Anchors
Use 3/8" dia. Lag Bolts with 4" total
Combined 0 + 117 = 0.56 OK embedment at ea. corner
Action 945.0 *Cd 130.0 *Cd (Cd= 1.6)
MRP Planning CO.
130 Centennial Way, Suite F
Tustin, CA 92780 SHEET
JOB
SEISMIC DEMANDS ON NONSTRUCTURAL COMPONENTS Fpv
(ASCE 7-16, Chapter 13; ACI 318-14, 17.2.3.4.3d & 17.2.3.5.3c)
Project: Wells Fargo Bank
Location: 2520 El Camino Real -Carlsbad, CA
Component TL-30 Safe Anchorage
Weight of Component
Short Period Spectral Response Acceleration
Parameter
Component Amplification Factor
Component Response Modification Factor
Component Seismic Importance Factor
Height of Component Relative to Roof
Height of Roof Structure
Horizontal Dist ance from Edge of Component to
Center of Gravity
Vertical Distance from Bottom of Component to
Center of Gravity
Width of Component
Fp = 0.4"'apS05IPWP[1+2(z/h)) Eq (13.3-1)
RP
FpMAX = l.6S05IPWP Eq (13.3-2)
FpMIN = 0.3S05IPWP Eq (13.3-3)
Fpv = ±0.2505WP
X
y
b
=
=
=
=
=
=
=
=
0.127
1.274
0.239
0.159
Governing load combination: (0.9-0.2Sos)D+(O=2.0)QE
Overturning Moment = 2.0 x Fpy = 4165.1
Resisting Moment = (0.9-0.2S05) x WP = 2368.9
= (OTM -RM) Uplift Force = 816.5 b
Number of Anchors to resist uplift = 2
Number of Anchors to resist shear = 4
Anchorage Force = Uplift Force = 408 (Tension)
= Fp = 174
' I'
y
' ,,
2907 lbs
0.796
1.0 Table 13.5-1 or 13.6-1
2.5 Table 13.5-1 or 13.6-2
1.0 ASCE 7-16, Section 13.3.1
0.0
1.0
1.1 ft
3.0 ft
2.2 ft
xWP = 370.2 lbs
xWP = 3702.4 lbs
xWP = 694.2 lbs
X WP = 462.8 lbs
(ACI 318-14 17.2.3.4.3d)
ft-lbs
ft-lbs
lbs
Anchors
Anchors
lbs
lbs
·~
C.G. --
,,
X WP
b
5""
~--1.0,
Anchorage Force (Shear) Number of Anchors See Output for Strong Bolt-2 anchors
.
MRP Planning CO.
130 Centennial Way, Suite F ~
Tustin, CA 92780 SHEET
JOB t,(\,... 7,.o '\
SEISMIC DEMANDS ON NONSTRUCTURAL COMPONENTS F pv '• (ASCE 7-16, Chapter 13; ACI 318-14, 17.2.3.4.3d & 17.2.3.5.3c)
Project: Wells Fargo Bank ' CG --
Location: 2520 El Camino Real -Carlsbad, CA y
Component ATM Anchorage ' I' ,
Weight of Component WP = 1900 lbs X WP
Short Period Spectral Response Acceleration
Sos = Parameter 0.796
Component Amplification Factor aP = 1.0 Table 13.5-1 or 13.6-1 b
Component Response Modification Factor RP 2.5 Table 13.5-1 or 13.6-2
Component Seismic Importance Factor Ip = 1.0 ASCE 7-16, Section 13.3.1
Height of Component Relative to Roof z = 0.0
Height of Roof Structure h = 1.0
Horizontal Distance from Edge of Component to
Center of Gravity X = 1.1 ft
Vertical Distance from Bottom of Component to
Center of Gravity y = 2.8 ft
Width of Component b = 2.2 ft
Fp = 0.4*aµS05IpWp[l+2(z/h)) Eq (13.3-1) = 0.127 xWP = 242.0 lbs
RP
FpMAx = l.6SoslpWp Eq {13.3-2) = 1.274 X WP = 2419.8 lbs
FpMIN = 0.3S05IPWP Eq (13.3-3) = 0.239 xWP = 453.7 lbs
Fpv = ±0.25osWp = 0.159 xWP = 302.5 lbs
Governing load combination: (0.9-0.2S05)0+{0=2.0)QE (ACI 318-14 17.2.3.4.3d)
Overturning Moment = 2.0 X Fpy = 2495.5 ft-lbs
Resisting Moment = (0.9-0.2Sosl X WP = 1548.3 ft-lbs
Uplift Force (OTM -RM) = 430.5 lbs b
Num ber of Anchors to resist uplift = 2 Anchors
Number of Anchors to resist shear = 4 Anchors
Anchorage Force = Uplift Force lbs = 215 (Tension)
= Fp lbs Anchorage Force (Shear) = 113 Number of Anchors 3/8" dia. Titen HD anchors with
2 1/2" min. embed
MRP Planning CO.
