HomeMy WebLinkAbout1384 CYNTHIA LN; ; CBR2024-2574; PermitBuilding Permit Finaled
Residential Permit
Print Date: 07/01/2025
Job Address:
Permit Type:
Parcel#:
Valuation:
Occupancy Group:
#of Dwelling Units:
Bedrooms:
Bathrooms:
Occupant Load:
Code Edition:
Sprinkled:
Project Title:
1384 CYNTHIA LN, CARLSBAD, CA 92008-1507
BLDG-Residential
1562315300
$50,617.23
Work Class:
Track#:
Lot#:
Project#:
Plan#:
Construction Type:
Orig. Plan Check#:
Plan Check #:
Addition
Permit No:
Status:
{'Cityof
Carlsbad
CBR2024-2574
Closed -Finaled
Applied: 09/26/2024
Issued: 12/12/2024
Finaled Close Out: 07/01/2025
Final Inspection: 06/03/2025
INSPECTOR: de Roggenbuke, Dirk
McClane, Duncan
Description: COASTAL DREAM HOMES: REMODEL AND EXPAND THE SFD (+47 SF, -16 SF), ADD A 194 SF DETACHED OFFICE, 169 SF TRELi
AND INSTALL A GAS GRILL.
Applicant: Property Owner:
STEVE RAGAN
143 S CEDROS AVE
SOLANA BEACH, CA 92075-1914
(858) 442-3522
COASTAL DREAM HOMES LLC
1170 CHINQUAPIN AVE
CARLSBAD, CA 92008-3543
FEE
BUILDING PLAN CHECK
BUILDING PLAN REVIEW-MINOR PROJECTS (LOE)
BUILDING PLAN REVIEW-MINOR PROJECTS (PLN)
REMODEL-RESIDENTIAL-KITCHEN or BATH
SB1473 -GREEN BUILDING STATE STANDARDS FEE
SFD & DUPLEXES
STRONG MOTION -RESIDENTIAL (SMIP)
SWPPP INSPECTION TIER 1 -Medium BLDG
SWPPP PLAN REVIEW TIER 1-Medium
Total Fees: $3,378.68 Total Payments To Date: $3,378.68 Balance Due:
AMOUNT
$893.10
$204.00
$107.00
$414.00
$3.00
$1,374.00
$6.58
$292.00
$85.00
$0.00
Please take NOTICE that approval of your project includes the "Imposition" of fees, dedications, reservations, or other exactions hereafter
collectively referred to as "fees/exaction." You have 90 days from the date this permit was issued to protest imposition of these
fees/exactions. If you protest them, you must follow the protest procedures set forth in Government Code Section 66020(a), and file the
protest and any other required information with the City Manager for processing in accordance with Carlsbad Municipal Code Section
3.32.030. Failure to timely follow that procedure will bar any subsequent lega l action to attack, review, set aside, void, or annul their
imposition.
You are hereby FURTHER NOTIFIED that your right to protest the specified fees/exactions DOES NOT APPLY to water and sewer connection
fees and capacity changes, nor planning, zoning, grading or other similar application processing or service fees in connection with this
project. NOR DOES IT APPLY to any fees/exactions of which you have previously been given a NOTICE similar to this, or as to which the
statute of limitation has previously otherwise expired.
Building Division Page 1 of 1
1635 Faraday Avenue, Carlsbad CA 92008-7314 I 442-339-2719 I 760-602-8560 f I www.carlsbadca.gov
• ( City of
Carlsbad
RESIDENTIAL
BUILDING PERMIT
APPLICATION
8-1
Plan Check Qf)R..2,\)1:l1 ... ZS 7<../
Est. Value
PC Deposit
Date
Job Address 1384 CYNTHIA LN, CARLSBAD, CA 92008 Unit: APN: 156-231-53-00 ·-----
CT/Project #:. _________________ Lot #:. ____ Vear Built: ________ _
BRIEF DESCRIPTION OF WORK: REMODEL AND ADDITION OF 47 SF SINGLE FAMILY RESIDENCE
DETACHED 194 SF. OFFICE SPACE,PR0POSED 169 SF. TRELLIS
[TI New SF: Living SF,_). 'fl __ Deck SF, ----"Patio SF, _______ Garage SF __ _
Is this to create an Accessory Dwelling Unit? O Y O N New Fireplace? O YO N , if yes how many? ___ _
EJ Remodel: 1741 SF of affected area Is the area a conversion or change of use? O YO N
Additional Gas or Electrical Features? □ Pool/Spa: ____ SF ------------
0 Solar: ___ KW, ___ Modules, Mounted:ORoof OGround, Tilt: 0 YON, RMA: 0 YO N,
Battery:OYC N, Panel Upgrade: CY CN Electric Meter number: ------------
0th er:
APPLICANT (PRIMARY CONTACT) PROPERTY OWNER
Name: STEVE RAGAN Name: COAST AL DREAM HOMES L\..C..
Address:445 MARINE VIEW AVE SUITE 310 Address: 1384 CYNTHIA LN
City: DEL MAR State: CA Zip:_9_20_1_4 __ City: CARLSBAD State: CA Zip:_9_20_0_8 __ _
Phone: 858.442.3522 Phone: 858.259.3100
Email: STEVE@NEWMODERNDESIGN.COM Email: MJG.HOMES@GMAIL.COM
DESIGN PROFESSIONAL CONTRACTOR OF RECORD
Name:. _________________ Business Name:. _______________ _
Address: Address:. ________________ _
City: _______ State: ___ Zip:.____ City:. ______ State:. ___ Zip:. ______ _
Phone: Phone: _________________ _
Email: Email:. _________________ _
Architect State License: CSLB License #:. ______ Class:. ______ _
Carlsbad Business License# (Required):. _______ _
APPLICANT CERT/FICA TION: I certify that I have read the application and state that the above information lscorrect and that the information of the plans Is accurate. I
agree to comply with all City ordinances and State laws relating to building construction.
NAME (PRINT): STEVE RAGAN
1635 Faraday Ave Carlsbad, CA 92008
SIGN::...: -"=5';,..a;;;~:.;;;;..;;......;;_...;.k1:..;;;;~~~;.__DATE: 09/25/2024
Ph: 442-339-2719 Email: Building@carlsbadca.gov
NOV ~ 0 2024
REV. 04122
nu§ PAGE REQUIRED AT PERMIT ISSUANCE PLAN CHECK NUMBER: ______ _
A BUILDING PERMIT CAN BE ISSUED TO EITHER A STATE LICENSED CONTRACTOR OR A PROPERTY OWNER. IF THE PERSON SIGNING
THIS FORM IS AN AGENT FOR EITHER ENTITY AN AUTHORIZATION FORM OR LETTER IS REQUIRED PRIOR TO PERMIT ISSUANCE.
(OPTION A): LICENSED CONTRACTOR DECLARATION:
I herebya{f irm under penal tyof perjury that I am licensed under provisions of Chapter 9 ( commencing with Section 7000) of Division 3
of the Business and Professions Code, and my I icense is inf ul If orce and effect. I also affirm under penalty of perjury one of the
following declarations (CHOOSE ONE):
DI have and will maintain a certificate of consent to self-insure for workers' compensation provided by Section 3700 of the Labor Code, for the performance of the
work which this permit is issued. PolicyNo. _________________________________________ _
-OR-
DI have and will maintain worker's compensation, as required by Section 3700 of the Labor Code, for the performance of the work for which this permit is issued.
My workers' compensation insurance carrier and policy number are: Insurance Company Name: ______________________ _
Policy No. ____________________________ Expiration Date: _______________ _
-OR-
D Certificate of Exemption: I certify that in the performance of the work for which this permit is issued, I shall not employ any person in any manner so as to become
subject to the workers' compensation Laws of California. WARNING: Failure to secure workers compensation coverage is unlawful and shall subject an employer to
criminal penalties and civil fines up to $100,000.00, In addition the to the cost of compensation, damages as provided for in Section 3706 of the Labor Code,
interest and attorney's fees.
CONSTRUCTION LENDING AGENCY, IF ANY:
I hereby affirm that there is a construction lending agency for the performance of the work this permit is issued (Sec. 3097 (i) Civil Code).
Lender's Name: ______________________ Lender'sAddress: ______________________ _
CONTRACTOR CERT/FICA TION: The applicant certifies that all documents and plans clearly and accurately show all existing and proposed buildings, structures, access roads, and
utltlties/utllity easements. All proposed modifications and/or additions are clearly labeled on the site plan. Any potentially existing detail within these plans inconsistent with the site plan are
not approved for construction and may be required to be altered or removed. The city's approval of the application is based on the premise that the submitted documents and plans show
the correct dimensions of; the property, buildings, structures and their setbacks from property lines and from one another; access roads/easements, and utilities. The existing and proposed
use of each building as stated Is true and correct; all easements and other encumbrances to development have been accurately shown and labeled as well as all on-site grading/site preparation.
All improvements existing on the property were completed In accordance with all regulations in existence at the time of their construction, unless otherwise noted.
NAME (PRINT): __________ SIGNATURE: __________ DATE: ______ _
Note: If the person signing above Is an authorized agent for the contractor provide a letter of authorization on contractor letterhead.
(OPTION B): OWNER-BUILDER DECLARATION:
I hereby affirm that I am exempt from Contractor's License Law for the following reason:
Ii I, as owner of the property or my employees with wages as their sole compensation, will do the work and the structure is not intended or offered for sale (Sec.
7044, Business and Professions Code: The Contractor's License Law does not apply to an owner of property who builds or improves thereon, and who does such
work himself or through his own employees, provided that such improvements are not intended or offered for sale. If, however, the building or improvement Is sold
within one year of completion, the owner-builder will have the burden of proving that he did not build or improve for the purpose of sale).
-OR-
DI, as owner of the property, am exclusively contracting with licensed contractors to construct the project (Sec. 7044, Business and Professions Code: The
Contractor's License Law does not apply to an owner of property who builds or improves thereon, and contracts for such projects with contractor(s) licensed
pursuant to the Contractor's License Law).
-OR-
DI am exempt under Business and Professions Code Division 3, Chapter 9, Article 3 for this reason:
AND,
Ii FORM B-61 "Owner Builder Acknowledgement and Verification Form" is required for any permit issued to a property owner.
By my signature below I acknowledge that, except for my personal residence in which I must have resided for at least one year prior to completion of the
improvements covered by this permit, I cannot legally sell a structure that I have built as an owner-builder if it has not been constructed in its entirety by licensed
contractors./ understand that a copy of the applicable law, Section 7044 of the Business and Professions Code, is available upon request when this application is
submitted or at the following Web site: http:/ lwww.leginfo.ca.gov/ ca/aw.html.
OWNER CERTIFICATION: The applicant certifies that all documents and plans clearly and accurately show all existing and proposed buildings, structures, access roads, and utilities/utility
easements. All proposed modifications and/or additions are clearly labeled on the site plan. Any potentially existing detail within these plans Inconsistent with the site plan are not approved
for construction and may be required to be altered or removed. The city's approval of the application is based on the premise that the submitted documents and plans show the correct
dimensions of; the property, buildings, structures and their setbacks from property lines and from one another; access roads/easements, and utilities. The existing and proposed use of each
building as stated is true and correct; all easements and other encumbrances to development have been accurately shown and labeled as well as all on-site grading/site preparation. All
improvements existing on the property were completed in accordance with all regulations In existence at the time of their construction, unless otherwise noted.
NAME (PRINT): MICHAEL GALLAGHER SIGN: Mi.<:Juw/t tr}~~ht, DATE: 09/25/2024
Note: If the Derson sil!ninl! above Is an authorized aaent for the propertv owner Include form 8-62 signedbv ;;;pertv owner.
1635 Faraday Ave Carlsbad, CA 92008 Ph: 442-339-2719 Email: Building@carlsbadca.gov
2
REV. 04/22
Oo'cuslgn Envelope ID: 8082FFF2-9767-413C-BED7-F343927DBBC3
{Cityof
Carlsbad
OWNER-BUILDER
ACKNOWLEDGEMENT
FORM
B-61
Development Services
Building Division
1635 Faraday Avenue
442-339-2719
www.carlsbadca.gov
OWNER-BUILDER ACKNOWLEDGMENT FORM
Pursuant to State of California Health and Safety Code Section 19825-19829
To: Property Owner
An application for construction permit(s) has been submitted in your name listing you as the owner-builder of the
property located at:
Site Address 1384 CYNTHIA LANE, CARLSBAD, CA 92008
The City of Carlsbad ("City") is providing you with this Owner-Builder Acknowledgment and Verification form
to inform you of the responsibilities and the possible risks associated with typical construction activities issued
in your name as the Owner-Builder.
The City will not issue a construction permit until you have read and initialed your understanding of each
provision in the Property Owner Acknowledgment section below and sign t he form. An agent of the owner
cannot execute this notice unless you, the property owner, complete the Owner's Authorized Agent form and
it Is accepted by the City of Carlsbad.
INSTRUCTIONS: Please read and initial each statement below to acknowledge your understanding and
verification of this information by signature at the bottom of the form. These are very important construction
related acknowledgments designed to inform the property owner of his/her obligations related to the requested
permit activities.
I. ~.at.-nderstand a frequent practice of unlicensed contractors is to have the property owner obtain an "Owner ~ building permit that erroneously implies that the property owner is providing his or her own labor and
material personally. I, as an Owner-Builder, may be held liable and subject to serious financial risk for any injuries
sustained by an unlicensed contractor and his or her employees while working on my property. My homeowner's
II.
Ill.
IV.
V.
insurance may not provide coverage for those injuries. I am willfully acting as an Owner-Builder and am aware of
limits of my insurance coverage for injuries to workers on my property.
~understand building permits are not required to be signed by property owners unless they are responsible
Dt e construction and are not hiring a licensed contractor to assume this responsibility.
~nderstand as an "Owner-Builder" I am the responsible party of record on the permit. I understand that I
-,.,r.:m-"1"11'1"1'1-ect myself from potential financial risk by hiring a licensed contractor and having the permit filed in his
P'1er name instead of my own.
~understand contractors are required by law to be licensed and bonded in California and to list their license
s on permits and contracts.
'fl-'Ii!-n-ns~-.i!rtnderstand if I employ or otherwise engage any persons, other than California licensed contractors, and
value of my construction is at least five hundred dollars ($500), including labor and materials, I may be
considered an "employer" under state and federal law.
REV. 08/20
Docusign Envelope ID: 8D82FFF2-9767-413C-BED7-F343927DBBC3
Owner-Builder Acknowledgement Continued
VI. ~aAtunderstand if I am considered an "employer" under state and federal law, I must register with the state
~eral government, withhold payroll taxes, provide workers' compensation disability insurance, and
contribute to unemployment compensation for each "employee." I also understand my failure to abide by these
may subject me to serious financial risk.
VII. ~understand under California Contractors' State License Law, an Owner-Builder who builds single-family
resI en 1al structures cannot legally build them with the intent to offer them for sale, unless all work is performed
by licensed subcontractors and the number of structures does not exceed four within any calendar year, or all of
s performed under contract with a licensed general building contractor.
VIII. nderstand as an Owner-Builder if I sell the property for which this permit is Issued, I may be held liable
nancial or personal injuries sustained by any subsequent owner(s) which result from any latent
tion defects in the workmanship or materials.
IX. understand I may obtain more information regarding my obligations as an "employer'' from the Internal
e ue Service, the United States Small Business Administration, the California Department of Benefit
Payments, and the California Division of Industrial Accidents. I also understand I may contact the California
Contractors' State License Board (CSLB) at 1--800-321-CSLB (2752) or www.cslb.ca.gov for more information
!?lb t rcensed contractors.
X. am aware of and consent to an Owner-Builder building permit applied for in my name, and understand
XI.
XII.
t at am the party legally and financially responsible for proposed construction activity at the following address:
0i384 Cynthia Lane, Carl sbad, CA 92008
~gree that, as the party legally and financially responsible for this proposed construction activity, I will abide
applicable laws and requirements that govern Owner-Builders as well as employers.
~gree to notify the issuer of this form immediately of any additions, deletions, or changes to any of the
in orma ion I have provided on this form.
Licensed contractors are regulated by laws designed to protect the public. If you contract with someone who
does not have a license, the Contractor's State License Board may be unable to assist you with any financial loss
you may sustain as a result of a complaint. Your only remedy against unlicensed Contractors may be in civil court.
It is also important for you to understand that if an unlicensed Contractor or employee of that individual or firm
is injured while working on your property, you may be held liable for damages. If you obtain a permit as Owner-
Builder and wish to hire contractors, you will be responsible for verifying whether or not those contractors are
properly licensed and the status of their workers' compensation coverage.
Before a building permit can be issued, this form must be completed, signed by the property owner and returned
to the City of Carlsbad Building Division.
I declare under penalty of perjury that I have read and understand all of the informotian provided on this form and that my responses, including my
authority to sign this form, Is true and correct. I am aware that I hove the option to consult with legal counsel prior to signing this form, and I have
either (1) consulted with /ego/ counsel prior to signing this form or (2) have waived this right In signing this farm without the advice of legal counsel.
coastal Dream Homes LLC
Property Owner Name (PRINT) ~
OocuSlgned by:
Atidwl~}~
BF!f'll!tq,~t$.wner Signature
2 REV.08/20
PERMIT INSPECTION HISTORY for (CBR2024-2574)
Permit Type: BLDG-Residential
Work Class: Addition
Application Date: 09/26/2024 Owner: COASTAL DREAM HOMES LLC
Issue Date: 12/12/2024 Subdivision: PARCEL MAP NO 15737
Status:
Scheduled
Date
06/02/2025
06/03/2025
Closed -Finaled Expiration Date: 08/25/2025
IVR Number: 59181
Address: 1384 CYNTHIA LN
CARLSBAD, CA 92008-1507
Actual Inspection Type
Start Date
Inspection No. Inspection Primary Inspector
Checklist Item
Are erosion control BMPs
functioning properly?
Are perimeter control BMPs
maintained?
Is the entrance stabilized to
prevent tracking?
Have sediments been tracked
on to the street?
Has trash/debris accumulated
throughout the site?
Are portable restrooms
properly positioned?
Do portable restrooms have
secondary containment?
Status
COMMENTS
06/02/2025 BLDG-Final Inspection
Checklist Item
286517-2025
COMMENTS
Partial Pass Dirk de Roggenbuke
BLDG-Building Deficiency
BLDG-Plumbing Final
BLDG-Mechanical Final
BLDG-Structural Final
BLDG-Electrical Final
6/2/25 change AC breaker to 45 A per
manufacturer placard
6/2/25 GFCI required for garage EV
charging
06/03/2025 BLDG-Final Inspection
Checklist Item
286831-2025
COMMENTS
Passed Dirk de Roggenbuke
BLDG-Building Deficiency
BLDG-Plumbing Final
BLDG-Mechanical Final
BLDG-Structural Final
BLDG-Electrical Final
6/2/25 change AC breaker to 45 A per
manufacturer placard
6/3/25 correction made
6/2/25 GFCI required for garage EV
charging
6/3/25 correction made
Reinspection Inspection
Passed
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Relnspectlon Incomplete
Passed
Yes
Yes
No
Yes
No
Passed
Yes
Yes
Yes
Yes
Yes
Complete
Tuesday, July 1, 2025 Page 3 of3
PERMIT INSPECTION HISTORY for (CBR2024-2574)
Permit Type: BLDG-Residential Application Date: 09/26/2024 Owner: COASTAL DREAM HOMES LLC
Work Class: Addition Issue Date: 12/12/2024 Subdivision: PARCEL MAP NO 15737
Status: Closed -Finaled Expiration Date: 08/25/2025 Address: 1384 CYNTHIA LN
IVR Number: 59181 CARLSBAD, CA 92008-1507
Scheduled Actual Inspection Type Inspection No. Inspection Primary Inspector Reinspection Inspection
Date Start Date Status
Checklist Item COMMENTS Passed
BLDG-Building Deficiency Yes
BLDG-14 Yes
Frame-Steel-Bolting-Welding
(Decks)
BLDG-24 Rough-Topout Yes
BLDG-34 Rough Electrical Yes
BLDG-44 Yes
Rough-Ducts-Dampers
BLDG-SW-Inspection 276073-2025 Partial Pass Dirk de Roggenbuke Reinspection Incomplete
Checklist Item COMMENTS Passed
Are erosion control BMPs Yes
functioning properly?
Are perimeter control BMPs Yes
maintained?
Is the entrance stabilized to Yes
prevent tracking?
Have sediments been tracked Yes
on to the street?
Has trash/debris accumulated Yes
throughout the site?
Are portable restrooms Yes
properly positioned?
Do portable restrooms have Yes
secondary containment?
02/25/2025 02/25/2025 BLDG-16 Insulation 277181-2025 Passed Dirk de Roggenbuke Complete
Checklist Item COMMENTS Passed
BLDG-Building Deficiency 2/25/25 insulation cert. received Yes
BLDG-17 Interior 276965-2025 Passed Dirk de Roggenbuke Complete
Lath/Drywall
Checklist Item COMMENTS Passed
BLDG-Building Deficiency Yes
BLDG-27 Shower 276964-2025 Passed Dirk de Roggenbuke Complete
PanfTubs
Checklist Item COMMENTS Passed
BLDG-Building Deficiency Yes
BLDG-SW-Inspection 277118-2025 Partial Pass Dirk de Roggenbuke Re inspection Incomplete
Tuesday, July 1, 2025 Page 2 of 3
Building Permit Inspection History Finaled
{cityof
Carlsbad
PERMIT INSPECTION HISTORY for (CBR2024-2574)
Permit Type: BLDG-Residential Application Date: 09/26/2024 Owner: COASTAL DREAM HOMES LLC
Work Class: Addition Issue Date: 12/12/2024 Subdivision: PARCEL MAP NO 15737
Status: Closed -Finaled Expiration Date: 08/25/2025 Address: 1384 CYNTHIA LN
IVR Number: 59181 CARLSBAD, CA 92008-1507
Scheduled Actual Inspection Type Inspection No. Inspection Primary Inspector Reinspection Inspection
Date Start Date Status
12/31/2024 12/31/2024 BLDG-11 272304-2024 Passed Dirk de Roggenbuke Complete
Foundatlon/Ftg/Piers
(Rebar)
Checklist Item COMMENTS Passed
BLDG-Building Deficiency Yes
BLDG-21 272170-2024 Passed Dirk de Roggenbuke Complete
Underground/Underflo
or Plumbing
Checklist Item COMMENTS Passed
BLDG-Building Deficiency Yes
BLDG-SW-Inspection 272305-2024 Partial Pass Dirk de Roggenbuke Re inspection Incomplete
Checklist Item COMMENTS Passed
Are erosion control BMPs Yes
functioning properly?
Are perimeter control BMPs Yes
maintained?
Is the entrance stabilized to Yes
prevent tracking?
Have sediments been tracked Yes
on to the street?
Has trash/debris accumulated Yes
throughout the site?
Are portable restrooms Yes
properly positioned?
Do portable restrooms have Yes
secondary containment?
01/24/2025 01/24/2025 BLDG-14 274351-2025 Passed Duncan McClane Complete
Frame/Steel/Bolting/We
ldlng (Decks)
Checklist Item COMMENTS Passed
BLDG-Building Deficiency Yes
BLDG-15 Roof/ReRoof 274352-2025 Passed Duncan McClane Complete
(Patio}
Checklist Item COMMENTS Passed
BLDG-Building Deficiency Yes
02/12/2025 02/12/2025 BLDG-84 Rough 275958-2025 Passed Dirk de Roggenbuke Complete
Combo(14,24,34,44)
Tuesday, July 1, 2025 Page 1 of 3
George Postulka Inspection Services
PO Box 503
RECORD COPY
Poway, CA 92074
(858) 354-9918 SPECIAL INSPECTION REPORT
Project: Ga lla.-gh e, f{ps I
Addreu: 'j_/?'I ;ft i-/z,',,, Ln,
City: Ca ~ bq,
City of Carlsbad
FEB 12 202~
BUILDING DIVISION
Permit Number. C.86 202':f-'2. $'? Lf Plan File Number. _________ _
TYPE OF OBSERVATIONS:
Reinforcing Steel _ Reinforced Concrete_ Structural Masonry_ Field Welding_
Epoxy$_ Prestresscd Concrete_ Shop Welding_ Bolting_ Fireproofing_
Number of Samples:__ Type: __________________ _
Materials/DesignMix/Psi: 11 -GI~ -r; a 11 -> 6 7 (i ~I,~ . .v,
->lw/?sar:1 $1:r ?·C. £51< '+o S:7 €>y0 I-2 G
Date: /'2.-2 7 -2 'I
REPORT ,
I absANf'YL -1:& :1:r1k,/4e,,f a£-#= 't dot,J1:J,;, in-If) -1-fu. -e.y,sfll$
C,::,,,Crr,{g -£041.te4-ft;f? at f/4-e. o,..S: /,k
• ' e et(tS ft"fo
hP✓ £-{2.£ -f"o~ Ot'N uo,1 -z. flol--e Wlfi.S. 1r;11rt21~~ g/soz.
IJJ/ hole; tve,.< brv s6,,J~,,dJ'2/4w,,, c.fuv: o,-":rv, io e"1/2J,-,eJ--;
WORK INSPEC~CONFORMS WITH APPROV~j~~ AND SPECIFICATIONS UNLESS OTHERWISE NOTED
tf.. eor5--e ~ f«lh J'?.f"tt:124 tee TIME IN:/ 4: 00 TIME OUT:_. ___ _
Inspector (Print) Certification #
General Contractor: C. 6"6/a / JJ,. ~ J4m ,s J
..... , ~c.-..---~-~~~~_:_:_:~~~----_-_-_-_-_-_-~_ -ddress:jlJ_-=ei~J-11="'--/,.,_'loi.e__ ______ _ City: ____________ _ ~ '. --= tho ' b '--;-s·
Phone: -------------o Site ontact 1gnaturc
•
True North
COMPLIANCE SERVICES
December 4, 2024
City of Carlsbad
Community Development Department -Building Division
1635 Faraday Ave.
City of Carlsbad -FINAL REVIEW
City Permit No: CBR2024-2574
True North No.: 24-018-861
Carlsbad, CA 92008
Plan Review: Residential Addition
Address: 1384 Cynthia Ln
Applicant Name: Steve Ragan
Applicant Email: steve@newmoderndesign.com
OCCUPANCY AND BUILDING SUMMARY:
Occupancy Groups: R-3
Occupant Load: N/ A
Type of Construction: V-B
Sprinklers: No
Stories: 2-Story
Area of Work (sq. ft.): 47 sq. ft. Addition + 194 sq.ft. Office Space + 1741 Remodel
The plans have been reviewed for coordination with the permit application.
Valuation: Confirmed
Scope of Work: Confirmed
Floor Area: Confirmed
Attn: Building & Safety Department,
True North Compli ance Serv ices, Inc. has completed the final review of the following documents for the project
referenced above on behalf of the City of Carlsbad:
I.
2.
3.
4.
Drawings: One (I) copy dated November 19, 2024, by New Modern Design.
Structural Calculations: One (I) copy, by Brian H. Qualls.
Geotechnical Report: One ( l) copy dated September I 0, 2024, by East County Soil Consultation and
Engineering, Inc.
Other Documents: One (I) copy dated October 25, 2024, by East County Soil Consultation and Engineering,
Inc ..
The 2022 California Building, Mechanical, Plumbing, and Electrical Codes (i.e., 2021 IBC, UMC, UPC, and 2020
NEC, as amended by the State of California), 2022 California Green Building Standards Code, 2022 California
Existing Building Code, and 2022 California Energy Code, as applicable, were used as the basis of o ur review.
Please note that our review has been completed and we have no further comments.
True North Compliance Services, Inc.
8369 Vickers Street, Suite 207, San Diego, CA 92111
T / 562.733.8030
We have enclosed the above noted documents bearing our review stamps for your use. Please call if you have any
questions or if we can be of further assistance.
Sincerely,
True North Compliance Services
Review By: Qamar Aloqaily -Plan Review Engineer
Quality Review By: Alaa Atassi -Plan Review Engineer
Gallagher Residence
1384 Cynthia Lane,
Carls bad, CA 92008
Structural Calculations -24168
Qualls Engineering
Structural Engineering Services
New Modem Design
6969 Shoreline Drive
Carlsbad, CA 92014
Phone: 619 920-8314
Qualls Engineering Sheet 1/26
Structural Engineering Services Project: Gallagher Residence Job#: 241 68
GOVERNING CODE:
CONCRETE:
REINFORCING STEEL:
SAWN LUMBER:
ENGINEERED WOOD
Engineer: JF
DESIGN BASIS
2022 CBC
f c = 2,500 psi (MINIMUM)
ASTM A615, Fy = 60 ksi
Date: 09-20-24
DOUGLAS FIR LARCH, ALLOWABLE STRESS DESIGN PER 2022 CBC.
