Loading...
HomeMy WebLinkAbout2026-01-27; City Council; 12; Utilities Department’s Fiscal Year 2024-25 Operations and Maintenance Update ReportCA Review TL Meeting Date: Jan. 27, 2026 To: Mayor/President and City Council/Board Members From: Geoff Patnoe, City Manager/Executive Manager Staff Contact: Amanda Flesse, Utilities Director/General Manager amanda.flesse@carlsbadca.gov, 442-339-2722 Subject: Utilities Department’s Fiscal Year 2024-25 Operations and Maintenance Update Report Districts: All Recommended Action Receive and file the Utilities Department’s Fiscal Year 2024-25 Operations and Maintenance update report on the water, recycled water and wastewater operations and maintenance programs. Executive Summary This report provides an update on the water, wastewater and recycled water operations and maintenance programs for fiscal year, or FY, 2024-25, which is July 1, 2024, through June 30, 2025. Explanation & Analysis The City of Carlsbad’s and the Carlsbad Municipal Water District’s water, recycled water and wastewater operations and maintenance programs focused on enhancing the efficiency, sustainability and reliability of water resources in fiscal year 2024-25. CMWD’s water operations and maintenance programs prioritized maintaining CMWD infrastructure to ensure a safe and reliable drinking water supply while also implementing conservation initiatives to promote responsible water use among residents. The recycled water operations and maintenance programs strived to improve the reliability of the recycled water distribution and storage network and increase the use of treated wastewater for non-potable applications, reducing the demand for potable water resources. Key initiatives included the integration of a new 1.5-million-gallon recycled water tank into the system and public outreach to encourage the adoption of recycled water in landscaping and irrigation. In the wastewater division, the city focused on managing its assets, extending the useful life of its infrastructure and enhancing the capacity of wastewater facilities to accommodate growth and improve environmental compliance. Regular maintenance schedules have been established to minimize disruptions and ensure operational efficiency. Jan. 27, 2026 Item #12 Page 1 of 28 Overall, these programs align with Carlsbad's commitment to sustainable water management and environmental stewardship, supporting the city's long-term resilience and community well-being. The Utilities Department’s Fiscal Year 2024-25 Annual Report is provided as Exhibit 1. Fiscal Analysis This item is a presentation on the work related to management of city and CMWD utility assets, and it has no fiscal impact. Next Steps The city and the CMWD will continue to focus on enhancing the efficiency, sustainability and reliability of their water resources. Environmental Evaluation The proposed action is not a “project” as defined by the California Environmental Quality Act, or CEQA, Section 21065 and CEQA Guidelines Section 15378(b)(5) and does not require environment review under CEQA Guidelines Section 15060(c)(3) and 15061(b)(3), because the proposed action to receive and file a report on the utilities operations and maintenance programs is an organizational or administrative government activity that does not involve any commitment to any specific project which may result in a potentially significant physical impact on the environment. Any subsequent action or direction stemming from the proposed action may require preparation of an environmental document in accordance with CEQA or the CEQA Guidelines. Exhibit 1. Utilities Department’s Fiscal Year 2024-25 Operations and Maintenance Update Jan. 27, 2026 Item #12 Page 2 of 28 Exhibit 1 Jan. 27, 2026 Item #12 Page 3 of 28 Utilities Department Operations and Maintenance Update Report FY 2024-25 1 Executive Summary The City of Carlsbad and the Carlsbad Municipal Water District (CMWD), operating as the Utilities Department within the Public Works Branch, owns, operates and maintains extensive water, wastewater and recycled water systems which include: • 273 miles of wastewater collection pipelines • 11 lift stations • 457 miles of water distribution pipelines • 9 reservoirs • 97 miles of recycled water distribution pipelines • Carlsbad Water Recycling Facility (CWRF) Jan. 27, 2026 Item #12 Page 4 of 28 Utilities Department Operations and Maintenance Update Report FY 2024-25 2 Jan. 27, 2026 Item #12 Page 5 of 28 Utilities Department Operations and Maintenance Update Report FY 2024-25 3 The city expends significant resources to operate and maintain these systems and has been successful in protecting the environment and supporting the community’s public health and providing necessary resources to the community. This update report includes the following summaries for Fiscal Year (FY) 2024-25: • Water distribution operations and construction • Wastewater collections and lift station operations • Capital Improvement Project (CIP) updates The Utilities Department uses data to monitor system performance and operational efficiency. The Key Performance Indicators (KPIs) used in this report are developed using industry best practices, including the national American Water Works Association (AWWA) standards for water and wastewater operations. AWWA identifies nationwide performance indicators that allow the City of Carlsbad to compare its performance to agencies across the nation, regardless of size or location. For these KPIs, the city strives to be in the 75th percentile, or the upper 25%. Jan. 27, 2026 Item #12 Page 6 of 28 Utilities Department Operations and Maintenance Update Report FY 2024-25 4 Water and Recycled Water Mission: Provide quality utility services in a fiscally and environmentally