HomeMy WebLinkAbout1975-01-28; Planning Commission; ; SP 146 - CONSIDERATION OF AN AMENDMENT TO SPECICIC PLAN -146; CONSIDERATION OF PARCEL SPLIT #230CITY OF CARLSBAD
PLANNING DEPARTMENT
STAFF REPORT
January 28, 1975
TO: PLANNING COMMISSION
FROM: PLANNING DEPARTMENT
REPORT ON: CONSIDERATION OF AN AMENDMENT TO SPECICIC PLAN -146
CONSIDERATION OF PARCEL SPLIT #230
APPLICANT: AZALEA, INC., by John W. Bartman
450 N. Roxbury Drive
Beverly Hills, CA 90210
•I. REQUEST: The applicant is requesting approval of:
A) An amendment to SP-146 (for the Kelly-Kurlander-
Vanderberg shopping center) to allow the project
to be constructed in five phases;
B) A parcel map creating 2 lots over a 22..S acre site;
The subject property is located on the east side of El Camino
Real between Haymar Drive and Marron Road.
II. RECOMMENDATIONS:
A) . Amendment to SP-146: Staff recommends approval of the
proposed amendment to SP-146 based on the following1
justification:
1) The proposed phasing meets all policy and ordinance
requirements of the City of Carlsbad.
2) The proposed phasing will not adversely affect the
approved specific plan.
B) Parcel Split 230: Staff recommends approval of PS-230 based
on the following justification:
1) The parcel map meets all City ordinances and policy
requirements.
2) The parcel map meets all Subdivision Map Act require-
ments. ,
III. RECOMMENDED CONDITIONS OF APPROVAL:'
A) Conditions for Amendment to SP-146:
1) Phasing of SP-146 shall be according to those
phases numbered A through E as shown on the plot
plan labelled Exhibit D, dated l-21-(g). /->
2) The public improvements for SP-146 shall be provided
with the respective phases as follows:
PHASE A:
a) Initiate and consummate street vacation of
Osuna Drive right of way to allow vacation
before expiration of temporary encroachment
permit.
b) Construct complete storm drain from Marron
.Road to downstream connection to existing drain,
subject to approval of City Engineer, and
dedicate easements from same.
c) Construct complete public improvements,
(including curb, gutter, sidewalk, any
additional fire hydrants, and mission bell
street lights) along entire El Cami.no Real
frontage.
d) Extend all utilities, including sewer and water,
required for ultimate development and dedicate
easements for same, through Phase A.
e) Construct public improvements at Marron Road
entrance.
f) Waiver direct access rights to El Camino Real
and Marron Road except at entrances shown.
PHASE B:
a) Construct complete public improvements along
entire Marron Road and Haymar Drive frontage.
Access to Haymar Drive from El Camino Real shall
be right turn in and right turn out only.
b) Construct all water and sewer lines and dedicate
.easements for same.
-2-
c) Redesign and revise existing intersection
improvements across from Phase .B access to
El Camino Real to integrate traffic movements
across and on to £1 Camino Real. Such work shall
include rechannelization, restriping, signal and
utility relocation, as approved by the City Engineer,
d) Convert Phase A access to El Camino Real to right
turn in and out only.
PHASE C, D AND E:
a) Construct additional fire hydrants as required by
the Fire Marshall.
B) Conditions for PS-230: •
1) The final map shall be substantially in conformance
with the tentative known as Exhibit B, dated 1-21-74.
2) The final map shall indicate existing lot lines.
3) Prior to approval of Final Map, the applicant shall:
a) Provide improvement security to construct
complete public frontage improvements, including
curb, gutter, sidewalk, any additional fire
hydrants and mission bel-1 street lights along
El Camino Real frontage.
b) Provide improvement.security to construct (or
enter into a future agreement with the City to
construct) complete public frontage improvements
along Haymar Drive.
c) Waiver direct access rights from El Camino Real
and Haymar Drive,, except at access points approved
with the specific plan, shown on the Parcel Map-
as abutting thereon.
d) Provide improvement plans for storm drains,
water and sewer. Construct storm drains, water
and sewer systems and dedicate easements for
same within limits of first phase of development.
