Loading...
HomeMy WebLinkAbout2026-02-18; Planning Commission; 01; Toll Brothers Bressi Ranch General Plan Amendment - Recommendation on whether or not to allow further processing of the request Meeting Date: Feb. 18, 2026 Item 1 To: Planning Commission Staff Contact: Eric Lardy, Assistant Director of Community Development, 442-339-2712, eric.lardy@carlsbadca.gov Subject: Toll Brothers Bressi Ranch General Plan Amendment - Recommendation on whether or not to allow further processing of the request. Location: 6405 Alicante Rd. / APN 213-260-12-00 / District 2 Case Numbers: GPA2025-0001 / AMEND2025-0003 / CT2025-0006 / PUD2025-0006 (DEV2024- 0088) Applicant/Representative: Eric Everhart, Senior Land Entitlement Manager, Toll Brothers, 714-347-1300, eeverhart@tollbrothers.com, Permit Type(s): ☐ SDP ☐ CUP ☐ CDP ☐ TM/TPM ☒ GPA ☐ REZ ☐ LCPA ☒ Other: AMEND (Bressi Ranch Master Plan), CT, PUD CEQA Recommendation: ☐ Not a Project ☐ Exempt ☐ IS/ND or IS/MND ☐ EIR ☐ Other: Commission Action: ☐ Decision ☒ Recommendation to City Council ☐ Informational (No Action) Recommended Actions City staff have developed two options for Planning Commission consideration: 1) ADOPT Planning Commission Resolution RECOMMENDING that the City Council remand the project application back to city staff for further processing (Exhibit 1); or 2) ADOPT Planning Commission Resolution RECOMMENDING DENIAL of the project application (Exhibit 2). Existing Conditions & Project Description Existing Setting The site consists of a vacant approximately 7-acre parcel that is designated Planned Industrial (PI) in the General Plan and is zoned Planned Community for its location in the Bressi Ranch Master Plan. The existing Master Plan designates the property along with the adjacent properties between it and El Camino Real as Planning Area 2 and establishes the zoning for the site as P-M Planned Industrial that allows for a variety of non-retail office and industrial uses. The corner lot has three street frontages and is bounded by Gateway Road to the north, Alicante Road to the east and Town Garden Road to the south. Site Map Feb. 18, 2026 Item #1 1 of 61 Table “A” below includes the General Plan designations, zoning and current land uses of the subject site and surrounding properties. TABLE A – SITE AND SURROUNDING LAND USE Location General Plan Designation Zoning Designation Current Land Use Site Planned Industrial Planned Community (P-C), Bressi Ranch Master Plan Vacant North Planned Industrial Planned Community (P-C), Bressi Ranch Master Plan Industrial and Office Buildings South Open Space Planned Community (P-C), Bressi Ranch Master Plan Open Space East R-8, Residential 4 to 8 units per acre Planned Community (P-C), Bressi Ranch Master Plan Residential Development West Planned Industrial Planned Community (P-C), Bressi Ranch Master Plan Office Campus Buildings General Plan Designation Zoning Designation City Council Direction for General Plan Amendments A comprehensive update to the city’s General Plan was approved in September 2015. The Housing Element portion of the General Plan was updated in 2021 to address changing housing needs and determine how much housing must be planned for to meet existing and projected housing needs at various affordability levels. In January 2024, the City Council approved a General Plan amendment to the Land Use Element to complete a required program under the Housing Element that accommodated housing on 16 sites throughout the city to meet the city’s RHNA Allocation for 3,379 units at a variety of income levels. This is the largest and main program to ensure the city has a Certified Housing Element through the Housing Cycle that covers the period from 2021 to 2029. Feb. 18, 2026 Item #1 2 of 61 Although the city will periodically review and update its General Plan, there occasionally arises a need or desire to change some specific portion of the General Plan such as the land use designation for a piece of land or for a specific area. Typically, General Plan amendments are initiated by city staff, the Planning Commission, or the City Council, unless a specific request is made by a project proponent (applicant) as part of a land use development proposal. Following the adoption of the 2024 General Plan amendment, city staff began to receive requests from different property owners and developers to explain what General Plan amendments are, how to apply for one, and how General Plan amendment applications are processed. The City Council was presented with options on how to process privately initiated General Plan amendments through a July 15, 2025, City Council staff report (Exhibit 3). At that meeting, City Council directed staff through a minute motion to process General Plan amendment applications using the expedited permit review process without an automatic staff recommendation of denial (Exhibit 4). What this establishes is a two-step process for review of any new General Plan amendments. The General Plan amendment procedure assists staff, the Planning Commission, and the City Council when reviewing the merits of an amendment application. Prior to filing an official application for a General Plan amendment, the representatives of Toll Brothers, Inc. (project applicant) discussed the proposed amendment with the city’s Community Development team. This gave the applicant a first-hand opportunity to find out the procedures of the amendment process. When the General Plan amendment application was submitted by the project applicant on Oct. 28, 2025, a staff planner was assigned to review the application material to make sure all the required information was provided. The project applicant was notified within 30 days after filing as to whether the application was complete or not. City staff issued a city review letter providing an overview of the process and establishing a schedule for the consideration of the application by the Planning Commission and City Council. The letter also included planning standards, missing/incomplete items and whether additional information was required to make the project application complete. These comments were not intended to be pre-decisional on the merits of the application, but to disclose items that need to be worked out, which is common in the early stages of a development application.1 Components of Submitted Application The details of the request consist of a General Plan amendment, Master Plan Amendment, Residential Planned Development Permit, and Vesting Tentative Tract Map to develop 111 three-story, 35-foot-tall, attached townhomes (for-sale) with a proposed density of 15.8 dwelling units per acre and a total of 252 parking spaces. Access to the development is proposed by a single entry off Gateway Road. The site is currently subject to the PI General Plan Land Use Designation and is zoned Planned Community (P-C Zone) within Planning Area 2 of the Bressi Ranch Master Plan, MP 178K. The project application proposes modifying the General Plan Land Use Designation from PI to R-23, allowing development between 19 and 23 units per acre. Additionally, the project proposes to amend the Bressi Ranch Master Plan designation to Residential Density Multiple Zone (RD-M Zone). Primary vehicular access with a gated entry is proposed off Gateway Road. A second, gated emergency access- only driveway is proposed off Alicante Road. Each unit is proposed to have a two-car garage. A total of 30 visitor parking spaces are proposed throughout the development. Earthwork will consist of 32,133 cubic yards of cut, 11,688 cubic yards of fill, resulting in 20,445 cubic yards of exported material. To process the land use development application, the following permit types and actions are required. - General Plan amendment GPA2025-0001: The property is currently designated as Planned Industrial (PI) in the General Plan. There is no residential density assigned to that designation. The project application proposes modifying the General Plan Land Use Designation from PI to Residential-23 (R-23), allowing development between 19 and 23 units per acre. The current project is proposing a density of 15.8 units per acre, and would need to either modify the proposed number of units, or modify the requested General Plan designation to R-15 (range between 11.5 and 15 units per acre) for a total of 105 units. Other combinations of changes could be considered as part of the site design and consistent with land 1 The city review letter is intended to outline the process, schedule, and ultimately the items needed to make the submittal complete and should be utilized only if and upon the City Council taking affirmative action to remand the application back to city staff for processing. Feb. 18, 2026 Item #1 3 of 61 use policies. As part of a complete project review, an analysis of key General Plan Policies for Land Use, Housing, and Mobility, would need to be prepared and presented to the Planning Commission and City Council - Master Plan Amendment (AMEND2025-0003): The Bressi Ranch Master Plan was originally adopted in 2003 allowing for the development of 623 residential units. It was most recently updated by the Land Use and Safety Element update approved on Jan. 30, 2024, that allowed for development of 248 additional units on two vacant sites. Consistent with CMC § 21.38.020, the Planned Community Zone references the Master Plan. CMC § 21.38.060 establishes the contents of the Master Plan and CMC § 21.38.080 establishes that the City Council is the final decision maker. The proposal would update Planning Area 2 of the Master Plan and the designation of this site from the Planned Industrial (P-M) zone to the Residential Density-Multiple (RD-M) zone that allows for “Dwelling, Multiple Family” as an allowed use consistent with the density within the General Plan. - Tentative Map (CT2025-0006): As a for-sale development, the property will be processing a Vesting Tentative Map2 through Title 20 of the Carlsbad Municipal Code and the Subdivision Map Act. As the General Plan and Master Plan Amendment will be approved by the City Council, they will be the decision maker for the Tentative Map and the Planned Development Permit. - Planned Development Permit (PUD2025-0006): Approval of a Planned Development Permit (PDP) is necessary to show how the townhomes comply with established standards relative to architectural design, lot coverage, height, building setbacks, residential parking, and private recreational space. The project will be required to review and comply with the Citywide Objective Design Standards. Considerations for Planning Commission At its Feb. 18, 2026, meeting, the Planning Commission will evaluate and recommend whether or not to allow processing of the requested General Plan amendment – limiting the discussion to land use and general plan issues and policies only. There should be no consideration of the merits of the project itself as that consideration may only occur after city staff has complete a full review and there is a full record for the Planning Commission to review. City staff will be able to briefly respond to questions about the surrounding land use context, the scope of the project, and about the adopted Housing Element and Land Use Element of the General Plan. Because city review of the land use development application has been limited, city staff will be unable to provide technical commentary about the proposed project or provide any staff recommendation as to whether the project provides additional public benefits to the community as compared to the existing land use designation, or conversely, if there are any environmental effects the project may have on surrounding land uses and activities.3 It would be appropriate for the Planning Commission to review what the present General Plan calls for in the location or area affected and deliberate on questions that they may have if this project is recommended for further processing. Additional considerations for discussion may include any of the following: - Appropriateness of the proposed size and density of the proposed project. - Provision of additional benefit to the community. 2 A Vesting Tentative Map is intended to establish vested rights to proceed with a project in substantial compliance with the regulations in effect at the time the application is determined to be complete for processing. 3 The project applicant must still complete their application and provide more detail and specific information about the proposed housing development. Feb. 18, 2026 Item #1 4 of 61 - Land use compatibility issues associated with the proposed General Plan amendment. - The financial land use impacts of the proposed change. - The state of the current market of land designated Planned Industrial (PI) versus Residential-23 (R-23). - Provision of public facilities – and the infrastructure needed to accommodate the change. - Level and diversity of community support and opposition. At the public hearing, the Planning Commission will consider the staff report and all its attachments, comments from the project applicant, and other public testimony in its review and will make a recommendation to the City Council. There are no predetermined reasons or limits to what the Planning Commission bases its recommendation on, other than it cannot be based on the merits of the project itself. A formal hearing on the merits would involve discussing specific design attributes (such as height, architectural style), holding a public hearing, considering evidence presented by the applicant and public, applying relevant zoning and planning regulations to ensure the amendment proposal is consistent with the specific facts of the project, and making written findings that support the ultimate recommendation. It is requested that the motion to adopt either recommendation include a description of reasons or rationale associated with the recommendation. Public Outreach & Comment Public notice of this hearing for the project was mailed on Feb 6. 