Loading...
HomeMy WebLinkAboutAMEND 2023-0001; SMAC; LIMITED GEOTECHNICAL INVESTIGATION; 2024-02-29 Civil Engineering • Land Planning • Surveying STORM WATER QUALITY MANAGEMENT PLAN (SWQMP) SMAC Shell Building PUD 2017-0008 (DEV 2017-0169) August 10, 2018 Revised April 18, 2025 Van Allen Way Carlsbad, CA 92008 APN 212-120-01 Prepared For: 5801-5807 Van Allen Owner, LLC 12501 Seal Beach Boulevard, Suite 225 Seal Beach, CA 90740 KARN Engineering and Surveying, Inc. Scott Harry, P.E., P.L.S 760-728-1134 www.karnengineeering.com -~----... ..... -..... -------.... . .... -------.,.. -w----..... • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • CITY OF CARLSBAD PRIORITY DEVELOPMENT PROJECT (PDP) STORM WATER QUALITY MANAGEMENT PLAN (SWQMP) FOR SMAC Shell Building PUD 2017-0008 {DEV 2017-0169) ENGINEER OF WORK: ~792 PREPARED FOR: SMAC 5807 Van Allen Way Carlsbad, CA 92008 760-929-7575 PREPARED BY: KARN Engineering and Surveying, !Inc . 129 W. Fig Street Fallbrook, CA 92028 760-728-1134 DATE: August 10, 2018 Addendum 1: 4/18/25 Revision for increased parking spaces Attachment 1f: Trash Capture Calculations and Specifications Attachment 2e: Hydromodification Calculations • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • TABLE OF CONTENTS Certification Page Project Vicinity Map FORM E-34 Storm Water Standard Questionnaire Site Information FORM E-36 Standard Project Requirement Checklist Summary of PDP Structural BMPs Attachment 1: Backup for PDP Pollutant Control BMPs Attachment 1 a: OMA Exhibit Attachment 1 b: Tabular Summary of DMAs and Design Capture Volume Calculations Attachment 1 c: Harvest and Use Feasibility Screening (when applicable) Attachment 1 d: Categorization of Infiltration Feasibility Condition (when applicable) Attachment 1 e: Pollutant Control BMP Design Worksheets / Calculations Attachment 2: Backup for PDP Hydromodification Control Measures Attachment 2a: Hydromodification Management Exhibit Attachment 2b: Management of Critical Coarse Sediment Yield Areas Attachment 2c: Geomorphic Assessment of Receiving Channels Attachment 2d : Flow Control Facility Design Attachment 3: Structural BMP Maintenance Thresholds and Actions Attachment 4: Single Sheet BMP (SSBMP) Exhibit • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • CERTIFICATION PAGE Project Name: SMAC Project ID: PUD 2017-0008 (DEV 2017-0169) I hereby declare that I am the Engineer in Responsible Charge of design of storm water BMPs for this project, and that I have exercised responsible charge over the design of the project as defined in Section 6703 of the Business and Professions Code, and that the design is consistent with the requirements of the BMP Design Manual, which is based on the requirements of SDRWQCB Order No. R9-2013-0001 (MS4 Permit) or the current Order . I have read and understand that the City Engineer has adopted minimum requirements for managing urban runoff, including storm water, from land development activities, as described in the BMP Design Manual. I certify that this SWQMP has been completed to the best of my ability and accurately reflects the project being proposed and the applicable source control and site design BMPs proposed to minimize the potentially negative impacts of this project's land development activities on water quality. I understand and acknowledge that the plan check review of this SWQMP by the City Engineer is confined to a review and does not relieve me, as the Engineer in Responsible Charge of design of storm water BMPs for this project, of my responsibilities for project design . R.C.E. 63792 Exp. 9-30-20 KARN Engineering and Surveying, Inc . Date 1 ' , "" OF CAl\t~/ • ·' -- • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • PROJECT VICINITY MAP CITY OF OCEANSIDE PACIFIC OCEAN ADA C) CITY OF N ALLEN OLLEGE LVD . NOT TO SCALE • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • C_cicyof Carlsbad STORM WATER STANDARDS QUESTIONNAIRE Development Services Land Development Engineering 1635 Faraday Avenue (760) 602-2750 www.carlsbadca.gov E-34 I INSTRUCTIONS: To address post-development pollutants that may be generated from development projects, the city requires that new development and significant redevelopment priority projects incorporate Permanent Storm Water Best Management Practices (BMPs) into the project design per Carlsbad BMP Design Manual (BMP Manual). To view the BMP Manual, refer to the Engineering Standards (Volume 5) . This questionnaire must be completed by the applicant in advance of submitting for a development application (subdivision, discretionary permits and/or construction permits). The results of the questionnaire determine the level of storm water standards that must be applied to a proposed development or redevelopment project. Depending on the outcome, your project will either be subject to 'STANDARD PROJECT' requirements or be subject to 'PRIORITY DEVELOPMENT PROJECT' (PDP) requirements . Your responses to the questionnaire represent an initial assessment of the proposed project conditions and impacts. City staff has responsibility for making the final assessment after submission of the development application. If staff determines that the questionnaire was incorrectly filled out and is subject to more stringent storm water standards than initially assessed by you, this will result in the return of the development application as incomplete. In this case, please make the changes to the questionnaire and resubmit to the city . If you are unsure about the meaning of a question or need help in determining how to respond to one or more of the questions, please seek assistance from Land Development Engineering staff . A completed and signed questionnaire must be submitted with each development project application. Only one completed and signed questionnaire is required when multiple development applications for the same project are submitted concurrently . PROJECT INFORMATION PROJECT NAME: SMAC Shell Building PROJECT ID: PUD 2017-0008 ADDRESS: Van Allen Way, Carlsbad, CA 92008 APN : 212-120-01 The project is (check one): IX] New Development D Redevelopment The total proposed disturbed area is: ft2 ( 3.20 ) acres The total proposed newly created and/or replaced impervious area is: 941249 ft2 ( ) acres If your project is covered by an approved SWQMP as part of a larger development project, provide the project ID and the SWQMP # of the larger development project: Project ID SWQMP#: Then, go to Step 1 and follow the instructions . When completed, sign the form at the end and submit this with your application to the city . E-34 Page 1 of 4 REV 02/16 • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • STEP1 TO BE COMPLETED FOR ALL PROJECTS To determine if your project is a "development project", please answer the following question: YES NO Is your project LIMITED TO routine maintenance activity and/or repair/improvements to an existing building □ ~ or structure that do not alter the size (See Section 1.3 of the BMP Design Manual for guidance)? If you answered "yes" to the above question, provide justification below then go to Step 5, mark the third box stating "my project is not a 'development project' and not subject to the requirements of the BMP manual" and complete applicant information . Justification/discussion: (e.g. the project includes only interior remodels within an existing building): If you answered "no" to the above question, the project is a 'development project', go to Step 2 . STEP2 TO BE COMPLETED FOR ALL DEVELOPMENT PROJECTS To determine if your project is exempt from PDP requirements pursuant to MS4 Permit Provision E.3.b.(3), please answer the following questions: Is your project LIMITED to one or more of the following : YES NO 1 . Constructing new or retrofitting paved sidewalks, bicycle lanes or trails that meet the following criteria: a) Designed and constructed to direct storm water runoff to adjacent vegetated areas, or other non- erodible permeable areas; □ lXl b) Designed and constructed to be hydraulically disconnected from paved streets or roads; c) Designed and constructed with permeable pavements or surfaces in accordance with USEPA Green Streets quidance? 2. Retrofitting or redeveloping existing paved alleys, streets, or roads that are designed and constructed in □ IX] accordance with the USEPA Green Streets guidance? 3 . Ground Mounted Solar Array that meets the criteria provided in section 1.4.2 of the BMP manual? □ Kl If you answered "yes" to one or more of the above questions, provide discussion/justification below, then go to Step 5, mark the second box stating "my project is EXEMPT from PDP ... " and complete applicant information . Discussion to justify exemption ( e.g. the project redeveloping existing road designed and constructed in accordance with the USEPA Green Street guidance): If you answered "no" to the above questions, your project is not exempt from PDP, go to Step 3 . E-34 Page 2 of 4 REV 04/17 • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • STEP3 TO BE COMPLETED FOR ALL NEW OR REDEVELOPMENT PROJECTS To determine if your project is a PDP, please answer the following questions (MS4 Permit Provision E.3.b.