BOISE CASCADE OR EQUIVALENT
BCI WOOD "I' JOISTS -ICC-ESR 1336
BC VERSALAM 2.0E/LVULSL-ICC-ESR 1040
PROJECT SCOPE
Project consists of a proposed addition and remodel to an existing two-story single-
family residence. The addition will include an approximately 200 square feet
detached office and an approximately 50 square feet infill of an existing second story
deck with a new roof above. The remodel of the existing residence will include
adjustment of exterior walls and windows, removal of existing interior bearing walls,
and a new roof over the existing master bathroom and closet located at 1384
Cynthia Lane, Carlsbad, CA 92008. The proposed addition and remodel is primarily
constructed utilizing wood frame construction with 2x metal plated roof trusses, 2x
stick framed roof. The new & existing foundation will be typical slab on grade with
turned down footings. There has been a soils report provided for this project.
Therefore, the foundation design will be based on recommendations of the project
geotechnical engineer.
Qualls Engineering
Structural Engineering Services
Design Loads:
Roof:
Dead Load ( DL)
Roofing
1/2" Plywood
Wood Framing
Insulation
1/2" Gyp. Bd.
Mech./Elec.
Misc.
LDL =
Live T ,oad (LL)
Project:
Engineer:
10.0 psf
1.3 psf
4.0 psf
0.5 psf
2.2 psf
0.5 psf
1.5 psf
20.0 psf
Gallagher Residence
F
Floor:
Dead Load ( DL )
Flooring
3/4" Plywood
Wood Framing
Insulation
5/8" Gyp. Bd.
Mech./Elec.
Misc.
Sheet: 2
Job #: 24168 ------Date:
4.0 psf
2.0 psf
3.0 psf
0.5 psf
2.8 psf
1.2 psf
_-!"'L.~5 psf I DL = 15.0 psf
Live Load (LL)
LL = ____ 20 .... 0 ... psf (Reducible)
DL + LL =I 40.0ipsf
LL=
DL+ LL =i 40.0 psf (Reducible)
55.olpsf
Walls:
Stud Walls
Exterior Stud Walls
Interior Stud Walls
Allowable Soils Bearing Pressure:
15.0 psf
7.0 psf
.ASBP = 2,000 psf @ 18 inches below lowest adjacent finished grade
Seismic:
Site Class: D
Ss = 1.044
s, = 0.379
F, = 1.200
F" = -
Occupancy Importance
Category Factor, Ic
Tl 1.00
Wind Load: (Simplified Envelope Procedure)
Basic Wind Speed: 96 mph
Exposure: C
MWFRS
P = 0.6*11.~K,/Ps30
(LRFD): P =
(.ASD): p =I
17.8 psf
10.7lpsf
Componwts & Cladding
P = 0.6*A~K,i*Pnct30
(LRFD): P =
(.ASD): p =I
21.8 psf
13.1 lpsf
Response
Mod. Factor
R
6.5
11.=
K,,=
P s30=
p net3o=
SMs = 1.130
SM,=.
Redundancy
Factor
pCs
Sos/(R/I)
p (LRFD) I (\SD )
1.3 0.151 0.108
1.29
1.0
13.8
16.9
0.753
Qualls Engineering
4403 f1.;1anchester Ave #203
Encinitas, CA 92024
760-652-9257
Project Title:
Engineer:
Project ID:
Project Descr:
Gallagher Residence
JF
24168 3
Project File: 24168 -Gallagher Residence.ec6 jWood Beam
UC#: KW-06015197, Build:20.24.08.01
DESCRIPTION: RB-1
Qualls Engineering (c) ENERCALC 1983-2023
CODE REFERENCES
Calculations per NOS 2018, IBC 2021 , ASCE 7-16
Load Combination Set : ASCE 7-16
Material Properties
Analysis Method : Allowable Stress Design
Load Combination : ASCE 7-16
Wood Species
Wood Grade
Douglas Fir-Larch
No.1
Fb +
Fb -
Fe-Pr11
Fe -Perp
Fv
Ft
1,350.0 psi
1,350.0 psi
925.0psi
625.0psi
170.0 psi
675.0psi
------------
E : Modulus of Elasticity
Ebend-xx 1,600.0ksi
Eminbend -xx 580.0ksi
Density 31.210pcf
Beam Bracing Beam is Fully Braced against lateral-torsional buckling
60,19 Lr 0.1 .19)
4x10 4x10 4x10
Span= 3.50 n 2 span= 11.250 n 3 4
span= 1.750 n
Applied Loads Service loads entered. Load Factors will be applied for calculations. ------
Beam self weight calculated and added to loading
Load for Span Number 1
Varying Uniform Load : D= 0.020->0.020, Lr= 0.020->0.020 ksf, Extent= 0.0 --» 3.50 ft, Trib Width= 0.0->5.0 ft, (ROOF)
Load for Span Number 2
Varying Uniform Load : D= 0.020->0.020, Lr= 0.020->0.020 ksf, Extent= 0.0 --» 11.250 ft, Trib Width= 0.0->8.0 ft, (ROOF)
Load for Span Number 3
Varying Uniform Load : D= 0.020->0.020, Lr= 0.020->0.020 ksf, Extent = 0.0 --» 1. 750 ft, Trib Width = 8.0->9.50 ft, (ROOF)
DESIGN SUMMARY
Maximum Bending Stress Ratio
Section used for this span
fb: Actual
F'b
= 0.288 1
4x10
= 585.88psi
= 2,025.00psi
Maximum Shear Stress Ratio
Section used for this span
fv: Actual
F'v
=
Design OK
0.224: 1
4x10
= 47.64 psi
= 212.50 psi
Load Combination +D+Lr+H, LL Comb Run (*L*) Load Combination +D+Lr+H, LL Comb Run (*LL)
Location of maximum on span
Span# where maximum occurs
Maximum Deflection
Max Downward Transient Deflection
Max Upward Transient Deflection
Max Downward Total Deflection
Max Upward Total Deflection
Overall Maximum Deflections
Load Combination Span
1
+D+Lr+H, LL Comb Run (*L*) 2
3
= 6.429ft Location of maximum on span
Span# where maximum occurs
= 10.494 ft
Span# 2 = Span# 2
0.079 in
-0.041 in
0.145 in
-0.073 in
Ratio=
Ratio=
Ratio=
Ratio=
1704>=240
1012 >=240
929>=180
576>=180
Span: 2 : Lr Only, LL Comb Run (*L*)
Span: 3 : Lr Only, LL Comb Run (*L*)
Span: 2 : +D+Lr+H, LL Comb Run (*L*)
Span: 3 : +D+Lr+H, LL Comb Run (*L *)
Max. "-" Defl Location in Span Load Combination Max. "+" Defl Location in Span
0.0000 0.000
0.1452 5.861
0.0000 5.861
+D+Lr+H, LL Comb Run (*L*)
+D+Lr+H, LL Comb Run (*L*)
-0.1249
0.0000
-0.0727
0.000
0.000
1.750
Qualls Engineering
4403 ~anchester Ave #203
Encinitas, CA 92024
760-652-9257
\Wood Beam
L IC#: KW-06015197, Build:20.24.08.01
DESCRIPTION: RB-1
Vertical Reactions
Load Combination
Max Upwar om all Load Cond1t1ons
Max Upward from Load Combinations
Max Upward from Load Cases
Max Downward from all Load Conditio
Max Downward from Load Cases (Resis
+D+H
+D+L+H, LL Comb Run (**L)
+D+L+H, LL Comb Run (*L*)
+D+L+H, LL Comb Run (*LL)
+D+L+H, LL Comb Run (L **)
+D+L+H, LL Comb Run (L*L)
+D+L+H, LL Comb Run (LL*)
+D+L+H, LL Comb Run (LLL)
+D+Lr+H, LL Comb Run (**L)
+D+Lr+H, LL Comb Run (*L*)
+D+Lr+H, LL Comb Run (*LL)
+D+Lr+H, LL Comb Run (L**)
+D+Lr+H, LL Comb Run (L*L)
+D+Lr+H, LL Comb Run (LL*)
+D+Lr+H, LL Comb Run (LLL)
+D+S+H
+D+0.750Lr+0.750L+H, LL Comb Run(*
+D+0.750Lr+0.750L+H, LL Comb Run (*
+D+0.750Lr+0.750L+H, LL Comb Run(*
+D+0.750Lr+0.750L+H, LL Comb Run (L
+D+0.750Lr+0.750L+H, LL Comb Run (L
+D+0.750Lr+0.750L+H, LL Comb Run (L
+D+0.750Lr+0.750L+H, LL Comb Run (L
+D+0.750L+0.750S+H, LL Comb Run(**
+D+0.750L+0.750S+H, LL Comb Run (*L
+D+0.750L+0.750S+H, LL Comb Run (*L
+D+0.750L+0.750S+H, LL Comb Run (L *
+D+0.750L+0.750S+H, LL Comb Run (L*
+D+0.750L+0.750S+H, LL Comb Run (LL
+D+0.750L+0.750S+H, LL Comb Run (LL
+D+0.60W+H
+D+0.750Lr+0.750L+0.450W+H, LL Comb
+D+0.750Lr+0.750L+0.450W+H, LL Comb
+D+0.750Lr+0.750L+0.450W+H, LL Comb
+D+0.750Lr+0.750L+0.450W+H, LL Comb
+D+0.750Lr+0.750L+0.450W+H, LL Comb
+D+0.750Lr+0.750L+0.450W+H, LL Comb
+D+0.750Lr+0.750L+0.450W+H, LL Comb
+D+0.750L+0.750S+0.450W+H, LL Comb
+D+0.750L+0.750S+0.450W+H, LL Comb
+D+0.750L+0.750S+0.450W+H, LL Comb
+D+0.750L+0.750S+0.450W+H, LL Comb
+D+0.750L+0.750S+0.450W+H, LL Comb
+D+0.750L+0.750S+0.450W+H, LL Comb
+D+0.750L+0.750S+0.450W+H, LL Comb
+0.60D+0.60W+0.60H
+D+0.70E+0.60H
+D+0.750L+0.750S+0.5250E+H, LL Comb
+D+0.750L+0.750S+0.5250E+H, LL Comb
+D+0.750L+0.750S+0.5250E+H, LL Comb
+D+0.750L+0.750S+0.5250E+H, LL Comb
+D+0.750L+0.750S+0.5250E+H, LL Comb
+D+0.750L+0.750S+0.5250E+H, LL Comb
+D+0.750L+0.750S+0.5250E+H, LL Comb
+0.60D+0.70E+H
Project Title:
Engineer:
Project ID:
Project Descr:
Qualls Engineering
Gallagher Residence
JF
24168 4
Project File: 24168 -Gallagher Residence.ec6
(c) ENERC I C 1983-2023
Support notation : Far left is #1 Values in KIPS
Support 1 Support 2 Support 3 Support 4
1.02
1.029
0.536
-0.025
-0.025
0.536
0.536
0.536
0.536
0.536
0.536
0.536
0.536
0.511
0.836
0.811
0.729
0.704
1.029
1.004
0.536
0.517
0.761
0.742
0.680
0.662
0.905
0.887
0.536
0.536
0.536
0.536
0.536
0.536
0.536
0.536
0.517
0.761
0.742
0.680
0.662
0.905
0.887
0.536
0.536
0.536
0.536
0.536
0.536
0.536
0.321
0.536
0.536
0.536
0.536
0.536
0.536
0.536
0.536
0.321
1.s=2----------------~-----
1.892
0.961
-0.018
-0.018
0.961
0.961
0.961
0.961
0.961
0.961
0.961
0.961
1.292
1.561
1.892
0.943
1.274
1.543
1.874
0.961
1.210
1.411
1.660
0.948
1.196
1.398
1.646
0.961
0.961
0.961
0.961
0.961
0.961
0.961
0.961
1.210
1.411
1.660
0.948
1.196
1.398
1.646
0.961
0.961
0.961
0.961
0.961
0.961
0.961
0.577
0.961
0.961
0.961
0.961
0.961
0.961
0.961
0.961
0.577
I
Qualls Engineering
4403 ~anchester Ave #203
Encinitas, CA 92024
760-652-9257
Project Title:
Engineer:
Gallagher Residence
JF 5 Project ID:
Project Descr:
24168
Wood Beam
UC#: KW-06015197, Build:20.24.08.01
DESCRIPTION: RB-2
Qualls Engineering
Project File: 24168 -Gallagher Residence.ec6
(c) ENERCALC INC 1983-2023
CODE REFERENCES
Calculations per NOS 2018, IBC 2021 , ASCE 7-16
Load Combination Set: ASCE 7-16
Material Properties
Analysis Method : Allowable Stress Design
Load Combination : ASCE 7-16
Fb +
Fb •
1,350.0 psi
1,350.0 psi
925.0psi
625.0psi
170.0psi
675.0psi
E : Modulus of Elasticity
Wood Species
Wood Grade
Beam Bracing
Douglas Fir-Larch
No.1
Fe -Prll
Fe -Perp
Fv
Ft
Beam is Fully Braced against lateral-torsional buckling
0(0.3J) r(0.34)
4x10
Span= 10.0 ft
Ebend-xx 1,600.0ksi
Eminbend -xx 580.0ksi
Density 31.210pcf
2
Applied Loads Service loads entered. Load Factors will be applied for calculations. ----
Beam self weight calculated and added to loading
Point Load : D = 0.370, Lr= 0.340 k@ 6.0 ft, (HIP BEAM BElW GRIDS E/F & 2/4)
Point Load : D = 0.370, Lr= 0.340 k@ 6.0 ft, (HIP BEAM BElW GRIDS E/F & 2/4)
Point Load : D = 0.330, Lr= 0.310 k@ 6.0 ft, (RB ON GRID 2.5 BElW D.5&E (L))
DESIGN SUMMARY
Maximum Bending Stress Ratio =
Section used for this span
fb: Actual =
F'b =
Load Combination
Location of maximum on span =
Span# where maximum occurs =
Maximum Deflection
Max Downward Transient Deflection
Max Upward Transient Deflection
Max Downward Total Deflection
Max Upward Total Deflection
Overall Maximum Deflections
Load Combination
+D+Lr
Vertical Reactions
Load Combination
Span
Max Upward from all Load Conditions
Max Upward from Load Combinations
Max Upward from Load Cases
DOnly
+D+Lr
+D+0.750Lr
+0.600
0.59Ei 1
4x10
1,206.04psi
2,025.00psi
+D+Lr
5.985ft
Span# 1
Maximum Shear Stress Ratio
Section used for this span
fv: Actual
F'v
Load Combination
Location of maximum on span
Span # where maximum occurs
0.092 in Ratio=
O in Ratio=
0.196 in Ratio=
O in Ratio=
1304>=240
0<240
613 >=180
0<180
Span: 1 : Lr Only
n/a
Span: 1 : +D+Lr
n/a
Max. "-" Defl Location in Span Load Combination
0.1957 5.292
Support notation : Far left is #1
Support 1 Support 2
--01!59 1.2
0.859 1.271
0.463 0.677
0.463 0.677
0.859 1.271
0.760 1.123
0.278 0.406
Design OK
= 0.276: 1
4x10
= 58.64 psi
= 212.50 psi
+D+Lr
= 9.234 ft
= Span# 1
Max. "+" Defl Location in Span
0.0000 0.000
Values in KIPS
Qualls Engineering
4403 "!'anchester Ave #203
Encinitas, CA 92024
760-652-9257
Project Title:
Engineer:
Gallagher Residence
JF 6 Project ID:
Project Descr:
24168
Wood Beam
UC#: KW-06015197, Build:20.24.08.01
DESCRIPTION: RB-3
Qualls Engineering
Project File: 24168 -Gallagher Residence.ec6
(c) ENERCALCI NC 1983-2023
CODE REFERENCES
Calculations per NOS 2018, IBC 2021, ASCE 7-16
Load Combination Set : ASCE 7-16
Material Properties
Analysis Method : Allowable Stress Design
Load Combination : ASCE 7-16
Fb + 1,350.0 psi
1,350.0 psi
925.0psi
625.0psi
170.0 psi
675.0psi
E : Modulus of Elasticity
Wood Species
Wood Grade
Beam Bracing
£
Douglas Fir-Larch
No.1
Fb -
Fe -Prll
Fe -Perp
Fv
Ft
Beam is Fully Braced against lateral-torsional buckling
D 0.13 Lr 0.13
6x12
Span : 14.50 ft
Ebend-xx 1,600.0 ksi
Eminbend -xx 580.0ksi
Density 31.210pcf
1
2
Applied Loads Service loads entered. Load Factors will be applied for calculations.
Beam self weight calculated and added to loading
Uniform Load : D = 0.020, Lr = 0.020 ksf, Tributary Width = 6.50 ft, (ROOF)
DESIGN SUMMARY
Maximum Bending Stress Ratio =
Section used for this span
0.422 1
6x12
Maximum Shear Stress Ratio
Section used for this span
fb: Actual =
F'b =
Load Combination
Location of maximum on span =
Span # where maximum occurs =
Maximum Deflection
712.0Spsi
1,687.50 psi
+D+Lr
7.250ft
Span# 1
fv: Actual
F'v
Load Combination
Location of maximum on span
Span # where maximum occurs
Max Downward Transient Deflection
Max Upward Transient Deflection
Max Downward Total Deflection
Max Upward Total Deflection
0.117 in Ratio=
O in Ratio=
0.246 in Ratio=
O in Ratio=
1492>=240
0<240
708>=180
0<180
Span: 1 : Lr Only
nla
Span: 1 : +D+Lr
n/a
Overall Maximum Deflections
Load Combination
+D+Lr
Span Max."-" Defl Location in Span Load Combination
0.2455 7.303
Vertical Reactions Support notation : Far left is #1 --------------------------Lo ad Combination Support 1 Support 2
~M~a-x~U~p_w_a-rd~rro_m_a-,-,li...-L-oad~C~o-n-d=it~1o_n_s-----~1.""984 1.984
Max Upward from Load Combinations 1.984 1.984
Max Upward from Load Cases 1.042 1.042
D Only 1.042 1.042
+D+Lr 1.984 1.984
+D+0.750Lr 1.749 1.749
+0.600 0.625 0.625
Lr Only 0.943 0.943
Design OK
= 0.192: 1
6x12
= 40.88 psi
= 212.50 psi
+D+Lr
= 0.000 ft
= Span# 1
Max. "+" Defl Location in Span
0.0000 0.000
Values in KIPS
Qualls Engineering
4403 Manchester Ave #203
Encinitas, CA 92024
760-652-9257
Project Title:
Engineer:
Gallagher Residence
JF 7 Project ID:
Project Descr:
24168
W o od Beam Project File: 24168 -Gallagher Residence.ec6
UC#: KW-06015197, B~u~ild-:2~0~.2-4.~08~.0~1----------~Q-ua~ll's-E=n-g~in-ee-n~·n-g-------------(~c) ENERCALC INC 1983-2023
DESCRIPTION: RH-1
CODE REFERENCES
Calculations per NDS 2018, IBC 2021, ASCE 7-16
Load Combination Set : ASCE 7-16
Material Pro erties -------------
Analysis Method : Allowable Stress Design
Load Combination : ASCE 7-16
Wood Species
Wood Grade
Beam Bracing
Douglas Fir-Larch
No.2
Completely Unbraced
0(0.8) r(0.74)
Fb +
Fb -
Fe-Prtl
Fe -Perp
Fv
Ft
4x8
Span= 3.50 ft
875.0psi
875.0psi
600.0psi
625.0psi
170.0 psi
425.0psi
E : Modulus of Elasticity
Ebend-xx 1,300.0 ksi
Eminbend -xx 470.0ksi
Density 31.210pcf
Applied Loads Service loads entered. Load Factors will be applied for calculations.
Beam self weight calculated and added to loading
Point Load : D = 0.80, Lr= 0.740 k@ 1.50 ft, (RB ON GRID 0 .5 BETW 2&3 (R))
DESIGN SUMMARY Design OK
Maximum Bending Stress Ratio = 0.367: 1 Maximum Shear Stress Ratio = 0.247 : 1
Section used for this span 4x8 Section used for this span 4x8
fb: Actual = 517.96psi fv: Actual = 52.39 psi
F'b = 1,411.50psi F'v = 212.50 psi
Load Combination +D+Lr Load Combination +D+Lr
Location of maximum on span = 1.507ft Location of maximum on span = 0.000ft
Span # where maximum occurs = Span# 1 Span # where maximum occurs = Span# 1
Maximum Deflection
Max Downward Transient Deflection 0.008 in Ratio= 5427 >=240 Span: 1 : Lr Only
Max Upward Transient Deflection O in Ratio= 0<240 n/a
Max Downward Total Deflection 0.016 in Ratio= 2587>=180 Span: 1 : +D+Lr
Max Upward Total Deflection O in Ratio= Q<180 n/a
Overall Maximum Deflections
Load Combination Span Max. "-" Defl Location in Span Load Combination Max. "+" Defl Location in Span
+D+Lr 1 0.0162 1.686 0.0000 0.000
Vertical Reactions Support notation : Far left is #1 Values in KIPS ----------------------------------------Lo ad Combination Support 1 Support 2 Max Upward fromalfload Conditions 0.890 0.61.""0 ________________________ _
Max Upward from Load Combinations 0.890 0.670
Max Upward from Load Cases 0.467 0.352
D~ o.ffl o.m
+D+Lr 0.890 0.670
+D+0.750Lr 0.784 0.590
+0.600 0.280 0.211
Lr Only 0.423 0.317
Qualls Engineering
4403 Manchester Ave #203
Encinitas, CA 92024
760-652-9257
Project Title:
Engineer:
Gallagher Residence
JF 8 Project ID:
Project Descr:
24168
1 Wood Beam
UC#: KW-06015197, Build:20.24.08.01
DESCRIPTION: FJ-1
Qualls Engineering
Project File: 24168 -Gallagher Re~ide~ce-~c6 J
(c) ENERCALC INC 1983-2023
CODE REFERENCES -----
Calculations per NOS 2018, IBC 2021 , ASCE 7-16
Load Combination Set : ASCE 7-16
Material Properties
Analysis Method : Allowable Stress Design
Load Combination : ASCE 7-16
Wood Species
Wood Grade
Douglas Fir-Larch
No.1
Fb +
Fb -
Fe -Prll
Fe-Perp
Fv
Ft
Beam Bracing Beam is Fully Braced against lateral-torsional buckling
D 0.015 L 0.04
2x12
Span = 12.50 fl
1,000.0 psi
1,000.0 psi
1,500.0 psi
625.0 psi
180.0psi
675.0psi
E : Modulus of Elasticity
Ebend-xx 1,700.0ksi
Eminbend -xx 620.0ksi
Density 31.210pcf
D(OIDCQ. 08)
2
Applied Loads Service loads entered. Load Factors will be applied for calculations.
Beam self weight calculated and added to loading
Uniform Load : D = 0.0150, L = 0.040 ksf, Tributary Width = 1.0 ft, (FLOOR)
Point Load : D = 0.080, Lr= 0.080 k@ 10.0 ft, (ROOF)
Point Load : D = 0.0850 k@ 10.0 ft, (WALL)
DESIGN SUMMARY
Maximum Bending Stress Ratio =
Section used for this span
o.s1e 1
2x12
Maximum Shear Stress Ratio
Section used for this span
fb: Actual =
F'b =
fv: Actual
F'v
Load Combination
516.24psi
1,000.00psi
+D+L
6.797ft
Span# 1
Load Combination
Location of maximum on span =
Span# where maximum occurs =
Location of maximum on span
Span# where maximum occurs
Maximum Deflection
Max Downward Transient Deflection
Max Upward Transient Deflection
Max Downward Total Deflection
Max Upward Total Deflection
Overall Maximum Deflections
Load Combination
+D+L
Span
-~1
0.073 in Ratio =
O in Ratio=
0.129 in Ratio=
O in Ratio=
2053>=360
0<360
1162>=240
0<240
Span: 1 : L Only
n/a
Span: 1 : +D+L
n/a
Max. "-" Defl Location in Span Load Combination
0.1291 6.387
Vertical Reactions Support notation : Far left is #1 ------------------------Lo ad Combination Support 1 Support 2
• Max Upward from all Load Con~1=t1o_n_s-----~o~. =00---· o.49~--
Max Upward from Load Combinations 0.400 0.499
Max Upward from Load Cases 0.250 0.250
D Only 0.150 0.249
+D+L 0.400 0.499
+D+Lr 0.166 0.313
+D+O. 750Lr+O. 750L 0.349 0.484
Design OK
= 0.220: 1
2x12
= 39.56 psi
= 180.00 psi
+D+L
= 11 .588ft
= Span# 1
Max. "+" Defl Location in Span
0.0000
Values in KIPS
0.000
Qualls Engineering
4403 Manchester Ave #203
Encinitas, CA 92024
760-652-9257
Project Title:
Engineer:
Gallagher Residence
JF 9 Project ID:
Project Descr:
24168
~ood Beam
UC#: KW-06015197, Build:20.24.08.01 Qualls Engineering
Project File: 24168 -Gallagher Residence.ec6
{c) ENERCALC I 1983-2023
DESCRIPTION: FJ-2
CODE REFERENCES -------------
Ca I cu I at ions per NOS 2018, IBC 2021, ASCE 7-16
Load Combination Set : ASCE 7-16
Material Properties
Analysis Method : Allowable Stress Design
Load Combination • ASCE 7-16
Wood Species
Wood Grade
Beam Bracing
Douglas Fir-Larch
No.1
Beam is Fully Braced against lateral-torsional buckling
Fb +
Fb -
Fc-Pr11
Fe -Perp
Fv
Ft
1,000.0 psi
1,000.0 psi
1,500.0 psi
625.0psi
180.0psi
675.0psi
E : Modulus of Elasticity
Ebend-xx 1,700.0ksi
Eminbend -xx 620.0ksi
Density 31.210pcf
D(OO(Q.~18)
D 0.015 L 0.04 D 0.015 L 0.04
2x12 2x12
2 3
Span= 7.0 ft Span = 3.250 ft
Applied Loads Service loads entered. Load Factors will be applied for calculations. ---------------Beam self weight calculated and added to loading
Load for Span Number 1
Uniform Load : D = 0.0150, L = 0.040 ksf, Tributary Width = 1.0 ft, (FLOOR)
Load for Span Number 2
Uniform Load : D = 0.0150, L = 0.040 ksf, Tributary Width = 1.0 ft, (FLOOR)
Point Load : D = 0.180, Lr = 0.180 k @ 3.250 ft, (ROOF)
Point Load : D = 0.0850 k @ 3.250 ft, (WALL)
DESIGN SUMMARY
Maximum Bending Stress Ratio =
Section used for this span
fb: Actual =
F'b =
Load Combination
Location of maximum on span =
Span # where maximum occurs =
Maximum Deflection
Max Downward Transient Deflection
Max Upward Transient Deflection
Max Downward Total Deflection
Max Upward Total Deflection
Overall Maximum Deflections
0.472 1
2x12
590.50psi
1,250.00psi
+D+O. 750Lr+O. 750L
7.000ft
Span# 1
0 .037 in Ratio=
-0 .011 in Ratio=
0.092 in Ratio =
-0.025 in Ratio =
Maximum Shear Stress Ratio
Section used for this span
fv: Actual
F'v
Load Combination
Location of maximum on span
Span # where maximum occurs
2104 >=360
7940 >=360
844 >=240
3403 >=240
Span: 2 : Lr Only
Span: 1 : Lr Only
Span: 2 : +D+Lr
Span: 1 : +D+Lr
=
=
=
=
=
Design OK
0.203: 1
2x12
45.61 psi
225.00 psi
+D+O. 750Lr+O. 750L
7.000 ft
Span# 1
Load Combination Span Max. "-" Defl Location in Span Load Combination Max. "+" Defl Location in Span
+D+Lr
1
2
0.0000
0.0924
0.000
3.250
-----------+ D +Lr -0.0247 4.145
0.0000 4.145
Vertical Reactions Support notation : Far left is #1 Values in KIPS -------------Lo ad Combination Support 1 Support 2 Support 3
Max Upward frc:-o-:-,m,-a:'."irr-=o-::--:r...co,,,.n.,.,,..,.t10::-,n=-=s------o.110 --if.951 --------
Max Upward from Load Combinations 0.038 0.951
Max Upward from Load Cases 0.11 O 0.528
Qualls Engineering
4403 Manchester Ave #203
Encinitas, CA 92024
760-652-9257
Wood Beam
UC#: KW-06015197, Build:20.24.08.01
DESCRIPTION: FJ-2
Vertical Reactions
Load Combination
·Max Downward from a oa on ItI0
Max Downward from Load Combinations
Max Downward from Load Cases (Resis
DOnly
+D+L
+D+Lr
+D+0. 750Lr+0. 750L
+D+0.750L
+0.60D
Lr Only
L Only
Project Title:
Engineer:
Project ID:
Project Descr:
Qualls Engineering
Gallagher Residence
JF
24168 10
Project File: 24168 -Gallagher Residence.ec6
(c) ENERCALC N 1983-2023
Support notation : Far left is #1 Values in KIPS -----------Support 1 Support 2 Support 3
-0.155 -------------
-0.155
-0.084
-0.072
0.038
-0.155
-0.052
0.011
-0.043
-0.084
0.110
0.528
0.828
0.792
0.951
0.753
0.317
0.264
0.300
Qualls Engineering
4403 Manchester Ave #203
Encinitas, CA 92024
760-652-9257
Project Title:
Engineer:
Gallagher Residence
JF 11 Project ID:
Project Descr:
24168
[wood Beam
UC#: KW-06015197, Build:20.24.08.01
DESCRIPTION: FB-1
Qualls Engineering
Project File: 24168 -Gallagher Resldence.ec6
(c) ENERCA[C INC1983-2023
CODE REFERENCES ----------------------
Calculations per NDS 2018, IBC 2021, ASCE 7-16
Load Combination Set : ASCE 7-16
Material Properties
Analysis Method : Allowable Stress Design
Load Combination : ASCE 7-16
Fb + 3,100.0 psi
3,100.0 psi
3,000.0psi
E : Modulus of Elasticity
Wood Species
Wood Grade
Beam Bracing
Boise Cascade
Versa Lam 3100
Fb -
Fc -Pr11
Fe -Perp
Fv
Ft
Beam is Fully Braced against lateral-torsional buckling
D 0.063
0(0.217~ L(0.58)
7x11 .25
Span= 15.50 ft
750.0psi
285.0 psi
2,100.0 psi
Ebend-xx 2,000.0ksi
Eminbend -xx 1,036.83ksi
Density 41.760pcf
2
Applied Loads Service loads entered. Load Factors will be applied for calculations.
