Loading...
HomeMy WebLinkAboutCUP 2022-0010; CARLSBAD DESALINATION PLANT PHASE 2; FINAL SOILS REPORT; 2025-08-28 certerra.com 12130 Santa Margarita Ct, Rancho Cucamonga, CA 91730 (909) 989-1751 Kiewit Infrastructure West Co. August 28, 2025 4650 Business Center Drive Fairfield, CA 94534 Subject: Final Soil Compaction Report Carlsbad Desalination Plant Phase 2 – Intake Modifications 4600 Carlsbad Blvd, Carlsbad, CA 92008 The purpose of this report is to document that earthwork for the Carlsbad Desalination Plant has been completed in conformance with the recommendations of the project geotechnical report and relevant project documents. A series of in place density (compaction) tests were taken within the subject site at the locations listed herein from February 3, 2023, and continuing through May 16, 2025. The compaction tests were taken in subgrade, base, and utility trenches. Field testing was by the direct transmission nuclear method, ASTM D6938. The maximum density – optimum moisture relationship was established in the laboratory by the ASTM D1557 test method. Testing was performed after compaction operations were completed and the methods used in compacting the tested materials were not observed by our representative. The field density tests were taken at locations selected by our representative and do not constitute certification of compaction of the subject improvements. We have performed the tests, as previously described, in accordance to generally accepted soil testing practices. No other warranty, express or implied, is made. A summary of the results of all tests performed is attached. We trust that this letter will serve your needs at this time. In you have any questions or require further assistance, please do not hesitate to contact us. Respectfully, RMA Group Slawek Dymerski, P.E, G.E President GE 2764 MAXIMUM DENSITY - OPTIMUM MOISTURE RELATIONSHIPS Soil Test Optimum Maximum Type Method1 Description Moisture Density (%) (pcf) certerra.com 12130 Santa Margarita Ct, Rancho Cucamonga, CA 91730 (909) 989-1751 1 M Reddish Brown Silty Sand W/ Gravel 10.3 126.1 2 3 4 5 6 7 8 9 M M M M M M M M Electrical Building Feeder Vaults Brown Sandy Clay Tan Silty Sand W/ Gravel Tan Silty Sand Brown Sandy Silt W/ Aggregates Crushed Aggregate Base Brown Silty Sand 11.5 11.4 11.0 11.0 13.3 8.9 6.3 9.5 125.4 124.5 121.4 122.3 121.2 127.4 138.7 129.7 1Test Method M – ASTM D1557 (Maximum Density Optimum Moisture Content Relationship) IN-PLACE DENSITIES Test Item2 Test3 Test Dry Relative Soil No. Date Tested Location Method Depth Moisture Density Compaction Type (ft) (%) (pcf) (%) certerra.com 12130 Santa Margarita Ct, Rancho Cucamonga, CA 91730 (909) 989-1751 1 2/13/23 UT Next To 2” PW Pipe N 0.0 7.7 120.5 92.9 9 2 2/13/23 UT 15’ South East Of The End Of Pipe N 3.0 7.9 122.7 