HomeMy WebLinkAbout2665 WILSON ST; ; CBR2024-2295; Recycle( City of
Carlsbad
CONSTRUCTION WASTE
MANAGEMENT PLAN
8-59
Development Services
Building Division
1635 Faraday Avenue
www.carlsbadca.gov
This form shall be completed for all demolitions and new construction, additions, and alterations.
The California's Green Building Standards Code (CALGreen) requires that at least 65% of construction site
debris generated during demolition projects, most new construction, as well as the majority of building
additions or alterations be recycled, reused, or otherwise diverted from landfill disposal.
STEP 1: The Applicant must submit PART 1 of this form before a building permit application is approved.
STEP 2: The permit holder shall utilize a waste management company that can provide verifiable
documentation that meets 65% waste diversion. Republic Services is the exclusive franchised waste hauler in
the City of Carlsbad.
• Option A-Roll-Off Bins: Call Customer Service (760) 332-6464 and ask for a C&D account for waste
diversion. Republic Services will provide roll-off bins for construction waste.
• Option B -Self Haul to Republic Services or other dump site that can provide verifiable
documentation. It must be a Cert ified Source Separated Recycling Facility. When you enter the site,
explain to gate operator that this is C&D material. When you exit the site, request a receipt and
certificate from gate operator for waste diversion.
STEP 3: Prior to permit close-out (permit final), the permit holder shall complete PART 2 of this form and
submit all trash and recycling weight receipts to the building inspector. Waste log, acknowledgement, and
tickets must be submitted to release your certificate of occupancy.
C&D CERTIFICATION:
□ I certify under penalty of perjury under the laws of the State of California that the information
provided in and with this form pertains to construction and demolition debris generated only from the
project listed in PART 1, that I have reviewed the accuracy of the information, and that the
information is true and correct to the best of my knowledge and belief.
D I understand the waste diversion requirements of the State of California and submit this Construction
Waste Management Plan pursuant to California Green Building Standards Code 4.408.2 or 5.408.1.1.
Failure to provide documentation of C&D reporting, reporting of waste diversion less than 65%, and
failure to provide adequate weight receipts, may result in enforcement action against me or other
responsible parties, including a notice of violation, citations, and any other remedies provided in
Chapters 1.08 and 1.10 of the Carlsbad Municipal Code. Projects are required to submit their Waste
Log, Acknowledgement Form, and Weight Receipts prior to Certificate of Occupancy (CO) issuance.
D This project does not involve disposal of universal or hazardous waste OR this project includes disposal
of universal or hazardous waste in a responsible, safe and verifiable manner. Disposal of asbestos-
containing materials, batteries, electronic waste, fluorescent bulbs, lead based paints, mercury
containing equipment and refrigerants, require special processing prior to commencement of
construction or demolition activities.
Date: ___________ _
Signature of Applicant
Page 1 of 4 rev 4/24
•
PART 1 Complete and submit this form when applying for a building permit. Permits will not be issued
without a completed Construction Waste Management Plan .
SECTION A Permit No. ____________ Project Title
Project Address ?.h(o5° LJ P.--~l)N ~I CA-RL17zlQ:2
Applicant Name M 1/(P ½FS 12-Phone
APN /56 -/80 -/?-tJV
7 ¢.0 'f/£-<g<JIJI
Last First
SECTION B Complete the following table with estimated waste tonnage to be generated by your project.
Material Type
Complete this line of the table only if
only using WASTE MANAGEMENT
roll-off bins.
Mixed C&D Debris
Asphalt & Concrete
Brick/ Masonry/ Tile
Mixed Inert Debris
Cabinets, Fixtures,
Windows circle all that apply)
Carpet
Carpet Padding/ Foam
Cardboard
Ceiling Tile (acoustic)
Drywall (used, new, scrap)
Landscape Debris (brush, trees,
stumps, etc.) No dirt.
