TAYLOR GROUP, INC.
https://taylorgroupinc-my.sharepoint.com/personal/ltaylor_taylor-group_us/Documents/00911 Final Geotechnical Report 05232024.docx
301 Mission Avenue
Suite 201
Oceanside
California 92054
tel: 760.721.9990
fax: 760.721.9991
www.visitTGI.com
April 19, 2024 Updated May 23, 2024 TGI Project No. 19.00911 Carlsbad 17 GP, LLC 234 Venture Street, Suite 100 San Marcos, California 92078 Attn: Mr. Richard Woolsey Subject: Final As-Graded Geotechnical Report Ocean Condominium Project 2501 State Street, Carlsbad, California CT 16-02 / GR2019-0028 / DWG 519-5A
References: Taylor Group, Inc., “Interim As-Graded Geotechnical Report, Ocean Condominium Project, 2501 State Street, Carlsbad, California, CT 16-02 / GR2019-0028 / DWG 519-5A”, TGI Project No. 19.00911, dated April 24, 2022 Taylor Group, Inc., “Geotechnical Design Report, Proposed Ocean Condominium Project, 2501 State Street, Carlsbad, California, CT 16-02 / GR2019-0028 / DWG 519-5A”, TGI Project No. 19.00911, dated April 24, 2020 Taylor Group, Inc., “Addendum to Geotechnical Design Report, Recommendations for
Slot-Cut Excavations along Northerly Property Line, Proposed Ocean Condominium
Project, 2501 State Street, Carlsbad, California, CT 16-02 / GR2019-0028 / DWG 519-
5A” TGI Project No. 19-00911, dated November 21, 2021 Grading Plans for Ocean Condominiums, Grading Plan No. GR2019-0028, Drawing No. 519-5A, Project No. CT16-02, prepared by Taylor Group, Inc., approved January 18, 2022 Dear Mr. Woolsey: This letter provides our final geotechnical certification for the subject project. TGI has previously provided the above-references interim as-graded geotechnical report providing geotechnical the results of our observation and testing for the site shoring, earthwork and subgrade preparation of the building pad for the structure. The previous report also provided final design recommendations for construction of the structure and other improvements. Subsequently to the April 2022 report, TGI has provided periodic geotechnical observation and testing of earthwork for onsite and offsite improvements associated with the project including the following:
FINAL AS-GRADED GEOTECHNICAL REPORT Page | 2 Ocean Condominiums – 2501 State Street (CT 16-02, GR2019-0028, Dwg. 519-5A) TGI Project No. 19.00911 Updated May 23, 2024
TAYLOR GROUP, INC.
https://taylorgroupinc-my.sharepoint.com/personal/ltaylor_taylor-group_us/Documents/00911 Final Geotechnical Report 05232024.docx
• Construction of a water main replacement in an easement located immediately north of the project boundary, including reconnection of existing water services, new water services to the project site, and replacement of a fire hydrant;
• Water main improvements in the State Street ROW along portions of the easterly property boundary;
• Installation of a fire service and fire hydrant in the State Steet ROW;
• Construction of a sewer main replacement in an easement along the northerly property boundary, including reconnection of existing sewer lateral and a new sewer lateral to the project site;
• Installation and relocation of various other underground utilities(electric, gas, telecommunications, CATV) in the State Street ROW and onsite;
• Subgrade preparation and Class 2 base placement and compaction for curb, gutter and sidewalk along the State Street frontage
• Paving subgrade preparation, Class 2 base placement and compaction, and paving operations in the State Street ROW;
• Paving subgrade preparation, Class 2 base placement and compaction, and paving operations in the private driveway of the property located immediately north of the project site affected by project construction operations (sewer and water main construction);
• Paving subgrade preparation and paving operations in the private driveway of the property located immediately north of the project site affected by project construction operations (sewer and water main construction);
• Paving subgrade preparation, Class 2 base placement and compaction, and paving operations for a small portion of an unnamed alley located south of the project site (damaged by construction equipment traffic);
• Fill placement to achieve finished grade elevations in the northerly and southerly side yards and the front setback area along the State Street frontage;
• Subgrade preparation, base, and paving for the concrete driveway to the subgrade parking level off the building;
• Subgrade preparation for concrete hardscape areas in the southerly side yard;
• Subgrade preparation, gravel base and drainage system installation for permeable pavers in the southerly side yard and a portion of the front yard;
• Construction of biofiltration planters on the structural podium deck level and front yard; TGI has observed earthwork operations and performed in-place dry density and moisture content tests on compacted fill and trench backfill in connection with the above-listed construction operations. In-place density tests results are summarized on Table 1. Test locations in the State Street ROW and in the southerly side yard area are identified on Figure 1. Trench fill test locations for sewer main and water main trenches within easements along the northerly property boundary and in the northerly side yard area are illustrated on Figure 2. All observation and testing has been performed by or under the supervision of a licensed Geotechnical Engineer.
FINAL AS-GRADED GEOTECHNICAL REPORT Page | 3 Ocean Condominiums – 2501 State Street (CT 16-02, GR2019-0028, Dwg. 519-5A) TGI Project No. 19.00911 Updated May 23, 2024
TAYLOR GROUP, INC.
https://taylorgroupinc-my.sharepoint.com/personal/ltaylor_taylor-group_us/Documents/00911 Final Geotechnical Report 05232024.docx
CONCLUSIONS
Based on our observations and testing, it is our professional opinion that the geotechnical aspects of the construction have been completed in accordance with the approved plans and the recommendations of the previously referenced project geotechnical reports prepared by TGI dated April 24, 2020 and April 4, 2022. TGI appreciates the opportunity to be of service to you. Please contact us if you have any questions regarding this report. Sincerely,
TAYLOR GROUP, INC.
Larry R. Taylor, P.E. GE 2602, Exp. 06.30.2024
TEST
No.DATE ELEV.
(feet)
SOIL
No.
