HomeMy WebLinkAboutAMEND 2024-0008; INNS OF AMERICA; PRELIMINARY DRAINAGE STUDY; 2025-05-08Jo PRELIMINARY DRAINAGE STUDY CARLSBAD COMMONS 5010 AVENIDA ENCINAS (INNS OF AMERICA) APN: 210-090-52 50 IO A venida Encinas Carlsbad, CA 92008 Prepared By: RCE 80667 Van Ryn Engineering, Inc. 16766 Bernardo Center Dr., Ste 115 San Diego, CA 92128 "~ VA N RVN Prepared for: Alliance Development Services 17828 Villamoura Dr., Poway, CA 92064 / May 8, 2025 EXP: 3-31-27 CITY OF CARLSBAD MAY 2 2 2025 PLANNING DIVISION DRAINAGE STUDY -5010 AVENJDA ENCINAS SPETEMBER 2024 TABLE OF CONTENTS 1. INTRODUCTION .................................................................................................................................. 4 1.1 Exi sting Conditions ......................................................................................................................... 4 1.2 Proposed Conditions ...................................................................................................................... 4 2. METHODOLOGY .................................................................................................................................. 5 2.1 Rationa l Method ............................................................................................................................. 5 2.2 Runoff Coefficient ........................................................................................................................... 5 2.3 Rainfall Intensity .............................................................................................................................. 5 2.4 Tributary Areas ............................................................................................................................... 5 3. CALCULATIONS/RESULTS ................................................................................................................... 6 3.1 Pre & Post-Development Peak Flow Comparison ....................................................................... 6 3.2 Storm Water Volume Calcu lations ................................................................................................ 8 4. CONCLUSION ...................................................................................................................................... 9 Appendix 1 ....................................................... Pre & Post Project Hydrology Calculations Appendix 2 .......................................................... Existing and Proposed Drainage Exhibits DRAINAGE STUDY-50I 0AVENIDA ENCINAS SPETEMBER 2024 Figure 1 Vicinity Map VICINITY MAP N. T.S. DRAINAGE STUDY -5 OJ O A VENJDA ENCJNAS SPETEMBER 2024 1. INTRODUCTION 1.1 Existing Conditions The project site is located at 5010 Avenida Encinas in Carlsbad, California. The lot is 117,738 square feet, or 2. 703 acres and consists of the existing hotel, parking areas, and landscape areas. The focus of this drainage study is the northern portion of the site along Cannon Road. This portion of the site exists as primarily pervious landscape area, except for the existing utility enclosure and concrete wall. This northern portion of the site is the only area where improvements are to be made, and the rest of the lot will remain unchanged. The drainage basin that is the focus of this study has a total area of 7,782 square feet, or 0.179 acres, and consists of 685 square feet of impervious surfaces. The area is made up of 8.80% impervious surfaces. 