Loading...
HomeMy WebLinkAboutCT 16-07; MARJA ACRES; SEWER STUDY; 2022-09-12 DEXTER WILSON ENGINEERING, INC. WATER ● WASTEWATER ● RECYCLED WATER CONSULTING ENGINEERS 2234 FARADAY AVENUE ● CARLSBAD, CA ● (760) 438-4422 SEWER STUDY FOR THE MARJA ACRES PROJECT IN THE CITY OF CARLSBAD September 12, 2022 Jesse Kleist September 12, 2022 DEXTER WILSON ENGINEERING, INC. PAGE 3 Sewer System Design Criteria The design criteria used for the evaluation of the offsite sewerage system impacts by the Marja Acres project are based on the City of Carlsbad Engineering Standards and Sewer Master Plan. The master plan was also used for verification and confirmation of existing wastewater facilities surrounding the project. Relevant sections of the City’s Engineering Standards and Sewer Master Plan regarding the design criteria for sewer lines and appurtenances are included in Appendix A. Sewer Generation Rates Chapter 6 in the City’s Engineering Standards identifies the average daily sewage flow to be 220 gpd per EDU. The City’s Engineering Standards states that an EDU equates to one single family residence. Some of Marja Acres will consist of apartment-style multi-family residential units and therefore will likely generate less wastewater than a typical single family residence. In fact, unlike the City’s Engineering Standards, the City’s Sewer Master Plan accounts for a lower unit flow factor for high-density residential development (176 gpd per EDU). Note that the master plan indicates that this lower flow factor is for apartments only. Residential low density to medium-high density is indicated as 220 gpd per EDU (akin to the City’s Engineering Standards) in the master plan. The sewer generation rates for the Marja Acres and the surrounding area are presented as Table 1. TABLE 1 CITY OF CARLSBAD SEWER GENERATION RATES Land Use Generation Rate Single Family Residential 220 gpd/EDU Multi-Family Residential (Apartments) 176 gpd/EDU Industrial (Warehouse) 220 gpd/5,000 ft2 Industrial (Office) 220 gpd/1,800 ft2 Commercial 220 gpd/1,800 ft2 Jesse Kleist September 12, 2022 DEXTER WILSON ENGINEERING, INC. PAGE 4 Peaking Factors The peaking factor for sewage flow less than 100,000 gpd is identified in the City’s Engineering Standards. It states for average daily flows of less than 100,000 gpd, a peaking factor of 2.5 shall be used to determine peak daily flows. The City’s Engineering Standards do not state what the peaking factor is for average daily flows that are greater than 100,000 gpd; however, the City’s Master Plan does provide more detail on peaking factors. The master plan breaks down peaking factors by tributary basin within the City. The tributary basin that Marja Acres is located in is identified as 17D-3. 17D-3 is shown to have a peak of 1.75 times the average which is what was used for estimating peak sewer flows in this report. Excerpts from the master plan regarding peaking factors and an e-mail correspondence from the City are included in Appendix A as well. Manning=s An@ The gravity sewer analyses are made using a computer program which uses the Manning Equation for all of its calculations. The Manning=s An@ used by the computer program is held as a constant for all depths in a circular conduit. The value of Manning=s An@ used for this study is 0.011 which corresponds with the recommended value in the City’s Engineering Standards. Depth and Velocity of Flow in Gravity Sewers Gravity sewer lines are designed to convey peak dry weather flow. Pipes that are 12-inches in diameter and smaller are designed to convey this flow with a maximum depth-to-diameter (d/D) ratio of 0.50. Pipes that are larger than 12-inches in diameter are designed for a maximum d/D ratio of 0.75. Gravity sewer lines are designed to maintain a minimum velocity