(1 )): YES NO 1. Is your project a new development that creates 10,000 square feet or more of impervious surfaces collectively over the entire project site? This includes commercial, industrial, residential, mixed-use, IX] □ and public development projects on public or private land. 2 . Is your project a redevelopment project creating and/or replacing 5,000 square feet or more of impervious surface collectively over the entire project site on an existing site of 10,000 square feet or □ IX] more of impervious surface? This includes commercial, industrial, residential, mixed-use, and public development projects on public or private land . 3. Is your project a new or redevelopment project that creates and/or replaces 5,000 square feet or more of impervious surface collectively over the entire project site and supports a restaurant? A restaurant is a facility that sells prepared foods and drinks for consumption, including stationary lunch counters and □ IX] refreshment stands selling prepared foods and drinks for immediate consumption (Standard Industrial Classification (SIC) code 5812) . 4. Is your project a new or redevelopment project that creates 5,000 square feet or more of impervious surface collectively over the entire project site and supports a hillside development project? A hillside □ IX] development project includes development on any natural slope that is twenty-five percent or Qreater . 5. Is your project a new or redevelopment project that creates and/or replaces 5,000 square feet or more of impervious surface collectively over the entire project site and supports a parking lot? A parking lot is ~ □ a land area or facility for the temporary parking or storage of motor vehicles used personally for business or for commerce. 6 . Is your project a new or redevelopment project that creates and/or replaces 5,000 square feet or more of impervious street, road, highway, freeway or driveway surface collectively over the entire project IX] □ site? A street, road, highway, freeway or driveway is any paved impervious surface used for the transportation of automobiles, trucks, motorcvcles, and other vehicles . 7. Is your project a new or redevelopment project that creates and/or replaces 2,500 square feet or more of impervious surface collectively over the entire site, and discharges directly to an Environmentally Sensitive Area (ESA)? "Discharging Directly to" includes flow that is conveyed overland a distance of □ [XI 200 feet or less from the project to the ESA , or conveyed in a pipe or open channel any distance as an isolated flow from the project to the ESA (i.e. not commingled with flows from adjacent lands).* 8. Is your project a new development or redevelopment project that creates and/or replaces 5,000 square feet or more of impervious surface that supports an automotive repair shop? An automotive repair □ [XI shop is a facility that is categorized in any one of the following Standard Industrial Classification (SIC) codes: 5013, 5014, 5541, 7532-7534, or 7536-7539. 9 . Is your project a new development or redevelopment project that creates and/or replaces 5,000 square feet or more of impervious area that supports a retail gasoline outlet (RGO)? This category includes □ fXI RGO's that meet the following criteria: (a) 5,000 square feet or more or (b) a project Average Daily Traffic (ADT) of 100 or more vehicles per day . 10. Is your project a new or redevelopment project that results in the disturbance of one or more acres of land IX] □ and are expected to generate pollutants post construction? 11 . Is your project located within 200 feet of the Pacific Ocean and (1) creates 2,500 square feet or more of impervious surface or (2) increases impervious surface on the property by more than 10%? (CMC □ IX] 21.203.040) If you answered "yes" to one or more of the above questions, your project is a PDP. If your project is a redevelopment project, go to step 4. If your project is a new project, go to step 5, check the first box stating "My project is a PDP ... " and complete applicant information . If you answered "no" to all of the above questions, your project is a 'STANDARD PROJECT.' Go to step 5, check the second box statinQ "My project is a 'STANDARD PROJECT' ... " and complete applicant information . E-34 Page 3 of 4 REV 04/17 • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • STEP4 TO BE COMPLETED FOR REDEVELOPMENT PROJECTS THAT ARE PRIORITY DEVELOPMENT PROJECTS (PDP) ONLY Complete the questions below regarding your redevelopment project (MS4 Permit Provision E.3.b.(2)): YES NO Does the redevelopment project result in the creation or replacement of impervious surface in an amount of less than 50% of the surface area of the previously existing development? Complete the percent impervious calculation below: Existing impervious area (A)= sq . ft. □ □ Total proposed newly created or replaced impervious area (B) = sq. ft. Percent impervious area created or replaced (B/A)*100 = % If you answered "yes", the structural BMPs required for PDP apply only to the creation or replacement of impervious surface and not the entire development. Go to step 5, check the first box stating "My project is a PDP ... " and complete applicant information . If you answered "no," the structural BMP's required for PDP apply to the entire development. Go to step 5, check the check the first box stating "My project is a PDP ... " and complete applicant information. STEPS CHECK THE APPROPRIATE BOX AND COMPLETE APPLICANT INFORMATION .lXI My project is a PDP and must comply with PDP stormwater requirements of the BMP Manual. I understand I must prepare a Storm Water Quality Management Plan (SWQMP) for submittal at time of application . □ My project is a 'STANDARD PROJECT' OR EXEMPT from PDP and must only comply with 'STANDARD PROJECT' stormwater requirements of the BMP Manual. As part of these requirements, I will submit a "Standard Project Requirement Checklist Form E-36" and incorporate low impact development strategies throughout my project. Note: For projects that are close to meeting the PDP threshold, staff may require detailed impervious area calculations and exhibits to verify if 'STANDARD PROJECT stormwater requirements apply . D My Project is NOT a 'development project' and is not subject to the requirements of the BMP Manual. Applicant Information and Signature Box Applicant Name: SMAC Corporation Applicant Title: Ed Neff, CEO Applicant Signature: Date: .. • Environmentally Sensitive Areas include but are not limited to all Clean Water Act Section 303(d) 1mpa1red water bodies; areas designated as Areas of Special Biological Significance by the State Water Resources Control Board (Water Quality Control Plan for the San Diego Basin (1994) and amendments); water bodies designated with the RARE beneficial use by the State Water Resources Control Board (Water Quality Control Plan for the San Diego Basin (1994) and amendments); areas designated as preserves or their equivalent under the Multi Species Conservation Program within the Cities and County of San Diego; Habitat Management Plan; and any other equivalent environmentally sensitive areas which have been identified by the City . This Box for Citv Use Onlv YES NO City Concurrence: □ □ By: Date: Project ID: E-34 Page 4 of 4 REV 04/17 • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • SITE INFORMATION CHECKLIST Project Summary Information Project Name SMAC Shell Building Project ID PUD 2017-0008 (DEV 201 7-0169) Project Address Van Allen Way Carlsbad, CA 92008 Assessor's Parcel Number(s) (APN(s)) 212-120-01 Project Watershed (Hydrologic Unit) Carlsbad 904 (Agua Hedionda HA 904.3) Parcel Area 3.07 Acres (133,729 Square Feet) Existing Impervious Area 0 Acres (0 Square Feet) (subset of Parcel Area) Area to be disturbed by the project 3.20 Acres (152,460 Square Feet) (Project Area) Project Proposed Impervious Area 2.16 Acres (94,249 Square Feet) (subset of Project Area) Project Proposed Pervious Area 1.04 Acres (43,502 Square Feet) ( subset of Project Area) Note: Proposed Impervious Area + Proposed Pervious Area = Area to be Disturbed by the Project. This may be less than the Parcel Area . • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • DescriDtion of Existing Site Condition and Drainage Patterns Current Status of the Site (select all that apply): o Existing development ~ Previously graded but not built out D Agricultural or other non-impervious use D Vacant, undeveloped/natural Description/ Additional Information: Existing Land Cover Includes (select all that apply): ~ Vegetative Cover D Non-Vegetated Pervious Areas o Impervious Areas