Loading...
HomeMy WebLinkAboutPD 2023-0034; 7500 CADENCIA ST; DRAINAGE STUDY 7500 CADENCIA ST; 2024-10-11DRAINAGE STUDY – 7500 CADENCIA ST 1 | P a g e DRAINAGE STUDY 7500 CADENCIA ST. PD2023-0034 GR2023-0041 DWG 545-9A APN: 223-260-09 7500 CADENCIA ST. Carlsbad, CA 92009 Prepared By: John A. Van Ryn, P.E. RCE 80667 EXP: 3-31-25 Van Ryn Engineering, Inc. 16766 Bernardo Center Dr., Ste 115 San Diego, CA 92128 Prepared for: Rick Guinn 7500 Cadencia St. Carlsbad, CA 92009 October 11th 2024 "~ VAN RVN DRAINAGE STUDY – 7500 CADENCIA ST 2 | P a g e TABLE OF CONTENTS 1. INTRODUCTION ................................................................................................................................... 4 1.1 Project Description ........................................................................................................................ 4 1.2 Existing Conditions ........................................................................................................................ 4 1.3 Proposed Conditions .................................................................................................................... 4 2. METHODOLOGY .................................................................................................................................. 5 2.1 Rational Method ........................................................................................................................... 5 2.2 Runoff Coefficient ......................................................................................................................... 5 2.3 Rainfall Intensity ............................................................................................................................ 6 2.4 Tributary Areas .............................................................................................................................. 6 3. CALCULATIONS/RESULTS ................................................................................................................... 6 3.1 Pre & Post Development Peak Flow Comparison ...................................................................... 6 4. CONCLUSION ....................................................................................................................................... 8 Appendix 1 .......................................................... Existing and Proposed Drainage Exhibits Appendix 2 ................................................................................... Supplemental Documents DRAINAGE STUDY – 7500 CADENCIA ST. 3 | P a g e Figure 1 Vicinity Map VICINITY MAP CITY OF CITY OF ENCINITAS NOT TO SCALE DRAINAGE STUDY – 7500 CADENCIA ST. 4 | P a g e 1. INTRODUCTION 1.1 Project Description The project is located on Cadencia Street approximately 500 feet northeast of the La Costa Ave and Cadencia St intersection, located in the City of Carlsbad. The site exists today as an existing developed lot with a single-family residence. The project proposes to construct an additional dwelling unit, and a covered patio onsite. Also proposed are hardscape and landscape improvement typical to residential redevelopment. 1.2 Existing Conditions The existing lot is approximately 34,072 sq-ft or 0.78 acres. Currently a residential home with existing hardscape that includes an concrete driveway makes up approximately 8,547 square feet of impervious area. The remaining area is made up of landscaping and natural ground cover on moderate to steep man-made slopes. Storm water sheet flows across the site in a westerly direction collecting in drainage ditches until it discharges offsite and directly into a storm drain on Cadencia St. Storm water continues through the public storm drain system and ultimately conveys westerly to the Pacific Ocean. For hydrological purposes, the subject property was