Loading...
HomeMy WebLinkAbout2055 BASSWOOD AVE; ; CBR2021-1893; Recycle(city of Carlsbad -CONSTRUCTION WASTE MANAGEMENT PLAN B-59 -. Development Services Building Division 1635 Faraday Avenue 760-602-2719 www.carlsbadca.gov Section 4.408.1 and Section 5.408.1 of the 2019 California Green Building Standards requires at least 65% of non-hazardous construction debris is recycled and/or salvaged for reuse. With the submitting of your application for a Building Permit or permit issuance, you must have completed a Construction Waste Management Plan (CWMP) demonstrating how you will recycle a minimum of 65% of the construction waste generated from your project. NOTICE: Applicant (contractor and subcontractors) shall comply with the project's CWMP. It is the Applicant's responsibility to collect all receipts from the facilities that recycle their materials AND all project waste/landfill disposal receipts. When working with the City's franchised hauler, Waste Management, one cumulative project receipt is acceptable. However, it is the Applicant's responsibility to confirm that ~he bins are collected for C&D Recycling. 1. This project shall gen~rate the least amount of waste possible by planning and ordering carefully, following all proper storage and handling_procedures to reduce broken and damaged materials, and reusing materials whenever possible. 2. Waste Management Servic.es can provide 2 roll-off bins, .one for. commingled construction debris and one for trash. The commingled construction roll-off bin will be taken to a Certified Mixed C&D Processing Facility to sort the material and e:reate receipt(s), to demonstrate the project has met a 65% diversion rate or greater. 3. Applicants with a goal of recycling greater than 65% of the project's total waste should work with, the City's exclusive franchised waste hauler, to develop a more specific CWMP. This plan may include using additional roll-off bins for particular phases of construction (e.g., concrete and wood waste) to ensure the highest waste diversion rate possible. 4. Contractors/subcontractors hauling their own waste as part of their scope of work (e.g., construction clean up companies, etc.) SHALL NOT be excluded from complying with the CWMP and shall provide weight and waste diversion receipts from a Certified Source Separated Recycling Facility. For a current list of Certified Recycling Facilities go to http://www.sandiego.gov/environmental-services/recycling/cd/index.shtml. S. If contractors/subcontractors furnish their own debris boxes as part of their scope of work, they SHALL NOT be excluded from complying with the CWMP and shall provide weight and waste diversion receipts from a Certified Source Separated Recycling Facility. Part 1 -Before the Project Begins Prior to issuance of a Building Permit, Applicant must submit PART 1 of the Construction Waste Management Plan (CWMP) Table. a. Submit completed and signed form to City with Building Permit application. Part 2 -During and After the Pro(ect Prior to receiving inspection for final sign off of the Building Permit or Certificate of Occupancy, Applicant must submit the fully completed and approved PART 2 of the Construction Waste Management Plan (CWMP) Table. a. Save all receipts and/or documents from reuse facilities, recycling centers, processing facilities, and landfills where materials were taken. b. Complete the Debris Recycling Report (DRR) as your project progresses. Recycling/diversion goals are (at a minimum) 65% of the waste generated by your project. c. Return completed form to: City of Carlsbad Building Division -1635 Faraday Ave, Carlsbad, CA 92008 or your inspector prior to requesting final inspection. Rev. 11/12118 c · C cityof Carlsbad CONSTRUCTION WASTE MANAGEMENT PLAN B-59 Developrnent__Services Building Division 1635 Faraday Avenue 760-602-2 719 www. car/sbadca. gov Many of the materials generated from your project can be recycled. You are required to list materials that will be reused, recycled or disposed from your project. If you have questions about the recycling requirement