Description/ Additional Information: Underlying Soil belongs to Hydrologic Soil Group (select all that apply): ONRCS Type A D NRCS Type B D NRCS Type C ~NRCS Type D Approximate Depth to Groundwater (GW): D GW Depth < 5 feet o 5 feet < GW Depth < 1 0 feet o 1 0 feet < GW Depth < 20 feet ® GW Depth > 20 feet Existing Natural Hydrologic Features (select all that apply): o Watercourses □ Seeps D Springs □Wetlands IX None Description / Additional Information: • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • Description of Existing Site Topography and Drainage [How is storm water runoff conveyed from the site? At a minimum, this description should answer (1) whether existing drainage conveyance is natural or urban; (2) describe existing constructed storm water conveyance systems, if applicable; and (3) is runoff from offsite conveyed through the site? if so, describe]: The existing property is a 3.07 acre mass graded site that slopes in a northwesterly direction. Runoff from the site sheet flows to an existing storm drain that conveys the site runoff to the storm drain system within Faraday Avenue. No runoff from adjacent parcels is conveyed through the site . • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • Description of Proposed Site Development and Drainage Patterns Project Description / Proposed Land Use and/or Activities: The project is proposing a shell type industrial building with associated parking . List/describe proposed impervious features of the project (e.g ., buildings, roadways, parking lots, courtyards, athletic courts, other impervious features): The project proposes a 55,000 square foot industrial building with associated parking and drive aisles. Are courtyard type area is proposed along the east portion of the building . List/describe proposed pervious features of the project (e.g., landscape areas): The project proposes landscaping throughout the parking area and along the perimeter adjacent to Faraday Avenue and Van Allen Way. Does the project include grading and changes to site topography? !!Yes □No Description/ Additional Information: The project proposes site grading that will maintain the existing runoff pattern, i.e. sheet flow towards the northwest comer of the property . Does the project include changes to site drainage (e.g., installation of new storm water conveyance systems)? ~Yes □No Description/ Additional Information: An 18" storm drain will convey runoff from the proposed low point near the southwest comer of the property to the proposed biofiltration basin. Runoff from the loading dock area will be conveyed within a storm drain that will connect to the biofiltration basin. A modular wetland system will be installed near the northwest comer of the site that will connect to the existing 24" RCP draining to Faraday Avenue . • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • Identify whether any of the following features, activities, and/or pollutant source areas will be present (select all that apply): IX On-site storm drain inlets D Interior floor drains and elevator shaft sump pumps D Interior parking garages D Need for future indoor & structural pest control Kl Landscape/Outdoor Pesticide Use D Pools, spas, ponds, decorative fountains, and other water features o Food service rg Refuse areas IX Industrial processes ~ Outdoor storage of equipment or materials D Vehicle and Equipment Cleaning D Vehicle/Equipment Repair and Maintenance o Fuel Dispensing Areas (g Loading Docks ~ Fire Sprinkler Test Water E Miscellaneous Drain or Wash Water Ii Plazas, sidewalks, and parking lots • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • Identification of Receiving Water Pollutants of Concern Describe path of storm water from the project site to the Pacific Ocean (or bay, lagoon, lake or reservoir, as applicable): Runoff flows from the site to Agua Hedionda Creek, to Agua Hedionda Lagoon, to the Pacific Ocean . List any 303(d) impaired water bodies within the path of storm water from the project site to the Pacific Ocean (or bay, lagoon, lake or reservoir, as applicable), identify the pollutant(s)/stressor(s) causing impairment, and identify any TMDLs for the impaired water bodies: 303(d) Impaired Water Body Pollutant(s)/Stressor(s) TMDLs Agua Hedionda Creek Bacterial indicator, manganese, phosphorus, selenium, TDS, total nitrogen, and toxicity, enterococcus, tecaJ co11torm . Identification of Project Site Pollutants Identify pollutants anticipated from the project site based on all proposed use( s) of the site ( see BMP Design Manual Appendix 8.6): Also a Receiving Not Applicable to Anticipated from the Water Pollutant of Pollutant the Project Site Project Site Concern Sediment X Nutrients X X Heavy Metals X X OrQanic Compounds X X Trash & Debris X Oxygen Demanding X Substances Oil & Grease X Bacteria & Viruses X X Pesticides X X • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • Hydromodification Manaaement Requirements Do hydromodification management requirements apply (see Section 1.6 of the BMP Design Manual)? 00 Yes, hydromodification management flow control structural BMPs required . D No, the project will discharge runoff directly to existing underground storm drains discharging directly to water storage reservoirs, lakes, enclosed embayments, or the Pacific Ocean . □ No, the project will discharge runoff directly to conveyance channels whose bed and bank are concrete-lined all the way from the point of discharge to water storage reservoirs, lakes, enclosed embayments, or the Pacific Ocean. D No, the project will discharge runoff directly to an area identified as appropriate for an exemption by the WMAA for the watershed in which the project resides . Description / Additional Information (to be provided if a 'No' answer has been selected above): Critical Coarse Sediment Yield Areas* *This Section only required if hydromodification management requirements aDDIY Based on the maps provided within the WMAA, do potential critical coarse sediment yield areas exist within the project drainage boundaries? □Yes ~ No, No critical coarse sediment yield areas to be protected based on WMAA maps If yes, have any of the optional analyses presented in Section 6.2 of the BMP Design Manual been performed? □ 6.2.1 Verification of Geomorphic Landscape Units (GLUs) Onsite D 6.2.2 Downstream Systems Sensitivity to Coarse Sediment D 6.2.3 Optional Additional Analysis of Potential Critical Coarse Sediment Yield Areas Onsite □ No optional analyses performed, the project will avoid critical coarse sediment yield areas identified based on WMAA maps If optional analyses were performed, what is the final result? D No critical coarse sediment yield areas to be protected based on verification of GLUs onsite □ Critical coarse sediment yield areas exist but additional analysis has determined that protection is not required. Documentation attached in Attachment 8 of the SWQMP . D Critical coarse sediment yield areas exist and require protection. The project will implement management measures described in Sections 6.2.4 and 6.2.5 as applicable, and the areas are identified on the SWQMP Exhibit. Discussion / Additional Information: • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • Flow Control for Post-Project Runofr "This Section only required if hydromodificatlon management reauirements apply List and describe point(s) of compliance (POCs) for flow control for hydromodification management (see Section 6.3.1 ). For each POC, provide a POC identification name or number correlating to the project's HMP Exhibit and a receiving channel identification name or number correlating to the project's HMP Exhibit. The biofiltration basin has been to designed to meet the hydromodification flow requirements. POC-1 is located within the biofiltration basin near the northwest comer of the site. A 9'x9' tree well is located near the north driveway connection with Faraday A venue for water quality treament purposes. The hydromodification and 100 year detention within the biofiltration basin are sufficient to offset the tree well flows . Has a geomorphic assessment been performed for the receiving channel(s)? ~ No, the low flow threshold is 0.102 (default low flow threshold) D Yes, the result is the low flow threshold is 0.102 D Yes, the result is the low flow threshold is 0.302 D Yes, the result is the low flow threshold is 0.502 If a geomorphic assessment has been performed, provide title, date, and preparer: Discussion/ Additional Information: (optional) • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • Other Site Reauirements and Constraints When applicable, list other site requirements or constraints that will influence storm water management design, such as zoning requirements including setbacks and open space, or City codes governing minimum street width, sidewalk construction, allowable pavement types, and drainage