94.6 9 3 2/13/23 UT 30’ South East Of End Of Pipe N 2.0 8.7 123.6 95.3 9 4 8/3/23 UT Electrical Duct Bank #9 N 5.0 19.6 119.3 95.8 3 5 8/4/23 UT Electrical Duct Bank #9 N 5.0 9.7 116.8 95.5 5 6 8/10/23 UT Electrical Duct Bank #9 N 1.0 11.7 121.1 99.8 4 7 8/10/23 UT Electrical Duct Bank #9 N 2.0 11.9 119.9 98.8 4 8 10/2/23 UT Electrical Duct Bank 8A N 4.0 9.9 117.0 95.7 5 9 10/24/23 UT Electrical Duct Bank 8a. N 1.0 11.3 116.3 95.8 4 10 11/10/24 SG Boat Ramp Stairs Founda�on N 5.6 9.1 116.5 95.3 5 11 1/25/24 EM Electrical Trench Number 12 N 5.0 20.9 105.7 84.3 2 12 1/30/24 EM Electrical Trench Number 12 N 5.0 15.1 120.5 96.1 2 13 1/30/24 SZ Electrical Bldg Pad N 3.1 8.4 120.4 95.5 1 14 1/30/24 FL Electrical Bldg Pad N 3.0 8.3 120.1 95.2 1 15 1/30/24 FL Electrical Bldg Pad N 2.2 8.4 119.9 95.1 1 16 1/30/24 FL Electrical Bldg Pad N 2.0 8.5 120.6 95.6 1 17 1/30/24 FL Electrical Bldg Pad N 1.0 8.3 121.7 96.5 1 18 1/30/24 FG Electrical Bldg Pad N 0.0 8.7 121.1 96.0 1 19 1/31/24 UT Electrical Duct Bank 12-3 N 1.0 12.9 114.4 93.5 5 20 2/13/24 UT Electrical Duct Bank #9 N 4.5 10.0 116.5 95.3 5 21 2/22/24 UT Electrical Duct Bank #9 N 1.0 10.9 120.7 98.7 5 22 3/22/24 UT Electrical Duct Bank N 4.0 12.1 116.1 95.6 4 23 4/4/24 SG Pile Slab, S Pile N 8.0 12.1 116.5 95.3 5 24 4/5/24 SG Pile Slab, S Pile N 8.0 11.2 119.9 98.0 5 25 4/9/25 SG East Side Of DSS (Roadway) N 6.3 12.9 116.2 95.0 5 26 4/9/25 SG East Side Of DSS (Roadway) N 5.3 12.8 117.0 95.7 5 IN-PLACE DENSITIES Test Item2 Test3 Test Dry Relative Soil No. Date Tested Location Method Depth Moisture Density Compaction Type (ft) (%) (pcf) (%) certerra.com 12130 Santa Margarita Ct, Rancho Cucamonga, CA 91730 (909) 989-1751 27 5/22/24 SG Condenser Pad N 1.5 12.4 119.1 98.3 6 28 5/22/24 SG Condenser Pad N 1.5 13.4 118.7 97.9 6 29 6/11/24 UT North Of Bent 8 N 0.0 12.2 116.4 95.2 5 30 6/11/24 UT North Of Bent 8 N 0.0 13.5 109.7 90.5 6 31 6/14/24 SG Backwash Pump Pipeline N 5.0 13.0 118.0 97.4 6 32 6/19/24 SG IPS Discharge Access, North Side N 1.0 10.2 113.3 93.5 6 33 6/19/24 SG West Intake Vault, North Side. N 19.5 11.7 111.1 91.7 6 34 6/19/24 SG West Intake Vault, East Side N 18.5 13.1 114.1 94.1 6 35 6/19/24 SG West Intake Vault, East Side N 17.1 11.6 114.8 94.7 6 36 6/19/24 SG West Intake Vault, North Side N 16.1 11.7 112.4 92.7 6 37 6/20/24 SG West Intake Vault, East Side N 15.8 11.8 115.3 90.5 7 38 6/20/24 SG West Intake Vault, South Side. N 14.8 12.1 114.9 90.2 7 39 6/20/24 SG West Intake Vault, North Side N 13.8 12.2 115.6 90.7 7 40 6/27/24 SG Internal Pump Sta�on N 12.8 12.4 112.3 92.7 6 41 6/27/24 SG Internal Pump Sta�on N 11.8 12.6 112.0 92.4 6 42 6/27/24 SG Internal Pump Sta�on N 10.8 12.3 112.1 92.5 6 43 6/28/24 SG Ips Intake Vault, East Vault N 9.1 13.1 110.2 90.9 6 44 6/28/24 SG Ips P, Intake Vault, West Vault N 7.1 