Loading...
HomeMy WebLinkAbout1973-11-27; Planning Commission; ; EIR 219|EIR 220|ZC 131|ZC 132|SP 141|SP 146 - MARRON ROAD AND EL CAMINO REAL CASESCITY OF CARLSBAD PLANNING DEPARTMENT STAFF REPORT FOR NOVEMBER 2?, 1973 CASE NOS: APPLICANTSi TO: PLANNING COMMISSION. REPORT ON: - CONSIDERATION OF EIR CONSIDERATION OF CHANGE OF ZONES CONSIDERATION OF SPECIFIC PLAN EIR-219 & 220 ZC-131 ZC-132 SP-141 SP-146 R. LADWIG FOR KELLY-KURLANDER, et al &'0. E. VANDERBURG . 509 Elm Avenue • . Carlsbad, California I. GENERAL INFORMATION A. Request; These cases cover a total parcel containing approximately 29.28 acres located at the northeast corner of the intersection of Marron Road and El Camino Real. Due to the multiplicity of ownerships, separate cases were submitted and are broken down as follows: ZC-131 and SP-141 deal with a 2.83 acre parcel that is located at the southeast corner of the intersection of Osuna Drive and El Camino Real. Zfr-132 and SP—146' deal with a 26.45 acre parcel located at the northeast '-' corner of the intersection of Osuna Drive andEl Camino Real. 1. On EIR-219 & 220; That the Planning Commission recommend to the City Council that a final EIR be accepted on the total property. 2. On ZC-131 & SP-141: That the Planning Commission recommend to the City Council a change of zone from R-l-10 (single family - 10,000 sq.ft. lots man.) to C-2 (General Commercial) and approve a specific plan for development of a portion of a shopping center on a portion of Lot 4» Section 32, Township 11 South, Range 4 West, San Bernardino Meridian, City of Carlsbad. 3. On ZC-132 & SP-146; That the Planning Commission recommend to the City Council a change of zone from R-l-10 (single family - 10,000 sq.ft. lots man.) and a specific plan for development of a major portion of a shopping center on a portion of Lots 4 & 5t Section 32, Township 11 South, Range 4 West, San Bernardino Meridian, City of Carlsbad. B. Background; The subject property, containing a total of 29.28 acres, easterly of and adjacent to El Camino Real between Marron Road .and Haymar Drive except for two service station sites located at the intersections. Said property extends easterly to the approximate intersection of Avenida De Anita (entrance road to the Tanglewood Project) and Marron Road. The two service station sites that are.exluded from this development are zoned C-2 & C-l with specific plans. The site at the intersection of Haymar Drive and El Camino Real does include a temporary bank facility. C. Zoning and General Plan; . • • • • 1. Zoning; Existing: R-l-10 Proposed: C-2 (S.P.) Adjacent: North - R-l-10 East - R-l-10 & P-C South - P-C & R-l-10 West - C-2 & C-l 2. General Plan; The land element of the General Plan does"not really provide for a land 'use designation for property north of Marron Road in this area. This may have resulted from the fact that in the middle 60's this area was in dispute as to whether it would fall into the jurisdiction of Oceanside or Carlsbad. In addition, this area is within the Buena Vista Creek Flood Plain and perhaps the feeling was that development would not occur. Since no designation is shown, any ultimate approval would not be in conflict with the General Plan and such approval would in-essence become the General Plan commitment for the area. II. ENVIRONMENTAL IMPACT REPORT NO. 219-20 A. Summary; The draft Environmental Impact Report was written for both the Kurlander-Kelly and Vanderburg properties. <, Staff has determined that the most important potential impacts of the proposed development are: 1. Traffic and congestion 2. Land use compatability 3. Aesthetics, and 4« Econonu.es/marketing. . B. Acceptability of Draft Report; The Draft Environmental Report for the Kelly-Kurlander and Vanderburg Commercial Site, prepared by Rick Engineering, was accepted by the Planning Director as' a preliminary E.I.R. This report was forwarded to the following agencies for comments: • — 2 - 1. Division of Highways 2. Regional Water Quality Control Board 3« Comprehensive Planning Organization . 4. Department of Public Health 5. San Diego County Sanitation and Flood Control 6. San Diego Regional Coastal Commission 9. School District • 10» City Engineer 11. Intergovernmental Clearing House C. Final Environmental Impact Report; The final Environmental Impact Record vail. include the draft EIR and staff comments below. Rather than repeating information contained in the draft EIR, staff will comment only on those areas which are deficient or need correction. 1. Economic Analysis; Staff feels that an environmental impact report on a project of this nature should necessarily include an economic/ market analysis. Unfortunately, the analysis provided by the applicant is somewhat misleading and . incomplete. • The report estimates generation of 395 new jobs as a result of the project. However, their projection.is based on employees/square feet floor area for regional shopping centers. Staff feels that the comparison of a community shopping facility with a market and drugstore as its major tenants with regional facilities with major department stores is not a valid one. The proposed complex is definitely within the size range (235,000 sq. ft. floor area'; 29.30 acres) of a Community Facility but its tenancy tends more toward the neighborhood center. A potential incongruency is the proposed hotel and motel complex. In addition