HomeMy WebLinkAbout2055 BASSWOOD AVE; ; CBR2021-1893; Recycle(city of
Carlsbad
-CONSTRUCTION WASTE
MANAGEMENT PLAN
B-59
-.
Development Services
Building Division
1635 Faraday Avenue
760-602-2719
www.carlsbadca.gov
Section 4.408.1 and Section 5.408.1 of the 2019 California Green Building Standards requires at least 65% of non-hazardous
construction debris is recycled and/or salvaged for reuse.
With the submitting of your application for a Building Permit or permit issuance, you must have completed a Construction Waste
Management Plan (CWMP) demonstrating how you will recycle a minimum of 65% of the construction waste generated from
your project.
NOTICE: Applicant (contractor and subcontractors) shall comply with the project's CWMP. It is the Applicant's responsibility to
collect all receipts from the facilities that recycle their materials AND all project waste/landfill disposal receipts. When working
with the City's franchised hauler, Waste Management, one cumulative project receipt is acceptable. However, it is the
Applicant's responsibility to confirm that ~he bins are collected for C&D Recycling.
1. This project shall gen~rate the least amount of waste possible by planning and ordering carefully, following all proper
storage and handling_procedures to reduce broken and damaged materials, and reusing materials whenever possible.
2. Waste Management Servic.es can provide 2 roll-off bins, .one for. commingled construction debris and one for trash. The
commingled construction roll-off bin will be taken to a Certified Mixed C&D Processing Facility to sort the material and
e:reate receipt(s), to demonstrate the project has met a 65% diversion rate or greater.
3. Applicants with a goal of recycling greater than 65% of the project's total waste should work with, the City's exclusive
franchised waste hauler, to develop a more specific CWMP. This plan may include using additional roll-off bins for
particular phases of construction (e.g., concrete and wood waste) to ensure the highest waste diversion rate possible.
4. Contractors/subcontractors hauling their own waste as part of their scope of work (e.g., construction clean up
companies, etc.) SHALL NOT be excluded from complying with the CWMP and shall provide weight and waste diversion
receipts from a Certified Source Separated Recycling Facility. For a current list of Certified Recycling Facilities go to
http://www.sandiego.gov/environmental-services/recycling/cd/index.shtml.
S. If contractors/subcontractors furnish their own debris boxes as part of their scope of work, they SHALL NOT be excluded
from complying with the CWMP and shall provide weight and waste diversion receipts from a Certified Source
Separated Recycling Facility.
Part 1 -Before the Project Begins
Prior to issuance of a Building Permit, Applicant must submit PART 1 of the Construction Waste Management Plan (CWMP) Table.
a. Submit completed and signed form to City with Building Permit application.
Part 2 -During and After the Pro(ect
Prior to receiving inspection for final sign off of the Building Permit or Certificate of Occupancy, Applicant must submit the fully
completed and approved PART 2 of the Construction Waste Management Plan (CWMP) Table.
a. Save all receipts and/or documents from reuse facilities, recycling centers, processing facilities, and landfills where
materials were taken.
b. Complete the Debris Recycling Report (DRR) as your project progresses. Recycling/diversion goals are (at a minimum)
65% of the waste generated by your project.
c. Return completed form to: City of Carlsbad Building Division -1635 Faraday Ave, Carlsbad, CA 92008 or your inspector
prior to requesting final inspection.
Rev. 11/12118
c · C cityof
Carlsbad
CONSTRUCTION WASTE
MANAGEMENT PLAN
B-59
Developrnent__Services
Building Division
1635 Faraday Avenue
760-602-2 719
www. car/sbadca. gov
Many of the materials generated from your project can be recycled. You are required to list materials that will be
reused, recycled or disposed from your project. If you have questions about the recycling requirement or completing
this form, please contact Waste Management at (760) 929-9400, a certified C&D recycler, or the Carlsbad Building
Division at (760) 602-2700. Please note: Unless you are self-hauling, Waste Management or approved haulers must be
used for all construction projects within the City of Carlsbad.
