Loading...
HomeMy WebLinkAboutAMEND 2024-0008; INNS OF AMERICA; SEWER CAPACITY STUDY; 2025-05-08Joh SEWER CAPACITY STUDY FOR: PRELIMINARY CARLSBAD COMMONS INNS OF AMERICA APN: 210-090-52 5010 A VENIDA ENCINAS CARLSBAD, CA 92008 AMEND: 2024-0008/CUP 2024-0009/PUD 2024 2024-0009 Prepared By: RCE 80667 Van Ryn Engineering, Inc. 16766 Bernardo Center Dr., Ste 115 San Diego, CA 92128 "~ VAN RVN Prepared for: Community Development Department Engineering Division 1635 Faraday Avenue Carlsbad, CA 92008 May 8, 2025 EXP: 3-31-27 CITY OF CARLSBAD MAY 2 2 2025 PLANNING DIVISION SEWER STUDY-5010 AVENIDA ENCINAS MAY2025 TABLE OF CONTENTS 1. INTRODUCTION ................................................................................................................................... 3 1.1 Purpose .......................................................................................................................................... 3 1.2 Land Use ........................................................................................................................................ 3 1.3 Vicinity Map ................................................................................................................................... 3 1.4 Site Map ......................................................................................................................................... 5 2. METHODOLOGY .................................................................................................................................. 6 2.1 Sewer Collection Method ............................................................................................................. 6 2.2 Design Criteria And Abbreviations .............................................................................................. 6 3. CALCULATIONS/RESULTS ................................................................................................................... 7 3.1 Projected Sewer Flows .................................................................................................................. 7 3.2 Peak Sewer Flow Rates ................................................................................................................. 7 3.3 Offsite Sewer Ca lculation ............................................................................................................. 7 3.4 Onsite Sewer Calculation .............................................................................................................. 7 4. CONCLUSION ....................................................................................................................................... 7 Appendix 1 ............................................................................................. Reference Material SEWER STUDY -5010 A VENIDA ENCINAS MAY2025 1. INTRODUCTION 1.1 Purpose This Sewer Study Report has been prepared for the proposed project located at 5010 Avenida Encinas in the City of Carlsbad, California. The project proposes new hardscape areas on the northwestern end of the site with new landscaping scattered in and around the proposed hardscaping. The existing hotel on-site will remain undisturbed. However, the project is proposing to convert the existing 98-room hotel into a 98-unit multi-family apartment building, therefore modifying the sewer generation rates and densities. The following study will show that the existing 8" VCP sewer main in A venida Encinas and the 8" sewer lateral currently serving the existing site are adequately sized to accommodate the proposed change in building use. This report will also indicate that the proposed sewer flows generated because of final construction are less than the City of Carlsbad: Sewer Master Plan Update -2019 flows allocated to the site. The purpose of this Sewer Study is to: i) Size the proposed sewer line intended to be constructed/ connected to the existing sewer main in the existing roadway. ii) Show that the proposed sewer generation for the proposed development is consistent with the 2019 City of Carlsbad Sewer Master Plan. iii) Show that the proposed flows downstream of the project site are less than or equal to the flows per the City of Carlsbad: Sewer Master Plan Update -2019. 1.2 Land Use 5010 Avenida Encinas is lo~ated at the comer intersection of Avenida Encinas and Cannon Road, approximately 200 feet west of the 5 (San Diego Parkway), located in the City of Carlsbad. The lot's total area is 111,738 sq.-ft (~2.7, acres). The existing site is within the Planned Industrial (P-M) zone in the City of Carlsbad, part of the Planned Industrial General Plan. The current land use is Hotel/Motel and the proposed land use is Multi-family. Per City of Carlsbad: Engineering Standards -2022 Ed., an equivalent dwelling unit (EDU) generates an average daily flow of 200 gpd/ ADF. Per Carlsbad Municipal Code Table 13.10.020(c)(5) for EDU conversion, each room of a hotel, motel, or other multiple dwelling designed for sleeping accommodations has an equivalent EDU of 1.00 (w/ cooking facilities). Therefore, Hotel/Motel & Multi-Family land use flows are based on identical sewage generation rates, approximating to 200 gpd/EDU/Unit (Total of 98 units existing & proposed). 