2026, to property owners and residents within 600 feet of the subject property (111 total notices) and posted with the San Diego Union-Tribune. Any General Plan amendment project is subject to City Council Policy No. 84 (Development Project Public Involvement Policy). As such, an Enhanced Stakeholder Outreach will be completed prior to a resubmittal as directed by the City Council. Any public comments received to date on the project application are included as Exhibit 5. Project Analysis Staff processed the General Plan amendment application per City Council direction, limiting city review of the application to one review cycle. As part of the intake for the expedited screening process. Resubmittal of application materials will not be accepted until a final “screening” decision from the City Council on the project is made. Once the completed application is submitted and deemed complete, additional project analysis will be provided and a more thorough assessment of the potential impacts of the proposed project may be prepared and presented to the decision-making bodies. General Plan Consistency The project site has a General Plan Land Use designation of Planned Industrial (PI) which does not allow residential development. The City of Carlsbad General Plan includes several goals and policies that guide development and land use within the city through a balance of policies. The site is adjacent to a variety of uses, including residential uses. The proposed project would change the General Plan Designation to Residential-23 (R-23). Municipal Code Consistency The CMC, most notably Tile 21 Zoning Code, includes requirements and provisions that guide development and land use within the city, consistent with the General Plan. The project’s zoning is Planned Community (P-C), which establishes that the Bressi Ranch Master Plan sets the zoning for the site. (CMC § 21.38.020). Local Coastal Program Consistency The project site is not within the Coastal Zone. Feb. 18, 2026 Item #1 5 of 61 Master Plan The subject property is located within the boundaries of the Bressi Ranch Master Plan, which provides specific development standards for new growth and development. The project proposes modifications to the Bressi Ranch Master Plan to be consistent with the development application. State Density Bonus The applicant is not proposing use of a State Density Bonus. Inclusionary Housing Ordinance The project is required to comply with the city’s inclusionary housing ordinance, which is intended to ensure that all residential development provides a range of housing opportunities for all economic segments of the population, including households of lower and moderate income. According to city code, projects are required to provide 15% of their total units as affordable to low-income households. However, the policy for the City Council adopted for the 2015 General Plan and the 2024 Housing Element Rezoning Program, projects with a General Plan amendment have been required to provide 20% of their total units as low-income residential units. The info bulletin on Inclusionary Housing Programs is included as Exhibit 6. Housing Crisis Act of 2019 (HCA) California Government Code Section 65589.5 does not mandate approval of a housing project found to be inconsistent with the General Plan and zoning, provided that the agency has made the necessary written findings and complied with the Housing Crisis Act’s requirements. If the proposed General Plan amendment is denied at the City Council level, the application would not proceed any further. If the City Council determines the General Plan amendment request should be considered further, it would only authorize staff to continue processing the application. However, the city would still retain its discretion to consider the application in accordance with all applicable laws and ordinances, reserving its right to approve, conditionally approve, or deny the project. Environmental Review The expedited screening process is meant for public analysis and disclosure for a General Plan amendment, using the legislative powers of a local government. The Planning Commission is recommending one of two options to the City Council. If the Planning Commission Adopts Exhibit 1 to RECOMMEND CITY COUNCIL REMAND TO STAFF FOR FURTHER PROCESSING, it does not constitute a project within the meaning of the California Environmental Quality Act (CEQA) under Public Resources Code section 21065 in that it has no potential to cause either a direct physical change in the environment or a reasonably foreseeable indirect physical change in the environment. If the recommendation is agreed to by the City Council, it does not have a legally binding effect on future discretionary actions to approve the project. Public input received and the deliberative land development application process will be used to prepare an environmental recommendation consistent with the CEQA and its implementing guidelines. The second option is the Planning Commission RECOMMENDING DENIAL of the application (Exhibit 2). Under Public Resources Code Section 21080(b)(5), CEQA does not apply for projects which a public agency rejects or disapproves. Further CEQA Guidelines Section 15270(b), includes this as an explicit statutory exemption to “allow for initial screening of projects on the merits for quick disapprovals prior to the initiation of the CEQA process where the agency can determine that the project cannot be approved.” Therefore, adoption of this option is considered exempt and a Notice of Exemption will be filed if the action is approved by City Council. Feb. 18, 2026 Item #1 6 of 61 Conclusion & Next Steps Please note that at this decision-point, the Planning Commission will evaluate and recommend whether or not to allow processing of the requested General Plan amendment – limiting the discussion to land use and general plan issues and policies only. Staff recommend the Planning Commission review the proposed project as a concept, take public comment through public hearing, deliberate, and make a recommendation by adopting one of the proposed resolutions. The proposed project is expected to be presented to the City Council in May 2026 for consideration of this same material. If the proposed project is denied at the City Council level, the application would not proceed any further. If the City Council determines the General Plan amendment request should be considered further, the project applicant will be permitted to proceed forward and complete the application.4 Processing of the General Plan amendment will take approximately 12-24 months depending upon the requirements to comply with the CEQA. It is important to note that a project that applies or resubmits for further processing should be in substantial compliance with the project as authorized by the City Council. Exhibits 1. Resolution 1, Recommendation to City Council to Proceed with General Plan Amendment (Remand to staff for processing) 2. Resolution Option 2, Recommendation to City Council Recommending Denial of the General Plan Amendment (Deny Project) 3. City Council Staff Report, July 15, 2025 4. City Council Minutes, July 15, 2025 5. Public Comments (If Any) 6. Info bulletin (IB-157) Inclusionary Housing Program 7. List of Acronyms and Abbreviations 8. Exhibits (Site Plan, Architectural Elevations, Landscape Plan, Tentative Map) 4 The Planning Commission recommendation does not in any way presume approval of the General Plan amendment or of the land use development project. Feb. 18, 2026 Item #1 7 of 61 Exhibit 1 A RESOLUTION OF THE PLANNING COMMISSION OF THE CITY OF CARLSBAD, CALIFORNIA, RECOMMENDING THAT THE CITY COUNCIL REMAND THE PROJECT APPLICATION BACK TO CITY STAFF FOR FURTHER PROCESSING OF A GENERAL PLAN AMENDMENT, BRESSI RANCH MASTER PLAN AMENDMENT, TENTATIVE TRACT MAP AND PLANNED DEVELOPMENT PERMIT TO CHANGE THE PLANNED INDUSTRIAL GENERAL PLAN DESIGNATION TO RESIDENTIAL ALLOW FOR APPROXIMATELY 111 3-STORY RESIDENTIAL TOWNHOMES ON A VACANT 7-ACRE PARCEL AT 6405 ALICANTE ROAD (APN 213601200), LOCATED SOUTH OF GATEWAY ROAD, WEST OF ALICANTE ROAD AND NORTH OF TOWN GARDEN ROAD. CASE NAME: TOLL BROTHERS BRESSI RANCH CASE NO.: GPA2025-0001/AMEND2025-0003/CT2025- 0006/PUD2025-0006 (DEV2024-0088) WHEREAS, Toll Brothers, “Developer,” has filed a verified application with the City of Carlsbad regarding property owned by Levine Investments LP, “Owner,” described as PARCEL 3 OF MINOR SUBDIVISION NO. 16-04, VIASAT BRESSI RANCH CAMPUS, IN THE CITY OF CARLSBAD, COUNTY OF SAN DIEGO, STATE OF CALIFORNIA, ACCORDING TO PARCEL MAP THEREOF NO. 21433, FILED IN THE OFFICE OF THE COUNTY RECORDER OF SAN DIEGO COUNTY, DECEMBER 28, 2016 AS FILE NO. 2016-7000548, AS AMENDED PURSUANT TO THAT CERTAIN CERTIFICATE OF CORRECTION RECORDED JANUARY 22, 2021 AS INSTRUMENT NO. 2021-0051891 OF OFFICIAL RECORDS. (“the Property”); and WHEREAS, said verified application constitutes a request for a General Plan Amendment, Bressi Ranch Master Plan Amendment, Tentative Tract Map and Planned Development Permit as shown on Exhibit(s) “A-LL” dated Sept. 22, 2025 on file in the Planning Division, GPA2025-0001 / AMEND2025-0003 / CT2025-0006 / PUD2025-0006 (DEV2024-0088) – TOLL BROTHERS BRESSI RANCH as provided by Chapters 21.38, 21.08, 21.12 and 21.45 of the Carlsbad Municipal Code; and WHEREAS, the Planning Commission did, on Feb. 18, 2026, hold a duly noticed public hearing as prescribed by law to consider said; and WHEREAS, this resolution does not constitute a project within the meaning of the California Environmental Quality Act under Public Resources Code section 21065 in that it has no potential to cause either a direct physical change in the environment or a reasonably foreseeable indirect physical change in PLANNING COMMISSI ON RESOLUTION NO. 7566 Feb. 18, 2026 Item #1 8 of 61 the environment. If the recommendation is agreed to by the City Council, it does not have a legally binding effect on future discretionary actions to approve the project. Public input received and the deliberative land development application process will be used to prepare an environmental recommendation consistent with the California Environmental Quality Act and implementing guidelines; and WHEREAS, at said public hearing, upon hearing and considering all testimony and arguments, if any, of all persons desiring to be heard, said Commission considered all factors relating to the General Plan Amendment, Bressi Ranch Master Plan Amendment, Tentative Tract Map and Planned Development Permit. NOW, THEREFORE, BE IT HEREBY RESOLVED by the Planning Commission of the City of Carlsbad as follows: A)That the foregoing recitations are true and correct. B)That based on the evidence presented at the public hearing, the Planning Commission RECOMMENDS CITY COUNCIL REMANDS THE PROPOSED PROJECT TO STAFF FOR PROCESSING PASSED, APPROVED, AND ADOPTED at a regular meeting of the Planning Commission of the City of Carlsbad, California, held on Feb. 18, 2026, by the following vote, to wit: AYES: Fitzgerald, Merz, Foster, Hubinger, Meenes. NAYES: Lafferty. ABSENT: None. ABSTAIN: Burrows. ____________________________________________ ROY MEENES, Chairperson Carlsbad Planning Commission ____________________________________________ MICHAEL STRONG, Director of Community Development Department         Exhibit 2 A RESOLUTION OF THE PLANNING COMMISSION OF THE CITY OF CARLSBAD, CALIFORNIA, RECOMMENDING CITY COUNCIL DENY GENERAL PLAN AMENDMENT, BRESSI RANCH MASTER PLAN AMENDMENT, TENTATIVE TRACT MAP AND PLANNED DEVELOPMENT PERMIT TO CHANGE THE PLANNED INDUSTRIAL GENERAL PLAN DESIGNATION TO RESIDENTIAL AND ALLOW FOR APPROXIMATELY 111, 3-STORY RESIDENTIAL TOWNHOMES ON A VACANT 7-ACRE PARCEL AT 6405 ALICANTE ROAD. (APN 213601200), LOCATED SOUTH OF GATEWAY ROAD, WEST OF ALICANTE ROAD AND NORTH OF TOWN GARDEN ROAD. CASE NAME: TOLL BROTHERS BRESSI RANCH CASE NO.: GPA2025-0001 AMEND2025-0003/CT2025- 0006/PUD2025-0006 (DEV2024-0088) WHEREAS, Toll Brothers, “Developer,” has filed a verified application with the City of Carlsbad regarding property owned by Levine Investments LP, “Owner,” described as PARCEL 3 OF MINOR SUBDIVISION NO. 16-04, VIASAT BRESSI RANCH CAMPUS, IN THE CITY OF CARLSBAD, COUNTY OF SAN DIEGO, STATE OF CALIFORNIA, ACCORDING TO PARCEL MAP THEREOF NO. 21433, FILED IN THE OFFICE OF THE COUNTY RECORDER OF SAN DIEGO COUNTY, DECEMBER 28, 2016 AS FILE NO. 2016-7000548, AS AMENDED PURSUANT TO THAT CERTAIN CERTIFICATE OF CORRECTION RECORDED JANUARY 22, 2021 AS INSTRUMENT NO. 2021-0051891 OF OFFICIAL RECORDS. (“the Property”); and WHEREAS, said verified application constitutes a request for a General Plan Amendment, Bressi Ranch Master Plan Amendment, Tentative Tract Map and Planned Development Permit as shown on Exhibit(s) “A-LL” dated Sept. 22, 2025 on file in the Planning Division, GPA2025-0001 / AMEND2025- 0003 / CT2025-0006 / PUD2025-0006 (DEV2024-0088) – TOLL BROTHERS BRESSI RANCH as provided by Chapters 21.38, 21.08, 21.12 and 21.45 of the Carlsbad Municipal Code; and WHEREAS, the Planning Commission did, on Feb. 18, 2026, hold a duly noticed public hearing as prescribed by law to consider said; and WHEREAS, Under Public Resources Code Section 21080(b)(5), CEQA does not apply for projects which a public agency rejects or disapproves. Further CEQA Guidelines Section 15270(b), includes this as an explicit statutory exemption to “allow for initial screening of projects on the merits for quick PLANNING COMMISSION RESOLUTION NO. Feb. 18, 2026 Item #1 10 of 61 disapprovals prior to the initiation of the CEQA process where the agency can determine that the project cannot be approved.” Therefore, adoption of this option is considered exempt and a Notice of Exemption will be filed if the action is approved by City Council; and WHEREAS, at said public hearing, upon hearing and considering all testimony and arguments, if any, of all persons desiring to be heard, said Commission considered all factors relating to the General Plan Amendment, Bressi Ranch Master Plan Amendment, Tentative Tract Map and Planned Development Permit. NOW, THEREFORE, BE IT HEREBY RESOLVED by the Planning Commission of the City of Carlsbad as follows: A) That the foregoing recitations are true and correct. B) That based on the evidence presented at the public hearing, the Planning Commission RECOMMENDS CITY COUNCIL DENY GPA2025-0001 (DEV2024-0088) – TOLL BROTHERS BRESSI RANCH based on the following findings: Findings: 1. The action to deny the proposed application is statutorily exempt under Public Resources Code Section 21080(b)(5), as CEQA does not apply for projects which a public agency rejects or disapproves. 2. The proposed application did not submit a Preliminary Application to establish the provisions of SB330 and limitations. However, it does meet the definition of a Housing Development Project under Government Code Section 65589.5(h)(2) 3. The City of Carlsbad has a Certified Housing Element that was approved by the City Council on April 6, 2021, submitted prior to the due date for the Sixth Housing Element Cycle on April 15, 2021, and confirmed to be in substantial compliance via correspondence from the Department of Housing and Community Development on July 13, 2021. 4. The site of the proposed project was not identified in the Housing Element Inventory of Vacant or Underutilized Sites as a candidate for rezoning or compliance with the Regional Housing Needs Allocation. 5. The City is in compliance with all required Housing Element Programs and implemented the required rezoning program through adoption of a General Plan Amendment and Rezoning Program in January 2024. The city continues to have sufficient sites in the Housing Element Inventory of Vacant and Underutilized sites to accommodate the remaining Regional Housing Needs Allocation. Therefore, none of the provisions in Government Code Section 65589.5(h)(11) “Builder’s remedy project” apply. Feb. 18, 2026 Item #1 11 of 61 6. The existing General Plan designation is Planned Industrial. The existing zoning is Planned Communities, which per the Carlsbad Municipal Code references the Bressi Ranch Master Plan. The Bressi Ranch Master Plan has assigned use regulations consistent with the zoning of Planned Industrial. Neither the General Plan, Zoning Ordinance, or Master Plan documents assign a residential density for this type of housing and the types of land uses and activities proposed by the project are not permitted as an allowed use. 7. The housing development project is inconsistent with the zoning ordinance and General Plan and can be disapproved under the qualification allowed under Government Code Section 65589.5(d)(5). PASSED, APPROVED, AND ADOPTED at a regular meeting of the Planning Commission of the City of Carlsbad, California, held on Feb. 18, 2026, by the following vote, to wit: AYES: NAYES: ABSENT: ABSTAIN: ___________________________________ ROY MEENES, Chairperson CARLSBAD PLANNING COMMISSION ATTEST: ________________________________ Eric Lardy, Assistant Director of Community Development Feb. 18, 2026 Item #1 12 of 61 Exhibit 3 City Council Staff Report, July 15, 2025 (On file in the Planning Division.) Feb. 18, 2026 Item #1 13 of 61 Exhibit 4 City Council Minutes, July 15, 2025 (On file in the Planning Division.) Feb. 18, 2026 Item #1 14 of 61 1 Eric Lardy From:Meghan MacArthur <meghandeberry@gmail.com> Sent:Sunday, February 1, 2026 3:42 PM To:Eric Lardy Subject:Viasat lot- Bressi ranch Follow Up Flag:Follow up Flag Status:Flagged Hi Mr. Lardy, I am a resident of Bressi ranch and was out walking my dog today when I saw that the empty viasat lot on the corner of Alicante and town garden has an applicaƟon for residenƟal development. I implore you and the city to please prevent this lot from being developed in this manner. The traffic impact this will have on our neighborhood is significant, and