11.9 110.2 90.9 6 45 6/28/24 SG Ips, Intake Vault, Center Area N 8.1 12.9 115.1 95.0 6 46 7/2/24 SG IPS Intake Vault, Center Area N 6.1 10.8 114.9 90.2 7 47 7/2/24 SG IPS, Intake Vault, East Center N 5.1 10.6 116.1 91.1 7 48 7/15/24 UT E/O Debris Sor�ng Sta�on N 4.0 13.5 109.5 90.3 6 49 7/19/24 SG IPS Intake Vault, East Side N 6.1 11.6 115.0 90.3 7 50 7/19/24 SG Ips Intake Vault, Center. N 5.1 10.6 116.7 91.6 7 51 7/19/24 SG IPS Intake Vault, West Side. N 4.1 11.2 116.6 91.5 7 52 7/26/24 UT Internal Pump Sta�on N 2.0 9.3 113.2 93.4 6 53 8/15/24 SG Ips Manhole N 9.0 12.2 109.5 90.3 6 IN-PLACE DENSITIES Test Item2 Test3 Test Dry Relative Soil No. Date Tested Location Method Depth Moisture Density Compaction Type (ft) (%) (pcf) (%) certerra.com 12130 Santa Margarita Ct, Rancho Cucamonga, CA 91730 (909) 989-1751 54 8/15/24 SG Brine Discharge Pipe In IPS N 11.0 13.2 114.3 94.3 6 55 8/15/24 SG Ips Manhole N 12.0 13.1 115.3 95.1 6 56 8/16/24 SG North Side Of Manhole, In IPS N 7.0 13.4 117.9 97.3 6 57 8/16/24 SG South Side Of Manhole In IPS N 5.0 13.2 113.3 93.5 6 58 8/16/24 SG 63” Brine Discharge Pipe In IPS. N 3.0 13.0 112.5 92.8 6 59 8/16/24 SG 63” Brine Discharge In IPS. N 1.0 13.3 109.6 90.4 6 60 8/22/24 SG Bulkhead Tie In Vaults N 4.0 13.4 114.8 90.1 9 61 8/22/24 SG Bulkhead Tie In Vaults N 3.0 12.2 117.5 92.2 7 62 8/22/24 SG Bulkhead Tie In Vaults N 2.0 12.9 115.1 90.3 7 63 8/26/24 SG Ips, West Tie In, North Side N 3.0 12.1 115.6 90.7 7 64 8/26/24 SG Ips, West Tie In, North Side N 1.0 11.9 114.9 90.2 7 65 8/26/24 SG Ips, East Tie In, East Side N 4.0 11.7 115.4 90.6 7 66 8/26/24 SG Ips East Tie In, North Side N 1.0 12.7 114.8 90.1 7 67 8/29/24 SG Retaining Wall Foo�ng Abutment N 0.0 13.0 115.3 95.1 6 68 8/29/24 SG Retaining Wall Foo�ng Abutment N 0.0 13.2 115.7 95.5 6 69 8/30/24 SG Retaining Wall Foo�ng Abutment N 0.0 13.7 115.4 95.2 6 70 8/30/24 SG Retaining Wall Foo�ng Abutment N 0.0 13.4 115.6 95.4 6 71 9/3/24 SG Retaining Wall Foo�ng Abutment N 0.0 13.7 115.4 95.2 6 72 9/3/24 SG Retaining Wall Foo�ng Abutment N 0.0 13.3 116.1 95.8 6 73 9/6/24 SG Concrete Trough, South Side N 1.4 13.0 118.5 97.8 6 74 9/9/24 SG East Ramp Abutment Ramp N 4.0 9.6 116.6 91.5 7 75 9/9/24 SG East Ramp Abutment Ramp N 3.0 10.2 116.7 91.6 7 76 9/9/24 SG East Ramp Abutment Ramp N 2.0 9.3 115.6 90.7 7 77 9/12/24 SG East Retaining Walls N 8.0 11.6 115.1 90.3 7 78 9/12/24 SG East Retaining Walls N 6.0 10.5 115.3 90.5 7 79 9/19/24 SG Storm Drain Precast Filter Box N 6.0 11.6 113.3 91.0 3 80 9/19/24 SG Storm Drain Precast Filter Box N 4.0 11.9 112.4 90.3 3 IN-PLACE DENSITIES Test Item2 Test3 Test Dry Relative Soil No. Date Tested Location Method Depth Moisture Density Compaction Type (ft) (%) (pcf) (%) certerra.com 12130 Santa Margarita Ct, Rancho Cucamonga, CA 91730 (909) 989-1751 81 9/19/24 SG