responsible manner for the City of Carlsbad community. The CMWD, a subsidiary of the City of Carlsbad, provides water services to about 85% of the city. Additionally, CMWD delivers recycled water for non-potable purposes such as irrigation to over 600 recycled water use sites. The City of Carlsbad has established a level of service that complies with state and federal potable water regulations to ensure that potable water supplied within the CMWD’s jurisdiction meets or exceeds public health and safety standards. Jan. 27, 2026 Item #12 Page 7 of 28 Utilities Department Operations and Maintenance Update Report FY 2024-25 5 Potable Water and Recycled Water Sources Potable water: • The CMWD imports all its potable water supply as treated water from the San Diego County Water Authority (SDCWA). • The two main water sources are the Colorado River, where the water is transported through the Colorado River Aqueduct, and Northern California, where water moves through the California Aqueduct (also known as the State Water Project). • In addition, desalination water makes up about 20% of the CMWD water portfolio. • Figure 1 illustrates the volume of potable water purchased throughout the fiscal year. Recycled water: • A substantial portion of the treated wastewater from the city is redirected from the Encina Wastewater Authority (EWA) to the adjacent Carlsbad Water Recycling Facility (CWRF) for additional treatment. Although the CMWD is the proprietor of the CWRF, EWA oversees the operation and maintenance of the facility. • Another source of recycled water is facilitated through a purchase agreement with Vallecitos Water District. The recycled water is distributed to the CMWD customers through the recycled water distribution system, which diminishes the annual amount of wastewater discharged into the Pacific Ocean by approximately 65%. • Figure 2 shows how much recycled water is produced and distributed throughout the system for the fiscal year. Average Water and Recycled Water Usage Potable water usage averages 13.5 million gallons a day Figure 1 0 100,000,000 200,000,000 300,000,000 400,000,000 500,000,000 600,000,000 GA L L O N S P E R M O N T H FY 24-25 Potable Water Usage 4.94 Billion gallons Jan. 27, 2026 Item #12 Page 8 of 28 Utilities Department Operations and Maintenance Update Report FY 2024-25 6 Recycled water usage averages 3.4 million gallons a day Figure 2 Activities and Accomplishments This section of the report includes a summary of activities and accomplishments for the following divisions of the water and recycled water department during FY 2024-25: • Water Operations • Construction Maintenance • Meter Services • Cross-Connection Water Operations Water operations encompass the management, distribution and treatment of water resources to ensure safe, reliable and sustainable access for communities and industries. These activities include sourcing, treating, storage and distribution of potable water. The Water Operations group, comprised of five water operators and one water operations supervisor, is responsible for the management and maintenance of nine reservoirs, more than 9,000 valves, three pump stations, and 74 pressure-reducing stations. The following is a list of accomplishments this team was able to achieve in FY 2024-25: • Fulfilled 100% of its regulatory sampling and reporting obligations to the State Water Resources Control Board. This work includes the Tri-annual Lead and Copper sampling, Consumer Confidence Report and electronic Annual Report. • Completed inspections of both the Maerkle and Lake Calavera Dams in collaboration with the state Division of Safety of Dams. These annual inspections are conducted to ensure compliance with all safety and performance standards. The primary purpose of these inspections is to identify any potential maintenance or operational issues prior to their development, which includes a comprehensive review of the instrumentation data from the dam surveillance network. 0 20,000,000 40,000,000 60,000,000 80,000,000 100,000,000 120,000,000 140,000,000 160,000,000 180,000,000 GA L L O N S P E R M O N T H FY 24-25 Recycled Water Usage 1.25 Billion gallons Jan. 27, 2026 Item #12 Page 9 of 28 Utilities Department Operations and Maintenance Update Report FY 2024-25 7 • Conducted a thorough cleaning and inspection of the Skyline Reservoir, a potable water reservoir with a capacity of 1.5 million gallons. Such inspections are mandated and conducted annually for each reservoir and encompass a review of specific design features and periodic maintenance to ensure adherence to drinking water storage regulations. • Cleaned and inspected 3 recycled water reservoirs. • Rebuilt 22 pressure-regulating stations. These stations are critical to the water distribution system to ensure safe and consistent water pressure to customers. Staff’s involvement in rebuilding and maintaining existing infrastructure saves money and time and helps develop staff talent. • Completed 46 scheduled water system shutdowns as part of the valve replacement program, capital improvement projects, and private development initiatives. This year, the Water Operations group assisted with the implementation of the construction of the $4.98 million Valve Replacement Program Phase III capital improvement program (CIP) project. This active construction project will replace 57 malfunctioning valves and install 30 new potable valves. The valve replacement program is crucial for ensuring that valves operate effectively, thereby facilitating complete shutdowns when it is necessary to repair a water main or respond to incidents involving hydrants. The implementation of these valves requires significant effort and coordination with the Water Operations group. • The