with so many kids and families using the street for biking and walking to/from school there is a serious safety concern. AddiƟonally, the noise impact to build a project of this nature will be incredibly disrupƟve to our community. We are already seeing the noise impact of larger jets at the airport and it’s difficult to put into words how the quality of life will be made worse throughout this process. We moved to Bressi to be in a safe and tucked away development, not to be surrounded at every possible corner by large 3-story townhomes crammed into a lot that is one of the few remaining undeveloped spaces remaining in the city. The residents of Bressi plan to fight this every step of the way and hope that we can have your support in Toll Bros pursuing other opƟons for development. Thank you, Meghan and Trevor MacArthur 2577 discovery rd CAUTION: Do not open aƩachments or click on links unless you recognize the sender and know the content is safe. Exhibit 5 Public Comments Feb. 18, 2026 Item #1 15 of 61 From:San-San Wardojo To:Eric Lardy Subject:Proposed New Homes in Bressi Ranch Date:Monday, February 2, 2026 8:26:23 PM Hello Mr. Lardy. . I’m writing to express concern about the recent sale of land that was not previously zoned forhousing and the plan to build over 100 homes on it. Traffic in this area is already heavy, and our roads don’t seem equipped to handle that manyadditional cars. I’m also worried about the impact on schools, utilities, drainage, and overall neighborhood safety. Many of us moved here based on the existing zoning and density. A development of this size is a major change, and I hope the City will carefully review the traffic and infrastructureimpacts and keep residents informed. Thank you for your time. Sincerely, San-San Wardojo CAUTION: Do not open attachments or click on links unless you recognize the sender and know the content is safe. Feb. 18, 2026 Item #1 16 of 61 Community Development Department | 1635 Faraday Ave. | Carlsbad, CA 92008 | www.carlsbadca.gov Inclusionary Housing Program IB-157 When housing prices spiked in the 1990s, many cities looked for ways to help make housing more affordable. One such tool that many jurisdictions implemented was INCLUSIONARY HOUSING REGULATIONS. Under these laws, developers are required to set aside a certain number of units within their residential development project and make them affordable to lower income households. As part of their inclusionary housing program, many cities also included provisions that allow developers to deviate from the strict adherence of the policy, so long as it is found that the alternative means of compliance meets the intent of the jurisdiction’s inclusionary housing policies, and is consistent with the housing affordability and fair housing choice goals specified in its long-range housing plan. This info-bulletin provides an overview of Carlsbad’s Inclusionary Housing Program and describes how it helps address affordable housing needs while advancing equitable development goals consistent with the city’s adopted Housing Element. NEED FOR LOCAL INCLUSIONARY HOUSING The state faces a serious housing problem that not only threatens its economic security, the lack of access to affordable housing can have a direct impact upon the health, safety, diversity, and welfare of Carlsbad residents. To retain a healthy livable environment and meet state mandated housing goals, more needs to be done to accommodate locally available and affordable housing stock. To help address this need, the city’s inclusionary housing ordinance, originally adopted in 1993, established the legal basis for requiring affordable (inclusionary) housing units in new residential development in the city. The law applies to all proposed development projects that include residential units and requires that a minimum of 15% of the units within a project be affordable to lower- income households. Since its implementation, the inclusionary housing ordinance has proven to be extremely effective. From 1995 to 2020, the city produced 19,026 housing units, of which roughly 13% were made affordable through this program. And it is anticipated that the city will generate over 500 additional affordable units over the next eight- year period. HOUSEHOLD INCOME & AFFORDABILITY We hear this a lot --- How do we make housing more affordable? The term “affordable housing” can be used to describe housing that receives some form of subsidy/restriction that forcibly keeps rents and mortgages low. It can also mean housing that’s naturally affordable simply because of market supply and demand. In order to make a meaningful difference in providing affordable housing, the solution should not be looked at as an “either-or” approach between privately produced housing and subsidized housing…it requires both. To help understand what qualifies as affordable, the U.S. Department of Housing and Urban Development (HUD) establishes income ranges for different household types, which they have grouped into five “income categories:” extremely low, very low, low, moderate and above- moderate household income. The household income for each of these categories is based on a percentage of the region’s Area Median Income or AMI. Exhibit 6 Feb. 18, 2026 Item #1 17 of 61 Page 2 of 6 Inclusionary Housing Program IB-157 (September 2025) Carlsbad falls within the San Diego County region, which has an AMI of $95,100 (2021) per year for a four-person household. In comparison, the city’s actual median income is closer to $108,000, but under state law the city must use the county AMI. To help illustrate, the table below shows the income levels for a family of four. For housing costs to be considered affordable, a family’s monthly rent/mortgage payment should generally not exceed 30% of the gross annual household income of any given income category. Affordable housing price is determined by state law, defined in Health and Safety Code sections 50053 (for-rent) and 50052.5 (for-sale). For a rental unit, total housing costs include the monthly rent payment as well as consideration for a utility allowance. With for-sale units, total housing costs include the mortgage payment, homeowner association dues, property taxes, mortgage insurance and any other related assessments. To learn more about HCD and housing, please see our Info-Bulletin: Carlsbad Housing Plan (IB-137). INCLUSIONARY HOUSING REQUIREMENTS The city’s Inclusionary Housing Ordinance (CMC §21.85) was passed by the City Council in 1993, and established the legal basis for requiring inclusionary housing in new residential development in the city. The following provides a summary of key standards required under the ordinance for new residential development in the city. Number of units required • Pursuant CA Attorney General Opinion No. 24-501, local inclusionary housing requirements can only be applied to base density units, not the density bonus units. As such, irrespective of the requirements set forth under §21.85.030.B, projects proposing seven or more housing units are required to restrict at least 15% of the base density units, not the density bonus units, for low-income households. For projects proposing six or fewer units, refer to Alternative #1 under the “Alternative Means of Compliance” section of this info-bulletin. • Inclusionary unit requirements apply to all residential development projects (rental or for-sale product), including mixed-use projects. • When calculating, fractional units ≥0.5 must be rounded up to the next whole number. Example: An applicant proposes to satisfy its inclusionary requirements for a 112-unit residential development by reserving 15% of the units for low- income households, or 17 units (112 X 0.15 = 16.8, rounded up to 17). The remaining 95 units (112 units minus 17) may be sold at market rate. Duration units protected • Inclusionary rental units shall remain restricted and affordable to the designated income group for not less than 55 years. • Inclusionary for-sale units shall remain restricted and affordable to the designated income group for not less than 30 years. Development standards • Inclusionary units should be located throughout the development rather than clustered in one area. • The inclusionary units must be indistinguishable from the market-rate units in the development, at least outwardly. • The inclusionary units must be constructed prior to or concurrent with development of the market-rate units, and prior to final building permit approval of the market-rate units. • Residents of the inclusionary units must have access to the same amenities – such as pool, fitness center and parking – as residents of the market-rate units. • The inclusionary units must include a similar mix and number of bedrooms as the market-rate units. • When ten or more inclusionary units are required, at least ten percent of those required units must provide at least three bedrooms. Feb. 18, 2026 Item #1 18 of 61 Inclusionary Housing Program IB-157 (September 2025) Page 3 of 6 • Inclusionary units must be provided in the same tenure (for-rent or for-sale) as the market-rate units. • Inclusionary units affordability cost is calculated pursuant to California Health and Safety Code Section 50053 (for-rent) and 50052.5 (for-sale). • To the extent possible, projects using for-sale units to satisfy inclusionary requirements shall be designed to be compatible with conventional mortgage financing programs. ALTERNATIVE MEANS OF COMPLIANCE The city understands that various constraints may frustrate a developer’s ability to meet the strict letter of the city’s inclusionary housing regulations. As such, the ordinance allows for the City Council to authorize “alternative means of compliance” when it is found that the alternative meets the intent of the city’s Inclusionary Housing Ordinance (CMC §21.85) and the goals and policies of the city’s 2021-2029 Housing Element. Council Policy Statement No. 57 (Policy 57) lists those alternatives that have been found to meet the intent of the city inclusionary code and help address its affordable housing needs. These alternative means of compliance are summarized in the sections below, but please refer to Policy 57 for the specific requirements. Alternative #1: Payment of in-lieu fee Rather than constructing the inclusionary unit as part of the development project, applicants proposing ≤six units may instead pay a fee. • $8,529 for a new single-family detached home • $15 per square foot of net building area for each proposed market-rate unit. The rates above are effective 2022. Please check the city’s Fee Schedule for the most current rates. “Net building area” means the aggregate gross floor area of all the unrestricted dwelling units within a development, excluding areas outside the dwelling unit’s habitable space such as garages, carports, parking areas, porches, patios, open space, and excluding common areas such as lobbies, common hallways, stairways, elevators and equipment spaces. Collected in-lieu fees are deposited into the city’s Housing Trust Fund, and applied towards the furthering of the city’s affordable housing needs pursuant to Council Policy Statement No. 90 (Policy 90). Alternative #2: Varying housing affordability In addition to providing more housing available for low income families, the city also recognizes a need to increase housing stock for other targeted and needed housing affordability levels such as moderate, very low- and extremely low-income households. As such, so long as the total average gross income restriction for the required inclusionary units does not exceed 80% of the AMI, the makeup of the inclusionary units can be comprised on any combination of income categories. Alternative #3: Increases in residential density While not specific to the city’s inclusionary housing ordinance, sometimes there is a request from a property owner to increase their residential density above what is authorized under the city’s current land use plans. In exchange for the increased density, the city will require that any future development on the site meet the following additional inclusionary housing requirements. • At least 20% of the total residential units (including Density Bonus units) are restricted for low-income households; or, Feb. 18, 2026 Item #1 19 of 61 Page 4 of 6 Inclusionary Housing Program IB-157 (September 2025) • A least 15% of the total residential units (including Density Bonus units) are restricted for low-income households and an additional 10% are restricted for moderate-income households; or, • At least 15% of the total residential units (including Density Bonus units) are restricted for very low- income households. This has been applied to properties that received an increase in residential density as part of the 2015 General Plan update and the 2021-29 Housing Element. Alternative #4: Reduction credit Residential development (for-sale or rental product) can reduce its inclusionary housing obligations from 15% to 12.5%, under the following conditions. • All affordable units must be made available to very low- or extremely low-income households. • Affordable units are located on the same site as the market-rate units. • No financial assistance from the city is provided. • Example: “A 78-unit residential development is proposed, which requires that 15% of the units be reserved for low-income (12 units). If the developer voluntarily agrees to make inclusionary units available to very low-income households, then the developer may receive an incentive reduction credit. Under this scenario, 10 units in a 78-unit development projects equates to 12.8%, which meets the minimum inclusionary housing requirement. Alternative #5: Use of accessory dwelling units Pursuant to CMC §21.85.070.B, construction of up to 15 accessory dwelling units (ADU) can be used to satisfy inclusionary housing requirements. Refer to our info- bulletin on ADUs (IB-111) for additional information. The standards below provide additional specifications for when this allowance can be used. • The project proposes ≥200 residential detached dwelling units. • The ADU may be an attached or detached product type (Junior ADU prohibited) . • The ADUs shall have an affordability term (≤80% AMI with rents ≤70% AMI) of at least 30 years. Notwithstanding the above, for projects proposing ≤six units, the in-lieu fee may be waived if a detached or attached ADU or Junior ADU is constructed concurrent with construction of the market-rate unit, deed restricted for low-income households for 30-years, and occupied by income-qualified families. Alternative #6: Off-site construction Circumstances may arise in which the public interest would be better served by allowing some or all of the required inclusionary units to be developed at an alternative site. This is referred to as a “Combined Inclusionary Housing Project” or “Combined Project.” To qualify, the following requirements must be met. • The inclusionary calculation requirements shall be based on the total number of market-rate units to be provided, as opposed to the total number of residential units in the project. See example below. Example: An applicant proposes to satisfy its inclusionary requirements for a 112-unit project by building 15% of the units for low-income households off-site. This leaves 85% of the units for market rate, for a total residential unit count of 132 units (112 ÷ 0.85 = 131.8, rounded to 132). Using the total residential unit count, the number of inclusionary units required is 20 (132 X 0.15 = 19.8, rounded to 20). • The decision-making authority of the permit application may approve a Combined Project subject to the following findings. o The site has not or will not receive a density increase or density bonus. o Site conditions make it physically infeasible to accommodate the inclusionary units on-site. o Significant price and product type disparities make it financially