130 Centennial Woy, Suite F 7 Tustin, CA 92780 SHEET
JOB ut:-~ io °'
SEISMIC DEMANDS ON NONSTRUCTURAL COMPONENTS F pv
(ASCE 7-16, Chapter 13; ACI 318-14, 17.2.3.4.3d & 17.2.3.S.3c)
Project: Wells Fargo Bank
Location: 2520 El Camino Real -Carlsbad, CA
Component Night Drop Anchorage
Weight of Component WP
Short Period Spectral Response Acceleration
Sos Parameter
Component Amplification Factor aP
Component Response Modification Factor Rp
Component Seismic Importance Factor IP
Height of Component Relative to Roof z
Height of Roof Structure h
Horizontal Distance from Edge of Component to
Center of Gravity X
Vertical Distance from Bottom of Component to
Center of Gravity y
Width of Component b
FP = 0.4*aµSoslµWp[1+2(z/h))
RP
Eq (13.3-1) =
Eq (13.3-2) =
Eq (13.3-3) =
=
' '
y
' ,,
= 1496 lbs
= 0.796
= 1.0 Table 13.5-1 or 13.6-1
= 2.5 Table 13.5-1 or 13.6-2
= 1.0 ASCE 7-16, Section 13.3.1
= 0.0
= 1.0
= 1.5 ft
= 2.8 ft
= 3.0 ft
0.127 x WP = 190.5 lbs
1.274 x WP 1905.3 lbs
0.239 x WP 357.2 lbs
0.159 X WP = 238.2 lbs
Governing load combination: (0.9-0.2S05)D+(O=2.0)QE (ACI 318-14 17.2.3.4.3d)
Overturning Moment = 2.0 x Fpy = 1964.8 ft-lbs
Resisting Moment = (0.9-0.2S0s) X WP = 1662.4 ft-lbs
Uplift Force (OTM-RM) = • 100.s lbs b
Number of Anchors to resist uplift = 2 Anchors
Number of Anchors to resist shear = 4 Anchors
Anchorage Force = Uplift Force lbs = 50 (Tension)
= Fp lbs = 89
'
CG. --
X W P
b
.
Anchorage Force (Shear) Number of Anchors See Simpson Output for Titen HD Anchors
MRP Planning CO.
130 Centennial Way, Suite F
Tustin, CA 92780 SHEET
JOB
SEISMIC DEMANDS ON NONSTRUCTURAL COMPONENTS Fpv
(ASCE 7-16, Chapter 13; ACI 318-14, 17.2.3.4.3d & 17.2.3.S.3c)
Project: Wells Fargo Bank
Location: 2520 El Camino Real -Carlsbad, CA
Component TCR Anchorage
Weight of Component WP
Short Period Spectral Response Acceleration Sos Parameter
Component Amplification Factor aP
Component Response Modification Factor RP
Component Seismic Importance Factor IP
Height of Component Relative to Roof z
Height of Roof Structure h
Horizontal Distance from Edge of Component to
Center of Gravity X
Vertical Distance from Bottom of Component to
Center of Gravity y
Width of Component b
Fp = 0.4*aµS05IpWp[l+2(z/h)]
RP
Eq (13.3-1) =
Eq ( 13.3-2) =
Eq (13.3-3) =
=
'-
'
y
'
= 941 lbs
= 0.796
= 1.0 Table 13.5-1 or 13.6-1
2.5 Table 13.5-1 or 13.6-2
= 1.0 ASCE 7-16, Section 13.3.1
= 0.0
= 1.0
= 0.5 ft
= 2.0 ft
= 1.0 ft
0.127 xWP 119.8 lbs
1.274 x WP = 1198.5 lbs
0.239 x WP 224.7 lbs
0.159 x W P 149.8 lbs
Governing load combination: (0.9-0.2S05)D+(O=2.0)QE (ACI 318-1417.2.3.4.3d)
Overturning Moment = 2.0 X Fpy = 898.8 ft-lbs
Resisting Moment = (0.9-0.2S0sl x WP = 348.5 ft-lbs
= (OTM-RM) lbs Uplift Force = 550.3
b
Number of Anchors to resist uplift = 2 Anchors
Number of Anchors to resist shear = 4 Anchors
Anchorage Force = Uplift Force :;; 275 lbs
(Tension)
:;; Fp
'
C.G. _ -
X WP
b
'l
~--1.oO\ ,
Anchorage Force (Shear) = 56 lbs
Number of Anchors See Simpson Output for Strong Bolt 2
Anchors
;:
MRP Planning CO.