1.2 Proposed Conditions The project proposes the construction of a new recreational space on the northern portion of the lot. The proposed hardscape consists of two concrete pickle ball courts, along with a room for bike and surfboard storage. The existing utility enclosure will remain undisturbed, but portions of the concrete wall will be removed to accommodate the proposed hardscape. The proposed conditions introduce 4,821 square feet of new/replaced impervious area, resulting in the percentage of impervious surfaces increasing to 67.55%. To account for the increase in impervious areas, a bioretention basin is proposed on the western side of the proposed hardscape. Runoff-from the new pickleball courts will be collected in a landscape drain which discharges directly into the proposed basin. DRAINAGE STUDY-5010AVENIDA ENCINAS SPETEMBER 2024 2. METHODOLOGY The proposed project has been analyzed to determine the peak runoff flow for the 100-year, 6-hour rainfall event using the Rational Method per the San Diego County Hydrology Manual. The Weighted Runoff Coefficient, C, for the existing and proposed conditions was calculated using section 3 .1.2 of the San Diego County Hydrology Manual. A rainfall intensity value was found using the equation located in Figure 3-1 of the manual. The rainfaJI intensity for the existing and proposed drainage areas was calculated using a minimum time of concentration of 5 min. Based on the 100-year, 6-hour conditions, the intensity was found to be 6.59 inches per hour. The County of San Diego Hydrology Manual Rainfall Isopluvials were used to find a precipitation value of 2.5 inches resulting from A 100-year, 6-hour rainfall event. Civil 3D Hydrographs were used to model the watershed, and correctly size the proposed bioretention basin to account for the increase in peak runoff resulting from the proposed conditions. 2.1 Rational Method As mentioned above, runoff from the project site was calculated for the 100-year storm events. Runoff was calculated using the Rational Method which is given by the following equation: Q =CxlxA Where: Q = Flow rate in cubic feet per second ( cfs) C = Runoff coefficient I = Rainfall Intensity in inches per hour (in/hr) A = Drainage basin area in acres, (ac) Rational Method calculations were performed using the San Diego County Hydrology Manual 2.2 Runoff Coefficient The runoff coefficients for the project were calcul ated using section 3.1.2 of the San Diego County Hydrology Manual and using a weighted average runoff coefficient based on the actual and proposed impervious areas. 2.3 Rainfall Intensity Rainfall intensity was determined using Figure 3-1 of the San Diego County Hydrology Manual. Based on a 5 min time of concentration for the existing and proposed conditions and an intensity of 6.59 inches per hour has been calculated. 