Beam self weight NOT internally calculated and added
Uniform Load : D = 0.0150, L = 0.040 ksf, Tributary Width= 14.50 ft, (FLOOR)
Uniform Load : D = 0.0070 ksf, Tributary Width= 9.0 ft, (WALL ABV)
DESIGN SUMMARY
Maximum Bending Stress Ratio =
Section used for this span
fb: Actual =
F'b =
Load Combination
Location of maximum on span =
Span # where maximum occurs =
Maximum Deflection Max Downward Transient Deflection
Max Upward Transient Deflection
Max Downward Total Deflection
Max Upward Total Deflection
Overall Maximum Deflections
Load Combination Span
0.67l 1
7x11.25
2,100.17psi
3,122.31 psi
+D+L
7.750ft
Span# 1
0.456 in Ratio=
O in Ratio=
0.677 in Ratio =
O in Ratio=
Maximum Shear Stress Ratio
Section used for this span
fv: Actual
F'v
Load Combination
Location of maximum on span
Span # where maximum occurs
407>=360
0<360
274 >=240
0<240
Span: 1 : L Only
n/a
Span: 1 : +D+L
n/a
Max. "-" Defl Location in Span Load Combination
+D+L 1 0.6767 7.807
Vertical Reactions Support notation : Far left is #1 ------------------------------Lo ad Combination Support 1 Support 2
1v1ax Upward from aTIToaifConait,ons 6.66 6~669 ----
Max Upward from Load Combinations 6.669 6.669
Max Upward from Load Cases 4.495 4.495
D Only 2.174 2.174
+D+L 6.669 6.669
+D+0.750L 5.545 5.545
+0.600 1.304 1.304
L Only 4.495 4.495
Design OK
= 0.394: 1
7x11.25
= 112.19 psi
= 285.00 psi
+D+L
= 14.595 ft
= Span# 1
Max. "+" Defl Location in Span
0.0000 0.000
Values in KIPS
Qualls Engineering
4403 ¥anchester Ave #203
Encinitas, CA 92024
760-652-9257
Project Title:
Engineer:
Gallagher Residence
JF 12 Project ID:
Project Descr:
24168
Wood Beam
UC-#: KW-06015197, Build:20.24.08.01
DESCRIPTION: FB-2
Qualls Engineenng
Project File: 24168 -Gallagher Residence.ec6
(c) ENERCALC INC 1983-2023
CODE REFERENCES
Calculations per NDS 2018, IBC 2021, ASCE 7-16
Load Combination Set : ASCE 7-16
Material Pro ertles
Analysis Method : Allowable Stress Design
Load Combination . ASCE 7-16
Wood Species
Wood Grade
Boise Cascade
Versa Lam 3100
Fb +
Fb •
Fe -Pru
Fe -Perp
Fv
Ft
Beam Bracing Beam is Fully Braced against lateral-torsional buckling
0(1 48) I r(1 48)
3.5x11.25
Span = 11.250 n
3,100.0 psi
3,100.0psi
3,000.0 psi
750.0psi
285.0 psi
2,100.0 psi
E : Modulus of Elasticity
Ebend-xx 2,000.0ksi
Eminbend -xx 1,036.83ksi
Density 41.760pcf
2
Applied Loads Service loads entered. Load Factors will be applied for calculations.
Beam self weight NOT internally calculated and added
Uniform Load : D = 0.020, Lr = 0.020 ksf, Tributary Width = 10.50 ft, (ROOF ABV+LOWER ROOF)
Uniform Load : D = 0.0160 ksf, Tributary Width= 9.0 ft, (WALL ABV)
Point Load : D = 1 .480, Lr= 1 .480 k@ 1.0 ft, (GIRDER TRUSS ON GRID D BETW 7&8 (R))
Uniform Load : D = 0.0150, L = 0.040 ksf, Tributary Width = 1.330 ft, (FLOOR)
DESIGN SUMMARY
Maximum Bending Stress Ratio =
Section used for this span
fb: Actual =
F'b =
Load Combination
Location of maximum on span =
Span # where maximum occurs =
Maximum Deflection Max Downward Transient Deflection
Max Upward Transient Deflection
Max Downward Total Deflection
Max Upward Total Deflection
Overall Maximum Deflections
0.449. 1
3.5x11.25
1,751.78psi
3,902.89psi
+D+Lr
5.173ft
Span# 1
0.116 in Ratio=
O in Ratio=
0.304 in Ratio=
O in Ratio=
Maximum Shear Stress Ratio
Section used for this span
fv: Actual
F'v
Load Combination
Location of maximum on span
Span # where maximum occurs
1162 >=360 Span: 1 : Lr Only
0 <360 n/a
444>=240 Span: 1 : +D+Lr
0<240 nla
Load Combination Span Max. "." Defl Location in Span Load Combination
+D+Lr 1 0.3037 5.502
=
=
=
=
=
Design OK
0.583: 1
3.5x11.25
207.78 psi
356.25 psi
+D+Lr
0.000ft
Span# 1
Max. "+" Defl Location in SpM
0.0000
Values in KIPS
0.000
Vertical Reactions Support notation : Far left is #1 ----------,-----------------------Lo ad Combination Support 1 Support 2
Max Upward from a IToacrCo_n_d~,ti-on_s ______ 5~.9--8Z-~~.54~8~------------
Max Upward from Load Combinations 5.982 3.548
Max Upward from Load Cases 3.452 2.235
D Only 3.452 2.235
+D+L 3.751 2.534
+D+Lr 5.982 3.548
Qualls Engineering
4403 !Vlanchester Ave #203
Encinitas, CA 92024
760-652-9257
I Wood Beam
Project Title:
Engineer:
Project ID:
Project Descr:
UC#:KW-o=so=1=5"'"'19=7~, B""u""ll-.-d:=20~.2~4.....,_o=e.~0~1 ----------~Q,...u....,al,-,,1s Engineering
DESCRIPTION: FB-3
Gallagher Residence
JF
24168 13
Project File: 24168-Gallagher Resldence.ec6
(c) ENERCALC INC 1983-2023
CODE REFERENCES ----------------------------------------------------
Calculations per NOS 2018, IBC 2021, ASCE 7-16
Load Combination Set : ASCE 7-16
Material Pro erties
Analysis Method : Allowable Stress Design
Load Combination . ASCE 7-16
Fb +
Fb -
Fe -Prll
Wood Species
Wood Grade
Douglas Fir-Larch Fe -Perp
~1 ~
Ft
Beam Bracing Beam is Fully Braced against lateral-torsional buckling
v ., 0(0.01995~ L(0.0532)
4x12
Span = 12.250 ft
1,350.0 psi
1,350.0 psi
925.0psi
625.0 psi
170.0 psi
675.0psi
E : Modulus of Elasticity
Ebend-xx 1,600.0ksi
Eminbend -xx 580.0ksi
Density 31 .210pcf
t 0{8.68) bF{9.69)
2
A__._p..,_p_li_e_d_L_o_a_d_s ___________________ Service loads entered. Load Factors will be applied for calculations.
Beam self weight calculated and added to loading
Load for Span Number 1
Uniform Load : D = 0.020, Lr= 0.020 ksf, Extent= 10.0 --» 12.250 ft, Tributary Width= 10.0 ft, (ROOF ABV)
Uniform Load: D = 0.0160 ksf, Extent= 10.0 --» 12.250 ft, Tributary Width= 9.0 ft, (WALL ABV)
Point Load : D = 0.680, Lr= 0.590 k@ 10.0 ft, (RB-2 (R))
Uniform Load: D = 0.0150, L = 0.040 ksf, Tributary Width= 1.330 ft, (FLOOR)
DESIGN SUMMARY Design OK
Maximum Bending Stregs Ratio
Section used for this span
=
fb: Actual =
F'b =
Load Combination
Location of maximum on span
Span # where maximum occurs =
Maximum Deflection
0.337: 1
4x12
625.86psi
1,856.25psi
+D+O. 750Lr+O. 750L
9.970ft
Span# 1
Maximum Shear Stress Ratio
Section used for this span
fv: Actual
F'v
Load Combination
Location of maximum on span
Span # where maximum occurs
Span: 1 : Lr Only
n/a
= 0.330: 1
4x12
= 70.16 psi
= 212.50 psi
+D+0.750Lr+0.750L
11 .356 ft
= Span# 1
Max Downward Transient Deflection
Max Upward Transient Deflection
Max Downward Total Deflection
Max Upward Total Deflection
0.044 in Ratio =
O in Ratio=
0.143 in Ratio=
O in Ratio=
3330>=360
0<360
1030>=240
0<240
Span: 1 : +D+0.750Lr+0.750L
n/a
Overall Maximum Deflections
Load Combination Span Max. "-" Defl Location in Span Load Combination
-+D=--+o=-.=75""o=L-r+...,o=-.1=5=0,.,.L _____ ......,..1 ---.....,0,..._ 1~4=2=7-6.661
Vertical Reactions Support notation : Far left is #1
Max. "+" Defl Location in Span
0.0000
Values in KIPS
0.000
=----=------------------------Lo ad Combination Support 1 Support 2
Max Upward from all LoairC-on~,t~,o-n_s____ 0.727----n.fs --
Max Upward from Load Combinations 0.727 2.345
Max Upward from Load Cases 0.370 1.432
D Only 0.370 1.432
+D+L 0.696 1. 758
Qualls Engineering
4403 ¥anchester Ave #203
Encinitas, CA 92024
760-652-9257
Project Title:
Engineer:
Project ID:
Project Descr:
Gallagher Residence
JF
24168 14
j wood Beam
UC#: KW-06015197~, B~u~ild~:2=0~.2~4_=os~.0~1----------Q~u-a·11s Engineering
Project Fife: 24168 -Gallagher Residence.ec6
(c) ENERCALCINC 1983-2023
DESCRIPTION: FB-4
CODE REFERENCES
Calculations per NOS 2018, IBC 2021 , ASCE 7-16
Load Combination Set : ASCE 7-16
Material Properties
Analysis Method : Allowable Stress Design
Load Combination : ASCE 7-16
Fb +
Fb -
1,350.0 psi
1,350.0 psi
925.0psi
625.0psi
170.0psi
675.0psi
E : Modulus of Elasticity
Ebend-xx 1,600.0 ksi
Fe -Prll
Fe -Perp
Fv
Eminbend -xx 580.0ksi
Wood Species
Wood Grade
Beam Bracing
Douglas Fir-Larch
No.1
Ft
Beam is Fully Braced against lateral-torsional buckling
0(0.01995~ L(0.0532)
3-2x12
Span• 7.0 ft
D 0.063
D 0.0266 Lr 0.0266
Density 31.210pcf
E 2.69)
3-2x12
2 Span • 3.250 ft
Applied Loads Service loads entered. Load Factors will be applied for calculations.
Beam self weight NOT internally calculated and added
Load for Span Number 1
Uniform Load : D = 0.020, Lr= 0.020 ksf, Extent= 4.0 --» 7.0 ft, Tributary Width= 1.330 ft, (ROOF)
Uniform Load : D = 0.0070 ksf, Extent= 4.0 --» 7.0 ft, Tributary Width= 9.0 ft, (WALL)
Point Load : D = 0.470, Lr= 0.420 k@ 0.750 ft, (RH-1 (L))
Point Load : D = 0.350, Lr= 0.320 k@ 4.0 ft, (RH-1 (R))
Uniform Load : D = 0.020, Lr= 0.020 ksf, Extent = 0.0 --» 0. 750 ft, Tributary Width = 1.330 ft, (ROOF)
Uniform Load : D = 0.0070 ksf, Extent= 0.0 --» 0.750 ft, Tributary Width = 9.0 ft, (WALL)
Point Load : E = -2.690 k @ 4.0 ft, (SEISMIC GRID 3)
Uniform Load : D = 0.0150, L = 0.040 ksf, Tributary Width = 1.330 ft, (FLOOR)
Load for Span Number 2
Uniform Load : D = 0.020, Lr = 0.020 ksf, Tributary Width = 1.330 ft, (ROOF)
Uniform Load : D = 0.0070 ksf, Tributary Width= 9.0 ft, (WALL)
Point Load : E = 2.690 k @ 3.250 ft, (SEISMIC GRID 3)
Uniform Load : D = 0.0150, L = 0.040 ksf, Tributary Width = 1.330 ft, (FLOOR)
DESIGN SUMMARY
Maximum Bending Stress Ratio
Section used for this span
= 0.805: 1
3-2x12
Maximum Shear Stress Ratio
Section used for this span
=
Design OK
0.424: 1
3-2x12
fb: Actual
F'b
= 1,739.02psi fv: Actual
F'v
= 115.46psi
Load Combination
Location of maximum on span
Span # where maximum occurs
Maximum Deflection
Max Downward Transient Deflection
Max Upward Transient Deflection
Max Downward Total Deflection
Max Upward Total Deflection
= 2,160.00psi
+1.105D-1.344E+0.60H
= 4.028ft
= Span# 1
0.007 in Ratio =
-0.010 in Ratio=
0.174 in Ratio=
-0.180 in Ratio=
Load Combination
Location of maximum on span
Span # where maximum occurs
= 272.00 psi
+1.105D+1.344E+0.60H
= 7.000ft
= Span# 1
11706>=360
7654>=360
448>=240
432>=240
Span: 1 : Lr Only, LL Comb Run (L*)
Span: 2 : Lr Only, LL Comb Run (L*)
Span: 2 : +0.60D+0.70E+H
Span: 2 : +D-0.70E+0.60H
Qualls Engineering
4403 Manchester Ave #203
Encinitas, CA 92024
760-652-9257
Wood Beam
-UC#: kW-06015197, Build:20.24.08.01
DESCRIPTION: FB-4
Overall Maximum Deflections
Project Title:
Engineer:
Project ID:
Project Descr:
Qualls Engineering
Gallagher Residence
JF
24168 15
Project File: 24168 -Gallagher Residence.ec6
(c) ENERCALC I C 1983-2023
Load Combination Span Max. "·" Defl Location in Span Load Combination Max. "+" Defl Location in Span
+D-0. 70E+0.60H ---1
Vertical Reactions
Load Combination
2
Max Upward rom aiflciadCond1llons
Max Upward from Load Combinations
Max Upward from Load Cases
Max Downward from all Load Conditio
Max Downward from Load Combinations
Max Downward from Load Cases (Resis
+D+H
+D+L +H, LL Comb Run (*L)
+D+L+H, LL Comb Run (L*)
+D+L+H, LL Comb Run (LL)
+D+Lr+H, LL Comb Run (*L)
+D+Lr+H, LL Comb Run (L*)
+D+Lr+H, LL Comb Run (LL)
+D+S+H
+D+0.750Lr+0.750L+H, LL Comb Run (*
+D+0.750Lr+0.750L+H, LL Comb Run (L
+D+0.750Lr+0.750L+H, LL Comb Run (L
+D+0.750L+0.750S+H, LL Comb Run (*L
+D+0.750L+0.750S+H, LL Comb Run (L*
+D+0,750L+0.750S+H, LL Comb Run (LL
+D+0.60W+H
+D+0.750Lr+0.750L+0.450W+H, LL Comb
+D+0.750Lr+0.750L+0.450W+H, LL Comb
+D+0.750Lr+0.750L+0.450W+H, LL Comb
+D+0.750L+0.750S+0.450W+H, LL Comb
+D+0.750L+0.750S+0.450W+H, LL Comb
+D+0.750L+0.750S+0.450W+H, LL Comb
+0.60D+0.60W+0.60H
+D+0.70E+0.60H
+D-0.70E+0.60H
+D+0.750L+0.750S+0.5250E+H, LL Comb
+D+0.750L+0.750S+0.5250E+H, LL Comb
+D+0.750L+0.750S+0.5250E+H, LL Comb
+D+0.750L+0.750S-0.5250E+H, LL Comb
+D+0.750L+0.750S-0.5250E+H, LL Comb
+D+0.750L+0.750S-0.5250E+H, LL Comb
+0.60D+0.70E+H
+0.60D-0. 70E+H
DOnly
Lr Only, LL Comb Run (*L)
Lr Only, LL Comb Run (L*)
Lr Only, LL Comb Run (LL)
L Only, LL Comb Run (*L)
L Only, LL Comb Run (L *)
L Only, LL Comb Run (LL)
EOnly
E Only* -1.0
H Only
0.0726
0.0000
3.832
3.832 +D-0.70E+0.60H
Support notation : Far left is #1
Support 1 Support 2 Support 3
2.402 2~-----------
2.359 2.655
2.402 2.402
-2.402 -2.402
-1.274 -1.097
-2.402 -2.402
0.678 0.974
0.638 1.187
0.864 1.160
0.824 1.373
0.658 1.080
1.226 1.265
1.206 1.372
0.678 0.974
0.633 1.213
1.229 1.332
1.184 1.572
0.648 1.133
0.818 1.113
0.788 1.273
0.678 0.974
0.633 1.213
1.229 1.332
1.184 1.572
0.648 1.133
0.818 1.113
0.788 1.273
0.407 0.584
-1 .003 2.655
2.359 -0.708
-0.613 2.394
-0.443 2.374
-0.473 2.534
1.909 -0.127
2.079 -0.148
2.049 0.012
-1.274
2.088
0.678
-0.020
0.548
0.528
·0.040
0.186
0.146
-2.402
2.402
2.265
-1.097
0.974
0.107
0.292
0.398
0.213
0.186
0.399
2.402
-2.402
0.0000
-0.1800
Values in KIPS
0.000
3.250
Qualls Engineering
4403 ¥anchester Ave #203
Encinitas, CA 92024
760-652-9257
Project Title:
Engineer:
Gallagher Residence
JF 16 Project ID:
Project Descr:
24168
~~:~-o~o~~:. BuIT.d':""'20"'.2~4~.o=e--.o--,-1 -----------a:-u--;al,-ts"'E~ng~in.,.,e=ering
Project File: 24168 -Gallagher Residence.ec6 j
(c) ENERCALC INC 1983-2023
DESCRIPTION: FB-5
CODE REFERENCES
Calculations per NOS 2018, IBC 2021, ASCE 7-16
Load Combination Set : ASCE 7-16
Material Properties
Analysis Method : Allowable Stress Design
Load Combination : ASCE 7-16
Fb +
Fb -
1,350.0 psi
1,350.0 psi
925.0psi
625.0psi
170.0 psi
675.0 psi
E : Modulus of Elasticity
Wood Species
Wood Grade
Beam Bracing
Douglas Fir-Larch
No.1
Beam is Fully Braced against lateral-torsional buckling
Fe -Prll
Fe-Perp
Fv
Ft
Ebend-xx 1,600.0 ksi
Eminbend -xx 580.0ksi
Density 31.210pcf
O(0.68)m((lll2) (0.ll) E(-2.4)
D 0.06 L 0.16
4x12
2 Span = 12.250 It
Applied Loads Service loads entered. Load Factors will be applied for calculations.
Beam self weight NOT internally calculated and added
Point Load : D = 0.320, Lr= 0.270 k@ 10.0 ft, (RB ON GRID D.7 BETW 2&3 (R))
Uniform Load : D = 0.0150, L = 0.040 ksf, Tributary Width= 4.0 ft, (FLOOR)
Point Load : D = 0.680, Lr= 0.550, L = 0.190, E = -2.40 k@ 10.0 ft, (FB-4 (L))
DESIGN SUMMARY
Maximum Bending Stress Ratio
Section used for this span
=
fb: Actual =
F'b =
Load Combination
Location of maximum on span =
Span # where maximum occurs =
Maximum Deflection
0.61Q 1
4x12
906.00psi
1,485.00psi
+D+L
7.109ft
Span# 1
Maximum Shear Stress Ratio
Section used for this span
fv: Actual
F'v
Load Combination
Location of maximum on span
Span # where maximum occurs
Span: 1 : L Only
Span: 1 : E Only
=
Design OK
0.552: 1
4x12
= 150.03 psi
= 272.00 psi
+1.079D+0. 750L-1.008E
= 11.356 ft
= Span# 1
Max Downward Transient Deflection
Max Upward Transient Deflection
Max Downward Total Deflection
Max Upward Total Deflection
0.133 in Ratio=
-0.129 in Ratio =
0.266 in Ratio =
-0.032 in Ratio =
1107 >=360
1139>=360
553 >=240
4656>=240
Span: 1 : +D+0. 750L-0.5250E
Span: 1 : +0.600+0.70E
Overall Maximum Deflections
Load Combination Span Max. "-" Deft Location in Span-L oad Combination
-+D~+-0~.7=5~0-L--0-.5~2=5=0E~-----1~-0.2658 6.527
Vertical Reactions
Load Combination
Max Upward from all Load ond1tions
Max Upward from Load Combinations
Max Upward from Load Cases
Max Downward from all Load Conditio
Max Downward from Load Combinations
Max Downward from Load Cases (Resis
DOnly
Support notation : Far left is #1
Support 1 Support 2
.566
1.566
1.015
-0.441
-0.441
0.551
3.064
1.959
-1.959
-0.661
-1.959
1.184
Max. "+" Deft Location in Span
0.0000
Values in KIPS
0.000
Qualls Engineering
4403 ~anchester Ave #203
Encinitas, CA 92024
760-652-9257
Project Title:
Engineer:
Gallagher Residence
JF 17 Project ID:
Project Descr:
24168
~dBeam
UC#: KW-06015197, Bulld:20.24.08.01 Qualls Engineering
Project File: 24168 -Gallagher Residence.ec6 J
(c) ENERCALC INC 1983-2023
DESCRIPTION: FB-6
CODE REFERENCES
Calculations per NOS 2018, IBC 2021, ASCE 7-16
Load Combination Set: ASCE 7-16
Material Properties
Analysis Method : Allowable Stress Design
load Combination : ASCE 7-16
Wood Species
Wood Grade
Beam Bracing
iLevel Truss Joist
Parallam PSL 2.0E
Beam is Fully Braced against lateral-torsional buckling
D 0.144
Fb +
Fb -
Fc -Prll
Fe -Perp
Fv
Ft
2,900.0 psi
2,900.0 psi
2,900.0 psi
750.0psi
290.0psi
2,025.0 psi
E : Modulus of Elasticity
Ebend-xx 2,000.0ksi
Eminbend -xx 1,016.54ksi
Density 45.070pcf
oco.1sWN~~-4f~3-lfl"231i'ftc\mlw'.L!:!.~~li4-~~~~@lltbiro.49)
1----r--"'D'-"0"-'-.1'-;L"-'r O!<,_•.!.J.1 ~---l.
0(0.46 Lr(0.4)
0.1
5.25x18.0 5.25x18.0
2 3
Span = 21 .50 ft Span = 3.250 ft
Applied Loads --'---'-----------·---------------Service loads entered. Load Factors will be applied for calculations.