requirements . Optional Additional Information or Continuation of Previous Sections As Needed This space provided for additional information or continuation of information from previous sections as needed . • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • Ccicyof Carlsbad Project Name: SMAC Shell Building Project ID: PUD 2011-ooos (DEV 2011-0169) DWG No. or Building Permit No.: STANDARD PROJECT REQUIREMENT CHECKLIST E-36 Project Information Source Control BMPs Development Services Land Development Engineering 1635 Faraday Avenue (760) 602-2750 www.carlsbadca.gov All development projects must implement source control BMPs SC-1 through SC-6 where applicable and feasible. See Chapter 4 and Appendix E.1 of the BMP Design Manual (Volume 5 of City Engineering Standards) for information to implement source control BMPs shown in this checklist. Answer each category below pursuant to the following. • "Yes" means the project will implement the source control BMP as described in Chapter 4 and/or Appendix E.1 of the Model BMP Design Manual. Discussion/justification is not required . • "No" means the BMP is applicable to the project but it is not feasible to implement. Discussion/justification must be provided. Please add attachments if more space is needed . • "N/A" means the BMP is not applicable at the project site because the project does not include the feature that is addressed by the BMP (e.g., the project has no outdoor materials storage areas). Discussion/justification may be provided . Source Control Requirement Applied? SC-1 Prevention of Illicit Discharges into the MS4 Iii Yes 0 No 0 N/A Discussion/justification if SC-1 not implemented: SC-2 Storm Drain Stenciling or Signage Iii Yes D No 0 N/A Discussion/justification if SC-2 not implemented: SC-3 Protect Outdoor Materials Storage Areas from Rainfall, Run-On, Runoff, and Wind □Yes 0 No Iii N/A Dispersal Discussion/justification if SC-3 not implemented: No outdoor material storage areas are proposed for this site . E-36 Page 1 of 4 Revised 09/16 • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • Source Control Requirement (continued) Applied? SC-4 Protect Materials Stored in Outdoor Work Areas from Rainfall, Run-On, Runoff, and □ Yes □ No Iii N/A Wind Dispersal Discussion/justification if SC-4 not implemented: No outdoor work areas are proposed . SC-5 Protect Trash Storage Areas from Rainfall, Run-On, Runoff, and Wind Dispersal Iii Yes □ No □ N/A Discussion/justification if SC-5 not implemented: SC-6 Additional BMPs based on Potential Sources of Runoff Pollutants must answer for each source listed below and identify additional BMPs. (See Table in Appendix E.1 of BMP Manual for guidance) . □ On-site storm drain inlets Iii Yes □ No □ N/A □ Interior floor drains and elevator shaft sump pumps □ Yes □ No Iii N/A □ Interior parking garages □ Yes □ No Iii N/A □ Need for future indoor & structural pest control □ Yes □No Iii N/A □ Landscape/Outdoor Pesticide Use Iii Yes □ No □ N/A □ Pools, spas, ponds, decorative fountains, and other water features □Yes □ No Iii N/A □ Food service □ Yes □ No Iii N/A □ Refuse areas Ill Yes □ No □ N/A □ Industrial processes Iii Yes □ No □ N/A □ Outdoor storage of equipment or materials Iii Yes □ No □ N/A □ Vehicle and Equipment Cleaning □ Yes □ No Iii N/A □ Vehicle/Equipment Repair and Maintenance □ Yes □ No Iii N/A □ Fuel Dispensing Areas □ Yes □ No Iii N/A □ Loading Docks li]Yes □ No □ N/A □ Fire Sprinkler Test Water Iii Yes □ No □ N/A □ Miscellaneous Drain or Wash Water Iii Yes □ No □ N/A □ Plazas, sidewalks, and oarkina lots Iii Yes □ No □ N/A For "Yes" answers, identify the additional BMP per Appendix E.1. Provide justification for "No" answers . All items marked "N/A" are features that are not a part of this project. E-36 Page 2 of 4 Revised 09/16 • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • Site Design BMPs All development projects must implement site design BMPs SD-1 through SD-8 where applicable and feasible. See Chapter 4 and Appendix E.2 thru E.6 of the BMP Design Manual (Volume 5 of City Engineering Standards) for information to implement site design BMPs shown in this checklist. Answer each category below pursuant to the following. • "Yes" means the project will implement the site design BMPs as described in Chapter 4 and/or Appendix E.2 thru E.6 of the Model BMP Design Manual. Discussion / justification is not required . • "No" means the BMPs is applicable to the project but it is not feasible to implement. Discussion/justification must be provided. Please add attachments if more space is needed . • "N/A" means the BMPs is not applicable at the project site because the project does not include the feature that is addressed by the BMPs (e.g., the project site has no existing natural areas to conserve). Discussion/justification may be provided . Site Design Requirement I Applied? SD-1 Maintain Natural DrainaQe Pathways and HydroloQic Features I D Yes I D No I Iii N/A Discussion/justification if SD-1 not implemented: No natural drainage pathways or hydrologic features existing on the site . SD-2 Conserve Natural Areas, Soils, and Vegetation I Iii Yes I D No ID N/A Discussion/justification if SD-2 not implemented: SD-3 Minimize Impervious Area I Iii Yes I D No ID N/A Discussion/justification if SD-3 not implemented: SD-4 Minimize Soil Compaction I Iii Yes I D No ID N/A Discussion/justification if SD-4 not implemented: SD-5 Impervious Area Dispersion I Iii Yes I D No ID N/A Discussion/justification if SD-5 not implemented: E-36 Page 3 of 4 Revised 09/16 • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • Site Dnian Reaulrement (continued) I Applied? SD-6 Runoff Collection I □Yes I D No I Iii N/A Discussion/justification if SD-6 not implemented: Utilizing Worksheet B.3-1 the project is categorized as a Category 5 project, which requires that "Applicant must implement lined retention BMPs" and capture and use techniques are not required . SD-7 Landscaping with Native or Drought Tolerant Species I Iii Yes I D No ID NIA Discussion/justification if SD-7 not implemented: SD-8 Harvestinq and Usinq Precipitation I D Yes I D No I Iii N/A Discussion/justification if SD-8 not implemented: Utilizing Worksheet B.3-1 the project is categorized as a Category 5 project, which requires that "Applicant must implement lined retention BMPs" and capture and use techniques are not required . E-36 Page 4 of 4 Revised 09/16 • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • SUMMARY OF PDP STRUCTURAL BMPS PDP Structural BMPs All PDPs must implement structural BMPs for storm water pollutant control (see Chapter 5 of the BMP Design Manual). Selection of PDP structural BMPs for storm water pollutant control must be based on the selection process described in Chapter 5. PDPs subject to hydromodification management requirements must also implement structural BMPs for flow control for hydromodification management (see Chapter 6 of the BMP Design Manual). Both storm water pollutant control and flow control for hydromodification management can be achieved within the same structural BMP(s) . PDP structural BMPs must be verified by the City at the completion of construction. This may include requiring the project owner or project owner's representative to certify construction of the structural BMPs (see Section 1.12 of the BMP Design Manual). PDP structural BMPs must be maintained into perpetuity, and the City must confirm the maintenance (see Section 7 of the BMP Design Manual) . Use this form to provide narrative description of the general strategy for structural BMP implementation at the project site in the box below. Then complete the PDP structural BMP summary information sheet for each structural BMP within the project ( copy the BMP summary information page as many times as needed to provide summary information for each individual structural BMP) . Describe the general strategy for structural BMP implementation at the site. This information must describe how the steps for selecting and designing storm water pollutant control BMPs presented in Section 5.1 of the BMP Design Manual were followed, and the results (type of BMPs selected). For projects requiring hydromodification flow control BMPs, indicate whether pollutant control and flow control BMPs are integrated together or separate . Self mitigating areas have been identify along the perimeter of the project and a de minimis area has been identified for the north project driveway . Harvesting and Re-Use. It was determined that Harvesting and Use of storm water is not feasible for this project. The City does not have a program for the use of storm water for toilet and urinal flushing, and re-use of irrigation run-off is not practical given the large volume of runoff from the site and the limited irrigation demand. Section B.3 of the City BMP Manual states that Worksheet B.3-1 should be utilized to "evaluate the