HomeMy WebLinkAbout2348 ZODIAC ST; ; CB052003; PermitCity of Carlsbad
1635 Faraday Av Carlsbad, CA 92008
07-22-200S Residential Permit Permit No: CB052003
Building Inspection Request Line (760) 602-2725
Job Address: 2348 ZODIAC ST CBAD
Permit Type: RESDNTL Sub Type: SFD Status:
Parcel No: 2132111000 Lot #: 29 Applied:
Valuation: $361,412.00 Construction Type: VN
CT02-21
Entered By:
Occupancy Group:
07/22/2005
# Dwelling Units:
Reference#:
Structure Type: SFD Issued:
Bedrooms: 3 Bathrooms: 3.5 Inspect Area:
BACARA @ THE GREENS PHS 9 Orig PC#: Project Title:
PLAN 1 3723 SF LIVING,764 SF GARAGE ,21 SF PORCH Plan Check#:
Applicant:
PULTE HOMES
SUITE 200
4141 JUTLAND DR 92117
858-490-3111
Building Permit
Add'I Building Permit Fee
Plan Check
Add'I Plan Check Fee
Plan Check Discount
Strong Motion Fee
Park in Lieu Fee
Park Fee
LFM Fee
Bridge Fee
Other Bridge Fee
BTD #2 Fee
BTD #3 Fee
Renewal Fee
Add'I Renewal Fee
Other Building Fee
Pot. Water Con. Fee
Meter Size
Add'I Pot. Water Con. Fee
Reel. Water Con. Fee
$1,353.52
$0.00
$879.79
$0.00
($70.38)
$36.14
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$2,999.00
D5/8
$0.00
$0.00
Owner:
PULTE HOME CORP
5993 AVENIDA ENCINAS #101
CARLSBAD CA 92008
Meter Size
Add'I Reel. Water Con. Fee
Meter Fee
SDCWA Fee
CFD Payoff Fee
PFF (3105540)
PFF (4305540)
License Tax (3104193)
License Tax ( 4304193)
Traffic Impact Fee (3105541)
Traffic Impact Fee (4305541)
Sidewalk Fee
PLUMBING TOT AL
ELECTRICAL TOTAL
MECHANICAL TOTAL
Housing Impact Fee
Housing lnlieu Fee
Housing Credit Fee
Master Drainage Fee
Sewer Fee
Additional Fees
TOTAL PERMIT FEES
ISSUED
05/23/2005
SB
Plan Approved:
07/22/2005
PC04-79
PC05-61
$0.00
$160.00
$2,461.00
$2,848.90
$6,577.70
$0.00
$0.00
$0.00
$660.00
$0.00
$0.00
$210.00
$60.00
$117.50
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$18,293.17
Total Fees: $18,293.17 Total Payments To Date: $0.00 Balance Due: $18,293.17
Inspector: V1A ~ FINAL APPROV L
Date: "'?J Ob o'-
3166 07/22/05 0002 01
CGP
Clearance:
NOTICE: Please take NOTICE that approval of your project includes the 'Imposition" of fees, dedications, reservations, or other exactions hereafter collectively
referred to as 'fees/exactions." You have 90 days from the date this permit was issued to protest imposition of these fees/exactions. If you protest them, you must
follow the protest procedures set forth in Government Code Section 66020(a), and file the protest and any other required information with the City Manager for
processing in accordance with Cartsbad Municipal Code Section 3.32.030. Failure to timely follow that procedure will bar any subsequent legal action to attack,
review, set aside, void, or annul their imposition.
You are hereby FURTHER NOTIFIED that your right to protest the specified fees/exactions DOES NOT APPLY to water and sewer connection fees and capacity
changes, nor planning, zoning, grading or other similar application processing or service fees in connection with this project. NOR DOES IT APPLY to any
f •
02
18293-17
• . . City of Carlsbad Bldg Inspection Request
. For: 12/05/2006 .