Beam self weight calculated and added to loading
Load for Span Number 1
Varying Uniform Load : D= 0.020->0.020, Lr= 0.020->0.020 ksf, Extent = 0.0 --» 6.0 ft, Trib Width = 2.0->5.0 ft, (ROOF)
Uniform Load : D = 0.020, Lr = 0.020 ksf, Extent = 6.0 --» 12.0 ft, Tributary Width = 5.0 ft, (ROOF)
Varying Uniform Load: D= 0.020->0.020, Lr= 0.020->0.020 ksf, Extent= 12.0 --» 15.50 ft, Trib Width= 5.0->7.0 ft, (ROOF)
Varying Uniform Load: D= 0.020->0.020, Lr= 0.020->0.020 ksf, Extent= 15.50 --» 21.50 ft, Trib Width= 7.0->3.50 ft, (ROOF)
Uniform Load : D = 0.0160 ksf, Tributary Width= 9.0 ft, (WALL)
Point Load : D = 0.460, Lr= 0.40 k@ 6.0 ft, (RB-2 (L))
Point Load : D = 0.150, Lr= 0.160 k@ 12.0 ft, (RB ON GRID D.8 BETW 2&3 (L))
Point Load : D = 0.110, Lr= 0.070 k@ 14.0 ft, (RB ON GRID D.7 BETW 2&3 (L))
Point Load : D = 0.230, Lr= 0.190 k@ 16.50 ft, (RB ON GRID D.5 BETW 2&3 (L))
Point Load : E = -0.560 k@ 20.0 ft, (SEISMIC GRID 2)
Load for Span Number 2
Varying Uniform Load: D= 0.020->0.020, Lr= 0.020->0.020 ksf, Extent= 0.0 --» 3.250 ft, Trib Width= 3.750->2.0 ft, (ROOF)
Uniform Load : D = 0.0160 ksf, Tributary Width = 9.0 ft, (WALL)
Point Load : D = 0.540, Lr= 0.490 k@ 3.250 ft, (RB-1 (L))
Uniform Load : D = 0.0150, L = 0.040 ksf, Tributary Width = 1.330 ft, (FLOOR)
Point Load : E = 1.270 k @ 3.250 ft, (SEISMIC GRID D)
Qualls Engineering
4403 rylanchester Ave #203
Encinitas, CA 92024
760-652-9257
Project Title:
Engineer:
Project ID:
Project Descr:
Gallagher Residence
JF
24168 18
j Wood Beam
UC#: KW-06015197:-, =su""'ilc-rd:=20~.2~4~.o=s~.0~1---------~Qua Is ngineering
Project File: 24168 • Gallagher Residence.ec6
(c) ENER Alei'Nc 1983-2023
DESCRIPTION: FB-6
DESIGN SUMMARY
Maximum Bending Stress Ratio
Section used for this span
fb: Actual
F'b
Load Combination
Location of maximum on span
Span # where maximum occurs
= 0.321: 1
5.25x18.0
= 1,112.41 psi
= 3,465.47psi
+D+Lr+H, LL Comb Run (L*) = 10.81 Oft
= Span# 1
Maximum Shear Stress Ratio
Section used for this span
fv: Actual
F'v
Load Combination
Location of maximum on span
Span # where maximum occurs
=
Design OK
0.206: 1
5.25x18.0
= 74.81 psi
= 362.50 psi
+D+Lr+H, LL Comb Run (LL)
= 20.059ft
= Span# 1
Maximum Deflection
Max Downward Transient Deflection
Max Upward Transient Deflection
Max Downward Total Deflection
Max Upward Total Deflection
0.144 in
-0.069 in
0.430 in
-0.193 in
Ratio=
Ratio=
Ratio=
Ratio=
1793>=360
1126>=360
600>=240
402>=240
Span: 1 : Lr Only, LL Comb Run (L*)
Span: 2 : Lr Only, LL Comb Run (L *)
Span: 1 : +D+Lr+H, LL Comb Run (L*)
Span: 2 : +D+Lr+H, LL Comb Run (L*)
Overall Maximum Deflections
Load Combination Span Max. "·" Defl Location in Span Load Combination
+D+Lr+H, LL Comb Run (L*)
Vertical Reactions
Load Combination
1
2
Max OpwarCHrom alf[o on 1t1ons
Max Upward from Load Combinations
Max Upward from Load Cases
Max Downward from all Load Conditio
Max Downward from Load Cases (Resis
+D+H
+D+L+H, LL Comb Run (*L)
+D+L+H, LL Comb Run (L*)
+D+L +H, LL Comb Run (LL)
+D+Lr+H, LL Comb Run (*L)
+D+Lr+H, LL Comb Run (L*)
+D+Lr+H, LL Comb Run (LL)
+D+S+H
+D+0.750Lr+0.750L+H, LL Comb Run(*
+D+0.750Lr+0.750L+H, LL Comb Run (L
+D+0.750Lr+0.750L+H, LL Comb Run (L
+D+0.750L+0.750S+H, LL Comb Run (*L
+D+0.750L+0.750S+H, LL Comb Run (L*
+D+0.750L+0.750S+H, LL Comb Run (LL
+D+0.60W+H
+D+0.750Lr+0.750L+0.450W+H, LL Comb
+D+0.750Lr+0.750L+0.450W+H, LL Comb
+D+0.750Lr+0.750L+0.450W+H, LL Comb
+D+0.750L+0.750S+0.450W+H, LL Comb
+D+0.750L+0.750S+0.450W+H, LL Comb
+D+0.750L+0.750S+0.450W+H, LL Comb
+0.60D+0.60W+0.60H
+D+0. 70E+0.60H
+D-0.70E+0.60H
+D+0.750L+0.750S+0.5250E+H, LL Comb
+D+0.750L+0.750S+0.5250E+H, LL Comb
+D+0.750L+0.750S+0.5250E+H, LL Comb
+D+0.750L+0.750S-0.5250E+H, LL Comb
+D+0.750L+0.750S-0.5250E+H, LL Comb
+D+0.750L+0.750S-0.5250E+H, LL Comb
+0.60D+0.70E+H
+0.60D-0. 70E+H
DOnly
Lr Only, LL Comb Run (*L)
Lr Only, LL Comb Run (L*)
0.4295 10.690
0.0000 10.690 +D+Lr+H, LL Comb Run (L*)
Support notation : Far left is #1
Support 1 Support 2 Support 3
. 0 7. 2
4.540 7.222
3.163 4.945
-0.231 -0.941
-0.231 -0.941
3.163 4.945
3.150 5.131
3.163 4.945
3.150 5.131
3.076 5.708
4.540 6.458
4.453 7.222
3.163 4.945
3.088 5.657
4.195 6.080
4.121 6.792
3.153 5.084
3.163 4.945
3.153 5.084
3.163 4.945
3.088 5.657
4.195 6.080
4.121 6.792
3.153 5.084
3.163 4.945
3.153 5.084
1.898 2.967
3.001 5.604
3.325 4.286
3.032 5.578
3.042 5.439
3.032 5.578
3.274 4.590
3.284 4.451
3.274 4.590
1.736 3.626
2.059 2.308
3.163 4.945
-0.087 0.764
1.377 1.513
Max. "+" Deft Location in Span
0.0000
-0.1935
Values in KIPS
0.000
3.250
Qualls Engineering
4403 ~anchester Ave #203
Encinitas, CA 92024
760-652-9257
Project Title:
Engineer:
Project ID:
Project Descr:
Gallagher Residence
JF
24168 19
~ood Beam _
UC#: KW-06015197, Build:20.24.08~.0~1----------
Project File: 24168-Gal~gher Residence.ec6 I
Qua11•-s=-ng-.ln-e-eri..,..n-g------------~(c,-.) ENERCALC INC 1983-2023
OESCRIPTION: FH-1
CODE REFERENCES
Calculations per NOS 2018, IBC 2021 , ASCE 7-16
Load Combination Set : ASCE 7-16
Material Properties
Analysis Method : Allowable Stress Design
Load Combination : ASCE 7-16
Wood Species
Wood Grade
Beam Bracing
Douglas Fir-Larch
No.2
Completely Unbraced
Fb + 900psi E : Modulus of Elasticity
Fb-900psi Ebend-xx 1600ksi
Fe -Prtl 1350 psi Eminbend -xx 580ksi
Fe -Perp 625psi
Fv 180 psi
Ft 575psi Density 31.21 pct
4x10
Span• 6.0 n
Applied Loads Service loads entered. Load Factors will be applied for calculations. ---------
Beam self weight calculated and added to loading
Uniform Load : D = 0.020, Lr= 0.020 ksf, Tributary Width = 11 .50 ft, (ROOF)
Uniform Load: D = 0.0160 ksf, Tributary Width= 9.0 ft, (WALL ABV)
Uniform Load : D = 0.0150, L = 0.040 ksf, Tributary Width= 7.50 ft, (FLOOR)
DESIGN SUMMARY
Maximum Bending Strei;s Ratio = 0.S0l 1 Maximum Shear Stress Ratio
Section used for this span 4x10 Section used for this span
fb: Actual = 858.52psi fv: Actual
F'b = 1,069.18psi F'v
Load Combination +D+L Load Combination
Location of maximum on span = 3.000ft Location of maximum on span
Span # where maximum occurs = Span# 1 Span # where maximum occurs
Maximum Deflection
Max Downward Transient Deflection 0.024 in Ratio= 3022>=360 Span: 1 : L Only
Max Upward Transient Deflection O in Ratio= 0<360 nla
Design OK
= 0.456: 1
4x10
= 82.12 psi
= 180.00 psi
+D+L
= 0.000ft
= Span# 1
Max Downward Total Deflection 0.071 in Ratio = 1017>=240 Span: 1 : +D+0.750Lr+0.750L
Max Upward Total Deflection
Overall Maximum Deflections
Load Combination
+D+0.750Lr+0.750L
Vertical Reactions
Load Combination
Span
Max Upward fromalIToa ond1 ions
Max Upward from Load Combinations
Max Upward from Load Cases
DOnly
+D+L
+D+Lr
+D+0.750Lr+0.750L
O in Ratio= 0 <240 nla
Max. "-" Deft Location in Span Load Combination
0.0708 3.022
Support notation : Far left is #1
Support 1 Support 2
2.673 2.673
2.673 2.673
1.481 1.481
1.481 1.481
2.381 2.381
2.171 2.171
2.673 2.673
Max. "+" Deft Location in Span
0.0000
Values in KIPS
0.000
Qualls Engineering
4403 Manchester Ave #203
Encinitas, CA 92024
760-652-9257
Project Title:
Engineer:
Gallagher Residence
JF 20 Project ID:
Project Descr:
24168
Wood Beam
UC#: KW-06015197, uild:20.24.08.01
DESCRIPTION: FH-2
Qualls Engineering
Project File: 24168 -Gallagher Residence.ec6
(c) E ERCALC IN 1983-2023
CODE REFERENCES
Calculations per NOS 2018, IBC 2021 , ASCE 7-16
Load Combination Set : ASCE 7-16
Material Properties
Analysis Method : Allowable Stress Design
Load Combination : ASCE 7-16
Fb +
Fb-
875.0 psi
875.0psi
600.0psi
625.0psi
170.0 psi
425.0psi
E : Modulus of Elasticity
Wood Species
Wood Grade
Beam Bracing
Douglas Fir-Larch
No.2
Completely Unbraced
0(2.28) lll(0.2S) L(2.56)
Fc -Prll
Fe -Perp
Fv
Ft
D 0.195 Lr 0.195
4x8
Span = 6.250 tt
Ebend-xx 1,300.0ksi
Eminbend -xx 470.0ksi
Density 31 .210pcf
2
AE_plied Loads Service loads entered. Load Factors will be applied for calculations.
Beam self weight calculated and added to loading
Uniform Load: D = 0.020, Lr = 0.020 ksf, Tributary Width = 9.750 ft, (ROOF)
Point Load : D = 2.280, Lr= 0.210, L = 2.560 k@ 0.50 ft, (FB ON GRID B BETW 7&8 (L))
Point Load : E = 1.160 k @ 0.50 ft, (SEISMIC GRID 7)
DESIGN SUMMARY
Maximum Bending Streas Ratio
Section used for this span
=
fb: Actual =
F'b =
Load Combination
Location of maximum on span =
Span # where maximum occurs =
Maximum Deflection
0.891: 1
4x8
1,003.03psi
1, 125.96psi
+D+L
1.186ft
Span# 1
Maximum Shear Stress Ratio
Section used for this span
fv: Actual
F'v
Load Combination
Location of maximum on span
Span# where maximum occurs
Span: 1 : Lr Only
Span: 1 : E Only• -1.0
=
=
=
=
=
Max Downward Transient Deflection
Max Upward Transient Deflection
Max Downward Total Deflection
Max Upward Total Deflection
0.050 in Ratio=
-0.017 in Ratio=
0.147 in Ratio=
O in Ratio=
1509>=360
4320>=360
509>=240
0 <240
Span: 1 : +D+0.750Lr+0.750L
n/a
Overall Maximum Deflections
Design OK
0.341 : 1
4x8
72.51 psi
212.50 psi
+D+0. 750Lr+0. 750L
5.657 ft
Span# 1
Load Combination ----S-p-an--M-a_x __ "-" Defl Location in Span -Load Combination Max. "+" Defl Location in Span
_+_D_+_o __ -75_o_L-r+-o-.7~5~0-L ______ 1 ____ 0 __ 1-4=7~1--2.943 --------------0~.o~o~o~o-0.000
Vertical Reactions Support notation : Far left is #1 Values in KIPS
Load Combination Support 1 Support 2
Max Upward from all Load Conditions . 2 .4
Max Upward from Load Combinations 5.092 1.435
Max Upward from Load Cases 2.724 0.809
Max Downward from all Load Conditio -1 .067 -0.093
Max Downward from Load Cases (Resis -1.067 -0.093
D Only 2.724 0.809
+D+L 5.079 1.014
Qualls Engineering
4403 ~anchester Ave #203
Encinitas, CA 92024
760-652-9257
Project Title:
Engineer:
Project ID:
Project Descr:
Gallagher Residence
JF
24168 21
, Wood Beam
'-uc~#~: KW=~-o=so~1=5=19=7, B-u-ild-:2=0.~24~_=oe~.0~1-----------a~u-a=11s~E~n-g~in-ee-ring
Project File: 24168 -Gallagher Residence.ec6
(c) ENERCAL IN 1983-2023
DESCRIPTION: FH-3
CODE REFERENCES
Calculations per NOS 2018, IBC 2021, ASCE 7-16
Load Combination Set : ASCE 7-16
Material Properties
Analysis Method : Allowable Stress Design
Load Combination : ASCE 7-16
Fb + 2,900.0 psi
2,900.0 psi
2,900.0 psi
E : Modulus of Elasticity
Fb •
Fe-Prtl
Fe• Perp
Fv
Ebend-xx 2,000.0ksi
Eminbend • xx 1,016.54ksi
Wood Species
Wood Grade
Beam Bracing
iLevel Truss Joist
Parallam PSL 2.0E
Completely Unbraced
D 0.065 L 0.065
Ft
0(4.94) lr(2.28 L(0.19) E(0.94)
5.25X18.0
Span~ 16.50 n
750.0psi
290.0 psi
2,025.0 psi
D 0.105 L 0.28
Density 45.070pcf
2
Ape!_ied Loads Service loads entered. Load Factors will be applied for calculations. -----------
Beam self weight calculated and added to loading
Load for Span Number 1
Uniform Load: D = 0.020, Lr= 0.020 ksf, Extent= 0.0 --» 6.50 ft, Tributary Width= 3.250 ft, (ROOF)
Uniform Load: D = 0.0150, L = 0.040 ksf, Extent= 6.50--» 16.50 ft, Tributary Width= 7.0 ft, (FLOOR)
Point Load : D = 4.940, Lr= 2.280, L = 0.190, E = 0.940 k @ 6.50 ft, (FB-6 (R))
DESIGN SUMMARY
Maximum Bending Stre~s Ratio
Section used for this span
=
fb: Actual =
F'b =
Load Combination
Location of maximum on span =
Span# where maximum occurs =
Maximum Deflection Max Downward Transient Deflection
Max Upward Transient Deflection
Max Downward Total Deflection
Max Upward Total Deflection
Overall Maximum Deflections
0.477: 1
5.25x18.0
1,252.18psi
2,624.74psi
+D+L
6.504ft
Span# 1
0.076 in Ratio =
-0.028 in Ratio =
0.295 in Ratio =
O in Ratio=
Maximum Shear Stress Ratio
Section used for this span
=
fv: Actual =
F'v =
Load Combination
Location of maximum on span =
Span # where maximum occurs =
2616 >=360
7014 >=360
672 >=240
0<240
Span: 1 : Lr Only
Span: 1 : E Only • -1.0
Span: 1 : +D+0.750Lr+0.750L
n/a
Design OK
0.258: 1
5.25x18.0
74.96 psi
290.00 psi
+D+L
0.000 ft
Span# 1
Load Combination Span Max. "-" Defllocation in Span Load Combination Max. "+" Defl Location in Span
+D+0.750Lr+0.750L 1 0.2946 8.009--------------~0~.0000 0.000
Vertical Reactions Support notation : Far left is #1 Values in KIPS ----------------Load Combination Support 1 Support 2
lAax Upward from all Load Conditi-on_s _______ 5-..--_=90=9 5.~2~6-------------
Max Upward from Load Combinations 5.909 5.261
Max Upward from Load Cases 3.895 3.005
Max Downward from all Load Conditio -0.570 -0.370
Max Downward from Load Cases (Resis -0.570 -0.370
D~ 3~ ~~
Qualls Engineering
Structural Engineering Services
Level Component Weight (psf)
Roof 20
Roof Excerior Wall 15
Interior Wall 7
Floor 15
2nd Floor Lower Roof 20
Ex tcrior Wall 15
Interior Wall 7
C, (ASD) W (lbs) V (lbs)
0.108 1,02,146 10,993
Level W, (kips) h. (ft)
Roof 35.2 19
2nd Floor 66.9 9
~:
X
0.02 19 0.75
Ps
10.7
North-South
Level Height (ft) Diaphragm
Deoth (ft)
Roof Peak 24.25 -
Roof 19 61
2nd Floor 9 93
~:
Direction Governing Load
North-South Seismic l 6.0 osf
East-West Seismic I 6.0 osf
Project: Gallagher Residence
Engineer: ...:...F __________ _
Lateral Analysis
Tributary Area (ft1
Tributary Tributary Weight IWeight
Length (ft) Height (ft) (lbs) (lbs)
1,400 28,000
79 9.0 10,665 35,215
60 9.0 3,764
1,400 21,000
1,385 27700 66,932 126 9.0 17,010
80 9.0 5,024
~: 1,02,146
W.h. k (k-ft) :w.Ji..': V, (lbs) Area (ft1 V, (psf)
l:(W,h/)
669 0.53 5,785 1,400 4.1
602 0.47 5,208 2,785 1.9
1,271 I:: 6.0
k
0.18 1.0
Wind Check
East-West
V, (psf) Level Diaphragm
Height (ft) Depth (ft)
-Roof Peak 24.25 -
1.8 Roof 19 36
1. 1 2nd Floor 9 45
2.9 L:
Sheet
Job#:
Date:
V, (psf)
-
3.1
2.3
5.3
22
24168
Qualls Engineering
Structural Engineering Services
Direction
North-South
Level
Roof
2nd Floor
Controlling
Load
Seismic
V.(psf)
4.1
1.9
North-South
Level Grid Wall 1
Roof B 3.25
D 10
A 12.75
B 3
2nd Floor C 3.5
D 3
F 4
Grid
B
D
A
B
C
D
F
Wall2
3
3.25
2.75
3.5
3.25
4
Sheet: 23 -----
Project: Gallagher Residence Job#: 24168
Engineer: ~F _________ _ Date:
Lateral Design
TribArea VDirect V Directly V Offset V
Cumulative
(ft1 (lbs) Above (lbs) Above (lbs) (lbs)
227 938 --938
465 1,921 --1,921
96 180 0 180
318 595 938 1,533
187 350 0 350
700 1,309 1,921 3,230
245 458 0 458
Wall Length (ft)
Effective Effective
Wall3 Wall4 Total Total Minimum V (plf) V (plf) SW Type (h:2w (h:2w
adjusted) adjusted)
6.25 4.347222 3 150 216 (E)
3 5.25 21.5 19.59722 3 89 98 6E
12.75 12.75 12.75 14 14 6E
5.75 3.680556 2.75 267 291 4E
7 5.444444 3.5 50 64 6E
3.5 3 12.75 9.069444 3 253 356 (E)3E
8 7.111111 4 57 64 6E
Qualls Engineering
Structural Engineering Services
Direction
East-West
Level
Roof
2nd Floor
Controlling
Load
Seismic
Vx (psf)
4.1
1.9
East-West
Level Grid Wall 1
2 4.75
3 5.75
Roof 5 14.75
7 11.5
8 17
4 3.5
5 4
2nd Floor SA 8
7 3
8 5.5
9 3
Grid
2
3
5
7
8
4
5
SA
7
8
9
Wall2
6
10
3.5
4
6
6
Sheet: 24 ----
Project: Gallagher Residence Job#: 24168
Engineer: ..,_F _________ _ Date:
Lateral Design
Trib Area V Direct V Directly V Offset V
(ft2) (lbs) Above (lbs) Above (lbs) Cumulative
(lbs)
45 186 --186
283 1,169 --I, I 6'J
340 1,405 --1,405
425 1,756 --1,756
225 930 --930
132 247 0 247
189 353 0 353
194 363 0 1,405 1,768
80 150 0 150
548 1,025 930 1,954
245 458 0 458
Wall Length (ft)
Effective Effective
Wall3 Total Total Minimum V (pit) V (pit) SW Type (b:2w (b:2w
adjusted) adjusted)
4.75 4.75 4.75 39 39 6E
6 17.75 17.75 5.75 66 66 6E
14.75 14.75 14.75 95 95 (E)
21.5 21.5 10 82 82 (E)
17 17 17 55 55 (E)
7 5.444-444 3.5 35 45 6E
8 7.111111 4 44 50 6E
8 8 8 221 221 6E
3 2 3 50 75 6E
11.5 11.5 5.5 170 170 6E
9 8 3 51 57 6E
Qualls Engineering
Structural Engineering Services
N orth-South J.....min
V (plf) (ft)
Roof D 10 89
A 12.75 14
B 5.75 267
2nd Floor C 3.5 so
D 3 253
F 4 57
North-South C (lbs) T (lbs) HD
Roof D 804 0 None
A 127 0 Nooe
B 2,399 1,188 IIDU2
2nd Floor C 450 286 None
D 2,280 1,684 ffi) IlD
F 515 0 Nooe
East-West J.....min V (plf} (ft)
Roof 2 4.75 39
3 6 66
4 3.5 35
5 4 44
2nd Floor SA 8 221
7 3 50
8 5.5 170
9 3 51
East-West C (lbs) T (lbs) HD
2 352 13 None Roof 3 593 379 None
4 317 0 None
s 398 8 None
2nd Floor SA 3,569 3,021 H DU2
7 449 103 None
8 3,051 2,426 I-IDU2
9 458 281 None
Project: Gallagher Residence
Engineer: ...i..;;;F __________ _
Overturning
Add'IM0, M., RoofTrib FloorTrib Ext Wall
(ft-lbs) (ft-lbs) (ft) (ft) (ft)
8,043 4.5 9
0 1,616 0.67 9
0 13,794 19.75 9
0 1,574 2.75
0 6.841 10 2 18
0 2,062 19.75 9
Capacity DCR (lbs)
600 0.00
600 0.00
3,075 0.39
600 0.48
2 000 0.84
600 0.00
Add'IM0, M., RoofTrib FloorTrib Ext Wall
(ft-lbs) {ft-lbs) (ft) (ft) (ft)
1,673 2.25 9
3,557 1.33
0 1,111 5.5 9
0 1,590 5.5 9
12,644 28 553 1.33 1.33
0 1,346 7.75 9
8,367 16,780 7.5 0.67
0 1,375 0.67 9
Capacity DCR (lbs)
600 0.02
600 0.63
600 0.00
600 0.01
3,075 0.98
600 0.17
3,075 0.79
600 0.47
Sheet: 25
Job#: 24168
Date:
Int Wall Add'I M,..
(ft) (ft-lbs)
9
Int Wall Add'IM,..
(ft) <Ct-lbs)
9
18
18
M, ..
(ft-lbs)
11 250
12,062
8,762
723
2,250
4,240
M, ..
lft-lbs)
2,031
1,613
1,501
1,960
5,522
1,305
4,327
668
Qualls Engineering Sheet: _2 __ 6 __ _
Structural Engineering Services Project:
Engineer:
Gallagher Residence
JF
Job#: 24168
Date:
FOUNDATION DESIGN
Allowable Soils Bearing Capacity 2,000 psf
New Foundation design b = 12
d = 18
12
18
2 #4
inch wide x
inch deep footing with
top and bottom
Existing Foundation design b = 15
d = 18
_J
1!======
Allowable Max Line Load
(N) W ma.,= b X ASBP = 2,000 plf
(E) W ma., = b X ASBP = 2,500 plf
Allowable Max Point Load
(N) P mu = b X 2d X ASBP = 6,000 lbs
(E) Pma,, = b X 2d X ASBP = 7,500 lbs
Spread Footing Design
-2 Pmax -b X ASBP
F2 = 2 foot square footing with 3 # 4 each way @ btm
Pm.._,= 8,000 lbs
F2.5 = 2.5 foo t square footing ·with 3 # 4 each way @ btm
pmax = 12,500 lbs
F3 = 3 foot square footing with 4 # 4 each way @ btm
pmax = 18,000 lbs
F3.5 = 3.5 foot square footing with 4 # 5 each way @ btm
p ma.,= 24,500 lbs
F4= 4 foot square footing with 5 # 5 each way @ btm
Pm,.,= 32,000 lbs
FS = 5 foot square footing with 6 # 5 each way @ btm
Pma., = 50,000 lbs
Maximum reaction :
FB-2 + (E) Beam 8400 lbs Provide F2.5
CITY
Coastal Dream Homes
1384 Cynthia Lane
Carlsbad, California 92008
EAST COUNTY SOIL CONSULTATION
AND ENGINEERING, INC.
10925 HARTLEY ROAD, SUITE "I"
SANTEE, CALIFORNIA 92071
TEL. 619-258-7901
September I 0, 2024
Project No 24-1106F4
Subject: Geotechnical Investigation for Proposed One-Story Office Addition
1384 Cynthia Lane
Carlsbad, California 92008
Ladies & Gentlemen·
In accordance with your request. we have pcrfonned a geotechnical investigation at the subject site
to evaluate the geotechnical site conditions and provide recommendations for design and
construction of the proposed office addition
SCOPE OF SERVICES
The following scope of work was perforn1ed for this investigation.
O Site reconnaissance and review of published geologic and geotechnical reports and maps
pertinent to the project area.
0 Subsurface exploration consisting of drilling one test boring within the general area of the
proposed construction. The test boring \-.;as logged bv our project supervisor
0 Collection of representative soil samples at selected depths The obtained samples were stored
in sealed containers and transported to the soil testing laboratory for subsequent analysis
0 Laboratory testing of samples representative of the types of soils encountered during the
subsurface exploration.
0 Geotechnical analysis of the field and laboratory data. which provided the basis for our
conclusions and recommendations
0 Production of this report. which summarizes the results of the above analysis and presents our
findings and recommendations for the proposed construction
Geotechoical Investigation for Proposed Onc-Stor~ Office Addition
1384 C~othia Lane
Carl\bad, Califo1·nia 92008
SITE DESCRIPTION AND PROPOSED CONSTRUCTION
Page 2
Sc1>tcmber 10, 2024
Project No. 24-1106F4
The site location is shown on the attached Vicinity Map, Figure I. The site is a rectangular-shaped,
residential lot located on the north side of Cynthia Lane in Carlsbad, California The lot is
bordered by Cynthia Lane to the south and other residences to the west, east and north The site is
presently occupied by a one and two-story single-family residence. The building area is relatively
level with general drainage to the south Vegetation consists of grass, shrubs and trees
It is our understanding that the proposed construction will consi st of a one-story, wood framed.
office addition with a slab-on-grade floor
SUBSURFACE EXPLORATION AND LABORATORY TESTING
One test boring was drilled on August 28. 2024 to a maximum depth of 5 feet with a hand auger
The approximate location of the test boring is shown on Figure 2 A log of the test boring is shown
on Figure 3.
Following the subsurface exploration, laboratory testing was performed to evaluate the pertinent
engineering properties of the foundation soils. The laboratory tests included in-place moisture
content and dry density, sieve analysis and an expansion index The tests were performed in
accordance with ASTM standards The test results are shown on the Log of Test Boring, Figure 3
and on the Results of Laboratory Tests, Figure 4
SUBSCRFACE SOIL CONDITIONS
The subsurface soil descriptions were interpreted from conditions encountered during the subsurface
exploration and/or inferred from the geologic literature. Detailed descriptions of the subsurface soils
are presented on the Logs of Test Borings, Figure 3 and are summarized, as follows
Fill· Fill soils were encountered in the boring to a depth of 2 feet and consisted of dark reddish brown.
dry to moist, loose to medium dense, silty sand
Terrace Deposits: Terrace deposits were encountered beneath the fill soils to the explored depth of
5 feet The terrace deposits consisted of reddish brown, moist, medium dense, silty sand
SOIL PROPERTIES
a. Compressihle Soils
011r tiPl<l nh"ervl'ltinn" ~nd testing indicate that loose fill soib oxic:.t to a depth of about I Z inchc:1 bclov.
existing grades.
EAST COUNTY SOIL CONSULT\TION AND ENGINEERING, INC.
Gcotechoic~tl fmcstigation for Pro1>oscd Onc-Stor) Office Addition
I 38..i Cynthia Lane
Carlsbad, California 92008
b Expansive Soils
Paj!.C 3
September 10, 2024
Project No. 2..i-t 106F-4
An expansion index test (ASTM D 4829) was performed on a representative sample of the fill
soils The results of the test are shown on Figure 4 An expansion index of O was obtained which
indicates the fill soils have a very low expansion potential
c. Groundwater
Static groundwater was not encountered to the depth of the test boring. The proposed building area
is located at an elevation over 50 feet above Mean Sea Level We do not expect groundwater to
affect the proposed construction. Recommendations to prevent or mitigate the effects of poor
surface drainage are presented in the Drainage section of this report
SEISMIC DESIGN VALUES
Seismic design values are presented on the attached Figure 5
GEOLOGY
From geologic maps published by the State of California, the site is underlain by sedimentary
terrace deposits
There are no known geologic hazards such as landslides, liquefaction-prone areas, or earthquake
faults at the site However, the proposed single-family residence is subject to ground shaking and
possible damage from earthquakes on nearby or more distant, active faults .
CONCLUSIONS
Construction of the proposed one-story otlice addition is feasible from a geotechnical standpoint
provided the recommendations presented in this report are properly implemented during construction
RECOMMENDATIONS
SITE GRADING
a Site Clearing
Areas of new construction should be cleared of vegetation, surface obstructions and other
dolctcnous matcrinl:;. These matcrinls should be properly disposed of off-site.
b Removal of Loose Surface Soils
EAST COUNTY SOIL CONSULTATION AND ENGINEERING. INC.
Gcotcchnical lll\cstigation for Proposed Onc-Stor~ Office Addition
1384 C) nthia Lane
Carlsbad, California 92008
Page4
Se1ltcmber JO, 2024
Pro,ject No. 24-1106F4
Within the new floor slab area, the upper 12 inches of loose fill should be scarified, moisture
conditioned to within 2 percent over optimum and compacted to at least 90 percent relative
compaction
c. Temporary Slopes and Excavations
Temporary vertical slopes and excavations should not exceed 5 feet in height. Temporary slopes and
excavations greater than 5 feet in height should be shored or laid back at a maximum inclination of 1.1
(horizontal to vertical)
d Compaction and Method of Filling
Prior to fill placement, the exposed subgrade soils should be scarified to a depth of 6 to 8 inches,
moisture conditioned to slightly above the optimum moisture content and compacted to at least 90
percent relative compaction
The on-site soils may be reused as compacted fill, provided they are free of organic materials and
debris, and rocks or cobbles over 6 inches in dimension Any imported till soil should be
predominantly granular and approved by our field representative
All fill and trench backfill should be compacted to a minimum relative compaction of 90 percent as
determined by ASTM D 1557 Fill should be placed at a moisture content slightly above the
optimum moisture content, in lifts 6 to 8 inches thick, with each lift compacted by mechanical
means.