130 Centennial Way, Suite F
Tustin, CA 92780 SHEET
JOB
SEISMIC DEMANDS ON NONSTRUCTURAL COMPONENTS Fpv
(ASCE 7-16, Chapter 13; ACI 318-14, 17.2.3.4.3d & 17.2.3.S.3c)
Project: Wells Fargo Bank
Location: 2520 El Camino Real -Carlsbad, CA
Component Coin Cage Anchorage
Weight of Component WP
Short Period Spectral Response Acceleration
Sos Parameter
Component Amplification Factor aP
Component Response Modification Factor RP
Component Seismic Importance Factor Ip
Height of Component Relative to Roof z
Height of Roof Structure h
Horizontal Distance from Edge of Component to
Center of Gravity X
Vertical Distance from Bottom of Component to
Center of Gravity y
Width of Component b
FP = 0.4*apSoslpWp[l +2(z/h)]
RP
Eq (13.3-1) =
Eq (13.3-2) =
Eq (13.3-3) =
=
' I'
y
"
= 725 lbs
= 0.796
= 1.0 Table 13.5-1 or 13.6-1
= 2.5 Table 13.5·1 or 13.6-2
= 1.0 ASCE 7-16, Section 13.3.1
= 0.0
= 1.0
= 1.0 ft
= 3.0 ft
= 2.0 ft
0.127 x WP = 92.3 lbs
1.274 x WP 923.4 lbs
0.239 x WP = 173.1 lbs
0.159 x WP 115.4 lbs
Governing load combination: (0.9-0.2S05)D+(O=2.0)Qe (ACI 318-14 17.2.3.4.3d)
Overturning Moment = 2,0 X f py = 1038.8 ft-l bs
Resisting Moment = (0.9-0.2S0s) x W p = 537.1 ft-lbs
= (OTM • RM) lbs Uplift Force = 250.9 b
Number of Anchors to resist uplift = 2 Anchors
Number of Anchors to resist shear = 4 Anchors
Anchorage Force = Uplift Force lbs = 125 (Tension)
= Fp = 43 lbs
~
C.G --
,,
X WP
b
q
,-~-WO,
Anchorage Force (Shear) Number of Anchors See Simpson Output for Strong Bolt 2
Anchors
Company:Date:2/7/2025
Engineer:Page:1
Project:Wells Fargo Bank
Address:2520 El Camino Real
Phone:
E-mail:
Anchor Designer™ for
Concrete Software
Version 3.3.2501.2
1.Project information
Project description:
Location:
Design name: Design
Comment:
2. Input Data & Anchor Parameters
General
Design method:ACI 318-19
Units: Imperial units
Anchor Information:
Anchor type: Torque controlled expansion anchor
Material: Carbon Steel
Diameter (inch): 0.500
Nominal Embedment depth (inch): 2.750
Effective Embedment depth, hef (inch): 2.250
Code report: ICC-ES ESR-3037
Anchor category: 1
Anchor ductility: Yes
hmin (inch): 4.00
cac (inch): 6.00
Cmin (inch): 6.00
Smin (inch): 2.75
Base Material
Concrete: Normal-weight
Concrete thickness, h (inch): 4.00State: Cracked
Compressive strength, f’c (psi): 2500
Ȍc,V:1.0
Reinforcement condition: B tension, B shear
Supplemental edge reinforcement: Not applicable
Reinforcement provided at corners: No
Ignore concrete breakout in tension: No
Ignore concrete breakout in shear: No
Ignore 6do requirement: Not applicable
Build-up grout pad: No
Recommended Anchor
Anchor Name: Strong-Bolt® 2 - 1/2"Ø STB2, hnom:2.75" (70mm)
Code Report: ICC-ES ESR-3037
Input data and results must be checked for agreement with the existing circumstances, the standards and guidelines must be checked for plausibility.
Simpson Strong-Tie Company Inc.5956 W. Las Positas Boulevard Pleasanton, CA 94588 Phone: 925.560.9000 Fax: 925.847.3871 www.strongtie.com
SIMPSON
Strong!fie.
Company:Date:2/7/2025
Engineer:Page:2
Project:Wells Fargo Bank
Address:2520 El Camino Real
Phone:
E-mail:
Anchor Designer™ for
Concrete Software
Version 3.3.2501.2
Load and GeometryLoad factor source: ACI 318 Section 5.3
Load combination: not set
Seismic design: Yes
Anchors subjected to sustained tension: Not applicable
Ductility section for tension: 17.10.5.2 not applicable
Ductility section for shear: 17.10.6.2 not applicable
ȍ0 factor: not set
Apply entire shear load at front row: Yes
Anchors only resisting wind and/or seismic loads: No
Strength level loads:
Nua [lb]:408
Vuax [lb]:74
Vuay [lb]:0
<Figure 1>
Input data and results must be checked for agreement with the existing circumstances, the standards and guidelines must be checked for plausibility.
Simpson Strong-Tie Company Inc.5956 W. Las Positas Boulevard Pleasanton, CA 94588 Phone: 925.560.9000 Fax: 925.847.3871 www.strongtie.com
SIMPSON
Strong!fie.
f I
0lb
741b
Company:Date:2/7/2025
Engineer:Page:3
Project:Wells Fargo Bank
Address:2520 El Camino Real
Phone:
E-mail:
Anchor Designer™ for
Concrete Software
Version 3.3.2501.2
<Figure 2>
3. Resulting Anchor Forces
Anchor Tension load,
Nua (lb)
Shear load x,
Vuax (lb)
Shear load y,
Vuay (lb)
Shear load combined,
¥(Vuax)²+(Vuay)² (lb)
1 408.0 74.0 0.0 74.0
Sum 408.0 74.0 0.0 74.0
Maximum concrete compression strain (‰): 0.00
Maximum concrete compression stress (psi): 0
Resultant tension force (lb): 408Resultant compression force (lb): 0
Eccentricity of resultant tension forces in x-axis, e'Nx (inch): 0.00
Eccentricity of resultant tension forces in y-axis, e'Ny (inch): 0.00
Eccentricity of resultant shear forces in x-axis, e'Vx (inch): 0.00
Eccentricity of resultant shear forces in y-axis, e'Vy (inch): 0.00
Input data and results must be checked for agreement with the existing circumstances, the standards and guidelines must be checked for plausibility.
Simpson Strong-Tie Company Inc.5956 W. Las Positas Boulevard Pleasanton, CA 94588 Phone: 925.560.9000 Fax: 925.847.3871 www.strongtie.com
SIMPSON
Strong!fie.