2.4 Tributary Areas Drainage basins are delineated in the Post-Project Hydrology Exhibit in Appendix 2 and graphically portray the tributary area for each drainage basin. DRAINAGE STUDY-5010 AVENIDA ENCINAS SPETEMBER 2024 3. CALCULATIONS/RESULTS 3.1 Pre & Post-Development Peak Flow Comparison 3.1.1 Pre-Development Peak Flow Precipitation 1ooyr,6hr = 2.5 (See Appendix 1 for County of San Diego Rainfall Isopluvial Map) Weighted Runoff Coefficient "C" = (7,079 sf)(O.35) + (685 sf)(.9O) = 0.40 7,782 sf Time of Concentration "Tc"= 5 min. Intensity "i" = 7.44P6o-0645 = 7.44(2.5)(5-·0645) = 6.59 in/hr Q=C*i* A= 0.40*6.59 in/hr*O.179 ac = 0.47 CFS 3.1.2 Post-Development Peak Flow ➔ D = 5 min., for minimum Tc Weighted Runoff Coefficient "C" = (2,525 sf)(O.35) + (5 ,25 7 sf)(.9O) = 0.72 7,782 sf Time of Concentration "Tc" = 5 min. Intensity "i" = 7.44P6o-0•645 = 7.44(2.5)(5-·0645) = 6.59 in/hr Q=C*i* A= 0.72*6.59 in/hr*O.179 ac = 0.85 CFS ➔ D = 5 min., for minimum Tc DRAINAGE STUDY-5010 AVENIDA ENCINAS SPETEMBER 2024 Below are a series of tables which summarize the calculations provided. ' SITE IMPERVIOUS AREA COMPOSITION TOTAL TOTAL TOTAL WEIGHTED IMPERVIOUS PERVIOUS % PROJECT RUNOFF IMPERVIOUS AREA AREA AREA COEFFICIENT (SQ-FT) (SQ-FT) SURFACES "C" (SQ-FT) Existing 685 7,079 7,782 8.80% 0.40 Conditions Proposed 5,257 2,525 7,782 67.55% 0.72 Conditions Table 1. Runoff Coefficient "C" Comparison The table above shows the difference in the weighted runoff coefficient, "C", between the existing and proposed condition. Calculations of the weighted runoff coefficients are based on Section 3 .1.2 of the San Diego County Hydrology Manual and underlying hydro logic soil group B. EXISTING DRAINAGE FLOWS WEIGHTED DRAINA DRAINAGE RUNOFF Q100 I 100 GE AREA AREA COEFFICIENT (CFS) (IN /HR) (SQ-FT) (C) SITE 7,782 0.40 0.47 6.59 Table 2. Existing Condition Peak Drainage Flow Rates Table 2 above lists the peak flow rates for the project site in the existing condition for the respective rainfall events. PROPOSED DRAINAGE FLOWS DRAINAGE RUNOFF DRAINAGE Q1 00 I 100 AREA COEFFICIENT AREA (CFS) (IN/HR) (SQ-FT) (C) SITE 7,782 0.72 0.85 6.59 Table 3. Proposed Condition Peak Drainage Flow Rates Table 3 above lists the peak flow rates for the project site for the proposed condition for the respective rainfall events. DRAINAGE STUDY -5010 AVENIDA ENCINAS SPETEMBER 2024 PEAK FLOW COMPARISON --------------------------- DRAINAGE Ql00 CONDITION AREA UNDETAINED Vl00 (SQ-FT) (CFS) (CU -FT) EXISTING 7,782 0.47 650 PROPOSED 7,782 0.85 1,170 Table 4. Proposed Condition Peak Drainage Flow Rates Table 4 above shows a comparison between the peak flow rates and precipitation volume for the proposed condition and the existing condition. 3.2 Storm Water Volume Calculations 3.2.1 Pre-Development Volum e Vol=C*P6*A Vol=0.40*2.5 in*0.179 ac*3,630 = 650 cu-ft 3.2.2 Post-Development Volume Vol=C*P6*A Vol=0.72*2.5 in*0.179 ac*3,630 = 1,170 cu-ft Li Vol= Post-Development Volume -Pre-Developement Vo lume Li Vol= 1,170 cu-ft -650 cu-ft= 520 cu-ft Because the proposed site improvements lead to an increase in peak runoff, a bioretention basin was designed and sized to slow the peak runoff, and additional runoff volume. AutoCad Hydroghaphs was used to calculate the peak runoff after the bioretention basin was implemented. See Appendix 1 for the Hydraflow Hydrographs summary. 