All grading, fill placement, and compaction should be performed in accordance with the grading
requirements of the City of Carlsbad Fill placement and compaction should be observed and
tested as necessary by our field representative
EROSION CONTROL
Due to the predominantly sandy nature of the on-site soils, areas of recent grading or exposed soils
may be subject to erosion During construction, surface water should be controlled via bem1s, gravel/
sandbags, silt fences, straw wattles, siltation or bioretention basins, positive surface grades or other
methods to avoid damage to the finish work or adjoining properties All site entrances and exits must
have coarse gravel or steel shaker plates to minimize offsite sediment tracking Best Management
Practices (BMPs) must be used to protect storm drains and minimize pollution The contractor
should take measures to prevent erosion of graded areas until such time as pennanent drainage and
erosion control measures have been installed. After complet10n of gradmg, all excavated surfaces
"ho11lci pxhihit poc;itivC' <irnini:1ee i:1nd eliminate areas where water might pond
FOUNDATIONS
a . The proposed one-story office addition may be supported on new, continuous and/or individual
spread footings extending at least 18 inches mto the underlying medium dense fill soils New,
EAST COLNTY SO1L CONSULTATION AND ENGINEERING, INC.
Geot<--chnical lmcstigation for Proposed One-Stor~ Otlice Addition
1384 CJnthia Lane
Carlsbad, California 92008
Page 5
September 10, 2024
Pro,jcct No. 24-l l06F4
individual footings should be at least 18 inches square and reinforced with a grid of #4 bars
spaced 12 inches on centers ( each way) and placed on concrete blocks at the bottom of the
footings. Footing depths should be confirmed by our field representative
• An allowable soil bearing \.alue of 2,000 pounds per square foot may be used for the design of
continuous and spread footings at least 12 inches wide and founded a minimum of 12 inches
into properly compacted fill soils as set forth in the 2022 California Building Code This value
may be increased by 400 psf for each additional foot of depth or width to a maximum value of
4,000 psf Another one-third is allowed for wind and seismic loads
b. Lateral loads may be resisted by an equivalent fluid passive soil pressure of 350 pounds per
cubic foot A coefficient of friction of O 4 may also be used If passive and friction values are
used together, the friction value should be reduced by one-third
c. All footing excavations should be obsen·ed and approved by our field representative.
d. For design purposes, total and differential settlements of 1'2 inch may be utilized
FLOOR SLABS
Floor slabs should be at least 5 inches thick and reinforced with #4 bars placed at 18 inches on
centers in two directions in the middle of the slabs The reinforcmg steel should be supported on
steel chairs or concrete blocks Floor slabs should be underlain by 2 inches of clean sand over a
I 0-mil visqueen moisture barrier over 2 inches of clean sand lo minimize the potential for
shrinkage cracks, concrete should have a minimum compressive strength of 3,000 psi and a
maximum water-cement ratio of O 5 No special inspection of concrete is required Some shrinkage
cracks are still possible.
DRAINAGE
Surface water should not be allowed to pond next to buildings Finished grades should slope at
least 2 percent away from buildings and along drainage swales Roof gutters and downspouts
connecting to solid, outlet pipes arc recommended Outlet pipes should be discharged to an
appro\.ed outlet
LIMITATIONS OF INVESTIGATION
Our investigation was perfonned using the skill and degree of care ordinarily exercised under similar
circumstances by reputable soil engineers and geologists practicing in these or similar localities No
other warranty, e~prcssed or implied, is made as to the conclusions and professional advice included in
this report This report provides no warranty, either expressed or implied, concerning future building
performance Future damage from geotechmcal or other causes is a possibility
This report is prepared for the sole use of our client and may not be assigned to others without the
written consent of the client and ECSC&E, Inc.
EAST COUNTY SOIL CONSULTATION AND ENGINEERING, INC.
Geotechoical Investigation for Proposed One-Story Office Addition
1384 Cynthia Lane
Carlsbad, California 9'2008
Page 6
Sep tern ber to, 2024
Project No. 24-1106F4
The samples collected and used for testing, and the observations made, are believed representative of
site conditions; however, soil and geologic conditions can vary significantly between test borings, test
pits and surface exposures. As in most major projects, conditions revealed by construction
excavations may vary with preliminary findings. If this occurs, the changed conditions must be
evaluated by a representative of bCSC&h and designs adjusted as required or alternate designs
recommended.
This report is issued with the understanding that it is the responsibility of the owner, or of his/her
representative to ensure that the information and recommendations contained herein arc brought to the
attention of the project architect and engineer. Appropriate recommendations should be incorporated
into the structural plans. lbe necessary steps should be taken to see that the contractor and
subcontractors caIT) out such recommendations in the field .
The findings of this report are valid as of this present date. However, changes in the conditions of a
property can occur with the passage of ti.me, whether they are due to natural processes or the works of
man on this or adjacent properties. In addition, changes in applicable or appropriate standards may
occur ftom legislation or the broaderung of knowledge. Accordingly. the findings of this report may
be invalidatt:<l wholly or partia]ly by changes outside of our control. Therefore, this report is subject to
revie\, and should be updated after a period of two years.
ADDffiONALSERVICES
A review of plans and specifications. field observations and testing under our direction are integral
parts of the recommendations made in this report. If East County Soil Consultation and Engineering,
Inc. is not retained for these services, the client agrees to assume our responsihility for any potential
claims that may arise during construction. Observation and testing are additional services provided by
our fim1 and should be budgeted within the cost of development.
This opportunity to be of service is appreciated. If you have any que~tions, or we can be of further
service, please do not hesitate to call or contact us.
Attachments: Figures 1 through 5 and Refcrcm;l!s
EAST COUNTY SOIL CONSUL'fATION AND ENGINEERING, INC.
Gcotcchnical Jmcstigation for Pro1l0scd Onc-StoQ Office Addition
1384 C) nthia Lane
Carlsbad, California 92008
QI
~ "' -l"l
0
FIGURE 1
VICINITY MAP
Buena v,stil way Buena v, ta Way
Knowles Ave
Lac;una Or
Page 7
Sc1,tcrnbcr 10, 2024
P.-oject 1'o. 24-1106F4
0
EAST COUNTY SOIL CONSULTATlON AND ENGINEERll'liG, l"IC.
Geotechnical Jme~tigation for Pro1>osed One-Stor~ Ollicc Addition
138-1 C) nthia Lane
Carlsbad, California 92008
FIGl'.RE 2
LOCATION OF TEST BORING
I f(;fNO
B-1 • APPROX IMA TE LOCA TlOl\J OF TES r BORING
Pa~e 8
September IO, 202-1
Projt'Ct No. U-1106F-I
EAST COUNTY SOIL CONSl LTATION ANO ENGIN~:ERING. INC.
Gcotechnical lnve~ti~ation for Pro1,oscd One-Story Office Addition
1384 C)nthia Lane
Carlsbad, California 92008
FIGURE 3
LOG OF TEST BORING
BORING B-1
DEPTH SOIL DESCRIPTION
Surface FILL
I .O'
2.0'
5.0'
darJ.. reddish brom,. di") to moist. loose to medium dense. silt~ sand
" "
TERRACE DEPOSITS
reddish bro" n. moist, mcdmm dense. silt~ sand
bottom of bonng. no ca, mg. no ground,,ater
Bonng backfilled 8/28/2024
Pa~c 9
September 10, 2024
Project No. 24-1 I06F-'
y M
117.4 6.9
7.1
Y = DRY DENSlTY IN PCF 1\11 MOISTURE CONTENT 11\/ 0,0
EAST COUNTY SOIL CONSULTATION AND ENGINEERING. INC.
Geotcchnical lm·estigation for Proposed Onc-Stor, Office Addition
1384 C)nthia Lane
Page to
Sc1ltcmhcr 10, 2024
Project No.24-1106F4 Carlsbad, California 92008
I
I
FIGURE 4
RESULTS OF LABORATORY TESTS
EXPANSION INDEX
(ASTM D 48l21_
~ TEST I INITIAL SATURATEDIINITIAL ORY I EXPANSION EXPANSION l
LOCATI01' MOISTURE MOISTURE I ••• DENSITY INDEX POTENTIAL
d CONTENT CONTENT (PCF) ~
(% (''A,)
"-. :-i __ ~--1 R_.~_" -~--1 HU ---1----0---+--\'FR) I.OW
U.S. Standard
Siew Size
2"
I'"
1/2"
1/!f'
#-l
#8
#1(,
#10
#5()
#100
#200
uses
PARTICLE SIZE A~ALYSIS
(ASTM D422)
Percent Passing
8-1@ 1.0'
Fill
--
.
100
99
98
98
87
48
D
28
----SM --
Percent Passing
8-1 '_!' 2.5'
Terrace Dc1)0,its
-
.
.
.
100
99
99
89
-PJ
12
1()
-~-SM ---~ ---
EAST COUNTY SOIL CONSULTATION A~D ENGINEERING, INC.
Geotcchnical lmcsti~ation for Pro1>osed One-Stor) Office Addition
138..f C)nthia Lane
Page l J
Se11tember 10, 20U
Pro,ject No.24-1106F4 Carlsbad, California 92008
FIGURE 5
SEIS!\11C DESIGN VALUES
The following CBC seismic design values may be used
1384 Cynthia ln, Carlsbad, CA 92008, USA
l '• I 11 I I I '
0..1lgn Code Referenc• Docum•nt
Risk Cattgo.-y
Site Clan
Typ• Valu•
<,~ 1044
';: 037q
'>'4<.. LB
S'-4. mill <;ee Senion 11 4.8
Sos 0753
S.01 null See ':.ec.t,on 11 4.8
Type Value
soc null See Sec.lion 11.4.8
Fa 1082
f, null -See Sec.t,on 11 4 8
Description
Dncrlptlon
9/l0/20i4 2·5•1:12 PM
ASU7 lt>
n
MCER ground motion. (tor O.l second penod)
1-.-'CEri qH ,incl motion. (fo, l Os µe11od)
Si:e mod,tied spectral acceleration value
Site rnocl,l,ed spectral acceleration v,11,,e
Numeric se1~ri,1c design value at O 2 second SA
Numeric. se,smK design value ,H 1 0 sec.and ~A
Se1s1ri.c design co1te901y
<;,It' ampl t:cat,011 factor dt 0.2 ~«and
Site a01plitic.it1011 facto, di 1.0 second
EAST COUNTY SOIL CONSULTATION AND ENG11'EERING. INC.
Geotcchnical lmestigation for Pro1>osed Onc-Stor) Office Addition
t3!U c,othia Lane
Carlsbad, California 92008
REFERENCES
Pu~c 12
September 10, 2024
Project No.24-1106F4
I. "2022 California Building Code, California Code of Regulations. Title 24, Part 2 Volume 2
of 2", Published by International Code Council
2 ''Geologic Map of the San Diego 30" x 60' Quadrangle, California", by Michael P
Kennedy and Siang S. Tan, 2008
3 ''Geotechnical and foundation Engincermg Design and Construction··, by Robert \,\t Day,
1999
4 ·'Maps of Known Active Fault Near-Source Zones in California and Adjacent Portions of
Nevada to be used with I 997 Lniform Building Code", Published by international
Conference of Building Officials.
5 ''Geologic Maps of the "!\lorthwestern Part of San Diego County, California", Department of
Conservation Division of Mmes and Geology, by Siang S Tan and Michael P Kennedy,
1996.
6 ''Bearing Capacity of Soils, Technical Engineering and Design Guides as Adapted from the
US Army Corps of Engineers, No T Published by A5CF Press, 1994
7. "Foundations and Earth Structures. Design Manual 7 2", by Department of Navy Naval
Facilities Engineering Command, May 1982, Revalidated b1 Change I September 1986
8. "Ground Motions and Soil Liquefaction during Earthquakes". by H.B Seed and l M ldnss,
1982
EAST COt.NTY SOIL CONSULTATION AND ENGINEERING, INC.
EAST COUNTY SOIL CONSULTATION
AND ENGINEERING. INC.
Coastal Dream Homes
1384 Cynlhia Lan~
Carlsbad, California 92008
1092S HARTLEY ROAD, SUITE "I"
SANTEE, CALU'ORNIA 92071
TEL. 619-258-7901
Subject: Review of Foundation Plan and Details for Proposed
One-Story Office Addition
1384 Cynthia Lane
Carlsbad, California 92008
October 25. 2024
Project No. 24-1106F4
Reference: "Geotechnical Investigation for Proposed One-Stof)' Office Addition. 1384
Cynthia Lane, Carlsbad, California 92008''. Project No. 24-1106F4. Prepared by
East County Soil Consultation and Engineering, Inc .. Dated September 10, 2024.
Ladies & Gentlemen:
In accordance with your request, we have revie\-,ed the foundation plan and details prepared by
Qualls Engineering of Encinitas, California for the proposed office addition al the subject site.
·1 he foundation plan and details were found to be in accordance with the recommendations
presented in the referenced geotechnicaJ report. Our finn should observe the foundation
excavations for proper size and embedment into competent bearing soils.
This opportunity to be of service is appreciated. If you have any questions, or we can be of
further service, please do not hesitate to call or contact us.
CBR2024-257 4
1384 CYNTHIA LN
.MruliQn: COASTAL DR[AM HOMES: 47 SF 2ND STORY ADDITION+ 194 SF
DETACHED OFFICE ADDITION (241 TOTAL SF UV ADDED)// MINOR INTERIOR REMODEL
1562315300
10/30/2024
CBR2024-257 4
ClTY Gallagher Residence
1384 Cynthia Lane,
Carlsbad, CA 92008
Structural Calculations -24168
Qualls Engineering
Structural E ngineering Services
CBR2024-257 4
1384 CYNTHIA LN
~: COASTAL DREAM HOMES: 47 SF 2ND STORY ADDITION+ 194 SF
DETACHED OFFICE ADDITION (241 TOTAL SF LIV ADDED}// MINOR
INTERIOR REMODEL
1562315300
10/30/2024
CBR2024-257 4
New Modem Design
6969 Shoreline Drive
Carlsbad, CA 92014
Phone: 619 920-8314
Qualls Engineering Sheet 1/31
Structural Engineering Services Project: Gallagher Residence Job#: 24168
GOVERNING CODE:
CONCRETE:
REINFORCING STEEL:
SAWN LUMBER:
ENGINEERED WOOD
Engineer: -'J:.:..F _______ _
DESIGN BASIS
2022 CBC
fc = 2,500 psi (MINIMUM)
ASTM A615, Fy = 60 ksi
Date: 10/24/24
DOUGLAS FIR LARCH, ALLOWABLE STRESS DESIGN PER 2022 CBC.
BOISE CASCADE OR EQUIVALENT
BCI WOOD "I' JOISTS -ICC-ESR 1336
BC VERSALAM 2.0E/LVL/LSL-ICC-ESR 1040
PROJECT SCOPE
Project consists of a proposed addition and remodel to an existing two-story single-
family residence. The addition will include an approximately 200 square feet
detached office and an approximately 50 square feet infill of an existing second story
deck with a new roof above. The remodel of the existing residence will include
adjustment of exterior walls and windows, removal of existing interior bearing walls,
and a new roof over the existing master bathroom and closet located at 1384
Cynthia Lane, Carlsbad, CA 92008. The proposed addition and remodel is primarily
constructed utilizing wood frame construction with 2x metal plated roof trusses, 2x
stick framed roof. The new & existing foundation will be typical slab on grade with
turned down footings. There has been a soils report provided for this project.
Therefore, the foundation design will be based on recommendations of the project
geotechnical engineer.
Qualls Engineering
Structural Engineering Services Project: Gallagher Residence
Sheet: 1a
Job#: 24168
Engineer: -..::J:..:...F _______ _ Date:
Correction Responses
Correction S1 :
Architect to provide soils report.
Correction S3:
a. Seismic design criteria matches soils report.
b. See sheet S1 .0, statement of special inspection section for specific list of special inspection
required for this project.
Correction S4:
See sheet S1 .0 for Hilti X-U ICC number listed in table. See updated detail 14 for embedment
listed. See detail updated to show blocking at 24" O.C. Clip spacing does not need to be called
out as it is shown connected to each framing member per plan or blocking with spacing given.
Correction S5:
CPTZ is a concealed Simpson product and is the desired callout at the trellis connection. See
updated foundation plan for footing size called out at trellis. New slab callout does match soils
report. We have increased vapor barrier thickness. Your earlier correction says you did not
receive the soils report, so I'm not really sure how you decided to issue this correction. Soils
report does not require isolated footings to be tied together. See S1 .2 for spread footing
schedule and note on foundation plan referencing this schedule.
Correction S6:
i. See updated framing plan.
ii. It is up to the contractor to select the specific product per the dimensions given on plan.
Either option for CBTZ works for the required load
iii. It is up to the contractor to select the specific product per the dimensions given on plan. It is
common knowledge that for a 4x12 you should use an HU412.
iv. Structural calculation and plans have been produced with the use of as-built structural plans.
If I have listed a shear wall as existing, it is because I have confirmed that the existing shear
wall per as-built drawings works. See updated plans at grid D specifying existing 3E.
v. See updated plans calling out existing 6E to match calculations.
vi. These are cal fill rafters. See updated plan for double rafter supporting them.
vii. See new detail 13/SD2
viii. See updated plans and calculations for wall removed. Header size has been added to
plans. Trusses are parallel, so there is no significant load on this header. Header is ok by
inspection, no calculation required.
ix. See updated plans for details provided. It is up to the contractor to select the specific product
per the dimensions given on plan. Either option for CBTZ works for the required load
Correction S7:
a. 2x T&G is not required at this detail. It is architectural, not structural and thus is not required
to be shown on structural details. T&G is shown in detail 7/SD1 for clarity, but is referenced to
architectural drawings since this is non-structural ceiling treatments.
Qualls Engineering
Structural Engineering Services Project: Gallagher Residence
Sheet: 1b
Job#: 24168
Engineer: _J_F _______ _ Date:
b-d. It is up to the contractor to select the specific product per the dimensions given on plan.
This is basic knowledge for framers and there isn't structural concern with regards to loading.
e. 2x T&G is not required at this detail. It is architectural, not structural and thus is not required
to be shown on structural details. T&G is shown in detail 7/SD1 for clarity, but is referenced to
architectural drawings since this is non-structural ceiling treatments. See note added to detail
regarding eave.
f. 2x T&G is not required at this detail. It is architectural, not structural and thus is not required
to be shown on structural details. T&G is shown in detail 7/SD1 for clarity, but is referenced to
architectural drawings since this is non-structural ceiling treatments.
g. It is up to the contractor to select the specific product per the dimensions given on plan. This
is basic knowledge for framers and there isn't structural concern with regards to loading.
h. At location detail 16 is cut, existing floor joists were notched. Detail is correct. Calculation
was completed for a triple 2x12. In reality the beam is two new full depth 2x12's with an existing
triple 2x12 that is notched down to 2x10 depth for deck. The triple notched 2x12 was
considered stronger than a single full depth 2x12, so calculations was just done for a triple 2x12
for clarity.
i. It is up to the contractor to select the specific product per the dimensions given on plan. This
is basic knowledge for framers and there isn't structural concern with regards to loading.
Correction S8:
a. It is up to the contractor to select the specific product per the dimensions given on plan. This
is basic knowledge for framers and there isn't structural concern with regards to loading.
b. Footing depth matches soils report.
c. See updated detail.
d. See updated calculations sheets 27-31 for check on worst case epoxy anchor. See updated
details for minimum footing size shown.
e. CPTZ is a post base connection. Please review Simpson product manual for clarity.
Correction S9:
Designs have been completed according to CBC section 1605 equation 16-6, rather than your
referenced ASCE 7-16. Vertical component has been considered. Dead load is not taken as
1.0D per your comment but has been taken as . 79D per CBC incorporating Ev.
Correction S10:
6x6 header spanning 6' with trib area per plan should be ok by inspection. For clarity, the max
moment of referenced header is 990 #-ft. The capacity of a 6x6 beam supporting roof load only
is approx. 3,900 #-ft.
Correction S11:
Structural calculation and plans have been produced with the use of as-built structural plans. If I
have listed a shear wall as existing, it is because I have confirmed that the existing shear wall
per as-built drawings works. I have added additional labels per your request for clarity.
Qualls Engineering
Structural Engineering Services Project: Gallagher Residence
Sheet: 1c
Job#: 24168
Engineer: _J'--F _______ _ Date:
Note to the Engineering Reviewer:
Please feel free to reach out to me directly if there are any items that may require further
consideration. We find it is simpler and clearer to coordinate with you directly and hope to avoid
another round of formal corrections. Thanks for your partnership in providing our client the most
streamlined approach possible.
Jacob Farabaugh
jacob@q uallseng. com
(760) 704-8293
Qualls Engineering
Structural Engineering Services
Design Loads:
Roof:
Dead Load ( DL)
Roofing
1 /2" Plywood
Wood Framing
Insulation
1/2" Gyp. Bd.
Mech./Elec.
l\iisc.
IDL =
Live Load (LL)
Project:
Engineer:
10.0 psf
1.3 psf
4.0 psf
0.5 psf
2.2 psf
0.5 psf
1.5 psf
20.0 psf
Gallagher Residence
F
Floor:
Dead Load ( DL)
Flooring
3 / 4" Plywood
Wood Framing
Insulation
5/8" Gyp. Bd.
Mech./Elec.
l\iisc.