separated into 2 individual basins: Basin A and B. Basin A is primarily comprised of the existing residential home, concrete driveway, and landscaping surrounding the existing PCC brow ditches. Basin B encompasses the remaining, previously graded pervious area of the existing lot. Due to its composition of existing landscaping and natural ground, Basin B is deemed self-mitigating. The project site has a hydrologic soil group type D, according to the USDA web soil survey. The peak storm water run-off for the site was calculated using the rational method equation (Q=CiA). The precipitation volume of 2.8 inches was used for design consideration according to the San Diego County 100yr 6hr Isopluvial Map. A 7.4 in/hr intensity was determined from the San Diego County Hydrology Manual Figure 3-1 assuming the minimum allowable time of concentration of 5 minutes because the site is relatively small. This resulted in a peak pre-project run-off of Q= 2.52 CFS. A weighted runoff coefficient of 0.52 based on the existing 30% of impervious area. See section 3 of this report for detailed calculations. 1.3 Proposed Conditions The project proposes to construct a covered patio with planter boxes and a structural retaining wall onsite. The project proposes a new total of 9,233 square feet of impervious area. Similar to the existing site condition, storm water will be conveyed in a westerly direction. Drainage will be collected in area drains and conveyed into the existing onsite drainage channel to the south of the property. The existing PCC brow ditches, that confluence near the southwest corner of the property, are going to be removed and replaced with separate brooks box catch basins and splash walls for both the northeast and southeast brow ditch approaches. Drainage collected in the catch basins will convey water through new PVC storm drainpipes and into a new onsite brooks box clean out. The cleanout will connect to the existing PVC storm drainpipe that connects to the adjacent public cleanout on Cadencia St. As previously stated, the subject property was separated into 2 individual basins for hydrological purposes. Basin A consists of the existing residential home and driveway, landscaping surrounding the existing PCC brow ditches, and separate brooks box catch basins and splash walls. Basin B DRAINAGE STUDY – 7500 CADENCIA ST. 5 | P a g e encompasses the remaining, previously graded pervious area of the existing lot. Due to its composition of existing landscaping and natural ground, Basin B is deemed self-mitigating. During the 100-year storm event, runoff will follow the pre-development flow path in a westerly direction and outlet into a storm drain on Cadencia St. As in the existing condition, the peak storm water runoff for the site was calculated using the rational method equation (Q=CiA). The precipitation volume of 2.8 inches was used for design consideration according to the San Diego County 100yr 6hr Isopluvial Map. A 7.4 in/hr intensity was determined from the San Diego County Hydrology Manual Figure 3- 1 assuming the minimum allowable time of concentration of 5 minutes because the site is relatively small. This resulted in a peak post-project runoff of Q= 2.55 CFS. A weighted runoff coefficient of 0.53 based on the proposed 32.4% of impervious area. See section 3 of this report for detailed calculations. 2. METHODOLOGY The proposed project has been analyzed to determine the peak runoff flow for the 100 year, 6 hour rainfall event using the Rational Method per the San Diego County Hydrology Manual. The Weighted Runoff Coefficient, C, for the existing and proposed conditions were calculated using Table 3-1 of the same manual. The rainfall intensity for the existing and proposed drainage areas were calculated using a minimum Tc of 5 min, and the rainfall intensity equation described in section 3.1.3 of the San Diego County Hydrology Manual which yields an intensity of 7.4 inches per hour, for both the existing and proposed conditions. The proposed LID best management practices have been sized and located such that runoff will be directed to pervious areas where feasible, and into an onsite storm water detention basin before ultimately discharging to the downstream conveyance system. 