3.2.3 Proposed Basin Volumes PR-DETENTION BASIN: The proposed basin has 12.6 inches or 1.05 feet of freeboard above the top of grate elecation of 44.5 feet. There is 6" or 0.5 feet of ponding below the top of grate elevation, meaning the basin has a combined depth of 18.6 inches or 1.55 feet. The basin has a storage volume equal to 300 cubic ft. The basin will have a 12" x 12" box inlet approximately 6" above the bottom elevation with 2 -4" orifice cut outs at the dirt elevatoin. The riser structure will connect to an existing storm drain curb inlet box with a 12" pipe. According to Hydraflow Hydrographs, the basin will be able to slow the peak runoff leaving the site from 0.86 CFS to 0.457 CFS. This is a smaller peak runoff value than the exisitng site value equal to 0.47 CFS. To verify DRAINAGE STUDY-50I0AVENIDA ENCINAS SPETEMBER 2024 that ponding during a 100 year, 6 hour storm event will not exceed 36 hours a calculation was done based off of the soil type on site. According to NRCS Soil Survey Maps, the soil on the site is type "B", which corresponds to an infiltration rate of approximately 0.200 inches per hour. Given that the basin in question has 6 inches of ponding, this means it will take approximately 30 hours for the basin to drawdown completely. Precise infiltration tests will determine more accurate drawdown times during review of the construciton plans. (6 in)/ (0.2 in/lhr) = 30 hours. Since the calculated vaue of30 hours is less than the ellowed limit of36 hours, the proposed basin complies with the City of Carlsbad's standards. 4. CONCLUSION As discussed previously the proposed project's peak runoff flow and volume will be mitigated using the proposed bioretention basin. Therefore, the project will not negatively affect the downstream facilities or adjacent properties. It is my professional opinion that the storm drain system as proposed in this report and on the grading plans herein is adequate to intercept, contain and convey QIO0 and will not create negative impacts to the downstream system from the velocity, volume, or surface flows. DRAINAGE STUDY-5010 AVENJDA ENCINAS APPENDIX 1 EXISTING & PROPOSED HYDROLOGY CALCULATIONS SPETEMBER 2024 ..... +-\,/· r t 1 --•-------· . .,--(· --r --·•----· ···r T ~ t~~ .. I _j'·-.. ' " '~ 1 I • -. I ' -· ,'-!) I i ,-r.· i ···.::.-~·t j:. -+-r --. . ........... . \·t·,·· ~1J~~>: ·11 ' r+.: t r J -\.-~j-j ·.;:S,-:§ .. T", 1 l -; •• , T l ----····'- • ..; ···-~---··t}~~- ;~ ···1 :, ···t:···· :------·--···~/"t ···/·:-·-·--, County of San Diego Hydrology Manual '• .::.. ... ,f,1,f, ..• <~ Rainfall Isopluvials 100 Year Rainfall Event -6 Hours lsopluvial (inches) DPW ~GIS De,o:tftff.enrof P/Jbiic W~ c~,;,;m/orrT,i.lli:;,n&-n--.cc,- THIS MAP IS PROVIDED WITHOUT WARRANTY OF ANY KIND, EITHER EX.PRES~ OR IMPLIED, INCLUDING, BUT NOT LIMITED TO, THE IMPLIED WARRANTIES OF MERCHANTABILITY AND FITNESS FOR A PARTICULAR PURPOSE. Copyright SanGIS. Al Rights Reserved. This products may contain information from the SANOAG Regional Information System which cannot be reproduced without the written permission of SANOAG. This product may contain information which has been reproduced with permission granted by Thomas Brothers Maps. 3 Miles 5010 AVENIDA ENCINAS J-2439 S/8/202S Drainage Area Area Description ON-SITE EX. EX-1 DRAINAGE AREA TOTAL: 8MP location Basin Description