Loading...
HomeMy WebLinkAboutCT 16-02; OCEAN CONDOMINIUMS; FINAL SOILS REPORT; 2024-05-23 Geotechnical Engineering  Civil Engineering  Environmental Site Assessment TAYLOR GROUP, INC. https://taylorgroupinc-my.sharepoint.com/personal/ltaylor_taylor-group_us/Documents/00911 Final Geotechnical Report 05232024.docx 301 Mission Avenue Suite 201 Oceanside California 92054 tel: 760.721.9990 fax: 760.721.9991 www.visitTGI.com April 19, 2024 Updated May 23, 2024 TGI Project No. 19.00911 Carlsbad 17 GP, LLC 234 Venture Street, Suite 100 San Marcos, California 92078 Attn: Mr. Richard Woolsey Subject: Final As-Graded Geotechnical Report Ocean Condominium Project 2501 State Street, Carlsbad, California CT 16-02 / GR2019-0028 / DWG 519-5A References: Taylor Group, Inc., “Interim As-Graded Geotechnical Report, Ocean Condominium Project, 2501 State Street, Carlsbad, California, CT 16-02 / GR2019-0028 / DWG 519-5A”, TGI Project No. 19.00911, dated April 24, 2022 Taylor Group, Inc., “Geotechnical Design Report, Proposed Ocean Condominium Project, 2501 State Street, Carlsbad, California, CT 16-02 / GR2019-0028 / DWG 519-5A”, TGI Project No. 19.00911, dated April 24, 2020 Taylor Group, Inc., “Addendum to Geotechnical Design Report, Recommendations for Slot-Cut Excavations along Northerly Property Line, Proposed Ocean Condominium Project, 2501 State Street, Carlsbad, California, CT 16-02 / GR2019-0028 / DWG 519- 5A” TGI Project No. 19-00911, dated November 21, 2021 Grading Plans for Ocean Condominiums, Grading Plan No. GR2019-0028, Drawing No. 519-5A, Project No. CT16-02, prepared by Taylor Group, Inc., approved January 18, 2022 Dear Mr. Woolsey: This letter provides our final geotechnical certification for the subject project. TGI has previously provided the above-references interim as-graded geotechnical report providing geotechnical the results of our observation and testing for the site shoring, earthwork and subgrade preparation of the building pad for the structure. The previous report also provided final design recommendations for construction of the structure and other improvements. Subsequently to the April 2022 report, TGI has provided periodic geotechnical observation and testing of earthwork for onsite and offsite improvements associated with the project including the following: FINAL AS-GRADED GEOTECHNICAL REPORT Page | 2 Ocean Condominiums – 2501 State Street (CT 16-02, GR2019-0028, Dwg. 519-5A) TGI Project No. 19.00911 Updated May 23, 2024 TAYLOR GROUP, INC. https://taylorgroupinc-my.sharepoint.com/personal/ltaylor_taylor-group_us/Documents/00911 Final Geotechnical Report 05232024.docx • Construction of a water main replacement in an easement located immediately north of the project boundary, including reconnection of existing water services, new water services to the project site, and replacement of a fire hydrant; • Water main improvements in the State Street ROW along portions of the easterly property boundary; • Installation of a fire service and fire hydrant in the State Steet ROW; • Construction of a sewer main replacement in an easement along the northerly property boundary, including reconnection of existing sewer lateral and a new sewer lateral to the project site; • Installation and relocation of various other underground utilities(electric, gas, telecommunications, CATV) in the State Street ROW and onsite; • Subgrade preparation and Class 2 base placement and compaction for curb, gutter and sidewalk along the State Street frontage • Paving subgrade preparation, Class 2 base placement and compaction, and paving operations in the State Street ROW; • Paving subgrade preparation, Class 2 base placement and compaction, and paving operations in the private driveway of the property located immediately north of the project site affected by project construction operations (sewer and water main construction); • Paving subgrade preparation and paving operations in the private driveway of the property located immediately north of the project site affected by project construction operations (sewer and water main construction); • Paving subgrade preparation, Class 2 base placement and compaction, and paving operations for a small portion of an unnamed alley located south of the project site (damaged by construction equipment traffic); • Fill placement to achieve finished grade elevations in the northerly and southerly side yards and the front setback area along the State Street frontage; • Subgrade preparation, base, and paving for the concrete driveway to the subgrade parking level off the building; • Subgrade preparation for concrete hardscape areas in the southerly side yard; • Subgrade preparation, gravel base and drainage system installation for permeable pavers in the southerly side yard and a portion of the front yard; • Construction of biofiltration planters on the structural podium deck level and front yard; TGI has observed earthwork operations and performed in-place dry density and moisture content tests on compacted fill and trench backfill in connection with the above-listed construction operations. In-place density tests results are summarized on Table 1. Test locations in the State Street ROW and in the southerly side yard area are identified on Figure 1. Trench fill test locations for sewer main and water main trenches within easements along the northerly property boundary and in the northerly side yard area are illustrated on Figure 2. All observation and testing has been performed by or under the supervision