infeasible to accommodate the inclusionary units on-site. Feb. 18, 2026 Item #1 20 of 61 Inclusionary Housing Program IB-157 (September 2025) Page 5 of 6 o There is a documented lack of development capacity to deliver affordable housing on-site. o The off-site option provides greater financial feasibility/cost effectiveness than the on-site. o The off-site option provides better access to jobs, schools, transit, and services. o The off-site option supports housing goals and policies in the city’s Housing Element. Notwithstanding, the City Council shall retain final permit approval authority, including approval of the Affordable Housing Agreement, on any Combined Project that requires financial assistance from the city. Alternative #7: Inclusionary housing credit bank For projects that build inclusionary units in excess of code requirements, and where the city is financially participating in the project, the city can sell those excess units in the form of credits to other developers to satisfy their inclusionary requirement. The proceeds from the credit sales are deposited into the city’s Housing Trust Fund and redistributed pursuant to Policy 90. • Bank Creation. The City Council may approve the creation of an inclusionary housing credit bank, subject to the following findings. o The inclusionary units are in excess of the minimum number of units required under the city’s Inclusionary Housing Ordinance; or o The inclusionary units are part of a 100% affordable housing project; and o The inclusionary units are constructed and received final inspection; and o The city financially contributed to the construction of the project. • Credit Purchase Eligibility. Projects proposing more than seven, but no more than 50 residential units are eligible to purchase credits. • Credit Price. The price for each inclusionary unit shall be determined by dividing the city’s financial contribution by the total number excess inclusionary units, subject to annual CPI adjustments. • Credit Bank. Applicants must pay the credit price of available credits from the oldest established inclusionary housing bank that is located within the same city quadrant in which the market-rate units are located, or if none available, sites which are contiguous to the quadrant in which the units are proposed. • Credit Purchase Ratio – The amount of credits to be purchased shall be based on the following. o 7 to 20 units: 1.0 credit/inclusionary unit o 21 to 35 units: 1.5 credits/inclusionary unit o 36 to 50 units: 2.0 credits/inclusionary unit • Credit Purchase Approval. The decision-making authority of the development project is authorized to approve credit purchases, so long as the findings below are met. Should a request to purchase credits occur after discretionary approval, the Community Development Director or the Housing & Homeless Services Director shall have the authority to approve credits, subject to the same findings. o The project site is located within the same Growth Management Plan quadrant that the housing credit is located, or if nonavailable, sites which are contiguous (share a common boarder) with the quadrant in which the units are proposed. o Sufficient housing credits available to purchase. • Credit Price Payment. Payment of credit purchases shall be due prior to recordation of the final map or issuance of a building permit, in situations where the project does not include a subdivision. If the project entitlements expire, credits will be made available to another eligible project(s). Alternatives not listed, but may be considered The City Council may approve other alternatives means of compliance not listed in Policy 57 when evidence is provided that the alternative helps achieve relevant Feb. 18, 2026 Item #1 21 of 61 Page 6 of 6 Inclusionary Housing Program IB-157 (September 2025) Housing Element policies and goals and assists the city in meeting its state housing requirements. As part of the City Council’s consideration, the applicant must also show why compliance with current inclusionary housing regulations would be infeasible or present unreasonable hardship in light of such factors as project size, site constraints, market competition, price and product type disparity, available financial subsidies, and approved alternatives listed in Policy 57. AFFORDABLE HOUSING AGREEMENTS An Affordable Housing Agreement (AHA) is a legally binding agreement between the developer and the city to ensure that the inclusionary requirements of a residential development are satisfied. CMC §21.85.140 provides the specific requirements of the AHA, but the more significant components are listed below. •A project condition shall be added to projects subject to the inclusionary ordinance and Policy 57 requiring that an AHA be reviewed, approved, and recorded prior to Final Map or issuance of building permits, whichever is first. •Among other items, the AHA must include the number of required inclusionary units, the unit sizes, location, affordability tenure, required findings, terms and conditions of affordability and unit production schedule. •The AHA and all relevant terms and conditions shall be recorded against the entire development. •The AHA shall bind all future owners and successors in interest for the term of years specified therein. APPROVAL AUTHORITY The approval authority for the development project subject to these standards is as follows: •The decision-making authority for the underlying permit application(s) shall have the authority to approve projects found consistent with Policy 57. •Development projects that propose an alternative means of compliance that is not specifically provided for in the CMC or Policy 57 shall be considered by the Housing Commission for a recommendation to the City Council. •Approval authority of the AHA is as follows: o AHA that are consistent with CMC §21.85 and Policy 57 and do not request financial assistance from the city shall first be considered by the Affordable Housing Policy Team for a recommendation to the H&HS Director. o Affordable Housing Agreements that propose a deviation(s) to Policy 57 or request financial assistance shall first be considered by the Affordable Housing Policy Team and Housing Commission for a recommendation to the City Council, which has the authority to issue final approval of the alternative. YOUR OPTIONS FOR SERVICE To schedule an appointment or to learn more about this program, please contact the Planning Division at 442-339- 2600 or via email at Planning@carlsbadca.gov or the Housing & Homeless Services Department at 442-339- 4721 or via email at Housing@carlsbadca.gov. Feb. 18, 2026 Item #1 22 of 61 LIST OF ACRONYMS AND ABBREVIATIONS Exhibit 7 This is a list of acronyms and abbreviations (in alphabetical order) that are commonly used in staff reports. Acronym Description Acronym Description APA American Planning Association LCPA Local Coastal Program Amendment APN Assessor Parcel Number LOS Level of Service AQMD Air Quality Management District MND Mitigated Negative Declaration BMP Best Management Practice NCTD North County Transit District CALTRANS California Department of Transportation ND Negative Declaration CC City Council PC Planning Commission CCR Conditions, Covenants and Restrictions PDP Planned Development Permit CEQA California Environmental Quality Act PEIR Program Environmental Impact Report CFD Community Facilities District PUD Planned Unit Development CIP Capital Improvement Program ROW Right of Way COA Conditions of Approval RWQCB Regional Water Quality Control Board CofO Certificate of Occupancy SANDAG San Diego Association of Governments CT Tentative Parcel Map SDP Site Development Permit CUP Conditional Use Permit SP Specific Plan DIF Development Impact Fee SWPPP Storm Water Pollution Prevention Program DISTRICT City Council Member District Number TM Tentative Map EIR Environmental Impact Report ZC Zone Change EIS Environmental Impact Statement (federal) EPA Environmental Protection Agency FEMA Federal Emergency Management Agency GP General Plan GPA General Plan Amendment GIS Geographic Information Systems HCA Housing Crisis Act 2019 IS Initial Study Feb. 18, 2026 Item #1 23 of 61 BRESSI RANCH APPLICANTS: TOLL BROTHERS/ LEVINE INVESTMENTS CONTACT: ERIC EVERHART TOLL BROTHERS (909) 438-6224 350 Commerce Suite 200 Irvine, CA 92602 ENTITLEMENT COVER SHEET ENTITLEMENT ENGINEERING TITLE SHEET / NOTES C1 SITE PLAN C2 CROSS SECTIONS C3 PARKING PLANS C4 PRELIMINARY GRADING C5 CONCEPTUAL WALL PLAN C6 EXISTING EASEMENTS C7 TITLE SHEET & INDEX TRACT MAP 1 STATISTICAL SUMMARY & SECTIONS 2 TENTATIVE TRACT MAP & EXISTING EASEMENTS 3 PHOTOMETRICS SITE PLAN 1 PHOTOMETRICS SITE PLAN 2 FIXTURE CUT SHEETS 2 ALTA/NSPS LAND TITLE SURVEY 1 ALTA/NSPS LAND TITLE SURVEY 2 ENTITLEMENT ARCHITECTURE BLDG 5A|5-PLEX FRONT ELEVATION A1.1 BLDG 5A|5-PLEX REAR ELEVATION A1.2 BLDG 5A|5-PLEX RIGHT AND LEFT ELEVATIONS A1.3 BLDG 5B|5-PLEX FRONT ELEVATION A1.4 BLDG 5B|5-PLEX REAR ELEVATION A1.5 BLDG 5B|5-PLEX RIGHT AND LEFT ELEVATIONS A1.6 BLDG 5A|FLOOR PLANS A1.7 BLDG 5B|FLOOR PLANS A1.8 PLAN ONE|FLOOR PLANS A1.9 LAN ONE X|FLOOR PLANS A1.10 PLAN TWO|FLOOR PLANS A1.11 PLAN THREE|FLOOR PLANS A1.12 PLAN FOUR|FLOOR PLANS A1.13 ROOF PLANS A1.14 ENTITLEMENT LANDSCAPE CONCEPTUAL SITE PLAN L.1 ENTRY ENLARGEMENT PLAN & ELEVATIONS L.2 OPEN SPACE ENLARGEMENT PLAN L.3 TYPICAL PASEO & ALLEY ENLARGEMENT PLAN L.4 CONCEPTUAL OPEN SPACE EXHIBIT L.5 CONCEPTUAL WALL AND FENCE PLAN L.6 MWELO CALCULATIONS L.7 PLANT PALETTE L.8 ENTITLEMENT FIRE DEPARTMENT PRELIMINARY FIRE ACCESS & DEFENSIBLE SPACE EXHIBIT 1 ENTITLEMENT DRY UTILITIES DRY UTILITIES COMPOSITE EXHIBIT 1 ENTITLEMENT TRAFFIC STUDY TRAFFIC STUDY / VMT ANALYSIS ATTACHMENTS (SEPARATE) P1 APPLICATION CITY PROCESSING BRIEF (CCN) CIVIL WATER DISTRIBUTION ANALYSIS CIVIL TECHNICIAN MEMO WILL SERVE LETTERS CLTA PRELIMINARY TITLE REPORT Exhibit 8 Feb. 18, 2026 Item #1 24 of 61 2 1 14 15 16 17 18 20 21 22 23 24 25 26 27 28 29 30 3 4 M 13 5EV 6EV 7EV 19 DR O P OF F 8EV 9EV 10EV 11EV 12EV P4 P2 P3 P4 P4 P2 P3 P4 P4P3P1X P1 P4 P3 P1 XP1 P4 P3 P1X P1 P4 P2 P3 P1X P1 P4 P2 P3 P1X P1 P4 P2 P3 P3 P4 P4 P2 P3 P3 P4 P4 P2 P3P3 P2 P4P4P2P3P3P2P4 P4P2P3P3P2P4P4P2P3P3P2P4 P4 P2 P3P3 P2 P4 P4P2P3P3P2P4 P4 P2 P3 P1X P1 P4 P2 P3 P1 XP1 P3P4P2P3P1X P1 P3 P4 P2 P3 P1X P1 P3 P4 P2 P3 P1X P1 P3 P4 P2 P3 P1 X P1 P3 BRESSI RANCH | TOLL BROTHERS NOTE: SQUARE FOOTAGE MAY VARY BASED ON CALCULATION METHODS CARLSBAD, CALIFORNIA Wilson Mikami Corporation9 Corporate Park, Suite 100, Irvine, CA, 92606T: (949) 679-0090 | F: (949) 679-0091 WILSON MIKAMICORPORATION9.22.2025 BRESSI RANCH VESTING TENTATIVE TRACT MAP NO. XXXXXX SITE PLAN VICINITY MAP PROPERTY OWNER CIVIL ENGINEER WILSON MIKAMI CORPORATION GEOTECHNICAL ARCHITECTWOODLEY ARCHITECTURE GROUPLGC VALLEY, INC. ZONE 3 SUMMARY C1 Feb. 18, 2026 Item #1 25 of 61 CATV TEL CATVTEL CATV TEL CA T V TE L CATV TEL TE L CA T V P4P2P3P4 P4P2P3P4 P4 P3 P1 XP1 P4P3P1X P1 P4 P3 P1 X P1 P4 P2 P3 P1 X P1 P4 P2 P3 P1 X P1 P4 P2 P3P3 P4 P4 P2 P3P3 P4 P4 P2 P3 P3 P2 P4 P4 P2 P3 P3 P2 P4 P4 P2 P3 P3 P2 P4 P4 P2 P3 P3 P2 P4P4 P2 P3 P3 P2 P4P4 P2 P3 P3 P2 P4 P4 P2 P3 P1 X P1 P4 P2 P3 P1X P1 P3 P4 P2 P3 P1 X P1 P3 P4 P2 P3 P1 X P1 P3 P4 P2 P3 P1 X P1 P3 P4P2P3P1X P1 P3 2 1 14 15 16 17 18 20 21 22 23 24 25 26 27 28 29 30 3 4 M 13 5EV 6EV 7EV 19 DROPOFF 8EV 9EV 10EV 11EV 12EV TO W N G A R D E N R O A D ALICANTE ROAD GA T E W A Y R O A D A A A A A A A A A A A A A A B B B B C C 1 2 3 4 5 6 7 8 9 101112 131415 16 17 18 19 20 21 A B C D F E G G H I J B D D E E F F G G BRESSI RANCH | TOLL BROTHERS NOTE: SQUARE FOOTAGE MAY VARY BASED ON CALCULATION METHODS CARLSBAD, CALIFORNIA Wilson Mikami Corporation9 Corporate Park, Suite 100, Irvine, CA, 92606T: (949) 679-0090 | F: (949) 679-0091 WILSON MIKAMICORPORATION9.22.2025 SITE PLAN C2 1 LEGEND A EASEMENT NOTES 13R-5CN Feb. 18, 2026 Item #1 26 of 61 BRESSI RANCH | TOLL BROTHERS NOTE: SQUARE FOOTAGE MAY VARY BASED ON CALCULATION METHODS CARLSBAD, CALIFORNIA Wilson Mikami Corporation9 Corporate Park, Suite 100, Irvine, CA, 92606T: (949) 679-0090 | F: (949) 679-0091 WILSON MIKAMICORPORATION9.22.2025 CROSS SECTIONS C3Feb. 18, 2026 Item #1 27 of 61 P4P2P3P4 P4P2P3P4 P4 P3 P1 XP1 P4P3P1X P1 P4 P3 P1 X P1 P4 P2 P3 P1 X P1 P4 P2 P3 P1 X P1 P4 P2 P3P3 P4 P4 P2 P3P3 P4 P4 P2 P3 P3 P2 P4 P4 P2 P3 P3 P2 P4 P4 P2 P3 P3 P2 P4 P4 P2 P3 P3 P2 P4P4 P2 P3 P3 P2 P4P4 P2 P3 P3 P2 P4 P4 P2 P3 P1 X P1 P4 P2 P3 P1X P1 P3 P4 P2 P3 P1 X P1 P3 P4 P2 P3 P1 X P1 P3 P4 P2 P3 P1 X P1 P3 P4P2P3P1X P1 P3 2 1 14 15 16 17 18 20 21 22 23 24 25 26 27 28 29 30 3 4 M 13 5EV 6EV 7EV 19 DROPOFF 8EV 9EV 10EV 11EV 12EV 3 4 1 2 M 5EV 6EV 7EV 1 2 3 4 5 6 7 8 9 10 11 121314 15 16 17 18 19 20 21 A B C D FE G H J I K 2 1 14 15 16 17 18 20 21 22 23 24 25 26 27 28 29 30 3 4 M 13 19 DROPOFF 8EV 9EV 10EV 11EV 12EV BRESSI RANCH | TOLL BROTHERS NOTE: SQUARE FOOTAGE MAY VARY BASED ON CALCULATION METHODS CARLSBAD, CALIFORNIA Wilson Mikami Corporation9 Corporate Park, Suite 100, Irvine, CA, 92606T: (949) 679-0090 | F: (949) 679-0091 WILSON MIKAMICORPORATION9.22.2025 PARKING PLAN C4 1 LEGEND A Feb. 18, 2026 Item #1 28 of 61 1 2 3 4 5 6 7 8 9 10 11 121314 15 16 17 18 19 20 21 A B C D FE G H J I K P4P2P3P4 P4P2P3P4 P4 P3 P1 XP1 P4P3P1X P1 P4 P3 P1 X P1 P4 P2 P3 P1 X P1 P4 P2 P3 P1 X P1 P4 P2 P3P3 P4 P4 P2 P3P3 P4 P4 P2 P3 P3 P2 P4 P4 P2 P3 P3 P2 P4 P4 P2 P3 P3 P2 P4 P4 P2 P3 P3 P2 P4P4 P2 P3 P3 P2 P4P4 P2 P3 P3 P2 P4 P4 P2 P3 P1 X P1 P4 P2 P3 P1X P1 P3 P4 P2 P3 P1 X P1 P3 P4 P2 P3 P1 X P1 P3 P4 P2 P3 P1 X P1 P3 P4P2P3P1X P1 P3 2 1 14 15 16 17 18 20 21 22 23 24 25 26 27 28 29 30 3 4 M 13 5EV 6EV 7EV 19 DROPOFF 8EV 9EV 10EV 11EV 12EV BRESSI RANCH | TOLL BROTHERS NOTE: SQUARE FOOTAGE MAY VARY BASED ON CALCULATION METHODS CARLSBAD, CALIFORNIA Wilson Mikami Corporation9 Corporate Park, Suite 100, Irvine, CA, 92606T: (949) 679-0090 | F: (949) 679-0091 WILSON MIKAMICORPORATION9.22.2025 C5 PRELIMINARY GRADING Feb. 18, 2026 Item #1 29 of 61 P4P2P3P4 P4P2P3P4 P4 P3 P1 XP1 P4P3P1X P1 P4 P3 P1 X P1 P4 P2 P3 P1 X P1 P4 P2 P3 P1 X P1 P4 P2 P3P3 P4 P4 P2 P3P3 P4 P4 P2 P3 P3 P2 P4 P4 P2 P3 P3 P2 P4 P4 P2 P3 P3 P2 P4 P4 P2 P3 P3 P2 P4P4 P2 P3 P3 P2 P4P4 P2 P3 P3 P2 P4 P4 P2 P3 P1 X P1 P4 P2 P3 P1X P1 P3 P4 P2 P3 P1 X P1 P3 P4 P2 P3 P1 X P1 P3 P4 P2 P3 P1 X P1 P3 P4P2P3P1X P1 P3 2 1 14 15 16 17 18 20 21 22 23 24 25 26 27 28 29 30 3 4 M 13 5EV 6EV 7EV 19 DROPOFF 8EV 9EV 10EV 11EV 12EV BRESSI RANCH | TOLL BROTHERS NOTE: SQUARE FOOTAGE MAY VARY BASED ON CALCULATION METHODS CARLSBAD, CALIFORNIA Wilson Mikami Corporation9 Corporate Park, Suite 100, Irvine, CA, 92606T: (949) 679-0090 | F: (949) 679-0091 WILSON MIKAMICORPORATION9.22.2025 C6 CONCEPTUAL WALL PLAN Feb. 18, 2026 Item #1 30 of 61 TO W N G A R D E N R O A D ALICANTE ROAD GA T E W A Y R O A D MINOR SUBDIVISON NO. 16-04 PARCEL MAP NO. 21433 PARCEL 3 FILE NO. 2016-7000548 BRESSI RANCH | TOLL BROTHERS NOTE: SQUARE FOOTAGE MAY VARY BASED ON CALCULATION METHODS CARLSBAD, CALIFORNIA Wilson Mikami Corporation9 Corporate Park, Suite 100, Irvine, CA, 92606T: (949) 679-0090 | F: (949) 679-0091 WILSON MIKAMICORPORATION9.22.2025 EXISTING EASEMENTS C7Feb. 18, 2026 Item #1 31 of 61 GATEW A Y R O A D AL I C A N T E R O A D TOWN GARDEN ROAD C A M P B E L L P L 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 A B C D F E G H J I K L CORPORATION WILSON MIKAMI BASIS OF BEARING:BENCHMARK:VESTING TENTATIVE TRACT MAP XXXXXBRESSI RANCH BRESSI RANCH VESTING TENTATIVE TRACT MAP SHEET LEGEND LEGEND 2 A RECORD OWNER: LEGAL DESCRIPTION: GENERAL NOTES: TITLE SHEET 1 Feb. 18, 2026 Item #1 32 of 61 CORPORATION WILSON MIKAMI BASIS OF BEARING:BENCHMARK:VESTING TENTATIVE TRACT MAP XXXXXBRESSI RANCH STATISTICAL SUMMARY & SECTIONS STATISTICAL SUMMARY AND SECTIONS 2 Feb. 18, 2026 Item #1 33 of 61 G A T E W A Y R O A D ALICANTE ROAD TO W N G A R D E N R O A D CAMPBELL PL D D D D D D D D D DD D D 1 2 3 4 5 6 7 8 9 10 11 121314 15 16 17 18 19 20 21 A B C D FE G H J I K L 2 1 14 15 16 17 18 20 21 22 23 24 25 26 27 28 29 30 3 4 M 13 5EV 6EV 