3 SEWER STUDY -5010 AVENIDA ENCINAS 1.3 Vicinity Map - ""O '"Jt!. -~ MAY2025 z,a.;_~l 4 SEWER STUDY -5010 AVENJDA ENCINAS MAY2025 1.4 Site Plan, 5 SEWER STUDY -5010 AVENIDA ENCINAS MAY2025 2. METHODOLOGY 2.1 Sewer Collection System The proposed CARLSBAD COMMONS -INNS OF AMERICA multi-family apartment building lies in the Agua Hedionda Creek Watershed (Figure 1.4_Carlsbad Watershed Basins) within the Carlsbad Sewer Service Area (Figure 1.3_Sewer Service Area) located in the City of Carlsbad (Figure 1.l_Location Map). As-built dra,wings for the project site obtained from the City of Carlsbad do show a current 8" sewer lateral connection sloped down at 4.4% to the street's 8" PVC sewer main and manhole (Grading Plan-Sewer Connection). Any wastewater collected within the existing 8" sewer lateral pipe that drains to the existing 8" PVC sewer main in Avenida Encinas, then north to the 24" VCP sewer main along Cannon Road, then southwest into the 42" RCP Vista/Carlsbad Interceptor System. Once there, sewage is conveyed south via the City of Carlsbad gravity main to the Encina Water Pollution Control Facility (Figure 2.2_Existing Interceptor System). 2.2 Design Criteria and Abbreviations The list below illustrates the criteria necessary for sewer system analysis. Values were obtained from the City of Carlsbad: Sewer Master Plan Update -2019 & the City of Carlsbad Engineering Standards Vol. 1, 2022 Ed .. • Equivalent Residential EDU= 200 gpd, ADF (Chapter 6, Section 1, Page 42; 2022 Ed.) • Hotel/Multi-Family EDU Conversion w/ cooking Facilities= 1.0 (Table 13.10.020(c)) • Peak Flow Factor= 2.5 (Average Daily Flow less than 100,000 gal/day). • Manning's "N" Value: o All Pipes= 0.013 • 0.50 dn/D for any diameter, gravity sewer pipes (Chapter 6, Section 1, Page 42; 2022 Ed.) • 0.75 dn/D for any diameter, gravity sewer pipes (Chapter 6, Section 1, Page 42; 2022 Ed.) • Minimum Design Velocity= 2.0 ft/sec (Gravity Main) • Maximum Design Velocity= 12 ft/ sec (Gravity Main) • Gpd = Gallons per Day • GPM = Gallons per Minute • MGD = Million Gallons per Day • EDU = Equivalent Dwelling Units • ADF = Average Daily Flow Rate Sewer mains, unable to sustain a minimum velocity of 2 ft/s at peak flow shall be designed to have a minimum slope of that listed in the City of Carlsbad Engineering Standards -2022 Ed., 6.5(A). Volume 1. Public sewer mains are to be at an 8" minimum. Sewer laterals are to be at a 4" minimum. Maximum velocities greater than 12 ft/s should be avoided. 6 SEWER STUDY -5010 AVENIDA ENCINAS MAY2025 3. CALCULATIONS/RESULTS 3.1 Projected Sewer Flow Rates The project site is located within the Northwest Quadrant Facility Management Zone (Figure_l.7-Local Facility Management Zone), as part of the Carlsbad Sewer Service Area, and utilizes the Vista/Carlsbad Interceptor pipeline system. South of the Agua Hedionda Lift Station, an ex. 8" PVC sewer pipe in Avenida Encinas per drawing number: 333-2GE1, conveys sewage to an existing 24" PVC sewer main • ' per drawing number: 333-2GE1 in Cannon Road before flowing into a 42" RCP sewer interceptor (VC 13 via Table _2.4 Vista/Carlsbad Ownership) gravity main and discharges south through the remaining pipeline reaches (VC14-16) to the Encinas Wastewater Treatment Plant. The current full flow capacity for the 42" RCP gravity main pipe (pipeline reach VC13) flowing to the Encinas Wastewater Treatment Plant is 20.5 mgd, with an_ average flow of 4.65 mgd, and a current capacity of 30.9%. For the existing hotel, the gpd of the DWP is estimated to generate an average flow rate of 19,600 gpd (98 Hotel Units x 1.0 x 200 gpd/ EDU), and a peak dry weather rate.of 49,000 gpd (98 Jf: 1.0 x 2.5 x 200) based off the existing structure's 98 units, 1.0 Conversion Factor, 200 gpdper capita for Equivalent Dwelling Units, and a Peak Factor of 2.5. For the multi-family apartments, the gpd of the DWF is estimated to generate an average flow rate of 19,600 gpd (98 Multi-Family Units x 200 gpd/ EDU), and a peak dry weather rate of 49,000 (98 x 2.5 x 200 x 1.0) gpd based off the proposed structure's 98 units, 1.0 Conversion Factor, 200 gpd per capita for Equivalent Dwelling Units, and a Peak Factor of 2.5. The final flow rate of 49,000 (98 x 2.5 x 200) gpd was determined for the proposed condition at 5010 Avenida Encin~s (approximately 34.03 gpm or 0.076 cfs). 3.2 Peak Sewer Flow Rates To determine the Ratio of Peak to Average Sewage flow needed for the sizing of the onsite sewer pipe, the equivalent popul~tion was calculated using the ratio of peak dry weather flow to average dry weather flow. Depending on the equivalent population within the tributary area, peak weather flow factor was calculated using page 43 of the City of Carlsbad Engineering Standards -2022 Ed., Chapter 6, Voiume 1. Based on the site's equivalent population of average daily flow less than 100,000 gpd, a Peak Factor of 2.5 was determined. P~r design sewer criteria in the City of Carlsbad: ,Sewer Master Plan Update-2019 (and the EDU factoring of the Hotel Units to Multi-Family Units (Table_13.10.020(c)), the gpd per EDU remained the same, and the proposed change in building use should have no new impacts on the existing sewer main or interceptor system 7 SEWER STUDY -5010 AVENJDA ENCINAS MAY2025 3.3 Offsite Sewer Calculations Population Data Proposed total flow rate = 19,600 gpd Peaking Factor= 2.5 Total Peak Plow= (Q)= 2.5 * 19,600 gpd = 49,000 gpd I gal/day= 1.547 * 10-6 cfs (Q) = 49,000 * (1.547 * 10-6) = 0.076 cfs Pipe Characteristics PVC Pipe, n = 0.013 Diameter = 8" Capacity= 30.9% (Q) = 0.076 cfs (S) Slope = 0.32% Hydraulic Radius (R) =(A -Flow Area/P-Wetted Perimeter)= ((0.349) I (2.09)) = 0.17' Manning's Eqn. (QMAX) = (1.49/n)* A *R213*S 112) = (l.49/0.013)*(0.349)*(0.17)213*(.0032)112 = 0. 