DRY
DENSITY
(lb/ft3)
MOISTURE
(%)
RELATIVE
COMPACTION
(%)
PASS
or
FAIL
COMMENTS
1 12/23/2022 -1.0 1 125.6 8.7 95.9%PASS Fire Service
2 12/23/2022 -1.0 1 123.3 9.2 94.1%PASS Fire Service
3 12/23/2022 -1.0 1 125.6 8.8 95.9%PASS Fire Service
4 01/12/2023 FG 1 127.2 8.5 97.1%PASS S. Walkway
5 01/12/2023 FG 1 125.8 9.0 96.0%PASS S. Walkway
6 01/12/2023 FG 1 123.3 8.9 94.1%PASS S. Walkway
7 01/26/2024 -1.0 1 121.5 8.7 92.7%PASS Com. Trench
8 01/26/2024 -1.0 1 122.6 8.5 93.6%PASS Com. Trench
9 01/26/2024 -1.0 1 124.4 8.3 95.0%PASS Com. Trench
10 02/13/2024 28.0 1 123.6 8.2 94.4%PASS Sanitary Sewer
11 02/13/2024 32.0 1 122.2 8.8 93.3%PASS Sanitary Sewer
12 02/13/2024 28.0 1 122.8 9.1 93.7%PASS Sanitary Sewer
13 02/14/2024 32.0 1 122.5 9.3 93.5%PASS Sanitary Sewer
14 02/14/2024 27.0 1 123.0 8.7 93.9%PASS Sanitary Sewer
15 02/14/2024 32.0 1 123.8 9.0 94.5%PASS Sanitary Sewer
9 16 02/14/2024 34.0 1 124.5 8.5 95.0%PASS Sanitary Sewer
17 02/15/2024 28.0 1 121.5 8.3 92.7%PASS Sanitary Sewer
18 02/15/2024 31.0 1 123.6 8.7 94.4%PASS Sanitary Sewer
19 02/15/2024 28.5 1 122.4 9.0 93.4%PASS Sanitary Sewer
20 02/15/2024 28.0 1 120.1 9.2 91.7%PASS Sanitary Sewer
21 02/16/2024 30.0 1 121.5 10.0 92.7%PASS Sanitary Sewer
22 02/16/2024 29.0 1 122.2 9.5 93.3%PASS Sanitary Sewer
23 02/16/2024 32.0 1 121.9 9.7 93.1%PASS Sanitary Sewer
24 02/16/2024 28.0 1 123.5 8.8 94.3%PASS Sanitary Sewer
25 02/16/2024 30.0 1 124.2 9.5 94.8%PASS Sanitary Sewer
26 02/17/2024 28.0 1 125.1 9.2 95.5%PASS Sanitary Sewer
27 02/17/2024 31.0 1 123.3 9.7 94.1%PASS Sanitary Sewer
28 02/17/2024 33.0 1 125.0 8.5 95.4%PASS Sanitary Sewer
0029 02/23/2024 28.0 4 122.2 8.3 95.9%PASS State St.
0030 02/23/2024 29.0 4 123.4 8.6 96.9%PASS State St.
0031 02/23/2024 30.0 4 122.8 8.7 96.4%PASS State St.
0032 02/23/2024 31.0 4 123.1 9.0 96.6%PASS State St.
Table 1. Field Density Test Summary
PROJECT: Ocean's 17 Condominiums
PROJECT No: 19.00911
LOCATION: State Street, Carlsbad, CA
Project No: 19.00932 Field Density Test Summary 1 of 8
TEST
No.DATE ELEV.
(feet)
SOIL
No.
DRY
DENSITY
(lb/ft3)
MOISTURE
(%)
RELATIVE
COMPACTION
(%)
PASS
or
FAIL
COMMENTS
Table 1. Field Density Test Summary
PROJECT: Ocean's 17 Condominiums
PROJECT No: 19.00911
LOCATION: State Street, Carlsbad, CA
0033 03/06/2024 30.0 4 120.2 9.2 94.3%PASS Storm Drain
0034 03/06/2024 31.0 4 119.8 9.8 94.0%PASS Storm Drain
0035 03/06/2024 30.0 4 119.7 9.5 94.0%PASS Storm Drain
0036 03/06/2024 31.0 4 121.1 9.8 95.1%PASS Storm Drain
0037 03/06/2024 30.0 4 120.8 9.7 94.8%PASS Storm Drain
0038 03/07/2024 -1.0 2 112.3 8.3 97.1%PASS Curb and Gutter
0039 03/07/2024 -1.0 2 113.5 8.7 98.1%PASS Curb and Gutter
40 03/07/2024 -1.0 2 111.1 8.4 96.0%PASS Curb and Gutter
41 03/07/2024 -1.0 2 112.1 8.7 96.9%PASS Curb and Gutter
42 03/07/2024 -1.0 2 110.5 8.6 95.5%PASS Curb and Gutter
43 03/07/2024 -1.0 2 113.5 8.5 98.1%PASS Curb and Gutter
44 03/07/2024 29.0 4 122.5 9.2 96.2%PASS Storm Drain
45 03/07/2024 30.0 4 121.2 9.5 95.1%PASS Storm Drain
46 03/07/2024 28.0 4 120.8 8.9 94.8%PASS Storm Drain
47 03/08/2024 30.0 4 123.0 9.0 96.5%PASS Storm Drain
48 03/08/2024 -1.0 4 121.7 9.4 95.5%PASS Curb and Gutter
49 03/08/2024 30.0 4 120.2 8.7 94.3%PASS Storm Drain
50 03/08/2024 29.0 4 120.8 8.9 94.8%PASS Storm Drain
51 03/08/2024 31.0 4 121.0 9.2 95.0%PASS Storm Drain / State S.
52 03/08/2024 31.0 4 123.4 8.9 96.9%PASS Storm Drain / State S.
53 03/12/2024 -1.0 4 119.8 8.2 94.0%PASS Sidewalk (West side of State St.)
54 03/12/2024 -1.0 4 119.5 8.4 93.8%PASS Sidewalk (West side of State St.)
55 03/12/2024 -1.0 4 120.5 8.5 94.6%PASS Sidewalk (West side of State St.)
56 03/12/2024 -1.0 4 119.8 9.0 94.0%PASS Sidewalk (West side of State St.)
57 03/12/2024 -1.0 4 117.2 9.2 92.0%PASS Sidewalk (West side of State St.)
58 03/12/2024 -1.0 4 118.2 9.4 92.8%PASS Sidewalk (West side of State St.)
59 03/13/2024 29.0 4 117.5 9.7 92.2%PASS Storm Drain
60 03/13/2024 30.0 4 118.9 9.5 93.3%PASS Storm Drain
61 03/13/2024 30.0 4 122.0 9.6 95.8%PASS Storm Drain
62 03/13/2024 29.5 4 123.4 9.9 96.9%PASS Storm Drain
63 03/13/2024 30.0 4 121.1 9.4 95.1%PASS Storm Drain
64 03/14/2024 -1.0 7 119.5 9.7 97.4%PASS Curb and Gutter
Project No: 19.00932 Field Density Test Summary 2 of 8
TEST
No.DATE ELEV.
(feet)
SOIL
No.
