Loading...
HomeMy WebLinkAbout2348 ZODIAC ST; ; CB052003; PermitCity of Carlsbad 1635 Faraday Av Carlsbad, CA 92008 07-22-200S Residential Permit Permit No: CB052003 Building Inspection Request Line (760) 602-2725 Job Address: 2348 ZODIAC ST CBAD Permit Type: RESDNTL Sub Type: SFD Status: Parcel No: 2132111000 Lot #: 29 Applied: Valuation: $361,412.00 Construction Type: VN CT02-21 Entered By: Occupancy Group: 07/22/2005 # Dwelling Units: Reference#: Structure Type: SFD Issued: Bedrooms: 3 Bathrooms: 3.5 Inspect Area: BACARA @ THE GREENS PHS 9 Orig PC#: Project Title: PLAN 1 3723 SF LIVING,764 SF GARAGE ,21 SF PORCH Plan Check#: Applicant: PULTE HOMES SUITE 200 4141 JUTLAND DR 92117 858-490-3111 Building Permit Add'I Building Permit Fee Plan Check Add'I Plan Check Fee Plan Check Discount Strong Motion Fee Park in Lieu Fee Park Fee LFM Fee Bridge Fee Other Bridge Fee BTD #2 Fee BTD #3 Fee Renewal Fee Add'I Renewal Fee Other Building Fee Pot. Water Con. Fee Meter Size Add'I Pot. Water Con. Fee Reel. Water Con. Fee $1,353.52 $0.00 $879.79 $0.00 ($70.38) $36.14 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $2,999.00 D5/8 $0.00 $0.00 Owner: PULTE HOME CORP 5993 AVENIDA ENCINAS #101 CARLSBAD CA 92008 Meter Size Add'I Reel. Water Con. Fee Meter Fee SDCWA Fee CFD Payoff Fee PFF (3105540) PFF (4305540) License Tax (3104193) License Tax ( 4304193) Traffic Impact Fee (3105541) Traffic Impact Fee (4305541) Sidewalk Fee PLUMBING TOT AL ELECTRICAL TOTAL MECHANICAL TOTAL Housing Impact Fee Housing lnlieu Fee Housing Credit Fee Master Drainage Fee Sewer Fee Additional Fees TOTAL PERMIT FEES ISSUED 05/23/2005 SB Plan Approved: 07/22/2005 PC04-79 PC05-61 $0.00 $160.00 $2,461.00 $2,848.90 $6,577.70 $0.00 $0.00 $0.00 $660.00 $0.00 $0.00 $210.00 $60.00 $117.50 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $18,293.17 Total Fees: $18,293.17 Total Payments To Date: $0.00 Balance Due: $18,293.17 Inspector: V1A ~ FINAL APPROV L Date: "'?J Ob o'- 3166 07/22/05 0002 01 CGP Clearance: NOTICE: Please take NOTICE that approval of your project includes the 'Imposition" of fees, dedications, reservations, or other exactions hereafter collectively referred to as 'fees/exactions." You have 90 days from the date this permit was issued to protest imposition of these fees/exactions. If you protest them, you must follow the protest procedures set forth in Government Code Section 66020(a), and file the protest and any other required information with the City Manager for processing in accordance with Cartsbad Municipal Code Section 3.32.030. Failure to timely follow that procedure will bar any subsequent legal action to attack, review, set aside, void, or annul their imposition. You are hereby FURTHER NOTIFIED that your right to protest the specified fees/exactions DOES NOT APPLY to water and sewer connection fees and capacity changes, nor planning, zoning, grading or other similar application processing or service fees in connection with this project. NOR DOES IT APPLY to any f • 02 18293-17 • . . City of Carlsbad Bldg Inspection Request . For: 12/05/2006 . Permit# CB052003 Inspector Assignment: PS --- Title: BACARA @ THE GREENS PHS 9 Description: PLAN 1 3723 SF LIVING,764 SF GARAGE ,21 SF PORCH Type: RESDNTL Sub Type: SFD