7EV 19 DROPOFF 8EV 9EV 10EV 11EV 12EV CORPORATION WILSON MIKAMI BASIS OF BEARING:BENCHMARK:VESTING TENTATIVE TRACT MAP XXXXXBRESSI RANCHTENTATIVE TRACT MAP 3 EASEMENT NOTES 1 LEGEND A TENTATIVE TRACT MAP Feb. 18, 2026 Item #1 34 of 61 Feb. 18, 2026 Item #1 35 of 61 Feb. 18, 2026 Item #1 36 of 61 BLDG 5A|5-PLEX FRONT ELEVATION F E C D B A F E C D B A F E C D B A A D C B MATERIAL NOTES | TRANSITIONAL A. CONCRETE FLAT ROOF TILE B. STUCCO C. IRON RAILING D. STONE VENEER F E C D B A F E C D B A SHEET A1.1 Feb. 18, 2026 Item #1 37 of 61 BLDG 5A|5-PLEX REAR ELEVATION SHEET A1.2 Feb. 18, 2026 Item #1 38 of 61 BLDG 5A|5-PLEX ELEVATIONS RIGHT ELEVATION LEFT ELEVATION SHEET A1.3 Feb. 18, 2026 Item #1 39 of 61 BLDG 5B|5-PLEX FRONT ELEVATION F E C D B A F E C D B A F E C D B A A C D B MATERIAL NOTES | TRANSITIONAL A. CONCRETE FLAT ROOF TILE B. STUCCO C. IRON RAILING D. STONE VENEER F E C D B A F E C D B A SHEET A1.4 Feb. 18, 2026 Item #1 40 of 61 BLDG 5B|5-PLEX REAR ELEVATION SHEET A1.5 Feb. 18, 2026 Item #1 41 of 61 BLDG 5B|5-PLEX ELEVATIONS RIGHT ELEVATION LEFT ELEVATION SHEET A1.6 Feb. 18, 2026 Item #1 42 of 61 7'-9"CLG. FOYEROPEN TO ABV.HS OFFICE /OPT. BED. 49'-0" CLG.CPT. 9'-0" CLG. COATCLOSET 9'-0" CLG.HS HALL BATH1ST FLOOR 8'-3"CLG. GARAGE 9'-0" CLG.CONC. TYP. GARAGE NOTE:INDICATES MINIMUM CLEAR UNOBSTRUCTEDGARAGE AREA OF 20'0" X 20'-0" & 7'-0" IN HEIGHT NO AFFIXED OBSTRUCTIONS SUCH AS, BUT NOT LIMITEDTO WATER HEATERS, WASHERS AND DRYERS, SINKS,AND FURNACES SHALL NOT INTRUDE INTO THESEDESIGNATED PARKING AREAS. THE MEASUREMENTSHALL BE FROM THE FACE OF INTERIOR WALLS NOTINCLUDING STRUCTURAL SUPPORT 2-1 DS FOYER 9'-0" CLG.HS BED. 29'-0" CLG.CPT. 9'-0" CLG.CPT. COATCLOSET GARAGE 9'-0" CLG.CONC. BA. 39'-0" CLG.HS TYP. GARAGE NOTE:INDICATES MINIMUM CLEAR UNOBSTRUCTEDGARAGE AREA OF 20'0" X 20'-0" & 7'-0" IN HEIGHT NO AFFIXED OBSTRUCTIONS SUCH AS, BUT NOT LIMITEDTO WATER HEATERS, WASHERS AND DRYERS, SINKS,AND FURNACES SHALL NOT INTRUDE INTO THESEDESIGNATED PARKING AREAS. THE MEASUREMENTSHALL BE FROM THE FACE OF INTERIOR WALLS NOTINCLUDING STRUCTURAL SUPPORT 3-1 DS FOYER 9'-0" CLG.HS BED. 29'-0" CLG.CPT. 9'-0" CLG.CPT. COATCLOSET GARAGE 9'-0" CLG.CONC. DS BA. 3 9'-0" CLG.HS METERS TYP. GARAGE NOTE:INDICATES MINIMUM CLEAR UNOBSTRUCTEDGARAGE AREA OF 20'0" X 20'-0" & 7'-0" IN HEIGHT NO AFFIXED OBSTRUCTIONS SUCH AS, BUT NOT LIMITEDTO WATER HEATERS, WASHERS AND DRYERS, SINKS,AND FURNACES SHALL NOT INTRUDE INTO THESEDESIGNATED PARKING AREAS. THE MEASUREMENTSHALL BE FROM THE FACE OF INTERIOR WALLS NOTINCLUDING STRUCTURAL SUPPORT 4-1 DS FOYER9'-0" CLG.HS BED. 2 9'-0" CLG.CPT. 9'-0" CLG.CPT. COATCLOSET GARAGE9'-0" CLG.CONC. DS BA. 3 9'-0" CLG.HS METERS TYP. GARAGE NOTE:INDICATES MINIMUM CLEAR UNOBSTRUCTED GARAGE AREA OF 20'0" X 20'-0" & 7'-0" IN HEIGHT NO AFFIXED OBSTRUCTIONS SUCH AS, BUT NOT LIMITED TO WATER HEATERS, WASHERS AND DRYERS, SINKS,AND FURNACES SHALL NOT INTRUDE INTO THESE DESIGNATED PARKING AREAS. THE MEASUREMENT SHALL BE FROM THE FACE OF INTERIOR WALLS NOT INCLUDING STRUCTURAL SUPPORT 4-1 DS FOYER 9'-0" CLG.HS BED. 29'-0" CLG.CPT. 9'-0" CLG.CPT. COATCLOSET GARAGE 9'-0" CLG.CONC. BA. 39'-0" CLG.HS TYP. GARAGE NOTE:INDICATES MINIMUM CLEAR UNOBSTRUCTEDGARAGE AREA OF 20'0" X 20'-0" & 7'-0" IN HEIGHT NO AFFIXED OBSTRUCTIONS SUCH AS, BUT NOT LIMITEDTO WATER HEATERS, WASHERS AND DRYERS, SINKS,AND FURNACES SHALL NOT INTRUDE INTO THESEDESIGNATED PARKING AREAS. THE MEASUREMENTSHALL BE FROM THE FACE OF INTERIOR WALLS NOTINCLUDING STRUCTURAL SUPPORT 3-1 GREATROOM9'-0" CLG.CPT. KITCH.9'-0" CLG.HS BALCONY9'-0" CLG.ELASTOMERIC CASUALDINING9'-0" CLG.CPT. PDR. 9'-0" CLG.HS 2-2 GREATROOM9'-0" CLG.CPT. KITCH. 9'-0" CLG.HS BALCONY 9'-0" CLG.ELASTOMERIC CASUALDINING 9'-0" CLG.CPT. PDR.8'-4" CLG.HS 3-2 GREATROOM9'-0" CLG.CPT. KITCH. 9'-0" CLG.HS BALCONY 9'-0" CLG. CASUALDINING 9'-0" CLG.CPT. PDR.8'-4" CLG.HS 4-2 GREATROOM9'-0" CLG.CPT. KITCH.9'-0" CLG.HS BALCONY9'-0" CLG. CASUALDINING9'-0" CLG.CPT. PDR.8'-4" CLG.HS 4-2 GREATROOM9'-0" CLG.CPT. KITCH. 9'-0" CLG.HS BALCONY 9'-0" CLG.ELASTOMERIC CASUALDINING 9'-0" CLG.CPT. PDR.8'-4" CLG.HS 3-2 9'-0" CLG.HS BED. 3 9'-0" CLG.CPT. BED. 2 9'-0" CLG.CPT. PRIM.SUITE 9'-0" CLG.CPT. LAU 9'-0" CLG.HS PRIM.BA. 9'-0" CLG.HS 9'-0" CLG.CPT. PRIM. SUITECLOSET HALL BA.3RD FLR. 9'-0" CLG.CPT. HALL3RD FLR. 2-3 BED. 4 9'-0" CLG.CPT. BED. 3 9'-0" CLG.CPT. PRIM.SUITE 9'-0" CLG.CPT. LAU 9'-0" CLG.HS PRIM.BA. 9'-0" CLG.HS 9'-0" CLG.HS 9'-0" CLG.CPT. PRIM. SUITECLOSET HALL BA.3RD FLR. 9'-0" CLG.CPT. HALL3RD FLR. 3-3 BED. 4 9'-0" CLG.CPT. BED. 3 9'-0" CLG.CPT. PRIM.SUITE 9'-0" CLG.CPT. LAU 9'-0" CLG.HS PRIM.BA. 9'-0" CLG.HS 9'-0" CLG.HS 9'-0" CLG.CPT. PRIM. SUITECLOSET HALL BA.3RD FLR. 9'-0" CLG.CPT. HALL3RD FLR. 4-3 BED. 4 9'-0" CLG.CPT. BED. 3 9'-0" CLG.CPT. PRIM.SUITE9'-0" CLG.CPT. LAU9'-0" CLG.HS PRIM.BA.9'-0" CLG.HS 9'-0" CLG.HS 9'-0" CLG.CPT. PRIM. SUITE CLOSET HALL BA.3RD FLR. 9'-0" CLG.CPT. HALL3RD FLR. 4-3 BED. 4 9'-0" CLG.CPT. BED. 3 9'-0" CLG.CPT. PRIM.SUITE 9'-0" CLG.CPT. LAU 9'-0" CLG.HS PRIM.BA. 9'-0" CLG.HS 9'-0" CLG.HS 9'-0" CLG.CPT. PRIM. SUITECLOSET HALL BA.3RD FLR. 9'-0" CLG.CPT. HALL3RD FLR. 3-3 BRESSI | TOWNS | TOLL BROTHERS group,incarchitecturalwoodley colorado // 731 southpark dr. suite B littleton, co 80120 / 303 683.7231california // 2943 pullman st. suite A santa ana, ca 92705 / 949 553.8919 THESE DRAWINGS ARE INTENDED FOR DESIGN DEVELOPMENT AND PRELIMINARY STUDIES ONLY AND ARE NOT TO BE USED FOR ANY OTHER PURPOSE, SUCH AS FINAL PLOTTING OR FINAL ENGINEERING. COPYRIGHT WOODLEY ARCHITECTURAL GROUP, INC. THESE DRAWINGS MAY NOT BE USED OR DUPLICATED WITHOUT THE EXPRESS WRITTEN PERMISSION OF WOODLEY ARCHITECTURAL GROUP, INC. 08.22.25 NOTE: SQUARE FOOTAGE MAY VARY BASED ON CALCULATION METHODS CARLSBAD, CALIFORNIA BUILDING 5A (4,3,2,3,4) FIRST FLOOR SCALE: 1/8" = 1'-0" SECOND FLOOR THIRD FLOOR SCALE: 1/8" = 1'-0"SCALE: 1/8" = 1'-0" 0' SCALE: 1/8" = 1' 8' 16' SHEET A1.7 Feb. 18, 2026 Item #1 43 of 61 DS FOYER 9'-0" CLG.HS BED. 29'-0" CLG.CPT. 9'-0" CLG.CPT. COATCLOSET GARAGE 9'-0" CLG.CONC. DS BA. 3 9'-0" CLG.HS METERS TYP. GARAGE NOTE:INDICATES MINIMUM CLEAR UNOBSTRUCTEDGARAGE AREA OF 20'0" X 20'-0" & 7'-0" IN HEIGHT NO AFFIXED OBSTRUCTIONS SUCH AS, BUT NOT LIMITEDTO WATER HEATERS, WASHERS AND DRYERS, SINKS,AND FURNACES SHALL NOT INTRUDE INTO THESEDESIGNATED PARKING AREAS. THE MEASUREMENTSHALL BE FROM THE FACE OF INTERIOR WALLS NOTINCLUDING STRUCTURAL SUPPORT 4-1 DS UTIL. GARAGE 9'-0" CLG.CONC. FOYERH.S. TYP. GARAGE NOTE:INDICATES MINIMUM CLEAR UNOBSTRUCTEDGARAGE AREA OF 20'0" X 20'-0" & 7'-0" IN HEIGHT NO AFFIXED OBSTRUCTIONS SUCH AS, BUT NOT LIMITEDTO WATER HEATERS, WASHERS AND DRYERS, SINKS,AND FURNACES SHALL NOT INTRUDE INTO THESEDESIGNATED PARKING AREAS. THE MEASUREMENTSHALL BE FROM THE FACE OF INTERIOR WALLS NOTINCLUDING STRUCTURAL SUPPORT 1-1 FOYER H.S. DS GARAGE9'-0" CLG.CONC. TYP. GARAGE NOTE:INDICATES MINIMUM CLEAR UNOBSTRUCTEDGARAGE AREA OF 20'0" X 20'-0" & 7'-0" IN HEIGHT NO AFFIXED OBSTRUCTIONS SUCH AS, BUT NOT LIMITEDTO WATER HEATERS, WASHERS AND DRYERS, SINKS,AND FURNACES SHALL NOT INTRUDE INTO THESEDESIGNATED PARKING AREAS. THE MEASUREMENTSHALL BE FROM THE FACE OF INTERIOR WALLS NOTINCLUDING STRUCTURAL SUPPORT 1x-1 7'-9"CLG. FOYEROPEN TO ABV.HS OFFICE /OPT. BED. 49'-0" CLG.CPT. 9'-0" CLG. COATCLOSET 9'-0" CLG.HS HALL BATH1ST FLOOR 8'-3"CLG. GARAGE 9'-0" CLG.CONC. TYP. GARAGE NOTE:INDICATES MINIMUM CLEAR UNOBSTRUCTEDGARAGE AREA OF 20'0" X 20'-0" & 7'-0" IN HEIGHT NO AFFIXED OBSTRUCTIONS SUCH AS, BUT NOT LIMITEDTO WATER HEATERS, WASHERS AND DRYERS, SINKS,AND FURNACES SHALL NOT INTRUDE INTO THESEDESIGNATED PARKING AREAS. THE MEASUREMENTSHALL BE FROM THE FACE OF INTERIOR WALLS NOTINCLUDING STRUCTURAL SUPPORT 2-1 DS FOYER 9'-0" CLG.HS BED. 29'-0" CLG.CPT. 9'-0" CLG.CPT. COATCLOSET GARAGE 9'-0" CLG.CONC. BA. 39'-0" CLG.HS TYP. GARAGE NOTE:INDICATES MINIMUM CLEAR UNOBSTRUCTEDGARAGE AREA OF 20'0" X 20'-0" & 7'-0" IN HEIGHT NO AFFIXED OBSTRUCTIONS SUCH AS, BUT NOT LIMITEDTO WATER HEATERS, WASHERS AND DRYERS, SINKS,AND FURNACES SHALL NOT INTRUDE INTO THESEDESIGNATED PARKING AREAS. THE MEASUREMENTSHALL BE FROM THE FACE OF INTERIOR WALLS NOTINCLUDING STRUCTURAL SUPPORT 3-1 GREATROOM9'-0" CLG.CPT. KITCH. 9'-0" CLG.HS BALCONY 9'-0" CLG. CASUALDINING 9'-0" CLG.CPT. PDR.8'-4" CLG.HS 4-2 BALCONY9'-0" CLG.ELASTOMERIC KITCH. 9'-0" CLG.HSGREATROOM9'-0" CLG.CPT. CASUALDINING9'-0" CLG.CPT. PDR.±10'-10" CLG.HS 1-2 BALCONY9'-0" CLG.ELASTOMERIC KITCH. 9'-0" CLG.HSGREATROOM9'-0" CLG.CPT. CASUALDINING9'-0" CLG.CPT. PDR.±10'-10" CLG.HS 1x-2 GREATROOM9'-0" CLG.CPT. KITCH.9'-0" CLG.HS BALCONY9'-0" CLG.ELASTOMERIC CASUALDINING9'-0" CLG.CPT. PDR. 9'-0" CLG.HS 2-2 GREATROOM9'-0" CLG.CPT. KITCH. 9'-0" CLG.HS BALCONY 9'-0" CLG.ELASTOMERIC CASUALDINING 9'-0" CLG.CPT. PDR.8'-4" CLG.HS 3-2 BED. 4 9'-0" CLG.CPT. BED. 3 9'-0" CLG.CPT. PRIM.SUITE 9'-0" CLG.CPT. LAU 9'-0" CLG.HS PRIM.BA. 9'-0" CLG.HS 9'-0" CLG.HS 9'-0" CLG.CPT. PRIM. SUITECLOSET HALL BA.3RD FLR. 9'-0" CLG.CPT. HALL3RD FLR. 4-3 BED. 2 9'-0" CLG.CPT. PRIM.SUITE 9'-0" CLG.CPT. BED. 3/OPT. LOFT 9'-0" CLG.CPT. PRIM.BA.9'-0" CLG.HS 9'-0" CLG.CPT. HALL3RD FLR. 9'-0" CLG.HS HALL BA.3RD FLR. 9'-0" CLG.CPT. PRIM. SUITECLOSET 1-3 BED. 29'-0" CLG.CPT. PRIM.SUITE9'-0" CLG.CPT. BED. 3/OPT. LOFT 9'-0" CLG.CPT. PRIM.BA.9'-0" CLG.HS 9'-0" CLG.CPT. HALL3RD FLR. 9'-0" CLG.HS HALL BA.3RD FLR. 9'-0" CLG.CPT. PRIM. SUITECLOSET 1x-3 9'-0" CLG.HS BED. 3 9'-0" CLG.CPT. BED. 2 9'-0" CLG.CPT. PRIM.SUITE 9'-0" CLG.CPT. LAU 9'-0" CLG.HS PRIM.BA. 9'-0" CLG.HS 9'-0" CLG.CPT. PRIM. SUITECLOSET HALL BA.3RD FLR. 9'-0" CLG.CPT. HALL3RD FLR. 2-3 BED. 4 9'-0" CLG.CPT. BED. 3 9'-0" CLG.CPT. PRIM.SUITE 9'-0" CLG.CPT. LAU 9'-0" CLG.HS PRIM.BA. 9'-0" CLG.HS 9'-0" CLG.HS 9'-0" CLG.CPT. PRIM. SUITECLOSET HALL BA.3RD FLR. 9'-0" CLG.CPT. HALL3RD FLR. 3-3 BRESSI | TOWNS | TOLL BROTHERS group,incarchitecturalwoodley colorado // 731 southpark dr. suite B littleton, co 80120 / 303 683.7231california // 2943 pullman st. suite A santa ana, ca 92705 / 949 553.8919 THESE DRAWINGS ARE INTENDED FOR DESIGN DEVELOPMENT AND PRELIMINARY STUDIES ONLY AND ARE NOT TO BE USED FOR ANY OTHER PURPOSE, SUCH AS FINAL PLOTTING OR FINAL ENGINEERING. COPYRIGHT WOODLEY ARCHITECTURAL GROUP, INC. THESE DRAWINGS MAY NOT BE USED OR DUPLICATED WITHOUT THE EXPRESS WRITTEN PERMISSION OF WOODLEY ARCHITECTURAL GROUP, INC. 08.22.25 NOTE: SQUARE FOOTAGE MAY VARY BASED ON CALCULATION METHODS CARLSBAD, CALIFORNIA BUILDING 5B (1,1x,2,3,4) FIRST FLOOR SCALE: 1/8" = 1'-0" SECOND FLOOR THIRD FLOOR SCALE: 1/8" = 1'-0"SCALE: 1/8" = 1'-0" 0' SCALE: 1/8" = 1' 8' 16' SHEET A1.8 Feb. 18, 2026 Item #1 44 of 61 DS UTIL. GARAGE FOYER TYP. GARAGE NOTE: INDICATES MINIMUM CLEAR UNOBSTRUCTED GARAGE AREA OF 20'0" X 20'-0" & 7'-0" IN HEIGHT NO AFFIXED OBSTRUCTIONS SUCH AS, BUT NOT LIMITED TO WATER HEATERS, WASHERS AND DRYERS, SINKS, AND FURNACES SHALL NOT INTRUDE INTO THESE DESIGNATED PARKING AREAS. THE MEASUREMENT SHALL BE FROM THE FACE OF INTERIOR WALLS NOT INCLUDING STRUCTURAL SUPPORT 26 ' - 4 " 28'-412" BALCONY KITCH. GREATROOM CASUALDINING PDR. 26 ' - 4 " 31'-0" 7'-8" x 11'-11" BED. 2PRIM.SUITE BED. 3/OPT. LOFT PRIM.BA. HALL3RD FLR. HALL BA.3RD FLR. PRIM. SUITECLOSET 26 ' - 4 " 31'-0" BRESSI | TOWNS | TOLL BROTHERS group,incarchitecturalwoodley colorado // 731 southpark dr. suite B littleton, co 80120 / 303 683.7231california // 2943 pullman st. suite A santa ana, ca 92705 / 949 553.8919 THESE DRAWINGS ARE INTENDED FOR DESIGN DEVELOPMENT AND PRELIMINARY STUDIES ONLY AND ARE NOT TO BE USED FOR ANY OTHER PURPOSE, SUCH AS FINAL PLOTTING OR FINAL ENGINEERING. COPYRIGHT WOODLEY ARCHITECTURAL GROUP, INC. THESE DRAWINGS MAY NOT BE USED OR DUPLICATED WITHOUT THE EXPRESS WRITTEN PERMISSION OF WOODLEY ARCHITECTURAL GROUP, INC. 08.22.25 NOTE: SQUARE FOOTAGE MAY VARY BASED ON CALCULATION METHODS CARLSBAD, CALIFORNIA SCALE: 1/4" = 1' 0'4'8' PLAN ONE FLOOR PLANS FIRST FLOOR SCALE: 1/4" = 1'-0"SECOND FLOORTHIRD FLOOR SCALE: 1/4" = 1'-0"SCALE: 1/4" = 1'-0" PLAN ONE 3 BEDROOM 2.5 BATHROOM FIRST FLOOR SECOND FLOOR THIRD FLOOR TOTAL CONDITIONED GARAGE+UTILITY PATIO BALCONY 136 SQ. FT. 633 SQ. FT. 706 SQ. FT. 1475 SQ. FT. 588 SQ. FT. 12 SQ. FT. 96 SQ. FT. FIRST FLOOR SECOND FLOOR THIRD FLOOR 724 SQ. FT. 633 SQ. FT. (87.4%) 706 SQ. FT. (97.5%) SHEET A1.9 Feb. 18, 2026 Item #1 45 of 61 FOYER DS GARAGE TYP. GARAGE NOTE: INDICATES MINIMUM CLEAR UNOBSTRUCTED GARAGE AREA OF 20'0" X 20'-0" & 7'-0" IN HEIGHT NO AFFIXED OBSTRUCTIONS SUCH AS, BUT NOT LIMITED TO WATER HEATERS, WASHERS AND DRYERS, SINKS, AND FURNACES SHALL NOT INTRUDE INTO THESE DESIGNATED PARKING AREAS. THE MEASUREMENT SHALL BE FROM THE FACE OF INTERIOR WALLS NOT INCLUDING STRUCTURAL SUPPORT 26 ' - 4 " 27'-8" 1' - 5 12" BALCONY KITCH. GREATROOM CASUALDINING PDR. 26 ' - 4 " 31'-0" 7'-8" x 11'-11" BED. 2PRIM.SUITE BED. 3/OPT. LOFT PRIM.BA. HALL 3RD FLR. HALL BA.3RD FLR. PRIM. SUITE CLOSET 26 ' - 4 " 31'-0" BRESSI | TOWNS | TOLL BROTHERS group,incarchitecturalwoodley colorado // 731 southpark dr. suite B littleton, co 80120 / 303 683.7231california // 2943 pullman st. suite A santa ana, ca 92705 / 949 553.8919 THESE DRAWINGS ARE INTENDED FOR DESIGN DEVELOPMENT AND PRELIMINARY STUDIES ONLY AND ARE NOT TO BE USED FOR ANY OTHER PURPOSE, SUCH AS FINAL PLOTTING OR FINAL ENGINEERING. COPYRIGHT WOODLEY ARCHITECTURAL GROUP, INC. THESE DRAWINGS MAY NOT BE USED OR DUPLICATED WITHOUT THE EXPRESS WRITTEN PERMISSION OF WOODLEY ARCHITECTURAL GROUP, INC. 08.22.25 NOTE: SQUARE FOOTAGE MAY VARY BASED ON CALCULATION METHODS CARLSBAD, CALIFORNIA SCALE: 1/4" = 1' 0'4'8' PLAN ONEx FLOOR PLANS FIRST FLOOR SCALE: 1/4" = 1'-0"SECOND FLOORTHIRD FLOOR SCALE: 1/4" = 1'-0"SCALE: 1/4" = 1'-0" PLAN ONEX 3 BEDROOM 2.5 BATHROOM FIRST FLOOR SECOND FLOOR THIRD FLOOR TOTAL CONDITIONED GARAGE PATIO BALCONY 136 SQ. FT. 633 SQ. FT. 706 SQ. FT. 1475 SQ. FT. 588 SQ. FT. 12 SQ. FT. 91 SQ. FT. FIRST FLOOR SECOND FLOOR THIRD FLOOR 724 SQ. FT. 633 SQ. FT. (87.4%) 706 SQ. FT. (97.5%) SHEET A1.10 Feb. 18, 2026 Item #1 46 of 61 DS FOYER OFFICE /OPT. BED. 4 COAT CLOSET HALL BATH1ST FLOOR GARAGE DS TYP. GARAGE NOTE: INDICATES MINIMUM CLEAR UNOBSTRUCTED GARAGE AREA OF 20'0" X 20'-0" & 7'-0" IN HEIGHT NO AFFIXED OBSTRUCTIONS SUCH AS, BUT NOT LIMITED TO WATER HEATERS, WASHERS AND DRYERS, SINKS,AND FURNACES SHALL NOT INTRUDE INTO THESE DESIGNATED PARKING AREAS. THE MEASUREMENT SHALL BE FROM THE FACE OF INTERIOR WALLS NOT INCLUDING STRUCTURAL SUPPORT 49 ' - 1 0 12" 21'-0" GREATROOM KITCH. BALCONY CASUALDINING PDR. 49 ' - 9 " 21'-0" 10'-3" x 8'-10" BED. 3BED. 2 PRIM.SUITE LAU PRIM.BA. PRIM. SUITECLOSET HALL BA. 3RD FLR. HALL3RD FLR. 43 ' - 5 " 21'-0" BRESSI | TOWNS | TOLL BROTHERS group,incarchitecturalwoodley colorado // 731 southpark dr. suite B littleton, co 80120 / 303 683.7231 california // 2943 pullman st. suite A santa ana, ca 92705 / 949 553.8919 THESE DRAWINGS ARE INTENDED FOR DESIGN DEVELOPMENT AND PRELIMINARY STUDIES ONLY AND ARE NOT TO BE USED FOR ANY OTHER PURPOSE, SUCH AS FINAL PLOTTING OR FINAL ENGINEERING. COPYRIGHT WOODLEY ARCHITECTURAL GROUP, INC. THESE DRAWINGS MAY NOT BE USED OR DUPLICATED WITHOUT THE EXPRESS WRITTEN PERMISSION OF WOODLEY ARCHITECTURAL GROUP, INC. 08.22.25 NOTE: SQUARE FOOTAGE MAY VARY BASED ON CALCULATION METHODS CARLSBAD, CALIFORNIA SCALE: 1/4" = 1' 0'4'8' PLAN 2 FLOOR PLANS FIRST FLOOR SCALE: 1/4" = 1'-0"SECOND FLOORTHIRD FLOOR SCALE: 1/4" = 1'-0"SCALE: 1/4" = 1'-0" PLAN 2 3 BEDROOM 3.5 BATHROOM FIRST FLOOR SECOND FLOOR THIRD FLOOR TOTAL CONDITIONED GARAGE PATIO BALCONY 506 SQ. FT. 742 SQ. FT. 823 SQ. FT. 2071 SQ. FT. 502 SQ. FT. 5 SQ. FT. 93 SQ. FT. FIRST FLOOR SECOND FLOOR THIRD FLOOR 1008 SQ. FT. 742 SQ. FT. (73.6%) 823 SQ. FT. (81.6%) SHEET A1.11 Feb. 18, 2026 Item #1 47 of 61 SHEET DS FOYER BED. 2 COATCLOSET GARAGE BA. 3 TYP. GARAGE NOTE: INDICATES MINIMUM CLEAR UNOBSTRUCTED GARAGE AREA OF 20'0" X 20'-0" & 7'-0" IN HEIGHT NO AFFIXED OBSTRUCTIONS SUCH AS, BUT NOT LIMITED TO WATER HEATERS, WASHERS AND DRYERS, SINKS, AND FURNACES SHALL NOT INTRUDE INTO THESE DESIGNATED PARKING AREAS. THE