to being somewhat inconsistent with a supermarket/drugstore complex, there is some doubt as to the market feasibility of a hotel and motel at the proposed site. Site selection for hotel/motel facilities is generally made on one or more of these following criteria: 1. Immediate proximity to a heavily traveled interstate route; 2. Proximity to business, governmental centers; 3« Proximity to recreational facilities and tourist oriented amenities. The proposed site does not fit these criteria. Finally, there is some question as to the support population needed for such a complex. Generally speaking, supermarkets are convenience oriented facilities. Consumers tend to grocery shop at facilities which are near their homes and easily accessible. In this instance, accessibility does not appear to be a problem. However, a shopping complex of these dimensions would necessarily have to serve a maricet population the size of the population of Carlsbad and Vista combined. Staff feels that proximity to El Camino Real Plaza will not have a significant effect on increasing usage oi' the proposed complex, since the consumer does not, as a general rule, combine shopping activities associated with a regional plaza,, with activities associated with more frequent grocery/convenience shopping. - 3 - 2. Alternatives; One alternative not suggested by the applicant would be to scale down the development so that it would serve a more localized market. Such an alternative might eliminate the hotel/motel and reduce total floor space and acreage. 3. Sewer Capability; The draft E.I.R. fails to express the sewer situation in this area. The area is presently served by the main trans- mission sewer trunk that comes from the City o'f Vista down the Buena Vista Creek. The City of Carlsbad did purchase some 1% of the capacity of this trunk line from the City of Vista for the purpose of serving this area. Based upon present flows, no additional capacity is available. Therefore, before any additional development could occur in this area, the City of Carlsbad would' have to obtain additional capacity rights in the existing trunk line or provide an alternative. An attached letter from C.R.W.Q.C.B. speaks of this matter. III. CONSIDERATION OF ZC-131 ' A. Request; That the Planning Commission recommend 'approval to the City Council of a change of zone from R-l-10 to C-2 on a 2.83 acre parcel to permit its development as a "part of a shopping center complex. IV. CONSIDERATION OF ZC-132 A. Request; That the Planning Commission recommend approval to the City Council of a.change of zone from R-l-10 to C-2 on a 26.45 acre parcel to permit its development as a part of a shopping center complex. As a part of this request, the applicant is indicating the approximate 10.0 acre easterly'portion of the subject property to be developed for a Motel, Hotel and Restaurant uses. Due to a proposed terrain change which separates this area from the proposed commercial center and would be more oriented to the residential activity to the east and south, staff would recommend that this area not be considered for commercial zoning. In terms of development, this 10.0 acre parcel would be considered appropriate for residential development •for the following reasons:< 1. Due to terrain, any development could be effectively buffered from the influence of the activity on Route 78. 2. The area is of sufficient size and shape to develop for residential purposes. 3. The resulting approximate 19-28 acre shopping center would be. of sufficient size to adequately serve the existing and proposed residential development in the area. V. CONSIDERATION OF SP-141 A. Request; That the Planning Commission recommend to the City Council that Specific Plan be approved to permit the development of an approximate 2.83 acre portion of the shopping center. The applicant indicates that the approximate 24,OOP cq. it. of groso floor which is to be located in three small buildings c.ould be utilized for such uses as restaurant, small market, -4- liquor storss, shops, offices, etc. The proposed buildings are to be integrated as to design into the total shopping center and in addition, the parking layout is also proposed to be integrated into the remainder of the shopping center. VI. CONSIDERATION OF SP-146 v - A. Request: That the Planning Commission recommend to the City Council that a specific plan be approved to develop the subject approximate 26.45 acres for a shopping center." The applicant indicates that the proposed three buildings containing approximately 128,600 sq. ft. of gross floor area ' would be utilized'for a drugstore, market, hardware store and associated shops such as banks, restaurants, etc. In addition, a major restaurant structure and motel-hotel complex is shown on the easterly approximate 10 acres of the subject property. To develop the property, the applicant indicates that approximately 300,000 yards of dirt would have to be moved. In addition, there is a major drainage pipe feeds into the property which, as a part of development, would have to be extended. Finally, a large portion of the subject property is subject to flooding and protection will have to be provided to mitigate this problem. , . The applicant indicates that a total of approximately 700 parking spaces are proposed. Compliance to ordinance requirements would be dependent upon the ultimate uses. However, the proposed parking does exceed the General Plan recommended ratio of one space for every 400 sq. ft. of gross floor area. ¥ith regard to the precise design of the proposed development, there exists several problems with regard to the type and method of access from the development to El Camino Real. As proposed, the accesses would create several major traffic conflicts which is not considered appropriate. In addition, the resolution of what happens to Osuna Drive will have to occur.. 