Storm Drain Precast Filter Box N 2.0 11.5 112.6 90.4 3 82 9/24/24 SG Storm Drain Precast Filter Box N 2.0 11.4 112.3 90.2 3 83 9/26/24 SG Retaining Wall N 2.0 10.9 117.0 95.7 5 84 9/26/24 SG Retaining Wall N 2.0 10.3 116.6 95.3 5 85 9/30/24 SG 24” Storm Drain S/O Ips. N 3.0 10.9 116.1 91.1 7 86 10/1/24 SG 2” Water Line N 0.0 13.0 115.1 90.3 7 87 10/1/24 SG Roadway, Main Entrance And Exit N 0.0 11.9 115.6 95.2 6 88 10/1/24 B Roadway, Main Entrance And Exit N 1.0 4.5 132.3 95.4 8 89 10/1/24 SG Roadway, Main Entrance And Exit N 0.0 9.8 116.0 95.7 6 90 10/2/24 SG Retaining Wall W/O Bridge N 6.5 11.6 116.1 95.8 6 91 10/3/24 SG Retaining Wall N 3.0 11.2 110.1 90.8 6 92 10/3/24 SG Retaining Wall N 2.0 10.9 110.3 91.0 6 93 10/4/24 SG 2 Inch Water Line Trench N 2.0 11.7 115.7 95.5 6 94 10/11/24 SG 24” Storm Drain Ips Main Yard N 6.0 12.5 114.6 94.6 6 95 10/11/24 SG 24” Storm Drain Ips Main Yard N 2.0 11.9 111.1 91.7 6 96 10/17/24 SG North Side Of Water Filter N 4.0 12.2 111.6 92.1 6 97 10/28/24 WBF Electrical Retaining Wall N 2.0 8.8 121.4 95.3 7 98 10/28/24 WBF Electrical Retaining Wall N 2.0 7.6 119.9 94.1 7 99 11/4/24 WBF Electrical Retaining Wall N 0.0 6.3 117.8 92.5 7 100 11/4/24 WBF Electrical Retaining Wall N 0.0 7.2 117.9 92.5 7 101 11/4/24 WBF Electrical Retaining Wall N 0.0 9.5 116.4 91.4 7 102 11/4/24 WBF Electrical Retaining Wall N 0.0 10.3 114.7 90.0 7 103 11/26/24 SG East Retaining Wall, Center Area. N 0.0 12.8 115.4 95.2 6 104 11/26/24 SG West Ramp, Center Area. N 2.0 11.5 121.2 95.1 7 105 11/26/24 B PCC Guter, West Side N 0.9 5.6 135.0 97.3 8 106 11/26/24 B PCC Guter, East Side. N 0.9 6.6 134.0 96.6 8 107 11/26/24 SG Ips, Electrical Trench N 0.0 4.7 124.9 98.0 7 IN-PLACE DENSITIES Test Item2 Test3 Test Dry Relative Soil No. Date Tested Location Method Depth Moisture Density Compaction Type (ft) (%) (pcf) (%) certerra.com 12130 Santa Margarita Ct, Rancho Cucamonga, CA 91730 (909) 989-1751 108 11/26/24 SG West Ramp, Center Area N 0.0 9.2 112.4 92.7 6 109 12/19/24 SG Fore-Bay Backfill N 0.0 12.9 113.8 91.4 3 110 12/19/24 SG Fore-Bay Backfill N 0.0 11.3 117.6 94.5 3 111 12/19/24 SG West Road Concrete Trench Drain N 0.7 14.5 115.8 95.5 6 112 12/28/24 SG South Road Sub-Grade N 1.3 13.6 116.4 96.0 6 113 12/28/24 WBF East Retaining Walls West Side N 2.0 15.0 115.3 95.1 6 114 1/16/25 B East Roadway, Center Sec�on N 0.5 6.2 136.0 98.1 8 115 1/16/25 B Ips Parking Lot, Center Area. N 0.3 4.8 135.1 97.4 8 116 1/16/25 SG East Roadway. North Side N 0.5 13.3 115.4 95.1 4 117 1/22/25 B Ips, West Side N 0.4 4.2 132.3 95.4 8 118 1/22/25 B East Roadway N 0.5 4.5 133.2 96.0 8 119 1/22/25 B East Retaining Wall Roadway. N 0.5 5.4 132.3 95.4 8 120 1/22/25 B East Ramp N 0.5 3.9 133.9 96.5 8 121 2/8/25 B South Roadway, Center Area N 0.0 6.4 132.3 95.4 8 122 2/8/25 B South Roadway, West