feasibility of harvest and use, full retention, and partial retention BMPs ... " Utilizing Worksheet B.3-1 the project is categorized as a Category 5 project, which requires that "Applicant must implement lined retention BMPs" and capture and use techniques are not required . [Continue on next page as necessary.] • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • [Continued from previous page -This page is reserved for continuation of description of general strategy for structural BMP implementation at the site.] Infiltration feasibility (see Attachment I). Infiltration testing was performed by Geocon Corporation, inc. Infiltration rates were not sufficient to support infiltration type BMPs . Based on Worksheet B.3-1 and evaluation of site parameters biofiltration basins were chosen as the structural BMPs for this project for both water quality treatment and hydromodification . The biofiltration basin shows as two separate areas on the DMA exhibit and grading plans. However, the two areas will be connected at the rock layer by an 8 inch PVC pipe and at the surface elevation by three twelve inch (12") HDPE pipes that will be place beneath the driveway three inches (3") above the flow line of the biofiltration basin. The pipe connnections allow the two areas to function as a single biofiltration basin . • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • Structural BMP Summary Information [Copy this page as needed to provide information for each Individual proposed structural BMP] Structural BMP ID No . DWG 512-7A Sheet No. Type of structural BMP: D Retention by harvest and use (HU-1) □ Retention by infiltration basin (INF-1) D Retention by bioretention (INF-2) 4 D Retention by permeable pavement (INF-3) D Partial retention by biofiltration with partial retention (PR-1) N:Biofiltration (BF-1) D Flow-thru treatment control included as pre-treatment/forebay for an onsite retention or biofiltration BMP (provide BMP type/description and indicate which onsite retention or biofiltration BMP it serves in discussion section below) □ Detention pond or vault for hydromodification management D Other (describe in discussion section below) Purpose: D Pollutant control only D Hydromodification control only Ncombined pollutant control and hydromodification control □ Pre-treatment/forebay for another structural BMP □ Other (describe in discussion section below) Discussion (as needed): The biofiltration basin is located near the northwest corner of the site and runs west of the northern project driveway and north of the proposed shell building . The basin is divided by the north driveway but will function and shall be maintained as a single basin . Attachment 1f X IncludedTrash Capture Technical Report Addendum 1 - 4-18-25 • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • Attachment Seauence Attachment 1a Attachment 1 b Attachment 1 c Attachment 1d Attachment 1 e ATTACHMENT 1 BACKUP FOR PDP POLLUTANT CONTROL BMPS This is the cover sheet for Attachment 1 . Check which Items are Included behind this cover sheet: Contents DMA Exhibit (Required) See DMA Exhibit Checklist on the back of this Attachment cover sheet. (24"x36" Exhibit typically required) Tabular Summary of DMAs Showing DMA ID matching DMA Exhibit, DMA Area, and DMA Type (Required)* *Provide table in this Attachment OR on DMA Exhibit in Attachment 1 a Checklist }[Included ]{Included on DMA Exhibit in Attachment 1a □ Included as Attachment 1 b, separate from DMA Exhibit Form 1 .. 7, Harvest and Use Feasibility 1Q. Included Screening Checklist (Required unless □ Not included because the entire the entire project will use infiltration project will use infiltration BMPs BMPs) Refer to Appendix B.3-1 of the BMP Design Manual to complete Form 1-7 . Form 1-8, Categorization of Infiltration Feasibility Condition (Required unless the project will use harvest and use BMPs) Refer to Appendices C and D of the BMP Design Manual to complete Form 1-8 . :».included □ Not included because the entire project will use harvest and use BMPs Pollutant Control BMP Design J{lncluded Worksheets / Calculations (Required) Refer to Appendices B and E of the BMP Design Manual for structural pollutant control BMP design guidelines • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • Use this checklist to ensure the required information has been included on the OMA Exhibit: The OMA Exhibit must identify: o Underlying hydrologic soil group D Approximate depth to groundwater D Existing natural hydrologic features (watercourses, seeps, springs, wetlands) D Critical coarse sediment yield areas to be protected (if present) D Existing topography and impervious areas D Existing and proposed site drainage network and connections to drainage offsite D Proposed grading D Proposed impervious features o Proposed design features and surface treatments used to minimize imperviousness D Drainage management area (OMA) boundaries, OMA ID numbers, and OMA areas (square footage or acreage), and OMA type (i.e., drains to BMP, self-retaining, or self-mitigating) D Structural BMPs (identify location and type of BMP) • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • "'---, I If: OMA AREA TABLE I. D . AREA(SFJ COMMENTS PARKING/DRIVE AISLE 29,964 DRIVE AISLE I, 559 DRAINS TO TREE WELL HARDSCAPEfCONCJ 3,444 ROOF 59, 282 94,249 DRIVEWAY (OFF-SITEJ I. I 9 I POROUS CONCRETE LANDSCAPE 28.526 SELF Ml T. (EXIST. J 13,373 ... DE MIN/MUS AREA VARIES BIOFILTRAT/ON• 3,548 • THE BIOFILTRATION BASIN IS SEPARATED INTO TWO AREAS CONNECTED BY 3-12' HOPE PIPES, 3' ABOVE FLOW LINE AND AN 6' PVC PIPE AT THE ROCK LAYER ELEVATION THAT ALLOW THE TWO AREAS TO FUNCTION AS A SINGLE BIOFILTRATION BASIN . EXISTING SITE CONDTTIONS UNDEVELOPED MASS GRADED PAD SOIL GROUP SOIL TYPED GROUND WATER NO GROUND WATER OBSERVED AT 15' DEPTH . CRITICAL COARSE SEDIMENT NO ''STEEP SLOPE LANDS" EXIST ON-SITE. SITE DOES NOT REC/EVE ANY RUN-ON FLOW. ~ OMA EXHIBIT SMAC ~@~y[}={] 1" = 60' APN 212-120-01 SHEET10F2 AUGUST 8, 2018 1:\9513\DMA EXHIBIT • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • SELF -MmGA TING AREAS: -VEGETATION IN THE NATURAL OR LANDSCAPED AREA IS NATIVE AND/OR NON-NATIVE/NON-INVASIVE DROUGHT TOLERANT SPECIES THAT DO NOT REQUIRE REGULAR APPLICATION OF FERTILIZERS AND PEST/SIDES . -SOILS ARE UNDISTURBED NATIVE TOPSOIL, OR DISTURBED SOILS THAT HAVE BEEN AMENDED PER SD-F -THE INCIDENTAL IMPERVIOUS AREAS ARE LESS THAN 5 PERCENT OF THE SELF-MIT/GATING AREA. -IMPERVIOUS AREA WITHIN THE SELF-MITIGATED AREA SHOULD NOT BE HYDRAULICALLY CONNECTED TO OTHER IMPERVIOUS AREAS UNLESS IT IS A STORM WATER CONVEYANCE SYSTEM !SUCH AS A BROW DITCH) . -THE SELF-MITIGATING AREA IS HYDRAULICALLY SEPARATE FROM DMAs THAT CONTAIN PERMANENT STORM WATER POLLUTANT CONTROL BMPs . 6" CURB PER SDRSD G-1 PERVIOUS CONCRETE (3,000 PSI). 15-25% VOIDS CLASS 4 AB (3/4") 30% VOIDS COMPACTED TO 95% 6" PERFORATED PVC PIPE PLACE PERFORATIONS DOWN L_-+,J;;;~;::;;;.:;:;...~,:;:;~;g_-1 .. ROCK BELOW PIPE. 30 MIL STEGO BRAND STABILIZED SUBGRADE TYPE WATER STOP LINER COMPACTED TO 95% OF OR EQUIVALENT. FABRIC THE MODIFIED PROCTOR TO BE WRAPPED ON /, , /,, MAXIMUM DRY DENSITY PER BOTTOM AND SIDES OF AASHTO T-180 CLASS 4 AB LA YER MIN. LBR 40 POROUS CONCRETE SECTION scale: NT S .."aaicwiia■ ------........-..----- CD SOIL FILTER MIX 50%SAND SURFACE PLANTING SEE LANDSCAPE PLANS 20% COMPOSTED LEAVES 30% TOPSOIL 5 MIN/IN MINIMUM PERCOLATION RATE. ® 3"SAND 3" PEA GRAVEL 15" 3/4" WASHED GRAVEL WOVEN MONOFILAMENT POLYPROPYLENE GEOTEXTILE WITH A FLOW RATE GREATER THAN 100 GPM/SF (ASTM D4491) 6" SCH 40 PVC PERF.PIPE WIDTH PER PLAN t 30 MIL. STEGO BRAND TYPE WATER STOP LINER OR EQUIVALENT BIOFILTRATION BASIN SECTION (ADJACENT DRIVEWAY) sca!e N T.S CD SOIL FILTER MIX 50% SAND 20% COMPOSTED LEAVES 30% TOPSOIL 5 IN/MIN. MINIMUM PERCOLATION RATE. ® 3"SAND 3" PEA GRAVEL 15" 3/4" WASHED GRAVEL SURFACE PLANTING SEE LANDSCAPE PLANS WOVEN MONOFILAMENT P GEOTEXTILE WITH A FLOW RATE GREATER THAN 100 GPM/SF (ASTM D4491) 6"SCH 40 PVC PERF. PIPE WIDTH --.i PER PLAN BUILDING FF=245.77 =-y c'!llt---;,--=:::!._.;;z:___RET. WALL 30MIL (PER STRUCTURAL PLANS) MOISTURE BARRIER PER GEOTECHNICAL SPECIFICATIO'IJS STEGO BRAND TYPE WATER STOP LINER OR EQUIVALENT BIOFIL TRA TION BASIN SECTION (ADJACENT BUILDING) scale NT S OMA EXHIBIT SMAC APN 212-120-01 SHEET 2 OF 2 August 10, 2018 l:\9513\DMA EXHIBIT • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • Category # - 2 3 Stan<lar<l Ill Drainage Basin Inputs -6 7 8 9 ---Ill . • ' . • . ' .. Description Drainage Basin ID or Name Basin Drains to the Following BMP Type 85th Percentile 24-hr Storm Depth Design Infiltration Rate Recommended by Geotechnical Engineer lmpe,vious Surfaces Not Directed to Dispersion Area (C=0.90) Semi-Pervious Surfaces Not Serring as Dispersion Area (C=0.30) Engineered Pervious Surfaces Not Serving as Dispersion Area (C=0.10) Natural Type A Soil Not Serving as Dispersion