Sheet: 2
Job #: 24168 ------Date:
4.0 psf
2.0 psf
3.0 psf
0.5 psf
2.8 psf
1.2 psf
__ 1_.S ... psf
I DL = 15.0 psf
Live Load (LL)
LL = ____ 20_.o ... psf (Reducible)
DL + LL =! 40.0lpsf
LL =
DL + LL =I
40.0 psf (Reducible)
55.olpsf
Walls:
Stud Walls
Exterior Stud Walls
Interior Stud Walls
Allowable Soils Bearing Pressure:
15.0 psf
7.0 psf
ASBP = 2,000 psf@ 18 inches below lowest adjacent finished grade
Seismic:
Site Class: D
Ss = 1.044
S1 = 0.379
F, = 1.200
Fv = -
Response
Occupancy Importance Mod. Factor
Category Factor, I,
I1 1.00
Wind Load: (Simplified Envelope Procedure)
Basic Wind Speed: 96 mph
Exposure: C
MWFRS
P = 0.6*)."'K,./P530
(LRFD): P =
(ASD): p =I
17.8 psf
10.11psf
Components & Cladding
p = 0.6*),/K,.*P nct30
(LR.FD): P =
(ASD): p =I
21.8 psf
13.11psf
R
6.5
,_ =
K,. =
Ps30=
pnt130=
SMs = 1.130
Si11 = -
Redundancy pCs
Pactor Sos/(R/I)
p ( LRFD ) (.\SD )
1.3 0.151 I 0.108
1.29
1.0
13.8
16.9
0.753
Qua11s Engineering
4403 Manchester Ave #203
Encinitas, CA 92024
760-652-9257
Project Title:
Engineer:
Project ID:
Project Descr:
Gallagher Residence
JF
24168 3
I Woo~ Beam
UC#: KW-06015197, B,.-u-c,ild7:-<-20'"""'.2,..,4---=_o=e.-'07"1 ---------Qualls Engineering
Project File: 24168 -Gallagher Residence.ec6
-(c) ENERCALC INC 1983-2023
DESCRIPTION: RB-1
CODE REFERENCES
Calculations per NOS 2018, IBC 2021, ASCE 7-16
Load Combination Set : ASCE 7-16
Material Properties
Analysis Method : Allowable Stress Design
Load Combination : ASCE 7-16
Wood Species
Wood Grade
Douglas Fir-Larch
No.1
Fb +
Fb -
Fe -Pr11
Fe -Perp
Fv
Ft
1,350.0 psi
1,350.0 psi
925.0 psi
625.0psi
170.0psi
675.0psi
E : Modulus of Elasticity
Ebend-xx 1,600.0 ksi
Eminbend -xx 580.0ksi
Density 31.210pcf
Beam Bracing Beam is Fully Braced against lateral-torsional buckling
D O 0.1 Lr O 0.1 000.16 Lr00.16 6 .19 Lr 0.1 .19)
4x10 4x10 4x10
Span= 3.50 ft 2 Span= 11250 ft
3 4 Span= 1.750 ft
Service loads entered. Load Factors will be applied for calculations. --------
Beam self weight calculated and added to loading
Load for Span Number 1
Varying Uniform Load : D= 0.020->0.020, Lr-0.020->0.020 ksf, Extent= 0.0 --» 3.50 ft, Trib Width = 0.0->5.0 ft, (ROOF)
Load for Span Number 2
Varying Uniform Load : D= 0.020->0.020, Lr= 0.020->0.020 ksf, Extent= 0.0 --» 11 .250 ft, Trib Width= 0.0->8.0 ft, (ROOF)
Load for Span Number 3
Varying Uniform Load : D= 0.020->0.020, Lr-0.020->0.020 ksf, Extent= 0.0 --» 1.750 ft, Trib Width= 8.0->9.50 ft, (ROOF)
DESIGN SUMMARY
Maximum Bending Stress Ratio
Section used for this span
fb: Actual
F'b
= 0.28Q 1
4x10
= 585.88psi
= 2,025.00psi
Load Combination +D+Lr+H, LL Comb Run (*L*)
Location of maximum on span
Span # where maximum occurs
Maximum Deflection
Max Downward Transient Deflection
Max Upward Transient Deflection
Max Downward Total Deflection
Max Upward Total Deflection
Overall Maximum Deflections
= 6.429ft
= Span# 2
0.079 in
-0.041 in
0.145 in
-0.073 in
Ratio=
Ratio=
Ratio=
Ratio=
Maximum Shear Stress Ratio
Section used for this span
fv: Actual
F'v
Load Combination
Location of maximum on span
Span # where maximum occurs
=
Design OK
0.224 : 1
4x10
= 47.64 psi
= 212.50 psi
+D+Lr+H, LL Comb Run (*LL)
= 10.494 ft
= Span# 2
1704>=240
1012>=240
929>=180
576>=180
Span: 2 : Lr Only, LL Comb Run (*L*)
Span: 3 : Lr Only, LL Comb Run (*L*)
Span: 2 : +D+Lr+H, LL Comb Run (*L*)
Span: 3 : +D+Lr+H, LL Comb Run (*L *)
Load Combination Span Max. "-" Defl Location in Span Load Combination Max."+" Defl
-0.1249
0.0000
-0.0727
Location in Span
0.000
0.000
1.750
--1 -0.0000--,cooo ·-+D+Lr+H , LL Comb Run (*L*)
+D+Lr+H, LL Comb Run (*L*) 2 0.1452 5.861
3 0.0000 5.861 +D+Lr+H, LL Comb Run (*L *)
Qualls Engineering
4403 Manchester Ave #203
Encinitas, CA 92024
760-652-9257
!Wood Beam
UC#: KW-06015197, Build:20.24.08.01
DESCRIPTION: RB-1
Vertical Reactions
Load Combination
Max Upward from alfLoadConditions
Max Upward from Load Combinations
Max Upward from Load Cases
Max Downward from all Load Conditio
Max Downward from Load Cases (Resis
+D+H
+D+L+H, LL Comb Run (..,L)
+D+L +H, LL Comb Run (*L *)
+D+L +H, LL Comb Run (*LL)
+D+L +H, LL Comb Run (L**)
+D+L+H, LL Comb Run (L*L)
+D+L+H, LL Comb Run (LL*)
+D+L+H, LL Comb Run (LLL)
+D+Lr+H, LL Comb Run (**L)
+D+Lr+H, LL Comb Run (*L•)
+D+Lr+H, LL Comb Run (*LL)
+D+Lr+H, LL Comb Run (L**)
+D+Lr+H, LL Comb Run (L*L)
+D+Lr+H, LL Comb Run (LL•)
+D+Lr+H, LL Comb Run (LLL)
+D+S+H
+D+0.750Lr+0.750L+H, LL Comb Run(*
+D+0.750Lr+0.750L+H, LL Comb Run(*
+D+0.750Lr+0.750L+H, LL Comb Run (*
+D+0.750Lr+0.750L+H, LL Comb Run (L
+D+0.750Lr+0.750L+H, LL Comb Run (L
+D+0.750Lr+0.750L+H, LL Comb Run (L
+D+0.750Lr+0.750L+H, LL Comb Run (L
+D+0.750L+0.750S+H, LL Comb Run (**
+D+0.750L+0.750S+H, LL Comb Run (*L
+D+0.750L+0.750S+H, LL Comb Run (*L
+D+0.750L+0.750S+H, LL Comb Run (L *
+D+0.750L+0.750S+H, LL Comb Run (L*
+D+0.750L+0.750S+H, LL Comb Run (LL
+D+0.750L+0.750S+H, LL Comb Run (LL
+D+0.60W+H
+D+0.750Lr+0.750L+0.450W+H, LL Comb
+D+0.750Lr+0.750L+0.450W+H, LL Comb
+D+0.750Lr+0.750L+0.450W+H, LL Comb
+D+0.750Lr+0.750L+0.450W+H, LL Comb
+D+0.750Lr+0.750L+0.450W+H, LL Comb
+D+0.750Lr+0.750L+0.450W+H, LL Comb
+D+0.750Lr+0.750L+0.450W+H, LL Comb
+D+0.750L+0.750S+0.450W+H, LL Comb
+D+0.750L+0.750S+0.450W+H, LL Comb
+D+0.750L+0.750S+0.450W+H, LL Comb
+D+0.750L+0.750S+0.450W+H, LL Comb
+D+0.750L+0.750S+0.450W+H, LL Comb
+D+0.750L+0.750S+0.450W+H, LL Comb
+D+0.750L+0.750S+0.450W+H, LL Comb
+0.60D+0.60W+0.60H
+D+0.70E+0.60H
+D+0.750L+0.750S+0.5250E+H, LL Comb
+D+0.750L+0.750S+0.5250E+H, LL Comb
+D+0.750L+0.750S+0.5250E+H, LL Comb
+D+0.750L+0.750S+0.5250E+H, LL Comb
+D+0.750L+0.750S+0.5250E+H, LL Comb
+D+0.750L+0.750S+0.5250E+H, LL Comb
+D+0.750L+0.750S+0.5250E+H, LL Comb
+0.60D+0.70E+H
Project Title:
Engineer:
Project ID:
Project Descr:
Qualls Engineering
Gallagher Residence
JF
24168 4
Project File: 24168 -Gallagher Residence.ec6
(c) ENERCALC INC 1983~023
Support notation : Far left is #1
Support 1 Support 2S upport3Support 4--_-_-_-_-_
1.892
1.892
0.961
-0.018
Values in KIPS
1.029
1.029
0.536
-0.025
-0.025
0.536
0.536
0.536
0.536
0.536
0.536
0.536
0.536
0.511
0.836
0.811
0.729
0.704
1.029
1.004
0.536
0.517
0.761
0.742
0.680
0.662
0.905
0.887
0.536
0.536
0.536
0.536
0.536
0.536
0.536
0.536
0.517
0.761
0.742
0.680
0.662
0.905
0.887
0.536
0.536
0.536
0.536
0.536
0.536
0.536
0.321
0.536
0.536
0.536
0.536
0.536
0.536
0.536
0.536
0.321
-0.018
0.961
0.961
0.961
0.961
0.961
0.961
0.961
0.961
1.292
1.561
1.892
0.943
1.274
1.543
1.874
0.961
1.210
1.411
1.660
0.948
1.196
1.398
1.646
0.961
0.961
0.961
0.961
0.961
0.961
0.961
0.961
1.210
1.411
1.660
0.948
1.196
1.398
1.646
0.961
0.961
0.961
0.961
0.961
0.961
0.961
0.577
0.961
0.961
0.961
0.961
0.961
0.961
0.961
0.961
0.577
QuaHs Engineering
4403 Manchester Ave #203
Encinitas, CA 92024
760-652-9257
Project Title:
Engineer:
Gallagher Residence
JF 5 Project ID:
Project Descr:
24168
Wood Beam
LIC#:KW-06015197,Build:2024.08.01
DESCRIPTION: RB-2
--------a~u~alfs Engin8ering-
Project File: 24168 -Gallagher Residence.ec6
(c) ENERCALC INC 1983-2023
CODE REFERENCES
Calculations per NOS 2018, IBC 2021, ASCE 7-16
Load Combination Set : ASCE 7-16
Material Properti~------
Analysis Method : Allowable Stress Design Fb +
Fb -
1,350.0 psi
1,350.0 psi
925.0psi
625.0psi
170.0 psi
675.0psi
E : Modulus of Elasticity
Load Combination : ASCE 7-16
Wood Species
Wood Grade
Douglas Fir-Larch
No.1
Fe -Prll
Fe -Perp
Fv
Ft
Beam Bracing Beam is Fully Braced against lateral-torsional buckling
D(0.3J) r(0.34)
4x10
Span= 10.0 n
Ebend-xx 1,600.0 ksi
Eminbend -xx 580.0ksi
Density 31.210pcf
Applied Loa<!!_ _ Service loads entered. Load Factors will be applied for calculations
Beam self weight calculated and added to loading
Point Load : D = 0.370, Lr= 0.340 k@ 6.0 ft, (HIP BEAM BETW GRIDS E/F & 2/4)
Point Load : D = 0.370, Lr= 0.340 k@ 6.0 ft, (HIP BEAM BETW GRIDS E/F & 2/4)
Point Load : D = 0.330, Lr= 0.310 k@ 6.0 ft, (RB ON GRID 2.5 BETW D.5&E (L))
DESIGN SUMMARY
Maximum Bending Stress Ratio =
Section used for this span
lb: Actual =
Pb =
Load Combination
Location of maximum on span =
Span # where maximum occurs =
Maximum Deflection
Max Downward Transient Deflection
Max Upward Transient Deflection
Max Downward Total Deflection
Max Upward Total Deflection
Overall Maximum Deflections
Load Combination
+D+Lr
Vertical Reactions
Load Combination
Span
1
0.59& 1
4x10
1,206.04psi
2,025.00psi
+D+Lr
5.985ft
Span # 1
0.092 in Ratio=
O in Ratio=
0.196 in Ratio=
O in Ratio=
Maximum Shear Stress Ratio
Section used for this span
fv: Actual
F'v
Load Combination
Location of maximum on span
Span # where maximum occurs
1304>=240
0<240
613>=180
0<180
Span: 1 : Lr Only
nla
Span: 1 : +D+Lr
nla
Max. ,;:_;; Defl Location -in Span
0.1957
Load Combination
Support notation : Far left is #1
Support 1 Support 2
Max Upward from all Load C-ondifions
Max Upward from Load Combinations
Max Upward from Load Cases
-----0.859 1.271
0.859 1.271
0.463 0.677
DOnly 0.463 0.677
+D+Lr 0.859 1.271
+D+0.750Lr 0.760 1.123
+0.60D 0.278 0.406
Design OK
= 0.276: 1
4x10
= 58.64 psi
= 212.50 psi
+D+Lr
= 9.234 ft
= Span# 1
Max. "+" Deft Location in Span
-b.oo~ 0.000
Values in KIPS
Qua«s Engineering
4403 Manchester Ave #203
Encinitas, CA 92024
760-652-9257
Project Title:
Engineer:
Gallagher Residence
JF 6 Project ID:
Project Descr:
24168
[wood Beam Project File: 24168 -Gallagher Residence.ec6
UC#: KW-060f5197, Build:20.24.08.0f --(c) ENERCALC INC:1983-2023-
DESCRIPTION: RB-3
CODE REFERENCES -------
Calculations per NDS 2018, IBC 2021, ASCE 7-16
Load Combination Set : ASCE 7-16
Materi!!_Properties ______ _
Analysis Method : Allowable Stress Design
Load Combination ASCE 7-16
Wood Species
Wood Grade
Douglas Fir-Larch
No.1
Fb +
Fb -
Fc-Prll
Fe -Perp
Fv
Ft
Beam Bracing Beam is Fully Braced against lateral-torsional buckling
D 0.13 Lr 0. 13
£ 6x12
Span= 14.50 n
1,350.0 psi
1,350.0 psi
925.0 psi
625.0 psi
170.0 psi
675.0 psi
E: Modulus of Elasticity
Ebend-xx 1,600.0ksi
Eminbend -xx 580.0ksi
Density 31.210pcf
l
2
Applied Loads __ ____ _ Service loads entered. Load Factors will be applied for calculations.
Beam self weight calculated and added to loading
Uniform Load : D = 0.020, Lr= 0.020 ksf, Tributary Width= 6 .50 ft, (ROOF)
DESIGN SUMMARY
Maximum Bending Stress Ratio =
Section used for this span
fb: Actual =
F'b =
Load Combination
Location of maximum on span =
Span # where maximum occurs =
Maximum Deflection
Max Downward Transient Deflection
Max Upward Transient Deflection
Max Downward Total Deflection
Max Upward Total Deflection
Overall Maximum Deflections
Span Load Combination
+D+Lr 1 -
Vertical Reactions ------Load Combination
Max Upward from all LoacfConditions
Max Upward from Load Combinations
Max Upward from Load Cases
□Only
+D+Lr
+D+0.750Lr
+0.600
Lr Only
0.422 1 Maximum Shear Stress Ratio
6x12 Section used for this span
712.05psi fv: Actual
1,687.50psi F'v
+D+Lr Load Combination
7.250ft Location of maximum on span
Span# 1 Span# where maximum occurs
0.117 in Ratio= 1492 >=240 Span: 1 : Lr Only
O in Ratio= 0<240 n/a
0.246 in Ratio= 708 >=180 Span: 1 : +O+Lr
O in Ratio= 0<180 n/a
Max. "." Defl Location in Span Load Combination
6.2455 ,r303
Support notation : Far left is #1
-----Support 1 Support 2
----·r:g·54 1.984
1.984 1.984
1.042 1.042
1.042 1.042
1.984 1.984
1.749 1.749
0.625 0.625
0.943 0.943
Design OK
= 0.192: 1
6x12
= 40.88 psi
= 212.50 psi
+D+Lr
= 0.000 ft
= Span# 1
Max. "+" Deft Location in Span
0.0000 0~000
Values in KIPS
Qualls Engineering
4403 Manchester Ave #203
Encinitas, CA 92024
760-652-9257
I Wood Beam L ---------UC#: KW-06015197, Build:20.24.08.01
DESCRIPTION: RH-1
CODE REFERENCES -------
Project Title:
Engineer:
Project ID:
Project Descr:
Qualls Engineering-
Gallagher Residence
JF
24168 7
Project File: 24168 -Gallagher Residence.ec6
(c) ENERCALC INC 1983-2023
Calculations per NOS 2018, IBC 2021, ASCE 7-16
Load Combination Set: ASCE 7-16
Material Propert~es
Analysis Method : Allowable Stress Design
Load Combination : ASCE 7-16
Fb +
Fb •
875.0 psi
875.0psi
600.0psi
625.0 psi
170.0 psi
425.0 psi
E : Modulus of Elasticity
Wood Species
Wood Grade
Beam Bracing
Douglas Fir-Larch
No.2
Completely Unbraced
,.
D(0.8) r(0.74)
Fe -Pr11
Fe -Perp
Fv
Ft
4x8
Span= 3.50 ft
Ebend-xx 1,300.0 ksi
Eminbend -xx 470.0ksi
Density 31.210pcf
Applied Load!__ Service loads entered. Load Factors will be applied for calculations.
Beam self weight calculated and added to loading
Point Load : D = 0.80, Lr= 0.740 k@ 1.50 ft, (RB ON GRID D.5 BETW 2&3 (R))
DESIGN SUMMARY
Maximum Bending Stress Ratio =
Section used for this span
fb: Actual =
F'b =
Load Combination
Location of maximum on span =
Span# where maximum occurs =
Maximum Deflection
Max Downward Transient Deflection
Max Upward Transient Deflection
Max Downward Total Deflection
Max Upward Total Deflection
Overall Maximum Deflections ------
0.367: 1
4x8
517.96psi
1,411.50psi
+D+Lr
1.507ft
Span# 1
0.008 in Ratio=
O in Ratio=
0.016 in Ratio=
O in Ratio=
Maximum Shear Stress Ratio
Section used for this span
fv: Actual
F'v
Load Combination
Location of maximum on span
Span # where maximum occurs
5427>=240 Span: 1 : Lr Only
0<240 n/a
2587>=180 Span: 1 : +D+Lr
0<180 n/a
Span Max. "." Defl Location in Span Load Combination
Design OK
= 0.247: 1
4x8
= 52.39 psi
= 212.50 psi
+D+Lr
= 0.000 ft
= Span# 1
Max. "+" Defl Location in Span Load Combination
+D+Lr 0~0162 1.686 --------------1 0.0000 0.000
Vertical Reactions Support notation : Far left is #1 Values in KIPS
--------Load Combination Support 1 Support 2
Max Upward from aIToad Condmons
Max Upward from Load Combinations
Max Upward from Load Cases
0.890 0.670 --------------
0.890 0.670
0.467 0.352
DOnly 0.467 0.352
+D+Lr 0.890 0.670
+D+0.750Lr 0.784 0.590
+0.600 0.280 0.211
Lr Only 0.423 0.317
QuaHs Engineering
4403 Manchester Ave #203
Encinitas, CA 92024
760-652-9257
[_wood Beam __ --
u c#: KW-06015197, Build:20.24.08.01
DESCRIPTION: FJ-1
CODE REFERENCES -------
Project Title:
Engineer:
Project ID:
Project Descr:
Gallagher Residence
JF
24168 8
-------------
Qualls Engineering
Project File: 24168 -Gallagher Residence.ec6
(c) ENERCALC INC 1983~023
---------------
Calculations per NDS 2018, IBC 2021 , ASCE 7-16
Load Combination Set : ASCE 7-16
Material Properties ___ _
Analysis Method : Allowable Stress Design
Load Combination : ASCE 7-16
Wood Species
Wood Grade
Douglas Fir-Larch
No.1
Fb +
Fb -
Fc-Prtl
Fe -Perp
Fv
Ft
Beam Bracing Beam is Fully Braced against lateral-torsional buckling
D 0.015 L 0.04
2x12
Span = 12.50 tt
1,000.0 psi
1,000.0 psi
1,500.0 psi
625.0psi
180.0 psi
675.0psi
E : Modulus of Elasticity
Ebend-xx 1,700.0 ksi
Eminbend -xx 620.0ksi
Density 31 .210pcf
D(OIDCQ. 08)
2
Applied Loads _ ___ Service loads entered. Load Factors will be applied for calculations.
Beam self weight calculated and added to loading
Uniform Load : D = 0.0150, L = 0.040 ksf, Tributary Width= 1.0 ft, (FLOOR)
Point Load : D = 0.080, Lr = 0.080 k @ 10.0 ft, (ROOF)
Point Load : D = 0.0850 k@ 10.0 ft, (WALL)
DESIGN SUMMARY Design OK
Maximum Bending Stress Ratio =
Section used for this span
fb: Actual =
F'b =
Load Combination
Location of maximum on span =
Span # where maximum occurs =
Maximum Deflection
Max Downward Transient Deflection
Max Upward Transient Deflection
Max Downward Total Deflection
Max Upward Total Deflection
Overall Maximum Deflections
0.51& 1
2x12
516.24psi
1,000.00psi
+D+L
6.797ft
Span# 1
0.073 in Ratio=
O in Ratio=
0.129in Ratio =
O in Ratio=
Maximum Shear Stress Ratio
Section used for this span
fv: Actual
F'v
Load Combination
Location of maximum on span
Span # where maximum occurs
2053>=360 Span: 1 : L Only
0<360 n/a
1162>=240 Span: 1 : +D+L
0<240 n/a
=
=
=
=
=
0.220: 1
2x12
39.56 psi
180.00 psi
+D+L
11.588 ft
Span# 1
Load Combination
+D+L
Span Max. "-" Defl Location in Span Load Combination Max. "+" Deft Location in Span
-f 0.1291 --6.387 0.0000
Vertical Reactions ----------Load Combination
Max Upward from alIToad Conditions
Max Upward from Load Combinations
Max Upward from Load Cases
DOnly
+D+L
+D+Lr
+D+O. 750Lr+O. 750L
Support notation : Far left is #1 Values in KIPS -------------Support 1 Support 2
0.400--cf499-
0.400 0.499
0.250 0.250
0.150 0.249
0.400 0.499
0.166 0.313
0.349 0.484
0.0~
Qualls Engineering
4403 Manchester Ave #203
Encinitas, CA 92024
760-652-9257
Project Title:
Engineer:
Gallagher Residence
JF 9 Project ID:
Project Descr:
24168
--------
I Wood Beam
UC#: KW-06015197, Build:20.24.0B:of Qualls Engineering
Project File: 24168 -Gallagher Residence.ec6
-(c) ENERCALC INC1 9a3-:2023
DESCRIPTION: FJ-2
CODE REFERENCES
Calculations per NOS 2018, IBC 2021, ASCE 7-16
Load Combination Set : ASCE 7-16
Mate_rial Properties
Analysis Method : Allowable Stress Design
Load Combination ASCE 7-16
Wood Species
Wood Grade
Douglas Fir-Larch
No.1
Beam Bracing Beam is Fully Braced against lateral-torsional buckling
D 0.015 L 0.04
2x12
Span = 7.0 rt
Fb +
Fb -
Fe -Prll
Fe• Perp
Fv
Ft
1,000.0 psi
1,000.0 psi
1,500.0 psi
2
625.0psi
180.0psi
675.0psi
E : Modulus of Elasticity
Ebend-xx 1,700.0 ksi
Eminbend -xx 620.0ksi
Density 31.210pcf
0(0011)0~18)
D 0.015 L 0.04
2x12
3
Span = 3.250 rt
Service loads entered. Load Factors will be applied for calculations.
Beam self weight calculated and added to loading
Load for Span Number 1
Uniform Load : D = 0.0150, L = 0.040 ksf, Tributary Width= 1.0 ft, (FLOOR)
Load for Span Number 2
Uniform Load : D = 0.0150, L = 0.040 ksf, Tributary Width = 1.0 ft, (FLOOR)
Point Load : D = 0.180, Lr = 0.180 k @ 3.250 ft, (ROOF)
Point Load : D = 0.0850 k @ 3.250 ft, (WALL)
DESIGN SUMMARY
Maximum Bending Stress Ratio = 0.472 1 Maximum Shear Stress Ratio
Section used for this span 2x12 Section used for this span
fb: Actual = 590.50psi fv: Actual
F'b = 1,250.00psi F'v
Load Combination +D+0.750Lr+0.750L Load Combination
Location of maximum on span = 7.000ft Location of maximum on span
Span # where maximum occurs = Span# 1 Span# where maximum occurs
Maximum Deflection Max Downward Transient Deflection 0.037 in Ratio = 2104>=360 Span: 2 : Lr Only
Max Upward Transient Deflection -0.011 in Ratio = 7940>=360 Span: 1 : Lr Only
Max Downward Total Deflection 0.092 in Ratio= 844>=240 Span: 2 : +D+Lr
Max Upward Total Deflection -0.025 in Ratio= 3403>=240 Span: 1 : +D+Lr
Overall Maximum Deflections -----Load Combination Span Max. "-" Defl Location in Span Load Combination
-1--0.0000 -·o.ooo +D+Lr
+D+Lr 2 0.0924 3.250
Vertical Reactions Support notation : Far left is #1
Load Combination Support 1 Support 2 Support 3
Max Upward from all Load Cond1flon-s ---
Max Upward from Load Combinations
0.110 -0~95·1--~ -----
0.038 0.951
Max Upward from Load Cases 0.110 0.528
Design OK
= 0.203: 1
2x12
= 45.61 psi
= 225.00 psi
+D+O. 750Lr+O. 750L
= 7.000 ft
= Span# 1
Max. "+" Defl Location in Span
-0.0247 4.145
0.0000 4.145
Values in KIPS
QuaNs Engineering
4403 Manchester Ave #203
Encinitas, CA 92024
760-652-9257
.-----Wood Beam
UC#: KW-06015197, Build:20.24.08.01-
OESCRIPTIQN: FJ-2
Vertical Reactions
Load Combination
-Max Downward from alfloacf Cond1t10
Max Downward from Load Combinations
Max Downward from Load Cases (Resis
DOnly
+D+L
+D+Lr
+D+0. 750Lr+0.750L
+D+0.750L
+0.60D
Lr Only
L Only
Project Title:
Engineer:
Project ID:
Project Descr:
Qualls Engineering
Gallagher Residence
JF
24168 10
Proje~ File: 241~~ghe~Re~idence~ec6 J
(c) ENERCALC INC 1983-2023
Support notation : Far left is #1
Support 1 Support 2 Support 3
Values in KIPS
--0.155
-0.1 55
-0.084
-0.072
0.038
-0.155
-0.052
0.011
-0.043
-0.084
0.110
0.528
0.828
0.792
0.951
0.753
0.317
0.264
0.300
QuaHs Engineering
4403 Manchester Ave #203
Encinitas, CA 92024
760-652-9257
Project Title:
Engineer:
Gallagher Residence
JF 11 Project ID:
Project Descr:
24168
[wood Be~~ ___ -~ -=--=----
Project File: 24168 -Gallagher Residence.ec6 J
Qualls Engin-e-er~in_g_________ (c) ENERCALCINC 1983-2023 uc#: KW-06015197, Build:20.24.08.01
DESCRIPTION: FB-1
CODE REFERENCES --------
Ca I cu I at ions per NOS 2018, IBC 2021, ASCE 7-16
Load Combination Set: ASCE 7-16
Materi!'I Prope_rt_ie_s _________ _
Analysis Method : Allowable Stress Design Fb +
Fb -
3,100.0 psi
3,100.0 psi
3,000.0 psi
E : Modulus of Elasticity
Load Combination ASCE 7-16
Wood Species
Wood Grade
Boise Cascade
Versa Lam 3100
Fe -Prll
Fe -Perp
Fv
Ft
Beam Bracing Beam is Fully Braced against lateral-torsional buckling
D 0.063
0(0.217~ L(0.58)
7X11.25
Span= 15.50 ft
750.0psi
285.0 psi
2,100.0psi
Ebend-xx 2,000.0ksi
Eminbend -xx 1,036.83ksi
Density 41 .760pcf
..
2
Applied Loa<!_s Service loads entered. Load Factors will be applied for calculations.
Beam self weight NOT internally calculated and added
Uniform Load : D = 0.0150, L = 0.040 ksf, Tributary Width= 14.50 ft, (FLOOR)
Uniform Load : D = 0.0070 ksf, Tributary Width = 9.0 ft, (WALL ABV)
DESIGN SUMMARY
Maximum Bending Stress Ratio =
Section used for this span
fb: Actual =
F'b =
Load Combination
Location of maximum on span =
Span# where maximum occurs =
Maximum Deflection
Max Downward Transient Deflection
Max Upward Transient Deflection
Max Downward Total Deflection
Max Upward Total Deflection
Overall Maximum Deflections
0.67l 1
7x11.25
2,100.17 psi
3,122.31psi
+D+L
7.750ft
Span# 1
0.456 in Ratio=
O in Ratio=
0.677 in Ratio=
O in Ratio=
Maximum Shear Stress Ratio
Section used for this span
fv: Actual
F'v
Load Combination
Location of maximum on span
Span# where maximum occurs
407>=360 Span: 1 : L Only
0<360 n/a
274>=240 Span: 1 : +D+L
0<240 n/a
-Load Combination
+D+L
Span
-1 -
Max. "-" Defl Location in Span Load Combination
0.6767 7.807
Vertical Reactions Support notation : Far left is #1
---···----Load Combination
Max Upwardrrom an Load Conditions ----
Max Upward from Load Combinations
Max Upward from Load Cases
DOnly
+D+L
+D+0.750L
+0.60D
L Only
Support 1 Support 2
--6.669 6.669 ----
6.669 6.669
4.495 4.495
2.174 2.174
6.669 6.669
5.545 5.545
1.304 1.304
4.495 4.495
Design OK
=
=
=
=
=
0.394: 1
7x11.25
112.19 psi
285.00 psi
+D+L
14.595 ft
Span# 1
Max. "+" Defl Location in Span
0.0000
Values in KIPS
ci:Ooo -
Qualls Engineering
4403 Manchester Ave #203
Encinitas, CA 92024
760-652-9257
Project Title:
Engineer:
Gallagher Residence
JF 12 Project ID:
Project Descr:
24168
!Wood Beam
-----7
Project File: 24168 -Gallagher Residence.ec6 1
UC#: KW-0601 5197, Build:20.24.08.01
DESCRIPTION: FB-2
CODE REFERENCES
Calculations per NOS 2018, IBC 2021 , ASCE 7-16
Load Combination Set : ASCE 7-16
Qualls Engineering (c) ENERCALC INcT983-2023
N!_aterial Properties __
Analysis Method : Allowable Stress Design
Load Combination : ASCE 7-16
Fb+ 3,100.0psi
3,100.0 psi
3,000.0 psi
E : Modulus of Elasticity
Wood Species
Wood Grade
Beam Bracing
Boise Cascade
Versa Lam 3100
Fb-
Fc -Prtl
Fe -Perp
Fv
Ft
Beam is Fully Braced against lateral-torsional buckling
0(1 48) I r(1 48)
3.5x11 .25
Span = 11.250 ft
750.0 psi
285.0psi
2,100.0 psi
Ebend-xx 2,000.0ksi
Eminbend -xx 1,036.83ksi
Density 41 .760pcf
2
~pp~ed Loads Service loads entered. Load Factors will be applied for calculations.
Beam self weight NOT internally calculated and added
Uniform Load : D: 0.020, Lr: 0.020 ksf, Tributary Width= 10.50 ft, (ROOF ABV+LOWER ROOF)
Uniform Load : D: 0.0160 ksf, Tributary Width: 9.0 ft, (WALL ABV)
Point Load : D = 1 .480, Lr= 1 .480 k@ 1.0 ft, (GIRDER TRUSS ON GRID D BETW 7&8 (R))
Uniform Load : D = 0.0150, L = 0.040 ksf, Tributary Width = 1.330 ft, (FLOOR)
DESIGN SUMMARY
Maximum Bending Stress Ratio =
Section used for this span
fb: Actual =
F'b =
Load Combination
Location of maximum on span =
Span # where maximum occurs =
Maximum Deflection
Max Downward Transient Deflection
Max Upward Transient Deflection
Max Downward Total Deflection
Max Upward Total Deflection
Overall Maximum Deflections
0.449. 1
3.5x11.25
1,751.78psi
3,902.89psi
+D+Lr
5.173ft
Span# 1
0.116 in Ratio =
O in Ratio=
0.304 in Ratio=
O in Ratio=
Maximum Shear Stress Ratio
Section used for this span
fv: Actual
F'v
Load Combination
Location of maximum on span
Span# where maximum occurs
1162>=360
0<360
444>=240
0<240
Span: 1 : Lr Only
nla
Span: 1 : +D+Lr
n/a
Load Combination
+D+Lr
_S_p_a_n -Max. "-" Defl Location in Span Load Combination
1 0.3037 5.502
Vertical Reactions
Load Conibination -----
Max Upward from alfload Conditions
Max Upward from Load Combinations
Max Upward from Load Cases
DOnly
+D+L
+D+Lr
Support notation : Far left is #1
Support 1 Support 2
-5.982-3.548
5.982 3.548
3.452 2.235
3.452 2.235
3.751 2.534
5.982 3.548
Design OK
= 0.583: 1
3.5x11.25
= 207.78 psi
= 356.25 psi
+D+Lr
= 0.000 ft
= Span# 1
Max . ..-:;,;-Defl Location in Span
--6.0000 -·o.ooo
Values in KIPS
Quails Engineering
4403 Manchester Ave #203
Encinitas, CA 92024
760-652-9257
Wood Beam
• UC#: KW-06015197, Build:20.24.08.01
DESCRIPTION: FB-3
CODE REFERENCES -----
Project Title:
Engineer:
Project ID:
Project Descr:
Gallagher Residence
JF
24168 13
----·-----------
Project File: 24168 -Gallagher Residence.ec6
Qualls Engineering (c) ENERCALC INC 1983-2023
Calculations per NOS 2018, IBC 2021 , ASCE 7-16
Load Combination Set : ASCE 7-16
Material Prope~ie!i _______ _
Analysis Method : Allowable Stress Design Fb +
Fb -
1,350.0 psi
1,350.0 psi
925.0 psi
625.0 psi
170.0 psi
675.0 psi
E : Modulus of Elasticity
Load Combination . ASCE 7-16 Ebend-xx 1,600.0 ksi
Fe -Prll
Fe -Perp
Fv
Eminbend -xx 580.0ksi
Wood Species
Wood Grade
Douglas Fir-Larch
No.1
Ft Density 31.210pcf
Beam Bracing Beam is Fully Braced against lateral-torsional buckling
D 0.01995 L 0.0532
4x12
2 Span= 12 250 fl
Applied Loads Service loads entered. Load Factors will be applied for calculations.