2.1 Rational Method As mentioned above, runoff from the project site was calculated for the 100-year storm events. Runoff was calculated using the Rational Method which is given by the following equation: Q = C x I x A Where: Q = Flow rate in cubic feet per second (cfs) C = Runoff coefficient I = Rainfall Intensity in inches per hour (in/hr) A = Drainage basin area in acres, (ac) Rational Method calculations were performed using the San Diego County Hydrology Manual (Section 3.1) 2.2 Runoff Coefficient The runoff coefficients for the project were calculated using section 3.1.2 of the San Diego County Hydrology Manual and using a weighted average runoff coefficient based on the actual and proposed impervious areas which was calculated to be 0.52 and 0.53, respectively. DRAINAGE STUDY – 7500 CADENCIA ST. 6 | P a g e 2.3 Rainfall Intensity Rainfall intensity was determined using the Rainfall Intensity section of the San Diego County Hydrology Manual (Section 3.1.3). Based on a 5 min time of concentration, an intensity of 7.4 inches per hour has been calculated for both the existing and proposed conditions. 2.4 Tributary Areas Drainage basins are delineated in the Post-Project Hydrology Exhibit in Appendix 1 and graphically portray the tributary area for each drainage basin. 3. CALCULATIONS/RESULTS 3.1 Pre & Post-Development Peak Flow Comparison 3.1.1 Pre-Development Peak Flow P100yr,6hr = 2.8 C= 8,547 sf * 0.9 + 19,935 sf *0.35 = 0.52 28,482 sf Tc=5 min. i=7.44*P6*D-0.645 → D = 5 min., for minimum time of concentration i=7.44*2.8*5-0.645 = 7.4 in/hr Q=C*i*A = 0.52 * 7.4 in/hr * 0.65 ac = 2.52 cfs 3.1.2 Post-Development Peak Flow Cn = 9,233 sf * 0.9 + 19,249 sf *0.35 = 0.53 28,482 sf Tc=5 min. i=7.44*P6*D-0.645 → D = 5 min, for minimum time of concentration i=7.44*2.8*5-0.645 = 7.4 in/hr Q=C*i*A = 0.53 * 7.4 in/hr * 0.65 ac = 2.55 cfs Below are a series of tables which summarize the calculations provided: SITE IMPERVIOUS AREA COMPOSITION TOTAL IMPERVIOUS AREA (SQ-FT) TOTAL PERVIOUS AREA (SQ-FT) TOTAL PROJECT AREA (SQ-FT) % IMPERVIOUS SURFACES WEIGHTED RUNOFF COEFFICIENT “C” Existing 8,547 19,935 28,482 30% 0.52 DRAINAGE STUDY – 7500 CADENCIA ST. 7 | P a g e Proposed 9,233 19,249 28,482 32.4% 0.53 Table 1. Runoff Coefficient “C” Comparison The table above shows the difference in the weighted runoff coefficient, “C”, between the existing and proposed condition. Calculations of the weighted runoff coefficients are based on Table 3-1 of the San Diego County Hydrology Manual and underlying hydrologic soil group D. EXISTING DRAINAGE FLOWS DRAINAGE AREA DRAINAGE AREA (SQ-FT) WEIGHTED RUNOFF COEFFICIENT (C) Q100 (CFS) I100 (IN/HR) BASIN A 28,482 0.52 2.52 7.4 Table 2. Existing Condition Peak Drainage Flow Rates Table 2 above lists the peak flow rates for the project site in the existing condition for the respective rainfall events. PROPOSED DRAINAGE FLOWS DRAINAGE AREA DRAINAGE AREA (SQ-FT) RUNOFF COEFFICIENT (C) Q100 (CFS) I100 (IN/HR) BASIN A 28,482 0.53 2.55 7.4 Table 3. Proposed Condition Peak Drainage Flow Rates Table 3 above lists the peak flow rates for the project site for the proposed condition for the respective rainfall events. PEAK FLOW COMPARISON CONDITION DRAINAGE AREA (SQ-FT) Q100 (CFS) Existing 28,482 2.52 Proposed 28,482 2.55 Table 4. Proposed Condition Peak Drainage Flow Rates Table 4 above shows a comparison between the peak flow rates and precipitation volume for the