Area (C=0.10) Natural Type B Soil Noc Serving as Dispersion Area (C=0.14) Natural Type C Soil Noc Serring as Dispersion Area (C=0.23) Natural Type D Soil Noc Serving as Dispersion Arca (C=0.30) Does Tributary Incorporate Dispersion, Tree Wells, and/ or Rain Barrels? Impervious Surfaces Directed to Dispersion Area per SD-13 (Ci=0.90) Semi-Pervious Surfaces Serving as Dispersion Area per SD-B (Ci=0.30) Ill Engineered Pervious Surfaces Serving as Dispersion Area per SD-B (Ci=0.10) Dispersion Ill An·a, Tree Well - & Rain Barrel 11111111:a Inputs (Optional) Ill -11D llfDI El Bl Treatment El Train Inputs & m Calculations lfll IIEil El Initial Runoff El Factor - Calculation IIJI 1111 El IIDI Dispersion m Arca Adjustments ■ El Tree & Barrel IIIEll Adjustments IIDI Rcsuhs 1111 m m 11111 Worksheet B.1-1 General Notes; Natural Type A Soil Serving as Dispersion Area per SD-B (Ci=0.10) Natural Type B Soil Serving as Dispersion Area per SD-13 (Ci=0.14) Natural Type C Soil Serving as Dispersion Area per SD-B (Ci=0.23) atural Type D Soil Serving as Dispersion Area per SD-B (Ci=0.30) umber of Tree Wells Proposed per SD-A Average Mature Tree Canopy Diameter Number of Rain Barrels Proposed per SD-E Average Rain Barrel Size Does BM"P Overflow to Stormwater Features in Downstream Drainage? Identify Downstream Drainage Basin Providing Treatment in Series Percent of Upstream Flows Directed to Downstream Dispersion Areas Upstream Impervious Surfaces Directed to Dispersion Area (Ci=0. 90) Upstream Impervious Surfaces Not Directed to Dispersion Area (C=0.90) Total Tributary Area lrtitial Runoff Factor for Standard Drainage Areas Initial Runoff Factor for Dispersed & Dispersion Areas Initial Weighted Runoff Factor Initial Desii,,n Capture Volume Total l mpervious Area Dispersed to Pervious Surface Total Pervious Dispersion Area Ratio of Dispersed Impervious Arca to Pervious Dispersion Area AdjustmL'flt Factor for Dispersed & Dispersion Areas Runoff Factor After Dispersion Techrtiques Design Capture Volume After Dispersion Techrtiques Total Tree Well Volume Reduction Total Rain Barrel Volume Reduction Final Adjusted Runoff Factor Final Effective Tributary Area Initial Design Capture Volume Retained by Site Design Elements Final Design Capnire Volume Tributary to BMP /ff Units IIIIDlilllll Bio filtration Retention unitless 0.62 0.62 inches 0.000 0.000 in/hr 94,249 1,559 sq-ft sq-ft sq-ft sq-ft sq-ft sq-ft 28,526 0 sq-ft No Yes yes/no sq-ft sq-ft sq-ft sq-ft sq-ft sq-ft sq-ft # 1'.3 ft # gal No 0 unitless unitless percent 0 0 cubic-feet 0 0 cubic-feet 122,775 1,559 sq-ft 0.76 0.90 unitless 0.00 0.00 urtitless 0.76 0.90 unitless 4,821 72 cubic-feet 0 0 sq-ft 0 0 sq-ft n/a n/a ratio 1.00 1.00 ratio 0.76 0.90 urtitless 4,821 72 cubic-feet 0 76 cubic-feet 0 0 cubic-feet 0.76 0.00 unitless 93,309 0 sq-ft 0 76 cubic-feet 4,821 0 cubic-feet n. t\ppucancs may use uus worKsneer to crucware aestgn capture vommes ror up to I u aratnage areas user input musr oe prov1aea ror yeuow snaaea ceus, values for all other cells will be automatically generated, errors/notifications will be highlighted in red and summarized below. Upon completion of this wnf'"k .. h,·rt nrnrN•rl tn th,• -,nn ,ntH'1-;1tf' "RMP S1-,1oo-wnrlr-.hrPtf~\ • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • Automated Worksheet B.3-1: Pro·ect-Scale BMP Feasibili Category Capture & Use Inputs Infiltration Inputs # l!I 2 3 4 5 6 7 8 9 Ill -lfl Calculations Ill ----Result Ill Worksheet B.3-1 General Notes: Description Design Capture Volume for Entire Project Site Proposed Development Type umber of Residents or Employees at 11roposed Development Total Planted Area within Development Water Use Category for Proposed Planted Areas Ts Average Site Design Infiltration Rate :50.500 laches per Hour? fa Average Site Design Infiltration Rate :50.010 Inches per Hour? ls Infiltration of the Full DCV Anticipated to Produce Negative Impacts? Ts Infiltration of Any Volume Anticipated to Produce egative Impacts? 36-1 lour Toilet Use Per Resident or Employee Subtotal: Anticipated 36 I Iour Toilet Use Anticipated 1 Acre Landscape Use Over 36 Hours Subtotal: Anticipated Landscap Use Over 36 I Tours Total Anticipated Use Over 36 Hours Total Anticipated Use/ Design Capture Volume Are Full Capture and Use Techniques Feasible for this Project? Is Full Retention Feasible for this Project? Is Partial Retention Feasible for this Project? Feasibility Category Value Units ': Industrial unitless 30 # 41,899 sq-ft Moderate unitless cs yes/no Yes yes/no 0 yes/no No yes/no 1.10 cubic-feet 33 cubic-feet 196.52 cubic-feet 189 cubic-feet 222 cubic-feet 0.05 cubic-feet No unitless 0 yes/no yes/no 5 1,2,3,4,5 A. Applicants may use this worksheet to determine the types of structural BMPs that are acceptable for implementation at their project site (as required in Section 5 of the BMPDM). User input should be provided for yellow shaded cells, values for all other cells will be automatically generated. Projects demonstrating feasibility or potential feasibility via this worksheet are encouraged to incorporate capture and use features in tl1eir project. B. Negative impacts associated with retention may include geotcchnical, groundwater, water balance, or other issues identified by a geotechnical engineer and substantiated through completion of Form 1-8 . C. Feasibility Category 1: Applicant must implement capture & use, retention, and/or infiltration elements for the entire DCV . D. Feasibility Category 2: Applicant must implement capture & use elements for the entire DCV. E. Feasibility Category 3: Applicant must implement retention and/or infiltration clements for all DMAs with Design Infiltration Rates greater than 0.50 in/hr . r . Feasibility Category 4: Applicant must implement standard unlined biofiltration BMPs sized at ~3% of the effective impervious tributary area for all DMAs with Design Infiltration Rates of 0.011 to 0.50 in/hr. Applicants may be permitted to implement lined BMPs, reduced size BMPs, and / or specialized biofiltration BMPs provided additional criteria identified in "Supplemental Retention Criteria for on-Standard Bio filtration BMPs" are satisfied . G. Feasibility Category 5: Applicant must implement standard !incl biofiltration BMl's s.ized at ~3% of the effective impervious tributary area for all DMAs with Design Infiltration Rates of 0.010 in/hr or less. Applicants may also be permitted to implement reduced size and/ or specialized biofiltration BM11s provided additional criteria identified in "Supplemental Retention Criteria for on-Standard Biofiltration BMPs" are satisfied. IL PDPs participating in an offsite altemative compliance program arc not held to the feasibility categories presented herein . • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • I I , • I I •• t • I • I I I I • I I I , I I Category # Description Units -Drainage Basin ID or Name ---· 1 -Design Infiltration Rate Recommended by Geotechnical Engineer -2 Effective Tributary Area 93,30 sq-ft 3 Minimum Biofiltration Footprint Sizing Factor 0.030 ratio 4 Design Capture Volume Tributary to BMP 4,821 cubic-feet BMP Inputs 5 ls Biofiltration Basin Impermeably Lined or Unlined? Lined unitless 6 Provided Biofiltration BMP Surface Area 3,548 sq-ft 7 Provided Surface Ponding Depth 6 inches 8 Provided Soil Media Thickness 1 inches 9 Provided Depth of Gravel Above Underdr • nv t 18 ·nches El Diameter of Underdrain or Hydromod Orifice (Select Smallest) 2.25 inches -Provided Depth of Gravel Below the Underdrain 3 inches -Volume Infiltrated Over 6 Hour Storm 0 cubic-feet -Soil Media Pore Space Available for Retention 0.05 unitless Ill Gravel Pore Space Available for Retention 0.00 unitless -Effective Retention Depth 0.90 inches Retention -Calculated Retention Storage Drawdown (Including 6 Hr Storm) 120 hours Calculations -Volume Retained by BMP 266 cubic-feet Ill Fraction ofDCV Retained 0.06 ratio -Portion of Retention Performance Standard Satisfied 0.07 ratio El Fraction ofDCV Retained (normalized to 36-hr drawdown) 0.03 ratio -Design Capture Volume Remaining for Bio tr 0 4,676 cubic-feet El Max Hydromod Flow Rate through Underdr 0.2454 CFS El Max Soil Filtration Rate Allowed by Underdrain Orifice 2.99 in/hr -Soil Media Filtration Rate per Specifications 5.00 in/hr 11&1 Soil Media Filtration Rate to be used for Sizing 2.99 in/hr El Depth Biofiltered Over 6 Hour Storm 17.93 inches -Soil Media Pore Space Available for Biofiltration 0.20 unitless Effective Depth of Bio filtration Storage 16.80 inches Drawdown Time for Surface Ponding 2 hours Drawdown Time for Effective Biofiltration Depth 6 hours Biofiltration IEII Calculations El --Total Depth Biofiltered 34.73 inches El Option 1 -Biofilter 1.50 DCV: Target Volume 7,014 cubic-feet 1111 Option 1 -Provided Biofiltration Volume 7,014 cubic-feet -Option 2 -Store 0.75 DCV: Target Volume 3,507 cubic-feet El Option 2 -Provided