: :
I
I
,. "" """ I
7'M I
Company:Date:2/7/2025
Engineer:Page:4
Project:Wells Fargo Bank
Address:2520 El Camino Real
Phone:
E-mail:
Anchor Designer™ for
Concrete Software
Version 3.3.2501.2
4. Steel Strength of Anchor in Tension (Sec. 17.6.1)
Nsa (lb)Nsa (lb)
12100 0.75 9075
5. Concrete Breakout Strength of Anchor in Tension (Sec. 17.6.2)
Nb =kc a f’chef1.5 (Eq. 17.6.2.2.1)
kc a f’c (psi)hef (in)Nb (lb)
17.0 1.00 2500 2.250 2869
0.75 Ncb =0.75 (ANc/ANco)ed,N c,N cp,NNb (Sec. 17.5.1.2 & Eq. 17.6.2.1a)
ANc (in2)ANco (in2 ca,min (in)ed,N c,N cp,N Nb (lb)0.75 Ncb (lb)
45.56 45.56 36.00 1.000 1.00 1.000 2869 0.65 1399
6. Pullout Strength of Anchor in Tension (Sec. 17.6.3)
0.75 Npn =0.75 c,P aNp(f’c/2,500)n (Sec. 17.5.1.2, Eq. 17.6.3.1 & Code Report)
c,P a Np (lb)f’c (psi)n 0.75 Npn (lb)
1.0 1.00 2870 2500 0.50 0.65 1399
Input data and results must be checked for agreement with the existing circumstances, the standards and guidelines must be checked for plausibility.
Simpson Strong-Tie Company Inc.5956 W. Las Positas Boulevard Pleasanton, CA 94588 Phone: 925.560.9000 Fax: 925.847.3871 www.strongtie.com
SIMPSON
Strong!fie.
/4
¢ 'Y 'Y 'Y
¢ ¢'fl J
'Y /4
Company:Date:2/7/2025
Engineer:Page:5
Project:Wells Fargo Bank
Address:2520 El Camino Real
Phone:
E-mail:
Anchor Designer™ for
Concrete Software
Version 3.3.2501.2
8. Steel Strength of Anchor in Shear (Sec. 17.7.1)
Vsa (lb)grout grout Vsa (lb)
6510 1.0 0.65 4232
9. Concrete Breakout Strength of Anchor in Shear (Sec. 17.7.2)
Shear perpendicular to edge in x-direction:
Vbx =min|7(le /da)0.2 da a f’cca11.5;9 a f’cca11.5| (Eq. 17.7.2.2.1a & Eq. 17.7.2.2.1b)
le (in)da (in)a f’c (psi)ca1 (in)Vbx (lb)
2.25 0.500 1.00 2500 24.00 39311
Vcbx =(AVc/AVco)ed,V c,V h,VVbx (Sec. 17.5.1.2 & Eq. 17.7.2.1a)
AVc (in2)AVco (in2)ed,V c,V h,V Vbx (lb)Vcbx (lb)
288.00 2592.00 1.000 1.000 3.000 39311 0.70 9173
Shear parallel to edge in y-direction:
Vbx =min|7(le /da)0.2 da a f’cca11.5;9 a f’cca11.5| (Eq. 17.7.2.2.1a & Eq. 17.7.2.2.1b)
le (in)da (in)a f’c (psi)ca1 (in)Vbx (lb)
2.25 0.500 1.00 2500 24.00 39311
Vcby =(2)(AVc/AVco)ed,V c,V h,VVbx (Sec. 17.5.1.2, 17.7.2.1(c) & Eq. 17.7.2.1a)
AVc (in2)AVco (in2)ed,V c,V h,V Vbx (lb)Vcby (lb)
288.00 2592.00 1.000 1.000 3.000 39311 0.70 18345
10. Concrete Pryout Strength of Anchor in Shear (Sec. 17.7.3)
Vcp =kcpNcb =kcp(ANc /ANco)ed,N c,N cp,NNb(Sec. 17.5.1.2 & Eq. 17.7.3.1a)
kcp ANc (in2)ANco (in2)ed,N c,N cp,N Nb (lb)Vcp (lb)
1.0 45.56 45.56 1.000 1.000 1.000 2869 0.70 2008
11. Results
Interaction of Tensile and Shear Forces (Sec. R17.8)
Tension Factored Load, Nua (lb)Design Strength, øNn (lb)Ratio Status
Steel 408 9075 0.04 Pass
Concrete breakout 408 1399 0.29 Pass (Governs)
Pullout 408 1399 0.29 Pass
Shear Factored Load, Vua (lb)Design Strength, øVn (lb)Ratio Status
Steel 74 4232 0.02 Pass
T Concrete breakout x+ 74 9173 0.01 Pass
|| Concrete breakout y+ 74 18345 0.00 Pass
Pryout 74 2008 0.04 Pass (Governs)
Interaction check (Nua/ҀNua)5/3 (Vua/ҀVua)5/3 Utilization Ratio Permissible Status
Sec. R17.8 0.13 0.00 13.2% 1.0 Pass
1/2"Ø STB2, hnom:2.75" (70mm) meets the selected design criteria.
Input data and results must be checked for agreement with the existing circumstances, the standards and guidelines must be checked for plausibility.
Simpson Strong-Tie Company Inc.5956 W. Las Positas Boulevard Pleasanton, CA 94588 Phone: 925.560.9000 Fax: 925.847.3871 www.strongtie.com
SIMPSON
Strong!fie.