'VII. STAFF RECOMMENDATIONS ' A. On the EIR; 1. That the Planning Commission move to recommend to the City Council that the Final EIR BE ACCEPTED to include: a. The draft EIR b. Staff comments contained in this report c. Any public input received as a part of the public input held regarding this EIR. Justification is based on: 1. That the Final EIR does comply with the Environmental Protection regulation of the State of California and City of Carlsbad. 2. That the Final EIR does adequately express the effects of the proposed development on the environment. _ 5 — E. On ZC-131: That it be moved that the Planning Commission recommend to the City Council that a change of zone from R-l-10 to C-2 BE APPROVED on the subject property. Justification is based upon: 1. Based upon the study conducted by the city staff and the General Plan consultant, the subject property is considered appropriate for a neighborhood shopping center to serve the area. 2. The subject site of approximately 2.8 acres is of sufficient size and shape to be utilized for ancillary shops and offices. C. On ZC-132; That it be moved that the Planning Commission recommend to the City Council that a change of zone from R-l-10 to C--1 BE APPROVED for an approximate 16.45 acre portion -of the subject property, adjacent to El Camino Real and that the remaining easterly approximate 10 acres remain as R-l-10. Justification is based upon: 1. In conjunction with the property considered under ZC-131, the resulting property, based upon, a -study conducted by the city staff and the City's General Plan consultant, would be of sufficient size and shape to provide a neighborhood commercial facility that would adequately meet the needs for the existing and proposed residential development in the area. 2. The proposed zoning would be compatible to the existing and proposed zoning in the area. . . D. On SP-141 and 146; That it be moved that the Planning Commission recommend to the City Council that SP-141 and 146 be approved subject to the conditions outlined below, with the exception that the easterly approximate 10 acres of the subject property be deleted from this consideration. Justification is based upon: • ' f 1. The approximate 19 acre commercial shopping center is considered to be the optimum size for a neighborhood shopping center._ 2. The proposed specific plan does conform to the approved zoning. 3. A substantial terrain break does occur approximately 369 ft. westerly of the easterly boundary of the subject property which results in some 10 acres which would be oriented away from the activity adjacent to El Camino Real. Said property is considered to be. more appropriate for residential development rather than an expansion of a potential neighborhood shopping center to a size more in the lines of a community shopping center which would more adversely affect the adjacent property. - 6 - E. _Racommended Conditions for SP-1A1 and 146; Any approval of these specific plans should be subject to the following conditions: 1. The Specific Plan is granted for the land described in the application and any attachments thereto, and as shown on the plot plan submitted labeled Exhibit A. The location of all buildings, fences, signs, roadways, parking areas, landscaping, and other facilities or features shall be .located substantially as shown on the plot-plan labeled Exhibit A, except or unless indicated otherwise herein. 2. Prior to the issuance of any permits, a parcel map outlining parcels, shall be submitted to the City of Carlsbad for consideration and approval. 3. Prior to the issuance of any permits, abandonment proceedings shall be completed on Osuna Drive. 4« Prior to the issuance of any permits, a revised specific plan shall be submitted to the Planning Director for consideration and approval showing the following: a. The deletion pf the approximate ten acres located along the easterly boundary of the subject property. b. The revision of the egress and ingress from the subject development to El Camino Real. The major access shall be provided in line with the main entrance from El Camino Real to the existing Plaza Camino Real to the west. All other access points to El Camino Real shall be on .the basis of right turn in and right turn out only. The final circulation design shall be as approved by the City Engineer. c. The relocation of any proposed building areas to accom- modate the final accesses to El Camino Real. 5. Except for approved accesses, all vehicular access rights to public streets should be dedicated to the City of Carlsbad as a part of the consideration of any parcel map. 6. The developer shall be required to install in a manner acceptable to the City Engineer any necessary improvement to provide for protection from potential flooding. » 7. Storm drains shall be constructed in a manner acceptable to the City Engineer in conformance with the City's master drainage plan. 8. Water main shall be extended along. Haymar Drive as required by the City Engineer. 