7 cfs Velocity (V) = (Q/A) = (0.7 / .349) = 2.01 fps < 12 fps, 2.01 fps > 2.0 fps, velocity is OK. QMAX>Q Depth of flow QI QMAX= (0.076 I 0.7) = (0.1 I) Current d/D (depth/ diameter) in existing 8" Pipe= ~0.206' Proposed Capacity= ~0.32 < .5' ., additional Capacity is OK. 8 SEWER STUDY -5010 AVENIDA ENCINAS MAY2025 3.4 Onsite Sewer Calculations Pipe Characteristics PVC Pipe, n = 0.013 Diameter = 8" (S) Slope= 4.4% Hydraulic Radius (R) =(A -Flow Area/P-Wetted Perimeter)= ((.349) / (2.09)) = 0.17' Manning's Eqn. (QMAX) = (1.49/n)* A *R213*S 112) = ( 1.49/0.013)*0.349*(.17)213*(.044) 112 = 2.57 cfs QMAX > Q => Existing 8" Sewer Lateral has capacity for demands Velocity (V) = (Q/A) = (2.57 / .349) = 7.37 fps < 12 fps, 7.37 > 2 fps, velocity in accepted limits: OK. 4. CONCLUSION The approved City of Carlsbad: Sewer Master Plan Update -2019 identified the proposed project site area of 5010 Avenida Encinas as flowing into the Vista/ Carlsbad Interceptor, and ultimately the Encina Water Po llution Control Facility. With the proposed building use change of the 98 hotel units to 98 multi-family apartments, Carlsbad Commons -Inns of America has an anticipated total anticipated flow rate of 49,000 gpd, same as the existing use. The analysis of the existing, offsite 8" sewer main that has a 0.32% slope within Avenida Encinas Street confinned the piping has adequate capacity to convey the proposed wastewater flow rate of 49,000 gpd, an estimated velocity of 2.01 fps, and a consistent depth of ~32.0%. The analysis of the onsite, existing 8" lateral has an existing slope of 4.4% with a velocity of 7 .3 7 fps and a set, maximum depth of 50%. 9 SEWER STUDY -5010 A VENIDA ENCINAS MAY2025 APPENDIX! REFERENCE MATERIALS 10 Figure 1-1. Location Map Cities • City of Carlsbad □ City of Oceanside □ City of Encinitas □ City of Vista □City of San Marcos Sewer Master Plan Update L "'\~ City of Carlsbad r .,/ ~ City of Carlsbad C ii 11 for n I 1, 1 MILES Document Path: C:\Projects\Carlsbad\SewerMasterPlan_ 10046316\Jon_Figures\Jan _27 _ mapdocs\Carlsbad_ City.mxd June 2019 I 1-3 Figure 1-3. Carlsbad Sewer Service Area Sewer Service Areas • Carlsbad Sewer Service Area •Buena Sanitation District CJ City of Encinitas CJ City of Oceanside • City of Vista Leucadia Wastewater District □Vallecitos Water District Sewer Master Plan Update L "''"\ City of Carlsbad r .I~ tewater District City of Carlsbad C1llfornl1 1 Uon_ 1gures an_ _mapdocs\ ewer_ eNtce.mx 1 MILES June 2019 I 1-7 Figure 1-3. Carlsbad Sewer Service Area Sewer Service Areas • Carlsbad Sewer Service Area • Buena Sanitation District City of Encinitas □City of Oceanside • City of Vista Leucadia Wastewater District □Vallecitos Water District Sewer Master Plan Update City of Carlsbad City of Carlsbad ( I JI f Or n I I 1 MILES Vallecitos Water District June2019 I 1-7 Figure 1-7. Local Facility Management Zones Quadrants •Northwest Northeast Southwest •Southeast CILFMP Zones Sewer Master Plan Update City of Carlsbad 0 City of Carlsbad Cali fornia , MILES 2 Document Path: C:IProjects\Carlsbad\SewerMasterPlan_ 10046316\Jon _Figures\Jan_27 _mapdocs\Carlsbad _ City_LFMP.mxd June 20 19 I 1-13 Sewer Master Plan Update City of Carlsbad Figure 2-1. Existing Lift Stations and Force Mains Chinqua LS ·-'. ' ' ' ~ Lift Stations [§1 1n Service ~Recently Removed -Force Mains , J Boundaries _...,.., , I ~. #Jr' __,, I -j /j • f ~ -I, / -( I / f I c.·,carlsbad Sewer Service Area Gravity Mains ~ 0 1 MILES City of 1-~"'\ Carlsbad ·~ ~ Ca 11 f or n 1 ii Document Path: C:\ProjeclslCarlsbad\SewerMasterPlan_10046316\Jon_Figures\Jan_27 _mapdocs\Ca~sbad_Ex_LS_FM.mxd 2-6 I June 2019 Sewer Master Plan Update City of Carlsbad Figure 2-2. Existing Interceptor System Interceptors Facilities -Vista/ Carlsbad I!]] Lift Stations -North Agua Hedionda ~ Encina Water Pollution Control Facility -south Agua Hedionda ••Buena Boundaries -Vallecitos ~iCarlsbad Sewer Service Area -North Batiquitos Collection System -Gravity Mains ocument ath: ures an_ _mapdocs\ utab _lnterceptors_v .mxd 2-10 I June 2019 City of Carlsbad Ca l ifornia 1 MILES Figure 2-3. Vista/Carlsbad Interceptor V VC1il~- \ ' VC12 & VC13 -4 Interceptor System -Gravity Mains -Force Mains VC1ll • Delineating Manholes lb§] Lift Stations vc VC16 ~ Encina Water Pollution Control Facility Collection System -Gravity Mains Boundaries Sewer Master Plan Update City of Carlsbad c ,Carlsbad Sewer Service Area 0 0.5 MILES □tyof 1-)"\ Carlsbad ~ C1 l lfo r nl1 I , ;.