'F 'F 'F
'F 'F
'F 'F 'F
'F
'F 'F 'F
'F 'F
Company:Date:2/7/2025
Engineer:Page:1
Project:Wells Fargo Bank
Address:2520 El Camino Real
Phone:
E-mail:
Anchor Designer™ for
Concrete Software
Version 3.3.2501.2
1.Project information
Project description:
Location:
Design name: Design
Comment:
2. Input Data & Anchor Parameters
General
Design method:ACI 318-19
Units: Imperial units
Anchor Information:
Anchor type: Concrete screw
Material: Carbon Steel
Diameter (inch): 0.375
Nominal Embedment depth (inch): 2.500
Effective Embedment depth, hef (inch): 1.770
Code report: ICC-ES ESR-2713
Anchor category: 1
Anchor ductility: No
hmin (inch): 4.00
cac (inch): 2.69
Cmin (inch): 1.75
Smin (inch): 3.00
Base Material
Concrete: Normal-weight
Concrete thickness, h (inch): 4.00State: Cracked
Compressive strength, f’c (psi): 2500
Ȍc,V:1.0
Reinforcement condition: B tension, B shear
Supplemental edge reinforcement: Not applicable
Reinforcement provided at corners: No
Ignore concrete breakout in tension: No
Ignore concrete breakout in shear: No
Ignore 6do requirement: Not applicable
Build-up grout pad: No
Recommended Anchor
Anchor Name: Titen HD® - 3/8"Ø THD, hnom:2.5" (64mm)
Code Report: ICC-ES ESR-2713
Input data and results must be checked for agreement with the existing circumstances, the standards and guidelines must be checked for plausibility.
Simpson Strong-Tie Company Inc.5956 W. Las Positas Boulevard Pleasanton, CA 94588 Phone: 925.560.9000 Fax: 925.847.3871 www.strongtie.com
15
SIMPSON
Strong!fie.
Company:Date:2/7/2025
Engineer:Page:2
Project:Wells Fargo Bank
Address:2520 El Camino Real
Phone:
E-mail:
Anchor Designer™ for
Concrete Software
Version 3.3.2501.2
Load and GeometryLoad factor source: ACI 318 Section 5.3
Load combination: not set
Seismic design: Yes
Anchors subjected to sustained tension: Not applicable
Ductility section for tension: 17.10.5.3 (d) is satisfied
Ductility section for shear: 17.10.6.3 (c) is satisfied
ȍ0 factor: not set
Apply entire shear load at front row: Yes
Anchors only resisting wind and/or seismic loads: No
Strength level loads:
Nua [lb]:215
Vuax [lb]:113
Vuay [lb]:0
<Figure 1>
Input data and results must be checked for agreement with the existing circumstances, the standards and guidelines must be checked for plausibility.
Simpson Strong-Tie Company Inc.5956 W. Las Positas Boulevard Pleasanton, CA 94588 Phone: 925.560.9000 Fax: 925.847.3871 www.strongtie.com
16
SIMPSON
Strong!fie .
I/
1131b
f I
/ ·, ..
/ .,,.·
0lb
Company:Date:2/7/2025
Engineer:Page:3
Project:Wells Fargo Bank
Address:2520 El Camino Real
Phone:
E-mail:
Anchor Designer™ for
Concrete Software
Version 3.3.2501.2
<Figure 2>
3. Resulting Anchor Forces
Anchor Tension load,
Nua (lb)
Shear load x,
Vuax (lb)
Shear load y,
Vuay (lb)
Shear load combined,
¥(Vuax)²+(Vuay)² (lb)
1 215.0 113.0 0.0 113.0
Sum 215.0 113.0 0.0 113.0
Maximum concrete compression strain (‰): 0.00
Maximum concrete compression stress (psi): 0
Resultant tension force (lb): 215Resultant compression force (lb): 0
Eccentricity of resultant tension forces in x-axis, e'Nx (inch): 0.00
Eccentricity of resultant tension forces in y-axis, e'Ny (inch): 0.00
Eccentricity of resultant shear forces in x-axis, e'Vx (inch): 0.00
Eccentricity of resultant shear forces in y-axis, e'Vy (inch): 0.00
Input data and results must be checked for agreement with the existing circumstances, the standards and guidelines must be checked for plausibility.
Simpson Strong-Tie Company Inc.5956 W. Las Positas Boulevard Pleasanton, CA 94588 Phone: 925.560.9000 Fax: 925.847.3871 www.strongtie.com
17
SIMPSON
Strong!fie.
: :
I
I
,. "" """ I
7'M I
Company:Date:2/7/2025
Engineer:Page:4
Project:Wells Fargo Bank
Address:2520 El Camino Real
Phone:
E-mail:
Anchor Designer™ for
Concrete Software
Version 3.3.2501.2
4. Steel Strength of Anchor in Tension (Sec. 17.6.1)
Nsa (lb)Nsa (lb)
10890 0.65 7079
5. Concrete Breakout Strength of Anchor in Tension (Sec. 17.6.2)
Nb =kc a f’chef1.5 (Eq. 17.6.2.2.1)
kc a f’c (psi)hef (in)Nb (lb)
17.0 1.00 2500 1.770 2002
0.75 Ncb =0.75 (ANc/ANco)ed,N c,N cp,NNb (Sec. 17.5.1.2 & Eq. 17.6.2.1a)
ANc (in2)ANco (in2 ca,min (in)ed,N c,N cp,N Nb (lb)0.75 Ncb (lb)
28.20 28.20 36.00 1.000 1.00 1.000 2002 0.65 976
6. Pullout Strength of Anchor in Tension (Sec. 17.6.3)
0.75 Npn =0.75 c,P aNp(f’c/2,500)n (Sec. 17.5.1.2, Eq. 17.6.3.1 & Code Report)
c,P a Np (lb)f’c (psi)n 0.75 Npn (lb)
1.0 1.00 1235 2500 0.50 0.65 602
Input data and results must be checked for agreement with the existing circumstances, the standards and guidelines must be checked for plausibility.