Job Address: Suite: Location: OWNER 2348 ZODIAC ST Lot PULTE HOME CORP Owner: PULTE HOME CORP Remarks: Total Time: 29 Phone: 6197780887 In spector: ---M-6 __ Requested By: MATT Entered By: JANEAN CD Description Act Comment 19 Final Structural _ft_ 29 Final Plumbing l 39 Final Electrical 49 Final Mechanical Comments/Notices/Holds Associated PCRs/CVs Original PC# PC04-79 lns12ection Histo[Y Date Description Act lnsp Comments 10/30/2006 39 Final Electrical AP MC EMR 09/14/2006 23 Gas/TesVRepairs AP PD 09/13/2006 23 Gas/TesVRepairs CA PD 09/12/2006 17 Interior Lath/Drywall AP PD 09/12/2006 18 Exterior Lath/Drywall AP PD 09/12/2006 23 Gas/TesVRepairs NR PD LOW TEST 08/30/2006 16 Insulation AP PD 08/28/2006 84 Rough Combo AP PD 08/24/2006 84 Rough Combo CA MC PER CONTRACTOR 08/15/2006 13 Shear Panels/HD's AP PY 07/25/2006 15 Roof/Reroof AP PD 12/12/2005 81 Underground Combo AP PS 11/29/2005 21 Underground/Under Floor AP PS Dec. 5. 2006 7:24PM BALEARAS CONSTRUCTION!. r; (;ity of-Carlsbad l No.3875 P. 163S Faraday Avenu@, Carlsbad Callfonila 92008 INSPECTION RECORD INSPECTION RECORD CARD WITH APPROVED PLANS MUST BE l<EPT ON THE JOB CALL PRIOR TO 4:00 P.M. FOR NEXT WORK DAY INSPECTION BUILDING INSPECTION: (760) 602-2725 TI~T PANELS POUR~RI~ FINAL 'I •. , .. ··•:i ' PLUMBING_ -; \ . · ·, •. ~EWER' A.NO Bl/CO Ill.Pl/CO l . .,,.. .;, '·.:..., ;P UNDERGROUND iiiit..WASTE D WATER ,~···. ft~J,1· • C: 111"1.' TOP OUT □WASTE □WAT-~f\··, :./f ."n ,. /1 ,/ TUBANDSHOWERPAN ~ Yfl't,/11 'f.'L '-~ □ CAS TIST □ GAS PIPING' • • , '1 . O 1, f (d ~ V \NATERHEATER DSOtARWATER ~{'of5/ol,, M'- FINAL < I ELECTRICAL IULECTRIC UNDERGROUND· ·CUJFER ROUGH ElECTRIC WALLS IL-IL tt> i ~""":p,.___-+------------- h • o r.t ,,/ ROUCH ELECTRIC CEILING 0 ,-,, .,., rz •1 JinLECTRIC SERVICE □ TEMPORARY ~ BONDING D POOL f lNAL MECHAN/0.t II UNDERGROUND DUCTS & PIPING II D DUCT & PLEM. D REF, PIPING (i f!J JI. ,/ ... HEAT· AIR COND. SYSITMS lj,]..AJ 7 v•. VENTILATING SYSTEMS a FINAL CALL FOR FINAL INSPECTION WHEN ALL Af'PROPRIA TE ITEMS ABOVE HAVE BEEN APPROVED FINAL Sign When Appropri•le Building Dept (lnspeolons) (760) 602-27_25 Lt.Jo,;. lob Ml. Fire Department (760) 602-4660 Planning Department (760) 615-6706 11., ... ...., r,t;.. Engineering Dept (Inspections) (760) 438-3891 LI'-I~ ,(,, 1'£...::i Building Inspector, (7a'"""pm) (760) 602-2700 CMWD (760) 438-2722 E)(! 7151 r I 11fl h.&bv r.,L1..t,. REV 1/2004 SEE 8ACK FOR SPECIAL NOTES H UNSAKER &ASSOCIATES SAN C !:CO INC. PLANNING ENGINEERING SURVEYING IRVINE LOS ANGELES RIVERSIDE SAN DIEGO DAVE HAMMAR LEX W ILLIMAN ALISA VIALPANDO DAN SMITH RAY MARTIN 101 79 Huennekens St. San Diego, CA 92121 (858) 558--4500 PH (858) 558-1414 FX www.HunsakerSD.com lnfo@Hunsaker5D.com October 27, 2005 City of Carlsbad Engineering Department 1635 Faraday Avenue Carlsbad, CA 92008-7314 Re: Building Form Setback Certification La Costa Greens Neighborhood 1.1 2 Carlsbad Tract 02-20/PUD 02-1 O(A) Drawing No. 406-4C Lots: 18 through 30 Dear City lnspector: Please be advised the building foundation forms are in conformanc~ with the precise grading plans as to horizontal and vertical location . The building setbacks were measured in relation to the property lines and were f~und to be in conformance with the approved precise grading plans for this property. Sincerely Daniel P. Smith L.S. 6854 Hunsaker & Associates San Diego, Inc. MP:lm k:12350\2005\c63.dOC wo 2350-13 10/2712005 3:37 PM • SOIL & TESTING, INt J 40949 SOUTHERN CALIFORNIA SOIL & TESTING, INC. 6280 RIVERDALE STREET, POST OFFICE BOX 600627, SAN DIEGO, CA 92160-0627 Phone (619) 280-432 1, FAX (619) 280-4717 SCS& T FILE N0.