proposed condition and the existing condition. DRAINAGE STUDY – 7500 CADENCIA ST. 8 | P a g e 4. CONCLUSION As discussed previously, storm water will be routed toward an existing onsite concrete brow ditch that has been designed to detain the excess storm water produced during the 100yr storm event. The onsite storm water routing will assist in the reduction of peak-flows. The impact of the increase in peak flow from pre-development to post-development was analyzed through Hydraflow Express simulation. The Brow Ditch Exhibits in Appendix 1 displays how the depth of water remains the same (0.79 ft) for both development conditions due to the minor increase in peak flow from 2.52 to 2.55 cfs. With a total depth of 1 ft, it was concluded that the brow ditch has the sufficient capacity to help manage the impact of increased Q100. Therefore, the project will have no negative impact on downstream facilities or adjacent properties. It is my professional opinion that the storm drain system proposed in this report and on the precise grading plans is adequate to intercept, contain and convey Q100 and be beneficial to the private and public drainage system. DRAINAGE STUDY – 7500 CADENCIA ST. 9 | P a g e APPENDIX 1 EXISTING & PROPOSED DRAINAGE EXHIBITS LO T 4 8 7 AP N : 2 2 3 - 2 6 0 - 0 8 LO T 4 8 5 AP N : 2 2 3 - 2 6 0 - 0 9 LO T 4 7 5 AP N : 2 2 3 - 2 6 0 - 1 0 N7 9 ° 5 8 ' 4 0 " W , 1 9 1 . 8 0 ' N09° 59' 3 5 " E , 1 9 5 . 1 1 ' N8 0 ° 0 0 ' 2 5 " W , 1 5 7 . 3 8 ' N00° 00' 25"W, 198.22' CIVIL ENGINEERING I LAND SURVEYING San Diego I Manteca I 858.521.8100 vanrynengineering.com \_ \ /} l / I I /I (" I > / / / \ .,,-r __,,,_ I" I I I l I\ I \ / I ( I \ ( I \ / \ ' I I \ '<( I \ I ; r < ' \-ti I I \ I I I I j I I / ! I \ I >< I I I I I I I I. I I / 6! I I II >< • -)._ I I I I \ I I I I \ 1-'\_ I I I..._ C SE1F-M/11GA 11NG -~ ✓ C / \ /' /' I ,, I 1 ___ I I I I I \ j I I - I I J r-,-1"1 I ' I I I I L I I , ;\ I I t I GRAPHIC SCALE: 1" = 1 O' '-l v 1bK L67 L66 ~ 16---!--~36 --------- ' I I 4 1. ~I ..,_.,l ) \ .i I-'4/_ ' I / 1 I I J _[ V \ I r, "'"J- -~ '\, I C l ~" I V ~ -------- / / NODE 1.1 .EL ' 267.2 t \ I I 261 257 I l > I "-----L i ) t I I ~ V ------J - I I 4 / I v J sr ------- l \ • f I / I s \ \ 1 \ '( Ii ....______,. r ,; I \ I ,) 24c BASJN A '5r, -2 8, 4_8 2 SF2 ¢ 5 0.65 AC <~o ~O) NODE 1.2 EL=223.0 Qt-00= 2. 52CFS \ \ / I 1 \ r I X / ~ j ----......_ ' ?,re ij' ~ -,: -.-~ \iJ ~ I I / I I I I I I / I I I / '/ / ! I I , v 'b4 I \ I /. I \ \ ' ' \ • ' I I " I I I I \ I ' ' ' I I " / ) \ I I I I / ( ~ \ I I I / I \ I I ' I ~ 11 I I I I ' I lu I I I f ·21 I 'i l I I \ I/ X I I I I I I PRE-PROJECT HYOROLOG!C NODE MAP 7500 CA0ENCIA ST. [ I I CARLSBAD, CA 92009 LEGEND PROPERTY LINE RIGHT-OF-WAY ROAD CENTERLINE ADJACENT PROPERTY LINE DRAINAGE BASIN BOUNDARY PRE-PROJECT FLO'M.JNE PRE-PROJECT IMPERVIOUS AREA AREA CALCULATIONS TOTAL AREA IMPERVIOUS AREA PERVIOUS AREA % IMP Cn 28,482 SF (0.65 AC) 8,547 SF 19,935 SF JO% 0.52 SITE CONDITION HYDROLOGICAL SOIL GROUP D - - \ I I ' ) J I \ I / I I / / / I I I I / / \ V \ VAN RVN I LO T 2 5 2 LO T 2 7 0 LO T 4 8 7 AP N : 2 2 3 - 2 6 0 - 0 8 LO T 4 8 5 AP N : 2 2 3 - 2 6 0 - 0 9 LO T 4 7 6 AP N : 2 2 3 - 2 6 0 - 0 6 LO T 4 7 5 AP N : 2 2 3 - 2 6 0 - 1 0 N7 9 ° 5 8 ' 4 0 " W , 1 9 1 . 8 0 ' N09° 59' 3 5 " E , 1 9 5 . 1 1 ' N8 0 ° 0 0 ' 2 5 " W , 1 5 7 . 3 8 ' N00° 00' 25"W, 198.22' CIVIL ENGINEERING I LAND SURVEYING San Diego I Manteca I 858.521.8100 vanrynengineering.com < l I I " ' ~I I \ I _,-,/ J;,J"' \" \ I I \ I l 1 t ~) \ ,t{I\( \ ' I \.._ ! 1/ I I 1/ I J, I ) i / ~ C ,',., ~ / ~' \ \ ~,,~ \ \ ~,' J~ SELF-1111/GA 1111G • " \ ------\ -------< GRAPHIC SCALE: 1" = 20' 1~ do---Jo--~sb ~ \~' r I ~ \ I I --- I 'x I l J l I ~ ,· "'' .J, \ \ ' ------- -'ii ,1 ? s7 f <.1, ;J '· -------CA o ---E N C I A -------s r --- BASIN A 28 482 ~SF ' • 0.65 A,C El=22J.O Q100=2.55CFS -,_ I.J.J CK I ,_ (/J ""-\ • / ---I cJ Cy ------- / / / \ \ < L -\_ ~ \ I ' \ I I I I I I I I I I I I I I \ \ \. I I I I I I I I I I < 7--J / ( C ~ cc u . . 