PR-1 Bioretention Basin TOTAL Note: 100 Yr Storm at 5 Min TC Total Area (Ac) 0.18 0.18 Total Area (Ac) 0.18 0.18 Intensity: 6.59 in/hr ~_P_re_c~ip_:~ __ 2_.5_0 __ ~in DETENTION BASIN SIZING EX. PEAK RUNOFF VOLUME: PR. PEAK RUNOFF VOLUME: DELTA PRE VS. POST: 10.0 0.0 8.0 7.0 0.0 5.0 ~ ~ ~ ~ ~"'!,,. ~ 7 ~ 1' I', -~ ...... I I I HYDROLOGY SUMMARY PRE-PROJECT HYDOLOGY Total Weighted Total Area Impervious " " Runoff Intensity Peak Runoff Q: (sq-ft) Area (Sq-Ft) Impervious Pervlous Coefficient (In/hr) (CFS) 7782 685 9% 91% 0.40 6.59 0.47 7782 685 POST-PROJECT HYDOLOGY Total Impervious Wei1hted Peak Runoff Q Total Area Area " " Runoff Intensity Un-Detained: (sq-ft) (Sq-Ftl Impervious Pervlous Coefficient (in/hr) (CFS) 7782 5257 68% 32% 0.72 6.59 0.86 7782 5257 68% 32% 0.72 6.S9 0.86 Runoff Coefficient Impervious 0.90 Landscape 0.35 TOTAL LID PLANTER STORAGE CURVE DEPTH ELEVATI AREA STAGE TOTAL 646 cu-ft 0 44 196.6 0 0 1170 cu-ft 0.25 44.25 245.3 61.325 61.325 0.5 44.5 297.5 74.375 135.7 524 cu-ft 0.75 44.75 353.3 88.325 224.025 1 45 412.54 103.135 327.16 11 1 1 11111 1111111111 1 11 111 1111111111 111)11 111)111111 ' I EQUATION ' I = 7.44 P5 o-0.64S = 4.0 i',~~ ',, I lntensily (in/hr) ... P5 • 6-Hour Precipitation (In) 3.0 20 I i 1.0 f0.o j°·a .50.7 0.6 0.5 0.4 0.3 0.2 0.1 ~~ ...... , ' I',~ ...... ' • 7 8 9 10 ' I I I ' ~ 15 20 30 40 50 1 Minutes Duration P:\ACTM K>BS\2439_C:.rls~d 10 HospiUllity\CML\REPORTS\HVOROLOGV\1439-0RN<ALCS D • Duration (min) 11111111111 11111 ... ,', -... ,, -' ... ', ' - ~ ... ~~ ~ ~ I• I 3 Hours I I : :\' ::~ i 5.0 [ ,.5 a 4.0 = 3.S- 3.0 2.5 2.0 1.5 1.0 lntenslty-Ouratlon DNJgn Chart • Template Peak Runoff Volume: (cu-ft) 646 Peak Peak Runoff Q Runoff Detained: Volume: (CFS) (cu-ft) 0.54 1170 0.54 1170 Dtrectlona for AppH-n: (1) From precipitation maps determine 6 hr and 24 hr amounls ror lhe seleded lrequency. These maps are included in lhe Counly Hydrology Marual (10, 50, and 100 yr maps included in the De&ign and Procedure Manual). (2) Adjusl 6 hr pnidpitation (II necessary) so that It Is within lhe range of 45% to 65% of lhe 24 hr precipitation (not applicaple lo Desert). (3) Plol 6 hr precipitallon on the righl side of the chart. (4) Draw a line through the poinl paranel to the plotted lines. (5) This Hne Is the lntensily-duralion curve lor the location being analyzed . Appllcallon Form: (a) Selected frequency __ year p (b) P6 • __ in., P24 = __ .~ = %121 24 (c) Adjuoled P5121 • __ In. (d) Ix= __ min. (e) I= __ ln.Jhr . Note: This chart replaces the lntenslly-Durallon-Frequency curves used since 1965. 1.S 2 2.S 3 3.5 I I I I I S.S I I 1 I. Hydraflow Table of Contents DETENTION-UPDATED.gpw Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2025 Thursday, 05 / 8 / 2025 Watershed Mode I Schematic .................... • ............................................. _..................... 1 Hydrograph Return Period Recap.............................................................................. 2 100 -Year Summary Report ......................................................................................................................... 3 Hydrograph Reports ................................................................................................................... 