of 2.0 feet per second at peak dry weather flow to prevent the deposition of solids. Jesse Kleist September 12, 2022 DEXTER WILSON ENGINEERING, INC. PAGE 5 Estimated Sewer Flows for Marja Acres Based on the sewage generation factors presented in Table 1, the estimated average sewer generation for the project is calculated in Table 2 and the estimated peak flow is shown in Table 3. TABLE 2 MARJA ACRES ESTIMATED AVERAGE SEWER FLOW Land Use Quantity Sewer Generation Total (Average) Flow Residential (Townhomes) 248 DUs 220 gpd/DU 54,560 gpd Residential (Apartments) 46 DUs 176 gpd/DU 8,096 gpd Commercial 10,000 sq. ft. 220 gpd/1,800 sq. ft. 1,222 gpd Total 63,878 gpd TABLE 3 MARJA ACRES ESTIMATED PEAK SEWER FLOW Land Use Average Flow Peaking Factor Peak Flow Residential (Townhomes) 54,560 gpd 2.5 136,400 gpd Residential (Apartments) 8,096 gpd 2.5 20,240 gpd Commercial 1,222 gpd 2.5 3,055 gpd Total 159,695 gpd (111 gpm) Jesse Kleist September 12, 2022 DEXTER WILSON ENGINEERING, INC. PAGE 6 Existing and Proposed Sewer System There are several existing sewer lines in the vicinity of the Marja Acres project. Figure 2 provides the location of existing facilities in the vicinity of the project. There is an existing 12-inch sewer interceptor in Kelly Drive (labeled NAHT1B in the Master Plan) that conveys flow south from El Camino Real. From this line in Kelly Drive, an 8-inch sewer line runs southeast in El Camino Real and has been extended approximately 365 feet easterly in El Camino Real on account of the Robertson Ranch project which is directly across El Camino Real from Marja Acres. The recommended onsite private gravity sewer system is presented on Figure 3. Sewer System Analysis Offsite Public Analysis. To analyze the impact of the Marja Acres project on the existing gravity sewer system, a sewer system analysis was conducted. The system was analyzed under existing flow conditions and under existing flows plus flow from the Marja Acres development project. The As-Built drawings and offsite sewer access hole locations included in Appendix B were utilized to determine the sizes and slopes of the sewer lines analyzed in this study. The analyses of the offsite sewer system under both existing flows and existing plus proposed flows is presented in Appendix C. Exhibit A presents the sewer access hole and pipe diagram and the public sewer system within the project’s sub-basin. The existing average sewage flow in the sub-basin flowing in El Camino Real adjacent to the project site was estimated to be 159,055 gpd. This is based on previous sewer studies (Robertson Ranch) and an estimation of the existing development adjacent to El Camino Real. (EV)(EV)EV EV (EV)(EV) (EV)(EV)EV EV (EV)(EV) Jesse Kleist September 12, 2022 DEXTER WILSON ENGINEERING, INC. PAGE 9 The offsite analysis begins at sewer access hole (SAH) 16 in El Camino Real. The wastewater from the project will enter the existing gravity sewer line in El Camino Real near SAH 12 and SAH 6. The sewer is then conveyed to the 12-inch diameter interceptor in Kelly Drive approximately 150 feet northwest of the project. The analysis ends at this location (SAH 2). This interceptor in Kelly Drive joins the North Agua Hedionda Interceptor before flowing west and being pumped in both the Fox’s Landing Lift Station and Agua Hedionda Lift Station before eventually being conveyed southward to the Encina Treatment Plant. The results of the sewer flow analysis indicate that the sewer lines between the Marja Acres project and the interceptor in Kelly Drive have a maximum d/D ratio of 0.49 under existing peak flows and 0.60 under existing peak flows with the project included. These flows are in 8-inch diameter gravity sewer lines in El Camino Real where depth ratios of up to 0.50 are acceptable