Complete and submit this form when applying for c1 Building Permit. i\lote: Penn its will f.l_~ be issued
__ wit hout a comrbleted Construction Waste Man<1gement_Plan. ·------·-________ . _ _ ________ _
Applicant Information
Permit No. _____________ Project Title
Project Address_2._0_5'5 __ ~ __ W_OO:D __ -k._v_e-4,_Cfa._~ ___ L-~ __ P----=--' _CA ___ APN 205 -\~ • ~\ -00
Owner Contractor Architect Other
Applicant Name _Q~~-1A~ _____ a_s_~_-_A _____ 0 0 ~-0
Last First
l":2...-,a./' ol,,c NEr::-""'LES ~ I "DEL. MM.., I"',. C\?irJ.4 Applicant Address _;,.7_, t_O_.l:::) __ T_ll'l_v ___ c;._ • .v ____ -'--------------'--~------vi_7 ______ _
Phone , 65:o) 356 -e,~qe, E-mail Address hOl'Y\ecle~ncn\ ,for niet@, ~fY'\(;fl l. com·
Applicant Mailing Address l~""'Jeb '?i 'tJt )JE,t:t)\.€5 ~ r ta.-l-1~1 ~ 9-Z.'D lj •
(if different than project address)
Project Type
(check all that apply):
Brief Description
Commercial
□
Public Building □
CAe.-Po µ-~\S'M 0\/ AL-
Industrial □
Project Size ___________ Estimated Cost of Project$ ________________ _
(square footage)
Please check the appropr'iate box:
gi" plan on using WASTE MANAGEMENT roll-off bin(s) for all materials and will provide all receipts after construction.
DI plan on self-hauling to a certified recycling facility and will provide all receipts after construction.
D This is a proposed LEED certified project and I plan on separating materials on site in conjunction with WASTE
MANAGEMENT.
Acknowledgement: I certify under penalty of perjury under the laws of the State of California that the information
provided in and with this form pertains to construction and demolition debris generated only from the project listed
in PART 1, t hat I have reviewed the accuracy of the information, and that the information is true and correct to the
best of my knowledge and bel ief.
Print Name /11/JR..,<JU,::.--&. A . i)Jl1~ ~-
..
Signature '21tvl.LL.e'.:.-C. ~k .o!A.,,.__.. Date
Page 1 of 4 Rev. 11112/18
·-·--·-·--·--·----------------PART 1 Com plete, obtain signat ure, and submit this form when applving for a Building Permit. Note: Permits will
(cont'd) !:IOt be issued without a completed Construction Waste Management Plan.
DEBRIS RECYCLING ESTIMATE:
SECTION A Permit No. ____________ Project Title
ProjectAddress 205.5 ~A-5?WOOD 1'Ve ,CA,g.\b~D 1CA APN 205" -\60, 31 ·QO
) Applicant Name ______________________ Phone ---· .. -··----~----Last First
SECTION B Complete the following table with estimated waste tonnage to be generated by your project.
Th is is your plan for construction waste management. Changes can be made on the final recycle report.
Material Type
Complete this line of the table only if
only using WASTE MANAGEMENT
roll-off bins.
Mixed C&D Debris
Asphalt & Concrete
Brick/ Masonry/ Tile
Mixed Inert Debris -----Cabinets, Doors, Fixtures,
Windows (circle all that apply)
Carpet
Carpet Padding/ Foam
Cardboard ----·---
Ceiling Tile (acoustic)
Drywall (used, new, scrap)
Landscape Debris (brush, trees,
stumps, etc.) No dirt_. _____ _
~~ainted Wood & PalleJ~ -··-
Roofing Materials
Scrap Metal
Stucco
Other: Jil..MMJ~a. ;..,r ~,.e.,.u
TOTAL
SECTION C
Goal: the diversion rate shall be 65% by weights of debris.
A B C
Estimated
Waste Quantity
(tons)
Place a (0) check
next to items to be
reused or salvaged
----------·--
' I j --·--·-
----"-~ .. _._, __ -----+
I
Place a (0) check next Place a (U) check next
to items to be to items to be
recycled disposed at landfill
✓
1----------------1
I
L
To meet 65% Diversion Requirement (estimate) _ .. _ia_(_:) _____ x 0.65 = __ 0_i-=-· ________ tons
Total Estimated Woste from above Minimum Required Diversion
-l '?""1-· , __ 4 /71 C)--,AA . _ ~ _ . Contractor/Owner Signature __ ~--"-~ ___ '-r_, __ .,,-_v~-----____ Date
I
Page 2 of 4 Rev. 11/12118