4 Hydrograph No. 2, Reservoir, OUTFLOW ................................................................................ 4 Pond Report-BASIN 1 OUTFLOW ..................................................................................... 5 ID F Report.................................................................................................................... 7 1 Watershed Model Schematic Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2025 1 ~t!f V • Legend l::bts1. Qd.gin Description 1 Manual BASIN 1 INFLOW 2 Reservoir OUTFLOW Project: DETENTION-UPDATED.gpw Thursday, 05 I 8 I 2025 2 Hydrograph Return Period Rec~raflowHydrographs ExtensionforAutodesk®Civil3D®byAutodesk, Inc. v2025 Hyd. Hydrograph Inflow Peak Outflow (cfs) Hydrograph No. type hyd(s) Description (origin) 1-yr 2-yr 3-yr 5-yr 10-yr 25-yr 50-yr 100-yr 1 Manual ------------ ------------ ------ ------ ------------0.860 BASIN 1 INFLOW 2 Reservoir 1 --------------------------------------0.457 OUTFLOW Proj. file: DETENTION-UPDATED.gpw Thursday, 05 / 8 I 2025 3 Hydrograph Summary _Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2025 Hyd. Hydrograph Peak Time Time to Hyd. Inflow Maximum Total Hydrograph No. type flow interval Peak volume hyd(s) elevation strge used Description (origin) (cfs) (min) (min) (cuft) (ft) (cuft) 1 Manual 0.860 5 245 768 -----............ -----BASIN 1 INFLOW 2 Reservoir 0.457 5 250 745 1 44.59 153 OUTFLOW. ' DETENTION-UPDATED.gpw Return Period: 100 Year Thursday, 05 / 8 / 2025 4 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2025 Thursday, 05 I a I 2025 Hyd. No. 2 OUTFLOW Hydrograph type Storm frequency Time interval Inflow hyd. No. Reservoir name Storage Indication method used. Q (cfs) = Reservoir = 100 yrs = 5 min = 1 -BASIN 1 INFLOW = BASIN 1 OUTFLOW Peak discharge Time to peak Hyd. volume Max. Elevation Max. Storage OUTFLOW Hyd. No. 2 --100 Year = 0.457 cfs = 4.17 hrs = 745 cuft = 44.59 ft = 153 cuft 1.00 -.-------..----------,-------.--------..----------.-------.- Q (cfs) 1.00 0.90 -i------1---------+-------+------1---------+-------+-0.90 0.80 -+------+-------+------+------+-----.....+--------+-0.80 ... 0.70 -+------+-------+------+------+-----...+--------+-0.70 0.60 -+------+-------+------+------+--------IHI+------+ 0.60 0.50 -+------+-------+------+------+--------il-K+--------+-0.50 ---- -----0.40 --_-_-..:::.::.::::::---------+-------+------+---_-_-_-_-_--..------0.40 --- -----0.30 -+------+-------+------+------1-------------+-0.30 0.20 -+------+-------+------+------t------, ....... ----..... r-------t-0.20 -,11■-,,-----1.1------v--=\._---= 0.1 o t---=-=-=-=-=-=-=-=-~L-=-=-=-=-=-=-=-=--t===-=-=--t--====x.b ~-::--:.~=-=-=-:t=-=-=-~t•:::..-=-=-=---t 0.1 o ----fl~-f-~\ . ' 0.00 -1..::=::::::::::L....:::::::;_..t::::=:::::::t::::::::::";J.