per the City’s Engineering Standards and Master Plan. The critical section of this line is the last section prior to the connection to the 12-inch interceptor in Kelly Drive. This section of line is approximately 280 feet in length and was installed at a slope of 0.40 percent with a drop manhole at the upstream end to allow the sewer line to be installed below a gas line and box culvert. The maximum depth-to-diameter (d/D) ratio in this section of line, with Marja Acres included, during peak flows is 0.60. While new 8-inch sewer lines are to be designed for a maximum d/D ratio of 0.5, it is reasonable to allow an existing gravity sewer to flow at a d/D ratio of up to 0.75 during ultimate peak flows before recommending replacement. An e-mail correspondence with the City confirming adequate capacity is included in Appendix A. Onsite Private Analysis. In addition to the offsite analysis, an onsite sewer analysis was completed utilizing the proposed sewer access hole inverts throughout the project. The onsite analysis results are presented in Appendix D. Exhibit B presents the sewer access hole and pipe diagram for the proposed onsite sewer system. The sewer modeling results show the depth ratios in the proposed onsite gravity sewer lines to be in compliance with City design criteria. Appendix D includes the proposed onsite utility layout which includes the invert elevations of the new sewer lines. Jesse Kleist September 12, 2022 DEXTER WILSON ENGINEERING, INC. PAGE 10 Conclusions and Recommendations The following conclusions have been made related to providing sewer service to the Marja Acres project. 1. The Marja Acres project will sewer its flow to existing City of Carlsbad gravity lines in El Camino Real. 2. The development of the Marja Acres project is projected to result in average sewage flow of 63,878 gpd. 3. No offsite gravity sewer improvements are needed to provide sewer service to the proposed project. 4. There is one section of 8-inch gravity sewer that goes over half-full when adding Marja Acre’s sewage flow. The depth in this line (0.60 d/D) does remain below critical replacement level. 5. The sewer system analysis conducted indicates that the existing gravity sewer lines downstream of the project site can accommodate the wastewater flows for the Marja Acres project. 6. The proposed onsite layout and pipe sizes of the onsite gravity sewer system is presented on Figure 3. APPENDIX A DESIGN CRITERIA & PEAKING FACTORS FROM THE CITY OF CARLSBAD Volume 1 2/16/2016 Page 41 of 54 CHAPTER 6 – DESIGN CRITERIA FOR GRAVITY SEWER LINES AND APPURTENANCES Prior to preparation of improvement plans, Engineer-of-work shall submit a rough layout of system for review and approval by the City Engineer. 1. SEWER MAIN DEPTH AND SIZE A. Sewer main depth and size shall be as shown below unless approved by the City Engineer. B. Minimum depth, finish grade to top of pipe: 6 feet C. Maximum depth, finish grade to top of pipe: 15 feet D. Design calculations shall be submitted to verify size and bedding design. (Manning "N" PVC = 0.011 is norm). E. Minimum size of mainline shall be 8". F. 6" main line may be allowed on cul-de-sac streets with a maximum of 10 units. G. All sewer laterals and main line invert elevations shall be shown in profile on the improvement plans and shall include stations, slope, and distance. H. All sewer mains over 15" in diameter shall require special design subject to City Engineer approval. 2. SEWER LATERAL DEPTH AND SIZE A. 4" minimum diameter for single-family residence. B. 6" minimum diameter for all other use. C. Desirable depth at property line is 5 feet (top of pipe to finish grade @ top of curb). 