Storage Volume 3,507 cubic-feet -Portion of Bio filtration Performance Standard Satisfied 1.00 ratio -Do Site Design Elements and BMPs Satisfy Annual Retention Requirements? Yes yes/no Overall Portion of Perfonnance Standard Satisfied 1.00 ratio This BMP Overflows to the Fol.lowing Drainage Basin unit.less Result El --Deficit of Effectively Treated Stormwater 0 cubic-feet Worksheet B.5-1 General Notes: A. Applicants may use this worksheet to size Lined or Unlined Biofilt.ration BivIPs (BF-1, PR-1) for up to 10 basins. User input must be provided for yellow shaded cells, values for blue cells are automatically populated based on user inputs from previous worksheets, values for all other cells will be automatically generated, errors/notifications will be highlighted in red/orange and summarized below. BMPs fully I r , • TECHNICAL REPORT Hydraulic Design of Screen for Trash Capture in Basin FARADAY INDUSTRIAL / VAN ALLEN WAY 5801 Van Allen Way Carlsbad, CA 92008 Prepared For: KARN Engineering and Surveying, Inc. December 20, 2024. Revised: April 28, 2025 Prepared by: Luis Parra, PhD, CPSWQ, ToR, D.WRE. R.C.E. 66377 REC Consultants 2970 Fifth Avenue, Suite 340 San Diego, CA 92103 Telephone: (619) 232-9200 REC Consultants, Inc. 1 HYDRAULIC DESIGN OF A SCREEN FOR TRASH CAPTURE IN UPSTREAM END OF BIOFILTRATION BASIN FOR 5801 VAN ALLEN WAY, CARLSBAD, CA, 92008 Date: 12/20/2024 Revised: 4/28/2025 1. ANTECEDENTS The purpose of this analysis is to design a trash capture device just downstream of the inlet pipes discharging into the biofiltration basin for the Faraday Industrial / Van Allen Way project on 5801 Van Allen Way, Carlsbad, CA. Screen Trash Capture (STC) devices are designed upstream of the outlet structure because by adding a trash screen at the outlet of the basin the discharge behavior of the basin is affected and the basin was carefully calibrated for water quality and hydromodification compliance. Also, trash capture devices might impact negatively flood control conditions and safety factors when placed adjacent to the outlet structure of basins. An important note for the design is that the trash capture device designed in this report will more than satisfy trash capture requirements, as the new grading is less than 10,000 ft2 (not even a PDP) but the system designed traps the trash for an area over 124,000 sq-ft (2.875 acres). 2. DRAINAGE AREAS AND PEAK FLOWS Figure 1 shows the location of the Screen Trash Capture (STC) device, while Table 1 shows the main characteristics of the contributing area to obtain the trash capture flow. The intensity of design is equivalent to the NOAA 14 1-hour, 1-year intensity (0.421 in/hr at the project site). The C coefficient and contributing area were obtained from REC Drainage Report analysis (reference [1]). The Qtrash is simply obtained with the Rational Method as Q = C·I·A. In regards to the 100 year peak flow, the value obtained from the drainage report [1] is shown in Table 1 below. Table 1. Peak Flows Area (ac) C Coefficient I (in/hr) Qtrash (cfs) Q100 (cfs)(1) 2.857 0.9 0.421 1.083 14.614 Notes: (1): Q100 peak flow obtained from [1] 100-Yr Routing Analysis for Faraday Industrial The STC device must be able to (a) allow the flow Qtrash to pass through without any by-pass, and (b) allow the safe passage of Q100 without impacting flooding conditions upstream. A detailed methodologic approach will be explained in the next section. REC Consultants, Inc. FARADAY INDUSTRIAL / VAN ALLEN WAY, HMP AND 100 YEAR DETENTION FACILITY Screen for Tash Capture. December 20, 2024, revised April 28, 2025 2 TRASH CAPTURE SCREEN FIGURE 1. Location of Screen Trash Capture Device FARADAY INDUSTRIAL / VAN ALLEN WAY, HMP AND 100 YEAR DETENTION FACILITY Screen for Tash Capture. December 20, 2024, revised April 28, 2025 3 3. HYDRAULIC DESIGN OF TRASH SCREEN IN BIOFILTRATION BASIN Based on reference [2] submitted and approved by the State Water Board, and taking into account hydraulic equations related to weir and orifice equations (reference [3], among many others), the following is the detailed methodology for trash screen design in the biofiltration basin. Figure 2: Hydraulic Design of Trash Screen ∆Hscreen, 100 Scenario 2 ∆Hscreen, 100 Qweir Scenario 1 Htotal, 100 QweirQorif2 H100,p H100,p Qorif1 ∆Hscreen, 1QorifHscreen = 1 ft Htotal, 1 Q1 Q100 Peak flow with associated elevation (scenario 1) Q100 Peak elevation with associated flow (scenario 2) Qtrash * Note: Q100 for scenario 2 has a higher downstream elevation than screen height, therefore has an additional orifice flow above the trash screen but below the WSE. Hydraulic Design of Trash Screen H1,p Vertical Trash Screen REC Consultants, Inc. +- j7j r /I VI I /1 r/~.-------- :1/. ----=:;::::,-==~--~- / I I /I 1//1 r /I FARADAY INDUSTRIAL / VAN ALLEN WAY, HMP AND 100 YEAR DETENTION FACILITY Screen for Tash Capture. December 20, 2024, revised April 28, 2025 4 3.1 Downstream Requirements: Scenarios In reference to Figure 2, the trash capture device must be designed in accordance to three different cases. First, the device must be able to allow the Qtrash to pass through without any by-pass. Qtrash is shown in cyan in Figure 2. Second, the device must allow safe passage of the peak Q100 flow with associated elevation (maximum peak during routing with corresponding elevation) while maintaining a free board in the basin. This is referenced as Q100 Scenario 1 in Figure 2 and is represented by dark blue. The final scenario is referred to as Q100 Scenario 2 and analyzes the condition of the peak Q100 elevation with its associated flowrate (maximum elevation during routing with corresponding peak). Q100 Scenario 2 is represented by green in Figure 2. Note that in Q100 Scenario 2 the downstream elevation is higher than that of the top of screen. Therefore, Q100 Scenario 2 has an additional orifice flow above the screen but below the water surface elevation. The reader should be aware that the maximum inlet peak flow and the maximum elevation in the pond are not simultaneous because the outflow peak = maximum elevation occurs after the inflow peak. 3.2 Screen Design for Trash Flow Once Qtrash is known, the height of the screen Hscreen and its length Lscreen must be provided. REC selected a screen with a length of 16 ft and a height of 1ft. The energy loss through the screen, ∆Hscreen is then calculated with the orifice equation, under the following assumptions: the screen opening is typically 44% of the total area, and the clogging factor is typically 50%, meaning that only 22% of the entire Ascreen (Lscreen x Hscreen) is available for flow. Those screen and clogging assumptions were taken directly from [2]. In addition, the discharge coefficient of the screen CD,screen was experimentally determined from [2] and conservatively assumed as 0.53. This is the value we will use in equation (3.2). 𝐴௦௖௥௘௘௡ =𝑄௧௥௔ ൫0.22 · 𝐶஽,௦௖௥௘௘௡൯ඥ2𝑔 · ∆𝐻௦௖௥௘௘௡ (3.2) For the 1 year – 1 hour intensity, adding the ∆Hscreen,1 to the water surface elevation, H1,p , retrieved from the drainage report associated with a flowrate equivalent to the Qtrash allow us to obtain the required upstream level of ponding Htotal,1, which must be lower than the screen height. The reader should be aware that the screen designed with this methodology will have enough hydraulic capacity to treat Qtrash with the intrinsic assumptions associated with the design (44% opening area, 50% clogged area). For Qtrash, there will be no over-flow over the screen, as it is assumed that the screen will be properly maintained and will be never be clogged in excess of 50%. REC Consultants, Inc. FARADAY INDUSTRIAL / VAN ALLEN WAY, HMP AND 100 YEAR DETENTION FACILITY Screen for Tash Capture. December 20, 2024, revised April 28, 2025 5 Table 2 shows the trash screen to be designed in this report, while Figure 3 shows a schematic plan view of the design. Figure 3: Trash Screen Dimensions TRASH SCREEN DESIGN L=16 ft H=1 ft RIP RAP 8" pipe 18" pipe 239 238 238.5 REC Consultants, Inc. FARADAY INDUSTRIAL / VAN ALLEN WAY, HMP AND 100 YEAR DETENTION FACILITY Screen for Tash Capture. December 20, 2024, revised April 28, 2025 6 Table 2. Design for Trash Flow Conditions Qtrash (cfs) Htotal, 1 (1) (ft) H1,P (2) (ft) ∆Hscreen, 1 (3) (ft) Ascreen (required) (ft2) Ascreen (Provided) (ft2) Lscreen (ft) Hscreen (ft) 1.083 0.256 0.176 0.080 4.09 16 16 1 Notes: (1): Htotal, 1 = The peak depth upstream of the screen during the 1-year storm event. (2): H1,P = The peak depth downstream of the screen during the 1-year storm event. (3): ∆Hscreen, 1 = Energy loss through the screen (Htotal, 1 -H1,P = ∆Hscreen, 1) 3.3 Review of the Screen Design for Extreme Event: Overflow Design Typically, the 100-year flood event should be able to flow through the trash screen safely while maintaining a free board in the basin, and should be able to not create flooding conditions upstream, by significantly obstructing the flow and creating ponding levels above grade. The required upstream level of ponding was designed lower than Hscreen for Qtrash, so it not requires further calculation for the design trash flow. However, the required upstream level of ponding Htotal,100 is larger than Hscreen when the peak flow is Q100. Therefore, a detailed discharge equation is needed. When the downstream water level H100,p is larger than Hscreen, the discharge of Q100 is accomplished thru three (3) portions: discharge thru the screen, discharge above the screen via orifice equation associated with the orifice area: Height (above screen but below H100,p) x length of screen, and weir discharge via surface difference of elevation ∆Hscreen, 100. The resulting discharge equation is then: 𝑄ଵ଴଴ = ቀ൫0.61𝐻ଵ଴଴,௣ − (0.53 · 0.22 − 0.61)𝐻௦௖௥௘௘௡൯𝐿௣௥௢௩௜ௗ௘ௗቁ ඥ2𝑔 · ∆𝐻௦௖௥௘௘௡,ଵ଴଴ + 3.1 · 𝐿௣௥௢௩௜ௗ௘ௗ(∆𝐻௦௖௥௘௘௡)ଷ/ଶ (valid only if H100,p ≥ Hscreen) (3.3.1) If the downstream elevation, H100,p , during the occurrence of Q100 is less than Hscreen then the orifice equation through the screen plus the weir equation above the screen will be sufficient to describe the discharge of the extreme event. This second scenario does not occur in any of the conditions designed in this report. 