Sec�on N 0.0 6.9 134.8 97.2 8 123 2/8/25 B Main Yard Patch, North Sec�on. N 0.0 7.1 132.8 95.7 8 124 2/8/25 B Main Yard Patch Work N 0.0 6.3 132.4 95.5 8 125 2/24/25 B West Roadway, West Side. N 0.3 4.1 132.1 95.2 8 126 2/24/25 B West Ramp Roadway N 0.3 6.3 132.2 95.3 8 127 2/24/25 B Debris Sor�ng Sta�on. N 0.3 5.0 132.6 95.6 8 128 2/24/25 B West Roadway, West Side N 0.3 5.2 131.9 95.1 8 129 2/25/25 SG West Roadway, South Sec�on N 0.8 14.2 118.3 97.6 8 130 2/25/25 B West Roadway, South Sec�on N 0.4 5.6 133.0 95.9 8 131 2/25/25 B West Roadway, South Sec�on N 0.4 5.9 133.3 96.1 8 132 3/17/25 B West Roadway, North Side Of DSS N 0.3 6.4 132.0 95.2 8 133 3/17/25 B West Roadway, North Side Of DSS N 0.3 6.5 133.4 96.2 8 134 3/18/25 SG Oyster Farm Entrance/Sidewalk N 0.0 8.2 125.3 90.3 8 IN-PLACE DENSITIES Test Item2 Test3 Test Dry Relative Soil No. Date Tested Location Method Depth Moisture Density Compaction Type (ft) (%) (pcf) (%) certerra.com 12130 Santa Margarita Ct, Rancho Cucamonga, CA 91730 (909) 989-1751 135 3/18/25 SG Oyster Farm Entrance/Sidewalk N 0.0 7.8 127.2 91.7 8 136 3/19/25 B Oyster Farm Sidewalk N 0.0 6.1 125.2 90.3 8 137 3/19/25 B Oyster Farm Sidewalk N 0.0 6.4 125.5 90.5 8 138 4/16/25 B Roadway Patch Area E/O Bridge. N 0.0 7.9 132.9 95.8 8 139 4/16/25 B Upper Parking Lot, Patch Area N 0.0 6.3 132.5 95.5 8 140 5/16/25 LS 24” Storm Drain, Landscape Area N 5.0 11.4 105.8 87.3 6 141 5/16/25 LS 24” Storm Drain, Landscape Area N 4.0 10.4 103.9 85.7 6 142 5/16/25 LS 24” Storm Drain, Landscape Area N 2.0 10.3 103.4 85.3 6 143 5/16/25 LS 24” Storm Drain, Landscape Area N 3.0 13.7 105.6 87.1 6 2Item Tested: SG - Subgrade B - Base WBF – Wall Backfill FL – Fill EM – Electric Main SZ – Scarified Zone UT – Utility Trench FG – Finish Grade LS – Landscape (85% Req) 3Test Method: N - ASTM D6938 (Density of Soil In-Place by Direct Transmission Nuclear Method) 113 73 29 30 31 48 91 108 90 92 103 14 17 16 18 13 15 28 27 84 104 129 128 131 126 125 130 132 133 77 78 72 71 6769 138 118 12076 83 9997 98 119 100 101 102 68 70 51 46 38 42 44 35 34 66 50 43 74 75 107 63 65 117 64 60 61 57 139 58 54 52 115 59 36 65 33 56 49 41 45 53 553732 39 40 47 GG G 2' ' W 2' ' W 2' ' W 2''W 2''W 2''W 2''W G G GW GW GW EXISTING CDP-IPS AREA 03 AR E A 0 2 Kiewit Infrastructure West Co.Carlsbad Desalination Plant Ph 2 Intake Modifications 1 BASE MAP PROVIDED BY: HDR THIS PLAN HAS BEEN PREPARED FOR USE AS A Utility LOCATION MAP AND IS NOT INTENDED FOR CONSTRUCTION.FIGURE NO.: RMA JOB NO.: 00-230082-0 RANCHO CUCAMONGA, CA 91730 909.989.1751 · FAX 909.989.4287 12130 SANTA MARGARITA COURT www.rmacompanies.com *EOTECHNICAL EN*INEERIN* CONSTRUCTION INSPECTION MATERIALS TESTIN* NAP#14 #Approximate Compaction Test Location Not to Scale DATE: 08/27/2025 Project Address: 4600 Carlsbad Blvd Carlsbad, CA 92008