of a licensed Geotechnical Engineer. FINAL AS-GRADED GEOTECHNICAL REPORT Page | 3 Ocean Condominiums – 2501 State Street (CT 16-02, GR2019-0028, Dwg. 519-5A) TGI Project No. 19.00911 Updated May 23, 2024 TAYLOR GROUP, INC. https://taylorgroupinc-my.sharepoint.com/personal/ltaylor_taylor-group_us/Documents/00911 Final Geotechnical Report 05232024.docx CONCLUSIONS Based on our observations and testing, it is our professional opinion that the geotechnical aspects of the construction have been completed in accordance with the approved plans and the recommendations of the previously referenced project geotechnical reports prepared by TGI dated April 24, 2020 and April 4, 2022. TGI appreciates the opportunity to be of service to you. Please contact us if you have any questions regarding this report. Sincerely, TAYLOR GROUP, INC. Larry R. Taylor, P.E. GE 2602, Exp. 06.30.2024 TEST No.DATE ELEV. (feet) SOIL No. DRY DENSITY (lb/ft3) MOISTURE (%) RELATIVE COMPACTION (%) PASS or FAIL COMMENTS 1 12/23/2022 -1.0 1 125.6 8.7 95.9%PASS Fire Service 2 12/23/2022 -1.0 1 123.3 9.2 94.1%PASS Fire Service 3 12/23/2022 -1.0 1 125.6 8.8 95.9%PASS Fire Service 4 01/12/2023 FG 1 127.2 8.5 97.1%PASS S. Walkway 5 01/12/2023 FG 1 125.8 9.0 96.0%PASS S. Walkway 6 01/12/2023 FG 1 123.3 8.9 94.1%PASS S. Walkway 7 01/26/2024 -1.0 1 121.5 8.7 92.7%PASS Com. Trench 8 01/26/2024 -1.0 1 122.6 8.5 93.6%PASS Com. Trench 9 01/26/2024 -1.0 1 124.4 8.3 95.0%PASS Com. Trench 10 02/13/2024 28.0 1 123.6 8.2 94.4%PASS Sanitary Sewer 11 02/13/2024 32.0 1 122.2 8.8 93.3%PASS Sanitary Sewer 12 02/13/2024 28.0 1 122.8 9.1 93.7%PASS Sanitary Sewer 13 02/14/2024 32.0 1 122.5 9.3 93.5%PASS Sanitary Sewer 14 02/14/2024 27.0 1 123.0 8.7 93.9%PASS Sanitary Sewer 15 02/14/2024 32.0 1 123.8 9.0 94.5%PASS Sanitary Sewer 9 16 02/14/2024 34.0 1 124.5 8.5 95.0%PASS Sanitary Sewer 17 02/15/2024 28.0 1 121.5 8.3 92.7%PASS Sanitary Sewer 18 02/15/2024 31.0 1 123.6 8.7 94.4%PASS Sanitary Sewer 19 02/15/2024 28.5 1 122.4 9.0 93.4%PASS Sanitary Sewer 20 02/15/2024 28.0 1 120.1 9.2 91.7%PASS Sanitary Sewer 21 02/16/2024 30.0 1 121.5 10.0 92.7%PASS Sanitary Sewer 22 02/16/2024 29.0 1 122.2 9.5 93.3%PASS Sanitary Sewer 23 02/16/2024 32.0 1 121.9 9.7 93.1%PASS Sanitary Sewer 24 02/16/2024 28.0 1 123.5 8.8 94.3%PASS Sanitary Sewer 25 02/16/2024 30.0 1 124.2 9.5 94.8%PASS Sanitary Sewer 26 02/17/2024 28.0 1 125.1 9.2 95.5%PASS Sanitary Sewer 27 02/17/2024 31.0 1 123.3 9.7 94.1%PASS Sanitary Sewer 28 02/17/2024 33.0 1 125.0 8.5 95.4%PASS Sanitary Sewer 0029 02/23/2024 28.0 4 122.2 8.3 95.9%PASS State St. 0030 02/23/2024 29.0 4 123.4 8.6 96.9%PASS State St. 0031 02/23/2024 30.0 4 122.8 8.7 96.4%PASS State St. 0032 02/23/2024 31.0 4 123.1 9.0 96.6%PASS State St. Table 1. Field Density Test Summary PROJECT: Ocean's 17 Condominiums PROJECT No: 19.00911 LOCATION: State Street, Carlsbad, CA Project No: 19.00932 Field Density Test Summary 1 of 8 TEST No.DATE ELEV. (feet) SOIL No. DRY DENSITY (lb/ft3) MOISTURE (%) RELATIVE COMPACTION (%) PASS or FAIL COMMENTS Table 1. Field Density Test Summary PROJECT: Ocean's 17 Condominiums PROJECT No: 19.00911 LOCATION: State Street, Carlsbad, CA 0033 03/06/2024 30.0 4 120.2 9.2 94.3%PASS Storm Drain 0034 03/06/2024 31.0 4 119.8 9.8 94.0%PASS Storm Drain 0035 03/06/2024 30.0 4 119.7 9.5 94.0%PASS Storm Drain 0036 03/06/2024 31.0 4 121.1 9.8 95.1%PASS Storm Drain 0037 03/06/2024 30.0 4 120.8 9.7 94.8%PASS Storm Drain 0038 03/07/2024 -1.0 2 112.3 8.3 97.1%PASS Curb and Gutter 0039 03/07/2024 -1.0 2 113.5 8.7 98.1%PASS Curb and Gutter 40 03/07/2024 -1.0 2 111.1 8.4 96.0%PASS Curb and Gutter 41 03/07/2024 -1.0 2 112.1 8.7 96.9%PASS Curb and Gutter 42 03/07/2024 -1.0 2 110.5 8.6 95.5%PASS Curb and Gutter 43 03/07/2024 -1.0 2 113.5 8.5 98.1%PASS Curb and Gutter 44 03/07/2024 29.0 4 122.5 9.2 96.2%PASS Storm Drain 45 03/07/2024 30.0 4 121.2 9.5 95.1%PASS Storm Drain 46 03/07/2024 28.0 4 120.8 8.9 94.8%PASS Storm Drain 47 03/08/2024 30.0 4 123.0 9.0 96.5%PASS Storm Drain 48 03/08/2024 -1.0 4 121.7 9.4 95.5%PASS Curb and Gutter 49 03/08/2024 30.0 4 120.2 8.7 94.3%PASS Storm Drain 50 03/08/2024 29.0 4 120.8 8.9 94.8%PASS Storm Drain 51 03/08/2024 31.0 4 121.0 9.2 95.0%PASS Storm Drain / State S. 52 03/08/2024 31.0 4 123.4 8.9 96.9%PASS Storm Drain / State S. 53 03/12/2024 -1.0 4 119.8 8.2 94.0%PASS Sidewalk (West side of State St.) 54 03/12/2024 -1.0 4 119.5 8.4 93.8%PASS Sidewalk (West side of State St.) 55 03/12/2024 -1.0 4 120.5 8.5 94.6%PASS Sidewalk (West side of State St.) 56 03/12/2024 -1.0 4 119.8 9.0 94.0%PASS Sidewalk (West side of State St.) 57 03/12/2024 -1.0 4 117.2 9.2 92.0%PASS Sidewalk (West side of State St.) 58 03/12/2024 -1.0 4 118.2 9.4 92.8%PASS Sidewalk (West side of State St.) 59 03/13/2024 29.0 4 117.5 9.7 92.2%PASS Storm Drain 60 03/13/2024 30.0 4 118.9 9.5 93.3%PASS Storm Drain 61 03/13/2024 30.0 4 122.0 9.6 95.8%PASS Storm Drain 62 03/13/2024 29.5 4 123.4 9.9 96.9%PASS Storm Drain 63 03/13/2024 30.0 4 121.1 9.4 95.1%PASS Storm Drain 64 03/14/2024 -1.0 7 119.5 9.7 97.4%PASS Curb and Gutter Project No: 19.00932 Field Density Test Summary 2 of 8 TEST No.DATE ELEV. (feet) SOIL No. DRY DENSITY (lb/ft3) MOISTURE (%) RELATIVE COMPACTION (%) PASS or FAIL COMMENTS Table 1. Field Density Test Summary PROJECT: Ocean's 17 Condominiums PROJECT No: 19.00911 LOCATION: State Street, Carlsbad, CA 65 03/14/2024 -1.0 7 118.6 10.2 96.7%PASS Curb and Gutter 66 03/14/2024 -1.0 7 116.3 10.5 94.8%PASS Curb and Gutter 67 03/14/2024 -1.0 7 115.2 10.3 93.9%PASS Curb and Gutter 