__.., June 2019 I 2-13 Sewer Master Plan Update City of Carlsbad Table 2-4. Vista/Carlsbad Interceptor Ownership Buena Vista LS 2 vc4 2 vc5 2 VC6 2 vc1 2 vc8 2 vc9 2 VC10 2 VC11A 2 VC11B 3 Agua Hedionda LS VC12 VC13 VC14 VC15 3 VC16 4 2x24 (FM) 2x18 (FM) 2 30 (FM) 3 42 2 30 (FM) 3 42 2 54 3 2-14 I June 2019 23.1 23.1 33.0 21 .0 21 .0 20.5 21 .0 20.5 30.3 46.3 84.0 10.38 10.38 10.38 10.38 10.38 10.38 10.38 10.38 10.38 10.38 10.38 10.38 10.38 10.38 10.38 10.38 10.38 10.38 10.38 City of Vista 96.6 93.4 89.6 89.6 89.6 89.6 81 .9 79.4 79.4 75.5 74.7 69.1 69.1 69.1 69.1 69.1 56.1 56.1 50.2 14.2 14.5 11 .5 17.0 26.0 42.2 4.65 8.11 8.13 10.28 City of Carlsbad 1.0 2.2 2.0 2.4 2.4 3.3 5.7 6.5 6.5 7.0 7.2 6.3 10.2 10.2 30.9 43.9 43.9 49.8 Sewer Master Plan Update I..:), City of Carlsbad ~ ~ Table 2-4. Vista/Carlsbad Interceptor Ownership I Full City of Vista City of Carlsbad Flow Pipe Average Capacity Average Capacity Pipeline Pipe Size Capacity Flow 6 Percent Rights 8 Flow 6 Percent Rights 8 Reach (inches) (mgd) 5 (mgd) Capacity7 (mgd) (mgd) Capacity7 (mgd) Notes: 1 Per February 2002 Ownership, Operation, and Maintenance Agreement with the City of Vista agreement, as amended on June 11 , 2013 and May 20, 2014. 2 Per the February 2002 Agreement for Ownership, Operation, and Maintenance of the Vista/ Carlsbad Interceptor Sewer. In this agreement average flow rates were obtained from the October 1997 Sewer Master Plan Update for the City of Carlsbad. The Master Plan Update used a peaking factor of 2.0 for the Vista Carlsbad Interceptor System. The percent capacity for each pipeline reach is based on the ratio of average flow to total flow. 3 Per the 2011 Agreement for Planning and Design Phase Services for the Agua Hedionda Sewer Lift Station and Vista/ Carlsbad Interceptor Sewer, Reaches VC11B-VC15. 4 A separate multiagency agreement was prepared for Reach VC16, now referred to as the West Encina Influent Sewer. 5 Pipe capacity is based on a depth of flow (D) to pipe diameter (d) ratio of one and Manning's "n" value of 0.013 except for VC5 through VC10 which were assigned n=0.012 for PVC-lined pipe. 6 Average flow rates were obtained from the October 1997 Sewer Master Plan Update for the City of Carlsbad. 7 Percent capacity based on ra tio of agency's average flows shown in this table. 8 Capacity rights based on percent capacity multiplied by fu ll flow pipe capacity. FM=force main; LS=lift station; mgd=million gallons per day June 2019 I 2-15 Table 2-3. Summary of Existing Lift Stations Name Agua Hedionda -- Buena Vista Cannon Road El Fuerte Foxes Landing II Operated and Maintained by (Interceptor System Discharge) EWA (V/C) EWA (V/C) Carlsbad (SAHi) Carlsbad (NAHi) Constructio n/ Rehabilitatio n Date 2019 1975, 1994, 2018 2005, 2007, 2017 2001 2009 2001,2018 Quantity Lift Side: 4 FM Side: 4 4 3 3 - Pump/Motor Information I i Motor Size (Horse- power) 100 300 105 7.5 50 38.7 I Motor Type VFO VFO CSO CSO CSO VFD Design Point Lift Side: 4860 gpm X 30' FM Side: 3820 gpm x40' 6000 gpm X 142' 1420 gpm X 200' 360 gpm x50' 970 gpm X 127' 1500 gpm X 61' Firm Station Capacity1 (gpm) (mgd) 22,900 33.0 II 14,900 21 .5 2,440 3.5 360 0.5 970 1.4 2,600 3.7 ii Sewer Master Plan Update L '"'\""' City of Carlsbad r .I~ Forcemain Diameter (inches) FM Side: 30 24" 24" 14" 6" 8" 16" Material HOPE -- HOPE CIPP lined DIP HOPE PVC HOPE HOPE Comments Replaced in 2018 Upgrades ongoing in 2018 Flygt NP3301 1 duty and 1 standby .J Reconstructio n ongoing to be completed in 2019 including addition of redundant ______ .,........__ ____________ ~•~--~~---------•----.. ---•------'-----force mains Home 2012 20 VFO Plant Knots 1999 10 CSD Lane North Carlsbad 1997,2008 100 CSD Batiquitos (NBI) 800 gpm 8" 10" (back X 70' up) 355 gpm 6" x44' 1210 gpm 14" X 164' HOPE PVC 2 duty and 1 standby PVC 1 duty and 1 ____ standby PVC 172,300 gal overflow tank June 2019 I 2-7 Sewer Master Plan Update City of Carlsbad 4.2 Design Criteria The City of Carlsbad General Engineering Standards, Volume I, Chapter 6, Design Criteria for Gravity Sewer Lines and Appurtenances, provides design guidelines for the design of sewer gravity mains, lift stations, and forcemains. New sewer improvement plans must be reviewed and approved by the City Engineer. 4.2.1 Engineering Standards Design Criteria The design criteria from City's Engineering Standards are shown in Table 4-1. Criteria to be reconsidered in this Master Plan update, highlighted in Table 4-1 , include sewer generation rates, as lower water demands per capita due to voluntary and mandated water conservation measures are also reflected in lower wastewater flows. Table 4-1 . Sewer Design Criteria Parameter Sewer Generation Rate Residential, Single Family Residential, Multi-Family Commercial, Industrial or Institutional Peak Daily Flow Factor d/D Ratio for Gravity Mains For sewer mains s 12-inch For sewer mains> 12-inch For all sewer mains Engineering Standard Criteria (Volume 1, Chapter 6) Recommended Revised Criteria 220 gpd/EDU 200 gpd/EDU 176 gpd (80 percent of 220 gpd/EDU) 160 gpd (80 percent of 200 gpd/EDU) Flow projections for future schools, No change resort hotels, and certain industrial uses are based on EDU conversions documented in the Carlsbad Municipal Code (Table 13.10.020c). 