𝑄ଵ଴଴ = 0.22 · 0.53 · 𝐻௦௖௥௘௘௡ · 𝐿௣௥௢௩௜ௗ௘ௗඥ2𝑔 · ∆𝐻௦௖௥௘௘௡ + 3.1 · 𝐿௣௥௢௩௜ௗ௘ௗ൫𝐻௧௢௧௔௟,ଵ଴଴ − 𝐻௦௖௥௘௘௡൯ଷ/ଶ (valid only if H100,p < Hscreen) (3.3.2) Finally, the final confirmation is related with the Free-board (FB). FB must be larger than 0, and it is equal to the crest of the basin which is at an elevation of 1.5 ft minus the height of the upstream level of ponding Htotal,100. FB = 1.5 – Htotal,100. From Table 3, FB > 0.25 for the two worst case scenarios analyzed while discharging Q100. Tables 3 and 4 show the results of the designs related to the two scenarios for Q100. REC Consultants, Inc. FARADAY INDUSTRIAL / VAN ALLEN WAY, HMP AND 100 YEAR DETENTION FACILITY Screen for Tash Capture. December 20, 2024, revised April 28, 2025 7 Table 3. Design Review for Q100 Flow Conditions (Peak Q100 Inflow and Associated Elev.) Q100 (cfs) Ascreen (Provided) (ft2) Lscreen (ft) Hscreen (ft) ∆Hscreen, 1 (3) (ft) H100,P (2) (ft) Htotal, 100 (1) (ft) FB (ft) 14.614 16 16 1 0.322 0.926 1.248 0.252 Notes: 1: Htotal, 100 = The peak depth upstream of the screen during the 100-year storm event. 2: H100,P = The peak depth downstream of the screen during the 100-year storm event. 3: ∆Hscreen, 100 = Energy loss through the screen during the 100-year storm event. (Htotal, 100 -H100,P = ∆Hscreen, 100) Table 4. Design Review for Q100 Flow Conditions (Peak Q100 Elev. and Associated Inflow) Q100 (cfs) Ascreen (Provided) (ft2) Lscreen (ft) Hscreen (ft) ∆Hscreen, 1 (3) (ft) H100,P (2) (ft) Htotal, 100 (1) (ft) FB (ft) 5.420 16 16 1 0.026 1.223 1.249 0.251 Notes: 1: Htotal, 100 = The peak depth upstream of the screen during the 100-year storm event. 2: H100,P = The peak depth downstream of the screen during the 100-year storm event. 3: ∆Hscreen, 100 = Energy loss through the screen during the 100-year storm event. (Htotal, 100 -H100,P = ∆Hscreen, 100) 3.4 Summary of Design Dimensions related to the Screen Table 5 summarizes the dimensions for Hscreen (screen height) and Lprovided (total plan-view length of the screen provided). TABLE 5. Design Dimensions for STC STC ID Hscreen (ft) Lprovided (ft) 1 1.0 16.0 4. TRASH RELATED DESIGN WHERE THE SCREEN WILL BE PLACED 4.1 Estimate of Trash Generation (gallon/acre/yr) Without specific measurements there is no accurate manner to determine the expected trash generating capacity of the upstream areas of the Faraday industrial / 5801 Van Allen Way Project (gallons of trash/acre/year). However, there are many factors in terms of land use that lead REC to use a conservative value:  The Faraday Industrial / 5801 Van Allen Way project is located in an area considered to have a moderate baseline trash score.  The project’s land use is considered as Commercial – Not Retail. REC Consultants, Inc. I I I I I I I I I I I I I FARADAY INDUSTRIAL / VAN ALLEN WAY, HMP AND 100 YEAR DETENTION FACILITY Screen for Tash Capture. December 20, 2024, revised April 28, 2025 8 REC decided to use a local Oceanside study (reference [5]) but not to use downtown values included there, but rather commercial – non retail values. Per Oceanside [5], we should expect about 6.2 gallon/acre/year (commercial, not retail). Per trash hot-spot map [4], the project site isn’t located within a “Hot-Spot”. Therefore, REC decided to use the value of 6.2 gallon/acre/year of trash obtained from the standard Oceanside Reference. 4.2 Calculation of Trash Volume Arriving at Basin REC knows the approximate area A (acres) contributing to the basin where the trash capture devices will be incorporated. The following are the list of assumptions for calculation:  Trash porosity n = 0.4: the volume of trash must be increased to account for lack of compaction  Trash Generation constant of TG = 6.2 gallon/acre/year  Frequency of Trash Removal (FTR) of approximately 2 times a year: once before the wet season of Nov – April (highest rain typically December, January, and February), and once after the wet season. The expected volume of trash (Vtrash, ft3), accumulated in between cleaning operations can be obtained with the following equation: 𝑉௧௥௔௦௛ =𝐴 · 𝑇𝐺 7.48 · 𝐹𝑇𝑅(1 − ƞ) (4.2.1) The available volume for trash capture is the area in between the 238.5 contour and the trash screen, Asc,plan, (see Figure 3) multiplied by the height of the trash screen: 𝑉௔௩௔௜௟௔௕௟௘ = 𝐴௦௖,௣௟௔௡ ∗ 𝐻௦௖௥௘௘௡ (4.2.2) Table 6 shows the expected volume with the recommended trash removal frequency of 2 per year along with the available volume with the proposed trash screen. TABLE 6. Trash Volume at Trash Screen Frequency of Trash Removal (FTR) Vtrash (ft3) Asc,plan (ft2) Hscreen (ft) Vavailable (ft3) 2 / year 1.973 130.43 1 130.43 5. SUMMARY REC Consultants, Inc. FARADAY INDUSTRIAL / VAN ALLEN WAY, HMP AND 100 YEAR DETENTION FACILITY Screen for Tash Capture. December 20, 2024, revised April 28, 2025 9 The trash screen will be a 16’ long – 12” tall screen in the biofiltration basin, just downstream of the storm drains outlet into the basin. This screen will control the trash of the entire 2.857 acre site (much more than required by the non-PDP re-grading project, where the contributing area is less than 10,000 sq-ft). The trash can must be placed against the slope and in such a way that the water out of the pipes cannot reach the outlet of the basin without first going thru the trash screen. The screen will be subject to trash cleaning as follows:  One time prior to the rainy season: October or November  One time after the end of the rainy season: March to April 6. TYPICAL SCREEN MODELS Appendix 1 shows an approved example of a screen. No specific manufacturer is recommended, as long as the screen to be installed is listed among the State Water Board approved list for trash screens, but with the dimensions designed in this report (and not with the dimensions recommended by the manufacturer). 7. REFERENCES [1] Hydrology Report: 100-Year Routing Analysis for Faraday Industrial, City of Carlsbad. REC Consultants, Inc. Revised: Aug. 28, 2018. [2] Technical Report: Connector Pipe Screen Design. Full Capture TMDL Compliance Screen and By- Pass Sizing Requirements. County of Los Angeles Dpt. Of Public Works. April, 2007. [3] French, Richard: Open Channel Hydraulics. McGraw Hill, 1985. [4] Trash Free Carlsbad: https://storymaps.arcgis.com/stories/829857179b3843bfac18382f4a8edf65 [5] DMAX Engineering Inc.: City of Oceanside: Compliance Track Evaluation for The Statewide Trash Amendments. July 2017. REC Consultants, Inc. AUGUST 8 , 2018 1" = 60' I:\9513\DMA EXHIBIT EXISTING SITE CONDITIONS UNDEVELOPED MASS GRADED PAD SOIL GROUP SOIL TYPE D GROUND WATER NO GROUND WATER OBSERVED AT 15' DEPTH. CRITICAL COARSE SEDIMENT NO "STEEP SLOPE LANDS" EXIST ON-SITE. SITE DOES NOT RECIEVE ANY RUN-ON FLOW. NO SCALE POROUS CONCRETE SECTION I DMA AREA TABLE I. D. PARKING/DRIVE AISLE DRIVE AISLE HARDSCAPE!CONC! ROOF IMPERVIOUS TOTAL: DRIVEWAY !OFF-SITE! LANDSCAPE SELF MITIGATING DIMINIMUS AREA BIOFI LTRATION• AREA/SF! COMMENTS 29,964 I, 559 DRAINS TO TREE WELL 3,444 59,282 94,249 I, 191 POROUS CONCRETE 28,526 13,373 245 3,339 • THE BIOFILTRATION BASIN IS SEPARATED INTO TWO AREAS CONNECTED BY 3-12' HDPE PIPES, 3' ABOVE FLOW LINE AND AN 6' PVC PIPE AT THE ROCK LAYER ELEVATION THAT ALLOW THE TWO AREAS TO FUNCTION AS A SINGLE BIOFILTRATION BASIN. 30 MIL STEGO BRAND TYPE WATER STOP LINER OR EQUIVALENT. FABRIC TO BE WRAPPED ON BOTTOM AND SIDES OF CLASS 4 AB LAYER POROUS CONCRETE (3,000 PSI). 15-25% VOIDS CLASS 4 AB (3/4") 30% VOIDS COMPACTED TO 95% 6" PERFORATED PVC PIPE STABILIZED SUBGRADE COMPACTED TO 95% OF THE MODIFIED PROCTOR MAXIMUM DRY DENSITY PER AASHTO T-180. OMA EXHIBIT SMAC APN 212-120-01 SHEET10F2