3. PIPELINE MATERIAL TYPES A. Gravity sewer pipe and fittings shall have PVC conforming to ASTM D3034 for diameters 4" – 15" and ASTM F 679 for 18" – 24", with integral-bell gasketed joints (gasket and spigot end joint design). Pipe shall be made of PVC plastic having a cell classification of 12454-B or 12364-B as defined in ASTM D 1784 and shall have SDR of 35 and a minimum stiffness of 46 psi according to ASTM D 2412. B. All fittings and accessories shall be as manufactured and finished by the pipe supplier or approved equal and have bell and spigot configurations compatible with that of the pipe. Volume 1 2/16/2016 Page 42 of 54 C. PVC pipe joints shall be elastomeric gasket joints type conforming to Standard Specifications for Public Works (Greenbook) most recent edition. Rubber gaskets shall be factory installed and conform to ASTM F 477. Pipe joints shall have been tested and meet watertight performance requirements of ASTM D 3212, "Joints for Pipe Using Flexible Elastomeric Seals." D. PVC C-900 shall be used for gravity sewer pipelines with depths equal or greater than 15 feet. Engineering calculations shall be provided to verify that the pipe material will accommodate the design depth. E. Use of other pipe and fitting materials and types may be required by the City Engineer to meet specific conditions during design or construction. F. Service connections to the sewer main shall be watertight and not protrude into the sewer pipe. All materials used to make the service connections shall be compatible with each other and with the pipe material to be joined and shall be corrosion proof. G. Couplings used for repair, or transition to dissimilar pipe materials shall be approved by the City Engineer and provide corrosion proof watertight seal. 4. DESIGN PARAMETERS FOR GRAVITY SEWER MAIN SLOPE, FLOW AND DEMAND A. Gravity sewer pipelines shall be designed for a minimum velocity of 2 feet/second. Velocity, unless otherwise stated, shall be calculated from peak dry weather flow. B. Pipeline slopes shall satisfy the minimum velocity requirement aforementioned. Maximum velocities greater than 10 ft/second should be avoided. Slopes for Specific Pipe Sizes 8 through 12-inch diameter: 1) 8" minimum 0.40% desirable 0.50% 2) 10" minimum 0.28% desirable 0.40% 3) 12" minimum 0.21% desirable 0.30% Slopes for larger than 12-inch diameter pipe shall be designed to meet flow and velocity criteria and require specific approval of the City Engineer. Pipelines with horizontal curvature will require increase slope to achieve minimum required velocities. C. Gravity pipelines with diameters of 12" and less shall be designed to flow at depths of 0.5D during peak hour dry weather flow. Gravity pipelines with diameters greater than 12" shall be designed to flow at depths of 0.75D during peak hour dry weather flow. Volume 1 2/16/2016 Page 43 of 54 D. Peak hour sewer flow rates do not include infiltration or inflow (I/I). Infiltration is defined as the addition of groundwater into the sewer collection system and inflow is the addition of storm water into the sewer collection system. Because sewer collection system I/I is dependent on a number of factors including season, age of system, type of pipe material and joints, root intrusion, and presence of storm water system, the I/I flow rates will vary from system to system. The design of sewer pipelines connecting to sewer systems known to have I/I, or are susceptible to I/I, shall utilize peak wet weather flow estimates from the City of Carlsbad Sewer Master Plan or perform wet weather flow monitoring as directed by the City Engineer. Gravity pipelines designed to convey wet weather flow shall not exceed 0.90D for peak hour wet weather flow. E. Flowrate Generation 1) An Equivalent Dwelling Unit (EDU) = 220 gal/day, Average Daily Flow (ADF) 2) For ADF less than 100,000 gal/day, a peaking factor (PF) of 2.5 multiplied times the ADF shall be used to determine Peak Daily Flows (PDF). PDF = ADF x 2.5 a) Residential: Single Family Residence = 1 EDU b) Commercial Property: 1 EDU/1,800 ft2 (building space) i) To convert raw land to square feet of building space, assume 30% coverage. This could vary significantly dependent development constraints. ii) To convert improved pads to square feet of building space, assume 40% of coverage. 