•:lll-===-----1==1:::5;;L. 0.00 0.0 0.8 1.7 2.5 3.3 4.2 5.0 -HydNo.2 -HydNo.1 II 1 1 I 11 II Total storage used= 153 cuft Time (hrs) Pond Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2025 Pond No. 1 -BASIN 1 OUTFLOW Pond Data Contours -User-defined contour areas. Conic method used for volume calculation. Begining Elevation = 44.00 ft Stage I Storage Table Stage (ft) Elevation (ft) Contour area (sqft) Iner. Storage (cuft) Total storage (cuft) 0.00 44.00 197 0 0 0.25 44.25 245 55 55 0.50 44.50 298 · 68 123 0.75 44.75 353 81 204 1.00 45.00 413 96 300 Culvert/ Orifice Structures Weir Structures [AJ [BJ [CJ [PrfRsrJ [AJ [BJ Rise (in) = 6.00 4.00 Inactive 0.00 Crest Len (ft) = 4.00 Inactive Span (in) = 6.00 3.00 0.00 0.00 Crest El. (ft) = 44.60 44.00 No. Barrels = 1 2 0 0 WeirCoeff. = 3.33 3.33 Invert El. (ft) = 41.00 44.10 0.00 0.00 Weir Type = 1 Rect Length (ft) = 20.00 1.00 0.00 0.00 Multi-Stage = Yes No Slope(%) = 2.00 0.00 0.00 n/a N-Value = .013 .013 .013 n/a Orifice Coeff. = 0.60 0.60 0.60 0.60 Exfil.(in/hr) = 0.000 (by Wet area) Multi-Stage = n/a Yes No No TW Elev. (ft) = 0.00 5 Thursday, 05 / 8 / 2025 [CJ ~DJ Inactive 0.00 0.00 0.00 3.33 3.33 No No Note: Culvert/Orifice outflows are analyzed under inlet (ic) and outlet (oc) control. Weir risers checked for orifice conditions (ic) and submergence (s). Stage I Storage I Discharge Table Stage Storage Elevation ClvA ClvB ClvC PrfRsr WrA WrB WrC WrD Exfil User Total ft cuft ft cfs cfs cfs cfs cfs cfs cfs cfs -cfs cfs cfs 0.00 0 44.00 0.00 0.00 0.00 0.00 0.000 0.03 6 44.03 1.53 OC 0.00 0.00 -0.00 0.000 0.05 11 44.05 1.53 OC 0.00 0.00 0.00 0.000 0.08 17 44.08 1.53 OC 0.00 0.00 0.00 0.000 0.10 22 44.10 1.53 oc 0.00 ic 0.00 0.00 0.000 0.13 28 44.13 1.53 OC 0.01 ic 0.00 0.00 0.007 0.15 33 44.15 1.53 OC 0.02 ic 0.00 0.00 0.019 0.17 39 44.18 1.53 OC 0.03 ic 0.00 0.00 0.035 0.20 44 44.20 1.53 OC 0.05 ic 0.00 0.00 0.054 0.22 50 44.23 1.53 OC 0.08 ic 0.00 0.00 0.075 0.25 55 44.25 1.53 OC 0.10 ic 0.00 0.00 0.099 0.28 62 44.28 1.53 OC 0.12 ic 0.00 0.00 0.125 0.30 69 44.30 1.53 oc 0.15 ic 0.00 0.00 0.152 0.32 75 44.33 1.53 OC 0.18 ic 0.00 0.00 0.182 0.35 82 44.35 1.53 OC 0.21 ic 0.00 0.00 0.213 0.38 89 44.38 1.53 OC 0.25 ic 0.00 0.00 0.246 0.40 96 44.40 1.53 OC 0.28 ic 0.00 0.00 0.280 0.43 103 44.43 1.53 OC 0.32 ic 0.00 0.00 0.315 0.45 109 44.45 1.53 OC 0.34 ic 0.00 0.00 0.344 0.48 116 44.48 1.53 OC 0.37 ic 0.00 0.00 0.366 0.50 123 44.50 1.53 OC 0.39 ic 0.00 0.00 0.388 0.52 131 44.53 1.53 OC 0.41 ic 0.00 0.00 0.408 0.55 139 44.55 1.53 OC 0.43 ic 0.00 0.00 0.427 0.57 147 44.58 1.53 OC 0.45ic 0.00 0.00 0.446 0.60 155 44.60 1.53 OC 0.46 ic 0.00 0.00 0.463 0.62 164 44.63 1.53 OC 0.48ic 0.05 0.00 0.533 0.6,5 172 44.65 1.53 OC 0.50 ic 0.15 0.00 0.646 0.67 180 44.68 1.53 OC 0.51 ic 0.27 0.00 0.786 0.70 188 44.70 1.53 OC 0.53 ic 0.42 0.00 0.950 0.72 196 44.73 1.53 OC 0.54 ic 0.59 0.00 1.132 0.75 204 44.75 1.53 OC 0.56 ic 0.77 0.00 1.332 0.77 214 44.78 1.55 OC 0.57 ic 0.98 0.00 1.547 0.80 223 44.80 1.65 OC 0.46 ic 1.19 0.00 1.654 0.82 233 44.83 1.70 OC 0.34 ic 1.36 s 0.00 1.697 0.85 242 44.85 1.71 OC 0.29 ic. 1.42 s 0.00 1.714 0.87 252 44.88 1.73 OC 0.26 ic 1.47 s 0.00 -1.727 0.90 262 44.90 1.74 OC 0.23 ic 1.51 s 0.00 1.737 0.92 271 44.93 1.75 OC 0.21 ic 1.54 s 0.00 1.746 Continues on next page ... 