Water Operations team assumes a leadership role in the systematic shutdown of the system to facilitate various types of work. Figure 3 illustrates the distribution of workload within the division throughout the fiscal year. The nature of the shutdowns reflects the influence of private development and CIP projects on the Water Operations team. A comprehensive analysis of the shutdown types provides a detailed breakdown of the hours dedicated to water operations. Each year, the data is meticulously reviewed to assess the operational performance of the system. For instance, an increase in time allocated for repairs may necessitate a more in-depth examination to determine whether these repairs are proactive—identified during routine maintenance prior to a failure—or reactive—responding to a break or emergency situation. Shutdown type Water Operations Hours Figure 3 Systems operation s… Leave 18% Regulatory compliance 21%Admin/ Training / Meeting Maintenance 4% Shutdowns1% Repairs 7% CIP 17 Fire protection9 Private development 14 Internal 6 Jan. 27, 2026 Item #12 Page 10 of 28 Utilities Department Operations and Maintenance Update Report FY 2024-25 8 Construction Maintenance The Water Construction Maintenance team is a specialized group responsible for the installation, repair and maintenance related to water main appurtenances. Their expertise ensures the integrity and efficiency of new installations for construction projects, repairing leaks or replacing aging pipes to prevent future damage on pipelines and pumps, and maintaining safe and reliable water supply for our communities. This team also includes locating underground water, recycled water, wastewater and related infrastructure in the street and other locations prior to excavating to prevent damage to underground facilities. This team consists of eight utility workers and one utility locator, all operating under the supervision of a construction supervisor. Below is a list of their accomplishments for FY 2024-25. Activities and accomplishments • The valve exercise initiative achieved a completion rate of 96% for both potable and recycled water systems, successfully identifying and reporting malfunctioning valves for replacement. To ensure the regular exercise of all valves, the total of over 9,000 valves has been categorized into three distinct groups for annual evaluation. The established goal for the annual completion rate is to exercise 95% of valves scheduled for that year. • The valve exercise program is integral to a comprehensive maintenance protocol designed to ensure the reliable functionality of valves. • It entails the thorough operation of valves across their entire range of motion, thereby mitigating the risk of them becoming seized or inoperative. • This proactive strategy not only aids in the prevention of system failures, but also significantly reduces the likelihood of incurring expensive repairs. • A total of 4,506 fire hydrants are on a triennial maintenance schedule. • Fire hydrant maintenance exceeded expectations with 99% of scheduled hydrants serviced. • Service line replacements and valve replacements were completed efficiently, with no reclaimed service repairs reported. VALVE EXERCISE PROGRAM Potable Valves: 4,136 exercised (96% of scheduled) Identified 51 broken valves and referred to asset management for inclusion in the valve replacement program Recycled Valves: 214 exercised (96% of scheduled) Identified 3 broken or non-operational valves FIRE HYDRANT MAINTENANCE PROGRAM Fire Hydrants 1,516 hydrants maintained 99% of scheduled maintenance completed Jan. 27, 2026 Item #12 Page 11 of 28 Utilities Department Operations and Maintenance Update Report FY 2024-25 9 • Utility mark outs consist of temporary, colored spray-painted lines on the ground, which serve to identify the location and type of underground utilities to ensure safety and prevent damage to buried utilities during construction. • Before digging begins on a construction project, requests for utility mark-outs are made by calling 8-1-1. • Utilities responded to 28,472 mark-out requests in FY 2024-25, encompassing all potable, recycled and wastewater utilities. Figure 4 represents how each marking is broken out. This is a new matrix for the water construction team to monitor. It is important to track this data to evaluate the impact of both private and public projects on our streets and workforce. 8-1-1 Mark-Out Requests Figure 4 Potable 34% Recycled 33% Wastewater 33% UTILITY MARK-OUTS Utility Mark Outs 28,472 Jan. 27, 2026 Item #12 Page 12 of 28 Utilities Department Operations and Maintenance Update Report FY 2024-25 10 Figure 5 Figure 6 Potable Water: • Figure 5 indicates how many breaks were encountered each year on the potable water mains • Average: 0.875 breaks/100 miles • Benchmark: < 2 main breaks per calendar year per 100 miles of potable water mains • This is the fifth year in a row the benchmark was achieved Recycled water: • Figure 6 indicates how many breaks were encountered each year on the recycled water mains • Average: 2.062 breaks/100 miles • Benchmark: < 7.2 leaks or breaks per 100 miles of recycled water mains • This is the fifth year in a row the benchmark was achieved Note: Although the number of recycled water leaks or breaks appeared to double in FY 24-25, this only represents an increase from one to two, because the recycled water system only has 97 miles of pipeline. This is not indicative of a problem at this point but rather something to watch. WATER SYSTEM RELIABILITY Potable Water Main breaks - 6 Main leaks - 2 Main repairs - 1 Service replacements - 12 Potable valve replacements - 9 Recycled Water Main breaks - 1 Main leaks - 0 Main repairs - 1 Service repairs - 0 1.758 0.879 0.659 0.656 