3) Industrial Property: 1 EDU/5,000 ft2 (warehouse space) 1 EDU/1,800 ft2 (office space) a) To convert raw land to square feet of building space, assume 30% coverage. This could vary significantly dependent issues such as environmental restrictions. b) To convert improved pads to square feet of building space, assume 40% of coverage. c) Assume 60% of building space is warehouse, and 40% is office space. 5. HORIZONTAL AND VERTICAL LAYOUT A. Streets: See City of Carlsbad Standard Drawing No. GS-6 for location. B. Alley: Main to centerline shall be a minimum of three feet (3') offset. City of Carlsbad DUDEK SEWER MASTER PLAN 5-5 April 2012 of San Diego Water & Sewer Design Guide recommends the use of 80 gallons per capita day (gpcd), which equates to 197 gpd/DU for the City of Carlsbad (based on 2.46 persons per household). Based on these comparisons and the calculated unit flow rate for current conditions, the previously established flow generation rate of 220 gpd/EDU is considered to be appropriately conservative for flow projections in this master plan update. A lower unit flow factor of 176 gpd (80 percent of 220 gpd/EDU) is applied to high-density residential units in excess of approximately 20 units per acre (apartment complexes). A non-residential land use flow factor of 800 gpd per 10,000 square feet of building area is applied to commercial and industrial development projections in the Growth Database. The composite commercial/industrial unit factor was approved by City Staff for planning purposes, and is higher than the average unit flow calculated in the unit flow analysis documented in Section 3.7. It is noted that projections made using this factor are based on a mix of development types in existing business/industrial parks and may not be representative of smaller areas with a single land use type. Flow projections for future schools, resort hotels, and the expansion of the Legoland Water Park are based on EDU conversions documented in the Carlsbad Municipal Code (Table 13.10.020c). The unit flow factors established by City Staff to project ultimate wastewater flows in this Master Plan Update are summarized in Table 5-2. Table 5-2 Wastewater Unit Flow Factors Land Use Category Unit Wastewater Flow Residential Low Density to Med-High Density 220 gpd/DU Residential High Density (Apartments) 176 gpd/DU Commercial/Industrial 800 gpd/10,000 sq ft of building area High School 7.33 gpd/student Hotel 132 gpd/guest room Water Park (Legoland) 3,740 gpd/developed acre 5.4 PROJECTED ULTIMATE FLOWS Wastewater flow projections for future developments are made by applying the unit flow factors to the future build-out data in the modified Growth Database. Future wastewater flows are projected to be approximately 2.1 mgd and are summarized in Table 5-3. The future flows are based on flow projections for future development, and also include unit counts for existing residences that currently have septic systems and areas in LFMZ 6 that previously were pumped to LWWD from the La Golondrina and La Costa Meadows Lift Stations. It is noted that a minor wastewater service area boundary adjustment is assumed in the future to serve existing LWWD customers within the area of a proposed residential development located on the west side of El Camino Real, just south of Poinsettia Lane. 1 Steven Henderson From:David Hull <David.Hull@carlsbadca.gov> Sent:Tuesday, July 24, 2018 4:48 PM To:Steven Henderson Cc:Lindsey Stephenson Subject:RE: Marja Acres Water and Sewer Studies Hi Steve, When I mentioned the issue the City was looking into I had assumed you were referring to the sewer peaking factor comment we made on the sewer study. We have updated the model and determined that a 1.75 peaking factor is acceptable. The existing infrastructure will manage the additional waste water flows from the Marja project. We will not require the developer to make improvements to the public waste water system. We are still open to a meeting if you have other issues you would like to discuss. Please let me know if you would still like to meet and I can arrange at time and location. Thank you, David Hull, P.E. Associate Engineer City of Carlsbad Public Works 5950 El Camino Real Carlsbad, CA 92008 Office: 760-603-7322 Mobile: 760-497-4044 David.Hull@carlsbadca.gov From: Steven Henderson [mailto:Steven@dwilsoneng.com] Sent: Tuesday, July 24, 2018 9:41 AM To: David Hull <David.Hull@carlsbadca.gov> Cc: Lindsey Stephenson <Lindsey.Stephenson@carlsbadca.gov> Subject: RE: Marja Acres Water and Sewer Studies Hi David, Thanks for providing the update on your internal model. Have any results been yielded yet? Steven Henderson, P.E. Dexter Wilson Engineering, Inc. Office: 760-438-4422 Cell: 760-542-5910 From: David Hull [mailto:David.Hull@carlsbadca.gov] Sent: Monday, July 16, 2018 2:31 PM 2 To: Steven Henderson <Steven@dwilsoneng.com> Cc: Lindsey Stephenson <Lindsey.Stephenson@carlsbadca.gov> Subject: RE: Marja Acres Water and Sewer Studies Hi Steven, The City has been looking into this issue. Our consultant has recently revised the sewer model to reflect the most up to date information. The preliminary review has indicated that the Marja Acres peaking factor and estimated flows will be acceptable without an upsize to the system. The City will confirm this result with an updated model run later this week. At this time lets hold off on meeting. If the model confirms the system can handle the required flow, the City would not require Marja to revise the sewer study and upsize the sewer. Let’s plan to touch base when I have the final model results likely Wednesday or Thursday. Thank you, David Hull, P.E. Associate Engineer City of Carlsbad Public Works 5950 El Camino Real Carlsbad, CA 92008 Office: 760-603-7322 Mobile: 760-497-4044 David.Hull@carlsbadca.gov From: Steven Henderson [mailto:Steven@dwilsoneng.com] Sent: Tuesday, July 10, 2018 11:51 AM To: David Hull <David.Hull@carlsbadca.gov> Subject: Marja Acres Water and Sewer Studies Good Morning David, My name is Steven Henderson; I prepared the water/sewer studies for Marja Acres. The developer wanted to inquire on a meeting to review the initial comments and to ensure we can address them on the revised studies. If that sounds okay to you let me know your availability in the upcoming week or two and hopefully we can get something scheduled. Thanks, Steven Henderson, P.E. Dexter Wilson Engineering, Inc. Office: 760-438-4422 Cell: 760-542-5910 APPENDIX B SEWER AS-BUILT DRAWINGS IN EL CAMINO REAL APPENDIX C SEWER SYSTEM COMPUTER MODELING RESULTS EXISTING FLOW & EXISTING FLOW PLUS THE MARJA ACRES PROJECT FLOW DATE:FOR: BY:Exhibit A M.G.D.C.F.S. 365.97 16 14 153,865 153,865 1.75 269,264 0.269 0.417 8 0.93 0.140117 0.25333 0.38 0.2739 3.42 302.33 14 12 3,360 157,225 1.75 275,144 0.275 0.426 8 1.40 0.116694 0.22667 0.34 0.2355 4.07 314.22 12 10 0 157,225 1.75 275,144 0.275 0.426 8 2.40 0.089127 0.20000 0.30 0.1982 4.83 256.91 10 8 1,830 159,055 1.75 278,346 0.278 0.431 8 2.00 0.098770 0.20667 0.31 0.2074 4.67 296.67 8 6 0 159,055 1.75 278,346 0.278 0.431 8 0.80 0.156169 0.26667 0.40 0.2934 3.30 316.67 6 4 0 159,055 1.75 278,346 