6 BASIN 1 OUTFLOW Stage I Storage I Discharge Table Stage Storage Elevation ClvA ClvB ClvC PrfRsr WrA WrB WrC WrD Exfil User Total ft cuft ft -cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs 0.95 281 44.95 1.76 QC 0.19 ic 1.56 s 0.00 1.754 0.97 290 44.98 1.76 QC 0.17 ic 1.59 s 0.00 1.762 1.00 300 45.00 1.77 QC 0.16 ic 1.61 s 0.00 1.770 ... End 7 Hydraflow Rainfall Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2025 Thursday, 05 I 8 / 2025 Return Intensity-Duration-Frequency Equation Coefficients (FHA) Period (Yrs) B D E (N/A) 1 0.0000 0.0000 0.0000 ------- 2 69.8703 13.1000 0.8658 ------- 3 0.0000 0.0000 0.0000 ----- 5 79.2597 14.6000 0.8369 -------- 10 88.2351 15.5000 0.8279 ------- 25 102.6072 16.5000 0.8217 ----- 50 114.8193 17.2000 0.8199 ------- 100 127.1596 17.8000 0.8186 ----- File name: SampleFHA.idf Intensity= B /(Tc+ D)AE Return Intensity Values (in/hr) Period (Yrs) 5min 10 15 20 25 30 35 40 45 50 55 60 1 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2 5.69 4.61 3.89 3.38 2.99 2.69 2.44 2.24 2.07 1.93 1.81 1.70 3 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 J 5 6.57 5.43 4.65 4.08 3.65 3.30 3.02 2.79 2.59 2.42 2.27 2.15 10 7.24 6.04 5.21 4.59 4.12 3.74 3.43 3.17 2.95 2.77 2.60 2.46 25 8.25 6.95 6.03 5.34 4.80 4.38 4.02 3.73 3.48 3.26 3.07 2.91 50 9.04 7.65 6.66 5.92 5.34 4.87 4.49 4.16 3.88 3.65 3.44 3.25 100 9.83 8.36 7.30 6.50 5.87 5.36 4.94 4.59 4.29 4.03 3.80 3.60 Tc= time in minutes. Values may exceed 60. Precio file name· Sam□le.oco Rainfall Precipitation Table (in) Storm Distribution 1-yr 2-yr 3-yr 5-yr 10-yr 25-yr 50-yr 100-yr SCS 24-hour 0.00 2.20 0.00 3.30 4.25 5.77 6.80 7.95 SCS 6-Hr 0.00 1.80 0.00 0.00 2.60 0.00 0.00 4.00 Huff-1st 0.00 1.55 0.00 2.75 4.00 5.38 6.50 8.00 Huff-2nd 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Huff-3rd 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Huff-4th 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Huff-Indy 0.00 0.00 0.00 0.00 0.00 0;00 0.00 0.00 Custom 0.00 1.75 0.00 2.80 3.90 5.25 6.00 7.10 DRAINAGE STUDY-50J0AVENIDA ENCINAS APPENDIX2 EXISTING & PROPOSED DRAINAGE EXHIBITS SPETEMBER 2024 5010 A VEN/DA ENCINAS -EXISTING CONDITION HYDROLOGY WORKMAP ,,.,,.., / .,,.,,.,,.~ / \ ;I.,,.,,.,,.~ / .,,.,,.,,." / ,.. ---_,,./ -,ti_,,./ \. / .,,.,,.,,." ~ / / -It ..,,,,, -\ / /, · / ..--,aoit-5 ~ ~\-~~t,.\.. ~ / t..i· '{S' / /'--'------I HYDRANT '48- ® \ l / / EX~ 1 LAN~SCAPf; CU,,f \ CARLSBAD, CA 92008 Plot May 08, 2025 at 12: 43pm P: \ACTIVE JOBS\2439_Carlsbad 10 Hospitallity\CIVIL \REPORTS\HYDROLOGY\2439-HYDE.dwg w SCALE: 0 N s LEGEND PROPERTY UNE RIGHT-OF-WAY ROAD CENTERUNE ADJACENT PROPERTY UNE DRAINAGE BASIN BOUNDARY DRAINAGE FLOW PATH PRE-PROJECT IMPER'AOUS AREA FLOW ARROW BASIN SUMMARY AREA CALCULATIONS TOTAL AREA PER'AOUS AREA IMPER'AOUS AREA % IMP 7,782 S.F. (0.179 AC) 7,079 S.F. (0.16J AC) 685 S.F. (0.016 AC) 8.80% - - EX1 x.x x.x SF CFS E "~ 1" = 20' VA N RVN CIVIL ENGINEERING I LAND SURVEYING 20 40 San Diego I Manteca I 858.521 .8100 vanrynengineering.com 5010 A VEN/DA ENCINAS -PROPOSED CONDITION HYDROLOGY WORKMAP CARLSBAD, CA 92008 7"' ' ' '4 I ·• ~ ,f ', '·.., • .J,' ,4 ES SCALE: LEGEND PROPERTY UNE RIGHT-OF-WAY ROAD CEN1ERUNE ADJACENT PROPERTY UNE DRAINAGE BASIN BOUNDARY DRAINAGE Fl.OW PATH POST-PRO£CT IMPER'AOUS AREA &<'.. ~ POST-PRO£CT DE MIN/MIS AREA s 1" = 20· 20 Fl.OW ARROW BASIN SUMMARY TOTAL IMPER'AOUS AREA NEW/REPLACED IMPER'AOUS AREA % IMP 40 - - ttls-3:ZI I ... r· . ] • • • • • ·: ................. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . --------- 2,525 S.F. (0.058 AC) 5,257 S.F. (0.121 AC) 4,821 S.F. (0.11 AC) 67.55% "~ VAN RVN CIVIL ENGINEERING I LAND SURVEYING San Diego I Manteca I 858.521.8100 vanrynengineering.com