9. No development shall occur until sewer capacity is available in the Vista trunk line or other provision acceptable to the City Engineer is made to provide sewer to the subject property. 10. Upon availability of.sewer capacity, the.developer shall install a sewer line to serve the subject property which shall be compatible with the City's master sewer study for the area and does conform to City Standards. _ 7 ~ 114 Marron Road shall be dedicated and improved to City standards on the basis of an 84 ft. right of way width for the full frontage of the subject property. 12. Haymar Drive shall be dedicated and improved to City standards on the basis of a 64 ft. right of way. 13. The developer shall participate in the construction and/or revision of the traffic signal system on El Camino Real to accommodate the subject development. 14. • Unless the construction of the structure or facility is commenced not later than one year after the date the approval is granted and is diligently pursued thereafter, this approval will automatically become null and void. 15. Any minor change may be approved by the Planning Director. Any substantial change will require the filing of an application for an amendment to be considered by the Planning Commission. 16. All requirements of any law, ordinance or regulation of the State of California, City of Carlsbad, and any other governmental entity shall be complied with. I?. No signs or advertising of any type whatsoever shall be erected or installed until plans therefore have been approved by the City of Carlsbad. Prior to issuance of any permits for signs, a sign program for the total development shall, be submitted to the Planning Commission for consideration and approval. Said sign program shall conform to the City's sign limitations in effect at the time of development. Said develop- ment for sign purpose shall be considered a single development. 18. All areas shown as parking areas shall be surfaced with asphaltic concrete and shall be visibly marked outlining individual parking spaces and traffic flow. Said surfacing and marking shall be completed prior. to final inspection of the structure or structures by the Building Department. The surface shall be kept in a reasonably good state of repair at all times. Parking for the total development shall be provided on the basis of a minute of one parking space for each 100 sq. ft. of gross floor area. 19. Prior to obtaining a building permit and within 30 days hereof, the applicant shall file with the Secretary of the Planning Commission written acceptance of the conditions stated herein. 20. Compliance with and execution of all conditions listed hereon shall be necessary, unless otherwise specified, prior to obtaining a final building inspection clearance. Deviation from this requirement shall be permitted only by written consent of the Planning Director. - 8 - 21. Any mechanical and/or electrical equipment to be located on the roof or the .structure shall be screened in a manner acceptable to the Planning Director. Detailed plans for said screening shall be submitted, in triplicate, to the Planning Director. 22. The lighting of the sign shall be accomplished in such a manner that -there shall be no reflection on adjacent properties or streets which may be considered either objectionable by adjacent property owners or hazardous to motorists. . • 23. An incombustible trash enclosure shall be provided of a size and location acceptable to the Planning Director, and said area shall be enclosed with a fence and/or wall of sufficient height to adequately shield the area. Said fence and/or wall shall include a solid gate. 24. A detailed landscape and sprinkler plan prepared by a landscape architect, shall be submitted to the Planning Director for consideration and approval. Said landscaping shall be provided in the following manner: a. A perimeter planter of a size of 10 ft. wide shall be provided except for approved openings , adjacent to all public streets. b. A minimum of 5% of the total parking access shall be landscaped. Said areas shall be so located so as to break up the massive expanse of paved area. c. The sum of all the landscape areas shall not be less • -than 15^ of the total net land area. d. Concrete curbing shall be provided for planters located in parking areas. 25. Prior to final building inspection clearance, all landscaping •shall be installed. .Said landscaping shall, at all times, be maintained in £• a manner acceptable to the Planning Director. 26. All utilities, including electrical, telephone and cable television, shall be installed underground and/or shall b.e completely concealed from view. 27. All public improvements shall be made in conformity to the City of Carlsbad Engineering Design Criteria and Standard. Plans, the Sub- • division Ordinance and other City Standards to the satisfaction of the City Engineer without cost to the City of Carlsbad, and free of all liens and encumbrances. Improvement plans for water and sewer system shall meet the requirements of the respective service districts. VIII. Attachments 1. Baskin-Robbins letter of July 16, 1973 2. Letter from San Die-.o Museum of Han, Spencer Rogers dated Oct. 18, 1973 3. California Regional Water Quality Control Board dated November 14, 1973 - 9 -