Unpainted Wood & Pallets
Roofing Materials
Scrap Metal
Stucco
Other: 6C,'J:;;A P hd) IYJ'B£J¢.,
TOTAL
SECTION C
Estimated
Waste Quantity
(tons)
SDDLB --
IOOl> I.J3
To meet 65% Diversion Requirement (estimate)
A B C
Place a ( ✓) check
next to items to be
reused or salvaged
Place a ( ✓) check next
to items to be
recycled
V
\ODD L1$
Place a ( ✓) check next
to items to be
disposed at landfill
V
V
V
V
__ z_a--'--"5="--TT>--"---'-J-=------'x a.Gs= f225" L ?3 = 2 "/DtS -t--tons
Total Estimated Waste from above Minimum Required Diversion
Applicant Signature __ TJ.i..,.:::;.....:....Y't..c.....:....V-L..JDi-=:.-_tfi2.<-----+-=-f-e.-r'""""";::;_?J?-,-"-----'-----Date ____./'----:2=--..L.f _----'2=£'-------
Page 2 of 4 rev 4/24
PART 2. Complete and submit this form before final inspection. Projects are required to submit their Waste Log,
Acknowledgement Form, and Weight Receipts prior to Certificate of Occupancy {CO} issuance. Failure to provide
documentation, reporting of waste diversion less than 65%, and faUure to provide adequate weight receipts, may
render the Project non-compliant and the responsible parties subject to code enforcement.
Permit No. Project Title
___.:...;)...-=l.r.,-=lo-5 _..Lu=..,..;( L:;;;.;$0::..;:__;_IJ___,;;;;§t",.:,...a....' ________ __;APN /fb l 3D / 7(X)
,_"D--=-A.~V ..:...o:lb::;.....Lt:iD--'-""'-'H._E.=~==--------Phone 7 t,D lflt;' -<t;f7/
Last First
Use this Final log below to track loads of materials as they leave th'e job site.
@@SAVE RECEIPTS@@
' ' Indicate FINAL quantities in tons for each material and save receipts and documents from facilities where material is taken.
Additional Project log pages are available if necessary. Use City Conversion Table to convert volume to tons.
A B C
Date Material Type Actual Amt Actual Amt Actual Amt Destination Facility
Reused or Recycled Disposed in (Name, Address, Phone)
Salvaged Landfill
flS.am{!_/e: Palomar Transfer Station, 5960 El
01/01/2020 Concrete (broken J 5 tons . Camino Rea/
-(760} 603-0153
'7
Diversion Rate Achieved
r;.L l,!l~'1, ,rn
__ ___, ____ = 71/P %
Total of columns A + B
2!:65%
Total of columns A + B + C DIVERSION
Attach the following documentation to this Report:
• Original recycling weight tickets, landfill weight tickets
• Original donation receipts with photos and/or itemized descriptions
• Any other relevant information to support Recycling Report
Return completed form and documentation to:
City of Carlsbad
Building Division (1st Floor)
1635 Faraday Avenue
Carlsbad, CA 92008
I certify under penalty of perjury under the laws of the State of California that the information provided in and with
this form pertains to construction and demolition debris generated only from the project listed in PART 1, that I have
reviewed the accuracy of the information, an hat the information is true and correct to the best of my knowledge
• and belief.
Page 3 of4 rev4/24
E f u0bt.Pt> 1i!! RE;source Recovery
Mission Ave
.lido, CA 92025
J 745-3203
J.Stomer: 0000 Ticket':
Date:
DAVID R HOFER
Commodity Units
11 SELFHAUL REFUSE 1.33
[Gross(In): 13,500. lbs Scl#2
RAFAELA
In: 11:18
Out: 11:18
INVOIC!
T·ruck: 35 71/3 5=7 J
Container:
Route : 08011
Origin: 080 San Mc
Exte1
Rate Chai
125.00 per TON 166
Tare 10,840. lbs Scl#2 Net: 2,660 . lbs]
PAID CREDIT CARD G
Driver
t (J
/: 05123125
ti &
Commodity Units Rate
14 MIXED C & D 1.63 [Gross(In): 14,100. lbs Scl#5 128.00 per TON
Tare 10 ,840 . lbs Scl#5
Truck:
Container: Route: Origin:
INVOICE
3571/3571
08014
080 San Marco
Extended
Charge
208.64
Net : 3 , 260 . 1 b
---------------------P-A-W CREDIT CARD 208. 64
~g__r11.ct_ion & J?em.oJ:..it_i.on Diversion Certificate .,~l -Diversion Percentage 65%
This certifies that the company ·listed above has utilized an EDCO facility to d:
with LEED requirement. The diversion tonnage is based on an overall tonnage peJ
GREG
•.