Simpson Strong-Tie Company Inc.5956 W. Las Positas Boulevard Pleasanton, CA 94588 Phone: 925.560.9000 Fax: 925.847.3871 www.strongtie.com
18
SIMPSON
Strong!fie.
/4
¢ 'Y 'Y 'Y
¢ ¢'fl J
'Y /4
Company:Date:2/7/2025
Engineer:Page:5
Project:Wells Fargo Bank
Address:2520 El Camino Real
Phone:
E-mail:
Anchor Designer™ for
Concrete Software
Version 3.3.2501.2
8. Steel Strength of Anchor in Shear (Sec. 17.7.1)
Vsa (lb)grout grout Vsa (lb)
2855 1.0 0.60 1713
9. Concrete Breakout Strength of Anchor in Shear (Sec. 17.7.2)
Shear perpendicular to edge in x-direction:
Vbx =min|7(le /da)0.2 da a f’cca11.5;9 a f’cca11.5| (Eq. 17.7.2.2.1a & Eq. 17.7.2.2.1b)
le (in)da (in)a f’c (psi)ca1 (in)Vbx (lb)
1.77 0.375 1.00 2500 24.00 34371
Vcbx =(AVc/AVco)ed,V c,V h,VVbx (Sec. 17.5.1.2 & Eq. 17.7.2.1a)
AVc (in2)AVco (in2)ed,V c,V h,V Vbx (lb)Vcbx (lb)
288.00 2592.00 1.000 1.000 3.000 34371 0.70 8020
Shear parallel to edge in y-direction:
Vbx =min|7(le /da)0.2 da a f’cca11.5;9 a f’cca11.5| (Eq. 17.7.2.2.1a & Eq. 17.7.2.2.1b)
le (in)da (in)a f’c (psi)ca1 (in)Vbx (lb)
1.77 0.375 1.00 2500 24.00 34371
Vcby =(2)(AVc/AVco)ed,V c,V h,VVbx (Sec. 17.5.1.2, 17.7.2.1(c) & Eq. 17.7.2.1a)
AVc (in2)AVco (in2)ed,V c,V h,V Vbx (lb)Vcby (lb)
288.00 2592.00 1.000 1.000 3.000 34371 0.70 16040
10. Concrete Pryout Strength of Anchor in Shear (Sec. 17.7.3)
Vcp =kcpNcb =kcp(ANc /ANco)ed,N c,N cp,NNb(Sec. 17.5.1.2 & Eq. 17.7.3.1a)
kcp ANc (in2)ANco (in2)ed,N c,N cp,N Nb (lb)Vcp (lb)
1.0 28.20 28.20 1.000 1.000 1.000 2002 0.70 1401
11. Results
Interaction of Tensile and Shear Forces (Sec. R17.8)
Tension Factored Load, Nua (lb)Design Strength, øNn (lb)Ratio Status
Steel 215 7079 0.03 Pass
Concrete breakout 215 976 0.22 Pass
Pullout 215 602 0.36 Pass (Governs)
Shear Factored Load, Vua (lb)Design Strength, øVn (lb)Ratio Status
Steel 113 1713 0.07 Pass
T Concrete breakout x+ 113 8020 0.01 Pass
|| Concrete breakout y+ 113 16040 0.01 Pass
Pryout 113 1401 0.08 Pass (Governs)
Interaction check (Nua/ҀNua)5/3 (Vua/ҀVua)5/3 Utilization Ratio Permissible Status
Sec. R17.8 0.18 0.02 19.5% 1.0 Pass
3/8"Ø THD, hnom:2.5" (64mm) meets the selected design criteria.
Input data and results must be checked for agreement with the existing circumstances, the standards and guidelines must be checked for plausibility.
Simpson Strong-Tie Company Inc.5956 W. Las Positas Boulevard Pleasanton, CA 94588 Phone: 925.560.9000 Fax: 925.847.3871 www.strongtie.com
19
SIMPSON
Strong!fie.
'F 'F 'F
'F 'F
'F 'F 'F
'F
'F 'F 'F
'F 'F
OFFICE USE ONLY SAN DIEGO REGIONAL
HAZARDOUS MATERIALS
QUESTIONNAIRE
RECORD ID# __________________ 1
PLAN CHECK# _______________ _
Business Name
Samuel Group
Business Contact
Mesfin Samuel
Telephon.e #
214-922-8012
BP DATE
Project Address (include suite)
2520 El Camino Real
City
Carlsbad
State
CA
Zip Code
92008
APN#
1670305000
Mailing Address (include suite)
8828 N. Stemmons Fwy. Suite 500
Project Contact
Mesfin Samuel
City
Dallas
State
TX
Zip Code
75247
Applicant E-mail Telephone#
msamuel@samuelgroup.net 214-922-8012
Plan File#
The following questions represent the facility's activities, NOT the specific project description.
PART I: FIRE DEPARTMENT -HAZARDOUS MATERIALS DIVISION: OCCUPANCY CLASSIFICATION: /not required for projects within the City of San
Diego): Indicate by circling the item, whether your business will use, process, or store any of the following hazardous materials. If any of the items are circled,
applicant must contact the Fire Protection Agency with jurisdiction prior to plan submittal.