2.5 x Average Daily Flow No change 0.50 at peak hour dry weather flows 0.75 at peak hour dry weather flows 0.90 at peak hour wet weather flows No change -----------No change Manning's Roughness Coefficient For all other pipes Velocity for Gravity Mains Minimum allowable velocity Maximum allowable velocity Velocity for Force Mains Notes: 0.013 No change 2 feet per second No change 12 feet per second No change 2.5 feet per second No change 8 feet per second No change d/D=depth-to-diameter ratio; EDU=equivalent dwelling unit; V/C=Vista/Carlsbad 4-10 I June 2019 4.2.2 Sewer Master Plan Update City of Carlsbad The most important evaluation criteria for gravity sewers is the depth of flow, which is calculated in the hydraulic model based on Manning's Equation. The capacity of each gravity sewer is based on the relative depth of flow within the respective pipeline reach . Sewer interceptors are not typically designed to flow full , as unoccupied space at the top of the pipe is required for conveyance of sewage gasses and to provide contingent capacity for wet weather inflow and infiltration. Interceptor sizing is typically based on the pipeline flowing 75 percent full at the PWWF if the pipe is larger than 12-inches in diameter (Did = 0. 75). If the pipeline is 12-inches in diameter or smaller, a Did factor of 0.50 is used. Friction factors for pipelines are a required input to the model. The factors vary with the material and the age of the pipe . A roughness factor as indicated by a Manning's' coefficient ("n") of 0 .013 is typically used to evaluate existing interceptors and for projection of future sizing needs. Previous studies have shown that this value typically accounts for most pipe roughness, joints, and fouling that occur after several years of operation . At the direction of City staff, a Manning's coefficient of 0.012 was used in the evaluation of the PVC-lined RCP and centrifugally cast fiberglass reinforced plastic mortar pipeline sections of the V/C installed in 2002 (reaches VC5 through VC11 A). In the design of sewer lift stations, it is required that spare pumping units be included for mechanical reliability. A wastewater facility must be capable of conveying PWWFs with the largest operating unit out of service. Lift stations are typically equipped with a minimum of two pumps and have a secondary or emergency power source, consisting of either installed generators or a connection for a portable generator. Forcemains are evaluated based on maintenance of a minimum or maximum allowable flow velocity, varying between 2.5 and 8.0 feet per second. Velocities less than 2.5 feet per second can result in deposition in the forcemain, while velocities greater than 8.0 feet per second can damage the pipeline through excessive abrasion. Existing System Capacity Evaluation Criteria As stated in the previous section, the design criteria for gravity sewers provides unoccupied space at the top of the pipe for conveyance of sewage gasses and to provide contingent capacity for wet weather inflow and infiltration. In this Master Plan, the PWWF analysis assumes peak l&I rates coincide with the peak dry weather flow, and the duration of the PWWF condition is brief. When gravity pipelines are evaluated to determine if there is adequate capacity under the PWWF condition, a separate pipeline evaluation criteri a is often used to determine the permissible flow level before the pipeline should be upsized. This criteria is often referred to as "trigger" criteria. The 2012 Sewer Master Plan used a design storm from 2005 to estimate inflow and infiltration during wet weather flows. The 1.5 inch rainfall event on Wednesday, February 23, 2005 was therefore selected as the basis for PWWF. For this 2018 Master Plan update, the December 2010 storms will be used as the basis for PWWFs. This storm was a 10-year design storm event and is consistent with the assessment by the City of Vista in its 2017 Comprehensive Sewer Management Plan, which shares sewer interceptor systems that convey wastewater to the EWPCF. In addition , the 2012 Sewer Master Plan allowed for gravity sewers to flow up to 90 percent full under PWWF conditions before improvement projects were required. This same approach was used in the 2018 Master Pla n Update for the large diameter interagency interceptor gravity June 2019 I 4-11 Sewer Master Plan Update City of Carlsbad mains. A different approach was used in the 2018 Master Plan Update for the Carlsbad collection system which is made up of smaller diameter gravity mains. Figure 4-3 shows the d/D ratios and the corresponding flow/maximum or full flow (Q/Qr) ratios for circular pipes with a constant friction factor as used in the existing system capacity analysis. Figure 4-3. Comparison Depth Flow Relationship a ti a: ~ ~ -< .... 0 0 I- ~ ,Q. ,0 1' 0 -,1-~ VALUE S OF" ...:L A.NO _IL f f n if 1,0 .2 1,4 1,S 1-8 2,0 2,2 2,4 2•~ 2,8 3,0 3.2 3,4 3,6 t.O 0,9 0,8 O,i o.s o.s M/..NNJ NG o . ., 0.3 0,2 0,, 0 ----- \ ' I I I ,~~ --·--n.f VARIABLE ' ' I \\ --· n.f CONSTA T . I I \\ -·-·· INDE PENDANT Of n,f ~ I ' ~ ' -'1 1 I \ r\. D~RC Y-l~[S8, ~.CH V --~ J } \ F , 1 CTr lN FAI TOR. f h' ,,., ,./ I I I \ . ~ v· ,,. V 'I ' ' l. -. '\: -D-IS PH.ARO ~· / / ,,., I · / ' ' ./ \ \ ~- V ,, / / , ~ I/ _.,.;, I,.