68 03/14/2024 -1.0 7 118.1 9.9 96.3%PASS Curb and Gutter 69 03/14/2024 -1.0 7 119.5 9.3 97.4%PASS Driveway Aproach 70 03/14/2024 -1.0 7 118.7 10.3 96.7%PASS Driveway Aproach 71 03/20/2024 FG 7 117.6 9.8 95.8%PASS 2333 State St Parking Lot 72 03/20/2024 FG 7 118.1 9.7 96.3%PASS 2333 State St Parking Lot 73 03/20/2024 FG 7 116.5 10.1 94.9%PASS 2333 State St Parking Lot 74 03/20/2024 FG 7 117.3 9.4 95.6%PASS 2333 State St Parking Lot 75 03/20/2024 FG 7 118.1 10.0 96.3%PASS 2333 State St Parking Lot 76 03/20/2024 FG 7 117.6 10.7 95.8%PASS 2333 State St Parking Lot 77 03/20/2024 -0.5 3 114.5 9.5 91.6%PASS Fire Service 78 03/20/2024 -0.5 3 115.6 9.6 92.5%PASS Fire Service 79 03/20/2024 -0.5 3 116.1 9.8 92.9%PASS Fire Service 80 03/22/2024 -0.5 2 111.8 8.4 96.6%PASS Base Pave (State Street) 81 03/22/2024 -0.5 2 112.2 8.5 97.0%PASS Base Pave (State Street) 82 03/22/2024 -0.5 2 112.8 8.3 97.5%PASS Base Pave (State Street) 83 03/22/2024 -0.5 2 112.0 8.7 96.8%PASS Base Pave (State Street) 84 03/22/2024 -0.5 2 111.5 8.8 96.4%PASS Base Pave (State Street) 85 03/22/2024 -0.5 2 110.8 8.5 95.8%PASS Base Pave (State Street) 86 03/22/2024 -0.2 5 142.5 NA 97.5%PASS Base Pave (State Street) 87 03/22/2024 -0.2 5 141.8 NA 97.0%PASS Base Pave (State Street) 88 03/22/2024 -0.2 5 142.3 NA 97.3%PASS Base Pave (State Street) 89 03/22/2024 -0.2 5 143.0 NA 97.8%PASS Base Pave (State Street) 90 03/22/2024 -0.2 5 140.9 NA 96.4%PASS Base Pave (State Street) 91 03/25/2024 -0.5 2 110.1 8.5 95.2%PASS Base Pave (State Street) 92 03/25/2024 -0.5 2 109.8 7.9 94.9%PASS Base Pave (State Street) 93 03/25/2024 -0.5 2 109.9 9.3 95.0%PASS Base Pave (State Street) 94 03/25/2024 -0.5 2 110.5 8.7 95.5%PASS Base Pave (State Street) 95 03/25/2024 -0.5 2 111.1 9.0 96.0%PASS Base Pave (State Street) 96 03/25/2024 -0.5 2 110.8 8.7 95.8%PASS Base Pave (State Street) Project No: 19.00932 Field Density Test Summary 3 of 8 TEST No.DATE ELEV. (feet) SOIL No. DRY DENSITY (lb/ft3) MOISTURE (%) RELATIVE COMPACTION (%) PASS or FAIL COMMENTS Table 1. Field Density Test Summary PROJECT: Ocean's 17 Condominiums PROJECT No: 19.00911 LOCATION: State Street, Carlsbad, CA 97 03/25/2024 -0.2 5 139.5 NA 95.4%PASS Base Pave (State Street) 98 03/25/2024 -0.2 5 141.5 NA 96.8%PASS Base Pave (State Street) 99 03/25/2024 -0.2 5 142.2 NA 97.3%PASS Base Pave (State Street) 100 03/25/2024 -0.2 5 139.8 NA 95.6%PASS Base Pave (State Street) 101 03/25/2024 -0.2 5 140.5 NA 96.1%PASS Base Pave (State Street) 102 03/25/2024 -0.2 5 140.5 NA 98.6%PASS Base Pave (State Street) 103 04/02/2024 FG 6 138.5 NA 97.2%PASS Finish Paving (State Street) 104 04/02/2024 FG 6 138.4 NA 97.1%PASS Finish Paving (State Street) 105 04/02/2024 FG 6 139.4 NA 97.8%PASS Finish Paving (State Street) 106 04/02/2024 FG 6 137.5 NA 96.5%PASS Finish Paving (State Street) 107 04/02/2024 FG 6 135.2 NA 94.9%PASS Finish Paving (State Street) 108 04/02/2024 FG 6 136.1 NA 95.5%PASS Finish Paving (State Street) 109 04/02/2024 FG 6 140.2 NA 98.4%PASS Finish Paving (State Street) 110 04/02/2024 FG 6 139.5 NA 97.9%PASS Finish Paving (State Street) 111 04/02/2024 FG 6 138.8 NA 97.4%PASS Finish Paving (State Street) 112 04/03/2024 FG 6 137.5 NA 96.5%PASS Finish Paving (Parking Area) 113 04/03/2024 FG 6 138.2 NA 97.0%PASS Finish Paving (Parking Area) 114 04/03/2024 FG 6 140.0 NA 98.2%PASS Finish Paving (Parking Area) 115 04/03/2024 FG 6 139.5 NA 97.9%PASS Finish Paving (Parking Area) 0116 04/03/2024 FG 6 137.5 NA 96.5%PASS Finish Paving (Parking Area) 0117 04/03/2024 FG 6 138.1 NA 96.9%PASS Finish Paving (Parking Area) 0118 04/12/2024 -0.5 7 112.1 8.7 95.4%PASS Road Repair (State Street) 0119 04/12/2024 -0.5 7 114.4 9.3 97.4%PASS Road Repair (State Street) 0120 04/12/2024 FG 6 135.5 NA 95.1%PASS Road Repair (State Street) 0121 04/12/2024 FG 6 136.9 NA 96.1%PASS Road Repair (State Street) 0122 04/12/2024 FG 6 137.1 NA 96.2%PASS Road Repair (State Street) 0123 4/18/2024 -2.0 7 113.5 8.5 96.6%PASS Alley (Sub-Grade) 0124 4/18/2024 -2.0 7 112.2 9.0 95.5%PASS Alley (Sub-Grade) 0125 4/18/2024 -2.0 7 113.1 9.3 96.3%PASS Alley (Sub-Grade) 0126 4/18/2024 -1.0 7 112.9 9.5 96.0%PASS Alley (Sub-Grade) 0127 4/18/2024 -1.0 7 112.7 9.1 95.9%PASS Alley (Sub-Grade) 0128 4/18/2024 -1.0 7 112.5 9.3 95.7%PASS Alley (Sub-Grade) Project No: 19.00932 Field Density Test Summary 4 of 8 TEST No.DATE ELEV. (feet) SOIL No. DRY DENSITY (lb/ft3) MOISTURE (%) RELATIVE COMPACTION (%) PASS or FAIL COMMENTS Table 1. Field Density Test Summary PROJECT: Ocean's 17 Condominiums PROJECT No: 19.00911 LOCATION: State Street, Carlsbad, CA 0129 04/19/2024 FG 6 137.5 NA 96.5%PASS Alley (Paving) 0130 04/19/2024 FG 6 135.2 NA 94.9%PASS Alley (Paving) 0131 04/19/2024 FG 6 136.6 NA 95.9%PASS Alley (Paving) 0132 04/19/2024 FG 6 136.5 NA 95.8%PASS Alley (Paving) 0133 04/19/2024 FG 6 135.9 NA 95.4%PASS Alley (Paving) 0134 04/19/2024 FG 6 137.1 NA 96.2%PASS Alley (Paving) Project No: 19.00932 Field Density Test Summary 5 of 8 Soil No. MAXIMUM DRY DENSITY (lb/ft3) OPTIMUM MOISTURE (%) NOTES 1 131.0 9.0 Imported Fill (Stockpile) 2 115.7 8.5 Imported Class II Base 3 125.0 10.5 Site Soils (Clay w Sand) 4 127.4 10.0 Stockpile and Site Soils Blend 5 146.2 NA AC 3/4" 6 142.5 NA AC 1/2" 7 122.7 10.0 Imported Class II Base 104.1 112.5 114.7 138.9 135.4 110.4 Asphalt 1/2" Asphalt PG 64-10 Road Base Silty Sand Road Base Brown Clay w Sand Silty Sand w Sandy Clay DRY DENSITY FOR PASSING RC (lb/ft3) 117.9 DESCRIPTION Table 2. Maximum Density Test Summary PROJECT: Ocean's 17 Condominiums PROJECT No: 19.00911 LOCATION: State Street, Carlsbad, CA Project Number: 19.00932 Maximum Density Test Summary 6 of 8 Pr o j e c t N o . 