Occupancy Rating: Facility's Square Footage (including proposed project):
1. Explosive or Blasting Agents 5. Organic Peroxides 9. Water Reactives 13. Corrosives
2. Compressed Gases 6. Oxidizers 10. Cryogenics 14. Other Health Hazards
3. Flammable/Combustible Liquids 7. Pyrophorics 11. Highly Toxic or Toxic Materials 15. None of These.
4. Flammable Solids 8. Unstable Reactives 12. Radioactives
PART II: SAN DIEGO COUNTY DEPARTMENT OF ENVIRONMENTAL HEAL TH -HAZARDOUS MATERIALS DIVISION (HMD): If the answer to any of the
questions is yes, applicant must contact the County of San Diego Hazardous Materials Division, 5500 Overland Avenue, Suite 170, San Diego, CA 92123.
Call (858) 505-6700 prior to the issuance of a building permit.
FEES ARE REQUIRED Project Completion Date: Expected Date of Occupancy:
1.
2.
3.
4.
5.
6.
7.
8.
YES NO
□ [il
□ G]
□ G]
□ [il □ G]
□ G]
□ G]
□ [il
(for new construction or remodeling projects)
Is your business listed on the reverse side of this form? (check all that apply).
Will your business dispose of Hazardous Substances or Medical Waste in any amount?
Will your business store or handle Hazardous Substances in quantities greater than or equal to 55 gallons, 500
pounds and/or 200 cubic feet?
Will your business store or handle carcinogens/reproductive toxins in any quantity?
Will your business use an existing or install an underground storage tank?
Will your business store or handle Regulated Substances (CalARP)?
Will your business use or install a Hazardous Waste Tank System (Title 22, Article 10)?
Will your business store petroleum in tanks or containers at your facility with a total facility storage capacity equal to
or greater than 1,320 gallons? (California's Aboveground Petroleum Storage Act).
□ CalARP Exempt
I
Date Initials
□ CalARP Required
I
Date Initials
□ CalARP Complete
I
Date Initials
PART Ill: SAN DIEGO COUNTY AIR POLLUTION CONTROL DISTRICT (APCD): The following questions are intended to identify the majority of
air pollution issues at the planning stage. Your project may require additional measures not identified by these questions. Residences are typically
exempt, except-single building with more than four dwelling units and those with more than one detached residential buildings
on the property-e.g. granny flats [+Excludes garages & small outbuildings not used as dwelling units]. If yes is answered for the questions below
please see link for further instructions: here or for more comprehensive requirements, please contact apcdcomp@sdapcd.org or call (858) 586-2650.
YES NO
1. D lZ) Will the project disturb 100 square feet or more of existing building materials? If yes, submit an asbestos survey to apcdcomp@sdapcd.org.
□ r;;, Will any load supporting structural members be removed? If yes, submit an asbestos survey and demolition notification to
2. l!.J apcdcomp@sdapcd.org at least 10 working days prior to starting the demolition of a load bearing structure. A notification is required even if no asbestos is present
in the structure.
3. □ (ANSWER ONLY IF QUESTION 1 IS YES) Will 100 square feet or more of friable asbestos material be disturbed? If yes, submit a notification of asbestos
removal to apcdcomp@sdapcd.org at least 10 working days prior to starting asbestos removal.
4.0 Will any equipment or operations be installed that may require an APCD Permit to Operate? Please see the reverse side of this form for typical equipment
requiring an APCD permit. If yes, contact APCD prior to the issuance of a building permit.
Briefly describe business activities: Briefly describe proposed project:
Financial institution
/202?
Date
FIRE DEPARTMENT OCCUPANCY CLASSIFICATION: __________ ~----------------------
BY-DATE· I I
EXEMPT OR NO FURTHER INFORMATION REQUIRED RELEASED FOR BUILDING PERMIT BUT NOT FOR OCCUPANCY RELEASED FOR OCCUPANCY
COUNTY-HMO* APCD COUNTY-HMO APCD COUNTY-HMO APCD
!l..1on Cor,t. ~~ q_O ,..o,...