0.875 0 0.5 1 1.5 2 2.5 CY 2020 CY 2021 CY 2022 CY 2023 CY 2024 Potable Water Potable Water Target 0 0 1.053 1.031 2.062 0 1 2 3 4 5 6 7 8 CY 2020 CY 2021 CY 2022 CY 2023 CY 2024 Recycled Water Recycled Water Target Jan. 27, 2026 Item #12 Page 13 of 28 Utilities Department Operations and Maintenance Update Report FY 2024-25 11 Figure 7 serves as an indicator of the manner in which our construction team has addressed the system's requirements throughout the fiscal year. When comparing data from one year to the next, it is essential to comprehend the allocation of the team's time. A situation wherein unscheduled work constitutes a larger percentage of scheduled repair work may suggest a need to enhance our water replacement program or to focus efforts on specific areas that require attention. Construction Maintenance Hours Leave 4% Admin/ Training/ Meetings 12% Maintenance24% Unscheduled 12% Utility locates 13% Repair 35% Figure 7 Jan. 27, 2026 Item #12 Page 14 of 28 Utilities Department Operations and Maintenance Update Report FY 2024-25 12 Meter Services The Water Meter Services team is dedicated to the installation, maintenance and monitoring of water metering systems. These professionals ensure optimal performance and reliability, conducting regular inspections and providing prompt support to address any issues. Committed to customer satisfaction, the team strives to enhance water conservation efforts and promote efficient usage through advanced metering technologies. The four-person team is supervised by the Water Superintendent. In addition to the Water Meter Services team, an Accounting Supervisor is also a valued team member who is responsible for overseeing the water segment of the utility billing process. This individual is tasked with ensuring that the meters function correctly and that charges are accurately recorded and billed in accordance with established protocols. The Meter Services team accomplished the following tasks in FY 2024-25, ensuring accurate and timely date for utility billing and system monitoring. • Completed 100% of the monthly reading across all 30,245 active meters • Exchanged 910 meters to maintain performance standards and ensure accurate reading • Installed 25 new meters to support service expansion and accommodate new customer connections • Installed or removed 52 temporary construction meters for project-based utility access • Ensured timely support and resolution of utility billing-related customer service inquiries The dedication and efficiency of this team are demonstrated in the value of potable water service charges enjoyed by the CMWD customers. Based on an average of Tier 1, 10 units of water (1 unit = 748 gallons) = 7,480 gallons Water Consumption charge @ $5.19 per unit: $51.90 Monthly Base charge: 33.68 Total charges for 7,480 gallons: $85.58 or 1.1 cents per gallon Water is still 1 cent per gallon (on average) Jan. 27, 2026 Item #12 Page 15 of 28 Utilities Department Operations and Maintenance Update Report FY 2024-25 13 Customer Service Requests *Utility billing works closely with residents to make payment arrangements. Customer service distributed 2,741 non-payment doorhangers - 96 of these services were shutoff, and 31 were reconnected the same day, 26 reconnected next day, and 39 moved out. Cross-Connection The Cross- Connection team is a specialized group dedicated to identifying, managing and mitigating risks associated with potential cross-connection of recycled water and potable water systems and backflow prevention into the potable water system. With knowledge and expertise in backflow prevention device installation, testing and maintenance and regulatory compliance, the team ensures that drinking water remains safe and uncontaminated. They conduct risk assessments, implement preventive measures, and provide training and resources to stakeholders, fostering a culture of safety and compliance within the community. The team consists of five individuals, all operating under the supervision of the Water Superintendent. The Cross-Connection Division completed activities that support public health, environmental stewardship and reliability of water systems. Below is a list of accomplishments for FY 2024-25: • Completed 6,818 backflow tests. These tests are conducted to protect the potable water system from potential contamination and are performed annually or on a schedule established by regulations. A goal is not set for this item, but this metric serves as an indicator of workload and how much customer assistance and interaction are achieved by this team. • Conducted 140 water site inspections to ensure operational integrity and compliance • Oversaw 635 recycled water sites, supporting sustainable water management practices • Reviewed 68 irrigation system plans to facilitate the planning and development of public and private water infrastructure projects Customer service site visits, 6,768 Maintenance, 12 Installs, 80 Door Hangers for Non-Payment, 2,741 Turn Offs for Non-Payment*, 96 Reconnection for Non-Payment, 31 Customer service site visits Maintenance Installs Door Hangers for Non-Payment Turn Offs for Non-Payment Reconnection for Non-Payment Figure 8 Jan. 27, 2026 Item #12 Page 16 of 28 Utilities Department Operations and Maintenance Update Report FY 2024-25 14 Cross-Connection Control Plan The team prepared the CMWD’s Cross-Connection Control Plan and submitted it to the State Water Resources Control Board. The plan protects public health by providing a comprehensive guide for water systems to prevent contamination of drinking water from non-potable sources (i.e., cross-connections) in accordance with the state’s Cross-Connection Control Policy Handbook. This handbook establishes mandatory