19 . 0 0 9 1 1 Ca r l s b a d 1 7 Cl i e n t : Pr o j e c t N a m e : Oc e a n C o n d o m i n i u m s Dr a w n b y : C T Da t e : Da t e : 05 / 1 0 / 2 0 2 4 05 / 0 6 / 2 0 2 4 Ch e c k e d b y : L R T FI G U R E 1 IN - S I T U D E S N I T Y T E S T L O C A T I O N S ST A T E S T R E E T R O W A N D S O U T H E R L Y S I D E Y A R D IN-SITU DENSITY TEST LOCATION AND NUMBER (See Table 1) LEGEND ` 55 Pr o j e c t N o . 19 . 0 0 9 1 1 Ca r l s b a d 1 7 Cl i e n t : Pr o j e c t N a m e : Oc e a n C o n d o m i n i u m s Dr a w n b y : C T Da t e : Da t e : 05 / 1 0 / 2 0 2 4 05 / 0 6 / 2 0 2 4 Ch e c k e d b y : L R T FI G U R E 2 IN - S I T U D E S N I T Y T E S T L O C A T I O N S SE W E R A N D W A T E R M A I N S AN D N O R T H E R L Y S I D E Y A R D IN-SITU DENSITY TEST LOCATION AND NUMBER (See Table 1) LEGEND ` 55 MA T C H L I N E MA T C H L I N E 2333 STATE STREET 2333 STATE STREET Geotechnical Engineering  Civil Engineering  Environmental Site Assessment 301 Mission Avenue Suite 201 Oceanside California 92054 tel: 760.721.9990 fax: 760.721.9991 www.visitTGI.com April 4, 2022 TGI Project No. 19.00911 Carlsbad 17 GP, LLC Attn: Mr. Richard Woolsey 234 Venture Street, Suite 100 San Marcos, California 92078 Subject: Interim As-Graded Geotechnical Report Ocean Condominium Project 2501 State Street, Carlsbad, California CT 16-02 / GR2019-0028 / DWG 519-5A References: Taylor Group, Inc., “Geotechnical Design Report, Proposed Ocean Condominium Project, 2501 State Street, Carlsbad, California, CT 16-02 / GR2019-0028 / DWG 519-5A”, TGI Project No. 19.00911, dated April 24, 2020 Taylor Group, Inc., “Addendum to Geotechnical Design Report, Recommendations for Slot- Cut Excavations along Northerly Property Line, Proposed Ocean Condominium Project, 2501 State Street, Carlsbad, California, CT 16-02 / GR2019-0028 / DWG 519-5A” TGI Project No. 19-00911, dated November 21, 2021 Grading Plans for Ocean Condominiums, Grading Plan No. GR2019-0028, Drawing No. 519- 5A, Project No. CT16-02, prepared by Taylor Group, Inc., approved January 18, 2022 Dear Mr. Woolsey: In accordance with your request and Change-Order No. 3 dated October 11, 2021, to our Professional Services Agreement, Taylor Group, Inc. (TGI) has provided testing and observation services during the grading operations for the subject development. This report pertains to the rough grading operations for the building pad for the planned multi-story condominium building at the site. This is an interim report for our services during initial earthwork and grading activities performed from February 10 through April 1, 2022, during the preparation of the pad for the garage level slab. Additional grading will be performed following construction of the garage level slab and retaining walls for the partially subterranean garage level of the building. The scope of our services summarized in this report includes: • Observing the installation of temporary and permanent shoring • Observing grading operations including the removal of unacceptable site soils, removal and recompaction of existing soil and placement and compaction of imported fill soil. • Performing in-place dry density and moisture content tests on fill placed and compacted • during the grading operations. • Performing laboratory tests on samples of site soil and import to evaluate engineering characteristic and corrosion parameters • Preparing an Interim As-Graded Geologic Map. • Preparing this interim As-Graded Geotechnical Report Interim As-Graded Geotechnical Report Page | 2 Ocean Condominium Project, 2501 State Street, Carlsbad, California CT 16-02 / GR2019-0028 / DWG 519-5A April 4, 2022 GENERAL The project site is located at 2501 State Street in the northern coastal area of the City of Carlsbad, California (see Vicinity Map, Figure 1). Elliott Drilling Services, Inc. installed shoring in accordance with the approved plans. Pratt Equipment Corp. performed the grading. References to elevations and locations presented in this report are based on the surveyor’s or grade checker’s stakes in the field, surveyed bottom elevations, and/or interpolation from the referenced grading and shoring plans. SHORING INSTALLATION Temporary and permanent shoring was installed to facilitate the planned grading of the site that included removal of existing site soils to depths of approximately 8 to 12 feet below the previously existing grade. Shoring extends along the entire south and east boundaries of the site and short sections of the west and north boundaries at the southwest and northeast corners of the site. The shoring consists of soldier beams and wood lagging installed by Elliott Drilling Services between February 10 and February 25, 2022. Soldier beams were installed during the period of February 10-16, 2022. Lagging was installed during the excavation of site soils during the period of February 17 through March 9, 2022. TGI observed the installation of the soldier beams to verify that the beams were installed in accordance with the approved shoring plans with respect to depths, diameters, beam sections. Drilling at soldier beam S14 encountered concrete at a depth of approximately 4 feet and was drilled with a core barrel to the required depth. Table 2 on Plate 1 provides a summary of as-built information for the soldier beam installation. In general, the soldier beams were installed in accordance with the approved