DRY
DENSITY
(lb/ft3)
MOISTURE
(%)
RELATIVE
COMPACTION
(%)
PASS
or
FAIL
COMMENTS
Table 1. Field Density Test Summary
PROJECT: Ocean's 17 Condominiums
PROJECT No: 19.00911
LOCATION: State Street, Carlsbad, CA
65 03/14/2024 -1.0 7 118.6 10.2 96.7%PASS Curb and Gutter
66 03/14/2024 -1.0 7 116.3 10.5 94.8%PASS Curb and Gutter
67 03/14/2024 -1.0 7 115.2 10.3 93.9%PASS Curb and Gutter
68 03/14/2024 -1.0 7 118.1 9.9 96.3%PASS Curb and Gutter
69 03/14/2024 -1.0 7 119.5 9.3 97.4%PASS Driveway Aproach
70 03/14/2024 -1.0 7 118.7 10.3 96.7%PASS Driveway Aproach
71 03/20/2024 FG 7 117.6 9.8 95.8%PASS 2333 State St Parking Lot
72 03/20/2024 FG 7 118.1 9.7 96.3%PASS 2333 State St Parking Lot
73 03/20/2024 FG 7 116.5 10.1 94.9%PASS 2333 State St Parking Lot
74 03/20/2024 FG 7 117.3 9.4 95.6%PASS 2333 State St Parking Lot
75 03/20/2024 FG 7 118.1 10.0 96.3%PASS 2333 State St Parking Lot
76 03/20/2024 FG 7 117.6 10.7 95.8%PASS 2333 State St Parking Lot
77 03/20/2024 -0.5 3 114.5 9.5 91.6%PASS Fire Service
78 03/20/2024 -0.5 3 115.6 9.6 92.5%PASS Fire Service
79 03/20/2024 -0.5 3 116.1 9.8 92.9%PASS Fire Service
80 03/22/2024 -0.5 2 111.8 8.4 96.6%PASS Base Pave (State Street)
81 03/22/2024 -0.5 2 112.2 8.5 97.0%PASS Base Pave (State Street)
82 03/22/2024 -0.5 2 112.8 8.3 97.5%PASS Base Pave (State Street)
83 03/22/2024 -0.5 2 112.0 8.7 96.8%PASS Base Pave (State Street)
84 03/22/2024 -0.5 2 111.5 8.8 96.4%PASS Base Pave (State Street)
85 03/22/2024 -0.5 2 110.8 8.5 95.8%PASS Base Pave (State Street)
86 03/22/2024 -0.2 5 142.5 NA 97.5%PASS Base Pave (State Street)
87 03/22/2024 -0.2 5 141.8 NA 97.0%PASS Base Pave (State Street)
88 03/22/2024 -0.2 5 142.3 NA 97.3%PASS Base Pave (State Street)
89 03/22/2024 -0.2 5 143.0 NA 97.8%PASS Base Pave (State Street)
90 03/22/2024 -0.2 5 140.9 NA 96.4%PASS Base Pave (State Street)
91 03/25/2024 -0.5 2 110.1 8.5 95.2%PASS Base Pave (State Street)
92 03/25/2024 -0.5 2 109.8 7.9 94.9%PASS Base Pave (State Street)
93 03/25/2024 -0.5 2 109.9 9.3 95.0%PASS Base Pave (State Street)
94 03/25/2024 -0.5 2 110.5 8.7 95.5%PASS Base Pave (State Street)
95 03/25/2024 -0.5 2 111.1 9.0 96.0%PASS Base Pave (State Street)
96 03/25/2024 -0.5 2 110.8 8.7 95.8%PASS Base Pave (State Street)
Project No: 19.00932 Field Density Test Summary 3 of 8
TEST
No.DATE ELEV.
(feet)
SOIL
No.
DRY
DENSITY
(lb/ft3)
MOISTURE
(%)
RELATIVE
COMPACTION
(%)
PASS
or
FAIL
COMMENTS
Table 1. Field Density Test Summary
PROJECT: Ocean's 17 Condominiums
PROJECT No: 19.00911
LOCATION: State Street, Carlsbad, CA
97 03/25/2024 -0.2 5 139.5 NA 95.4%PASS Base Pave (State Street)
98 03/25/2024 -0.2 5 141.5 NA 96.8%PASS Base Pave (State Street)
99 03/25/2024 -0.2 5 142.2 NA 97.3%PASS Base Pave (State Street)
100 03/25/2024 -0.2 5 139.8 NA 95.6%PASS Base Pave (State Street)
101 03/25/2024 -0.2 5 140.5 NA 96.1%PASS Base Pave (State Street)
102 03/25/2024 -0.2 5 140.5 NA 98.6%PASS Base Pave (State Street)
103 04/02/2024 FG 6 138.5 NA 97.2%PASS Finish Paving (State Street)
104 04/02/2024 FG 6 138.4 NA 97.1%PASS Finish Paving (State Street)
105 04/02/2024 FG 6 139.4 NA 97.8%PASS Finish Paving (State Street)
106 04/02/2024 FG 6 137.5 NA 96.5%PASS Finish Paving (State Street)
107 04/02/2024 FG 6 135.2 NA 94.9%PASS Finish Paving (State Street)
108 04/02/2024 FG 6 136.1 NA 95.5%PASS Finish Paving (State Street)
109 04/02/2024 FG 6 140.2 NA 98.4%PASS Finish Paving (State Street)
110 04/02/2024 FG 6 139.5 NA 97.9%PASS Finish Paving (State Street)
111 04/02/2024 FG 6 138.8 NA 97.4%PASS Finish Paving (State Street)
112 04/03/2024 FG 6 137.5 NA 96.5%PASS Finish Paving (Parking Area)
113 04/03/2024 FG 6 138.2 NA 97.0%PASS Finish Paving (Parking Area)
114 04/03/2024 FG 6 140.0 NA 98.2%PASS Finish Paving (Parking Area)
115 04/03/2024 FG 6 139.5 NA 97.9%PASS Finish Paving (Parking Area)
0116 04/03/2024 FG 6 137.5 NA 96.5%PASS Finish Paving (Parking Area)
0117 04/03/2024 FG 6 138.1 NA 96.9%PASS Finish Paving (Parking Area)
0118 04/12/2024 -0.5 7 112.1 8.7 95.4%PASS Road Repair (State Street)
0119 04/12/2024 -0.5 7 114.4 9.3 97.4%PASS Road Repair (State Street)
0120 04/12/2024 FG 6 135.5 NA 95.1%PASS Road Repair (State Street)
0121 04/12/2024 FG 6 136.9 NA 96.1%PASS Road Repair (State Street)
0122 04/12/2024 FG 6 137.1 NA 96.2%PASS Road Repair (State Street)
0123 4/18/2024 -2.0 7 113.5 8.5 96.6%PASS Alley (Sub-Grade)
0124 4/18/2024 -2.0 7 112.2 9.0 95.5%PASS Alley (Sub-Grade)
0125 4/18/2024 -2.0 7 113.1 9.3 96.3%PASS Alley (Sub-Grade)
0126 4/18/2024 -1.0 7 112.9 9.5 96.0%PASS Alley (Sub-Grade)
0127 4/18/2024 -1.0 7 112.7 9.1 95.9%PASS Alley (Sub-Grade)
0128 4/18/2024 -1.0 7 112.5 9.3 95.7%PASS Alley (Sub-Grade)
Project No: 19.00932 Field Density Test Summary 4 of 8
TEST
No.DATE ELEV.
(feet)
SOIL
No.