__,_.05;"---_/ d_o~~--'-----'I.____ P.O. NO.: __________ _ C PL FIELD INSPECTION REPORT FOR: 0 Q.C. CONCRETE NC □ REINFORCED CONCRETE FIX □ REINFORCED MASONRY 0 EPOXY ANCHORS PROJECT TITLE: DSA FILE NO.: PERMIT NO.: ARCHITECT: ENGINEER: GENERAL CONTRACTOR: SUB CONTRACTOR: LOCATION OF WORK INSPECTED: MATERIAL CLASSIFICATION: DA~ -l,)-0_5 DESCRIPTION OF WORK INSPECTED: TIME ARRIVED: UBC I hereby certify that I have inspected the above reported work. Unless noted otherwise, the work inspected is to the .best of my knowledge in compliance with the approved pla , specifications and applic ble sec ions of the governing building laws. ,,,. Inspector lnitials __ --+_,,.....__~------- DSA I hereby certify tha I nave inspected the above reported work in accordance with the requirements of DSA approved documents. Sampling and testing were conducted in accordance with the requirements of the DSA approved documents. The work inspected complies with the DSA approved documents. Yes: __ No: __ Inspector Initials _____________ _ SCST205 (REV 8/04) PAGE __ OF □ WELDING □ FIREPROOFING □ H.S. BOLTING □ DSA APP. NO.: PLAN FILE NO.: I TIME DEPARTED: P.E. REVIEW: DTE -GE30CON INCORPORATED 6960 FLAN DERS DRIVE ■ GEOTECHNICAL CONSULTANTS 3 SAN DIEGO, CALIFORN IA 92121-2974 ■ TEL (8581 558-6900 ■ FAX (8581 558-6159 ~ FOUNDATION OBSERVATION REPORT PROJECT NAME: --'7_.,.. __ _;_ _______ _;_'--________ PROJECT NO. , ...,..! J --f:., .-:._ -,,:: LOCATION: _______________________ DATE: i:' f 4-, ' ,-1,[)~ FOUNDATION LOCATION (if not entire building) _.......,__~--=------'----,_-_.;.-'-_.__,...,..:...· ..c..~_-_F_,,._l_.;;.. ..... J ______ _ PLAN FILE NO. PERMIT NOS: J-r 0 ADDITIONAL OBSERVATION REQUIRED FOUNDATION TYPE : d-e ~:ST ANTIAL CONFORMANCE 0 CONVENTIONAL ~CJ CT POST-TENSIONED • PURPOSE OF OBSERVATION GI Verify soil conditions exposed are similar to those anticipated o· Verify footing excavations extend to minimum depth recommended in soil report D Verify foundation reinforcement complies with minimum recommended in soil report D Verify slab reinforcement, sand bedding and moisture barrier comply with minimum recommended in soil report D Verify footings have been extended to an appropriate bearing strata 0 Other -------------------------------------- ~ -· l / I I ':.\. ( ---, -. i.l. • APPLICABLE SOIL REPORT : TITLE : ------'-/-----'--'-1 1·:_.....;~_;__..:,_ ____ -=-c..--'-"-=~~-=-~-' ......... L_;'c....::-=J.= • ...r~. _, -"-1:....C.... -'-\.;---"-.-'r;...--,5b='"--~ \_ ------'----------'----'---------'---'--'"-=---'----i--~1.!..:i"-..,.,..:.........,,'l-"L:;._, _l DA TE : ';/ • 1 '} ' ,'~ • SOIL REPORT RECOMMENDATIONS BASED ON : 0 Expansion Condition O VERY LOW EJ LOW O MEDIUM 0 HIGH 0 VERY HIGH Q Fill Geometry -~---------------------------------- □ Other : -----='-------'=..:=::,~-------------------~----.