standards, replacing previous regulations, and requires public water systems to develop robust cross-connection control programs, including hazard assessments, backflow prevention device installation and testing, and customer education, all to safeguard the integrity of the public water supply. Jan. 27, 2026 Item #12 Page 17 of 28 Utilities Department Operations and Maintenance Update Report FY 2024-25 15 Goals for Fiscal Year 2025-26 for Water and Recycled Water The following is a list of goals for the Water and Recycled Water groups for the upcoming FY 2025-26. • Complete 100% backflow testing and recycled water sites inspections • Complete 100% of required sampling and reporting requirements • Complete 100% of meter readings monthly • Rehabilitate two potable water reservoirs • Meet all required regulatory requirements • Complete 100% of service requests, new installations and meter exchanges • Complete all 26 valve replacement locations (17 of these have already been completed) • Receive regulatory comments on and finalize the Cross-Connection Control Plan • Complete the normally closed valve project on Tamarack Avenue • Continue to assist with scope development for CIP projects • Complete Asset Management Master Plan Update – water and recycled water sections • Conduct condition assessments on equipment in three potable water and four recycled water pump stations Jan. 27, 2026 Item #12 Page 18 of 28 Utilities Department Operations and Maintenance Update Report FY 2024-25 16 Wastewater Mission: Prevent public sewer spills and convey waste efficiently to the treatment plan by properly managing, operating and maintaining all parts of the sewer collections system in the city’s sewer service area. The Wastewater Division of the Utilities Department provides wastewater services to about 74% of the city. The City of Carlsbad wastewater is conveyed via a collections system and is treated by the Encina Wastewater Authority (EWA), a Joint Powers Authority co-owned by the cities of Carlsbad, Encinitas and Vista, along with the Buena Sanitation District, Leucadia Wastewater District, and Vallecitos Water District. On average, the City of Carlsbad collections system sends approximately six million gallons per day of wastewater to the treatment plant as represented in Figure 9 below. Figure 9 The City of Carlsbad operates and maintains an extensive wastewater collection system. The Wastewater Division utilizes an effective preventive maintenance (PM) program, with highly trained and efficient staff and technology to accomplish their mission (below). 4.50 5.00 5.50 6.00 6.50 Ju l -24 Au g -24 Se p -24 Oc t -24 No v -24 De c -24 Ja n -25 Fe b -25 Ma r -25 Ap r -25 Ma y -25 Ju n -25MI L L I O N G A L L O N S Average Monthly Wastewater Flow Sent to EWA FY 24-25 Jan. 27, 2026 Item #12 Page 19 of 28 Utilities Department Operations and Maintenance Update Report FY 2024-25 17 Wastewater is highly regulated in California, and the city has established a level of service that complies with state and federal wastewater discharge regulations, including maintenance, asset management, spill prevention and reporting requirements. Activities and Accomplishments During FY 2024-25, the City of Carlsbad Wastewater Division reported zero spills from or caused by the city’s wastewater collections system. It takes a rigorous preventive maintenance program to accomplish this, and the wastewater staff work with the Utilities Maintenance Planner to continually review and refine their preventative maintenance schedules. Key Performance Indicators Sewer spills per 100 miles of sewer mains This KPI measures the sewer spills caused by components over which the city could have some ability to control, such as maintenance issues (e.g., roots), Fats, Oils and Grease (FOG) or construction debris. • This does not include overflows related to capacity issues • This KPI is expressed in number of spills per 100 miles of sewer mains • Figure 10 shows the average sewer spills for the past four fiscal years FY 2024-25 result: Exceeded benchmark of less than 0.80 non-capacity sewer spills per 100 miles of sewer mains. Figure 10 Scheduled vs. unscheduled wrench time Wrench time is a term used to describe the time that staff spend performing hands-on work rather than other activities such as meetings or training. • Measuring scheduled vs. unscheduled wrench time helps assess the efficacy of the current maintenance programs. • An effective preventive maintenance program that is properly executed will reduce the amount of unscheduled time spent on equipment failures or other maintenance related 0 0.37 0.73 00 0.2 0.4 0.6 0.8 FY 21-22 FY 22-23 FY 23-24 FY 24-25 Non-Capacity Sewer Spills Per 100 Miles of Pipe (target <= 0.80) Jan. 27, 2026 Item #12 Page 20 of 28 Utilities Department Operations and Maintenance Update Report FY 2024-25 18 issues because it allows staff to identify problems in advance and schedule the time to address them, rather than stop what they are doing to respond to unexpected failures. FY 2024-25 result: Wastewater staff spent more of their available time on scheduled work than on non-scheduled work. Wastewater time allocation in FY 2024-25 Sewer Main Cleaning The Collections team adheres to a maintenance schedule for the cleaning and inspection of sewer pipelines, ensuring the proper operation of the entire sewer system. • The cleaning program is the most effective method of reducing sewer spills • The cleaning schedule is reviewed each year, evaluating information such as the type of debris found in the mains during cleaning, and adjusted if needed FY 2024-25 results: • Cleaned 100% of the scheduled gravity mains – 139 miles, which represents 3,205 segments, or 48% of the lines in the preventive