~,,, '/ ~- ~>O /4 V .h HYDR, UL.IC ~ l'l-... ocn, . v-, J'I'' v-,,.,. RAl)Jt S, R ~,,, ,.,·•~·\ V ~y~ / ~ / ~ '· . I " L 'ARU " ~ ,.// ,I' ,A'-. 1/ 8 ,, I/ v..:--I/"'-,, . 1 ........ "-11.. ~-~ / /¼ ~ ,.,.. ·-.,., --~ ~-~ ::;------( ,--- o 0.1 o.i o,3 o.◄ o,s o.6 o.t o.& 0,9 1.0 1,1 1.2 1.3 HYORAUl lC £LEM£ TS v, 0, ~, ANO R V-f O;. Af R-f As indicated in red, the pipe is flowing at 99 percent of its full pipe flow capacity when the depth is 80 percent of full pipe. In areas between 80 percent and 100 percent of depth the hydraulic regime is unstable. The use of the 0.80 value is considered more conservative than the 0.85 value. The lnfoSWMM model reports the partial flow ratio of full flow using the equation Q/Qr. In instances where the d/D is greater than 0.980 and the Q/Qr< 0.99 the line is surcharging because of a downstream restriction. In this Master Plan Update, improvement projects were triggered in the existing system when pipes had both a d/D >0.80 and Q/Qr>0.99. Pipelines that had only one or the other of these constraints were put on a "watch" list. 4-12 I June 2019 Sewer Master Plan Update L ""°"' City of Carlsbad r J ~ Using a d/O ratio of 0.5 for small diameter pipes and 0.75 for larger diameter pipes for peak dry weather flow has been considered. However, with the potential for ROIi, using a d/O ratio of 0.80 for capacity evaluation of the system during PWWF is a conservative approach. If ROIi is reduced significantly in future years, the alternative standard may become appropriate. June 2019 I 4-13 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 EXHIBIT 1 ORDINANCE NO. CS-2QZ AN ORDINANCE OF THE CITY COUNCIL OF THE CITY OF CARLSBAD, CALIFORNIA, AMENDING THE CARLSBAD MUNICIPAL CODE, TITLE 13 -SEWERS AND TITLE 18 -BUILDING CODES AND REGULATIONS, TO CLARIFY SEWER AND TRAFFIC FEES RELATED TO OUTDOOR DINING AREAS The City Council of the City of Carlsbad, California, hereby ordains as follows: SECTION 1: That Title 13, Chapter 13.10, Section 13.10.20, subsection (c) of the Carlsbad Municipal Code is amended to read as follows: 13.10.020-Equivalent dwelling units. (c) Table 13.10.020(c) shall be used to determine equivalent dwelling units. TABLE 13.10.020(c) Type of Building, Structure or Use Equivalent Dwelling Units (1) Each space of a trailer court or mobilehome park 1.00 (2) Each duplex 2.00 (3) Each separate apartment in an apartment house 1.00 (4) Each housing accommodation designed for occupancy by a single 1 :oo person or one family, irrespective of the number actually occupying such accommodation (5) Each room of a lodginghouse, boardinghouse, hotel, motel or other multiple dwelling designed for sleeping accommodations for one or more individuals Without cooking facilities 0.60 With cooking facilities 1.00 (6) Churches, theaters and auditoriums, per each unit of seating 1.33 capacity (a unit being one hundred fifty persons or any fraction thereof) (7) Restaurants No seating 2.67 Seating (See Note) 2.67 plus 1.00 per each 7 seats or fraction thereof Delicatessen or fast food, using only disposable tableware: No seating 2.67 Seating (See Note) 2. 76 plus 1.00 per each 21 seats' or fraction thereof (8) Automobile service stations: Not more than four gasoline pumps 2.00 More than four gasoline pumps 3.00 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 (9) Self-service laundries, per each washer . 75 (10) Office space in industrial or commercial establishments not listed Divide the gross above and warehouses floor area of the building in square feet by 1800 (11) Schools: Elementary schools For each .sixty pupils or fraction thereof 1.00 Junior high schoots For each fifty pupils or fraction thereof 1.00 High schools For each thirty pupils or fraction thereof 1.00 (12) In the case ofall commercial, industrial and business establishments not included in subdivisions· .1 through· 10, inclusive, of this· subsection, the ·number of equivalent dwelling units shall be determined in each case by the utilities director and shall be based upon his estimate of the volume and type of wastewater to be discharged into the sewer. The provisions of Chapter 13.16 shall apply to all cases under this subsection and an industrial waste permit shall be required. Any such permit, issued for any use hereunder, shall include a specific volume of sewage authorized for such use. If said amount is exceeded, it shall be grounds for revocation of the permit (13) Theme park (LEGOLAND California) per acre 17.00 Note: Seats allowed iri incidental outdoor dining areas pursuant to Section 21.26.013, and seats allowed without any parking requirement in outdoor, sid~walk or curb cafes, as defined by and pursuant to the ·Carlsbad Village Master Plan.and Design Manual and the City Council, shall not count towards. the generation of equivalent dwelling units. However, any . combination of outdoor seats which exceeds the number of indoor seats and therefore is required to be parked, shall count towards the generat,ion of equivalent dwelling units." SECTION 2: That· Title 18, Chapter 18.42, Section 18.42.020, subsection (e) of the Carlsbad Municipal Code is amended to read as follows: 18.42.020 -Definitions. 