plans. Most of the soldier beam sections exceeded those specified in the plans. All beams had the pile diameters specified in the plans and were installed to at least the design depths. GRADING OPERATIONS Grading for the building pad included removal and off-site disposal of approximately 6 to 10 feet of existing clayey fill soils across the site to expose the Old Paralic Deposits (“terrace deposits”). Approximately 2 to 4 feet of weathered terrace deposits was removed and stockpiled on site to be replaced as compacted fill. Following removal of existing fill and weathered terrace deposits, the firm terrace beneath the pad was scarified and recompacted to a depth of 12-inches prior to placement of compacted fill to achieve building pad elevations. Excavation and removal of unacceptable site soils began on February 17 in conjunction with the shoring operations and continued through March 9, 2022. Some obstructions were encountered during excavation that were not anticipated. The obstructions are noted on Plate 1 and including concrete footings, remnants of a concrete hydraulic structure (manhole or cesspool), remnants of 4” clay pipes and a concrete slab. These obstructions were removed with some breaking required. Interim As-Graded Geotechnical Report Page | 3 Ocean Condominium Project, 2501 State Street, Carlsbad, California CT 16-02 / GR2019-0028 / DWG 519-5A April 4, 2022 Placement of fill began on March 11 and proceeded from east to west. The fill placement for the building pad was completed on April 1, 2022. Slot-cut excavations along the northerly property boundary were performed with continuous observation by a representative of TGI during the period of March 11 through March 18, 2022. The “A,B,C” slot cutting and replacement of engineered fill were executed in general accordance with the recommendations in TGI’s November 2021 Addendum. During the grading operations, we observed compaction procedures and performed in-place density tests to evaluate the dry density and moisture content of the fill materials. We performed in-place density tests in general conformance with ASTM Test Method D 6938 (nuclear). Table I presents the results of the in-place dry density and moisture content tests. In general, the in-place density test results indicate the compacted fill possesses a dry density of at least 90 percent of the laboratory maximum dry density near to slightly above optimum moisture content at the locations tested. The Final As-Graded Geologic Map, Plate 1, presents the approximate locations of the in-place density tests. TGI tested laboratory samples of material used for fill to evaluate moisture-density relationships, optimum moisture content and maximum dry density (ASTM D 1557) and grain size distribution (ASTM D 422). TGI tested samples material within the upper approximately 3 feet of finish grade to evaluate the water-soluble sulfate content (California Test No. 417) characteristics and shear strength of the fill. AS-GRADED SOIL AND GEOLOGIC CONDITIONS The soil and geologic conditions encountered during grading are similar to those described in the referenced geotechnical design report. All unacceptable clayey undocumented fill soils were excavated and disposed of offsite. The placement of compacted fill was performed in accordance with recommendations provided in the project geotechnical report. The As-Graded Geologic Map, Plate 1, depicts the general geologic conditions observed during grading. The finished building pad at the site is underlain by engineered fill ranging in thickness between approximately 6.5 to 8 feet overlying dense Old Paralic Deposits. In general, the compacted fill consists of sand with silt (SP) derived from removals of approved site soils (weathered terrace deposits) and silty sand (SM) imported from two borrow locations. CONCLUSIONS AND RECOMMENDATIONS 1.0 General 1.1 Based on our observations, we judge that the temporary and permanent shoring has been completed in accordance with the approved plans and the recommendations of the previously referenced project geotechnical report prepared by TGI dated April 24, 2020, and the geotechnical requirements of the referenced grading plans. Interim As-Graded Geotechnical Report Page | 4 Ocean Condominium Project, 2501 State Street, Carlsbad, California CT 16-02 / GR2019-0028 / DWG 519-5A April 4, 2022 1.2 Based on our observations and testing, we judge that grading for the building pad has been performed in conformance with the recommendations of the previously referenced project geotechnical report prepared by TGI dated April 24, 2020, the supplemental recommendations for slot cutting dated and the geotechnical requirements of the referenced grading plans. 1.3 We did not observe soil or geologic conditions during grading that would preclude the continued development of the property as planned. Based on laboratory test results and field observations, it is our opinion that the fill observed and tested as part of the grading for this project was generally compacted to a dry density of at least 90 percent of the laboratory maximum dry density near to slightly above optimum moisture content. 1.4 The site is underlain by compacted fill and Old Paralic Deposits. We observed the placement of compacted fill during the grading operations and performed in-place density tests to evaluate the dry density and moisture content of the fill material. 