DRY
DENSITY
(lb/ft3)
MOISTURE
(%)
RELATIVE
COMPACTION
(%)
PASS
or
FAIL
COMMENTS
Table 1. Field Density Test Summary
PROJECT: Ocean's 17 Condominiums
PROJECT No: 19.00911
LOCATION: State Street, Carlsbad, CA
0129 04/19/2024 FG 6 137.5 NA 96.5%PASS Alley (Paving)
0130 04/19/2024 FG 6 135.2 NA 94.9%PASS Alley (Paving)
0131 04/19/2024 FG 6 136.6 NA 95.9%PASS Alley (Paving)
0132 04/19/2024 FG 6 136.5 NA 95.8%PASS Alley (Paving)
0133 04/19/2024 FG 6 135.9 NA 95.4%PASS Alley (Paving)
0134 04/19/2024 FG 6 137.1 NA 96.2%PASS Alley (Paving)
Project No: 19.00932 Field Density Test Summary 5 of 8
Soil
No.
MAXIMUM
DRY DENSITY
(lb/ft3)
OPTIMUM
MOISTURE
(%)
NOTES
1 131.0 9.0 Imported Fill (Stockpile)
2 115.7 8.5 Imported Class II Base
3 125.0 10.5 Site Soils (Clay w Sand)
4 127.4 10.0 Stockpile and Site Soils Blend
5 146.2 NA AC 3/4"
6 142.5 NA AC 1/2"
7 122.7 10.0 Imported Class II Base
104.1
112.5
114.7
138.9
135.4
110.4
Asphalt 1/2"
Asphalt PG 64-10
Road Base
Silty Sand
Road Base
Brown Clay w Sand
Silty Sand w Sandy Clay
DRY DENSITY FOR
PASSING RC
(lb/ft3)
117.9
DESCRIPTION
Table 2. Maximum Density Test Summary
PROJECT: Ocean's 17 Condominiums
PROJECT No: 19.00911
LOCATION: State Street, Carlsbad, CA
Project Number: 19.00932 Maximum Density Test Summary 6 of 8
Pr
o
j
e
c
t
N
o
.
19
.
0
0
9
1
1
Ca
r
l
s
b
a
d
1
7
Cl
i
e
n
t
:
Pr
o
j
e
c
t
N
a
m
e
:
Oc
e
a
n
C
o
n
d
o
m
i
n
i
u
m
s
Dr
a
w
n
b
y
:
C
T
Da
t
e
:
Da
t
e
:
05
/
1
0
/
2
0
2
4
05
/
0
6
/
2
0
2
4
Ch
e
c
k
e
d
b
y
:
L
R
T
FI
G
U
R
E
1
IN
-
S
I
T
U
D
E
S
N
I
T
Y
T
E
S
T
L
O
C
A
T
I
O
N
S
ST
A
T
E
S
T
R
E
E
T
R
O
W
A
N
D
S
O
U
T
H
E
R
L
Y
S
I
D
E
Y
A
R
D
IN-SITU DENSITY TEST LOCATION AND NUMBER
(See Table 1)
LEGEND
`
55
Pr
o
j
e
c
t
N
o
.
19
.
0
0
9
1
1
Ca
r
l
s
b
a
d
1
7
Cl
i
e
n
t
:
Pr
o
j
e
c
t
N
a
m
e
:
Oc
e
a
n
C
o
n
d
o
m
i
n
i
u
m
s
Dr
a
w
n
b
y
:
C
T
Da
t
e
:
Da
t
e
:
05
/
1
0
/
2
0
2
4
05
/
0
6
/
2
0
2
4
Ch
e
c
k
e
d
b
y
:
L
R
T
FI
G
U
R
E
2
IN
-
S
I
T
U
D
E
S
N
I
T
Y
T
E
S
T
L
O
C
A
T
I
O
N
S
SE
W
E
R
A
N
D
W
A
T
E
R
M
A
I
N
S
AN
D
N
O
R
T
H
E
R
L
Y
S
I
D
E
Y
A
R
D
IN-SITU DENSITY TEST LOCATION AND NUMBER
(See Table 1)
LEGEND
`
55
MA
T
C
H
L
I
N
E
MA
T
C
H
L
I
N
E
2333 STATE STREET
2333 STATE STREET
Geotechnical Engineering Civil Engineering Environmental Site Assessment
301 Mission Avenue
Suite 201
Oceanside
California 92054
tel: 760.721.9990
fax: 760.721.9991
www.visitTGI.com
April 4, 2022
TGI Project No. 19.00911
Carlsbad 17 GP, LLC
Attn: Mr. Richard Woolsey
234 Venture Street, Suite 100
San Marcos, California 92078
Subject: Interim As-Graded Geotechnical Report
Ocean Condominium Project
2501 State Street, Carlsbad, California
CT 16-02 / GR2019-0028 / DWG 519-5A
References: Taylor Group, Inc., “Geotechnical Design Report, Proposed Ocean Condominium
Project, 2501 State Street, Carlsbad, California, CT 16-02 / GR2019-0028 / DWG
519-5A”, TGI Project No. 19.00911, dated April 24, 2020
Taylor Group, Inc., “Addendum to Geotechnical Design Report, Recommendations for Slot-
Cut Excavations along Northerly Property Line, Proposed Ocean Condominium Project, 2501
State Street, Carlsbad, California, CT 16-02 / GR2019-0028 / DWG 519-5A” TGI Project No.
19-00911, dated November 21, 2021
Grading Plans for Ocean Condominiums, Grading Plan No. GR2019-0028, Drawing No. 519-
5A, Project No. CT16-02, prepared by Taylor Group, Inc., approved January 18, 2022
Dear Mr. Woolsey:
In accordance with your request and Change-Order No. 3 dated October 11, 2021, to our Professional Services
Agreement, Taylor Group, Inc. (TGI) has provided testing and observation services during the grading operations for
the subject development. This report pertains to the rough grading operations for the building pad for the planned
multi-story condominium building at the site. This is an interim report for our services during initial earthwork and
grading activities performed from February 10 through April 1, 2022, during the preparation of the pad for the garage
level slab. Additional grading will be performed following construction of the garage level slab and retaining walls for
the partially subterranean garage level of the building.
The scope of our services summarized in this report includes:
• Observing the installation of temporary and permanent shoring
• Observing grading operations including the removal of unacceptable site soils, removal and recompaction
of existing soil and placement and compaction of imported fill soil.
• Performing in-place dry density and moisture content tests on fill placed and compacted
• during the grading operations.
• Performing laboratory tests on samples of site soil and import to evaluate engineering characteristic and
corrosion parameters
• Preparing an Interim As-Graded Geologic Map.
• Preparing this interim As-Graded Geotechnical Report
Interim As-Graded Geotechnical Report Page | 2 Ocean Condominium Project, 2501 State Street, Carlsbad, California
CT 16-02 / GR2019-0028 / DWG 519-5A
April 4, 2022
GENERAL
The project site is located at 2501 State Street in the northern coastal area of the City of Carlsbad, California (see
Vicinity Map, Figure 1). Elliott Drilling Services, Inc. installed shoring in accordance with the approved plans. Pratt
Equipment Corp. performed the grading.