Beam self weight calculated and added to loading
Load for Span Number 1
Uniform Load : D = 0.020, Lr= 0.020 ksf, Extent= 10.0 --» 12.250 ft, Tributary Width= 10.0 ft, (ROOF ABV)
Uniform Load : D = 0.0160 ksf, Extent= 10.0--» 12.250 ft, Tributary Width= 9.0 ft, (WALL ABV)
Point Load : D = 0.680, Lr= 0.590 k@ 10.0 ft, (RB-2 (R))
Uniform Load : D = 0.0150, L = 0.040 ksf, Tributary Width = 1.330 ft, (FLOOR)
DESIGN SUMMARY
Maximum Bending Stress Ratio
Section used for this span
=
fb: Actual =
F'b =
Load Combination
Location of maximum on span =
Span# where maximum occurs =
Maximum Deflection Max Downward Transient Deflection
Max Upward Transient Deflection
Max Downward Total Deflection
Max Upward Total Deflection
Overall Maximum Deflections
0.337: 1
4x12
625.86psi
1,856.25psi
+D+0.750Lr+0.750L
9.970ft
Span# 1
0.044 in Ratio=
O in Ratio =
0.143 in Ratio=
O in Ratio=
Maximum Shear Stress Ratio
Section used for this span
=
fv: Actual =
F'v =
Load Combination
Location of maximum on span =
Span# where maximum occurs =
3330>=360
0<360
1030>=240
0<240
Span: 1 : Lr Only
nla
Span: 1 : +D+0.750Lr+0.750L
nla
Design OK
0.330: 1
4x12
70.16 psi
212.50 psi
+D+O. 750Lr+O. 750L
11 .356 ft
Span# 1
Load Combination Span Max. "-" Def! Location in Span Load Combination Max. "+" Def! Location in Span
+D+0.750Lr+0.750L ----~1--0.1427 6.661
Vertical Reactions Support notation : Far left is #1 --------------Load Combination
Max Upward from all Load onditions
Max Upward from Load Combinations
Max Upward from Load Cases
D Only
+D+L
Support 1 Support 2
0.727 2.345-·-·-------
0.727 2.345
0.370 1.432
0.370 1.432
0.696 1.758
0.0000 0.000
Values in KIPS
Qualls Engineering
4403 Manchester Ave #203
Encinitas, CA 92024
760-652-9257
fwoodBeam-
Project Title:
Engineer:
Project ID:
Project Descr:
Gallagher Residence
JF
24168 14
Project File: 24168 -Gallagher Residence.ec6
Lie# :-KW--06015197, Build:20.24.08.0-1 -------Qualls Engineering ---(c) ENERCALC INC1983-2023
DESCRIPTION: FB-4
CODE REFERENCES
Calculations per NDS 2018, IBC 2021, ASCE 7-16
Load Combination Set : ASCE 7-16
M~terial Prope~es __ _
Analysis Method : Allowable Stress Design
Load Combination : ASCE 7-16
Wood Species
Wood Grade
Douglas Fir-Larch
No.1
Fb +
Fb -
Fe-Prll
Fe -Perp
Fv
Ft
1,350.0 psi
1,350.0 psi
925.0psi
625.0psi
170.0 psi
675.0 psi
E : Modulus of Elasticity
Ebend-xx 1,600.0 ksi
Eminbend -xx 580.0ksi
Density 31 .210pcf
Beam Bracing Beam is Fully Braced against lateral-torsional buckling
D(0.01995j L(0.0532)
E 2.69)
3-2'<12 3-2'<12
2 3
Span• 7.0 ft Span • 3.250 ft
~pplied Loads Service loads entered. Load Factors will be applied for calculations.
Beam self weight NOT internally calculated and added
Load for Span Number 1
Uniform Load : D = 0.020, Lr= 0.020 ksf, Extent = 4.0 --» 7 .0 ft, Tributary Width = 1.330 ft, (ROOF)
Uniform Load : D = 0.0070 ksf, Extent= 4.0 --» 7.0 ft, Tributary Width= 9.0 ft, (WALL)
Point Load : D = 0.470, Lr= 0.420 k@ 0.750 ft, (RH-1 (L))
Point Load : D = 0.350, Lr= 0.320 k@ 4.0 ft, (RH-1 (R))
Uniform Load : D = 0.020, Lr= 0.020 ksf, Extent= 0.0 --» 0 .750 ft, Tributary Width = 1.330 ft, (ROOF)
Uniform Load: D = 0.0070 ksf, Extent= 0.0 --» 0.750 ft, Tributary Width= 9.0 ft, (WALL)
Point Load : E = -2.690 k@ 4.0 ft, (SEISMIC GRID 3)
Uniform Load : D = 0.0150, L = 0.040 ksf, Tributary Width = 1.330 ft, (FLOOR)
Load for Span Number 2
Uniform Load : D = 0.020, Lr = 0.020 ksf, Tributary Width = 1.330 ft, (ROOF)
Uniform Load : D = 0.0070 ksf, Tributary Width = 9.0 ft, (WALL)
Point Load : E = 2.690 k @ 3.250 ft, (SEISMIC GRID 3)
Uniform Load : D = 0.0150, L = 0.040 ksf, Tributary Width = 1.330 ft, (FLOOR)
DESIGN SUMMARY
Maximum Bending Stress Ratio
Section used for this span
= 0.805 1
3-2x12
Maximum Shear Stress Ratio
Section used for this span
=
Design OK
0.424: 1
3-2x12
fb: Actual
F'b
= 1,739.02psi fv: Actual
F'v
= 115.46psi
Load Combination
Location of maximum on span
Span# where maximum occurs
Maximum Deflection
Max Downward Transient Deflection
Max Upward Transient Deflection
Max Downward Total Deflection
Max Upward Total Deflection
= 2,160.00psi
+1.105D-1 .344E+0.60H
= 4.028ft
= Span# 1
0.007 in Ratio =
-0.010 in Ratio =
0.174 in Ratio=
-0.180 in Ratio =
Load Combination
Location of maximum on span
Span # where maximum occurs
= 272.00 psi
+1 .105D+1.344E+0.60H
= 7.000ft
= Span# 1
11706>=360
7654>=360
448>=240
432>=240
Span: 1 : Lr Only, LL Comb Run (L*)
Span: 2 : Lr Only, LL Comb Run (L*)
Span: 2 : +0.60D+0.70E+H
Span: 2 : +D-0. 70E+0.60H
Qualls Engineering
4403 Manchester Ave #203
Encinitas, CA 92024
760-652-9257
Project Title:
Engineer:
Project ID:
Project Descr:
Gallagher Residence
JF
24168
--------------------------
15
'Wood Beam Project File: 24168 -Gallagher Residence.ec6
L LIC#:Kw ::-06015-1-97-, Buii-d:2-0.24-.0-8.01 _________ -Qualls Engineering (c) ENERCALC INC-1983-2023"
DESCRIPTION: FB-4
Overall Maximum Deflections
Max. "." Defl Location in Span Load Combination -----Max. "+" Defl Location in Span Load Combination
+D-0~OE +0 .60H
Span
1
2
0 .0726
0.0000
3.832 __ ,
3.832
--------0:-0000 -0.000-
3.250 +0-0. 70E+0.60H -0.1800
Vertical Reactions Support notation : Far left is #1 Values in KIPS ---------------------Load Combination Support 1 Support 2 Support 3
Max Upward from all Loa_d_C_o_n_d-iti-o-ns _____ ·2.402 2.655--
Max Upward from Load Combinations 2.359 2.655
Max Upward from Load Cases 2.402 2.402
Max Downward from all Load Conditio -2.402 -2.402
Max Downward from Load Combinations -1 .274 -1 .097
Max Downward from Load Cases (Resis -2.402 -2.402
+D+H 0.678 0.974
+D+L+H, LL Comb Run (•L) 0.638 1.187
+D+L+H, LL Comb Run (L•) 0.864 1.160
+D+L +H, LL Comb Run (LL) 0.824 1.373
+D+Lr+H, LL Comb Run (*L) 0.658 1.080
+D+Lr+H, LL Comb Run (L*) 1.226 1.265
+D+Lr+H, LL Comb Run (LL) 1.206 1.372
+D+S+H 0.678 0.974
+D+0.750Lr+0.750L+H, LL Comb Run(* 0.633 1.213
+D+0. 750Lr+O. 750L +H, LL Comb Run (L 1.229 1.332
+D+0.750Lr+0.750L+H, LL Comb Run (L 1.184 1.572
+D+0.750L+0.750S+H, LL Comb Run (*L 0.648 1.133
+D+0.750L+0.750S+H, LL Comb Run (L* 0.818 1.113
+D+0.750L +0.750S+H, LL Comb Run (LL 0.788 1.273
+D+0.60W+H 0.678 0.974
+D+0.750Lr+0.750L +0.450W+H, LL Comb 0.633 1.213
+D+0.750Lr+0.750L +0.450W+H, LL Comb 1.229 1.332
+D+0.750Lr+0.750L +0.450W+H, LL Comb 1.184 1.572
+D+0.750L+0.750S+0.450W+H, LL Comb 0.648 1.133
+D+0.750L+0.750S+0.450W+H, LL Comb 0.818 1.113
+D+0.750L+0.750S+0.450W+H, LL Comb 0.788 1.273
+0.60O+0.60W+0.60H 0.407 0.584
+D+0.70E+0.60H -1.003 2.655
+D-0.70E+0.60H 2.359 -0.708
+D+0.750L+0.750S+0.5250E+H, LL Comb -0.613 2.394
+D+0.750L+0.750S+0.5250E+H, LL Comb -0.443 2.374
+D+0.750L+0.750S+0.5250E+H, LL Comb -0.473 2.534
+D+0.750L+0.750S-0.5250E+H, LL Comb 1.909 -0.127
+D+0.750L+0.750S-0.5250E+H, LL Comb 2.079 -0.148
+D+0.750L+0.750S-0.5250E+H, LL Comb 2.049 0.012
+0.60O+0.70E+H -1.274 2.265
+0.600-0. 70E+H 2.088 -1 .097
D Only 0.678 0.974
Lr Only, LL Comb Run (*L) -0.020 0.107
Lr Only, LL Comb Run (L•) 0.548 0.292
Lr Only, LL Comb Run (LL) 0.528 0.398
L Only, LL Comb Run (*L) -0.040 0.213
L Only, LL Comb Run (L •) 0.186 0.186
L Only, LL Comb Run (LL) 0.146 0.399
E Only -2.402 2.402
E Only• -1 .0 2.402 -2.402
H Only
Qualls Engineering
4403 Manchester Ave #203
Encinitas, CA 92024
760-652-9257
l ~ood ~ea_m __
UC#: KW-06015197, Build:20.24.08.01
DESCRIPTION: FB-5
CODE REFERENCES -----
Project Title:
Engineer:
Project ID:
Project Descr:
Gallagher Residence
JF
24168 16
Qualls Engineering
Project File: 24168 -Gallagher Residence.ec6 J
------(c) ENERCALC INC 1983-2023
Calculations per NOS 2018, IBC 2021, ASCE 7-16
Load Combination Set: ASCE 7-16
Material Properti_es ___ _
Analysis Method : Allowable Stress Design
Load Combination ASCE 7-16
Fb + 1,350.0 psi
1,350.0 psi
925.0psi
625.0psi
170.0psi
675.0psi
E : Modulus of Elasticity
Wood Species
Wood Grade
Beam Bracing
Douglas Fir-Larch
No.1
Beam is Fully Braced against lateral-torsional buckling
Fb -
Fe -Pr11
Fe• Perp
Fv
Ft
Ebend-xx 1,600.0 ksi
Eminbend -xx 580.0ksi
Density 31.210pcf
D(0.68)lllt(l)J'.i!j (0.2') E(-2.4)
0 0.06 L 0.16
4x12
2
Span= 12.250 n
Applied Loads ___ _ Service loads entered. Load Factors will be applied for calculations.
Beam self weight NOT internally calculated and added
Point Load : D = 0.320, Lr= 0.270 k@ 10.0 ft, (RB ON GRID D.7 BElW 2&3 (R)}
Uniform Load : D = 0.0150, L = 0.040 ksf, Tributary Width= 4.0 ft, (FLOOR)
Point Load : D = 0.680, Lr= 0.550, L = 0.190, E = -2.40 k@ 10.0 ft, (FB-4 (L))
DESIGN SUMMARY
Maximum Bending Stress Ratio
Section used for this span
=
fb: Actual =
F'b =
Load Combination
Location of maximum on span =
Span # where maximum occurs =
Maximum Deflection
0.610 1
4x12
906.00psi
1,485.00 psi
+D+L
7.109ft
Span# 1
Maximum Shear Stress Ratio
Section used for this span
fv: Actual
F'v
Load Combination
Location of maximum on span
Span# where maximum occurs
Span: 1 : L Only
Span: 1 : E Only
=
Design OK
0.552 : 1
4x12
= 150.03 psi
= 272.00 psi
+1.0790+0.750L-1.008E
= 11.356 ft
= Span# 1
Max Downward Transient Deflection
Max Upward Transient Deflection
Max Downward Total Deflection
Max Upward Total Deflection
0.133 in Ratio=
-0.129 in Ratio=
0.266 in Ratio =
-0.032 in Ratio =
1107>=360
1139 >=360
553>=240
4656>=240
Span: 1 : +D+0.750L-0.5250E
Span: 1 : +0.60D+0.70E
Overall Maximum Deflections
Load Combination
+D+0.750L-0.5250E
Vertical Reactions
Load Combination
Span
1
Max Upward from alfCoacrconditions
Max Upward from Load Combinations
Max Upward from Load Cases
Max Downward from all Load Conditio
Max Downward from Load Combinations
Max Downward from Load Cases (Resis
D Only
Max. "-" Defl Location in Span Load Combination
0~2658 6.527
Support notation : Far left is #1
Support 1 Support 2
----~.566 -·3~0~
1.566 3.064
1.015 1.959
-0.441 -1 .959
-0.661
-0.441 -1.959
0.551 1.184
Max. "+" Defl Location inSpan
0.0000 0.000
Values in KIPS
Qualls Engineering
4403 Manchester Ave #203
Encinitas, CA 92024
760-652-9257
Project Title:
Engineer:
Gallagher Residence
JF 17 Project ID: 24168
Project Descr:
I Wood Beam Project File: 24168 -Gallagher Residence.ec6 j
---------QuaTISEngin-ee-ri-ng______ (c) ENERCALC INC 1983·2023 LIC#: KW-06015197, Build:20.24.08.01
DESCRIPTION: FB-6
CODE REFERENCES --· ------------
Calculations per NOS 2018, IBC 2021 , ASCE 7-16
Load Combination Set : ASCE 7-16
Mat!rial Properti_e_s __
Analysis Method : Allowable Stress Design
Load Combination ASCE 7-16
Wood Species
Wood Grade
iLevel Truss Joist
Parallam PSL 2.0E
Beam Bracing Beam is Fully Braced against lateral-torsional buckling
D 0.144
D(0.46 Lr(0.4)
D0.1 Lr 0.1
Fb +
Fb -
Fe -Prtl
Fe -Perp
Fv
Ft
2,900.0 psi
2,900.0 psi
2,900.0 psi
750.0psi
290.0psi
2,025.0 psi
--------
E : Modulus of Elasticity
Ebend-xx 2,000.0ksi
Eminbend -xx 1,016.54 ksi
Density 45.070pcf
5.25x18.0 5.25x18.0
2 3 Span = 21.50 ft Span= 3.250 ft
Applied Loads
Beam self weight calculated and added to loading
Load for Span Number 1
Service loads entered. Load Factors will be applied for calculations.
Varying Uniform Load : D= 0.020->0.020, Lr= 0.020->0.020 ksf, Extent = 0.0 --» 6.0 ft, Trib Width = 2.0->5.0 ft, (ROOF)
Uniform Load : D = 0.020, Lr= 0.020 ksf, Extent= 6.0 --» 12.0 ft, Tributary Width= 5.0 ft, (ROOF)
Varying Uniform Load : D= 0.020->0.020, Lr= 0.020->0.020 ksf, Extent= 12.0 --» 15.50 ft, Trib Width= 5.0->7.0 ft, (ROOF)
Varying Uniform Load : D= 0.020->0.020, Lr= 0.020->0.020 ksf, Extent = 15.50--» 21 .50 ft, Trib Width= 7.0->3.50 ft, (ROOF)
Uniform Load : D = 0.0160 ksf, Tributary Width= 9.0 ft, (WALL)
Point Load: D = 0.460, Lr= 0.40 k@ 6.0 ft, (RB-2 (L))
Point Load : D = 0.150, Lr= 0.160 k@ 12.0 ft, (RB ON GRID D.8 BETW 2&3 (L))
Point Load : D = 0.110, Lr= 0.070 k@ 14.0 ft, (RB ON GRID D.7 BETW 2&3 (L))
Point Load : D = 0.230, Lr= 0.190 k@ 16.50 ft, (RB ON GRID D.5 BETW 2&3 (L))
Point Load : E = -0.560 k @ 20.0 ft, (SEISMIC GRID 2)
Load for Span Number 2
Varying Uniform Load : D= 0.020->0.020, Lr= 0.020->0.020 ksf, Extent= 0.0 --» 3.250 ft, Trib Width = 3.750->2.0 ft, (ROOF)
Uniform Load : D = 0.0160 ksf, Tributary Width= 9.0 ft, (WALL)
Point Load : D = 0.540, Lr= 0.490 k@ 3.250 ft, (RB-1 (L))
Uniform Load : D = 0.0150, L = 0.040 ksf, Tributary Width = 1.330 ft, (FLOOR)
Point Load : E = 1.270 k@ 3.250 ft, (SEISMIC GRID D)
QuaHs Engineering
4403 Manchester Ave #203
Encinitas, CA 92024
760-652-9257
Wood Beam
LIC#:-KW-06015197, Build:20.24.08.01
DESCRIPTION: FB-6
DESIGN SUMMARY
Maximum Bending Stress Ratio
Section used for this span
=
Project Title:
Engineer:
Project ID:
Project Descr:
Gallagher Residence
JF
24168 18
QuallsEngineering
Project File: 24168 -Gallagher Residence.ec6
(c) ENERCALC INC 1983-2023
0.321: 1
5.25x18.0
Maximum Shear Stress Ratio
Section used for this span
=
Design OK
0.206: 1
5.25x18.0
fb: Actual
F'b
= 1,112.41psi fv: Actual
F'v
= 74.81 psi
= 3,465.47psi
Load Combination +D+Lr+H, LL Comb Run (L*)
= 10.81 Oft
= Span# 1
Load Combination
Location of maximum on span
Span # where maximum occurs
= 362.50 psi
+D+Lr+H , LL Comb Run (LL)
= 20.059ft
= Span # 1
Location of maximum on span
Span # where maximum occurs
Maximum Deflection
Max Downward Transient Deflection
Max Upward Transient Deflection
Max Downward Total Deflection
Max Upward Total Deflection
0 .144 in
-0.069 in
0.430 in
-0.193 in
Ratio=
Ratio=
Ratio=
Ratio=
1793>=360
1126>=360
600 >=240
402 >=240
Span: 1 : Lr Only, LL Comb Run (L*)
Span: 2 : Lr Only, LL Comb Run (L*)
Span: 1 : +D+Lr+H, LL Comb Run (L *)
Span: 2 : +D+Lr+H, LL Comb Run (L *)
Overall Maximum Deflections
Load Combination Span
-+D+Lr+H, LL Comb Run_(_L-*)---1
2
Max. "-" Defl Location in Span Load Combination
Vertical Reactions
Load Combination
Max UpwarcfTrom all LoadConditions
Max Upward from Load Combinations
Max Upward from Load Cases
Max Downward from all Load Conditio
Max Downward from Load Cases (Resis
+D+H
+D+L+H, LL Comb Run (*L)
+D+L +H, LL Comb Run (L *)
+D+L+H, LL Comb Run (LL)
+D+Lr+H, LL Comb Run (*L)
+D+Lr+H, LL Comb Run (L *)
+D+Lr+H, LL Comb Run (LL)
+D+S+H
+D+0.750Lr+0.750L+H, LL Comb Run (*
+D+0.750Lr+0.750L+H, LL Comb Run (L
+D+0.750Lr+0.750L+H, LL Comb Run (L
+D+0.750L+0.750S+H, LL Comb Run (*L
+D+0.750L+0.750S+H, LL Comb Run (L*
+D+0.750L+0.750S+H, LL Comb Run (LL
+D+0.60W+H
+D+0.750Lr+0.750L+0.450W+H, LL Comb
+D+0.750Lr+0.750L+0.450W+H, LL Comb
+D+0.750Lr+0.750L+0.450W+H, LL Comb
+D+0.750L+0.750S+0.450W+H, LL Comb
+D+0.750L+0.750S+0.450W+H, LL Comb
+D+0.750L+0.750S+0.450W+H, LL Comb
+0.60D+0.60W+0.60H
+D+0.70E+0.60H
+D-0. 70E+0.60H
+D+0.750L+0.750S+0.5250E+H, LL Comb
+D+0.750L+0.750S+0.5250E+H, LL Comb
+D+0.750L+0.750S+0.5250E+H, LL Comb
+D+0.750L+0.750S-0.5250E+H, LL Comb
+D+0.750L+0.750S-0.5250E+H, LL Comb
+D+0.750L+0.750S-0.5250E+H, LL Comb
+0.60D+0.70E+H
+0.60D-0. 70E+H
DOnly
Lr Only, LL Comb Run (*L)
Lr Only, LL Comb Run (L*)
0.4295 10.690
0.0000 10.690 +D+Lr+H, LL Comb Run (L*)
Support notation : Far left is #1
Support 1 Support 2 Support 3
.540 7.222
4.540 7.222
3.163 4.945
-0.231 -0.941
-0.231 -0.941
3.163 4.945
3.150 5.131
3.163 4.945
3.150 5.131
3.076 5.708
4.540 6.458
4.453 7.222
3.163 4.945
3.088 5.657
4.195 6.080
4.121 6.792
3.153 5.084
3.163 4.945
3.153 5.084
3.163 4.945
3.088 5.657
4.195 6.080
4.121 6.792
3.153 5.084
3.163 4.945
3.153 5.084
1.898 2.967
3.001 5.604
3.325 4.286
3.032 5.578
3.042 5.439
3.032 5.578
3.274 4.590
3.284 4.451
3.274 4.590
1.736 3.626
2.059 2.308
3.163 4.945
-0.087 0.764
1.377 1.513
Max. "+" Defl Location in Span
0 .0000 • 0.000
-0.1935 3.250
Values in KIPS
Qualls Engineering
4403 Manchester Ave #203
Encinitas, CA 92024
760-652-9257
Project Title:
Engineer:
Gallagher Residence
JF 19 Project ID:
Project Descr:
24168
JWood Be'!m __
UC#: KW-06015197, Build:20.24.08.01 Qualls Engineering
Project File: 24168 -Gallagher Residence.ec6
(c) ENERCALC INC 1983-2023
DESCRIPTION: FH-1
CODE REFERENCES
Calculations per NOS 2018, IBC 2021 , ASCE 7-16
Load Combination Set : ASCE 7-16
Material Properties __
Analysis Method : Allowable Stress Design
Load Combination : ASCE 7-16
Fb + 900psi
900psi
E : Modulus of Elasticity
Wood Species
Wood Grade
Beam Bracing
Douglas Fir-Larch
No.2
Completely Unbraced
Fb -
Fc-Prll
Fe -Perp
Fv
Ft
4x10
Span• 8.0 ft
1350 psi
625psi
180 psi
575 psi
Ebend-xx 1600ksi
Eminbend -xx 580ksi
Density 31. 21 pcf
2
Service loads entered. Load Factors will be applied for calculations ----------Beam self weight calculated and added to loading
Uniform Load : D = 0.020, Lr= 0.020 ksf, Tributary Width= 11 .50 ft, (ROOF)
Uniform Load: D = 0.0160 ksf, Tributary Width= 9.0 ft, (WALL ABV)
Uniform Load : D = 0.0150, L = 0.040 ksf, Tributary Width= 7.50 ft, (FLOOR)
DESIGN SUMMARY
Maximum Bending Stress Ratio = 0.80l 1 Maximum Shear Stress Ratio
Section used for this span 4x10 Section used for this span
fb: Actual = 858.52psi fv: Actual
F'b = 1,069.18psi F'v
Load Combination +D+L Load Combination
Location of maximum on span = 3.000ft Location of maximum on span
Span # where maximum occurs = Span# 1 Span # where maximum occurs
Maximum Deflection
0.024 in Ratio= 3022>=360 Span: 1 : L Only
O in Ratio= 0<360 n/a
Design OK
= 0.456 : 1
4x10
= 82.12 psi
= 180.00 psi
+D+L
= 0.000 ft
= Span# 1
Max Downward Transient Deflection
Max Upward Transient Deflection
Max Downward Total Deflection 0.071 in Ratio= 1017>=240 Span: 1 : +D+0.750Lr+0.750L
Max Upward Total Deflection O in Ratio= 0<240 n/a
Overall Maximum Deflections
Load Combination Max. "-" Deft Location in Span Load Combination
+D+O. 750Lr+0.750L
Vertical Reactions
Load Combination
Max Upward from allloaa Conditfons--
Max Upward from Load Combinations
Max Upward from Load Cases
DOnly
+D+L
+D+Lr
+D+O. 750Lr+0.750L
0.0708 3.022
Support notation : Far left is #1 -----Support 1 Support 2
-Y-673 2.673
2.673 2.673
1.481 1.481
1.481 1.481
2.381 2.381
2.171 2.171
2.673 2.673
Max. "+" Deft Location in Span
0.0000
Values in KIPS
-0:000
Qualls Engineering
4403 Manchester Ave #203
Encinitas, CA 92024
760-652-9257
Wood Beam
UC#: KW-06015197, Build:20.24.08.01
DESCRIPTION: FH-2
CODE REFERENCES
Project Title:
Engineer:
Project ID:
Project Descr:
Qualls Engineering
Gallagher Residence
JF
24168 20
Project File: 24168 -Gallagher Residence.ec6 1
-(c)ENERCALC INC 1953-:2023 J
-------------Calculations per NOS 2018, IBC 2021, ASCE 7-16
Load Combination Set : ASCE 7-16
Material Prope"!i~--
Analysis Method : Allowable Stress Design
Load Combination ASCE 7-16
Fb + 875.0 psi
875.0psi
600.0psi
625.0psi
170.0psi
425.0 psi
E : Modulus of Elasticity
Wood Species
Wood Grade
Beam Bracing
Douglas Fir-Larch
No.2
Completely Unbraced
0(2.28) llf(IUS) l (2.56)
Fb -
Fe -Pr11
Fe -Perp
Fv
Ft
D 0.195 Lr 0.195
4x8
Span = 6.250 ft
Ebend-xx 1,300.0 ksi
Eminbend -xx 470.0ksi
Density 31.210pcf
2
Applied Load!_ ____ _ Service loads entered. Load Factors will be applied for calculations.