0.278 0.431 8 0.80 0.156169 0.26667 0.40 0.2934 3.30 276.67 4 2 0 159,055 1.75 278,346 0.278 0.431 8 0.40 0.220856 0.32667 0.49 0.3827 2.53 DATE:FOR: BY:Exhibit A M.G.D.C.F.S. 365.97 16 14 153,865 153,865 1.75 269,264 0.269 0.417 8 0.93 0.140117 0.25333 0.38 0.2739 3.42 302.33 14 12 3,360 157,225 1.75 275,144 0.275 0.426 8 1.40 0.116694 0.22667 0.34 0.2355 4.07 314.22 12 10 25,960 183,185 1.75 320,574 0.321 0.496 8 2.40 0.103843 0.21333 0.32 0.2167 5.15 256.91 10 8 0 183,185 1.75 320,574 0.321 0.496 8 2.00 0.113754 0.22667 0.34 0.2355 4.74 296.67 8 6 0 183,185 1.75 320,574 0.321 0.496 8 0.80 0.179861 0.28667 0.43 0.3229 3.46 316.67 6 4 37,918 221,103 1.75 386,930 0.387 0.599 8 0.80 0.217091 0.32000 0.48 0.3727 3.61 276.67 4 2 0 221,103 1.75 386,930 0.387 0.599 8 0.40 0.307013 0.40000 0.60 0.4920 2.74 63878 Junction with Kelly Drive Existing Trailer Park (21 Units) Existing Commercial (15,000 sf) dn/D(2)Ca for Velocity(3) VELOCITY (f.p.s.)Remarks Flow from Robertson Ranch PEAK FLOW (DESIGN FLOW)LINE SIZE (inches) AS-BUILT SLOPE (%)DEPTH K' (1)dn (feet) SEWER STUDY SUMMARY 3/11/2022 Marja Acres Sewer Study (Existing Flows; Existing Pipe) JOB NUMBER:629-030 Dexter Wilson Engineering REFER TO: LENGTH (feet)FROM TO IN-LINE FLOW (gpd) AVG. DRY WEATHER FLOW (gpd) PEAKING FACTOR PEAK FLOW (gpd) Remarks Flow from Robertson Ranch Existing Trailer Park (21 Units) Marja Acres Partial Flow Marja Acres Partial Flow Junction with Kelly Drive SEWER STUDY SUMMARY 3/11/2022 629-030 Marja Acres Sewer Study (Existing plus Project Flows; Existing Pipe) Dexter Wilson EngineeringJOB NUMBER: LENGTH (feet) PEAK FLOW (gpd) TOFROM IN-LINE FLOW (gpd) REFER TO: DEPTH K' (1) AVG. DRY WEATHER FLOW (gpd) PEAKING FACTOR dn (feet)dn/D(2)Ca for Velocity(3) VELOCITY (f.p.s.) LINE SIZE (inches) AS-BUILT SLOPE (%) PEAK FLOW (DESIGN FLOW) 1 K' based on n = 0.011 2 dn/D using K' in Brater King Table 7-14 3 From Brater King Table 7-4 based on dn/D APPENDIX D SEWER SYSTEM COMPUTER MODELING RESULTS MARJA ACRES PROJECT FLOW PROPSOED ONSITE GRAVITY SEWER SYSTEM DATE:FOR:SHT BY:Exhibit B S.A.H. #Elev.S.A.H. #Elev.M.G.D.C.F.S. 128 214 80.6 212 76.8 1,760 1,760 2.50 4,400 0.004 0.007 8 3.00 0.001275 0.02667 0.04 0.0105 1.46 128 212 76.8 210 73.6 1,760 3,520 2.50 8,800 0.009 0.014 8 2.50 0.002793 0.04000 0.06 0.0192 1.60 80 210 73.6 208 72.7 1,760 5,280 2.50 13,200 0.013 0.020 8 1.05 0.006464 0.05333 0.08 0.0294 1.56 62 208 72.7 206 69.9 12,100 17,380 2.50 43,450 0.043 0.067 8 4.66 0.010099 0.06667 0.10 0.0409 3.70 81 206 69.9 204 63.8 1,760 19,140 2.50 47,850 0.048 0.074 8 7.51 0.008764 0.06667 0.10 0.0409 4.07 48 204 63.8 202 60.1 3,300 22,440 2.50 56,100 0.056 0.087 8 7.60 0.010209 0.06667 0.10 0.0409 4.78 194 202 60.1 12 52.4 3,520 25,960 2.50 64,900 0.065 0.100 8 3.98 0.016326 0.08667 0.13 0.0600 3.77 128 126 82.1 124 80.9 1,760 1,760 2.50 4,400 0.004 0.007 8 0.94 0.002280 0.03333 0.05 0.0147 1.04 128 124 80.9 122 78.9 1,760 3,520 2.50 8,800 0.009 0.014 8 1.57 0.003524 0.04000 0.06 0.0192 1.60 128 122 78.9 120 76.9 1,760 5,280 2.50 13,200 0.013 0.020 8 1.58 0.005273 0.04667 0.07 0.0242 1.90 128 120 76.9 118 68.4 1,760 7,040 2.50 17,600 0.018 0.027 8 6.62 0.003433 0.04000 0.06 0.0192 3.19 327 118 68.4 116 65.2 7,040 14,080 2.50 35,200 0.035 0.054 8 1.00 0.017664 0.08667 0.13 0.0600 2.04 51 116 65.2 114 63.9 2,420 16,500 2.50 41,250 0.041 0.064 8 2.47 0.013170 0.08000 0.12 0.0534 2.69 63 114 63.9 112 63.3 12,100 28,600 2.50 71,500 0.072 0.111 8 1.00 0.035881 0.12667 0.19 0.1039 2.40 52 112 63.3 110 62.7 0 28,600 2.50 71,500 0.072 0.111 8 1.02 0.035541 0.12667 0.19 0.1039 2.40 57 110 62.7 108 61.2 0 28,600 2.50 71,500 0.072 0.111 8 2.61 0.022192 0.10000 0.15 0.0739 3.37 173 108 61.2 106 52.7 0 28,600 2.50 71,500 0.072 0.111 8 4.91 0.016187 0.08667 0.13 0.0600 4.15 