9 C " C ( [ :a, I ---------- r L I ' I r \ l r \ L.T/J I 11 \ I r \ I I { I ---------- r POST-PROJECT HYOROLOG!C NODE MAP 7500 CA0ENCIA ST. CARLSBAD, CA 92009 LEGEND PROPERTY LINE RIGHT-OF-WAY ROAD CENTERLINE ADJACENT PROPERTY UN£ DRAINAGE BASIN BOUNDARY POST-PROJECT Fl.O'MJNE POST-PROJECT IMPERVIOUS AREA AREA CALCULATIONS TOTAL AREA IMPERVIOUS AREA PERVIOUS AREA % IMP Cn 28,482 SF (0. 78 AC) 9,233 SF 19,249 SF 32.4% 0.53 SITE CONDITION HYDROLOGICAL SOIL GROUP D - - VAN RVN DRAINAGE STUDY – 7500 CADENCIA ST. 10 | P a g e APPENDIX 1 BROW DITCH EXHIBITS Channel Report Hydraflow Express Extension for Autodesk® Civil 3D® by Autodesk, Inc.Friday, Dec 13 2024 Pre-Development Brow Ditch Capacity Triangular Side Slopes (z:1) = 0.33, 0.33 Total Depth (ft) = 1.00 Invert Elev (ft) = 245.00 Slope (%)= 16.70 N-Value = 0.012 Calculations Compute by:Known Q Known Q (cfs) = 2.52 Highlighted Depth (ft)= 0.79 Q (cfs)= 2.520 Area (sqft)= 0.21 Velocity (ft/s)= 12.24 Wetted Perim (ft) = 1.66 Crit Depth, Yc (ft) = 1.00 Top Width (ft)= 0.52 EGL (ft)= 3.12 0 .25 .5 .75 1 1.25 Elev (ft) Depth (ft)Section 244.50 -0.50 245.00 0.00 245.50 0.50 246.00 1.00 246.50 1.50 247.00 2.00 Reach (ft) - -- - ' / V 7 ~ ---/ V ~ -/ ~ // - Channel Report Hydraflow Express Extension for Autodesk® Civil 3D® by Autodesk, Inc.Friday, Dec 13 2024 Post-Development Brow Ditch Capacity Triangular Side Slopes (z:1) = 0.33, 0.33 Total Depth (ft) = 1.00 Invert Elev (ft) = 245.00 Slope (%)= 16.70 N-Value = 0.012 Calculations Compute by:Known Q Known Q (cfs) = 2.55 Highlighted Depth (ft)= 0.79 Q (cfs)= 2.550 Area (sqft)= 0.21 Velocity (ft/s)= 12.38 Wetted Perim (ft) = 1.66 Crit Depth, Yc (ft) = 1.00 Top Width (ft)= 0.52 EGL (ft)= 3.17 0 .25 .5 .75 1 1.25 Elev (ft) Depth (ft)Section 244.50 -0.50 245.00 0.00 245.50 0.50 246.00 1.00 246.50 1.50 247.00 2.00 Reach (ft) - -- - ' / V 7 ~ ---/ V ~ -/ ~ // - DRAINAGE STUDY – 7500 CADENCIA ST. 11 | P a g e APPENDIX 2 SUPPLIMENTAL DOCUMENTS Hydrologic Soil Group—San Diego County Area, California Natural Resources Conservation Service Web Soil Survey National Cooperative Soil Survey 5/31/2023 Page 1 of 4 36 6 0 9 9 0 36 6 1 0 0 0 36 6 1 0 1 0 36 6 1 0 2 0 36 6 1 0 3 0 36 6 1 0 4 0 36 6 1 0 5 0 36 6 1 0 6 0 36 6 1 0 7 0 36 6 0 9 9 0 36 6 1 0 0 0 36 6 1 0 1 0 36 6 1 0 2 0 36 6 1 0 3 0 36 6 1 0 4 0 36 6 1 0 5 0 36 6 1 0 6 0 36 6 1 0 7 0 477710 477720 477730 477740 477750 477760 477770 477780 477790 477800 477810 477820 477830 477840 477850 477710 477720 477730 477740 477750 477760 477770 477780 477790 477800 477810 477820 477830 477840 477850 33° 5' 17'' N 11 7 ° 1 4 ' 1 9 ' ' W 33° 5' 17'' N 11 7 ° 1 4 ' 1 4 ' ' W 33° 5' 14'' N 11 7 ° 1 4 ' 1 9 ' ' W 33° 5' 14'' N 11 7 ° 1 4 ' 1 4 ' ' W N Map projection: Web Mercator Corner coordinates: WGS84 Edge tics: UTM Zone 11N WGS84 0 30 60 120 180Feet 0 5 10 20 30Meters Map Scale: 1:650 if printed on A landscape (11" x 8.5") sheet. Soil Map may not be valid at this scale. USDA = MAP LEGEND MAP INFORMATION Area of Interest (AOI) Area of Interest (AOI) Soils Soil Rating Polygons A A/D B B/D C C/D D Not rated or not available Soil Rating Lines A A/D B B/D C C/D D Not rated or not available Soil Rating Points A A/D B B/D C C/D D Not rated or not available Water Features Streams and Canals Transportation Rails Interstate Highways US Routes Major Roads Local Roads Background Aerial Photography The soil surveys that comprise your AOI were mapped at 1:24,000. Warning: Soil Map may not be valid at this scale. Enlargement of maps beyond the scale of mapping can cause misunderstanding of the detail of mapping and accuracy of soil line placement. The maps do not show the small areas of contrasting soils