1.5 Laboratory testing of near-grade soil conditions indicates the upper approximately 6.5 to 8 feet of engineered fill soil underlying the building pad has a “very low” expansion potential (expansion index of 20 or less). Laboratory testing indicates that the fill soil possesses “S0” water-soluble sulfate exposure class. The results of the laboratory expansion index and water-soluble sulfate tests are presented herein. 1.6 It is anticipated that excavations within the fill and underlying formational deposits for foundations, utilities and other improvements can be accomplished with moderate effort using conventional heavy-duty equipment. 2.0 Finish Grade Soil Conditions 2.1 Based on observations during grading, plasticity tests and laboratory grain size analysis tests, the engineered fill and native deposits underlying the completed building pad meet the specifications listed in Section 6.3.6 of the design report and are judged to be “non-expansive” (expansion index [EI] of 20 or less) as defined by the 2019 California Building Code (CBC) Section 1803.5.3. 2.2 A direct shear test (ASTM D 3080) was performed on a representative sample of the imported fill to assess the shear strength properties of the engineered fill. A sample was remolded to approximately 90% relative compaction and tested in an unsaturated state. Results are included in Attachment 1. The test results indicate that the shear strength of the compacted fill exceed the minimum shear strength requirements stated in Section 6.3.3 of the design report and are consistent with the design assumptions made for the purpose of providing design bearing capacity of shallow foundations. 2.3 Laboratory testing of a representative sample of imported fill soil representing the finished grade materials indicated that the water-soluble sulfate content is 0.02%. The test results indicate the sample tested possess “S0” sulfate exposure to concrete structures as defined by 2019 CBC Section 1904 and ACI 318-19, Chapter 19. Other soil samples from the site could yield different concentrations. Additionally, over time landscaping activities (i.e., addition of fertilizers and other soil nutrients) may affect the concentration. 2.4 TGI does not practice in the field of corrosion engineering. Further evaluation by a corrosion engineer may be performed if improvements susceptible to corrosion are planned. Interim As-Graded Geotechnical Report Page | 5 Ocean Condominium Project, 2501 State Street, Carlsbad, California CT 16-02 / GR2019-0028 / DWG 519-5A April 4, 2022 3.0 Applicability Of Design Recommendations Based on our observations, testing and analysis of the as-graded geotechnical conditions of the completed building pad, we conclude that the design recommendations provided in the geotechnical report prepared by TGI dated April 24, 2020 remain applicable for the completed building pad. LIMITATIONS The conclusions and recommendations contained herein apply only to our work with respect to development and represent conditions on the date of our final observation. Any subsequent improvement should be done in conjunction with our observation and testing services. As used herein, the term “observation” implies only that we observed the progress of the work with which we agreed to be involved. Our services did not include the evaluation or identification of the potential presence of hazardous materials. Our conclusions and opinions as to whether the work essentially complies with the job specifications are based on our observations, experience and test results. Subsurface conditions, and the accuracy of tests used to measure such conditions, can vary greatly at any time. We make no warranty, express or implied, except that our services were performed in accordance with engineering principles generally accepted at this time and location. TGI will accept no responsibility for any subsequent changes made to the site by others, by the uncontrolled action of water, or by the failure of others to properly repair damages caused by the uncontrolled action of water. The findings and recommendations of this report may be invalidated wholly or partially by changes outside our control. Therefore, this report is subject to review and should not be relied upon after a period of three years. TGI appreciates the opportunity to be of service to you. Please contact us if you have any questions regarding this report. Sincerely, TAYLOR GROUP, INC. Larry R. Taylor Principal Engineer G.E. 2602 FIGURE 1. SITE LOCATION AND VICINITYTGI Project No. 19.00911 Drawn by: MC Checked by: MC Date: May 2019 Reference: USGS Topographic Maps, San Luis Rey 7.5 Minute Quadrangle, California, San Diego County, 2015 NORTH 2501 State Street, Carlsbad, California SUBJECT SITE PROJECT: PROJECT No:19.00911-2100 LOCATION:2501 STATE STREET, CARLSBAD, CA DATE ELEV.