HomeMy WebLinkAbout1975-01-28; Planning Commission; ; SP 146 - CONSIDERATION OF AN AMENDMENT TO SPECICIC PLAN -146; CONSIDERATION OF PARCEL SPLIT #230CITY OF CARLSBAD PLANNING DEPARTMENT STAFF REPORT January 28, 1975 TO: PLANNING COMMISSION FROM: PLANNING DEPARTMENT REPORT ON: CONSIDERATION OF AN AMENDMENT TO SPECICIC PLAN -146 CONSIDERATION OF PARCEL SPLIT #230 APPLICANT: AZALEA, INC., by John W. Bartman 450 N. Roxbury Drive Beverly Hills, CA 90210 •I. REQUEST: The applicant is requesting approval of: A) An amendment to SP-146 (for the Kelly-Kurlander- Vanderberg shopping center) to allow the project to be constructed in five phases; B) A parcel map creating 2 lots over a 22..S acre site; The subject property is located on the east side of El Camino Real between Haymar Drive and Marron Road. II. RECOMMENDATIONS: A) . Amendment to SP-146: Staff recommends approval of the proposed amendment to SP-146 based on the following1 justification: 1) The proposed phasing meets all policy and ordinance requirements of the City of Carlsbad. 2) The proposed phasing will not adversely affect the approved specific plan. B) Parcel Split 230: Staff recommends approval of PS-230 based on the following justification: 1) The parcel map meets all City ordinances and policy requirements. 2) The parcel map meets all Subdivision Map Act require- ments. , III. RECOMMENDED CONDITIONS OF APPROVAL:' A) Conditions for Amendment to SP-146: 1) Phasing of SP-146 shall be according to those phases numbered A through E as shown on the plot plan labelled Exhibit D, dated l-21-(g). /-> 2) The public improvements for SP-146 shall be provided with the respective phases as follows: PHASE A: a) Initiate and consummate street vacation of Osuna Drive right of way to allow vacation before expiration of temporary encroachment permit. b) Construct complete storm drain from Marron .Road to downstream connection to existing drain, subject to approval of City Engineer, and dedicate easements from same. c) Construct complete public improvements, (including curb, gutter, sidewalk, any additional fire hydrants, and mission bell street lights) along entire El Cami.no Real frontage. d) Extend all utilities, including sewer and water, required for ultimate development and dedicate easements for same, through Phase A. e) Construct public improvements at Marron Road entrance. f) Waiver direct access rights to El Camino Real and Marron Road except at entrances shown. PHASE B: a) Construct complete public improvements along entire Marron Road and Haymar Drive frontage. Access to Haymar Drive from El Camino Real shall be right turn in and right turn out only. b) Construct all water and sewer lines and dedicate .easements for same. -2- c) Redesign and revise existing intersection improvements across from Phase .B access to El Camino Real to integrate traffic movements across and on to £1 Camino Real. Such work shall include rechannelization, restriping, signal and utility relocation, as approved by the City Engineer, d) Convert Phase A access to El Camino Real to right turn in and out only. PHASE C, D AND E: a) Construct additional fire hydrants as required by the Fire Marshall. B) Conditions for PS-230: • 1) The final map shall be substantially in conformance with the tentative known as Exhibit B, dated 1-21-74. 2) The final map shall indicate existing lot lines. 3) Prior to approval of Final Map, the applicant shall: a) Provide improvement security to construct complete public frontage improvements, including curb, gutter, sidewalk, any additional fire hydrants and mission bel-1 street lights along El Camino Real frontage. b) Provide improvement.security to construct (or enter into a future agreement with the City to construct) complete public frontage improvements along Haymar Drive. c) Waiver direct access rights from El Camino Real and Haymar Drive,, except at access points approved with the specific plan, shown on the Parcel Map- as abutting thereon. d) Provide improvement plans for storm drains, water and sewer. Construct storm drains, water and sewer systems and dedicate easements for same within limits of first phase of development. Construct (or enter into future agreement with the City for installation) the complete storm drain, water and sewer systems for the entire specific plan and dedication of the remainder when the next phase of development occurs. e) Arrange to provide fire hydrants as required by the Fire Marshal 1. -3- IV. BACKGROUND: A) Location: East side of El Camino Real between Haymar Drive and Marron Road. B) Legal Description: Parcels 1 and 2 of Parcel Map No. 487 as shown on map recorded at Page 487 of Parcel Maps, Records of San Diego County, State of California. Also, a portion of Lot 4, fraction Section 32, township 11 S, Range 4 W, San Bernardino Meridian, and further described in the files of the Planning Department. C) Site Description: The site is vacant and unimproved except for an existing temporary Bank of America facility. The property slopes up to the east and is covered with sparse scrub vegetation. D) Project Description: The project consists of two separate actions. The first of these invloves the amending of SP-146 to allow the Kelly-Kurlander-Vandenburg Shopping Center to be constructed in five phases. Phase A would include two structures (presumably financial institutions) at El Camino Real and Marron Road. Phase B would include the site's 2 major tenants plus 2 other buildings for unspecified commercial uses. The bulk -of the shopping center's parking will be provided with Phase B. Phase C, D, and E will consist of the addition of shops at the project's northern and- southern boundaries. The proposed parcel map would divide an existing 21.91 acre parcel into two lots comprised of 10.76 and 11.80 acres. A small triangular lot at Osuna Drive and El Camino Real is being added to Lot 1. ' E) Zoni ng: Subject Property: C-2 (S.P.) North: R-l-10,000 South: R-l-10,000 and P-C East: R-l-10,000 and P-C West: C-2 and C-l F) Surrounding Land Use: An existing temporary savings and loan is locate a south of the subject property, an existing service station is at the northwest corner of the site and the Plaza Camino Real is directly west of the site. The Tiburon Development is located southeast of the site. G) General Plan Recommendation: The General Plan Land Use Element shows the subject property as Community Commercial. The proposed parcel map conforms with this designation. .4. H) En v i r o n m e n t a 1 Impact Requlrements: An Environmental Impact Report was certified "by the City Council concurrent with a zone change and specific plan approving a shopping center on the subject property. The Planning Director has determined that the subject proposal meets the require- ments of CEQA and the Carlsbad Environmental Protection Ordinance for reason of prior compliance because it Involves no changes in either the project or the circum- stances under which it is to be developed. A copy of the . certified EIR will be made available to the Planning Commission and City Council. I) Pi scuss ion: At the time Specific Plan 146 for the subject shopping center wa^ approved by the Planning Commission, the applicant indicated' an October, 1974 target date for start of construction. This schedule, of course, has not been met and the applicant now proposes to build the center in phases. One immediate constraint faced by the applicant is that the existing temporary Bank of America and Home Federal Savings and Loan facilities are approaching expiration of their Conditional Use Permits. In order to keep their Federal Charters active, these facilities will need to be moved into permanent facilities within the year. Phase A would presumably be built as soon as possible in order to meet deadlines for these two facilities. The applicant has no new timetable for the start of Phase B (the major portion of the center). Obtaining financing has been the major obstacle to the start of construction. The applicant is cautiously optimistic that money may become available within the next six months to begin construction on Phase B. ATTACHMENTS: Plj9t of existing property Plot plan for PS-230, Exhibit B, dated 1-21-75 Phasing plan for SP-146, Exhibit D, dated 1-21-75 City Council Resolution 3304 approving SP-141 and 146. SDH/vb 1-22-75 -5- V-. - .1 •?•** \\ <••'.'• 7 AiL A DETAIL. in=!00' v. OCEANSI'DE-eCARLSBAD