HomeMy WebLinkAbout2345 CAMINO VIDA ROBLE; ; CBC2025-0032; RecyclePage 1 of 4 rev 4/24
CONSTRUCTION WASTE
MANAGEMENT PLAN
B-59
Development Services
Building Division
1635 Faraday Avenue
www.carlsbadca.gov
This form shall be completed for all demolitions and new construction, additions, and alterations.
The California’s Green Building Standards Code (CALGreen) requires that at least 65% of construction site
debris generated during demolition projects, most new construction, as well as the majority of building
additions or alterations be recycled, reused, or otherwise diverted from landfill disposal.
STEP 1: The Applicant must submit PART 1 of this form before a building permit application is approved.
STEP 2: The permit holder shall utilize a waste management company that can provide verifiable
documentation that meets 65% waste diversion. Republic Services is the exclusive franchised waste hauler in
the City of Carlsbad.
•Option A – Roll-Off Bins: Call Customer Service (760) 332-6464 and ask for a C&D account for waste
diversion. Republic Services will provide roll-off bins for construction waste.
•Option B – Self Haul to Republic Services or other dump site that can provide verifiable
documentation. It must be a Certified Source Separated Recycling Facility. When you enter the site,
explain to gate operator that this is C&D material. When you exit the site, request a receipt and
certificate from gate operator for waste diversion.
STEP 3: Prior to permit close-out (permit final), the permit holder shall complete PART 2 of this form and
submit all trash and recycling weight receipts to the building inspector. Waste log, acknowledgement, and
tickets must be submitted to release your certificate of occupancy.
APPLICANT CERTIFICATIONS:
CHECK EACH BOX
☐I certify under penalty of perjury under the laws of the State of California that the information
provided in and with this form pertains to construction and demolition debris generated only from the
project listed in PART 1, that I have reviewed the accuracy of the information, and that the
information is true and correct to the best of my knowledge and belief.
☐I understand the waste diversion requirements of the State of California and submit this Construction
Waste Management Plan pursuant to California Green Building Standards Code 4.408.2 or 5.408.1.1.
Failure to provide documentation of C&D reporting, reporting of waste diversion less than 65%, and
failure to provide adequate weight receipts, may result in enforcement action against me or other
responsible parties, including a notice of violation, citations, and any other remedies provided in
Chapters 1.08 and 1.10 of the Carlsbad Municipal Code. Projects are required to submit their Waste
Log, Acknowledgement Form, and Weight Receipts prior to Certificate of Occupancy (CO) issuance.
☐This project does not involve disposal of universal or hazardous waste OR this project includes disposal
of universal or hazardous waste in a responsible, safe and verifiable manner. Disposal of asbestos-
containing materials, batteries, electronic waste, fluorescent bulbs, lead based paints, mercury
containing equipment and refrigerants, require special processing prior to commencement of
construction or demolition activities.
_______________________________________________ Date:______________________
Signature of Applicant
4
4
4
4
Lauren Cossio Digitally signed by Lauren Cossio
DN: C=US, E=lauren@crewbuilders.com, O=Crew Builders Inc,
OU=Business, CN=Lauren Cossio
Date: 2025.05.15 11:54:47-07'00'
5/15/25
,
L City of
Carlsbad
□
□
□
■
Page 2 of 4 rev 4/24
PART 1 Complete and submit this form when applying for a building permit. Permits will not be issued without a
completed Construction Waste Management Plan.
SECTION A Permit No. Project Title
Project Address APN
Applicant Name Phone
Last First
SECTION B Complete the following table with estimated waste tonnage to be generated by your project.
Material Type
Estimated
Waste Quantity
(tons)
A
Place a () check
next to items to be
reused or salvaged
B
Place a () check next
to items to be
recycled
C
Place a () check next
to items to be
disposed at landfill
Complete this line of the table only if
only using WASTE MANAGEMENT
roll-off bins.
Mixed C&D Debris
Asphalt & Concrete
Brick / Masonry / Tile
Mixed Inert Debris
Cabinets, Doors, Fixtures,
Windows (circle all that apply)
Carpet
Carpet Padding / Foam
Cardboard
Ceiling Tile (acoustic)
Drywall (used, new, scrap)
Landscape Debris (brush, trees,
stumps, etc.) No dirt.
Unpainted Wood & Pallets
Roofing Materials
Scrap Metal
Stucco
Other: ________________
TOTAL
SECTION C
To meet 65% Diversion Requirement (estimate) x 0.65 = tons
Total Estimated Waste from above Minimum Required Diversion
Applicant Signature Date
2345 Camino Vida Roble
2345 Camino Vida Roble Carlsbad, CA
9.03
1.28
.27
148.12
10.58 6.877
Lauren Cossio Digitally signed by Lauren CossioDN: C=US, E=lauren@crewbuilders.com, O=Crew Builders Inc, OU=Business, CN=Lauren Cossio
Date: 2025.05.15 11:55:01-07'00'5/15/254
4
4
4
4
□ □ □
□ □ □
□ □ □
□ □ □
□ □ □
□ □ □
□ □ □
□ □ □
□ □ □
□ □ □
□ □ □
□ □ □
□ □ □
□ □ □
□ □ □
□ □ □
□ l!]