maintenance program o Some lines were cleaned multiple times because they are in areas with a history of roots, grease or other debris issues. Including the multiple cleanings, 175 total miles were cleaned • 82% of the lines cleaned had no debris. Grit was the type of debris most found in the remaining lines, which is normal. Debris types are shown in Figure 12. Trainings/ Meetings 33% Scheduled 59% Unscheduled8% Figure 11 Jan. 27, 2026 Item #12 Page 21 of 28 Utilities Department Operations and Maintenance Update Report FY 2024-25 19 Manhole Condition Assessment Manholes are visually inspected when the associated sewer mains are being cleaned. FY 2024-25 result: 3,120 manholes were inspected. Forty-three were rated as poor and two were rated as failing. These 45 manholes were referred to Asset Management for more in-depth assessment and possible rehabilitation. Construction Debris1% Grease 9% Grit 62% Multiple Debris Types 11% Roots 9% Sand 8% Figure 12 Rehab Needed 1% No Rehab Needed 99% FY 2024-25 Manhole Inspection Results Figure 13 Jan. 27, 2026 Item #12 Page 22 of 28 Utilities Department Operations and Maintenance Update Report FY 2024-25 20 Sewer Main CCTV Inspection (Condition Assessment) The primary way that defects in gravity sewer mains are inspected and identified is with a truck- mounted closed-circuit television, or CCTV, system. • Gravity mains with a diameter of 15” or smaller are inspected on a 5-year schedule by staff • Gravity mains with a diameter over 15” are inspected on a 7-year schedule by a specialized contractor • Sewer mains with structural defects are potential candidates for rehabilitation or replacement, depending on the number and severity of the defects FY 2024-25 results: • Staff conducted 794 CCTV inspections and performed condition assessments on 30 miles of sewer mains • 28 sewer mains had structural deficiencies that will eventually need to be repaired. These were referred to asset management for further review and potential placement on the rehabilitation and replacement list Lift Stations The City of Carlsbad has 11 city-owned and operated sewer lift stations and two that are co- owned with the City of Vista and operated by EWA. • Most of the wastewater flows via gravity to the treatment plant, but there are some areas where the wastewater needs to be pumped, or “lifted,” from a low point to a higher elevation so that it can continue to flow via gravity. • Lift stations have pumps, electrical components and other complex equipment that is monitored by the city’s Supervisory Control and Data Acquisition (SCADA) system and need to be regularly maintained. • While equipment can fail for a variety of reasons (e.g., defects, age, unexpected materials passing through the pumps), maintenance-related failures are tracked because they can be prevented with proper maintenance. This means they are a reflection on the effectiveness of the preventative maintenance program and the quality of work performed by staff. FY 2024-25 results: • Staff performed 100% of the scheduled preventive maintenance at the city’s lift stations and no maintenance-related equipment failures occurred. • As indicated in Figure 14 below, equipment failures have been decreasing over the last three years, which could be due to increased and more proactive preventive maintenance activities. For example, staff have proactively tested pumps to detect problems before failures occur. Jan. 27, 2026 Item #12 Page 23 of 28 Utilities Department Operations and Maintenance Update Report FY 2024-25 21 Sewer System Management Plan (SSMP) Update The SSMP is a regulatory document that identifies how the city complies with the Waste Discharge Requirements established by the State Water Resources Control Board. This plan is required to be updated every six years and approved by the City Council. FY 2024-25 result: Completed in June 2025, approved by the City Council in July 2025 and submitted to the State Water Resources Control Board. Fats, Oils and Grease (FOG) Management Program The city is required by the State Water Resources Control Board to have a program to reduce the amount of FOG that is put into the collection system by food service establishments (FSEs). The city’s program consists of annual inspections to verify that required maintenance activities are being conducted by the FSEs. Notices of Violation (NOVs) and Administrative Citations are issued to FSEs that are not compliant after a generous amount of time is given to the facility to achieve compliance. FY 2024-25 Results: • Completed 256 inspections: 93% overall compliance rate; this is the third straight year that compliance exceeded 90% (previous years were in the 40-50% range) • Issued 54 NOVs, and 24 restaurants went into the Administrative Citation process 30 25 14 0 5 10 15 20 25 30 35 FY 22-23 FY 23-24 FY 24-25 Lift Station Failures Figure 14 Jan. 27, 2026 Item #12 Page 24 of 28 Utilities Department Operations and Maintenance Update Report FY 2024-25 22 Goals for FY 2025-26 • Complete 100% of scheduled cleaning on 200 miles of gravity sewer mains • Complete 100% of scheduled condition assessments on 4,737 manholes • Complete 100% of scheduled CCTV inspections on 65 miles of sewer main • Complete CCTV inspections on at least 50% of the large diameter sewer mains, or trunk lines • Complete inspections on 271 FSEs for the FOG Management Program and achieve a 95% compliance rate • Perform 3D scanning on manholes rated Poor or Failing, and those that are too deep for visual inspections • Evaluate capital improvement planning software options to replace current software that no longer meets division needs. Capital planning software assists with evaluating sewer gravity main defects found during CCTV inspections