.!, Reviewed 0 .;; <t _Q?l_lS/2025 SH_ -
Date/Initials
~ t <tr, (.O~ o,ego
.. *A stamp in this box only exempts businesses from completing or updating a Hazardous Materials Business Plan. Other permItt1ng requirements may still apply
HM-9171 (01/22) County of San Diego -DEH -Hazardous Materials Division
LIST OF BUSINESSES WHICH REQUIRE REVIEW AND APPROVAL FROM THE COUNTY OF SAN DIEGO
DEPARTMENT OF ENVIRONMENTAL HEALTH -HAZARDOUS MATERIALS DIVISION
Check all that apply:
AUTOMOTIVE
D Battery Manufacturing/Recycling
D Boat Yard
D Car Wash
D Dealership Maintenance/Painting
D Machine Shop
D Painting
D Radiator Shop
D Rental Yard Equipment
D Repair/Preventive Maintenance
0 Spray Booth
D Transportation Services
D Wrecking/Recycling
CHEMICAL HANDLING
D Agricultural supplier/distributor
D Chemical Manufacturer
D Chemical Supplier/Distributor
D Coatings/Adhesive
D Compressed Gas Supplier/Distributor
D Dry Cleaning
D Fiberglass/Resin Application
D Gas Station
D Industrial Laundry
D Laboratory
D Laboratory Supplier/Distributor
0 Oil and Fuel Bulk Supply
D Pesticide Operator/Distributor
CHEMICAL HANDLING
D Photographic Processing
D Pool Supplies/Maintenance
D Printing/Blue Printing
D Road Coatings
D Swimming Pool
D Toxic Gas Handler
D Toxic Gas Manufacturer
METAL WORKING
D Anodizing
D Chemical Milling/Etching
D Finish-Coating/Painting
D Flame Spraying
D Foundry
D Machine Shop-Drilling/Lathes/Mills
D Metal Plating
D Metal Prepping/Chemical Coating
D Precious Metal Recovery
D Sand Blasting/Grinding
D Steel Fabricator
D Wrought Iron Manufacturing
AEROSPACE
D Aerospace Industry
D Aircraft Maintenance
D Aircraft Manufacturing
MISCELLANEOUS
D Asphalt Plant
D Biotechnology/Research
D Cannabis-related
D Manufacturing D Dispensary D Other
D Co-Generation Plant
D Dental Clinic/Office
D Dialysis Center
D Emergency Generator
D Frozen Food Processing Facility
D Hazardous Waste Hauler
D Hospital/Convalescent Home
D Laboratory/Biological Lab
D Medical Clinic/Office
D Nitrous Oxide (NO.) Control System
D Pharmaceuticals
□ Public Utility
D Refrigeration System
D Rock Quarry
D Ship Repair/Construction
D Telecommunications Cell Site
D Veterinary Clinic/Hospital
D Wood/Furniture Manufacturing/Refinishing
D Brewery/Winery/Distillery
ELECTRONICS
D Electronic Assembly/Sub-Assembly D Electronic Components Manufacturing
D Printed Circuit Board Manufacturing
NOTE: THE ABOVE LIST INCLUDES BUSINESSES, WHICH TYPICALLY USE, STORE, HANDLE, AND DISPOSE OF HAZARDOUS SUBSTANCES.
ANY BUSINESS NOT INCLUDED ON THIS LIST, WHICH HANDLES, USES OR DISPOSES OF HAZARDOUS SUBSTANCES MAY STILL REQUIRE
HAZARDOUS MATERIALS DIVISION (HMO) REVIEW OF BUSINESS PLANS. FOR MORE INFORMATION CALL (858) 505-6880.
LIST OF AIR POLLUTION CONTROL DISTRICT PERMIT CATEGORIES
Businesses, which include any of the following operations or equipment, will require clearance from the Air Pollution Control District.
CHEMICAL
47 -Organic Gas Sterilizers
32 -Acid Chemical Milling
33 -Can & Coil Manufacturing
44 -Evaporators, Dryers & Stills Processing
Organic Materials
24 -Dry Chemical Mixing & Detergent Spray
Towers
35 -Bulk Dry Chemicals Storage
55 -Chrome Electroplating Tanks
COATINGS & ORGANIC SOLVENTS
27 -Coating & Painting
37 -Plasma Arc & Ceramic Deposition Spray
Booths
38 -Paint, Stain & Ink Mfg
27-Printing
27 -Polyester Resin/Fiberglass Operations
METALS
18 -Metal Melting Devices
19 -Oil Quenching & Salt Baths
32 -Hot Dip Galvanizing
39 -Precious Metals Refining
ORGANIC COMPOUND MARKETING
{GASOLINE, ETC)
25 -Gasoline & Alcohol Bulk Plants & Terminals
25 -Intermediate Refuelers
26 -Gasoline & Alcohol Fuel Dispensing
COMBUSTION
34 -Piston Internal -Combustion Engines
13 -Boilers & Heaters (1 million BTU/hr or larger)
14 -Incinerators & Crematories
15 -Bum Out Ovens
16 -Core Ovens
20 -Gas Turbines, and Turbine Test Cells & Stands
48 -Landfill and/or Digester Gas Flares
ELECTRONICS
29 -Automated Soldering
42 -Electronic Component Mfg
FOOD
~sh Canneries
12-Smoke Houses
50 -Coffee Roasters
35 -Bulk Flour & Powered Sugar Storage
SOLVENT USE
28 -Vapor & Cold Degreasing
30 -Solvent & Extract Driers
31 -Dry Cleaning
ROCK AND MINERAL
04 -Hot Asphalt Batch Plants
05 -Rock Drills
06 -Screening Operations
07 -Sand Rock & Aggregate Plants
08 -Concrete Batch, CTB, Concrete Mixers, Mixers
&Silos
1 0 -Brick Manufacturing
OTHER
01 -Abrasive Blasting Equipment
03-Asphalt Roofing Kettles & Tankers
46 -Reverse Osmosis Membrane Mfg
51 -Aqueous Waste Neutralization
11 -Tire Buffers
17 -Brake Debonders
23 -Bulk Grain & Dry Chemical Transfer & Storage
45-Rubber Mixers
21 -Waste Disposal & Reclamation Units
36 -Grinding Booths & Rooms
40 -Asphalt Pavement Heaters
43 -Ceramic Slip Casting
41 -Perlite Processing
40-Cooling Towers -Registration Only
91 -Fumigation Operations
56 -WWTP (1 million gal/day or larger) & Pump
Station
NOTE: OTHER EQUIPMENT NOT LISTED HERE THAT IS CAPABLE OF EMITTING AIR CONTAMINANTS MAY REQUIRE AN AIR POLLUTION
CONTROL DISTRICT PERMIT. IF THERE ARE ANY QUESTIONS, CONTACT THE AIR POLLUTION CONTROL DISTRICT AT (858) 586-2600.
HM-9171 (09/18) County of San Diego -DEH -Hazardous Materials Division