References to elevations and locations presented in this report are based on the surveyor’s or grade checker’s stakes
in the field, surveyed bottom elevations, and/or interpolation from the referenced grading and shoring plans.
SHORING INSTALLATION
Temporary and permanent shoring was installed to facilitate the planned grading of the site that included removal of
existing site soils to depths of approximately 8 to 12 feet below the previously existing grade. Shoring extends along
the entire south and east boundaries of the site and short sections of the west and north boundaries at the southwest
and northeast corners of the site.
The shoring consists of soldier beams and wood lagging installed by Elliott Drilling Services between February 10
and February 25, 2022. Soldier beams were installed during the period of February 10-16, 2022. Lagging was
installed during the excavation of site soils during the period of February 17 through March 9, 2022.
TGI observed the installation of the soldier beams to verify that the beams were installed in accordance with the
approved shoring plans with respect to depths, diameters, beam sections. Drilling at soldier beam S14 encountered
concrete at a depth of approximately 4 feet and was drilled with a core barrel to the required depth. Table 2 on Plate
1 provides a summary of as-built information for the soldier beam installation.
In general, the soldier beams were installed in accordance with the approved plans. Most of the soldier beam
sections exceeded those specified in the plans. All beams had the pile diameters specified in the plans and were
installed to at least the design depths.
GRADING OPERATIONS
Grading for the building pad included removal and off-site disposal of approximately 6 to 10 feet of existing clayey
fill soils across the site to expose the Old Paralic Deposits (“terrace deposits”). Approximately 2 to 4 feet of weathered
terrace deposits was removed and stockpiled on site to be replaced as compacted fill. Following removal of existing
fill and weathered terrace deposits, the firm terrace beneath the pad was scarified and recompacted to a depth of
12-inches prior to placement of compacted fill to achieve building pad elevations.
Excavation and removal of unacceptable site soils began on February 17 in conjunction with the shoring operations
and continued through March 9, 2022. Some obstructions were encountered during excavation that were not
anticipated. The obstructions are noted on Plate 1 and including concrete footings, remnants of a concrete hydraulic
structure (manhole or cesspool), remnants of 4” clay pipes and a concrete slab. These obstructions were removed
with some breaking required.
Interim As-Graded Geotechnical Report Page | 3 Ocean Condominium Project, 2501 State Street, Carlsbad, California
CT 16-02 / GR2019-0028 / DWG 519-5A
April 4, 2022
Placement of fill began on March 11 and proceeded from east to west. The fill placement for the building pad was
completed on April 1, 2022.
Slot-cut excavations along the northerly property boundary were performed with continuous observation by a
representative of TGI during the period of March 11 through March 18, 2022. The “A,B,C” slot cutting and
replacement of engineered fill were executed in general accordance with the recommendations in TGI’s November
2021 Addendum.
During the grading operations, we observed compaction procedures and performed in-place density tests to
evaluate the dry density and moisture content of the fill materials. We performed in-place density tests in general
conformance with ASTM Test Method D 6938 (nuclear). Table I presents the results of the in-place dry density and
moisture content tests. In general, the in-place density test results indicate the compacted fill possesses a dry density
of at least 90 percent of the laboratory maximum dry density near to slightly above optimum moisture content at the
locations tested. The Final As-Graded Geologic Map, Plate 1, presents the approximate locations of the in-place
density tests.
TGI tested laboratory samples of material used for fill to evaluate moisture-density relationships, optimum moisture
content and maximum dry density (ASTM D 1557) and grain size distribution (ASTM D 422). TGI tested samples
material within the upper approximately 3 feet of finish grade to evaluate the water-soluble sulfate content (California
Test No. 417) characteristics and shear strength of the fill.
AS-GRADED SOIL AND GEOLOGIC CONDITIONS
The soil and geologic conditions encountered during grading are similar to those described in the referenced
geotechnical design report. All unacceptable clayey undocumented fill soils were excavated and disposed of offsite.
The placement of compacted fill was performed in accordance with recommendations provided in the project
geotechnical report. The As-Graded Geologic Map, Plate 1, depicts the general geologic conditions observed during
grading. The finished building pad at the site is underlain by engineered fill ranging in thickness between
approximately 6.5 to 8 feet overlying dense Old Paralic Deposits. In general, the compacted fill consists of sand with
silt (SP) derived from removals of approved site soils (weathered terrace deposits) and silty sand (SM) imported from
two borrow locations.
CONCLUSIONS AND RECOMMENDATIONS
1.0 General
1.1 Based on our observations, we judge that the temporary and permanent shoring has been completed in
accordance with the approved plans and the recommendations of the previously referenced project
geotechnical report prepared by TGI dated April 24, 2020, and the geotechnical requirements of the referenced
grading plans.
Interim As-Graded Geotechnical Report Page | 4 Ocean Condominium Project, 2501 State Street, Carlsbad, California
CT 16-02 / GR2019-0028 / DWG 519-5A
April 4, 2022
1.2 Based on our observations and testing, we judge that grading for the building pad has been performed in
conformance with the recommendations of the previously referenced project geotechnical report prepared by
TGI dated April 24, 2020, the supplemental recommendations for slot cutting dated and the geotechnical
requirements of the referenced grading plans.
1.3 We did not observe soil or geologic conditions during grading that would preclude the continued development
of the property as planned. Based on laboratory test results and field observations, it is our opinion that the fill
observed and tested as part of the grading for this project was generally compacted to a dry density of at least
90 percent of the laboratory maximum dry density near to slightly above optimum moisture content.
1.4 The site is underlain by compacted fill and Old Paralic Deposits. We observed the placement of compacted
fill during the grading operations and performed in-place density tests to evaluate the dry density and moisture
content of the fill material.
1.5 Laboratory testing of near-grade soil conditions indicates the upper approximately 6.5 to 8 feet of engineered
fill soil underlying the building pad has a “very low” expansion potential (expansion index of 20 or less).
Laboratory testing indicates that the fill soil possesses “S0” water-soluble sulfate exposure class. The results
of the laboratory expansion index and water-soluble sulfate tests are presented herein.
1.6 It is anticipated that excavations within the fill and underlying formational deposits for foundations, utilities and
other improvements can be accomplished with moderate effort using conventional heavy-duty equipment.
2.0 Finish Grade Soil Conditions
2.1 Based on observations during grading, plasticity tests and laboratory grain size analysis tests, the engineered
fill and native deposits underlying the completed building pad meet the specifications listed in Section 6.3.6
of the design report and are judged to be “non-expansive” (expansion index [EI] of 20 or less) as defined by
the 2019 California Building Code (CBC) Section 1803.5.3.
2.2 A direct shear test (ASTM D 3080) was performed on a representative sample of the imported fill to assess the
shear strength properties of the engineered fill. A sample was remolded to approximately 90% relative
compaction and tested in an unsaturated state. Results are included in Attachment 1. The test results indicate
that the shear strength of the compacted fill exceed the minimum shear strength requirements stated in Section
6.3.3 of the design report and are consistent with the design assumptions made for the purpose of providing
design bearing capacity of shallow foundations.