MEASUREMENT SHALL BE FROM THE FACE OF INTERIOR WALLS NOT INCLUDING STRUCTURAL SUPPORT 51 ' - 4 " 21'-012" GREATROOM KITCH. BALCONY CASUALDINING PDR. 51 ' - 4 " 21'-012" 17'-3" x 10'-10" BED. 4BED. 3 PRIM.SUITE LAU PRIM.BA. PRIM. SUITECLOSET HALL BA.3RD FLR. HALL 3RD FLR. 47 ' - 3 12" 21'-012" BRESSI | TOWNS | TOLL BROTHERS group,incarchitecturalwoodley colorado // 731 southpark dr. suite B littleton, co 80120 / 303 683.7231 california // 2943 pullman st. suite A santa ana, ca 92705 / 949 553.8919 THESE DRAWINGS ARE INTENDED FOR DESIGN DEVELOPMENT AND PRELIMINARY STUDIES ONLY AND ARE NOT TO BE USED FOR ANY OTHER PURPOSE, SUCH AS FINAL PLOTTING OR FINAL ENGINEERING. COPYRIGHT WOODLEY ARCHITECTURAL GROUP, INC. THESE DRAWINGS MAY NOT BE USED OR DUPLICATED WITHOUT THE EXPRESS WRITTEN PERMISSION OF WOODLEY ARCHITECTURAL GROUP, INC. 08.22.25 NOTE: SQUARE FOOTAGE MAY VARY BASED ON CALCULATION METHODS CARLSBAD, CALIFORNIA SCALE: 1/4" = 1' 0'4'8' PLAN THREE FLOOR PLANS FIRST FLOOR SCALE: 1/4" = 1'-0"SECOND FLOORTHIRD FLOOR SCALE: 1/4" = 1'-0"SCALE: 1/4" = 1'-0" PLAN THREE 4 BEDROOM 3.5 BATHROOM FIRST FLOOR SECOND FLOOR THIRD FLOOR 1001 SQ. FT. 796 SQ. FT. (79.5%) 863 SQ. FT. (86.2%) FIRST FLOOR SECOND FLOOR THIRD FLOOR TOTAL CONDITIONED GARAGE PATIO BALCONY 573 SQ. FT. 796 SQ. FT. 863 SQ. FT. 2232 SQ. FT. 428 SQ. FT. 29 SQ. FT. 187 SQ. FT. A1.12 Feb. 18, 2026 Item #1 48 of 61 SHEET DS FOYER BED. 2 COATCLOSET GARAGE DS BA. 3 METERS TYP. GARAGE NOTE: INDICATES MINIMUM CLEAR UNOBSTRUCTED GARAGE AREA OF 20'0" X 20'-0" & 7'-0" IN HEIGHT NO AFFIXED OBSTRUCTIONS SUCH AS, BUT NOT LIMITED TO WATER HEATERS, WASHERS AND DRYERS, SINKS, AND FURNACES SHALL NOT INTRUDE INTO THESE DESIGNATED PARKING AREAS. THE MEASUREMENT SHALL BE FROM THE FACE OF INTERIOR WALLS NOT INCLUDING STRUCTURAL SUPPORT 49 ' - 1 0 " 21'-012" GREATROOM KITCH. BALCONY CASUALDINING PDR. 52 ' - 4 " 21'-012" 17'-5" x 11'-2" BED. 4BED. 3 PRIM.SUITE LAU PRIM.BA. PRIM. SUITECLOSET HALL BA.3RD FLR. HALL 3RD FLR. 52 ' - 4 " 21'-012" BRESSI | TOWNS | TOLL BROTHERS group,incarchitecturalwoodley colorado // 731 southpark dr. suite B littleton, co 80120 / 303 683.7231 california // 2943 pullman st. suite A santa ana, ca 92705 / 949 553.8919 THESE DRAWINGS ARE INTENDED FOR DESIGN DEVELOPMENT AND PRELIMINARY STUDIES ONLY AND ARE NOT TO BE USED FOR ANY OTHER PURPOSE, SUCH AS FINAL PLOTTING OR FINAL ENGINEERING. COPYRIGHT WOODLEY ARCHITECTURAL GROUP, INC. THESE DRAWINGS MAY NOT BE USED OR DUPLICATED WITHOUT THE EXPRESS WRITTEN PERMISSION OF WOODLEY ARCHITECTURAL GROUP, INC. 08.22.25 NOTE: SQUARE FOOTAGE MAY VARY BASED ON CALCULATION METHODS CARLSBAD, CALIFORNIA SCALE: 1/4" = 1' 0'4'8' PLAN FOUR FLOOR PLANS FIRST FLOOR SCALE: 1/4" = 1'-0"SECOND FLOORTHIRD FLOOR SCALE: 1/4" = 1'-0"SCALE: 1/4" = 1'-0" PLAN FOUR 4 BEDROOM 3.5 BATHROOM FIRST FLOOR SECOND FLOOR THIRD FLOOR 1001 SQ. FT. 796 SQ. FT. (79.5%) 863 SQ. FT. (86.2%) FIRST FLOOR SECOND FLOOR THIRD FLOOR TOTAL CONDITIONED GARAGE PATIO BALCONY 573 SQ. FT. 796 SQ. FT. 863 SQ. FT. 2232 SQ. FT. 428 SQ. FT. 29 SQ. FT. 187 SQ. FT. A1.13 Feb. 18, 2026 Item #1 49 of 61 SHEET BRESSI | TOWNS | TOLL BROTHERS group,incarchitecturalwoodley colorado // 731 southpark dr. suite B littleton, co 80120 / 303 683.7231 california // 2943 pullman st. suite A santa ana, ca 92705 / 949 553.8919 THESE DRAWINGS ARE INTENDED FOR DESIGN DEVELOPMENT AND PRELIMINARY STUDIES ONLY AND ARE NOT TO BE USED FOR ANY OTHER PURPOSE, SUCH AS FINAL PLOTTING OR FINAL ENGINEERING. COPYRIGHT WOODLEY ARCHITECTURAL GROUP, INC. THESE DRAWINGS MAY NOT BE USED OR DUPLICATED WITHOUT THE EXPRESS WRITTEN PERMISSION OF WOODLEY ARCHITECTURAL GROUP, INC. 08.22.25 NOTE: SQUARE FOOTAGE MAY VARY BASED ON CALCULATION METHODS CARLSBAD, CALIFORNIA ROOF PLANS ROOF PLAN - 5A ROOF PLAN - 5B SCALE: 1/8" = 1'-0" SCALE: 1/8" = 1'-0" 0' SCALE: 1/8" = 1' 8' 16' A1.14 Feb. 18, 2026 Item #1 50 of 61 LEGEND Project Entry - Refer to Enlargement Sheet L-2 Primary Open Space - Refer to Sheet L-3 Secondary Open Space - Refer to Sheet L-2 Typical Paseo and Alley - Refer to Sheet L-4 Emergency Rear Access Gate Bike Racks Community Mailboxes Typical ADA Ramp at Paseo Entry Parking Stalls with Striping Stormwater Basin Transformers per Civil Engineer Existing Offsite Street Trees to Remain 1 6 11 11 11 7 99 9 9 9 12 12 8 2 2 3 3 4 4 4 5 5 6 7 8 11 9 12 10 10 1 ALECANTE ROAD GA T E W A Y R O A D TO W N G A R D E N R O A D 09.08.25 CARLSBAD, CALIFORNIA L-1 BRESSI RANCH - Collaborative 0 15’ 30’ 60’ Scale: 1”= 30’-0”CONCEPTUAL SITE PLAN Feb. 18, 2026 Item #1 51 of 61 ELEVATION A SCALE: 3/16”=1’-0” ELEVATION B SCALE: 3/16”=1’-0” LEGEND Enhanced Vehicular Paving Entry Median with Callbox Project ID Wall Vehicular Entry Gate and Entry Block Wall Pedestrian Entry Gate Perimeter Wall/Fence Accent Tree Row Open Lawn Area Community Seating Area Focal Entry Tree KEYMAP A B 1 13 3 2 101045 7 4 56 6 2 2 3 4 5 6 77 7 8 8 9 9 10 10 10 10 GA T E W A Y R O A D 09.08.25 CARLSBAD, CALIFORNIA L-2 BRESSI RANCH - Collaborative 0 5’ 10’ 20’ Scale: 1”= 10’-0”ENTRY ENLARGEMENT PLAN & ELEVATIONS Feb. 18, 2026 Item #1 52 of 61 KEYMAP LEGEND Open Lawn Area Accent Tree Row Shade Structure with Seating Built-in Barbecue Botanical Garden with Bench Seating D.G. Pathway Center Plaza with Enhanced Paving and Lounge Seating Community Mailboxes Bike Racks Parking Stalls with Striping Focal Canopy Tree Private Patio at Unit Entry per Architect Transformer 1 1 2 2 2 3 3 4 4 5 56 7 6 7 8 8 11 11 11 9 9 12 12 10 10 13 13 09.08.25 CARLSBAD, CALIFORNIA L-3 BRESSI RANCH - Collaborative OPEN SPACE ENLARGEMENT PLAN 0 5’ 10’ 20’ Scale: 1”= 10’-0” Feb. 18, 2026 Item #1 53 of 61 1 7 2 3 8 KEYMAP LEGEND Pedestrian Walk (4’ Width Typical) Typical ADA Ramp at Paseo Entry Concrete Driveway Accent Street Tree Private Patio at Unit Entry per Architect Paseo Canopy Tree Retaining Wall with Guardrail Accent Shrub in Garage Pocket Planter 1 2 3 44 5 5 6 6 7 8 09.08.25 CARLSBAD, CALIFORNIA L-4 BRESSI RANCH - Collaborative TYPICAL PASEO & ALLEY ENLARGEMENT PLAN 0 5’ 10’ 20’ Scale: 1”= 10’-0” Feb. 18, 2026 Item #1 54 of 61 LEGEND 3,990 SF COMMON OPEN SPACE TOTAL: 18,625 SF 166 SF PER UNIT (18,625/112 UNITS) 14,635 SF ALECANTE ROAD GA T E W A Y R O A D TO W N G A R D E N R O A D 09.08.25 CARLSBAD, CALIFORNIA L-5 BRESSI RANCH - Collaborative CONCEPTUAL OPEN SPACE EXHIBIT 0 15’ 30’ 60’ Scale: 1”= 30’-0” Feb. 18, 2026 Item #1 55 of 61 Entry Block Wall - 7’ ht. Perimeter Block Wall - 6’ ht. Tubular Steel Perimeter Fence - 6’ ht. Retaining Block Wall - Height Varies per Civil Retaining MSE Wall - Height Varies per Civil Tubular Steel Guardrail - 3’-6” ht. Project ID Wall - 3’ ht. Vehicular Entry Gate Pedestrian Entry Gate Rear Emergency Access Gate LEGEND ALECANTE ROAD GA T E W A Y R O A D TO W N G A R D E N R O A D 09.08.25 CARLSBAD, CALIFORNIA L-6 BRESSI RANCH - Collaborative CONCEPTUAL WALL AND FENCE PLAN 0 15’ 30’ 60’ Scale: 1”= 30’-0” Feb. 18, 2026 Item #1 56 of 61 ALECANTE ROAD GA T E W A Y R O A D LEGEND Low Water Use - 58,115 SF Medium Water Use - 16,090 SF High Water Use - 2,950 SF TO W N G A R D E N R O A D P-25(C) Page 1 of 4 Revised 3/22 Development Services Planning Division 1635 Faraday Avenue (442) 339-2610 www.carlsbadca.gov WELO WORKSHEETS LANDSCAPE MANUAL APPENDIX F P-25(C) WATER EFFICIENT LANDSCAPE WORKSHEET This worksheet is filled out by the project applicant and it is a required element of the Landscape Documentation Package. HYDROZONE INFORMATION TABLE Please complete the hydrozone table(s) for each hydrozone. Use as many tables as necessary to provide the square footage of landscape area per hydrozone. * Hydrozone VLW - Very Low Water Use Plants LW - Low Water Use Plants MW - Moderate Water Use Plants HW - High Water Use Plants **Irrigation Method MS = Micro-spray S = Spray R = Rotor RO - Rotator B= Bubbler D= Drip O = Other ***Plant Factor from WUCOLS III or list as water feature as appropriate Controller # Hydrozone* Zone or Valve Irrigation Method** Plant Type/Factor*** (PF) Hydrozone Area (Sq. Ft.) % of Total Landscaped Area Total 100% 111 LowModHigh (Turf) --- DripDripSpray .3.5.8 58,11516,0902,950 75.420.83.8 P-25(C) Page 2 of 4 Revised 10/21 MAXIMUM APPLIED WATER ALLOWANCE A landscape project subject to the Water Efficient Landscape Ordinance shall include the MAWA for the plans, including the calculations used to determine the MAWA. A landscape project shall not exceed the MAWA. The MAWA for a landscape project shall be determined by the following equations: Residential: MAWA = (ETo)(0.62)[(0.55 x LA) + (0.45 x SLA)] Commercial/Industrial: MAWA = (ETo)(0.62)[(0.45 x LA) + (0.55 x SLA)] The abbreviations used in the equation have the following meanings: MAWA Maximum Applied Water Allowance in gallons per year. ETo Evapotranspiration in inches per year. 0.62 Conversion factor to gallons per square foot. 0.55/.045 (x LA) ET adjustment factor (ETAF) for plant factors and irrigation efficiency. LA Landscaped area includes special landscaped area in square feet. 0.45/0.55 (x SLA) The additional ET adjustment factor for a special landscaped area (eg, 1.0 - 0.55 = 0.45). SLA Special landscaped area in square feet. Show Calculation: MAXIMUM APPLIED WATER ALLOWANCE = ______________________ GALLONS PER YEAR 1,236,555 P-25(C) Page 3 of 4 Revised 10/21 ESTIMATED TOTAL WATER USE A landscape project subject to the Water Efficient Landscape Ordinance shall include the ETWU for the plans, including the calculations used to determine the ETWU. The ETWU for a proposed project shall not exceed the MAWA. The following equation shall be used to calculate the ETWU for each landscaped area and the entire project: The abbreviations used in the equation have the following meanings: ETWU Estimated total water use in gallons per year. ETo Evapotranspiration in inches per year. 0.62 Conversion factor to gallons per square foot. PF Plant factor from WUCOLS III HA Hydrozone Area in square feet. Each HA shall be classified based upon the data included in the landscape and irrigation plan as high, moderate, low, or very low water use. IE Irrigation Efficiency of the irrigation method used in the hydrozone. SLA Special landscaped area in square feet. Please use the following “Hydrozone Table for Calculating ETWU” form to document the calculation.   +=SLAIE HAxPFEToETWU)62.0)(( P-25(C) Page 4 of 4 Revised 10/21 Hydrozone Table for Calculating ETWU Please complete the hydrozone table(s). Use as many tables as necessary. CITY OF CARLSBAD ESTIMATED TOTAL WATER USE (ETWU) Hydrozone Number (1 – 5 with SLA Zone Below – use as many tables as necessary to complete all hydrozones) Process Step No. (Below) 1 2 3 4 5 SLA Evapotranspiration Rate (ETo)* 1 Conversion Factor 2 0.62 (Step 1 x Step 2) 3 Plant Factor (PF)** (From WUCOLS) (VLW – HW) (0.1 - 0.8) 4 Area of Hydrozone (sq. ft.) (HA) 5 (Step 4 x Step 5) 6 Irrigation Efficiency (IE)*** 7 (Step 6 ÷ Step 7) 8 (Total All Step 8 + Total SLA sq. ft. in Step 5) 9 (Step 3 x Step 9) Estimated Total Water Use in gallons per year (ETWU) - Total shall not exceed MAWA 10 ETo* West of I-5 = 40.0 East of I-5 and West of El Camino Real = 44.0 East of El Camino Real = 47.0 Applicant may provide a different ETo if supported by documentation subject to approval by the City Planning Division ***IE Micro-spray = .80 Spray = .55 Rotor = .70 Bubbler = .75 Drip = .80 Applicant may provide a different IE if supported by documentation subject to approval by the City Planning Division (Turf and Landscape Irrigation Best Management Practices, April 2005) ** Plant Factor & Water Use 0.1 = VLW - Very Low Water Use Plants 0.3 = LW - Low Water Use Plants 0.5 = MW - Moderate Water Use Plants 0.8 = HW - High Water Use Plants 47 29.14 0.3 0.5 0.8 58,115 16,090 2,950 17,435 8,045 2,360 0.8 0.8 0.55 21,794 10,056 4,290 36,140 1,053,120 09.08.25 CARLSBAD, CALIFORNIA L-7 BRESSI RANCH - Collaborative MWELO CALCULATIONS 0 15’ 30’ 60’ Scale: 1”= 30’-0” Feb. 18, 2026 Item #1 57 of 61 TREES: FOCAL ENTRY TREE ACCENT ROW TREE SLOPE/BASIN/STREET TREE PASEO TREE EXISTING STREE TREE Agonis flexuosa Peppermint Tree 36” Box L Albrizia julibrissin Silk Tree 36” Box L Ficus rubignosa Rusty Leaf Fig 36” Box M Grevillea robusta Silk Oak 36” Box L Magnolia grandiflora Southern Magnolia 36” Box M Olea europaea (Fruitless) Olive Field Dug L Parkinsonia ‘Desert Museum’ Desert Museum Palo Verde 36” Box VL Pinus pinea Italian Stone Pine 36” Box L Pinus torreyana Torrey Pine 36” Box L Pistacia chinensis Chinses Pistache 36” Box M Platanus acerfolia London Plane Tree 36” Box M Platanus racemosa Western Sycamore 36” Box M Prosopis ssp. Mesquite 36” Box VL Quercus ssp. Oak 36” Box L/M Tipuana tipu Tipu Tree 36” Box M Ulmus parvifolia Chinese Elm 36” Box M Acer ssp. Maple 36” Box M Lagerstroemia spp. Crape Myrtle 24” Box L Liquidamber styraciflua Sweet Gum 36” Box M Liriodendon tulipifera Tulip Tree 36” Box M Magnolia grandiflora Southern Magnolia 36” Box M Olea europaea (Fruitless) Olive 36” Box L Pistacia chinensis Chinese Pistache 36” Box L Platanus x acerfolia ‘Columbia’ London Plane Tree 36” Box M Podocarpus gracilior African Fern Pine 36” Box M Prunus ssp. Cherry Plum 24” Box L/M Quercus ssp. Oak 36” Box L/M Araucaria heterophylla Norfolk Island Pine 24” Box M Arbutus unedo Strawberry Tree 36” Box L Bauhinia x blakeana Hong King Orchid Tree 36” Box M Callistemon ssp. Bottle Brush 24” Low L Cassia leptophylla Gold Medallion Tree 24” Box L Ginkgo biloba Maidenhair Tree 36” Box M Jacaranda mimosifolia Jacaranda 24” Box L Lagerstroenia ssp. Crape Myrtle 36” Box L Laurus nobilis Bay Laurel 24” Box L Lyanthothamnus ssp. Ironwood 24” Box L Pinus canariensis Canary Island Pine 24” Box L Pinus halepensis Aleppo pine 24” Box L Platanus racemosa Western Sycamore 24” Box L Podocarpus gracilior African Fern Pine 36” Box M Quercus ssp. Oak 36” Box LV Rhus lancea African Sumac 36” Box L Schinus molle Pepper Tree 24” Box L Arbutus ‘Marina’ Marina Strawberry Tree 36” Box L Cercis canadensis Eastern Redbud 24” Box M Lagerstroemia spp. Crape Myrtle 24” Box L Laurus nobilis Bay Laurel 24” Box L Melalueca leucadendra Weeping Paperbark 24” Box L Pinus halepensis Aleppo pine 24” Box L Tristania conferta Brisbane Box 24” Box M *Protect in Place SYMBOL SCIENTIFIC NAME COMMON NAME SIZE WUC. SHRUB AND GROUNDCOVER: Acacia redolens Prostrate Acacia 1 gal. VL Achillea millefolium Yarrow 1 gal. Agave spp. Agave 5 gal. VL Aloe spp. Aloe 5 gal. L Alogyne huegelli Blue Hibiscus 15 gal. L Arctostaphylos spp. Manzanita 5 gal. L Artemisia ssp. Sagebrush 1 gal. L Asparagus densiflorus Asparagus Fern 5 gal. M Berberis aquifolium ‘Compacta’ Oregon Grape 15 gal. L Bulbine frutescens Stalked Bulbine 1 gal. L Buxus japonica ‘Green Beauty’ Japanese Boxwood 5 gal. M Callistemon spp. Bottle Brush 5 gal. L Carex tumulicola Foothill Sedge 1 gal. L Ceanothus ssp. Wild Lilac 1 gal. L Chondropetalum tectorum Small Cape Rush 5 gal. L Cistus ‘Sunset’ Magenta Rockrose 5 gal. L Crassula spp. Jade Plant 5 gal. L Dasylirion ssp. Desert Spoom 5 gal. VL Dianella ssp. Flax Lily 5 gal. L Dietes bicolor Fortnight Lily 5 gal. L Erigeron x moerheimii Santa Barbara Daisy 1 gal. M Festuca californica ssp. California Fescue 1 gal. L Hesperaloe spp. Yucca 5 gal. L Heteromeles arbutifolia Toyon 15 gal. VL Ilex spp. Holly 5 gal. M Juncus patens California Gray Rush 5 gal. M Lavandula ssp. Lavender 5 gal. L Leymus condensatus ‘Canyon Prince’ Wild Rye 5 gal. L Ligustrum japonicum ‘Texanum’ Waxleaf Privet 5 gal. L Lomandra spp. Dwarf Mat Rush 5 gal. L Muhlenbergia rigens Deer Grass 1 gal. L Myoporum p. ‘Putah Creek’ Creeping Myoporum 1 gal. L Myrtus communis Common Myrtle 5 gal. L Olea europaea ‘Montra’ Little Ollie Dwarf Olive 5 gal. VL Phormium spp. New Zealand Flax 15 gal. L Prunus caroliniana ‘Bright n Tight’ Bright N Tight Carolina Laurel 15 gal. L Rhaphiolepis spp. Indian Hawthorn 5 gal. L Ribes speciosum Fuchsia Flowering Gooseberry 5 gal. VL Rosmarinus officinalis Rosemary 5 gal. L Rosa ssp. Rose 5 gal. M Salvia