24 (e) "Trip" means an arrival at or a departure from a proj.ect by any motor vehicle averaged over a one-day period (12:01 a.m. to 11:59 p.m.) as determined according to Table 18.42.020(e}. In using this table, the sq·uare footage of the building, structure or use shall include all interior floor area of a building or structure, and all usable ground area of a 25 26 27 28 use without ,a structure, except any designated open space area. Where the table establishes traffic generation for a project o~ the basis of square footage, acreage, or some other unit, the unif establishing the greatest number of trips shall be utilized. When a project has more than one use the number of trips shall be calculated by adding .. J CHAPTER 6 -DESIGN CRITERIA FOR SEWER FACILITIES Prior to preparation of improvement plans, Engineer of Work shall submit a preliminary layout of the sewer system for review and approval by the City Engineer. Basis of design shall be demonstrated for the development type and density and corresponding sewer flow generation factors and the following design criteria. 6.1 SEWER FLOW GENERATION FACTORS A. Flow Rate Generation -The values in the latest adopted Sewer Master Plan shall govern: 1) An Equivalent Dwelling Unit (EDU) = 200 gal/day, Average Daily Flow (ADF) 2) For ADF less than 100,000 gal/day, a peaking factor (PF) of 2.5 multiplied times the ADF shall be used to determine Peak Daily Flow (PDF). PDF = ADF x 2.5 a) Residential: Single Family and Multi-Family Residence= 1 EDU b) Commercial Property: 1 EDU/1,800 square feet of building space i) To convert raw land to square feet of building space, assume 30% coverage. This could vary significantly dependent development constraints. ii) To convert improved pads to square feet of building space, assume 40% of coverage. c) Industrial Property: i) 1 EDU/5,000 square feet of warehouse space ii) 1 EDU/1,800 square feet of office space iii) To convert raw land to square feet of building space, assume 30% coverage. This could vary significantly dependent issues such as environmental restrictions. iv)· To convert improved pads to square feet of building space, assume 40% of coverage. v) Assume 60% of building space is warehouse, and 40% is office space. 6.2. SEWER MAIN DEPTH AND SIZE A. Sewer main depth and size shall be as shown below unless approved by the City Engineer, B. Minimum depth, finish grade to top of pipe: 6 feet C. Maximum depth, finish grade to top of pipe: 15 feet D. Design calculations shall be submitted as a basis for pipe size and bedding design. (Manning's "n" for all types of pipe shall be = 0.013). E. Minimum pipe diameter of sewer main shall be 8 inches. A 6-inch sewer main may be allowed on cul-de-sac streets with a maximum of 10 units. F. A decrease in the pipe diameter in the downstream direction of flow will not be allowed Volume 1 Page 42 of 54 10/02/24 without hydraulic calculations and prior approval of the City·Engineer. G. Residential (multiple-unit single-family and multi-family), commercial and industrial developmer:,ts shall complete wastewater hydraulic modeling as required by the City Engineer prior to discretionary project approval. Any sewer main shown to be deficient at or downstream of the development's connection point shall be replaced with larger diameter pipe as indicated by hydraulic modeling. ' H. All sewer laterals and gravity sewer main invert elevations shall be shown in profile on the improvement plans. Show stationing of manholes and laterals, invert elevations at manholes and lateral connections, and the distance, pipe size, pipe type, standard dimension ratio and pipe slope of sewer main segments. I. All sewer mains 15" and greater pipe diameters shall require special design subject to City Engineer approval. 6.3 SEWER LATERALS A. Use 4" minimum drameter pipe for each seier lateral to single-family residences. B. Use 6" minimum diameter pipe for sewer laterals for all other development types and sized for the drainage fixture units in accordance with the latest adopted California Plumbing Code or for the proposed industrial use water demand. C. Sew!3r lateral depth at the property line shall be 5 feet (top of pipe to finish grade @ top of curb). , D. Sewer laterals shall be constructed in accordance with the Carlsbad Standard Drawings. The minimum horizontal distance from water services, fire hydrants, driveways, light standards, electrical utilities, etc. is 1 O feet. Special approval is required for horizontal clearance less than specified herein. 1) Install at a right angle or radial to the main. 2) Laterals shall not be located in driveways. 3) No connections shall be permitted on laterals other than as allowed by the Standard Drawings. 4) Location of property cleanout: See Standard Drawing No. S-7. 5) If the lowest sanitary sewer fixture in a building structure is lower than 2-feet above the nearest upstream manhole cover, then the owner must provide a backwater valve on the sewer lateral to prevent sewage backflow into the structure. The valve must be installed in a valve box for accessibility and be visible from the public right- of-way. The property owner shall be responsible for the installation and maintenance of the backwater valve. The backwater valve shall be shown on the precise grading and improvement plans. 