Construct (or enter into future agreement with the
City for installation) the complete storm drain,
water and sewer systems for the entire specific
plan and dedication of the remainder when the
next phase of development occurs.
e) Arrange to provide fire hydrants as required by
the Fire Marshal 1.
-3-
IV. BACKGROUND:
A) Location: East side of El Camino Real between Haymar Drive
and Marron Road.
B) Legal Description: Parcels 1 and 2 of Parcel Map No. 487
as shown on map recorded at Page 487 of Parcel Maps, Records
of San Diego County, State of California. Also, a portion of
Lot 4, fraction Section 32, township 11 S, Range 4 W, San
Bernardino Meridian, and further described in the files of
the Planning Department.
C) Site Description: The site is vacant and unimproved except
for an existing temporary Bank of America facility. The
property slopes up to the east and is covered with sparse
scrub vegetation.
D) Project Description: The project consists of two separate
actions. The first of these invloves the amending of
SP-146 to allow the Kelly-Kurlander-Vandenburg Shopping
Center to be constructed in five phases. Phase A would
include two structures (presumably financial institutions)
at El Camino Real and Marron Road. Phase B would include
the site's 2 major tenants plus 2 other buildings for
unspecified commercial uses. The bulk -of the shopping
center's parking will be provided with Phase B. Phase C,
D, and E will consist of the addition of shops at the
project's northern and- southern boundaries.
The proposed parcel map would divide an existing 21.91
acre parcel into two lots comprised of 10.76 and 11.80
acres. A small triangular lot at Osuna Drive and El Camino
Real is being added to Lot 1. '
E) Zoni ng:
Subject Property: C-2 (S.P.)
North: R-l-10,000
South: R-l-10,000 and P-C
East: R-l-10,000 and P-C
West: C-2 and C-l
F) Surrounding Land Use: An existing temporary savings and
loan is locate a south of the subject property, an existing
service station is at the northwest corner of the site and
the Plaza Camino Real is directly west of the site. The
Tiburon Development is located southeast of the site.
G) General Plan Recommendation: The General Plan Land Use
Element shows the subject property as Community Commercial.
The proposed parcel map conforms with this designation.
.4.
H) En v i r o n m e n t a 1 Impact Requlrements: An Environmental
Impact Report was certified "by the City Council concurrent
with a zone change and specific plan approving a shopping
center on the subject property. The Planning Director
has determined that the subject proposal meets the require-
ments of CEQA and the Carlsbad Environmental Protection
Ordinance for reason of prior compliance because it
Involves no changes in either the project or the circum-
stances under which it is to be developed. A copy of the
. certified EIR will be made available to the Planning
Commission and City Council.
I) Pi scuss ion: At the time Specific Plan 146 for the subject
shopping center wa^ approved by the Planning Commission,
the applicant indicated' an October, 1974 target date for
start of construction. This schedule, of course, has not
been met and the applicant now proposes to build the
center in phases.
One immediate constraint faced by the applicant is that
the existing temporary Bank of America and Home Federal
Savings and Loan facilities are approaching expiration
of their Conditional Use Permits. In order to keep their
Federal Charters active, these facilities will need to
be moved into permanent facilities within the year. Phase
A would presumably be built as soon as possible in order
to meet deadlines for these two facilities.
The applicant has no new timetable for the start of Phase
B (the major portion of the center). Obtaining financing
has been the major obstacle to the start of construction.
The applicant is cautiously optimistic that money may
become available within the next six months to begin
construction on Phase B.
ATTACHMENTS:
Plj9t of existing property
Plot plan for PS-230, Exhibit B, dated 1-21-75
Phasing plan for SP-146, Exhibit D, dated 1-21-75
City Council Resolution 3304 approving SP-141 and 146.
SDH/vb
1-22-75
-5-
V-. - .1 •?•**
\\ <••'.'• 7
AiL A
DETAIL. in=!00'
v.
OCEANSI'DE-eCARLSBAD