that could have been shown at a more detailed scale. Please rely on the bar scale on each map sheet for map measurements. Source of Map: Natural Resources Conservation Service Web Soil Survey URL: Coordinate System: Web Mercator (EPSG:3857) Maps from the Web Soil Survey are based on the Web Mercator projection, which preserves direction and shape but distorts distance and area. A projection that preserves area, such as the Albers equal-area conic projection, should be used if more accurate calculations of distance or area are required. This product is generated from the USDA-NRCS certified data as of the version date(s) listed below. Soil Survey Area: San Diego County Area, California Survey Area Data: Version 18, Sep 14, 2022 Soil map units are labeled (as space allows) for map scales 1:50,000 or larger. Date(s) aerial images were photographed: Mar 14, 2022—Mar 17, 2022 The orthophoto or other base map on which the soil lines were compiled and digitized probably differs from the background imagery displayed on these maps. As a result, some minor shifting of map unit boundaries may be evident. Hydrologic Soil Group—San Diego County Area, California Natural Resources Conservation Service Web Soil Survey National Cooperative Soil Survey 5/31/2023 Page 2 of 4USDA = □ D D D D D D D D ,,..,,,. ,,..,,,. □ ■ ■ □ □ ,,..._., t-+-t ~ tllWI ,..,,. ~ • Hydrologic Soil Group Map unit symbol Map unit name Rating Acres in AOI Percent of AOI ExG Exchequer rocky silt loam, 30 to 70 percent slopes D 1.6 87.0% SnG San Miguel-Exchequer rocky silt loams, 9 to 70 percent slopes D 0.2 13.0% Totals for Area of Interest 1.8 100.0% Description Hydrologic soil groups are based on estimates of runoff potential. Soils are assigned to one of four groups according to the rate of water infiltration when the soils are not protected by vegetation, are thoroughly wet, and receive precipitation from long-duration storms. The soils in the United States are assigned to four groups (A, B, C, and D) and three dual classes (A/D, B/D, and C/D). The groups are defined as follows: Group A. Soils having a high infiltration rate (low runoff potential) when thoroughly wet. These consist mainly of deep, well drained to excessively drained sands or gravelly sands. These soils have a high rate of water transmission. Group B. Soils having a moderate infiltration rate when thoroughly wet. These consist chiefly of moderately deep or deep, moderately well drained or well drained soils that have moderately fine texture to moderately coarse texture. These soils have a moderate rate of water transmission. Group C. Soils having a slow infiltration rate when thoroughly wet. These consist chiefly of soils having a layer that impedes the downward movement of water or soils of moderately fine texture or fine texture. These soils have a slow rate of water transmission. Group D. Soils having a very slow infiltration rate (high runoff potential) when thoroughly wet. These consist chiefly of clays that have a high shrink-swell potential, soils that have a high water table, soils that have a claypan or clay layer at or near the surface, and soils that are shallow over nearly impervious material. These soils have a very slow rate of water transmission. If a soil is assigned to a dual hydrologic group (A/D, B/D, or C/D), the first letter is for drained areas and the second is for undrained areas. Only the soils that in their natural condition are in group D are assigned to dual classes. Hydrologic Soil Group—San Diego County Area, California Natural Resources Conservation Service Web Soil Survey National Cooperative Soil Survey 5/31/2023 Page 3 of 4USDA = Rating Options Aggregation Method: Dominant Condition Component Percent Cutoff: None Specified Tie-break Rule: Higher Hydrologic Soil Group—San Diego County Area, California Natural Resources Conservation Service Web Soil Survey National Cooperative Soil Survey 5/31/2023 Page 4 of 4~ SITE IL__·-----_--_I SITE I I I I I . . . . . . . . • . -) . ,-. ' ' . : . . . ,, .,,. . . -... ·, "~ ~ ~ . I I I I I · . --- . . -~ . . . . . . . . ,=' ·- --. . . . . . . . ' ~ e,a\H'1'Y 0 ~i.NDIEc;o • I -······_--___JI DPW ~GIS [lep:I.J""iJ7ient Di P11Mc Works Grn,r,..