Beam self weight calculated and added to loading
Uniform Load : D = 0.020, Lr = 0.020 ksf, Tributary Width = 9 .750 ft, (ROOF)
Point Load : D = 2.280, Lr= 0.210, L = 2.560 k@ 0.50 ft, (FB ON GRID B BETW 7&8 (L))
Point Load : E = 1.160 k@ 0.50 ft, (SEISMIC GRID 7)
DESIGN SUMMARY
Maximum Bending Stress Ratio
Section used for this span
=
fb: Actual =
F'b =
Load Combination
Location of maximum on span =
Span # where maximum occurs =
Maximum Deflection
0.891: 1
4x8
1,003.03psi
1,125.96psi
+D+L
1.186ft
Span# 1
Maximum Shear Stress Ratio
Section used for this span
fv: Actual
F'v
Load Combination
Location of maximum on span
Span# where maximum occurs
Span: 1 : Lr Only
Span: 1 : E Only• -1.0
Design OK
= 0.341 : 1
4x8
= 72.51 psi
= 212.50 psi
+D+O. 750Lr+O. 750L
= 5.657 ft
= Span# 1
Max Downward Transient Deflection
Max Upward Transient Deflection
Max Downward Total Deflection
Max Upward Total Deflection
0.050 in Ratio =
-0.017 in Ratio=
0.147 in Ratio=
O in Ratio=
1509>=360
4320>=360
509>=240
0<240
Span: 1 : +D+0.750Lr+0.750L
n/a
Overall Maximum Deflections
Load Combination Span Max. "-" Defl Location in Span Load Combination
0.1471 2.943-
Support notation : Far left is #1
+D+0.750Lr+0.750L
Vertical Reactions
Load Combination --------
Max Upward from all Load Conditions
Max Upward from Load Combinations
Max Upward from Load Cases
Max Downward from all load Conditio
Max Downward from Load Cases (Resis
DOnly
+D+L
Support 1 Support 2
5.092-r:~ ------
5_092 1.435
2.724 0.809
-1.067 -0.093
-1.067 -0.093
2.724 0.809
5.079 1.014
Max. "+" Defl Location in Span
0.0000--
Values in KIPS
0.000
Qualls Engineering
4403 Manchester Ave #203
Encinitas, CA 92024
760-652-9257
Project Title:
Engineer:
Project ID:
Project Descr:
Gallagher Residence
JF
24168 21
Wood Beam
L -~---· -·---------------LIC#: KW-06015197, Build:20.24.08.01 Qualls Engineering
Project File: 24168 -Gallagher Resldence.ec6
(c) ENERCALCiNC 1983-::2023
DESCRIPTION: FH-3
CODE REFERENCES
Calculations per NOS 2018, IBC 2021, ASCE 7-16
Load Combination Set : ASCE 7-16
Material Properties '-----------An a I y sis Method : Allowable Stress Design Fb +
Fb -
2,900.0 psi
2,900.0 psi
2,900.0 psi
E : Modulus of Elasticity
Load Combination · ASCE 7-16
Wood Species
Wood Grade
Beam Bracing
il evel Truss Joist
Parallam PSL 2.0E
Completely Unbraced
0.065 Lr 0.065
0(4.94) Lr(2.26) L(0.19) E(0.94)
Fe -Prll
Fe -Perp
Fv
Ft
5.25x18.0
Span= 16.50 ft
750.0 psi
290.0 psi
2,025.0 psi
D 0.105 L 0.28
Ebend-xx 2,000.0ksi
Eminbend -xx 1,016.54ksi
Density 45.070pcf
4
2
Service loads entered. Load Factors will be applied for calculations. AppJied Loa~ ----
Beam self weight calculated and added to loading
Load for Span Number 1
Uniform Load : D = 0.020, Lr= 0.020 ksf, Extent= 0.0 --» 6.50 ft, Tributary Width= 3.250 ft, (ROOF)
Uniform Load : D = 0.0150, L = 0.040 ksf, Extent= 6.50 --» 16.50 ft, Tributary Width= 7.0 ft, (FLOOR)
Point Load : D = 4.940, Lr= 2.280, L = 0.190, E = 0.940 k @6.50 ft, (FB-6 (R))
DESIGN SUMMARY
Maximum Bending Stress Ratio
Section used for this span
=
fb: Actual =
F'b =
Load Combination
Location of maximum on span =
Span# where maximum occurs =
Maximum Deflection
Max Downward Transient Deflection
Max Upward Transient Deflection
Max Downward Total Deflection
Max Upward Total Deflection
Overall Maximum Deflections
0.477: 1
5.25x18.0
1,252.18psi
2,624.74psi
+D+l
6.504ft
Span# 1
0.076 in Ratio=
-0.028 in Ratio =
0.295 in Ratio=
O in Ratio=
Maximum Shear Stress Ratio
Section used for this span
=
fv: Actual =
F'v =
load Combination
Location of maximum on span =
Span# where maximum occurs =
2616>=360
7014>=360
672>=240
0<240
Span: 1 : Lr Only
Span: 1 : E Only * -1 .0
Span: 1 : +D+0.750lr+0.750l
n/a
Design OK
0.258: 1
5.25x18.0
74.96 psi
290.00 psi
+D+L
0.000ft
Span # 1
load Combination
+D+0. 750ir+0. 750l
Span
1
Max. "." Defl location in Span load Combination Max. "+" Defl Location in Span
Vertical Reactions
LoadCombination
Max Upward from -all Load Conditions
Max Upward from Load Combinations
Max Upward from Load Cases
Max Downward from all l oad Conditio
Max Downward from Load Cases (Resis
D Only
0.2946 8.009
Support notation : Far left is #1
Support 1 Support 2
• -5.909 5.261--
5.909 5.261
3.895 3.005
-0.570 -0.370
-0.570 -0.370
3.895 3.005
0.0000 6.000-
Values in KIPS
Qualls Engineering
Structural Engineering Services Sheet: 22
Project: Gallagher Residence Job#: 24168
En1-,~11ccr: r Date:
Lateral Analysis
Tributary Ate:1. (ft2)
Level Component Weight (psf) Tributary Tributary Weight IWeight
Length (ft) Height (ft) (lbs) (lbs)
Roof 20 28,000
Roof Exterior Wall 15 9.0 10,665 35,215
Interior Wall 7 9.0 3,764
rtoor 15 21.000
2nd Floor Lower Roof 20 27.700 66,932 Exterior Wall 15 9.0 17,010
Interior Wall 7 9.0 5,024
~: 1,02,146
C, (ASD) W (lbs) V (lbs)
0.108 1,02,146 10,993
Level w. (kips) h,. (ft) W,h/ (k-ft) ~ V, (lbs) Arca (ft1 V, (psf) I:(W,h,. k)
Roof 35.2 19 669 0.53 5,785 1,400 4.1
2nd Floor 66.9 9 602 0.47 5,208 2,785 1.9
~: 1,271 1:: 6.0
C, h,, X T. k
0.02 19 0.75 0.18 1.0
Wind Check
Ps
10.7
North-South East-West
Level V, (psf) Level Height (ft) Diaphragm V, (psi) Depth (ft)
Roof Peak Roof Peak 24.25
Roof 19 61 1.8 Roof 19 3.1
2nd rtoor 9 93 1.1 2nd Floor 9 2.3
:E: 2.9 5.3
Direction Governing Load
North-South Seismic I 6.0 psf
East-West Seismic I 6.0 psf
Qualls Engineering
Structural Engineering Services
Direction
North-South
Level
Roof
2nd Floor
Controlling
Load
Seismic
V,(psf)
4.1
1.9
North-South
Level Grid Wall1
Roof B
D
A
B
2nd Floor C
D
F
Grid
B
D
A
B
C
D
F
Wall2
3
3.25
2.75
3.5
~.25
4
Sheet: 23 -----
Project: Gallagh er Residence Job#: 24168
Engineer: __,_F _________ _ Date:
Lateral Design
TribArea VDirect V Directly V Offset V
Cumulative
(ftl (lbs) Above (lbs) Above (lbs) (lbs)
938 938
1,921 1,921
180 0 180
595 938 1,533
350 0 350
1,309 1,921 3,230
458 0 458
Wall Length (ft)
Effective Effective
Wall 3 Wall4 Total Total Minimum V (pit) V (pit) SW Type (h:2w (h:2w
adjusted) adjusted)
6.25 4.347222 3 150 216 (E
21.5 19.59722 3 89 98 GE
12.75 12.75 12.75 14 14 GE
5.75 3.680556 2.75 267 291 4E
7 5.444444 3.5 so 64 GE
12.75 9.069444 3 253 356 3E
8 7.111111 4 57 64 GE
Qualls Engineering
Structural Engineering Services
Direction
East-West
Level
Roof
2nd Floor
Controlling
Load
Seismic
Vx (psf)
4.1
1.9
East-West
Level Grid Wall 1
2
3
Roof 5
7
8
4
5
211d Floor SA
7
8
9
Grid
2
3
5
7
8
4
5
7
8
9
Wall 2
Sheet: 24 -----
Project: Gallagher Residence Job#: 24168
Engineer: ..,t.;:;.F _________ _ Date:
Lateral Design
Trib Area V Direct V Directly V Offset V
(fl) (lbs) Above (lbs) Above (lbs) Cumulative
(lbs)
186 186
1,169 I, I <,9
1,405 1,405
1,756 1,756
930 930
247 0 247
353 0 353
363 0 1,405 1,768
150 150
1,025 930 1,954
458 0 458
Wall Length (ft)
Effective Effective
Wa113 Total Total Minimum V (plf) SW Type (h:2w V (plf) (h:2w
adjusted) adjusted)
4.75 4.75 4.75 39 39 6E
17.75 17.75 5.75 66 66 6E
14.75 14.75 14.75 95 95
21.5 21.5 10 82 82
17 17 17 55 55
7 5.444444 3.5 35 45 6E
8 7.111111 4 44 50 6E
8 8 8 221 221 6E
3 2 3 50 75 6E
11.5 11.5 5.5 170 170 6E
6 6 6 76 76 6E
Qualls Engineering
Structural Engineering Services
North-South
Roof D
A
B
2nd Floor C 3.5
D 3
F 4
North-South C (lbs) T (lbs)
Roof D 804 0
A 127 0
B 2,399 1,188
2nd Floor C 450 286
D 2,280 1,684
F 515 0
East-We~t L..,min
ft
Roof 2 4.75
3
4
5
2nd Floor SA
7
8
9
East-West C (lbs) T (lbs)
2 352 13 Roof 3 593 379
4 317 0
s 398 8
2nd Floor SA 3,569 3,021
7 449 103
8 3,051 2,426
9 687 334
Project: Gallagher Residence
Engineer: F ------------
Overturning
v (plf) Add'lM01
ft-lbs
89
14
267
so
253
57
HD Capacity DCR (lbs)
None 600 0.00
None 600 0.00
IIDU2 3,075 0.39
None 600 0.48
llt'.\]lj 2,000 0.84
None 600 0.00
v (plf) Add'lM01 M.,
ft-lbs
39
66
35
44
221
so
170
76
HD Capacity DCR (lbs)
None 600 0.02
None 600 0.63
None 600 0.00
None 600 O.Ql
IIDU2 3,075 0.98
None 600 0.17
HDU2 3,075 0.79
None 600 0.56
Sheet: 25
Job#: 24168
Date:
Add'lM,,.
ft-lbs
Add'lM, ..
ft-lbs
11 1
M, ..
ft-lbs
11 250
12 062
8,762
723
2,250
4,240
M, ..
ft-lbs
2,031
1,613
1,501
1,960
5,522
1,305
4,327
2 671
Qualls Engineering
Structwal Engineering Services Project:
Engineer:
FOUNDATION DESIGN
Gallagher Residence
JF
Sheet: _.;;;2...;;.6 __ _
Job#: 24168
Date:
Allowable Soils Bearing Capacity 2,000 psf _:j 12
18
2#4
inch wide x
New Foundation design b = 12
d = 18
inch deep footing with
top and bottom
Existing Foundation design b = 15
d = 18 7======
Allowable Max Line Load
(N) W ma., = b X ASBP
(E) \V max = b X ASBP
Allowable Max Point Load
(N) P ma., = b X 2d X ASBP
(E) P ma., = b X 2d X ASBP
Spread Footing Design
F2= 2
F2.5 = 2.5
F3= 3
F3.5 = 3.5
F4= 4
FS = 5
Maximum reaction :
FB-2 + (E) Beam 8400
=
=
=
2,000 plf
2,500 plf
6,000 lbs
7,500 lbs
foot square footing with 3 # 4 each way @ btm
p max = 8,000 lbs
foot square footing with 3 # 4 each way @ btm
P max = 12,500 lbs
foot square footing with 4 # 4 each way @ btm
P m,x = 18,000 lbs
foot square footing with 4 # 5 each way @ btm
pmax = 24,500 lbs
foot square footing with 5 # 5 each way @ btrn
Pm:,x = 32,000 lbs
foot square footing with 6 # 5 each way @ btm
p max = 50,000 lbs
lbs Provide F2.5
SIMPSON
Strong-Tie
Anchor Designer™
Software
Version 3.2.2311.2
1,Project information
Project description:
Location:
Fastening description:
2. Input Data & Anchor Parameters
General
Design method:ACI 318-19
Units: Imperial units
Anchor Information:
Anchor type: Bonded anchor
Material: F1554 Grade 36
Diameter (inch): 0.625
Effective Embedment depth, her (inch): 9.000
Code report: ICC-ES ESR-4057
Anchor category: -
Anchor ductility: Yes
hm1n (inch): 10.38
Coe (inch): 18.37
Cm1n (inch}: 1.75
Sm1n (inch): 3.00
Recommended Anchor
Anchor Name: SET-3G™ -SET-3G w/ 5/8"0 F1554 Gr. 36
Code Report: ICC-ES ESR-4057
" 1116
f/)
Q ·')
i
' ,;,:
....... ,. •• 1,
Company: QUALLS ENGINEERING
Engineer: JACOB FARABAUGH
Project: GALLAHGER RESIDENCE
Address:
Phone:
E-mail:
Base Material
Concrete: Normal-weight
Concrete thickness, h (inch): 18.00
State: Cracked
Compressive strength, f c (psi): 2500
4-'c,v: 1.0
I Date: l
I Page: I 27
Reinforcement condition: Supplementary reinforcement not present
Supplemental edge reinforcement: Not applicable
Reinforcement provided at corners: No
Ignore concrete breakout in tension: No
Ignore concrete breakout in shear: No
Hole condition: Dry concrete
Inspection: Continuous
Temperature range, Short/Long: 150/110°F
Reduced installation torque (for AT-3G): Not applicable
Ignore 6do requirement: Not applicable
Build-up grout pad: No
Input data and results must be checked for agreement with the existing circumstances, the standards and guidelines must be checked for plausibility.
Simpson Strong-Tie Company Inc. 5956 w. Las Positas Boulevard Pleasanton, CA 94588 Phone: 925.560.9000 Fax: 925.847.3871 www.strongtie.com
SIMPSON
Strong-Tie
Anchor Designer™
Software
Version 3.2.2311.2
Load and Geometry
Load factor source: ACI 318 Section 5.3
Load combination: not set
Seismic design: Yes
Anchors subjected to sustained tension: No
Ductility section for tension: 17.10.5.2 not applicable
Ductility section for shear: 17.10.6.2 not applicable
Oo factor: not set
Apply entire shear load at front row: Yes
Anchors only resisting wind and/or seismic loads: Yes
Strength level loads:
Nus [lb]: 4229
Vuax [lb]: 0
Vuay [lb]: 0
<Figure 1>
0lb
z
t
Company: QUALLS ENGINEERING I Date: I
Engineer: JACOB FARABAUGH I Page: l 28
Project: GALLAHGER RESIDENCE
Address:
Phone:
E-mail:
42291b
0lb
Input data and results must be checked for agreement with the existing circumstances, the standards and guidelines must be checked for plausibility.
Simpson Strong-Tie Company Inc. 5956 W. Las Positas Boulevard Pleasanton, CA 84588 Phone: 925.560.9000 Fax: 925.847.3871 www.strongtie.com
SIMPSON
Strong-Tie
II>
<Figure 2>
Anchor Designer™
Software
Version 3.2.2311.2
CX)
Company:
Engineer:
Project:
Address:
Phone:
E-mail:
CX)
QUALLS ENGINEERING I Date: I
JACOB FARABAUGH I Page: I 29
GALLAHGER RESIDENCE
0
lJ") .
\D
0
0
M
~
0
lJ") .
\D
Input data and results must be checked for agreement with the existing circumstances, the standards and guidelines must be checked for plausibility.
Simpson Strong-Tie Company Inc. 5956 W. Las Positas Boulevard Pleasanton, CA 94588 Phone: 925.560.9000 Fax: 925.847.3871 www.strongtie.com
SIMPSON
Strong-Tie
Anchor Designer™
Software
Version 3.2.2311.2
3, Resulting Anchor Forces
Company:
Engineer:
Project:
Address:
Phone:
E-mail:
Anchor Tension load,
Nu, (lb)
Shear load x,
Vu■x (lb)
4229.0
Sum 4229.0
Maximum concrete compression strain (%o): 0.00
Maximum concrete compression stress (psi): 0
Resultant tension force (lb): 4229
Resultant compression force (lb): 0
0.0
0.0
Eccentricity of resultant tension forces in x-axis, e'N, (inch): 0.00
Eccentricity of resultant tension forces in y-axis, e'Ni (inch): 0.00
4, Steel Strength of Anchor in Tension 1sec, 17,6,1)
N .. (lb) ,p ¢N •• (lb)
13110 0.75 9833
s. Concrete Breakout Strength of Anchor in Tension 1sec, 17,6,2)
No= kcl,✓fcho11•5 (Eq. 17.6.2.2.1)
kc Ao f C (psi) h., (in)
17.0 1.00 2500 9.000 22950
0.751/JNcb = 0.75¢ (ANcl ANco)'P.d,N'Pc,N'Pcp,NNb (Sec. 17.5.1.2 & Eq. 17.6.2.1a)
QUALLS ENGINEERING
JACOB FARABAUGH
GALLAHGER RESIDENCE
Shear load y,
Vu,r; (lb)
0.0
0.0
ANc (in2) ANco (in2 Ca.min (in) 'Pod,N 'Pc,N 'Pcp,N
351.00 729.00 6.50 0.844 1.00 1.000 22950
§, Adhesive Strength of Anchor in Tension 1sec, 17,§,S)
fie.er = 'l'k,crfstioMormKsa,(fc/2,S00)"aN.•el•
'11<,cr (psi) fshorf..lerm K.,,, aN.iels fc (psi) n flc,cr (psi)
1356 1.00 1.00 1.00 2500 0.24 1356
Noe= AaTcr11'deher(Eq. 17.6.5.2.1)
la Tcr (psi) d, (in) hot (in) Nba (lb)
1.00 1356 0.63 9.000 23962
0.75,PNo = 0.75,p (ANol AN,o)'f',d,N• 'l'cp,N•Nba (Sec. 17.5.1.2 & Eq. 17.6.5.1a)
ANa (in2) AN.a (in2) CNa (in) Cs,mio, (in) 'Jf.d,N• Nao (lb)
227.82 307.10 8. 76 6.50 0.923 1.000 23962
l Date: l
I Page: I 30
Shear load combined, ✓(Vuax)2+(Vuay)2 (lb)
0.0
0.0
0.75¢N"" (lb)
0.65 4549
0.75,pN, (lb)
0.65 7995
Input data and results must be checked for agreement with the existing circumstances, the standards and guidelines must be checked for plausibility.
Simpson Strong-Tie Company Inc. 5956 W. Las Positas Boulevard Pleasanton, CA 94588 Phone: 925.560.9000 Fax: 925.847.3871 www.strongtle.com
SIMPSON
Strong-Tie
11, Results
Anchor Designer™
Software
Version 3.2.2311.2
lateractjon of Tensile and Shear forces (Sec, 17,8)
Tension Factored Load, Nua (lb)
Steel 4229
Concrete breakout 4229
Adhesive 4229
Company: QUALLS ENGINEERING
Engineer: JACOB FARABAUGH
Project: GALLAHGER RESIDENCE
Address:
Phone:
E-mail:
Design Strength, 111Nn (lb) Ratio
9833
4549
7995
0.43
0.93
0.53
SET-3G w/ 518"0 F1554 Gr. 36 with hef = 9.000 inch meets the selected design criteria.
12, Warnings
I Date: I
l Page: l 31
Status
Pass
Pass (Governs)
Pass
-Per designer input, the tensile component of the strength-level earthquake force applied to anchors does not exceed 20 percent of the total
factored anchor tensile force associated with the same load combination. Therefore the ductility requirements of ACI 31817.10.5.2 for tension
need not be satisfied -designer to verify.
-Per designer input, the shear component of the strength-level earthquake force applied to anchors does not exceed 20 percent of the total
factored anchor shear force associated with the same load combination. Therefore the ductility requirements of ACI 318 17.10.6.2 for shear need
not be satisfied -designer to verify.
-Designer must exercise own judgement to determine if this design is suitable.
-Refer to manufacturer's product literature for hole cleaning and installation instructions.
Input data and results must be checked for agreement with the existing circumstances, the standards and guidelines must be checked for plausibility.
Simpson Strong-Tie Company Inc. 5956 W. Las Positas Boulevard Pleasanton, CA 94588 Phone: 925.560.9000 Fax: 925.847.3871 www.strongtie.com
STORM WATER POLLUTION PREVENTION NOTES
1. ALL NECESSARY EQUIPMENT AND MATERIALS SHALL BE
AVAILABLE ON SITE TO FACILITATE RAPID INSTALLATION
OF EROSION AND SEDIMENT CONTROL BMPs WHEN RAIN
IS EMINENT.
2. THE OWNER/CONTRACTOR SHALL RESTORE ALL EROSION
CONTROL DEVICES TO WORKING ORDER TO THE SATISFACTION
OF THE CITY INSPECTOR AFTER EACH RUN-OFF PRODUCING
RAINFALL.
3. THE OWNER/CONTRACTOR SHALL INSTALL ADDITIONAL EROSION
CONTROL MEASURES AS MAY BE REQUIRED BY THE CITY
INSPECTOR DUE TO INCOMPLETE GRADING OPERATIONS Of
UNFORESEEN CIRCUMSTANCES WHICH MAY ARISE. D'J
4. ALL REMOVABLE PROTECTIVE DEVICES SHALL BE IN PL4
AT THE END OF EACH WORKING DAY WHEN THE FIVE (~
DAY RAIN PROBABILITY FORECAST EXCEEDS FORTY PECM T
( 40%). SILT AND OTHER DEBRIS SHALL BE REMOVED AF5 R
EACH RAINFALL. ;
5. ALL GRAVEL BAGS SHALL CONTAIN 3/4 INCH MINIMUM ~
AGGREGATE. CT
-■ 6. ADEQUATE EROSION AND SEDIMENT CONTROL AND PERI.TER
PROTECTION BEST MANAGEMENT PRACTICE MEASURES ~T
BE INSTALLED AND MAINTAINED. r+
0
7. THE CITY INSPECTOR SHALL HAVE THE AUTHORITY TO A.WER
TH'IS PLAN DURING OR BEFORE CONSTRUCTION AS NEEi:S
TO ENSURE COMPLIANCE WITH CITY STORM WATER QUAigi'
REGULATIONS. -■
::, u,
"C ~ ~
_OWNER'S CERTIFICATE:_ g•
I
I UNDERSTAND AND ACKNOWLEDGE THAT I MUST: (1) IMPLEMENT
BEST MANAGEMENT PRACTICES {BMPS) DURING CONSTRUCTION
ACTIVIITlES TO THE MAXIMUM EXTENT PRACTICABLE TO AVOID
THE MOBILIZATION OF POLLUTANTS SUCH AS SEDIMENT AND TO
AVOID THE EXPOSURE OF STORM WATER TO CONSTRUCTION
RELATED' POLLUTANTS: AND (2) ADHERE TO, AND AT ALL TIMES,
COMPLY WITH THIS CITY APPROVED' TIER 1 CONSTRUCTION SWPPP
THROUGHOUT THE DURATION OF THE CONSTRUCTION ACTliVlTIE:S
UNTIL THE CONSTRUCTION WORK IS COMPLETE AND APPROVED
BY THE CITY OF CARLSBAD.
MICHAEL GALLAGHER
OWNER(S)/OWNER'S AGENT NAME {PRINT)
MICHAEL t;ALLAt;HER
OWNER{S)70WNER1S AGENT NAME {.-SIG_N_A TU-R---,E)-
E-29
:J.,2..:J.,2..,2.0,2.4
DATE
STORM WATER COMPLIANCE FORM
TIER 1 CONSTRUCTION SWPPP
E-29
CB 2024-2574
SW_
BEST MANAGEMENT PRACTICES (BMP) SELECTION TABLE
Erosion Control Sediment Control BMPs Tracking Non-storm Water Waste Management and Materials BMPs Control BMPs Management BMPs Pollution Control BMPs
C: ..., C: C: 0 ..., 0 0 :;:; C: C: 'O :;:; :;:; c,, 0 Cl) 'O Cl) 'O (/) C: (.) (.) C: C: c,, E C: E C: ..., 0 ..., :, 2 0 '6 ·.:: .e-0 0 0 E Cl) ... :;:; ... Cl) (I) ::::E 'O (/) c,, ... ..., ..., C: :, >.. c,, ...,
C: Cl) ... $;. (I) c (/) (/) fl) ~ ·.:: <:::::.. c:r ... 0 C: (/) c,, a. (I) 8 ... ~ 0 Best Management Practice* <Id Oo "E -C: fl) <!) w C: 0 $;. 0 (Il a. 0 Cl) Cl) :;:; :i::-(/) 3 (/) ... Cl) 0 C: Cl) ..., (I) 0 ..., .c: I-(.)1.. (/) 'O Q> (/) ::::E ! (I) C: C: (BMP) Description (/) .I.I. Cl)(/) $;. E c,, Cl) c,, CD ·5 C: c,, 'O (/) i ➔ Cl) .Ill. C: C: 0 :::, ..., Cl) (/) Cl) .m. :, ~ Cl) 0 ..., 0 0 3 C: ... 0 ~~ 'O >.. 0 (/) C: C: 0 c,, ~ E :, E :;:; ... (.) C: 0 0 CD V) ·-c,, 0,-(.) (I) 0 0 .m.
X ::::E 0 c,, 0 C: Cl) a:: E 0 E] N Cl) ~o (.) O"l+J Cl) .,!?.5 0 II) 0 ·a. 1..-3:: Cl) 0 Cl)
Cl) 0 Cl) .E .¥ 1 -:, ..c = ~ =3 .... -:0 ·-0, j a.. e c,, 'O c,, 'O .c: C: Cl) LL Cl) :, ·--o Cl)t, C: 0 (.) C: '-C .¥ 'O 0 60 ..., -·-8-(.) ... 'O ... ..., ..c ... ..C C ·5 a; 0 •-C Cl) L. (.) _..., 0 0 'O Cl) Cl) (I)(.) C: 0 0 -o ..., ..., 0 = C: ·-C: N C: ... 0 -C 0 c,, .E 0 .c: Cl) 0 Cl) i .~;:; ~ t3 ..c
('-;; .b 0 ~ ti a: C '-0 a. 0 Cl)_ o_ 0 -0. 0 ~~ oo <!) i7i ;:;:; ;-<n> ii, .c. (/) a:: 3:: a.. a..o a.. >U ::::E (/) ::::E V) V)(.) :J:::::E
CASQA Designation ➔ r--r:o 0) ~ ,.,, '<t' I() r--r:o 0 -N -,.,, r--r:o N ,.,, '<t' I() co co 'T I I I I 'T I I I I I I I I I I I I I I I I I I
(.) (.) (.) (.) w w w w w w w w ~ ~ V) V) V) V) i i i i i i Construction Activity w w w w Cl) V) V) (/) V) V) Cl) V) z z z z
)C Gradina /Soil Disturbance X X
Trench inn,/Excnvotion
ll • Stockoilina X X X X X X
• Drillinn/Borina
Concrete/ Asoholt Sowcuttino
Concrete Flotwork
Povino
r.onrl11it/PiM Installation
l{ StuccoAiortor Work X
) Wciste Oisnnsol X
ll Staaina/Lav Down Area X Ix X X X X
Fnuioment ~;-.;,-• ..... 11-io and F110linn
us Sqbstan,-,. llsP./":; ""' ·-
Dewoterina
Site Access A,-ross Dirt
Other (list):
Instructions:
1. Check the box to the left of all applicable construction activity {first column) expected to occur during construction.
2. Located along the top of the BMP Table is a list of BMP's with it's corresponding California Stormwater Quality Association {CASQA) designation number. Choose one
or more BMPs you intend to use during construction from the list. Check the box where the chosen activity row intersects with the BMP column.
3. Refer to the CASQA construction handbook for information and details of the chosen BMPs and how to apply them to the project.
SHOW THE LOCATIONS' OF ALL CHOSEN BMPs ABOVE
ON THE PROJECTS' SliE PLAN/EROSION CONTROL PLAN.
SEE' THE REVERSE SIDE OF THi$ SHEET FOR A $AMPLE
EROSION CONTROL PLAN.
PROJECT INFORMATION
1384 CYNTHIA LN Site Adcress: ____ ...:.....:...::..._ _____ _
156-231-53-00 Assessor's Parcel Number:--------
Emergency Contact: MICHAEL GALLAGHER
Nome:===========~
858.449.4785
24 Hour Phone:===========-
Construction Threat to Storm Water Quality
{Check Box)
0 MEDIUM or] LOW
(I) ...,
(/) o-3:: C: Cl)
cu E ..., Cl)
Cl) c,, l::;o C: C: oc U::::E
r:o I
i
X
X