126 106 52.7 104 50.8 8,096 36,696 2.50 91,740 0.092 0.142 8 1.54 0.037102 0.12667 0.19 0.1039 3.07 116 104 50.8 102 47.1 1,222 37,918 2.50 94,795 0.095 0.147 8 3.23 0.026458 0.10667 0.16 0.0811 4.07 142 102 47.1 6 40.0 0 37,918 2.50 94,795 0.095 0.147 8 4.96 0.021350 0.10000 0.15 0.0739 4.47 153 222 61.8 220 61.1 2,640 2,640 2.50 6,600 0.007 0.010 8 0.50 0.004669 0.04667 0.07 0.0242 0.95 59 220 61.1 218 60.8 1,100 3,740 2.50 9,350 0.009 0.014 8 0.49 0.006693 0.05333 0.08 0.0294 1.11 96 218 60.8 216 60.3 0 3,740 2.50 9,350 0.009 0.014 8 0.50 0.006636 0.05333 0.08 0.0294 1.11 33 216 60.3 202 60.1 0 3,740 2.50 9,350 0.009 0.014 8 0.48 0.006738 0.05333 0.08 0.0294 1.11 135 230 72.1 226 69.2 2,860 2,860 2.50 7,150 0.007 0.011 8 2.15 0.002448 0.03333 0.05 0.0147 1.69 89 226 69.2 224 65.2 0 2,860 2.50 7,150 0.007 0.011 8 4.48 0.001695 0.02667 0.04 0.0105 2.37 32 224 65.2 204 63.8 0 2,860 2.50 7,150 0.007 0.011 8 4.53 0.001686 0.02667 0.04 0.0105 2.37 190 240 81.3 104 77.2 3,300 3,300 2.50 8,250 0.008 0.013 8 2.16 0.002815 0.04000 0.06 0.0192 1.50 148 236 77.2 102 76.5 1,760 5,060 2.50 12,650 0.013 0.020 8 0.49 0.009101 0.06667 0.10 0.0409 1.08 364 234 76.5 6 73.1 7,040 12,100 2.50 30,250 0.030 0.047 8 0.93 0.015777 0.08667 0.13 0.0600 1.76 39 232 73.1 208 72.7 0 12,100 2.50 30,250 0.030 0.047 8 0.97 0.015379 0.08000 0.12 0.0534 1.97 131 132 63.9 130 59.9 1,222 1,222 2.50 3,055 0.003 0.005 8 3.09 0.000872 0.02000 0.03 0.0069 1.54 91 130 59.9 128 56.6 0 1,222 2.50 3,055 0.003 0.005 8 3.60 0.000808 0.02000 0.03 0.0069 1.54 SEWER STUDY SUMMARY 3/11/2022 Marja Acres Sewer Study (Proposed Flows; Onsite) JOB NUMBER:629-030 Dexter Wilson Engineering REFER TO: LENGTH (feet) IN-LINE FLOW (gpd) AVG. DRY WEATHER FLOW (gpd) PEAKING FACTOR* PEAK FLOW (gpd) PEAK FLOW (DESIGN FLOW) LINE SIZE (inches) DESIGN SLOPE (%)DEPTH K' (1)dn (feet)dn/D(2)Ca for Velocity(3) VELOCITY (f.p.s.) TOFROM 1 K' based on n = 0.011 2 dn/D using K' in Brater King Table 7-14 3 From Brater King Table 7-4 based on dn/D DATE:FOR:SHT BY:Exhibit B S.A.H. #Elev.S.A.H. #Elev.M.G.D.C.F.S. SEWER STUDY SUMMARY 3/11/2022 Marja Acres Sewer Study (Proposed Flows; Onsite) JOB NUMBER:629-030 Dexter Wilson Engineering REFER TO: LENGTH (feet) IN-LINE FLOW (gpd) AVG. DRY WEATHER FLOW (gpd) PEAKING FACTOR* PEAK FLOW (gpd) PEAK FLOW (DESIGN FLOW) LINE SIZE (inches) DESIGN SLOPE (%)DEPTH K' (1)dn (feet)dn/D(2)Ca for Velocity(3) VELOCITY (f.p.s.) TOFROM 161 128 56.6 104 50.8 0 1,222 2.50 3,055 0.003 0.005 8 3.60 0.000808 0.02000 0.03 0.0069 1.54 31 136 53.7 134 53.3 8,096 8,096 2.50 20,240 0.020 0.031 8 1.19 0.009297 0.06667 0.10 0.0409 1.72 50 134 53.3 106 52.7 0 8,096 2.50 20,240 0.020 0.031 8 1.12 0.009597 0.06667 0.10 0.0409 1.72 271 148 79.2 146 71.7 4,620 4,620 2.50 11,550 0.012 0.018 8 2.76 0.003489 0.04000 0.06 0.0192 2.09 123 146 71.7 142 68.5 2,200 6,820 2.50 17,050 0.017 0.026 8 2.63 0.005280 0.04667 0.07 0.0242 2.45 134 142 68.5 112 63.3 5,280 12,100 2.50 30,250 0.030 0.047 8 3.92 0.007669 0.06000 0.09 0.0350 3.01 169 140 72.2 138 69.0 2,420 2,420 2.50 6,050 0.006 0.009 8 1.89 0.002206 0.03333 0.05 0.0147 1.43 194 138 69.0 114 63.9 0 2,420 2.50 6,050 0.006 0.009 8 2.64 0.001867 0.03333 0.05 0.0147 1.43 90 156 70.4 152 69.3 1,320 1,320 2.50 3,300 0.003 0.005 6 1.22 0.003226 0.03000 0.06 0.0192 1.06 109 152 69.3 118 68.4 0 1,320 2.50 3,300 0.003 0.005 6 0.83 0.003925 0.03500 0.07 0.0242 0.84 25,960 37,918 63,878 * Peaking Factor of 2.50 is used onsite due to average flows in the separate tributary areas being less than 100,000 gpd 1 K' based on n = 0.011 2 dn/D using K' in Brater King Table 7-14 3 From Brater King Table 7-4 based on dn/D EXHIBIT A OFFSITE GRAVITY SEWER ACCESS HOLE AND PIPE DIAGRAM EXHIBIT B ONSITE GRAVITY SEWER ACCESS HOLE AND PIPE DIAGRAM (EV)(EV)EV EV (EV)(EV)