ssp. Sage 5 gal. L Trachelospermum asiaticum Asian Star Jasmine 1 gal. M Westringia spp. Coast Rosemary 5 gal. L SCIENTIFIC NAME COMMON NAME SIZE WUC. VINES AND ESPALIERS: Bougainvillea spp. Bougainvillea 15 gal. L Calliandra haematocephala Pink Powderpuff 15 gal. M Distictis ssp. Trumpet Vine 5 gal. M Eriobotrya deflexa Bronze Loquat 15 gal. M Jasminum polyanthum White jasmine 5 gal. M Lonicera japonica Japanese Honeysuckle 5 gal. M Macfadyena unguis-cati Cat’s claw 5 gal. L Magnolia grandiflora ‘Little Gem’ Little Gem Magnolia 15 gal. M Trachelospermum jasmnoides Star Jasmine 15 gal. M Rosa banksiae Lady Banks Rose 15 gal. L Vitis ssp. Roger’s Red California Grape 1 gal. L/M SCIENTIFIC NAME COMMON NAME SIZE WUC. ALECANTE ROAD GA T E W A Y R O A D TO W N G A R D E N R O A D 09.08.25 CARLSBAD, CALIFORNIA L-8 BRESSI RANCH - Collaborative PLANT PALETTE 0 20’ 40’ 80’ Scale: 1”= 40’-0” Feb. 18, 2026 Item #1 58 of 61 AeccD b F e a t u r e L i n e ( A e c c L a n d 1 2 0 ) AeccDbFeatureLine (AeccLand120) AeccDbFeatureLine (AeccLand120)AeccD b G r a d i n g ( A e c c L a n d 1 2 0 ) 3 4 8 9 10 11 12 14 15 16 17 18 20 21 22 23 24 25 27 28 29 30 31 1 2 19 M 26 13 5 EV 6 EV 7 EV 5' 98'-3" 26' 28 ' 13 8 ' - 9 " MANUAL GATE TO BE MINIMUM OF 2' WIDER THAN THE ROADWAY (1-FOOT ON EACH SIDE) TO W N G A R D E N RO A D GA T E W A Y R O A D ALICANTE ROAD EXISTING PARKING GARAGE EXISTING OPEN SPACE EXISTING OFFICEBUILDING 4' MAX. RETAINING WALL 5' MAX. RETAINING WALL 4.5' MAX. RETAINING WALL6.5' MAX. RETAINING WALL 6' MAX. RETAINING WALL 3' MAX. RETAINING WALL 28' 26' 28 ' 26' 26' 26' 2 6 ' 26' 5'5' 25 ' - 3 " 25'-6" 2 0 ' 26' RETAINING WALL R38' R 3 8 ' R17' R 3 8 ' R17' R38 ' R17' R38' R1 7 ' R 3 8 ' R 1 7 ' R 3 8 ' R 1 7 ' ZONE 0 LIMITS 5' 5' 30 ' 5' R17' 30 ' 25' 5' 30 ' 30'25' 100'-6" MOTORIZED VEHICULAR GATES SHALL BE MINIMUM OF 2' WIDER THAN THE ROADWAY (1-FOOT ON EACH SIDE) 5 EV 6 EV 7 EV 3 4 1 2 TOLL BROTHERS - BRESSI RANCHPRELIMINARY FIRE ACCESS & DEFENSIBLE SPACE EXHIBIT SHEET 1 OF 1DATE: 09/23/2025 PLANS PREPARED BY: 28506 AIROSO STREET RANCHO MISSION VIEJO, CA 92694 (949) 240-5911 0 GRAPHIC SCALE 1 inch = ft. 30'60' 30 INDICATES FIRE APPARATUS TURNING RADII: 24' WIDE PATH WITH 17' INSIDE AND 38' OUTSIDER=17 ' R=38 ' 24' PROPOSED PAVED ROADWAY MEETING CITY OF CARLSBAD FIRE DEPARTMENT REQUIREMENTS 150' HOSE PULL DISTANCE PROPOSED PUBLIC FIRE HYDRANT INDICATES PROPOSED BUILDING ENVELOPE. ALL BUILDING WITHIN THE PROJECT SITE SHALL MEET THE CALIFORNIA RESIDENTIAL CODE SECTION R337. LEGEND CITY OF CARLSBAD FIRE DEPARTMENT NOTES INDICATES FIRE DEPARTMENTTURNAROUND PER CITY OF CARLSBADFIRE DEPARTMENT GUIDELINES AUTOTURN TEMPLATE LEGEND INDICATES TRAILER-DRAWN AERIAL TRUCK INDICATES LIMITS OF APPARATUS FRAME/BODY INDICATES EXTERIOR LIMITS OF APPARATUS FRONT TIRES INDICATES EXTERIOR LIMITS OF APPARATUS REAR TIRES :40.0Steering Angle 8.00' (96")6.0::WidthLock to Lock Time APPARATUS DATA FOR AUTOTURN PATH ANALYSIS 61.04' (732.50") 6.75'(81")14.58' (175")28.42' (341")11.29'(135.50") DEFENSIBLE SPACE ZONE 1:FIRST 30' FROM THE STRUCTURE SHALL CONSIST OF IRRIGATED LANDSCAPE, WITH PLANT SPACINGAND PLANT SPECIES RESTRICTIONS PER THE 2025 CALIFORNIA WILDLAND-URBAN INTERFACE CODE,AS LOCALLY ADOPTED, AND THE CARLSBAD FIRE DEPARTMENT REQUIREMENTS. DEFENSIBLE SPACE ZONE 0:FIRST 5' FROM THE STRUCTURE SHALL CONSIST OF NO COMBUSTIBLE MATERIAL / HARDSCAPE PERTHE 2025 CALIFORNIA WILAND-URBAN INTERFACE CODE, AS LOCALLY ADOPTED, AND THE CARLSBADFIRE DEPARTMENT REQUIREMENTS. 0 GRAPHIC SCALE 1 inch = ft. 20'40' 20 0 GRAPHIC SCALE 1 inch = ft. 20'40' 20 AUTOTURN ENLARGEMENT AT ENTRY AUTOTURN ENLARGEMENT AT TURNAROUND DEFENSIBLE SPACE ZONE 2:MAXIMUM OF 70' FROM ZONE 1, ZONE 2 SHALL MEET PLANT SPACING AND PLANT SPECIESRESTRICTIONS PER THE 2025 CALIFORNIA WILDLAND-URBAN INTERFACE CODE, AS LOCALLYADOPTED, AND THE CARLSBAD FIRE DEPARTMENT REQUIREMENTS. 1.THIS PROJECT FALLS WITHIN A VERY HIGH FIRE HAZARD SEVERITY ZONE (VHFHSZ) AS ADOPTED BYTHE CITY OF CARLSBAD. 2.ALL STRUCTURES SHALL COMPLY WITH THE CONSTRUCTION REQUIREMENTS PER CHAPTER 5 OFTHE 2025 CALIFORNIA WILDLAND-URBAN INTERFACE CODE. 3.ALL PLANTING WITHIN 100' OF THE STRUCTURES, OR TO THE PROJECT BOUNDARY, SHALL COMPLYWITH THE DEFENSIBLE SPACE ZONES PER THE 2025 CALIFORNIA WILAND-URBAN INTERFACE CODE. 4.LADDER PAD LOCATIONS, AS REQUIRED BY CARLSBAD FIRE DEPARTMENT, FOR SECONDARY EGRESSLOCATIONS FROM SLEEPING AREAS ON THE 2ND AND 3RD LEVELS SHALL BE DEMONSTRATED ON AFIRE MASTER PLAN AS A DEFERRED SUBMITTAL. 12'25'33' 25 ' 40 ' Feb. 18, 2026 Item #1 59 of 61 CAT V TEL CAT V TEL CAT V TEL CATV TEL CAT V TEL TEL CATV GATEWAY RD TOWN GARDEN RD AL I C A N T E R D GATEWAY RD TOWN GARDEN RD INGELTON AVE AL V E R T O N D R DISCOVERY RD AL V E R T O N D R AL I C A N T E R D EL C A M I N O R E A L EL C A M I N O R E A L TOW N G A R D E N R D HA L I T E P L ARUNDIE AVE DOGWOOD RD AL I C A N T E R D TO P I A R Y S T PROJECT LOCATION S:\ M o r r o w C A D \ C l i e n t D r a w i n g s \ T o l l B r o t h e r s \ T O L 1 3 5 B r e s s i R a n c h - C a r l s b a d \ M o r r o w - C A D \ T O L B r e s s i R a n c h M a s t e r C o m p o s i t e . d w g - 1 T h u , 2 1 A u g 2 0 2 5 - 8 : 2 9 a m S:\ M o r r o w C A D \ C l i e n t D r a w i n g s \ T o l l B r o t h e r s \ T O L 1 3 5 B r e s s i R a n c h - C a r l s b a d \ M o r r o w - C A D \ T O L B r e s s i R a n c h M a s t e r C o m p o s i t e . d w g - 1 T h u , 2 1 A u g 2 0 2 5 - 8 : 2 9 a m CAUTION: IF THIS SHEET IS NOT 24X36 IT IS A REDUCED PRINT GENERAL NOTES: 1.DRY UTILITY COMPOSITE EXHIBIT IS FOR DESIGN STUDY AND CONFLICT CHECK ONLY. UTILITIES SHOULD NOT BE INSTALLED BASED ON THIS EXHIBIT. REFER TO RESPECTIVE UTILITY FINAL DESIGN(S) FOR SPECIFIC INSTALLATION REQUIREMENTS 2. CONTRACTOR SHALL BE RESPONSIBLE FOR INSTALLATION OF EACH DRY UTILITY SYSTEM IN ACCORDANCE WITH EACH DRY UTILITY AGENCY'S CURRENT SPECIFICATIONS, POLICIES AND PRACTICES OF WHICH THE CONTRACTOR IS TO BE THOROUGHLY FAMILIAR. 3. LOCATIONS OF EXISTING DRY UTILITIES ARE BASED UPON UTILITY MAPS, AS-BUILTS AND FIELD OBSERVATIONS. POT HOLING IS RECOMMENDED TO VERIFY LOCATION OF ANY EXISTING FACILITIES. TV GRADE 18" NATIVE SOILBACKFILL 12" SAND IMPORT TELEPHONE & CATVCONDUITS ℄ 18" T 12" SAND IMPORT E 3" SAND IMPORT ELECTRIC CONDUITS TV 18" 12" 12" TYPICAL JOINT TRENCH PROFILE JOINT TRENCH IS TWO OR MORE UTILITIES WHICH ARE LISTED BELOW (Electric, Telephone, CATV & Gas) 18" WIDE* JOINT TRENCH WIDTH AND DEPTH MAY VARY* JOINT TRENCH WILL INCLUDE A MINIMUM OF TWO UTILITIES BUT MAY NOT INCLUDE ALL FOUR SEE UTILITY DESIGN FOR SPECIFIC DETAIL ofSCALE: 1' = 40" TV GRADE 18" NATIVE SOILBACKFILL 6" SAND IMPORT COMMUNICATION CONDUITS COMMUNICATION TRENCH PROFILE (Telephone, CATV) 18" WIDE ℄ 18" T 3" SAND IMPORT TV GRADE 18" NATIVE SOIL BACKFILL ELECTRIC TRENCH PROFILE (ELECTRIC) 18" WIDE ℄ 18" 12" SAND IMPORT E 3" SAND IMPORTELECTRIC CONDUIT DRAWING HISTORY JOB NO. SHEET BYDESCRIPTION DATE 1130 Via Callejon San Clemente, CA 92673 949.218.8500 CREATED REVISIONS STATUS DATE DR A W N / P M : SCALE FORPREPARED BY PROJECT Pro p e r t y o f M o r r o w M a n a g e m e n t - S a n C l e m e n t e , C A PRELIMINARY 6 KHLLW Update 08/21/2025 5 EC 03/17/2025Added Comm LW 4 Transformers shifted per conflicts MM 02/11/2025 1 EC 12/17/2024Base Update OCINITITAL EXHIBIT 09/23/2025 VER.05Bressi Ranch DU Composite Exhibit Toll Brothers12/03/2024 KH L / F H TOL135 1' = 40" EC 2 12/19/2024LW Update 3 AL 01/30/2025Base Update 1 1 PL LEGEND SDGE 3314 PULL BOX CHARTER PULL BOX (2'x3') AT&T PULL BOX (2'x3') 3425 P P S SSSSS SDGE 3425 TRANSFORMER (78"x59") JOINT TRENCH ELECTRIC CONDUIT COMMUNICATIONS CONDUIT WORKING CLEARANCE TEL CATV EX. CHARTER PEDESTAL P/U POINT EX. AT&T CMPH P/U POINT Feb. 18, 2026 Item #1 60 of 61 Feb. 18, 2026 Item #1 61 of 61 6155 El Camino Real Carlsbad, CA 92009, USA Tel: (760) 795-6245 February 10, 2026 City of Carlsbad Mayor and City Council 1200 Carlsbad Village Drive Carlsbad, CA 92008 RE: Bressi Ranch Town Home Development, Lots 7-9, Carlsbad, CA Dear Mayor Blackburn and City Council Members: I am writing this letter to express our support for the change in zoning required at Bressi Ranch Lots 7-9 to allow for residential development. Viasat is a global communications company with ~1,600 staff in the Carlsbad area. As we continue to grow our business in Carlsbad, we see the benefits of having high-quality housing in immediate proximity to our campus as critical to our ability to attract new employees. Carlsbad is a great city, and we are proud to be a part of it. This project will provide homes for employees to live and enjoy life near their work, and as such we strongly support the project. Sincerely, Sincerely, Gary Dorris Director of Real Estate (760) 795-6245 Gary.Dorris@viasat.com 6155 El Camino Real Carlsbad, CA 92009, USA Tel: (760) 795-6245 February 10, 2026 City of Carlsbad Mayor and City Council 1200 Carlsbad Village Drive Carlsbad, CA 92008 RE: Bressi Ranch Town Home Development, Lots 7-9, Carlsbad, CA Dear Mayor Blackburn and City Council Members: I am writing this letter to express our support for the change in zoning required at Bressi Ranch Lots 7-9 to allow for residential development. Viasat is a global communications company with ~1,600 staff in the Carlsbad area. As we continue to grow our business in Carlsbad, we see the benefits of having high-quality housing in immediate proximity to our campus as critical to our ability to attract new employees. Carlsbad is a great city, and we are proud to be a part of it. This project will provide homes for employees to live and enjoy life near their work, and as such we strongly support the project. Sincerely, Sincerely, Gary Dorris Director of Real Estate (760)795-6245Gary.Dorris@viasat.com Item #1 - Correspondence Received by Feb. 13, 2026 at 3 p.m 1 Eric Lardy From:Conrad Grell <conradgrell@gmail.com> Sent:Friday, February 13, 2026 4:37 PM To:Planning Subject:GPA2025-0001 General Plan Amendment for Parcel Number 213601200 on Gateway Rd and Alicante Rd Decision Makers: This correspondence is with regard to GPA2025-0001…, the ApplicaƟon for Amendment to Parcel 213601200, to rezone it from Commercial to ResidenƟal and to approve building of 111 Town Homes on it. We received NoƟce on February 12, 2026. My wife and I strongly oppose this proposed re-zoning as well as the building of 3-story townhomes in this locaƟon, for several reasons as listed below. Thus, we urge you to take OpƟon Two and Deny this Amendment, and/or any proposal to build high-density residenƟal buildings on this parcel. Our posiƟon on this issue: Item #1 - Correspondence Received by Feb 17, 2026 at 10am 1. We purchased our home over twenty years ago with the knowledge that the Parcel being considered here was zoned as commercial. We preferred it that way because we anƟcipated that would to keep the density of housing low. We feel that by changing this zoning, the City of Carlsbad would be going back on their word and not respecƟng the trust we have had in the City Leaders. 2. Street traffic load would go up steeply. Related: Not too long ago, the City decided to implement chicanes on Gateway Road North of this Parcel (without our request for approval, by the way). Presumably, the purpose of these was to slow traffic in that area and/or to thwart racing. But the result has been that most traffic now chooses to drive on Town Garden Road in order to get to Bressi Town Center. This has created dangerous condiƟons for the residents and kids here who use the Bressi playground and park area adjoining Town Garden Road. The housing use proposed here would only make that traffic orders of magnitude worse. Also, the intersecƟon of Alicante and Town Garden Road would be mandated to be modified as well, something that is already too busy; it would become a blight on the neighborhood. 3. Fire danger will go up dangerously! We had a close call not too many years ago with wildfire coming up the canyon that borders on the south of this parcel. Building codes for commercial buildings, parƟcularly the materials used (eg- concrete, metal, gypsum, etc.), as opposed to the materials allowed for ResidenƟal (eg- wood framing) were instrumental in prevenƟng this fire from propagaƟng into our residenƟal area. Placing a Ɵnderbox of wood-framed 3- story townhomes right in the path is a recipe for disaster, not unlike the path of recent fires in Palisades in Los Angeles. This will be a major liability for the City of Carlsbad if these townhomes are constructed, parƟcularly if Bressi Ranch residents suffer damage to their homes and property as a result of a Carlsbad City decision to rezone Parcel 213601200 as ResidenƟal. 4. Commercial buildings in the area are mostly limited to two stories. The proposed 3-story structures will be unsightly and not in harmony with the appearance of the rest of the community. 5. We anƟcipate that the strain on electrical, water, and sewer uƟliƟes would be much greater with so many homes added to the grid. The area is relaƟvely new and the uƟliƟes were intended for Commercial/Light Industry loads, AS PLANNED, at relaƟvely low density. To now drop in 111 or more ResidenƟal homes in such a small parcel will require 2 Thank you for the NoƟce, and for seriously considering our comments herein. In closing, we hope you gather from our comments: WE DON’T WANT 111 TOWNHOMES in this locaƟon. Again, we urge you strongly to follow OpƟon Two. Sincerely, Conrad Grell Judi Lesight 2554 Town Garden Road CAUTION: Do not open aƩachments or click on links unless you recognize the sender and know the content is safe. serious infrastructure rework, at great cost (likely borne by Bressi taxpayers) and will cause reliability problems for Bressi Ranch residents. February 14, 2026 Members of the Planning Commission City of Carlsbad 1200 Carlsbad Village Drive Carlsbad, CA 92008 RE: Agenda Item 1, Toll Brothers Bressi Ranch Residential Development Dear Planning Commissioners: On behalf of the Building Industry Association of San Diego County (BIA), we write in support of the proposed Toll Brothers and Levine Investments residential development in the Bressi Ranch area that would deliver 111 attached townhomes to the City of Carlsbad. San Diego County continues to face a significant housing shortage across all income levels. Cities throughout the region are being called upon to thoughtfully adapt their land use policies to better respond to evolving housing needs. Projects that convert underutilized commercial or industrially designated properties into well-designed residential communities represent an important tool in addressing this imbalance. The proposed project reflects this type of thoughtful adaptation. By transitioning a previously graded and infrastructure-served site from office/industrial to residential use, the development would introduce much- needed for-sale housing in a location that already benefits from surrounding public improvements. Importantly, technical analyses indicate that a residential use would generate fewer daily vehicle trips than the site’s prior office/industrial zoning, helping align housing production with regional vehicle miles traveled (VMT) reduction goals. The project also proposes compliance with the City’s inclusionary housing requirements, contributing to Carlsbad’s affordable housing objectives while expanding homeownership opportunities. Developments of this scale and type provide attainable housing options for working families who seek to live near employment centers, schools, and community amenities. As cities work to implement their Housing Elements and respond to state housing mandates, flexibility in land use planning is essential. The BIA respectfully encourages the City to continue supporting well- planned residential projects that help close the region’s housing gap while meeting local development standards. Expanding housing supply in communities like Carlsbad is critical to maintaining