2.3 Laboratory testing of a representative sample of imported fill soil representing the finished grade materials
indicated that the water-soluble sulfate content is 0.02%. The test results indicate the sample tested possess
“S0” sulfate exposure to concrete structures as defined by 2019 CBC Section 1904 and ACI 318-19, Chapter
19. Other soil samples from the site could yield different concentrations. Additionally, over time landscaping
activities (i.e., addition of fertilizers and other soil nutrients) may affect the concentration.
2.4 TGI does not practice in the field of corrosion engineering. Further evaluation by a corrosion engineer may be
performed if improvements susceptible to corrosion are planned.
Interim As-Graded Geotechnical Report Page | 5 Ocean Condominium Project, 2501 State Street, Carlsbad, California
CT 16-02 / GR2019-0028 / DWG 519-5A
April 4, 2022
3.0 Applicability Of Design Recommendations
Based on our observations, testing and analysis of the as-graded geotechnical conditions of the completed
building pad, we conclude that the design recommendations provided in the geotechnical report prepared by TGI
dated April 24, 2020 remain applicable for the completed building pad.
LIMITATIONS
The conclusions and recommendations contained herein apply only to our work with respect to development and
represent conditions on the date of our final observation. Any subsequent improvement should be done in
conjunction with our observation and testing services. As used herein, the term “observation” implies only that we
observed the progress of the work with which we agreed to be involved. Our services did not include the evaluation
or identification of the potential presence of hazardous materials. Our conclusions and opinions as to whether the
work essentially complies with the job specifications are based on our observations, experience and test results.
Subsurface conditions, and the accuracy of tests used to measure such conditions, can vary greatly at any time. We
make no warranty, express or implied, except that our services were performed in accordance with engineering
principles generally accepted at this time and location.
TGI will accept no responsibility for any subsequent changes made to the site by others, by the uncontrolled action
of water, or by the failure of others to properly repair damages caused by the uncontrolled action of water. The
findings and recommendations of this report may be invalidated wholly or partially by changes outside our control.
Therefore, this report is subject to review and should not be relied upon after a period of three years.
TGI appreciates the opportunity to be of service to you. Please contact us if you have any questions regarding this
report.
Sincerely,
TAYLOR GROUP, INC.
Larry R. Taylor
Principal Engineer
G.E. 2602
FIGURE 1. SITE LOCATION AND VICINITYTGI Project No. 19.00911
Drawn by: MC Checked by: MC
Date: May 2019
Reference: USGS Topographic Maps, San Luis Rey 7.5 Minute Quadrangle, California, San Diego County, 2015
NORTH
2501 State Street, Carlsbad, California
SUBJECT SITE
PROJECT:
PROJECT No:19.00911-2100
LOCATION:2501 STATE STREET, CARLSBAD, CA
DATE
ELEV.(feet)SOILTYPE
DRYDENSITY
(lb/ft3)MOISTURE(%)
RELATIVECOMPACTION(%)
PASSorFAIL NOTES/COMMENTS
OCEAN CONDOMINIUMS
TEST No
Table 1. Field Density Test Summary
0001 03/11/22 27.5 1 116.8 12.8 99.8%Pass
0002 03/11/22 29.5 1 114.8 11.8 98.1%Pass
0003 03/15/22 31.0 1 109.2 11.1 93.3%Pass
0004 03/16/22 27.0 1 106.8 12.7 91.3%Pass
0005 03/16/22 29.0 1 108.7 11.9 92.9%Pass
0006 03/16/22 29.0 2 112.9 11.8 90.3%Pass
0007 03/17/22 27.0 2 113.0 11.1 90.4%Pass
0008 03/17/22 29.0 2 112.5 12.2 90.0%Pass
0009 03/17/22 30.0 2 114.0 13.0 91.2%Pass
0010 03/17/22 26.5 2 114.9 11.2 91.9%Pass
0011 03/17/22 28.5 2 112.3 10.4 89.8%Pass
0012 03/25/22 25.0 3 125.3 8.6 95.6%Pass
0013 03/25/22 25.5 3 123.2 9.2 94.0%Pass
0014 03/25/22 26.0 3 121.6 10.6 92.8%Pass
0015 03/25/22 27.0 3 124.1 9.5 94.7%Pass
0016 03/25/22 26.0 3 125.4 8.2 95.7%Pass
0017 03/20/22 27.0 3 123.5 7.7 94.3%Pass
0018 03/20/22 28.0 3 124.7 8.3 95.2%Pass
0019 03/20/22 26.5 3 125.1 8.5 95.5%Pass
0020 03/20/22 28.0 3 119.0 9.3 90.8%Pass
0021 03/20/22 28.0 3 121.3 9.2 92.6%Pass
0022 04/01/22 29.0 3 120.4 10.5 91.9%Pass
0023 04/01/22 30.0 3 121.3 9.6 92.6%Pass
0024 04/01/22 28.0 3 122.0 8.4 93.1%Pass
0025 04/01/22 30.0 3 120.8 8.6 92.2%Pass
0026 04/01/22 29.0 3 121.7 9.2 92.9%Pass
0027 04/01/22 FG 3 119.1 8.2 90.9%Pass
0028 04/01/22 FG 3 120.4 6.8 91.9%Pass
0029 04/01/22 FG 3 123.6 7.0 94.4%Pass
0030 04/01/22 FG 3 122.4 8.1 93.4%Pass
0031 04/01/22 FG 3 126.4 7.8 96.5%Pass
0032 04/01/22 FG 2 116.3 7.1 93.0%Pass
0033 04/01/22 FG 3 124.7 9.3 95.2%Pass
0034 04/01/22 FG 3 122.8 10.0 93.7%Pass
0035 04/01/22 FG 2 115.6 9.8 92.5%Pass
0036 04/01/22 FG 3 123.6 7.8 94.4%Pass
TAYLOR GROUP, INC.4/4/2022 Page 1 of 2
PROJECT:
PROJECT No:19.00911-2100
LOCATION:2501 STATE STREET, CARLSBAD, CA
SOIL No.
MAXIMUMDRY DENSITY
(lb/ft3)
OPTIMUM MOISTURE
(%)
DRY DENSITY FOR PASSING RC
(lb/ft3)NOTES
1 117.0 11.1 111.2 Site soil (weatherd terrace )
2 125.0 10.5 118.8 SFC Import
3 131.0 9.0 124.5 Hoover & Ash Import
Maximum Density Test Summary
Silt with sand (SP)
Grey-brown silty sand
Reddish-brown silty sand
DESCRIPTION
OCEAN CONDOMINIUMS
S
T
A
T
E
S
T
R
E
E
T
2
3
4
5 6
7
8
9
10
1112
13
14
15
16
17
19
20
21
22
23
24
25
26
27
28
29
30 31
32
33
34
35
36
1
18
TA
Y
L
O
R
G
R
O
U
P
,
I
N
C
.