or completing this form, please contact Waste Management at (760) 929-9400, a certified C&D recycler, or the Carlsbad Building Division at (760) 602-2700. Please note: Unless you are self-hauling, Waste Management or approved haulers must be used for all construction projects within the City of Carlsbad. Complete and submit this form when applying for c1 Building Permit. i\lote: Penn its will f.l_~ be issued __ wit hout a comrbleted Construction Waste Man<1gement_Plan. ·------·-________ . _ _ ________ _ Applicant Information Permit No. _____________ Project Title Project Address_2._0_5'5 __ ~ __ W_OO:D __ -k._v_e-4,_Cfa._~ ___ L-~ __ P----=--' _CA ___ APN 205 -\~ • ~\ -00 Owner Contractor Architect Other Applicant Name _Q~~-1A~ _____ a_s_~_-_A _____ 0 0 ~-0 Last First l":2...-,a./' ol,,c NEr::-""'LES ~ I "DEL. MM.., I"',. C\?irJ.4 Applicant Address _;,.7_, t_O_.l:::) __ T_ll'l_v ___ c;._ • .v ____ -'--------------'--~------vi_7 ______ _ Phone , 65:o) 356 -e,~qe, E-mail Address hOl'Y\ecle~ncn\ ,for niet@, ~fY'\(;fl l. com· Applicant Mailing Address l~""'Jeb '?i 'tJt )JE,t:t)\.€5 ~ r ta.-l-1~1 ~ 9-Z.'D lj • (if different than project address) Project Type (check all that apply): Brief Description Commercial □ Public Building □ CAe.-Po µ-~\S'M 0\/ AL- Industrial □ Project Size ___________ Estimated Cost of Project$ ________________ _ (square footage) Please check the appropr'iate box: gi" plan on using WASTE MANAGEMENT roll-off bin(s) for all materials and will provide all receipts after construction. DI plan on self-hauling to a certified recycling facility and will provide all receipts after construction. D This is a proposed LEED certified project and I plan on separating materials on site in conjunction with WASTE MANAGEMENT. Acknowledgement: I certify under penalty of perjury under the laws of the State of California that the information provided in and with this form pertains to construction and demolition debris generated only from the project listed in PART 1, t hat I have reviewed the accuracy of the information, and that the information is true and correct to the best of my knowledge and bel ief. Print Name /11/JR..,<JU,::.--&. A . i)Jl1~ ~- .. Signature '21tvl.LL.e'.:.-C. ~k .o!A.,,.__.. Date Page 1 of 4 Rev. 11112/18 ·-·--·-·--·--·----------------PART 1 Com plete, obtain signat ure, and submit this form when applving for a Building Permit. Note: Permits will (cont'd) !:IOt be issued without a completed Construction Waste Management Plan. DEBRIS RECYCLING ESTIMATE: SECTION A Permit No. ____________ Project Title ProjectAddress 205.5 ~A-5?WOOD 1'Ve ,CA,g.\b~D 1CA APN 205" -\60, 31 ·QO ) Applicant Name ______________________ Phone ---· .. -··----~----Last First SECTION B Complete the following table with estimated waste tonnage to be generated by your project. Th is is your plan for construction waste management. Changes can be made on the final recycle report. Material Type Complete this line of the table only if only using WASTE MANAGEMENT roll-off bins. Mixed C&D Debris Asphalt & Concrete Brick/ Masonry/ Tile Mixed Inert Debris -----Cabinets, Doors, Fixtures, Windows (circle all that apply) Carpet Carpet Padding/ Foam Cardboard ----·--- Ceiling Tile (acoustic) Drywall (used, new, scrap) Landscape Debris (brush, trees, stumps, etc.) No dirt_. _____ _ ~~ainted Wood & PalleJ~ -··- Roofing Materials Scrap Metal Stucco Other: Jil..MMJ~a. ;..,r ~,.e.,.u TOTAL SECTION C Goal: the diversion rate shall be 65% by weights of debris. A B C Estimated Waste Quantity (tons) Place a (0) check next to items to be reused or salvaged ----------·-- ' I j --·--·- ----"-~ .. _._, __ -----+ I Place a (0) check next Place a (U) check next to items to be to items to be recycled disposed at landfill ✓ 1----------------1 I L To meet 65% Diversion Requirement (estimate) _ .. _ia_(_:) _____ x 0.65 = __ 0_i-=-· ________ tons Total Estimated Woste from above Minimum Required Diversion -l '?""1-· , __ 4 /71 C)--,AA . _ ~ _ . Contractor/Owner Signature __ ~--"-~ ___ '-r_, __ .,,-_v~-----____ Date I Page 2 of 4 Rev. 11/12118