and generating a prioritized list to refer to Asset Management and Engineering for rehabilitation or replacement • Complete Asset Management Master Plan update – wastewater section • Lift Stations o Complete 100% of high priority PM activities o Meet goal of having a spare pump at each station by purchasing one more pump o Replace flow meter, vault and valves at the Cannon lift station o Pavement restoration and seal coat at Home Plant, Sand Shell and Knots lift stations o Replace motor control center (MCC) at Sand Shell lift station o Conduct condition assessments on equipment and wet wells at all 11 lift stations Jan. 27, 2026 Item #12 Page 25 of 28 Utilities Department Operations and Maintenance Update Report FY 2024-25 23 Capital Improvement Program Projects This section outlines the capital improvement projects successfully began or completed during the fiscal year, highlighting our commitment to enhancing infrastructure and community resources. Through strategic planning and effective allocation of resources, we have achieved significant milestones that not only bolster operational efficiency but also contribute to the overall quality of life for our residents. This is a comprehensive overview of the key projects undertaken, their impact on the community, and the collaborative efforts that made these accomplishments possible. FY 2024-25 Accomplishments The Engineering Division completed design and provided construction phase support services on the following projects. Costs listed are approximate. Water • SCADA software design for remote sites: $2.07 million • Carlsbad Palomar Airport Waterline Replacement Project: $2 million • Valley Water Main Replacement: $364,000 • El Fuerte & Maerkle Motorized Valve Project: $2.3 million • Water Reservoir Site Improvements: $460,000 ($235,000 La Costa Hi and $225,000 B-TAP Reservoir sites) • Pressure Reducing Station Replacements Project: $5 million (El Fuerte, Melrose, Palomar West) Recycled water • SCADA software design for recycled water remote sites: $420,000 • New 1.5-million-gallon recycled water D-4 tank: $6.06 million ($513,000 design, $5.55 million construction) Wastewater • SCADA software design for wastewater remote sites $510,000 • Replaced 615 linear feet of sewer main at Foxtail Loop to improve capacity: $844,000 • Installed an air-vacuum valve platform at Buena Vista Lift Station to improve operator safety during maintenance: $17,000 • Completed Knots Lift Station pump, check valve and electrical replacements: $78,500 Jan. 27, 2026 Item #12 Page 26 of 28 Utilities Department Operations and Maintenance Update Report FY 2024-25 24 FY 2025-26 Objectives The Engineering Division will work toward the following design and construction phase activities for capital improvement program projects in the upcoming fiscal year. Costs listed are approximate. Water • Replacement of electrical control panels at remote water sites: $3.0 million • Remove and reapply protective coatings at two steel water tanks (Elm & Skyline reservoirs): $2.5 million • Complete replacement of 5,000 linear feet of water mains in the Terramar area: $4.4 million • Complete design of pressure-reducing stations: $242,000 (Laguna, Kelly, Point D South, Lake Shore Gardens) • Complete design of 6” through 12” asbestos cement (AC) water main replacement in Adams St and Cove Dr: $661,000 • Complete design and construction of water valves and water and sewer pipeline replacement and relocation in the Village & Barrio area: $3.12 million • Complete construction phase support services for water valve package replacements: $4.98 million (87 valves at 26 locations) Recycled water • Start design for replacement of electrical control panels at remote recycled water sites: $826,000 Wastewater • Start design for replacement of electrical control panels at remote wastewater sites: $904,000 • Complete the Wastewater Master Plan Update: $425,000 • Complete the replacement of 630 linear feet of sewer main and rehabilitation of 900 linear feet of sewer main and seven manholes in the Terramar area: $1.1 million • Complete the design and begin construction to upsize 2,600 linear feet of sewer main (12” to 15”/18”) along Poinsettia Lane: $4.8 million • Rehabilitate 21 manholes in the Bressi Ranch area and the Poinsettia Lift Station that have been rated poor or failing: $616,000 • Complete the construction of Canon Lift Sation Improvements (replace flow meter, vault, valves, and electrical improvements): $1.4 million • Complete the Poinsettia Lift Station Generator Replacement (replace emergency 250- kW generator, power controls and communication and minor building improvements): $553,000 Jan. 27, 2026 Item #12 Page 27 of 28 Utilities Department Operations and Maintenance Update Report FY 2024-25 25 • Complete design of Chinquapin Lift Station Improvements (replace generator, electrical equipment and construct a building to reduce corrosion of electrical gear): $125,000 • Complete surface repairs at various sewer lift stations: $23,000 (Home Plant, Sand Shell, Knots) • Complete Pine restroom facilities slide rail retrofit design (install slide rails and modify pumps and discharge piping): $38,000 Jan. 27, 2026 Item #12 Page 28 of 28 Amanda L. Flesse, Utilities Director/CMWD General Manager Jan. 27, 2026 Utilities Status Report for Water, Wastewater and Recycled Water Programs Water Recycled waterWastewater TODAY’S PRESENTATION ITEM 11: Water, Wastewater, Recycled Water Operation and Maintenance Update 3 ITEM 12: Water, Wastewater, Recycled Water Operation and Maintenance Update WATER 5 WATER 6 Water Operations Construction Meters WATER OPERATIONS Water Operations Construction Meters Reservoirs Pump stations Pressure reducing stations SCADA 7 ITEM 12: Water, Wastewater, Recycled Water Operation and Maintenance Update •Rebuilt pressure-regulating valves at 22 pressure reducing stations •Annual inspections for Calavera and Maerkle dams •Completed Lead sampling report •Phase III Valve Replacement Project –46 scheduled shutdowns –57 non-functioning valves replaced –30 new valves 8 WATER OPERATIONS ACCOMPLISHMENTS ITEM 12: Water, Wastewater, Recycled Water Operation and Maintenance Update CONSTRUCTION MAINTENANCE Water Operations Construction Meters Exercise valves Repairs Fire hydrants Utility markouts 9 ITEM 12: Water, Wastewater, Recycled Water Operation and Maintenance Update Leave 4% Admin/ Training/ Meetings 12% Maintenance 24% Unscheduled 12% Utility locates 13% Repair 35% MAINTENANCE HOURS 10 ITEM 12: Water, Wastewater, Recycled Water Operation and Maintenance Update METER SERVICES Water Operations MetersConstruction Meter readings Exchanges Installations Replacements 11 ITEM 12: Water, Wastewater, Recycled Water Operation and Maintenance Update METER SERVICES ACCOMPLISHMENTS •Monthly reading of 30,245 active meters •Exchanged 910 meters •Installed 25 new meters •Installed/removed over 52 temporary construction meters 12 ITEM 12: Water, Wastewater, Recycled Water Operation and Maintenance Update 13 Customer service site visits, 6,768 Maintenance, 12 Installs, 80 Door Hangers for Non- Payment, 2,741 Turn Offs for Non- Payment*, 96 Reconnection for Non-Payment, 31 13 ITEM 12: Water, Wastewater, Recycled Water Operation and Maintenance Update WASTEWATER 15 15 WASTEWATER 16 Wastewater Operations Collections ITEM 12: Water, Wastewater, Recycled Water Operation and Maintenance Update WASTEWATER COLLECTIONS & OPERATIONS Maintenance responsibilities •Lift stations •CCTV inspection •Fats, oils and grease program •Manhole inspections •Updated SSMP •SCADA •ZERO SPILLS! 17 ITEM 12: Water, Wastewater, Recycled Water Operation and Maintenance Update RECYCLED WATER 19 CROSS CONNECTION •Completed 6,818 backflow tests •Conducted 140 recycled water use site inspections •Supervised 635 recycled water sites •Reviewed 68 irrigation system plans for public and private developments •Developed and submitted Cross Connection Control Plan 20 ITEM 12: Water, Wastewater, Recycled Water Operation and Maintenance Update CAPITAL IMPROVEMENT PROJECTS CIP ACCOMPLISHMENTS Water •SCADA software design for remote sites: $2.07 million •Palomar Airport Waterline Replacement: $2 million •Valley Water Main Replacement: $364,000 •El Fuerte & Maerkle Motorized Valves: $2.3 million •Water Reservoir Site Improvements: $460,000 ($235,000 La Costa Hi and $225,000 B-TAP Reservoir sites) •Pressure Reducing Station Replacements: $5 million (El Fuerte, Melrose, Palomar West) Recycled water •SCADA design for recycled water remote sites: $420,000 •New 1.5-million-gallon recycled water D-4 tank: $6.06 million ($513,000 design, $5.55 million construction) 22 Wastewater •SCADA design for wastewater remote sites $510,000 •Replaced 615 linear feet of sewer main at Foxtail Loop to improve capacity: $844,000 •Installed an air-vacuum valve platform at Buena Vista Lift Station to improve operator safety during maintenance: $17,000 •Completed Knots Lift Station pump, check valve and electrical replacements: $78,500 ITEM 12: Water, Wastewater, Recycled Water Operation and Maintenance Update CIP OBJECTIVES Water •Replace electrical control panels at remote water sites: $3.0 million •Remove and reapply protective coatings at two steel water tanks (Elm & Skyline reservoirs): $2.5 million •Complete replacement of 5,000 linear feet of water mains in the Terramar area: $4.4 million •Complete design of pressure-reducing stations: $242,000 (Laguna, Kelly, Point D South, Lake Shore Gardens) •Complete design of 6” through 12” asbestos cement (AC) water main replacement in Adams St and Cove Dr: $661,000 •Complete design and construction of water valves and water and sewer pipeline replacement and relocation in the Village & Barrio area: $3.12 million •Complete construction phase support services for water valve package replacements: $4.98 million (87 valves at 26 locations) Recycled water •Start design for replacement of electrical control panels at remote recycled water sites: $826,000 Wastewater •Start design for replacement of electrical control panels at remote wastewater sites: $904,000 •Complete the Wastewater Master Plan Update: $425,000 •Complete the replacement of 630 linear feet of sewer main and rehabilitation of 900 linear feet of sewer main and seven manholes in the Terramar area: $1.1 million •Complete the design and begin construction to upsize 2,600 linear feet of sewer main (from 12” to 15” & 18”) along Poinsettia Lane: $4.8 million •Rehabilitate 21 manholes in the Bressi Ranch area and the Poinsettia Lift Station: $616,000 •Complete the construction of Canon Lift Station Improvements (replace flow meter, vault, and check valves): $1.4 million •Complete the Poinsettia Lift Station Generator Replacement (emergency 250-kW generator, power controls, and communication): $553,000 •Complete design of Chinquapin Lift Station Improvements (replace generator, electrical equipment, and construct a building to reduce corrosion of electrical gear): $125,000 •Complete pavement resurfacing at various sewer lift stations: $23,000 (Home Plant, Sand Shell, Knots) •Complete slide rail retrofit at Pine restroom (install slide rails and modify pumps and discharge piping): $38,000 23 ITEM 12: Water, Wastewater, Recycled Water Operation and Maintenance Update NEXT STEPS •Asset Management Plans (2026) •Master Plans – CIP (2026) o Water o Wastewater •Rates for water, wastewater, and recycled water (2027) 24 ITEM 12: Water, Wastewater, Recycled Water Operation and Maintenance Update Thank you