•pfll/,; /11furrr,.itiw1 &rv,t r.i-:; San Diego County Hydrology Manual Section: 3 Date: June 2003 Page: 6 of 26 Table 3-1 RUNOFF COEFFICIENTS FOR URBAN AREAS Land Use Runoff Coefficient “C” Soil Type NRCS Elements County Elements % IMPER. A B C D Undisturbed Natural Terrain (Natural) Permanent Open Space 0* 0.20 0.25 0.30 0.35 Low Density Residential (LDR) Residential, 1.0 DU/A or less 10 0.27 0.32 0.36 0.41 Low Density Residential (LDR) Residential, 2.0 DU/A or less 20 0.34 0.38 0.42 0.46 Low Density Residential (LDR) Residential, 2.9 DU/A or less 25 0.38 0.41 0.45 0.49 Medium Density Residential (MDR) Residential, 4.3 DU/A or less 30 0.41 0.45 0.48 0.52 Medium Density Residential (MDR) Residential, 7.3 DU/A or less 40 0.48 0.51 0.54 0.57 Medium Density Residential (MDR) Residential, 10.9 DU/A or less 45 0.52 0.54 0.57 0.60 Medium Density Residential (MDR) Residential, 14.5 DU/A or less 50 0.55 0.58 0.60 0.63 High Density Residential (HDR) Residential, 24.0 DU/A or less 65 0.66 0.67 0.69 0.71 High Density Residential (HDR) Residential, 43.0 DU/A or less 80 0.76 0.77 0.78 0.79 Commercial/Industrial (N. Com) Neighborhood Commercial 80 0.76 0.77 0.78 0.79 Commercial/Industrial (G. Com) General Commercial 85 0.80 0.80 0.81 0.82 Commercial/Industrial (O.P. Com) Office Professional/Commercial 90 0.83 0.84 0.84 0.85 Commercial/Industrial (Limited I.) Limited Industrial 90 0.83 0.84 0.84 0.85 Commercial/Industrial (General I.) General Industrial 95 0.87 0.87 0.87 0.87 *The values associated with 0% impervious may be used for direct calculation of the runoff coefficient as described in Section 3.1.2 (representing the pervious runoff coefficient, Cp, for the soil type), or for areas that will remain undisturbed in perpetuity. Justification must be given that the area will remain natural forever (e.g., the area is located in Cleveland National Forest). DU/A = dwelling units per acre NRCS = National Resources Conservation Service 3-6 San Diego County Hydrology Manual Section: 3 Date: June 2003 Page: 7 of 26 3.1.3 Rainfall Intensity The rainfall intensity (I) is the rainfall in inches per hour (in/hr) for a duration equal to the Tc for a selected storm frequency. Once a particular storm frequency has been selected for design and a Tc calculated for the drainage area, the rainfall intensity can be determined from the Intensity-Duration Design Chart (Figure 3-1). The 6-hour storm rainfall amount (P6) and the 24-hour storm rainfall amount (P24) for the selected storm frequency are also needed for calculation of I. P6 and P24 can be read from the isopluvial maps provided in Appendix B. An Intensity-Duration Design Chart applicable to all areas within San Diego County is provided as Figure 3-1. Figure 3-2 provides an example of use of the Intensity-Duration Design Chart. Intensity can also be calculated using the following equation: I = 7.44 P6 D-0.645 Where: P6 = adjusted 6-hour storm rainfall amount (see discussion below) D = duration in minutes (use Tc) Note: This equation applies only to the 6-hour storm rainfall amount (i.e., P6 cannot be changed to P24 to calculate a 24-hour intensity using this equation). The Intensity-Duration Design Chart and the equation are for the 6-hour storm rainfall amount. In general, P6 for the selected frequency should be between 45% and 65% of P24 for the selected frequency. If P6 is not within 45% to 65% of P24, P6 should be increased or decreased as necessary to meet this criteria. The isopluvial lines are based on precipitation gauge data. At the time that the isopluvial lines were created, the majority of precipitation gauges in San Diego County were read daily, and these readings yielded 24-hour precipitation data. Some 6-hour data were available from the few recording gauges distributed throughout the County at that time; however, some 6-hour data were extrapolated. Therefore, the 24-hour precipitation data for San Diego County are considered to be more reliable. 