(feet)SOILTYPE DRYDENSITY (lb/ft3)MOISTURE(%) RELATIVECOMPACTION(%) PASSorFAIL NOTES/COMMENTS OCEAN CONDOMINIUMS TEST No Table 1. Field Density Test Summary 0001 03/11/22 27.5 1 116.8 12.8 99.8%Pass 0002 03/11/22 29.5 1 114.8 11.8 98.1%Pass 0003 03/15/22 31.0 1 109.2 11.1 93.3%Pass 0004 03/16/22 27.0 1 106.8 12.7 91.3%Pass 0005 03/16/22 29.0 1 108.7 11.9 92.9%Pass 0006 03/16/22 29.0 2 112.9 11.8 90.3%Pass 0007 03/17/22 27.0 2 113.0 11.1 90.4%Pass 0008 03/17/22 29.0 2 112.5 12.2 90.0%Pass 0009 03/17/22 30.0 2 114.0 13.0 91.2%Pass 0010 03/17/22 26.5 2 114.9 11.2 91.9%Pass 0011 03/17/22 28.5 2 112.3 10.4 89.8%Pass 0012 03/25/22 25.0 3 125.3 8.6 95.6%Pass 0013 03/25/22 25.5 3 123.2 9.2 94.0%Pass 0014 03/25/22 26.0 3 121.6 10.6 92.8%Pass 0015 03/25/22 27.0 3 124.1 9.5 94.7%Pass 0016 03/25/22 26.0 3 125.4 8.2 95.7%Pass 0017 03/20/22 27.0 3 123.5 7.7 94.3%Pass 0018 03/20/22 28.0 3 124.7 8.3 95.2%Pass 0019 03/20/22 26.5 3 125.1 8.5 95.5%Pass 0020 03/20/22 28.0 3 119.0 9.3 90.8%Pass 0021 03/20/22 28.0 3 121.3 9.2 92.6%Pass 0022 04/01/22 29.0 3 120.4 10.5 91.9%Pass 0023 04/01/22 30.0 3 121.3 9.6 92.6%Pass 0024 04/01/22 28.0 3 122.0 8.4 93.1%Pass 0025 04/01/22 30.0 3 120.8 8.6 92.2%Pass 0026 04/01/22 29.0 3 121.7 9.2 92.9%Pass 0027 04/01/22 FG 3 119.1 8.2 90.9%Pass 0028 04/01/22 FG 3 120.4 6.8 91.9%Pass 0029 04/01/22 FG 3 123.6 7.0 94.4%Pass 0030 04/01/22 FG 3 122.4 8.1 93.4%Pass 0031 04/01/22 FG 3 126.4 7.8 96.5%Pass 0032 04/01/22 FG 2 116.3 7.1 93.0%Pass 0033 04/01/22 FG 3 124.7 9.3 95.2%Pass 0034 04/01/22 FG 3 122.8 10.0 93.7%Pass 0035 04/01/22 FG 2 115.6 9.8 92.5%Pass 0036 04/01/22 FG 3 123.6 7.8 94.4%Pass TAYLOR GROUP, INC.4/4/2022 Page 1 of 2 PROJECT: PROJECT No:19.00911-2100 LOCATION:2501 STATE STREET, CARLSBAD, CA SOIL No. MAXIMUMDRY DENSITY (lb/ft3) OPTIMUM MOISTURE (%) DRY DENSITY FOR PASSING RC (lb/ft3)NOTES 1 117.0 11.1 111.2 Site soil (weatherd terrace ) 2 125.0 10.5 118.8 SFC Import 3 131.0 9.0 124.5 Hoover & Ash Import Maximum Density Test Summary Silt with sand (SP) Grey-brown silty sand Reddish-brown silty sand DESCRIPTION OCEAN CONDOMINIUMS S T A T E S T R E E T 2 3 4 5 6 7 8 9 10 1112 13 14 15 16 17 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 1 18 TA Y L O R G R O U P , I N C . AS  G R A ' E ' G E O T E C + N I C A L S I T E P L A N OC E A N C O N ' O 0 I N I U 0 S    S T A T E S T R E E T , C A R L S % A ' , C A GR          ' : G      A  C T      PLATE  SHEET NUMBER: tgi 30 1 M i s s i o n A v e n u e S u i t e 2 0 1 O c e a n s i d e C a l i f o r n i a 9 2 0 5 4 te l . 7 6 0 . 7 2 1 . 9 9 9 0 f a x . 7 6 0 . 7 2 1 . 9 9 9 1 w w w . v i s i t T G I . c o m Ge o t e c h n i c a l E n g i n e e r i n g C i v i l E n g i n e e r i n g REGISTERE D P R O F ESSIONA L E N G I NEER G E O TEC H N I C A L LAR R Y R U S SEL TA Y L O R S T ATE OF CAL I F O R NIA No . 2 6 6 2 Ex p . 0 6 . 3 0 . 2 0 2 0 RE V I S I O N S AP P R O V E D DA T E DR A W N B Y : CH E C K E D B Y : TG I P R O J E C T N O . : CL I E N T : CT LR T 19 . 0 0 9 1 1 CA R L S B A D 1 7 , G P DR A W I N G D A T E : PL O T D A T E : 04 / 0 1 / 2 0 2 2 04 / 0 4 / 2 0 2 2 36 TAYLOR GROUP, INC. P:\00911 Ocean Condominiums\Construction Phase\As-Graded Geotechnical\19.00911 Interim As-Graded Geotechnical Report_04042022.docx Appendix 1 Lab Testing Data for Fill Materials Ocean Condominiums - 2501 State Street, Carlsbad, CA Boring No.NA Depth:STOCKPILE Maximum Dry Density: 117.0 lb/ft2 Test Method: ASTM D 1557 (Method A)Optimum Moisture Content: 11.5% Project Name:OCEAN CONDOMINIUMS Location:2501 STATE STREET, CARLSBAD, CA Project Number:19.00911-2100 WEATHERED TERRACE (SITE SOIL)Maximum Dry Density and Moisture Content: Sand with silt (SP) MAXIMUM DENSITY DETERMINATION 95 100 105 110 115 120 125 130 135 140 145 0%5%10%15%20%25%30% DR Y D E N S I T Y ( L B / C U . F T . ) MOISTURE CONTENT (% BY WEIGHT) Dry Density vs. Moisture Content 2.65 2.70 2.75 ZERO AIR VOIDS CURVES Boring No.NA Depth:STOCKPILE Maximum Dry Density: 125.0 lb/ft2 Test Method: ASTM D 1557 (Method A)Optimum Moisture Content: 10.5% Project Name:OCEAN CONDOMINIUMS Location:2501 STATE STREET, CARLSBAD, CA Project Number:19.00911-2100 SFC IMPORT Maximum Dry Density and Moisture Content: Grey-brown silty aand (SM) MAXIMUM DENSITY DETERMINATION 95 100 105 110 115 120 125 130 135 140 145 0%5%10%15%20%25%30% DR Y D E N S I T Y ( L B / C U . F T . ) MOISTURE CONTENT (% BY WEIGHT) Dry Density vs. Moisture Content 2.65 2.70 2.75 ZERO AIR VOIDS CURVES Boring No.NA Depth:STOCKPILE Maximum Dry Density: 131 lb/ft2 Test Method: ASTM D 1557 (Method A)Optimum Moisture Content: 9% Project Name:OCEAN CONDOMINIUMS Location:2501 STATE STREET, CARLSBAD, CA Project Number:19.00911-2100 HOOVER & ASH IMPORT (SOIL #3)Maximum Dry Density and Moisture Content: Reddish-brown silty sand (SM) MAXIMUM DENSITY DETERMINATION 95 100 105 110 115 120 125 130 135 140 145 0%5%10%15%20%25%30% DR Y D E N S I T Y ( L B / C U . F T . ) MOISTURE CONTENT (% BY WEIGHT) Dry Density vs. Moisture Content 2.65 2.70 2.75 ZERO AIR VOIDS CURVES Sample Identification *D100(mm)D60(mm)D30(mm)*D10(mm)Cc Cu %Gravel %Sand %< No.200 SFC IMPORT 6.35 0.31 0.15 -14.5 62.0 3.3 76.6 20.1 BEACH LIFE IMPORT 6.35 ---0.0 74.7 25.3 HOOVER & ASH IMPORT 6.35 0.46 0.15 -4.9 46.0 1.9 77.3 20.8 0 ---- 0 ---- 0 *Extrapolated where particle diameter is beyond sieve sizes utilized. Sample Identification SYM LL PL PI % Moisture SFC IMPORT SM NP 7.8 BEACH LIFE IMPORT SM NP 4.6 HOOVER & ASH IMPORT SM NP 7.6 0 19.00911-2100 Classification Grey brown silty sand (SM) with gravel Reddish brown siltry fine sand (SM) 2501 State Street, Carlsbad, CA Project Name: Location: Project Number: GRAIN SIZE DISTRIBUTION (ASTM D 422) Reddish brown siltry fine sand (SM) Ocean Condominiums 0.0 10.0 20.0 30.0 40.0 50.0 60.0 70.0 80.0 90.0 100.0 0.0010.0100.1001.00010.000100.0001000.000 PE R C E N T F I N E R B Y W E I G H T GRAIN SIZE IN MILLIMETERS 1 3/432 4 10 30 40 100 2003/84 50 SILT AND CLAYGRAVELCOBBLESSAND coarse medium fine U.S. SIEVE NUMBERU.S. SIEVE OPENING IN INCHES HYDROMETER coarse fine Boring No.SFC Depth:BA Peak: F =39o c = 1,000 lb/ft2 Test Parameters: CU @ 0.02 in/min IMPORTED FILL Residual: F =36o c = 370 lb/ft2 Project:Ocean Condominiums Location:Carlsbad, CA Project Number:19.00911-2100 Remolded gd=117.0 pcf w(i)=9% w(f)=9% Shear