economic vitality and providing opportunities for current and future residents. Sincerely, Aimee Faucett President & CEO Building Industry Association of San Diego County Equitable Land Use Alliance 300 Carlsbad Village Dr, PMB 108A-79 Carlsbad, CA 92008 February 16, 2026 Re: February 18, 2026 Planning Commission Agenda Item #1: Request to change Planned Industrial area to R-23 Residential at Bressi Ranch Planning Commission: This item will decide your recommendation to the City Council regarding allowing further processing of a request by Toll Brothers to amend the General Plan and Bressi Ranch Master Plan, changing the designation of a parcel from Planned Industrial to R-23 Residential. Equitable Land Use Alliance (ELUA) urges you to support Option #2: ADOPT Planning Commission Resolution RECOMMENDING DENIAL of the project application. Original mixed-use plan compromised Bressi Ranch is a unique, carefully planned mixed-use community with intended walkability between jobs and community facilities. From the Master Plan: “A primary goal of the Bressi Ranch Master Plan is to create a pedestrian oriented community where the use of the automobile can be minimized. The Master Plan has a strong mixed-use component that includes residential, commercial and office/industrial uses in close proximity.” Replacing the originally planned industrial use with residential compromises the Master Plan, including the ability of residents to walk to jobs. Related to that, it is ELUA’s understanding that this parcel has been vacant for many years due to an “option” held by ViaSat that was only recently vacated. Thus, alternative light industrial uses consistent with the Master Plan should be explored for this site before conversion to residential, which could be a premature bait-and- switch. Concerns about future increases in density with concessions and waivers State density bonus and related laws are now routinely exploited by developers to achieve multiple concessions and unlimited waivers of development standards, allowing projects to avoid city-imposed density limits, height limits, massing standards, minimum setbacks, minimum parking requirements, other development standards, etc., and they can lead to unfunded infrastructure mandates. All of this can negatively affect the surrounding community and city. Although the staff report indicates a currently proposed housing density of 15.8 du/ac, the applicant is seeking a much higher R-23 designation for unknown reasons, rather than the more Equitable Land Use Alliance 2 applicable R-15 designation suggested by staff. Presumably, any designation change in the General Plan to R-15 for the site would be linked to the currently proposed project that does not include avoidance of city regulations. However, it is unclear whether the applicant could get the site re-designated as R-15 with the current project, but then later amend their application or submit a new application to exploit the state density bonus and related laws. The safest approach is to recommend denial of this application. That said, any recommendation to further its processing should come with an airtight guarantee that no density higher than R- 15, nor any concessions or waivers, can or will ever be pursued for the re-designated site, and that fair shares of necessary infrastructure upgrades will be fully funded by the developer. Vehicle Miles Traveled (VMT) impacts The very last page of the staff report for this project is a crude VMT assessment, claiming that the project will not have a significant environmental impact related to VMT due solely to its proposed 15.8 du/ac density. This "residential density" VMT subtraction is based on the assumption that people who live in higher-density projects take shorter and fewer trips and are more likely to use alternative modes of travel than other residents in the area. However, there is zero plausible evidence that this would be the case with these townhomes, relative to the surrounding community. If the application proceeds forward, this VMT subtraction should be rejected and the project required to implement alternative measures with meaningful chances of success. Conclusion Again, ELUA urges you to recommend DENIAL of this application. More time should be provided to explore the current industrial use. In addition, there should be a recommendation that, if the application is remanded back to staff for further processing, there needs to be guarantees that the applicant will not seek any higher densities, concessions or waivers, or other ways to avoid mitigating its impacts, including infrastructure and VMT. Please also listen to residents who live in the surrounding community who would be affected by the project. Thank you for your time and consideration of this important matter, ELUA Board of Directors • Steve Linke, PhD • Kris Wright • Diane Bedrosian, MD The Equitable Land Use Alliance is a nonpartisan nonprofit group based in Carlsbad, CA. We are dedicated to educating, engaging, and empowering residents to take part in housing policy decisions. Our mission is to support community self-determination and encourage thoughtful, sustainable development. Eric Lardy, Assistant Director of Community Development Feb. 18, 2026 Toll Brothers Bressi Ranch GPA2025-0001 / AMEND2025-0003 / CT2025-0006 / PUD2025-0006 PROCEDURES FOR PUBLIC HEARINGS 1.Public Hearing opened 2.Staff Presentation 3.Planning Commission questions on staff presentation 4.Applicant presentation 5.Public testimony opened 6.Input from public 7.Applicant response (if necessary) 8.Public testimony closed 9.Planning Commission discussion 10.Planning Commission vote 11.Public hearing closed 2 •April 2021 – Housing Element Approved •January 2024 – Rezoning Program (Housing Element) Approved •July 2025 – City Council Meeting •Two-step Screening Process Established ITEM 1 – Toll Brothers Bressi Ranch City Council Direction on General Plan Amendments 30-day Completeness Review SCREENING Application Submitted Planning Commission Recommend City Council Decision 12-24 Months Developing Full Application Materials CEQA Evaluation Project Specific Design Screening Hearings Option 1: Remand to Staff For Processing Applicant will be required to complete Enhanced Stakeholder Outreach Planning Commission Recommend City Council Decision on GPA Final Decision Project Does Not Move Forward Option 2: Denial of GPA ITEM 1 – Toll Brothers Bressi Ranch Project Site: •Vacant Lot •Between Gateway, Alicante, and Town Garden Roads •7.02-acres •Proposing Approximately 111 Townhome (for sale) units ITEM 1 – Toll Brothers Bressi Ranch Existing General Plan (Planned Industrial)Proposed General Plan (R-23 Units/Acre - ) •Applicant Requested a General Plan Amendment •Screening based on General Plan – Not Project Merits •Merits need to be discussed at a future hearing ITEM 1 – Toll Brothers Bressi Ranch Recommended Considerations for Planning Commission •Two Resident Comments Attached (Exhibit 6) •Five Comments since posting ITEM 1 – Toll Brothers Bressi Ranch Public Comment ITEM 1 – Toll Brothers Bressi Ranch California Environmental Quality Act (CEQA) •Option 1: Remand to Staff: Not a project under CEQA •Option 2: Recommend Denial Two Options: 1) ADOPT Planning Commission Resolution RECOMMENDING that the City Council remand the project application back to city staff for further processing (Exhibit 1) 2) ADOPT Planning Commission Resolution RECOMMENDING DENIAL of the project application (Exhibit 2) ITEM 1 – Toll Brothers Bressi Ranch Eric Lardy, Assistant Director of Community Development Feb. 18, 2026 Toll Brothers Bressi Ranch GPA2025-0001 / AMEND2025-0003 / CT2025-0006 / PUD2025-0006 ITEM 1 – Toll Brothers Bressi Ranch Icon style ITEM 1 – Toll Brothers Bressi Ranch Existing General Plan (Planned Industrial)Proposed General Plan (R-23 Units/Acre) Subject Site (105 units) 49 units 199 units Page Break: Update to Old RHNA Tables Cumulative Progress Toward Meeting 6th Cycle RHNA Income level RHNA Annual Rate (8 yrs) Building Permits Issued June 30, 2020 – April 29, 2021 Building Permits Issued April 30, 2021 – Dec. 31 2021 Building Permits Issued 2022 Building Permits Issued 2023 Building Permits Issued 2024 Building Permits Issued 2025 Total Remaining RHNA* Very Low 1,311 163.88 46 1 0 44 3 20 114 1,197 Low 784 98.00 7 2 0 158 14 19 200 584 Moderate 749 93.63 55 37 82 94 51 0 319 430 Above Moderate 1,029 128.63 86 9 43 344 221 417 1,120 0** Total 3,873 484.14 194 49 125 640 289 532 1,829 2,044 General Plan & Housing Element Annual Progress Report 2024 21 * Based on Production Only. Requirement is to maintain capacity for remaining RHNA. ** RHNA Production for Above Moderate Met Income group AMI Family of Four Density Extremely Low <30% AMI <$49,600 26.5 du/ac Very Low 30-50% AMI $49,601 – $82,700 26.5 du/ac Low 50-80% AMI $82,699- $132,399 26.5 du/ac Moderate 80-120% AMI $132,400 - $156,949- 11.5 du/ac Above Moderate >120% AMI >$156,950 <11.5 du/ac “du/ac” = dwelling units per acre 22 The 2025 area median income (AMI) for a family of four is $130,800. Lower Moderate Above Moderate Total RHNA 2,095 749 1,029 3,873 Buffer Amount +1,561 +845 +1,985 +4,391 Bressi Ranch Gateway Rd Industrial Site (assumed in Housing Element)199 0 0 199 Bressi Ranch Gateway Rd Industrial Site (current planned unit mix)48 0 272 320 Net Change to Buffer -151 0 +272 +121 Sunny Creek (assumed in Housing Element)124 88 0 212 Sunny Creek (current planned unit mix)42 0 170 212 Net Change to Buffer -82 -88 +170 0 Remaining Buffer After Pending Projects +1,328 +757 +2,427 +4,512 5th Cycle RHNA vs. 6th Cycle RHNA 5th Housing Cycle (2013 - 2021) Income Category Allocation Permits Issued (2013-2021)% Above Moderate 2,332 3,302 142% Moderate 1,062 420 40% Low 693 295 43% Very Low 912 92 10% Total 4,999 6th Housing Cycle (2021 - 2029) Income Category Allocation Permits Issued (2021-2025)% Above Moderate 1,029 929 90% Moderate 749 395 53% Low 784 200 26% Very Low 1,311 114 9% Total 3,873 24 General Plan & Housing Element Annual Progress Report 2025 25 26 Page Break: Airport Maps Subject Site (falls within Safety Zone 3 and Safety Zone 6) Pink (Safety Zone 3) •Residential Density > 16 units per acre is incompatible •Residential Density < 4 units per acre is compatible •Maximum density of 120 people per acre Yellow (Safety Zone 6) •Any residential density is compatible •No density limit for people per acre Subject Site (does not fall within Noise Contours) Subject Site (falls within Overflight Notification Area) Subject Site (falls within Airport Influence Area – Review Area 1) Subject Site (falls within Light Industry Planned Land Use) •Construct 5 New Structures •26 Three and Four Story Apts •SDBL Density Bonus: 6 Additional Units •1 Concessions / 4 Waivers per SDBL •Grading and Site Improvements ITEM 1 – Toll Brothers Bressi Ranch •Construct 5 New Structures •26 Three and Four Story Apts •SDBL Density Bonus: 6 Additional Units •1 Concessions / 4 Waivers per SDBL •Grading and Site Improvements ITEM 1 – Toll Brothers Bressi Ranch Bressi Ranch Presented by: Eric Everhart APPLICANT SLIDES BRESSI RANCH | CARLSBAD, CA Toll Brothers is an award-winning Fortune 500 company. As America’s luxury home builder, we build more than homes, we build lasting communities. Trusted since 1967, Toll Brothers embraces an unwavering commitment to quality and customer service. Each Toll Brothers home blends quality materials with superior design to create a dream home that is uniquely the homeowner’s. BRESSI RANCH | CARLSBAD, CA Site Location Al i c a n t e R d Town Garden Rd Gateway Rd Al v e r t o n D r Discovery Rd Ingleton Ave Arundel Ave To p i a r y S t Li s m o r e P l In n o v a t i o n W a y BRESSI RANCH | CARLSBAD, CA Tentative Tract Map BRESSI RANCH | CARLSBAD, CA Site Plan TO W N GA R D E N RO A D 10 BRESSI RANCH | CARLSBAD, CA Parking and Access TO W N G A R D E N R O A D ALICANTE ROAD GA T E W A Y R O A D UNIT TYPE NUMBER OF BEDROOMS NUMBER OF UNITS COVEREDPARKING UNCOVEREDPARKING GUESTPARKING EVPARKING PLAN 1 3 11 222 12 30 8 PLAN 1X 3 11 PLAN 2 3 24 PLAN 3 4 34 PLAN 4 4 31 TOTALS 111 BRESSI RANCH | CARLSBAD, CA Fire Access & Defensible Space Fire Dept. Turnaround LEGEND DEFENSIBLE SPACE ZONE 0 DEFENSIBLE SPACE ZONE 1 PROPOSED PAVED ROADWAY PROPOSED BUILDING ENVELOPE DEFENSIBLE SPACE ZONE 2 PROPOSED PUBLIC FIRE HYDRANT 150’ FIRE HOSE PULL DISTANCE Fire Dept. Turnaround BRESSI RANCH | CARLSBAD, CA Floor Plans – Building 5A SECOND FLOOR FIRST FLOOR THIRD FLOOR BRESSI RANCH | CARLSBAD, CA Elevations – Building 5B FRONT ELEVATION BRESSI RANCH | CARLSBAD, CA Elevations – Building 5B REAR ELEVATION BRESSI RANCH | CARLSBAD, CA Elevations – Building 5B RIGHT ELEVATION LEFT ELEVATION BRESSI RANCH | CARLSBAD, CA Entry Plan & Elevations BRESSI RANCH | CARLSBAD, CA Open Space Enlargement Plan BRESSI RANCH | CARLSBAD, CA Paseo & Alley Plan BRESSI RANCH | CARLSBAD, CA Common Open Space LEGEND Common Open Space TOTAL: 18,626 SF 166 SF per unit BRESSI RANCH | CARLSBAD, CA Walls & Fences TO W N G A R D E N R O A D BRESSI RANCH | CARLSBAD, CA MWELO Water Use BRESSI RANCH | CARLSBAD, CA Planting Palette Alternative Development Proposals for the Site BRESSI RANCH | CARLSBAD, CA Other Land Use Proposals BRESSI RANCH | CARLSBAD, CA Other Land Use Proposals BRESSI RANCH | CARLSBAD, CA Other Land Use Proposals BRESSI RANCH | CARLSBAD, CA Other Land Use Proposals BRESSI RANCH | CARLSBAD, CA Bressi Ranch Thank you LEVINE INVESTMENTS & BRESSI RANCH Presented by: Phone Number:Andrew Cohn (602)248-8181 A brief history of Levine’s legacy and Viasat’s Tenancy APPLICANT SLIDES Viasat - Phase 1 Buildings 1-4 & Café / Conference Location Building Square Footage Land Area Phase 1 - 02/27/2000 247,390 13 Acres Total 247,390 13 Acres Viasat - Phase 1 Buildings 1-4 & Café / Conference Viasat - Phase 2 (VACANT) Buildings 10 & 11 Location Building Square Footage Land Area Phase 1 - 02/27/2000 247,390 13 Acres Phase 2 - 04/15/2016 143,100 10 Acres Total 390,490 23 Acres Viasat - Phase 1 Buildings 1-4 & Café / Conference Viasat - Phase 3 Buildings 12, 13, Café / Conference Room & P1 Location Building Square Footage Land Area Phase 1 - 02/27/2000 247,390 13 Acres Phase 2 - 04/15/2016 143,100 10 Acres Phase 3 - 03/01/2017 196,045 5.40 Acres Total 586,535 28.40 Acres Viasat - Phase 2 (VACANT) Buildings 10 & 11 Viasat - Phase 1 Buildings 1-4 & Café / Conference Viasat - Phase 3 Buildings 12, 13, Café / Conference Room & P1 Viasat - Phase 4 Buildings 14, 15 & P2 Location Building Square Footage Land Area Phase 1 - 02/27/2000 247,390 13 Acres Phase 2 - 04/15/2016 143,100 10 Acres Phase 3 - 03/01/2017 196,045 5.40 Acres Phase 4 - 03/01/2017 173,637 7.31 Acres Total 760,172 35.71 Acres Viasat - Phase 2 (VACANT) Buildings 10 & 11 Viasat - Phase 1 Buildings 1-4 & Café / Conference Viasat - Phase 3 Buildings 12, 13, Café / Conference Room & P1 Viasat - Phase 4 Buildings 14, 15 & P2 Phase 5 Buildings 16, 17 & P3 Location Building Square Footage Land Area Phase 1 - 02/27/2000 247,390 13 Acres Phase 2 - 04/15/2016 143,100 10 Acres Phase 3 - 03/01/2017 196,045 5.40 Acres Phase 4 - 03/01/2017 173,637 7.31 Acres Phase 5 -7.02 Acres Total 760,172 42.73 Acres Viasat - Phase 2 (VACANT) Buildings 10 & 11 Viasat - Phase 1 Buildings 1-4 & Café / Conference Viasat - Phase 3 Buildings 12, 13, Café / Conference Room & P1 Viasat - Phase 4 Buildings 14, 15 & P2 Location Building Square Footage Land Area Phase 1 - 02/27/2000 247,390 13 Acres Phase 2 - 04/15/2016 143,100 10 Acres Phase 3 - 03/01/2017 196,045 5.40 Acres Phase 4 - 03/01/2017 173,637 7.31 Acres Phase 5 -7.02 Acres Total 760,172 42.73 Acres Viasat - Phase 2 (VACANT) Buildings 10 & 11 Toll Brothers Bressi Ranch Please rezone! PUBULIC COMENT RESIDENT DAVID PIERCE Perfect Location Work and Live in the Same City Close to Jobs & Necessities Southeast Access = Nicer Walk Long & Loud Walk to TJ’s without Second Gate Short & Shady Walk to TJ’s with Second Gate