Page 3 of 4 rev 4/24
PART 2. Complete and submit this form before final inspection. Projects are required to submit their Waste Log,
Acknowledgement Form, and Weight Receipts prior to Certificate of Occupancy (CO) issuance. Failure to provide
documentation, reporting of waste diversion less than 65%, and failure to provide adequate weight receipts, may
render the Project non-compliant and the responsible parties subject to code enforcement.
SECTION A Permit No. Project Title
Project Address APN
Applicant Name Phone
Last First
SECTION B Use this Final Log below to track loads of materials as they leave the job site.
SAVE RECEIPTS
Indicate FINAL quantities in tons for each material and save receipts and documents from facilities where material is taken.
Additional Project Log pages are available if necessary. Use City Conversion Table to convert volume to tons.
Date
Material Type
A
Actual Amt Reused or
Salvaged
B
Actual Amt
Recycled
C
Actual Amt Disposed in
Landfill
Destination Facility
(Name, Address, Phone)
Example:
01/01/2020
Concrete (broken)
5 tons Palomar Transfer Station, 5960 El
Camino Real – (760) 603-0153
TOTAL
SECTION C
Diversion Rate Achieved / = % ≥ 65%
Total of columns A + B Total of columns A + B + C DIVERSION
Attach the following documentation to this Report: Return completed form and documentation to:
• Original recycling weight tickets, landfill weight tickets City of Carlsbad
• Original donation receipts with photos and/or itemized descriptions Building Division (1st Floor)
• Any other relevant information to support Recycling Report 1635 Faraday Avenue
SECTION D
I certify under penalty of perjury under the laws of the State of California that the information provided in and with
this form pertains to construction and demolition debris generated only from the project listed in PART 1, that I have
reviewed the accuracy of the information, and that the information is true and correct to the best of my knowledge
and belief.
Applicant Signature Date
Carlsbad, CA 92008
3/6/25 Mixed C&D 0 1.51 0.81 Resource & Recovery Escondido
3/7/25 Mixed C&D 0 4.36 2.35 Sanco
3/10/25 Refuse 0 0 0.27 EDCO
3/18/25 Carpet 0 1.28 0 Los Angeles Fiber Company
0 71.5 30.87
7.15 10.58 68
Lauren Cossio Digitally signed by Lauren CossioDN: C=US, E=lauren@crewbuilders.com, O=Crew Builders Inc, OU=Business, CN=Lauren CossioDate: 2025.05.15 11:55:19-07'00'5/15/25l!]
Page 4 of 4 rev 4/24
CONVERSION TABLE FOR COMMON CONTRUCTION WASTE. This document is informational only and may be used to
convert truckload quantities to tons.
Category Material
Mixed Debris Construction
Demolition
Asphalt/Concrete Asphalt (broken)
Concrete (broken)
Concrete (solid slab)
Brick/Masonry/Tile Brick (broken)
Brick (whole, palletized)
Masonry brick (broken)
Tile
Building Materials (cabinets, doors, windows, etc.)
Cardboard (flat)
Carpet By square foot
By cubic yard
Carpet Padding/Foam
Ceiling Tiles Whole (palletized)
Loose
Drywall (new or used) 1/2” (by square foot)
5/8” (by square foot)
Demo/used (by cu. yd.)
Landscape Debris (brush, trees, etc.)