,
.-00999 -CASH AND CHECK CUSTOMER
ADDRESS
carlsbad, CA 92008
Contract: RESI -GATE Yr. 2
GROSS 13,860 Scale In
TARE 10,760 Tare Out
NET 3,100
Tracking Qty: 0.00
Qty
1. 55
Unit Description
TN MSW
54 Ticket #: 2820794
Weighmaster: GordiWe
In: March 21, 2025
Out: March 21, 2025
Vehicle: a666
Ref:
BOL:
INBOUND
CASH
Rate Extension
$101.2] $156.88
Tax
$0.00
Origin: CARLSBAD 100%
Signature:
Total
Paid
Change
.EDIT CARD-SCALE
12:14 pm
12:14 pm
Total
$156.88
$156.88
$156.88
$0.00
V
, , ,,::::oNDIDO RESOURCE RECOV
"!044 v,J WASHINGTON AVE
t:SCONOIDO r.11 """'n~ •◄r-
ecovery
Ticket: ., 2515
Date: 03/14/25
Rate
In: 12:58
Out: 12:59
--ffiVOICE
Truck: 3571/3571
Container:
Route: 08614
Origin: 086 Carlsbad
Units
1. 98
lbs Scl#2
128.00 per TON
Extended
Charge
253.44
Net: 3,960. lbs] Tare 10,760. lbs Scl#2
PAID CREDIT CARD 253.44
Construction & Demolition Diversion Certificate --Diversion Percentage 65%
This certifies that the company listed above has utilized an EDCO facility to divert construction demolition materials in accordance
with LEED requirement. The diversion tonnage is based on an overall tonnage percentage of the respective EDCO facility.
ARTURO Driver
t CJ
overy
I " Is (j
Commodity /'
14 MIXED C & D
[Gross(In): 14 .440.
~ck.et : ·&3-14-_ In : 16 : 0 2
\_ D_at~:... __ 02/20/25.) Out : 16: 20
Units
1. 84
lbs Scl#5
Rate
128.00 per TON
Tare 10.760 . lbs Scl#5
Truck: 3571/3571
Container :
Route: 086]4 ---------.
rigin: 086tarl sbad l
Extended
Charge e:\ 235.52
Net : 0.}lbsJ
_/ ----
. . . . . ~ .. G"Arn CREDIT CARD 235.52~
Construction & Demolition Diversion Certificate --Diversion Percentage 65%
This certifies that the company listed above has utilized an EDCO facility to di
with LEED requirement. The diversion tonnage is based on an overall tonnage per
GREG Driver
PALOMAR i-~J\11~:fER STAll
5960 El. ct.~· !NO REAL
rt.RLS ~/\ll. 1:,1, 92008
15:1'3:i'.
--.....__
':BCK CUSTOMER
RESI
uROSS
TARE
NET
Tracking Qty:
_JOB
-GATE Yr. 2
13,860
10,760
3,100
0.00
Qty
1. 55
Origin:
Unit Description
TN MSW
CARLSBAD
Signature:
Scale In
Tare Out
100%
54 Ticket #: 2810831
Vehicle:
Ref:
BOL:
INBOUND
CASH
a666
Rate Extension
$101. 2]{ ,· $156. 88 ;)
Tax
$0.00 ' . / ,.,
.J-~ ... ---·,~·---
Total
Paid
Change
.EDIT CARD-SCALE
Total
$156.88
$156.88
$156.88
$0.00
V
J
~ASH AND CHECK CUSTOMER
~Dad, CA 92008
Contract: RESI -
GROSS
TARE
GATE Yr. 2
12,820
10,760
2,060
Scale In
Tare Out
NET
Tracking Qty: 0.00
Qty Unit Description
1.03 TN YARD WASTE/COMPOST
Origin: CARLSBAD 100%
Signature:
s,1 Ticket #: 2810575
In:
Out:
Vehicle:
February 24, 2025
a666
Ref:
BOL:
INBOUND
CASH
Rate Ex te_!lS.l..QQ_
/ -..--... , )"" $94.39 /$97.22 \
( )
/ / (
\._ ~/ ,,.,.,, '~-------
Tax
$0.00
Total
Paid
Change
.EDIT CARD-SCALE
9:54 am
Total
$97.22
$97.22
$97.22
$0.00
V