Permit# CB052003 Inspector Assignment: PS ---
Title: BACARA @ THE GREENS PHS 9
Description: PLAN 1 3723 SF LIVING,764 SF GARAGE ,21 SF PORCH
Type: RESDNTL Sub Type: SFD
Job Address:
Suite:
Location:
OWNER
2348 ZODIAC ST
Lot
PULTE HOME CORP
Owner: PULTE HOME CORP
Remarks:
Total Time:
29
Phone: 6197780887
In spector: ---M-6 __
Requested By: MATT
Entered By: JANEAN
CD Description Act Comment
19 Final Structural _ft_
29 Final Plumbing l 39 Final Electrical
49 Final Mechanical
Comments/Notices/Holds
Associated PCRs/CVs Original PC# PC04-79
lns12ection Histo[Y
Date Description Act lnsp Comments
10/30/2006 39 Final Electrical AP MC EMR
09/14/2006 23 Gas/TesVRepairs AP PD
09/13/2006 23 Gas/TesVRepairs CA PD
09/12/2006 17 Interior Lath/Drywall AP PD
09/12/2006 18 Exterior Lath/Drywall AP PD
09/12/2006 23 Gas/TesVRepairs NR PD LOW TEST
08/30/2006 16 Insulation AP PD
08/28/2006 84 Rough Combo AP PD
08/24/2006 84 Rough Combo CA MC PER CONTRACTOR
08/15/2006 13 Shear Panels/HD's AP PY
07/25/2006 15 Roof/Reroof AP PD
12/12/2005 81 Underground Combo AP PS
11/29/2005 21 Underground/Under Floor AP PS
Dec. 5. 2006 7:24PM BALEARAS CONSTRUCTION!. r; (;ity of-Carlsbad l No.3875 P.
163S Faraday Avenu@, Carlsbad Callfonila 92008
INSPECTION RECORD
INSPECTION RECORD CARD WITH APPROVED PLANS
MUST BE l<EPT ON THE JOB
CALL PRIOR TO 4:00 P.M. FOR NEXT WORK DAY INSPECTION
BUILDING INSPECTION: (760) 602-2725
TI~T PANELS
POUR~RI~
FINAL 'I •. , .. ··•:i '
PLUMBING_ -; \ . · ·, •.
~EWER' A.NO Bl/CO Ill.Pl/CO l . .,,.. .;, '·.:..., ;P
UNDERGROUND iiiit..WASTE D WATER ,~···. ft~J,1· • C: 111"1.'
TOP OUT □WASTE □WAT-~f\··, :./f ."n ,. /1 ,/
TUBANDSHOWERPAN ~ Yfl't,/11 'f.'L '-~
□ CAS TIST □ GAS PIPING' • • , '1 . O 1, f (d ~
V \NATERHEATER DSOtARWATER ~{'of5/ol,, M'-
FINAL < I
ELECTRICAL
IULECTRIC UNDERGROUND· ·CUJFER
ROUGH ElECTRIC WALLS IL-IL tt> i ~""":p,.___-+-------------
h • o r.t ,,/
ROUCH ELECTRIC CEILING 0 ,-,, .,., rz •1
JinLECTRIC SERVICE □ TEMPORARY
~ BONDING D POOL
f lNAL
MECHAN/0.t II
UNDERGROUND DUCTS & PIPING II
D DUCT & PLEM. D REF, PIPING (i f!J JI. ,/ ...
HEAT· AIR COND. SYSITMS lj,]..AJ 7 v•.
VENTILATING SYSTEMS a
FINAL
CALL FOR FINAL INSPECTION WHEN ALL Af'PROPRIA TE ITEMS ABOVE HAVE BEEN APPROVED
FINAL Sign When Appropri•le
Building Dept (lnspeolons) (760) 602-27_25 Lt.Jo,;. lob Ml.
Fire Department (760) 602-4660
Planning Department (760) 615-6706 11., ... ...., r,t;..
Engineering Dept (Inspections) (760) 438-3891 LI'-I~ ,(,, 1'£...::i
Building Inspector, (7a'"""pm) (760) 602-2700
CMWD (760) 438-2722 E)(! 7151 r I 11fl h.&bv r.,L1..t,.
REV 1/2004 SEE 8ACK FOR SPECIAL NOTES
H UNSAKER
&ASSOCIATES
SAN C !:CO INC.
PLANNING
ENGINEERING
SURVEYING
IRVINE
LOS ANGELES
RIVERSIDE
SAN DIEGO
DAVE HAMMAR
LEX W ILLIMAN
ALISA VIALPANDO
DAN SMITH
RAY MARTIN
101 79 Huennekens St.
San Diego, CA 92121
(858) 558--4500 PH
(858) 558-1414 FX
www.HunsakerSD.com
lnfo@Hunsaker5D.com
October 27, 2005
City of Carlsbad
Engineering Department
1635 Faraday Avenue
Carlsbad, CA 92008-7314
Re: Building Form Setback Certification
La Costa Greens Neighborhood 1.1 2
Carlsbad Tract 02-20/PUD 02-1 O(A)
Drawing No. 406-4C
Lots: 18 through 30
Dear City lnspector:
Please be advised the building foundation forms are in conformanc~ with the
precise grading plans as to horizontal and vertical location . The building
setbacks were measured in relation to the property lines and were f~und to be in
conformance with the approved precise grading plans for this property.
Sincerely
Daniel P. Smith L.S. 6854
Hunsaker & Associates San Diego, Inc.