6) Install sewer laterals using wye fittings, or manholes as required, sized and located as shown on the Approved Plans. Volume 1 Page 43 of 54 10/02/24 7) Laterals shall . be bedded, backfilled and compacted in the same manner as the sewer main they are connected to. • 8) Sewer laterals cannot be connected to gravity mains of equal or lesser diameter. Sewer lateral diameter that meets or exceeds the gravity main shall require upsizlng of the gravity main as required by the City Engineer. • 6,4 MATERIALS FOR PIPE AND FITTINGS A. . Gravity sewer pipe and fittings shall be PVC conforming to ASTM 03034 for diameters 4" through 15" and ASTM F679 for 18" through 24" with integral bell and gasketed joints (gasket and spigot end joint design). Pipe shall be made of PVC plastic having a cell classification of 12454-B or 12364-B as defined in ASTM 01784 and shall have SOR of 35 or thicker, and a minimum stiffness of 46 psi according to ASTM 02412. B. • All fittings and accessories shall be as manufactured and finished by the pipe manufacturer with joints or joining systems compatible with that of the pipe. C. PVC pipe joints shall be elastomeric gasket joints conforming to Standard Specifications for Public Works (Greenback) most recent edition. Rubber gaskets shall be factory installed and conform to ASTM F417. Pipe joints shall have been tested and meet watertight performance requirements of ASTM 03212, "Joints for Pipe Using Flexible Elastomeric Seals". 0. PVC pressure pipe conforming to AWWA C900 or HOPE pipe conforming to AWWA C906 shall be used for gravity sewer pipelines with depths of 30 feet or greater or as required by the City Engineer for special installations. Engineering calculations shall be submitted for approval to demonstrate that the pipe material and wall thickness will accommodate the anticipated earth and live loads. E. Service connections to the sewer main shall be watertight and not protrude into the sewer pipe. All materials used to make the service connections shall be compatible with the pipe materials to be joined and shall be corrosion proof. F. Couplings used. for repair or transition to dissimilar pipe materials shall be ·approved by the City Engineer and provide a corrosion proof watertight sec;tl. G. Use of other pipe and fitting materials and types may be required by the City Engineer for special designs for accessibility constraints of adjacent improvements, deep installations, trenchless construction methods or other site conditions. Refer to the Approved Materials List in Volume 2 for alternative materials. 6.5 DESIGN CRITERIA FOR PIPE VELOCITY, SLOPE AND FLOW DEPTH A. Gravity sewer pipelines shall be designed for a minimum velocity of 2 feet/second. Velocity, unless otherwise stated, shall be calculated from peak dry weather flow. B. Pipe slope shall be established to satisfy the minimum velocity criterion. Maximum velocities greater than 12 ft/second should be avoided. Volume 1 Page 44 of 54 10/02/24 Slopes for 6-through , 12-inch diameter pipe, unless otherwise approved by the City Engineer: 1) 6" pipe, minimum slope = 2% 2) 8" pipe, minimum slope = 0.50% 3) 1 O" pipe, minimum slope = 0.40% 4) 12" pipe, minimum slope= 0.30% Pipe slope for 12-inch diameter or larger pipe shall be designed to meet flow and velocity criteria and shall be approved by the City Engineer. Pipelines with horizontal curvature may require increases slope to achieve minimum required velocities. C. • Gravity sewer mains of any diameter shall convey peak hour dry weather flow at depths of 50% of pipe diameter (d/D = 0.5) or less. Existing sewer mains not meeting this criterion shall be replaced with larger diameter pipe. D. Gravity sewer mains of any diameter shall convey peak wet weather flow at flow depths of 75% of pipe diameter (d/D = 0.75) or less. Existing sew~r mains not meeting this criterion shall be replaced with larger diameter pipe. E. Peak sewer flow rates do not include infiltration or inflow (1/1). Infiltration is defined as the addition of groundwater into the sewer collection system and inflow is the addition of storm water into the sewer collection system. Because sewer collection system 1/1 is dependent on many factors including season, age of system, pipe material and joint types, root intrusion, and presence of storm water flow, 1/1 flow rate estimates will vary. The design of sewer mains connecting to sewer systems known to have 1/1, or are susceptible to 1/1, shall utilize peak wet weather flow estimates from the latest adopted Sewer Master Plan or perform wet weather flow monitoring as directed by the City Engineer. 6.6 HORIZONTAL AND VERTICAL LAYOUT A. Streets: See City of Carlsbad Standard Drawing No. GS-6 for location. B. Alley: The centerline offset between the alley and the sewer main shall be three feet (3') minimum. C. Private Street: Sewer mains in private streets shall require special design consideration for access. D. Horizontal Curves: SOR 35, PVC pipe may be curved horizontally through longitudinal bending with the following limitations: Min. Radius PiE!e Diameter of Curvature 6-inch 150 feet 8-inch 200 feet 10-inch 250 feet 12-inch 300 feet 15~inch 375 feet Volume 1 10/02/24 Page 45 of 54