Loading...
HomeMy WebLinkAbout2026-03-02; Traffic Safety and Mobility Commission; 01; Guardrail on the West Side of Paseo Del Norte between Camino De Las Ondas and Sunflower WayMeeting Date: March 2, 2026 To: Traffic Safety & Mobility Commission From: John Kim, City Traffic Engineer Staff Contact: Miriam Jim, Senior Engineer miriam.jim@carlsbadca.gov, 442-339-5796 Lindy Pham, Associate Engineer lindy.pham@carlsbadca.gov, 442-339-2768 Subject: Guardrail on the West Side of Paseo Del Norte between Camino De Las Ondas and Sunflower Way District: 3 Recommended Action Support staff’s recommendation to install approximately 220 feet of guardrail on the west side of Paseo Del Norte between Camino De Las Ondas and Sunflower Way. Executive Summary Residents from the Harbor Pointe Community have requested the installation of guardrail on the west side of Paseo Del Norte between Camino De Las Ondas and Sunflower Way to prevent cars from going over the embankment along a curved segment of the roadway following a collision that resulted in a vehicle running off the road and descending the embankment slope in their community. In response to the request to install guardrail on Paseo Del Norte, staff conducted an analysis to evaluate whether guardrail would be appropriate for this segment of roadway in accordance with the guidelines found in 2025 Caltran’s Traffic Safety Systems Manual. Based on the analysis performed, installation of guardrail would reduce the severity of a run-off-road collision at this location. Therefore, staff recommend installing approximately 220 feet of guardrail on the west side of Paseo Del Norte along the curved segment between Camino De Las Ondas and Sunflower Way. Explanation & Analysis Background Paseo Del Norte is classified as Neighborhood Connector Street in the city’s General Plan Mobility Element. This roadway is located in the southwest quadrant of the city (Exhibit 1). The segment between Camino De Las Ondas and Sunflower Way has a posted speed limit of 40 miles per hour, or mph. It measures 64 feet in width from curb to curb, accommodating one TRAFFIC SAFETY & MOBILITY COMMISSION March 2, 2026 Item #1 Page 1 of 8 travel lane, a buffered bike lane, and a parking lane in each direction, along with a center two- way left turn lane. The surrounding land use is primarily residential. North of Camino De Las Ondas, Paseo Del Norte follows a straight alignment. Immediately south of Camino De Las Ondas, the roadway transitions into an S-curve before returning to a straight section that terminates at Poinsettia Lane, see Figure 1. West of Paseo Del Norte is a gated community called Harbor Pointe. Paseo Del Norte sits above the Harbor Pointe roofline, separated from the community by a fence and an embankment slope behind the sidewalk. In December 2024, staff received requests from residents of the Harbor Pointe Community to install guardrail along the west side of Paseo Del Norte, just south of Camino De Las Ondas at the curved section of the roadway, to prevent cars from going over the embankment following a collision where a southbound vehicle failed to negotiate the curve, breached a fence and came to rest on the Harbor Pointe community embankment. The location of the impact is shown in Figure 1. Analysis An evaluation was conducted to determine whether installing a guardrail would be appropriate for this segment of Paseo Del Norte based on the guidelines as described in the 2025 Caltrans Traffic Safety Systems Manual. Guardrail installation evaluation considered factors like collision history, roadway alignment and whether a car hitting guardrail would be more severe than going over an embankment slope. Staff reviewed collision data for this segment of Paseo Del Norte from 2020 through 2025. During this six-year period, four collisions were reported. Two of these involved southbound vehicles leaving the roadway and descending the embankment just south of Camino De Las Ondas at the curved section of the roadway. In both cases, driving under the influence was identified as the primary contributing factor and one of the incidents resulted in a fatality. To determine whether a car hitting guardrail would be more severe than going over an embankment slope, the Equal Severity Curve considering the height and slope of the embankment as presented in the 2025 Caltrans Traffic Safety Systems Manual was reviewed. Based on as-built plans for the Harbor Pointe Community, the existing embankment west of Paseo Del Norte is approximately 35 feet high with a 2:1 slope. According to the Equal Severity Curve, the severity of a car going over the embankment with this combination of height and Figure 1: Paseo Del Norte March 2, 2026 Item #1 Page 2 of 8 slope may be greater than the severity of striking a guardrail along the side of the roadway. In other words, guardrail would likely reduce the severity of run-off-road collisions, see Figure 2 below. Figure 2: Equal Severity Curve (2025 Caltrans Traffic Safety Systems Manual) Recommendation Based on the findings presented in this report, staff recommend installing approximately 220 feet of guardrail on the west side of Paseo Del Norte between Camino De Las Ondas and Sunflower Way. The guardrail will be placed behind the sidewalk at the curved section of the roadway as depicted in Figure 3. 35 Feet Height 2:1 Slope Figure 3: Location of Proposed Guardrail March 2, 2026 Item #1 Page 3 of 8 The City has contracted with Rick Engineering Co., a civil engineering firm, to develop the construction plans and bid documents for the installation of the guardrail on Paseo Del Norte. The 90-percent design plans are provided in Exhibit 2. Next Steps Upon receiving support from the Traffic Safety & Mobility Commission, staff will finalize the construction plans and bid documents in preparation for bidding. Since the estimated construction cost is within the threshold for the Informal Standard Public Works Contract process, the City Manager has the authority to award the construction contract to the lowest responsive bidder. Exhibits 1. Location Map 2. Paseo Del Norte Guardrail Design Plans (90%) March 2, 2026 Item #1 Page 4 of 8 1 LOCATION MAP March 2, 2026 Item #1 Page 5 of 8 10 0 % S U B M I T T A L - N O T F O R C O N S T R U C T I O N SAN DIEGO, CA 92110 5620 FRIARS ROAD 619-291-0707 rickengineering.com CITY OF CARLSBAD CARLSBAD, CALIFORNIA PASEO DEL NORTE GUARDRAIL CONSTRUCTION PLANS FOR PROJECT NO. 6013 Exhibit 2 March 2, 2026 Item #1 Page 6 of 8 10 0 % S U B M I T T A L - N O T F O R C O N S T R U C T I O N SAN DIEGO, CA 92110 5620 FRIARS ROAD 619-291-0707 rickengineering.com March 2, 2026 Item #1 Page 7 of 8 10 0 % S U B M I T T A L - N O T F O R C O N S T R U C T I O N SAN DIEGO, CA 92110 5620 FRIARS ROAD 619-291-0707 rickengineering.com PASEO DEL N O R T E CA M I N O D E L A S O N D A S PASEO DEL NORTE N MA T C H L I N E S T A 1 2 + 5 0 - S E E A B O V E M A T C H L I N E S T A 1 2 + 5 0 - S E E B E L O W N March 2, 2026 Item #1 Page 8 of 8