AS
G
R
A
'
E
'
G
E
O
T
E
C
+
N
I
C
A
L
S
I
T
E
P
L
A
N
OC
E
A
N
C
O
N
'
O
0
I
N
I
U
0
S
S
T
A
T
E
S
T
R
E
E
T
,
C
A
R
L
S
%
A
'
,
C
A
GR
'
:
G
A
C
T
PLATE
SHEET NUMBER:
tgi
30
1
M
i
s
s
i
o
n
A
v
e
n
u
e
S
u
i
t
e
2
0
1
O
c
e
a
n
s
i
d
e
C
a
l
i
f
o
r
n
i
a
9
2
0
5
4
te
l
.
7
6
0
.
7
2
1
.
9
9
9
0
f
a
x
.
7
6
0
.
7
2
1
.
9
9
9
1
w
w
w
.
v
i
s
i
t
T
G
I
.
c
o
m
Ge
o
t
e
c
h
n
i
c
a
l
E
n
g
i
n
e
e
r
i
n
g
C
i
v
i
l
E
n
g
i
n
e
e
r
i
n
g
REGISTERE
D
P
R
O
F
ESSIONA L E N G I NEER
G E O TEC
H
N
I
C
A
L
LAR
R
Y
R
U
S
SEL TA Y L O R
S T ATE OF
CAL
I
F
O
R
NIA
No
.
2
6
6
2
Ex
p
.
0
6
.
3
0
.
2
0
2
0
RE
V
I
S
I
O
N
S
AP
P
R
O
V
E
D
DA
T
E
DR
A
W
N
B
Y
:
CH
E
C
K
E
D
B
Y
:
TG
I
P
R
O
J
E
C
T
N
O
.
:
CL
I
E
N
T
:
CT LR
T
19
.
0
0
9
1
1
CA
R
L
S
B
A
D
1
7
,
G
P
DR
A
W
I
N
G
D
A
T
E
:
PL
O
T
D
A
T
E
:
04
/
0
1
/
2
0
2
2
04
/
0
4
/
2
0
2
2
36
TAYLOR GROUP, INC.
P:\00911 Ocean Condominiums\Construction Phase\As-Graded Geotechnical\19.00911 Interim As-Graded Geotechnical Report_04042022.docx
Appendix 1 Lab Testing Data for Fill Materials
Ocean Condominiums - 2501 State Street, Carlsbad, CA
Boring No.NA
Depth:STOCKPILE Maximum Dry Density: 117.0 lb/ft2
Test Method: ASTM D 1557 (Method A)Optimum Moisture Content: 11.5%
Project Name:OCEAN CONDOMINIUMS
Location:2501 STATE STREET, CARLSBAD, CA
Project Number:19.00911-2100
WEATHERED TERRACE (SITE SOIL)Maximum Dry Density and Moisture Content:
Sand with silt (SP)
MAXIMUM DENSITY DETERMINATION
95
100
105
110
115
120
125
130
135
140
145
0%5%10%15%20%25%30%
DR
Y
D
E
N
S
I
T
Y
(
L
B
/
C
U
.
F
T
.
)
MOISTURE CONTENT (% BY WEIGHT)
Dry Density vs. Moisture Content
2.65
2.70
2.75
ZERO AIR VOIDS CURVES
Boring No.NA
Depth:STOCKPILE Maximum Dry Density: 125.0 lb/ft2
Test Method: ASTM D 1557 (Method A)Optimum Moisture Content: 10.5%
Project Name:OCEAN CONDOMINIUMS
Location:2501 STATE STREET, CARLSBAD, CA
Project Number:19.00911-2100
SFC IMPORT Maximum Dry Density and Moisture Content:
Grey-brown silty aand (SM)
MAXIMUM DENSITY DETERMINATION
95
100
105
110
115
120
125
130
135
140
145
0%5%10%15%20%25%30%
DR
Y
D
E
N
S
I
T
Y
(
L
B
/
C
U
.
F
T
.
)
MOISTURE CONTENT (% BY WEIGHT)
Dry Density vs. Moisture Content
2.65
2.70
2.75
ZERO AIR VOIDS CURVES
Boring No.NA
Depth:STOCKPILE Maximum Dry Density: 131 lb/ft2
Test Method: ASTM D 1557 (Method A)Optimum Moisture Content: 9%
Project Name:OCEAN CONDOMINIUMS
Location:2501 STATE STREET, CARLSBAD, CA
Project Number:19.00911-2100
HOOVER & ASH IMPORT (SOIL #3)Maximum Dry Density and Moisture Content:
Reddish-brown silty sand (SM)
MAXIMUM DENSITY DETERMINATION
95
100
105
110
115
120
125
130
135
140
145
0%5%10%15%20%25%30%
DR
Y
D
E
N
S
I
T
Y
(
L
B
/
C
U
.
F
T
.
)
MOISTURE CONTENT (% BY WEIGHT)
Dry Density vs. Moisture Content
2.65
2.70
2.75
ZERO AIR VOIDS CURVES
Sample Identification *D100(mm)D60(mm)D30(mm)*D10(mm)Cc Cu %Gravel %Sand %< No.200
SFC IMPORT 6.35 0.31 0.15 -14.5 62.0 3.3 76.6 20.1
BEACH LIFE IMPORT 6.35 ---0.0 74.7 25.3
HOOVER & ASH IMPORT 6.35 0.46 0.15 -4.9 46.0 1.9 77.3 20.8
0 ----
0 ----
0
*Extrapolated where particle diameter is beyond sieve sizes utilized.
Sample Identification SYM LL PL PI % Moisture
SFC IMPORT SM NP 7.8
BEACH LIFE IMPORT SM NP 4.6
HOOVER & ASH IMPORT SM NP 7.6
0
19.00911-2100
Classification
Grey brown silty sand (SM) with gravel
Reddish brown siltry fine sand (SM)
2501 State Street, Carlsbad, CA
Project Name:
Location:
Project Number:
GRAIN SIZE DISTRIBUTION (ASTM D 422)
Reddish brown siltry fine sand (SM)
Ocean Condominiums
0.0
10.0
20.0
30.0
40.0
50.0
60.0
70.0
80.0
90.0
100.0
0.0010.0100.1001.00010.000100.0001000.000
PE
R
C
E
N
T
F
I
N
E
R
B
Y
W
E
I
G
H
T
GRAIN SIZE IN MILLIMETERS
1 3/432 4 10 30 40 100 2003/84 50
SILT AND CLAYGRAVELCOBBLESSAND
coarse medium fine
U.S. SIEVE NUMBERU.S. SIEVE OPENING IN INCHES HYDROMETER
coarse fine
Boring No.SFC
Depth:BA Peak: F =39o c = 1,000 lb/ft2
Test Parameters: CU @ 0.02 in/min IMPORTED FILL Residual: F =36o c = 370 lb/ft2
Project:Ocean Condominiums
Location:Carlsbad, CA
Project Number:19.00911-2100
Remolded
gd=117.0 pcf w(i)=9% w(f)=9%
Shear Strength Parameters:
DIRECT SHEAR TEST
0.0
1.0
2.0
3.0
4.0
5.0
0.0 1.0 2.0 3.0 4.0 5.0
Sh
e
a
r
S
t
r
e
s
s
,
k
i
p
s
/
f
t
2
Normal Stress, kips/ft2
Peak Shear
Residual Shear
ANALYTICAL REPORT
Eurofins Calscience
2841 Dow Avenue, Suite 100
Tustin, CA 92780
Tel: (714)895-5494
Laboratory Job ID: 570-85560-1
Client Project/Site: 19.00911 / 21.01001
For:
Taylor Group, Inc.