Strength Parameters: DIRECT SHEAR TEST 0.0 1.0 2.0 3.0 4.0 5.0 0.0 1.0 2.0 3.0 4.0 5.0 Sh e a r S t r e s s , k i p s / f t 2 Normal Stress, kips/ft2 Peak Shear Residual Shear ANALYTICAL REPORT Eurofins Calscience 2841 Dow Avenue, Suite 100 Tustin, CA 92780 Tel: (714)895-5494 Laboratory Job ID: 570-85560-1 Client Project/Site: 19.00911 / 21.01001 For: Taylor Group, Inc. 301 Mission Ave Suite 201 Oceanside, California 92054 Attn: Larry Taylor Authorized for release by: 3/10/2022 2:37:53 PM Sheri Fama, Project Manager I (657)210-6368 Sheri.Fama@Eurofinset.com The test results in this report meet all 2003 NELAC, 2009 TNI, and 2016 TNI requirements for accredited parameters, exceptions are noted in this report. This report may not be reproduced except in full, and with written approval from the laboratory. For questions please contact the Project Manager at the e-mail address or telephone number listed on this page. This report has been electronically signed and authorized by the signatory. Electronic signature is intended to be the legally binding equivalent of a traditionally handwritten signature. Results relate only to the items tested and the sample(s) as received by the laboratory. Definitions/Glossary Job ID: 570-85560-1Client: Taylor Group, Inc. Project/Site: 19.00911 / 21.01001 Qualifiers General Chemistry Qualifier Description H Sample was prepped or analyzed beyond the specified holding time Qualifier Glossary These commonly used abbreviations may or may not be present in this report. ¤Listed under the "D" column to designate that the result is reported on a dry weight basis Abbreviation %R Percent Recovery CFL Contains Free Liquid CFU Colony Forming Unit CNF Contains No Free Liquid DER Duplicate Error Ratio (normalized absolute difference) Dil Fac Dilution Factor DL Detection Limit (DoD/DOE) DL, RA, RE, IN Indicates a Dilution, Re-analysis, Re-extraction, or additional Initial metals/anion analysis of the sample DLC Decision Level Concentration (Radiochemistry) EDL Estimated Detection Limit (Dioxin) LOD Limit of Detection (DoD/DOE) LOQ Limit of Quantitation (DoD/DOE) MCL EPA recommended "Maximum Contaminant Level" MDA Minimum Detectable Activity (Radiochemistry) MDC Minimum Detectable Concentration (Radiochemistry) MDL Method Detection Limit ML Minimum Level (Dioxin) MPN Most Probable Number MQL Method Quantitation Limit NC Not Calculated ND Not Detected at the reporting limit (or MDL or EDL if shown) NEG Negative / Absent POS Positive / Present PQL Practical Quantitation Limit PRES Presumptive QC Quality Control RER Relative Error Ratio (Radiochemistry) RL Reporting Limit or Requested Limit (Radiochemistry) RPD Relative Percent Difference, a measure of the relative difference between two points TEF Toxicity Equivalent Factor (Dioxin) TEQ Toxicity Equivalent Quotient (Dioxin) TNTC Too Numerous To Count Eurofins Calscience 3/10/2022 Case Narrative Client: Taylor Group, Inc.Job ID: 570-85560-1 Project/Site: 19.00911 / 21.01001 Job ID: 570-85560-1 Laboratory: Eurofins Calscience Narrative Job Narrative 570-85560-1 Comments No additional comments. Receipt The samples were received on 2/22/2022 5:45 PM. Unless otherwise noted below, the samples arrived in good condition, and where required, properly preserved and on ice. The temperature of the cooler at receipt was 0.8º C. HPLC/IC No analytical or quality issues were noted, other than those described in the Definitions/Glossary page. General Chemistry Method 9045C: The following samples were received with less than 2 days remaining on the holding time or less than one shift (8 hours) remaining on a test with a holding time of 48 hours or less. As such, the laboratory had insufficient time remaining to perform the analysis within holding time: 19.00911 - SFC (570-85560-1), 21.01001 - B-1 @ 1'-5' (570-85560-2) and 21.01001 - B-1 @ 5'-10' (570-85560-3). No additional analytical or quality issues were noted, other than those described above or in the Definitions/Glossary page. Eurofins Calscience3/10/2022 Sample Summary Client: Taylor Group, Inc.Job ID: 570-85560-1 Project/Site: 19.00911 / 21.01001 Lab Sample ID Client Sample ID Matrix Collected Received 570-85560-1 Solid19.00911 - SFC 2 02/18/22 16:30 02/22/22 17:45 Eurofins CalsciencePage 5 of 16 3/10/2022 Client Sample Results Job ID: 570-85560-1Client: Taylor Group, Inc. Project/Site: 19.00911 / 21.01001 Lab Sample ID: 570-85560-1Client Sample ID: 19.00911 - SFC Matrix: SolidDate Collected: 02/18/22 16:30 Date Received: 02/22/22 17:45 Method: 300.0 - Anions, Ion Chromatography - Soluble RL Chloride 77 5.0 mg/Kg 02/24/22 19:56 1 Analyte Dil FacAnalyzedPreparedUnit DResult Qualifier 5.0 mg/Kg 02/24/22 19:56 1Sulfate200 General Chemistry RL pH 8.8 H 0.01 S.U.03/03/22 21:42 1 Analyte Dil FacAnalyzedPreparedUnit DResult Qualifier Eurofins Calscience 3/10/2022 Lab Chronicle Client: Taylor Group, Inc.Job ID: 570-85560-1 Project/Site: 19.00911 / 21.01001 Client Sample ID: 19.00911 - SFC Lab Sample ID: 570-85560-1 Matrix: SolidDate Collected: 02/18/22 16:30 Date Received: 02/22/22 17:45 Leach DI Leach NIH302/24/22 16:34 IRV 2667863 Type Batch Method Batch Prep Type LabAnalystRun Prepared or Analyzed Initial Amount Amount Final Batch NumberFactor Dil Soluble 4.03 g 40 mL Analysis 300.0 1 667815 02/24/22 19:56 NIH3 IRV 2Soluble IC-28Instrument ID: Leach DI Leach 217016 03/03/22 17:31 JXO4 ECL 4Total/NA 19.99 g 20 mL Analysis 9045C 1 217081 03/03/22 21:42 JXO4 ECL 4Total/NA 20 mL 20 mL PH4Instrument ID: Eurofins Calscience 3/10/2022