---- -·-~~~3~ • Mll>IIMUM FOUNDATION RECOMMENDATIONS: i:~{ Footing Depth : D 12 Inches ~~~ ...!,nches rn:.21 ~n .. r~es OTHER -It ;i r· (1\thJ. tAT_. F)(Dft.,w. Footing Reinforcement: D No.4 T&B D 2-No.4 T&B D 2-No.5 T&B ~st-Tensio ed OTHER : 1D f uF Q.fe, Interior Slab Reinforcement: D 6x6-10/10 D 6x6-6/6 D No.3@241nches D No.3@181nches ~st-Tensioned ::;~'~· ✓ I Slab Bedding Material and Thickness : --Vapor Barrier : Foundation Width : ...1......::-~_,_1.:..I.,_,..,___ __________________________ _ • OBSERVATIONS : Gl'substantial conformance with Soil Reports (see "Purpose of Observation") ~ubstantial conformance with Foundation Plans. Identify : ±,...,..... t'. LA. tJt (it) . J tlc.. ~ ~ _) . t . ,.) ,.,:..,... ). J\ TI-1.J ('n 11 • ,;.i).. • oS t ~ J...i\\J ,.-~([)~ 'Rf:1 rw F. I 0 Other ,/4 'ii;:+! .• • • '1«>T;.,'1T IS ASSUMED THAT Al1 FOOTING EXCAVATIONS Wil l BE QEANED Of LOOSE MATERIAL PRIOl! TO PLAONG CONCRETE AND THAT THE SOIL MOISTURE CONTENT Will BE MAINTAINED ,_/ , I / FIELD' COPIES TO GEOCON REPRESENT ATIWE I ·aEOCON INC ORP'O R0A 'l'E D 6960 FLANDERS DRIVE GEOTECHNICAL CONSULTANTS ~ ■ SAN DIEGO, CALIFORNIA 92121-297 4 ■ TEL 1858) 558-6900 ■ FAX (858) 558-6159 ., FOUNDATION OBSERVATION REPORT PROJECT NAME: n If;. Lh 'I:. 1 , \ • , < , _1 L PROJECT NO. t){J ¥0~ -~-/6 LOCATION : l I I I? J. t ~ l? A D I (' ~ DATE: __.)'--"'2,""'---• .._.,/ 2'----• _0..-5 __ _ FOUNDATION LOCATION ('f 1 not entire b ·1d· UI ing ~1 rt' l / J ~. ).. ()i ~ 1) J • "' ' PLAN FILE NO. PERMIT NOS : --so; C 13 o5::L ooij 0 ADDITIONAL OBSERVATION REQUIRED FOUNDATION TYPE : 0 CONVENTIONAL ~SST ANTIAL CONFORMANCE ~POST· TENSIONED - • PU~SE OF OBSERVATION af Verify soil conditions exposed are similar to those anticipated ~erify footing excavations extend to minimum depth recommended in soil report D Verify foundation reinforcement complies with minimum recommended in soil report , D Vefify slab reinforcement, sand bedding and moisture barrier comply with minimum recommended □/verify footings have been extended to an appropriate bearing strata in soil report 0 Other -------------------------------------- • APPLICABLE SOIL REPORT : F I it 5 • SOIL REPORT RECOMMENDATIONS BASED ON: t □/Expansion Condition □ VERY LOW riYLbJj:'/(p □ MEDIUM 0 HIGH 0 VERY HIGH 0 Fill Geometry _J.__.LL.=~------------------------------- 0 Other : ' P :f jtr:;: • MINIMUM FOUNDATION RECOMMENDATIONS : / ,, 0 ,;Footing Depth: D 12 Inches D 18 Inches f0""24 Inches OTHER1\ ~ 9? ffi)N. '\: ::f, Fr:<-0'/1.v Footing Reinforcement: D No.4 T&B D 2-No.4 T&B □ 2-No.5 T&B [!("Post-Tensioned OTHER : ~f 1\C 6lJY: • Interior Slab Reinforcement: D 6x6-10/10 D 6x6-6/6 D No.3@241nches D No.3@181nches CH"'Post-Tensioned ;1,, ✓ Slab Bedding Material and Thickness : -,;-------------Vapor Barrier : ________ _ Foundation Width : It\ J ). • OBSERVATIONS : [!(Substantial conformance with Soil Reports (see "Purpose of Observation") □"substantial conformance with Foundation Plans. Identify · 8 \ } f\1\\~ ~ I ,l . )1 I ◄ ct\l \,\ v\..o· ,4·CY;) ... 0 Other /4.........,_ ________________ _ NOTE/ IT IS ASSUMED THAT All FOOTING EXCAVATIONS Will BE QEANED OF LOOSE MA TE RIAL PRIOR TO PLACING CONCRETE AND THAT THE SOIL MOISTURE CONTENT Will BE MAINTAINED + .o-: J'\-er·, r,.r K.-e tt-t,--er FIELD COPIES TO GEOCON REPRESENTATIVE