MP:lm k:12350\2005\c63.dOC
wo 2350-13 10/2712005 3:37 PM
•
SOIL & TESTING, INt
J
40949
SOUTHERN CALIFORNIA SOIL & TESTING, INC.
6280 RIVERDALE STREET, POST OFFICE BOX 600627, SAN DIEGO, CA 92160-0627
Phone (619) 280-432 1, FAX (619) 280-4717
SCS& T FILE N0.__,_.05;"---_/ d_o~~--'-----'I.____
P.O. NO.: __________ _
C PL
FIELD INSPECTION REPORT FOR:
0 Q.C. CONCRETE
NC
□ REINFORCED CONCRETE
FIX
□ REINFORCED MASONRY
0 EPOXY ANCHORS
PROJECT TITLE: DSA FILE NO.:
PERMIT NO.:
ARCHITECT: ENGINEER:
GENERAL CONTRACTOR: SUB CONTRACTOR:
LOCATION OF WORK INSPECTED:
MATERIAL CLASSIFICATION:
DA~ -l,)-0_5 DESCRIPTION OF WORK INSPECTED: TIME ARRIVED:
UBC I hereby certify that I have inspected the above reported work. Unless noted otherwise,
the work inspected is to the .best of my knowledge in compliance with the approved pla ,
specifications and applic ble sec ions of the governing building laws. ,,,.
Inspector lnitials __ --+_,,.....__~-------
DSA I hereby certify tha I nave inspected the above reported work in accordance with the
requirements of DSA approved documents. Sampling and testing were conducted in
accordance with the requirements of the DSA approved documents. The work inspected
complies with the DSA approved documents.
Yes: __ No: __ Inspector Initials _____________ _
SCST205 (REV 8/04)
PAGE __ OF
□ WELDING □ FIREPROOFING
□ H.S. BOLTING □
DSA APP. NO.:
PLAN FILE NO.:
I
TIME DEPARTED:
P.E. REVIEW:
DTE
-GE30CON
INCORPORATED
6960 FLAN DERS DRIVE ■
GEOTECHNICAL CONSULTANTS 3
SAN DIEGO, CALIFORN IA 92121-2974 ■ TEL (8581 558-6900 ■ FAX (8581 558-6159 ~
FOUNDATION OBSERVATION REPORT
PROJECT NAME: --'7_.,.. __ _;_ _______ _;_'--________ PROJECT NO. , ...,..! J --f:., .-:._ -,,::
LOCATION: _______________________ DATE: i:' f 4-, ' ,-1,[)~
FOUNDATION LOCATION (if not entire building) _.......,__~--=------'----,_-_.;.-'-_.__,...,..:...· ..c..~_-_F_,,._l_.;;.. ..... J ______ _
PLAN FILE NO. PERMIT NOS:
J-r 0 ADDITIONAL OBSERVATION REQUIRED
FOUNDATION TYPE : d-e
~:ST ANTIAL CONFORMANCE 0 CONVENTIONAL ~CJ CT POST-TENSIONED
• PURPOSE OF OBSERVATION
GI Verify soil conditions exposed are similar to those anticipated
o· Verify footing excavations extend to minimum depth recommended in soil report
D Verify foundation reinforcement complies with minimum recommended in soil report
D Verify slab reinforcement, sand bedding and moisture barrier comply with minimum recommended in soil report
D Verify footings have been extended to an appropriate bearing strata
0 Other --------------------------------------
~ -· l / I I ':.\. ( ---, -. i.l. • APPLICABLE SOIL REPORT : TITLE : ------'-/-----'--'-1 1·:_.....;~_;__..:,_ ____ -=-c..--'-"-=~~-=-~-' ......... L_;'c....::-=J.= • ...r~. _, -"-1:....C.... -'-\.;---"-.-'r;...--,5b='"--~ \_
------'----------'----'---------'---'--'"-=---'----i--~1.!..:i"-..,.,..:.........,,'l-"L:;._, _l DA TE : ';/ • 1 '} ' ,'~
• SOIL REPORT RECOMMENDATIONS BASED ON :
0 Expansion Condition O VERY LOW EJ LOW O MEDIUM 0 HIGH 0 VERY HIGH
Q Fill Geometry -~----------------------------------
□ Other : -----='-------'=..:=::,~-------------------~----.----
-·-~~~3~ • Mll>IIMUM FOUNDATION RECOMMENDATIONS:
i:~{ Footing Depth : D 12 Inches ~~~ ...!,nches rn:.21 ~n .. r~es OTHER -It ;i r· (1\thJ. tAT_. F)(Dft.,w.