3-7 2.8 5 56 2.8 5 7.4 100 90 8.0 7.0 :i 0 -E "' Q) .c 6.0 5.0 4.0 3.0 2.0 g 10 ~09 ·~o.s ~07 0.6 0.5 0.4 0.3 0.2 0.1 ' • ' ,, r-... ' .... , .... , ... , .... ..... .. ...... ... i"-. • ' ""'i"-. .... , """:-.. .... ~ .... ~ ' ... ... ,, ·, r,,.._ i"-. ' ' -""'i"-. , .. ...... .. • ~ .. ' ' ' • ' .... .... , r,,.,.. ' ' :-.., ' ' i"-..._ ""r-... I = 3.2 in/hr ... "' ..... ' .... ... ... ..... r,,., ' ...... ' ·, ' ""'i"-. .. ' , ... ", "", 5 6 7 8 9 10 15 .. "" "" ~ ... .,.. ~ /~~ ""• """ ~ .. "'r,,. .. ~~ ... ~ ~. ""'-.... ~~ r,,..., .. ~~ ~ .. ""~ ~~ ~~ .. ... ""~ .. ~~ ~ .. , ...... ~~ ~~ ~ .. .. ~~ "r,,. ~. ~ .. ~~ ~~. ~ ... i'o,~ .,.. ~~ le = 20 min 1 1 20 30 Minutes .. .. ""• ~ .. .. ,.. ""· ~ .. ~~ "'• • ..,.. ... ~ .. ~~ ""· ~. ~ ~~ .. ~ .. "'• ~. ~ ""• ~~ .. .,.. ""· ~ ~ .. ~~ ""· .. .. ,.. ""· .. ~~ 40 50 Duration I = I = p6 = D = EQUATION 7.44 Ps D-0.645 Intensity (in/hr) 6-Hour Precipitation (in) Duration (min) 'r-... ... ' .... ~ r-.., r-... r--. i'o,~ ' r-... I', l•i'o, ~ r--. i'o,i'o, r-.. r--., I•~ ' '~ r-... I', ~"" ,. I'-. ""'r-.. I'~ , ... ... 1, r-...1', ""r,,. ' I', l•r,,. 'r-.. r-..1', 2 ~ ... ... •• r,,..., .. ~ > ~ ... ... ,.. ·~ ··~ "", .. .. i'o, ;,,,, • .. ...... ,.. .. ~ ... ~. r,,..., ·~ .. "'• ·~ .. ... ... ~. 3 Hours 4 ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ 5 6 O> ± 0 !::; -u ci3 0 6.0 'R 5.5 !.!l, 5.0 g 4.5 "§' 0 4.o l 3.5 .!:'.!.. 3.0 2.5 2.0 1.5 1.0 Intensity-Duration Design Chart -Example Directions for Application: (1) From precipitation maps determine 6 hr and 24 hr amounts for the selected frequency. These maps are included in the County Hydrology Manual (10, 50, and 100 yr maps included in the Design and Procedure Manual). (2) Adjust 6 hr precipitation (if necessary) so that it is within the range of 45% to 65% of the 24 hr precipitation (not applicaple to Desert). (3) Plot 6 hr precipitation on the right side of the chart. (4) Draw a line through the point parallel to the plotted lines. (5) This line is the intensity-duration curve for the location being analyzed. Application Form: (a) Selected frequency ~ year p (b) Ps = ---in., P24 = ---.~ = %(2) 24 {c) Adjusted p6<2l = ___ in. {d) Ix = ___ min. (e) I = ___ in./hr. Note : This chart replaces the Intensity-Duration-Frequency curves used since 1965. PG 1 1.5 2 2.5 3 3.5 4 4.5 5 5.5 6 Duration I I I I I I I I I I I 5 2.63 3.95 5.27 6.59 7.90 9.22 10.54 11.86 13.17 14.49 15.81 7 2.12 3.18 4.24 5.30 6.36 7.42 8.48 9.54 10.60 11.66 12.72 10 1.68 2.53 3.37 4.21 5.05 5.90 6.74 7.58 8.42 9.27 ToTf 15 1.30 1.95 2.59 3.24 3.89 4.54 5.19 5.84 6.49 7.13 7.78 20 1.08 1.62 2.15 2.69 3.23 3.77 4.31 4.85 5.39 5.93 6.46 25 0.93 1.40 1.87 2.33 2.80 3.27 3.73 4.20 4.67 5.13 560 30 0.83 1.24 1.66 2.07 2.49 2.90 3.32 3.73 4.15 4.56 4.98 ~o 0.69 1.03 1.38 1.72 207 2.41 2.76 3.10 3.45 3.79 4.13 50 0.60 0.90 1.1 9 1.49 1.79 2.09 2.39 2.69 2.98 3.28 3.58 60 0.53 0.80 1.06 1.33 1.59 1.86 2.12 2.39 2.65 2.92 3.18 90 0.41 0.61 0.82 f 02 1.23 1.43 1.63 1.84 2.04 2.25 2.45 120 0.34 0.51 0.68 0.85 1.02 1.19 1.36 1.53 1.70 1.87 2.04 150 0.29 0.44 0.59 I-0.73 >--0.88 1.03 1.18 1.32 1.47 1.62 1.76 180 0.26 0.39 0.52 0.65 0.78 0.91 1.04 1.18 1.31 1.44 1.57 240 0.22 0.33 0.43 0.54 0.65 0.76 0.87 0.98 1.08 1.19 1.30 300 0.19 0.28 0.38 0.47 0.56 0.66 0.75 0.85 0.94 1.03 1.13 360 0.17 0.25 0.33 0.42 050 0.58 0.67 0.75 0.84 0.92 1.00 FIGU R E ~