301 Mission Ave
Suite 201
Oceanside, California 92054
Attn: Larry Taylor
Authorized for release by:
3/10/2022 2:37:53 PM
Sheri Fama, Project Manager I
(657)210-6368
Sheri.Fama@Eurofinset.com
The test results in this report meet all 2003 NELAC, 2009 TNI, and 2016 TNI requirements for
accredited parameters, exceptions are noted in this report. This report may not be reproduced
except in full, and with written approval from the laboratory. For questions please contact the
Project Manager at the e-mail address or telephone number listed on this page.
This report has been electronically signed and authorized by the signatory. Electronic signature is
intended to be the legally binding equivalent of a traditionally handwritten signature.
Results relate only to the items tested and the sample(s) as received by the laboratory.
Definitions/Glossary
Job ID: 570-85560-1Client: Taylor Group, Inc.
Project/Site: 19.00911 / 21.01001
Qualifiers
General Chemistry
Qualifier Description
H Sample was prepped or analyzed beyond the specified holding time
Qualifier
Glossary
These commonly used abbreviations may or may not be present in this report.
¤Listed under the "D" column to designate that the result is reported on a dry weight basis
Abbreviation
%R Percent Recovery
CFL Contains Free Liquid
CFU Colony Forming Unit
CNF Contains No Free Liquid
DER Duplicate Error Ratio (normalized absolute difference)
Dil Fac Dilution Factor
DL Detection Limit (DoD/DOE)
DL, RA, RE, IN Indicates a Dilution, Re-analysis, Re-extraction, or additional Initial metals/anion analysis of the sample
DLC Decision Level Concentration (Radiochemistry)
EDL Estimated Detection Limit (Dioxin)
LOD Limit of Detection (DoD/DOE)
LOQ Limit of Quantitation (DoD/DOE)
MCL EPA recommended "Maximum Contaminant Level"
MDA Minimum Detectable Activity (Radiochemistry)
MDC Minimum Detectable Concentration (Radiochemistry)
MDL Method Detection Limit
ML Minimum Level (Dioxin)
MPN Most Probable Number
MQL Method Quantitation Limit
NC Not Calculated
ND Not Detected at the reporting limit (or MDL or EDL if shown)
NEG Negative / Absent
POS Positive / Present
PQL Practical Quantitation Limit
PRES Presumptive
QC Quality Control
RER Relative Error Ratio (Radiochemistry)
RL Reporting Limit or Requested Limit (Radiochemistry)
RPD Relative Percent Difference, a measure of the relative difference between two points
TEF Toxicity Equivalent Factor (Dioxin)
TEQ Toxicity Equivalent Quotient (Dioxin)
TNTC Too Numerous To Count
Eurofins Calscience
3/10/2022
Case Narrative
Client: Taylor Group, Inc.Job ID: 570-85560-1
Project/Site: 19.00911 / 21.01001
Job ID: 570-85560-1
Laboratory: Eurofins Calscience
Narrative
Job Narrative
570-85560-1
Comments
No additional comments.
Receipt
The samples were received on 2/22/2022 5:45 PM. Unless otherwise noted below, the samples arrived in good condition, and where
required, properly preserved and on ice. The temperature of the cooler at receipt was 0.8º C.
HPLC/IC
No analytical or quality issues were noted, other than those described in the Definitions/Glossary page.
General Chemistry
Method 9045C: The following samples were received with less than 2 days remaining on the holding time or less than one shift (8 hours)
remaining on a test with a holding time of 48 hours or less. As such, the laboratory had insufficient time remaining to perform the analysis
within holding time: 19.00911 - SFC (570-85560-1), 21.01001 - B-1 @ 1'-5' (570-85560-2) and 21.01001 - B-1 @ 5'-10' (570-85560-3).
No additional analytical or quality issues were noted, other than those described above or in the Definitions/Glossary page.
Eurofins Calscience3/10/2022
Sample Summary
Client: Taylor Group, Inc.Job ID: 570-85560-1
Project/Site: 19.00911 / 21.01001
Lab Sample ID Client Sample ID Matrix Collected Received
570-85560-1 Solid19.00911 - SFC 2 02/18/22 16:30 02/22/22 17:45
Eurofins CalsciencePage 5 of 16 3/10/2022
Client Sample Results
Job ID: 570-85560-1Client: Taylor Group, Inc.
Project/Site: 19.00911 / 21.01001
Lab Sample ID: 570-85560-1Client Sample ID: 19.00911 - SFC
Matrix: SolidDate Collected: 02/18/22 16:30
Date Received: 02/22/22 17:45
Method: 300.0 - Anions, Ion Chromatography - Soluble
RL
Chloride 77 5.0 mg/Kg 02/24/22 19:56 1
Analyte Dil FacAnalyzedPreparedUnit DResult Qualifier
5.0 mg/Kg 02/24/22 19:56 1Sulfate200
General Chemistry
RL
pH 8.8 H 0.01 S.U.03/03/22 21:42 1
Analyte Dil FacAnalyzedPreparedUnit DResult Qualifier
Eurofins Calscience
3/10/2022
Lab Chronicle
Client: Taylor Group, Inc.Job ID: 570-85560-1
Project/Site: 19.00911 / 21.01001
Client Sample ID: 19.00911 - SFC Lab Sample ID: 570-85560-1
Matrix: SolidDate Collected: 02/18/22 16:30
Date Received: 02/22/22 17:45
Leach DI Leach NIH302/24/22 16:34 IRV 2667863
Type
Batch
Method
Batch
Prep Type LabAnalystRun
Prepared
or Analyzed
Initial
Amount Amount
Final Batch
NumberFactor
Dil
Soluble 4.03 g 40 mL
Analysis 300.0 1 667815 02/24/22 19:56 NIH3 IRV 2Soluble
IC-28Instrument ID:
Leach DI Leach 217016 03/03/22 17:31 JXO4 ECL 4Total/NA 19.99 g 20 mL
Analysis 9045C 1 217081 03/03/22 21:42 JXO4 ECL 4Total/NA 20 mL 20 mL
PH4Instrument ID:
Eurofins Calscience
3/10/2022