Asphalt Composition
Shingles, asphalt Shingle
Unpainted Wood/Pallets By board foot
By cubic yard
Trash/Garbage
Other (estimated weight)
Column A
Volume
cy
cy
cy
cy
cy
cy
cy
cy
sq ft
cy
cy
sq ft
cy
sq ft
cy
cy
sq ft
sq ft
cy
cy
cy
bd ft
cy
cy
cy
cy
cy
cy
Column B Column C
Tons/Unit Tons
x 0.18 =
x 1.19 =
x 0.70 =
x 1.20 =
x 1.30 =
x 0.70 =
x 1.51 =
x 0.60 =
x 0.00175 =
x 0.15 =
x 0.05 =
x 0.0005 =
x 0.30 =
x 0.000125 =
x 0.0003 =
x 0.09 =
x 0.0008 =
x 0.00105 =
x 0.25 =
x 0.15 =
x
0.22 =
x 0.001375 =
x 0.15 =
x 0.18 =
x estimate =
Total ALL = 0
3825 Bancroft Drive, Spring Valley, CA 91977
P - 619-589-6001 F - 619-589-7158
CONSTRUCTION AND DEMOLITION DEBRIS RECYCLING LOG
Daily Log of Construction and Demolition (C&D) Materials Removed or Reused on Job Site
Date:5/13/2025 Job No:25022
Project:2345 Camino Vida Roble Customer:Crew Builders
Address:2345 Camino Vida Roble, San Diego, CA
DATE TICKET NO.DESTINATION LOCATION
WEIGHT
(TONS)
RECYCLED
WEIGHT
(TONS)
TRASH % RECYCLABLE MATERIAL TYPE
3/6/25 13219 Escondido Resource & Recovery Escondido, CA 1.51 0.81 65%Mixed C&D
3/7/25 32398 Sanco Lemon Grove, CA 4.36 2.35 65%Mixed C&D3/10/25 5879 Edco La Mesa, CA 0.27 0%Refuse
3/18/25 250324F Los Angeles Fiber Company Carlsbad, CA 1.28 100%Carpet
7.15 3.43
* 10 wheeler holds 20,250 lbs of concrete with allowable air space
TOTAL RECYCLED: Name of Person Verifying Accuracy:
68%
Signature:____________________________________
Angela Horton
f
Escondido Resource Recovery
1021 W Mission Ave
Escondido, CA 92025
(760) 745-3203
Customer: 0106 Ticket: 13219
Date: 03/06/25
CASPER COMPANY
3825 BANCROFT DR
SPRING VALLEY CA 91977
LtS C111r;1110 ii/ d
Commodity Units Rate
14 MIXED C & D 2.32
In: 9:53
Out: 10: 09
INVOICE
Truck: 0040/0040
Container:
Route: 08614
Origin: 086 Carlsbad
[Gross(In): 39,740. lbs Scl#5
128.00 per TON
Tare 35,100. lbs Scl#5
Extended
Charge
296.96
Net: 4. 640 . lbs J
TOTAL DUE 296.96
Construction & Demolition Diversion Certificate --Diversion Percentage 65%
This certifies that the company listed above has utilized an EDCO facility to di
with LEED requirement. The diversion tonnage is based on an overall tonnage per
VINCE Driver
SANCO Resource Recovery
67~0 Federal Blvd.
te~on Grove, CA 91945
(619) 287-7555
Customer: 0569
CASPER CO
3825 BANCROFT DR
SPRING VALLEY CA
2345 CAMINO VIDA
Ticket: 32398
Date: 03/07/25
Rate
In: 10:08
Out: 10:20
108.00 per TON
INVOICE
Truck: 0040/0040
Container: -
Route: 02034
Origin: 020 SAN DIEGO
Commodity Units
34 CONSTRUCTION/ DEMOL 6.71
[Gross(In): 47,500. lbs Scl#I Tare 34,080. lbs Scl#l
Extended
Charge
724.68
Net: 13,420. lbs]
TOTAL DUE 724.68
Construction & Demolition Diversion Certificate --Diversion Percentage 65%
This certifies that the company listed above has utilized an EDCO facility to divert construction demolition materials in accordance
with LEED requirement. The diversion tonnage is based on an overall tonnage percentage of the respective EDCO facility.
-~····---Christian Guerrero Driver
Escondido Resource Recovery
1021 W Mission Ave
Escondido, CA 92025
(760) 745-3203
Customer: 0106 Ticket: 657
Date: 03/10/25
CASPER COMPANY
3825 BANCROFT DR
SPRING VALLEY CA 91977
Commodity Units Rate
INVOICE
In: 14:18 Truck: 0002/0002
Out: 14:32 Container:
Route: 02311
Origin: 023 Oceanside
11 SELFHAUL REFUSE 4.26
[Gross(In): 42,040. lbs Scl#5
125.00 per TON
Tare 33,520. lbs Scl#5
Extended
Charge
532.50
Net: 8,520. lbs]
TOTAL DUE 532.50
VINCE Driver
EDCO Station
8184 Commercial St .
La Mesa, CA 91942
(619) 466-3355
Customer : 0171
CASPER CO
'3 825 BANCRO F'I D!L
c;gpJ.U NG VAT,T,E Y CA 91977
Ticket : 5879
Date : 03/10/25
In: 16:45
Out : 16:45
-
"2-ol...\-S-COtt'Y' l no v 'l c:AO\
12-olo\ e.
Commodity Units Rate
20 Commercial Refuse .27
[Gross(In): 5 .67 tons Scl#l Tare 5.40 tons Stored
INVOICE
Truck: 1057/1057
Container:
Route: 02020
Origin: 020 SAN DIEGO
Ex tended
Charge
90.00
Net : .27 tons]
TOTAL DUE 90.00
RAUL T . Driver
Certification for Recycled Used Carpet
I);
t..~
Rs
~S ANGELES FIBER COMPANY INC.
• Certification: 250324F
• Date: March 18, 2025
• Location: Crew Builders
2345 Camino Vida Roble
Carlsbad, CA
• Square Yards: 285 (2,562 square feet)
• The carpet removed from your premises was
sent to our recycling facility, processed and
recycled into new products and new uses.
None of the carpet was sent to a landfill.
Thank you for making a difference in our
environment, our community, and our future.