Footing Reinforcement: D No.4 T&B D 2-No.4 T&B D 2-No.5 T&B ~st-Tensio ed OTHER : 1D f uF Q.fe,
Interior Slab Reinforcement: D 6x6-10/10 D 6x6-6/6 D No.3@241nches D No.3@181nches ~st-Tensioned ::;~'~· ✓ I
Slab Bedding Material and Thickness : --Vapor Barrier :
Foundation Width : ...1......::-~_,_1.:..I.,_,..,___ __________________________ _
• OBSERVATIONS :
Gl'substantial conformance with Soil Reports (see "Purpose of Observation")
~ubstantial conformance with Foundation Plans. Identify : ±,...,..... t'. LA. tJt
(it) . J tlc.. ~ ~ _) . t . ,.) ,.,:..,... ). J\ TI-1.J ('n 11 • ,;.i).. • oS
t ~ J...i\\J ,.-~([)~ 'Rf:1 rw F.
I
0 Other
,/4 'ii;:+! .• •
• '1«>T;.,'1T IS ASSUMED THAT Al1 FOOTING EXCAVATIONS Wil l BE QEANED Of LOOSE MATERIAL PRIOl! TO PLAONG CONCRETE AND THAT THE SOIL MOISTURE CONTENT Will BE MAINTAINED
,_/ , I
/
FIELD' COPIES TO GEOCON REPRESENT ATIWE
I
·aEOCON
INC ORP'O R0A 'l'E D
6960 FLANDERS DRIVE
GEOTECHNICAL CONSULTANTS ~ ■ SAN DIEGO, CALIFORNIA 92121-297 4 ■ TEL 1858) 558-6900 ■ FAX (858) 558-6159 .,
FOUNDATION OBSERVATION REPORT
PROJECT NAME: n If;. Lh 'I:. 1 , \ • , < , _1 L PROJECT NO. t){J ¥0~ -~-/6
LOCATION : l I I I? J. t ~ l? A D I (' ~ DATE: __.)'--"'2,""'---• .._.,/ 2'----• _0..-5 __ _
FOUNDATION LOCATION ('f 1 not entire b ·1d· UI ing ~1 rt' l / J ~. ).. ()i ~ 1) J • "' '
PLAN FILE NO. PERMIT NOS : --so; C 13 o5::L ooij 0 ADDITIONAL OBSERVATION REQUIRED
FOUNDATION TYPE :
0 CONVENTIONAL ~SST ANTIAL CONFORMANCE ~POST· TENSIONED -
• PU~SE OF OBSERVATION
af Verify soil conditions exposed are similar to those anticipated
~erify footing excavations extend to minimum depth recommended in soil report
D Verify foundation reinforcement complies with minimum recommended in soil report ,
D Vefify slab reinforcement, sand bedding and moisture barrier comply with minimum recommended
□/verify footings have been extended to an appropriate bearing strata
in soil report
0 Other --------------------------------------
• APPLICABLE SOIL REPORT : F
I it 5
• SOIL REPORT RECOMMENDATIONS BASED ON: t
□/Expansion Condition □ VERY LOW riYLbJj:'/(p □ MEDIUM 0 HIGH 0 VERY HIGH
0 Fill Geometry _J.__.LL.=~-------------------------------
0 Other : ' P :f jtr:;:
• MINIMUM FOUNDATION RECOMMENDATIONS : / ,,
0 ,;Footing Depth: D 12 Inches D 18 Inches f0""24 Inches OTHER1\ ~ 9? ffi)N. '\: ::f, Fr:<-0'/1.v
Footing Reinforcement: D No.4 T&B D 2-No.4 T&B □ 2-No.5 T&B [!("Post-Tensioned OTHER : ~f 1\C 6lJY: •
Interior Slab Reinforcement: D 6x6-10/10 D 6x6-6/6 D No.3@241nches D No.3@181nches CH"'Post-Tensioned ;1,, ✓ Slab Bedding Material and Thickness : -,;-------------Vapor Barrier : ________ _
Foundation Width : It\ J ).
• OBSERVATIONS :
[!(Substantial conformance with Soil Reports (see "Purpose of Observation")
□"substantial conformance with Foundation Plans. Identify · 8 \ } f\1\\~ ~
I ,l . )1 I ◄ ct\l \,\ v\..o· ,4·CY;) ...
0 Other
/4.........,_ ________________ _
NOTE/ IT IS ASSUMED THAT All FOOTING EXCAVATIONS Will BE QEANED OF LOOSE MA TE RIAL PRIOR TO PLACING CONCRETE AND THAT THE SOIL MOISTURE CONTENT Will BE MAINTAINED
+ .o-: J'\-er·, r,.r K.-e tt-t,--er
FIELD COPIES TO GEOCON REPRESENTATIVE